- -J UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION HYDRAULIC MODEL STUDIES OF YELLOWTAIL DAM OUTLET WORKS (Final Studies) Hydraulics Branch Report No. Hyd-482 DIVISION OF ENGINEERING LABORATORIES OFFICE OF ASSISTANT COMMISSIONER AND CHIEF ENGINEER DENVER, COLORADO February 14, 1962 482

482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

-

-J

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

HYDRAULIC MODEL STUDIES OF

YELLOWTAIL DAM OUTLET WORKS

(Final Studies)

Hydraulics Branch Report No. Hyd-482

DIVISION OF ENGINEERING LABORATORIES

OFFICE OF ASSISTANT COMMISSIONER AND CHIEF ENGINEER DENVER, COLORADO

February 14, 1962

482

Page 2: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

Purpose .. Conclusions Introduction The Model The Investigation .

COMTENTS

Stilling Basin Studies. Preliminary Basin Recommended Basin . Channel Bank Protection . Unsummetrical Operation. . Stilling Basin Training Walls

Page

1 1 2 2 3

3 4 5 5 6 7

Figure

Location Map . . . . . . . . 1 Yellowtail Dam and Powerplant 2 Model Layout . . . . . . . . 3 Preliminary Basin . . . . . . 4 Basin No. 2 . . . . . . . · . . 5 Retaining Walls . . . . . . . 6 Operation of Recommended Basin, Low Flows . . 7 Operation of Recommended Basin, High Flows . 8 Operation of Recommended Basin, Unsymmetrical

Operation . . . . . . . . . . . . . . . .. . . 9 Operation of Recommended Basin, Low Training Walls . . 10 Wave Heights in Powerplant Tailrace . . . . . . . . . 11

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 3: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

Office of Assistant Commissioner and Chief Engineer

Division of Engineering Laboratories Hydraulics Branch Denver, Colorado February 14, 1962

Report No. Hyd:-482 Compiled by: T. J. Rhone Checked by: W. E. Wagner Reviewed by: J. W. Ball Submitted by: H. M. Martin

Subject: Hydraulic model studies of Yellowtail Dam Outlet Works (Final Studies)

PURPOSE

The model studies discussed in this report were conducted to develop a stilling basin that would operate satisfactorily for a higher than normal tailwater resulting from storage in a downstream conservation pool and for low tailwater when there is no storage in the pool.

CONCLUSIONS

1. The hydraulic jump swept from the preliminary stilling basin at the maximum discharge, 5, 000 second-feet, and low tailwater, elevation 3177. 5.

2. When the stilling basin floor was lowered 2. 5 feet, the jump remained in the basin at the low tailwater and the energy dissipa­tion was satisfactory for all flows, Figures 7, 8, and 9.

;:$, For the maximum discharge and with the tailwater elevation between 3183. 0 and 3188. 0, an occasional piece of riprap moved upstream into the basin where it rolled around with an abrasive action.

4. Retaining walls along :Jeth banks downstream from the basin training walls prevented the riprap from entering the basin. The walls also served to reduce the intensity of the wave action striking the side slopes, permitting a reduction in the size of the recommended riprap from 3-foot stones to 2-foot stones.

5. To prevent overloading the stilling basin walls during unwatering, the top of the center wall was lowered to elevation 3186. 0 and the top of the left wall to elevation 3190. 0. The operation of the basin was satis­factory with the lower walls, Figure 10.

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 4: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

INTRODUCTION

Yellowtail Dam is the principal feature of the Yellowtail Unit, Lower Bighorn Division of the Missouri River Basin Project. It is located on the Bighorn River about 45 miles southeast of Billings, Montana, Figure 1.

The dam is a concrete arch structure about 1,450 feet long and 520 feet high. The principal hydraulic features are the tunnel spillway and the river outlet works. The tunnel spillway is located in the left canyon wall .and the outlet works is located near the center of the dam to the right of the powerplant, Figure 2. The model studies described herein were concerned with the river outlet works. Model studies for the spillway are discussed in Hydraulics Branch Report No. Hyd-483.

The river outlet works consists of two 84-inch hollow-jet valves dis­charging into a stilling basin. The intake to the right valve, the irri­gation outlet, is at elevation 3400; the intake to the left valve, the evacuation outlet, is at elevation 3300. At the downstream ends of both valves, the centerlines are at elevation 3191. 38. At the maxi­mum reservoir elevation, 3657. 0, the design discharge for each valve is 2, 500 second-feet.

The tailwater elevation in the downstream channel is subject to wide variation due to a conservation pool and reregulating system about 6, 500 feet downstream from the dam. It is possible that the tail­water elevation will vary as much as 13. 8 feet for a discharge of 2, 000 second-feet, depending on the operation of the conservation pool.

THE MODEL

The model, built to a geometrical scale of 1: 28, included the two hollow-jet valves, the stilling basin; the powerplant afterbay and a section of the excavated channel downstream from the afterbay, Figure 3.

The 84-inch hollow-jet valves were represented by 3-inch model valves machined from brass. The stilling basin was made of wood treated to resist swelling. A plate glass panel was used for the right wall of the stilling basin so that the action of the jet penetrating the pool could be observed. The afterbay area and downstream channel were formed in river sand, so that erosion tendencies could be checked. The river sand had a median diameter of 0. 8 millimeter with 90 percent between the No. 8 and No. 200 Tyler Standard Screens.

2

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 5: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

Water was distributed to the valves through a baffled manifold con­nected directly to the laboratory supply system. Discharges in the model were measured using calibrated venturi-meters permanently installed in the laboratory. Pressure head at each valve was measured by U-tube mercury manometers connected to a piezometer placed 1 diameter upstream from the valve. Tailwater elevations were con­trolled by an adjustable tailgate at the downstream end of the model; the tailwater elevation was measured on a staff gage located near the center of the channel about 3 feet upstream from the tailgate.

THE INVESTIGATION

The model investigation was concerned with flow conditions in the stilling basin, the powerplant afterbay and in the channel downstream from the afterbay.

Stilling Basin Studies

The design of the preliminary basin was based on the procedures established in Hydraulics Branch Report No. Hyd-446, "Stilling Basin for High Head Outlet Works Utilizing Hollow-Jet Valve Control." The basin was designed for 2, 500 second-feet discharging through each valve at the maximum reservoir elevation. The total head at the valves was computed to be 420 feet at the left valve and 410 feet at the right valve. The preliminary basin, Figure 4, was 120 feet long and 40 feet wide with a 4-foot 4-inch-wide dividing wall along the basin centerline. The floor of the basin was at elevation 3150. 0 and the tops of the left training wall and center wall were at elevation 3193. 0. The top of the right side wall was at elevation 3203. 25. At the upstream e~d of the basin the floor sloped upward to the valves on a 30° angle. Wedge-shaped blocks converged the width of the upstream part of each compartment of ·the basin from 17 feet 10 inches at the valves to 4 feet 10 inches at the end of the sloping floor, Figure 4. At the downstream end of the wedges, each com­partment cl.bruptly widened to ·17 feet 10 inches. A 3-foot-high sill was placed across the downstream end of the basin. The upstream face of the sill was on a 2: 1 slope.

Downstream from the basin, the channel sloped upward on a 2-1/2: 1 slope to elevation 3168. 5. The right side of the downstream channel curved to the left toward the after bay. The right bank of the channel was on a 1-1/2: 1 _s,lope and was riprapped. ·

Four operatihg conditions at maximum and minimum tailwaters were used in evaluating the stilling basin performance:

1. Total discharge= 20, 000 second-feet.

3

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 6: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

12, 000 second-feet through spillway. 3, 000 second-feet through powerhouse. 5, 000 second-feet through outlet works.

Tailwater elevations 3188. 0 and 3191. 3.

2. Total discharge = 12, 000 second-feet.

4, 000 second-feet through spillway. 3, 000 second-feet through powerhouse. 5, 000 second-feet through outlet works.

Tailwater elevations 3183. 0 and 3190. 0.

3. Total discharge = 5, 000 second-feet

5, 000 second-feet through outlet works. Tailwater elevations 3177. 5 and 3186. 0

4. Total discharge = 2, 000 second-feet.

2, 000 second-feet through outlet works. Tailwater elevations 3175. 0 and 3189. 5.

To represent conditions 1, 2, and 3, the outlet works model was operated at a discharge of 5, 000 second-feet and the tailwater eleva­tion was set at one of the six values shown. To represent condition 4, the outlet works model was operated at a discharge of 2, 000 second-feet and the tailwater elevation was set at one of the two values shown.

Preliminary Basin

The preliminary basin operated satisfactorily for operating conditions 1 and 2 and for the higher tailwater elevation of condition 3. However, when the tailwater was lowered to elevation 3179. 0 with condition 3, the hydraulic jump swept from the basin.

To determine how much the basin floor should be lowered to retain the jump at the minimum tailwater elevation, the tailwater was initially set at elevation 3183. 0 and lowered in increments of 1 foot until the jump was on the verge of sweeping out. By this method it was determined that the jump remained in the basin for tailwater eleva­tion 3180. 0 or above. This elevation was 2. 5 feet higher than the minimum tailwater elevation, indicating that the basin floor should be lowered 2. 5 feet. A review of the design computations for the basin, substantiated this figure by showing that the width of each compartment of the basin should have been 19. 60 feet rather than 17. 83 feet for the basin floor and tail water elevations. The narrower width had been used because it was the maximum allowable due to space restrictions within the powerhouse. The 17. 83-foot width is

4

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 7: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

...

approximately 9 percent less than the theoretical .width. If the theoreti­cal sweepout depth of 26. 6 feet is increased by 9 percent, the sweepout depth becomes 29. 0 feet and allowing a 1. 0-!oot factor of safety the. floor of the basin elevation 3147. 5 rather than 3150. 0.

Recommended Basin

For the ~tilling basin,· the basin floor was lowered to elevation 3147. 5. The 30° slope at the upstream end of the basin was extended to the new floor elevation, Figure 5 .. The downstream end of the basin was not lengthened; so in effect, the length of the basin was reduced by 4. 33 feet~ The length of the converging sections along each wall was increased to corre::;;pond to the length of the modified sloping floor, but the amount of convergence was not changed. All other dimensions of the basin were the same as those of the preliminary basin. Oper­ation of this basin was very good. For both discharges and at all tail­water elevations, the energy dissipation was excellent. With the maxi­mum discharge and at the minimum tailwater elevation, the hydraulic jump remained in the basin. The jump in the basin was rough but the flow in the downstream channel was very smooth. .

Channel Bank Protection

To determine the size of riprap necessa~y to provide adequate protec­tion against bed scour and channel bank failure, the magnitude of the

. waves and the flow velocities adjacent to the right bank were deter­mined. Wave heights and flow velocities were measured at four different locations in the channel downstream from the end of the basin. The measuring stations were located about 5 feet (prototype) to the left of the contact line of the water surface and the right bank. Stations 1 through 4 were approximately 36, 82, 117, and 152 feet, respectively, downstream from the end of the stilling basin.

The direction of the surface flow at Station 1 was predominantly upstream due to the return eddy at the end of the basin. . The velocity was negligible and very few measurements were made at this station. At the other three stations, measurements were made for the four operating conditions previously described.

With a discharge of 2,000 second-feet, and at both tailwater elevations, the waves were less than 1 foot high and the velocity about 3. 5 feet · per second at Stations 2 and 3. At Station 4, the wave heights were the same but the velocity incr~ased to about 5. 3 feet per second. For a discharge of 5, 000 second-feet the maximum wave heights and veloci­ties occurred at the minimum tail water elevation 3177. 5. For this operating condition, the waves were about 2. 0 feet high at Station 2 and decreased to 1. 3 feet high at Station 4. The velocity was 9. 7

. feet per second at Station 4. On the basis of these measurements, it was decided that the riprap protection along the right bank should consist of 3~foot rocks.

5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 8: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

Pu.ring operation at the maximum discharge through the outlet works {condition 3) and with the tailwater between elevation 3183. 0 and 3188 .. .0, the turbulent action of the flow on the riprapped side slopes downstream from the basin dislo9ged an occasional stone from the rip­rap. The roller action of the jump at the end of the basin moved these stones into the basin where they moved back and forth with considerable abrasive action. These pieces of riprap did not move out o! the basin until the tailwater was lowered to approximately eleva­tion 3180. 0.

Several pieces of the riprap were numbered with paint for identification and placed on the bottom and sides of the channel. The model was operated at the critical conditions, and it was determined that most of the stones that moved into the basin came from the bottom of the channel at the end of the basin, with a few of the stones originating from the right bank of the channel.

To prevent riprap from moving into the basin, it was decided to pave with concrete any part of the upward sloping channel floor that was not excavated in sound rock, and to construct concrete retaining walls on top of the rock along both side slopes, Figure 6. On the right side slope, the retaining wall extended 80 feet down~tream from the end of the basin, parallel with the bank. On the left side, the wall extended 50 feet downstream in a straight line. The tops of both walls sloped so that they were 1 foot above the riprap on the left side and 3 feet above the riprap on the right side, Sections C-C and D-D, Figure 6.

With the paved apron and retaining walls in place, no riprap moved into the basin at any discharge-tailwater combination. The retaining walls on the right side also served to reduce the intensity of the waves striking the right bank. The maximum height of the waves was approximately the same, but the frequency was reduced about 50 percent. On the basis of the reduced frequency and intensity of the waves, it was recommended that the size of the riprap be reduced to 2-foot rocks.

The performance of the recommended basin with the addition of the retaining walls in the downstream channel was excellent at all _ discharge""'.tailwater combinations, and the appearance of the flow in the powerplant afterbay and downstream channel was very good, Figures 7 and 8.

Unsymmetrical Operation

With one valve operating at maximum capacity (2, 500 second-feet) and with minimum tailwater elevation 3175. 5, the toe of the jump moved downstream onto the horizontal floor, Figure 9. The jump

6

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 9: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

did not sweep from the basin, but extreme turbulence and considerable wave action occurred downstream from the basin; the turbulence was greater when the left valve was operating, but there was no damage to the side slopes of the downstream channel with single operation of either valve.

When the tailwater elevation was raised to 3177. 0, or when the dis­charge was reduced to 2, 000 second-feet, the jump moved upstream onto the chute and the excessive turbulence and large waves in the · downstream channel were eliminated.

Stilling Basin Training Walls

When it is necessary to unwater the stilling basin for any reason, it is usually accomplished by closing the downstream end of the basin with stop logs and pumping out the water. Structural investigations dis­closed that the center and left gravity walls in the stilling basin with their tops at elevation 3193 would not withstand the pressure differ­ential if the basin were unwatered with tailwater elevation 3189. 6, the maximum tailwater with the powerplant in operation and no flow through the spillway.

To determine what effect lowering these walls would have on the stilling basin performance and in the powerplant afterbay, the top of the center wall was lowe.red to elevation 3186. 0 and the top of the left wall to elevation 3187. 0. ·

For the maximum discharge with tailwater elevation 3191. 3, water spilled from the powerhouse tailrace into the left side of the upstream end of the basin. Farther downstream in the basin, a boil formed which spilled water from the basin into the tailrace, resulting in waves of 2 to 2. 5 feet in height, Figure l0A. For lower tailwater elevations, this objectionable action was somewhat reduced. When the left wall was raised to elevation 3190. 0, this objectionable action was eliminated even at the higher tailwater, Figure l0B. The top of the center wall was kept at elevation 3186. 0, which made it impossible to unwater the basin when the tailwater was above this elevation.

Wave measurements wtre obtained in the center of the tailrace at points 15 feet and about 100 feet downstream from the powerplant. Measurements were made with the maximum discharge through the outlet works and tailwater elevations 3188. 0 and 3191. 3. The wave he~ghts have been related to the height of the left wall, Figure 11. The tests indicated that the waves near the powerplant would be 2. 6 feet high at high tailwater and 1. 8 feet high at low tailwater when the top of the wall was at elevation 3187. 0. With the top of the wall at elevation 3190. 0, the waves were reduced to 2. 2 and 1. 5 feet high, respectively. With the top of the wall at elevation 3193. 0, the wave heights were 2. 0 and 1. 3 feet, respectively . Af the downstream

7

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 10: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

station, the waves with both tailwater elevations were about 1. 7 feet high for the low wall and about 1. 5 feet high when the top of the wall was at either of the other two elevations.

Although the wave heights increased slightly as the top of the left training wall was lowered, it was recommended that the top of the left wall should be at elevation 3190. 0. The top of the center wali may be lowered to elevation 31860 0.

After the model studies had been completed, it was determined that to provide structural stability it would be necessary to place a roof across the top of the stilling basin to tie the center and side walls together. Although this modification was not tested in the model, it was approved on the basis that the invert of the roof be placed at or above elevation 3194. 0, 2. 7 feet above the maximum tailwater.

\ i ; I

8

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 11: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

0

,.

0

FIGURE I REPORT HYD. 482

SCAL.E OF MILES

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

MISSOURI RIVER BASIN PROJECT' LOWER BIGHORN DIVISION-YELLOWTAIL UNIT-MONTANA

YELLOWTAIL DAM AND POWER.PLANT LOCATION MAP

CHECKEo.JIZZ--,?:: ___ t#'ft!._APPROVED-

DENV£R0 COLORADO, NOV. 21, 19S5

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 12: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

~ -'i- \ 0

-:-

·,~~ 0 _..,# 9"'q

00

,,;,7, ,,.,., o,e,bm_"'" , ___ ::,,,-----· ,'<-7 -' a< directed ,,,_ __ -~~ (p ~ ~) ~-::,..

'{,,:o Y , +n rnr.k. -~ .- __ .,,.. LI

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

MISSOURI RIVER BASIN PROJECT LOWER BIGHORN 0/VfSfON· YELLOWTAfL UNfT• MONTANA

YELLOWTAIL DAM AND POWER PLANT

PLAN

O.-NV61f, COLO.,,..ADO, JANUAlfY :,.111e1

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 13: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

I< ----------- - ---------- --------- --------------- -- - - ----- ---------18'-6" -- --- - -- ---------- --------- ---- - ----------- -------- ----------- _, I [

,--1-

--Powerhouse

6:1 Slope (Proto. 3168.5) _

,,--Toil race-----"' I

' . ... !:::

it)

~ .,1.86N

~

_---El 11.00'!--'

,,""'

0 I co I I

I I

-!A +1A

I I

I J ( I l \ '- ,,. I ! I -I I \ --- El. 31.57'!..----- I :'i' I ~/ \ \ 1' ( Proto. 3202.5) i "" I I I I

I I--.A---...1.l.-A..,_..ll.- I I I I I

__ t___, 1 ~--------------------- ---------------- -- 11'-2 v2·-- ------------- --- -------------------~-- -

PLAN '

t I ) . e ~ '·'." /··-3'" H.J. Volve ----------,···t:l.31.57"(Proto.3202.5).h i--r ·--,~= IK , Toil gate--

0

SCALE OF FEET

...1-:J!J9.36" (Proto. 3174,0) --~ =' §

I ~ · t' a .,, •.. , 11 l~l 11 IJ (Proto.3150)

,···EL 9.07"

--Sond fill·---,,-

SE CT ION A-A

YELLOWTAIL DAM RIVER OUTLETS 1:28 SCALE MODEL STUDIES

MODEL LAYOUT

:a "' ;!l .... :a­-1G> :,:c

I

p~ ·"' .. "'

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 14: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

~ ~

0

} It. Valves<:\

I I II I -<7B I 11 r 57 -1.8 "'"t"-, 120 -o !Y

_'f' I * <D • '

-===---r•..-'Q-- I :_1_:t-}: I ' <D V - I

,l?_ :t-+--, I =u::, ~~

Al i t I ~---,-:rt -~ -/··r-- I

<D ' ' - I '

, 0 -'t. Valves

~-

10

I I

' I I I I I I I I

I I I I I

<D V

-<JB

--r I I

'

I I I I I

=' ? -.., ... I I I I I

I I ,.

PLAN

,,--El. 3150.0

i ------~-p;:~.-..

~--- ------ - -si-1.e" ---------- ->l.c--- ------------ ------ - --- --120' -o"----- -I I I '

20 30 SE CT ION A-A SCALE OF FEET

r

YE LLOWTAIL DAM RIVER OUTLETS 1:28 SCALE MODEL STUDIES

PRELIMINARY STILLING BASIN

I ,

=o ! -~51-d1

I l I II[._

'f' -~6-0 i -

i_=,:;.t:,1:'.:SI:, I

- ------ --->-l I I

El. 3203.:_2_:i::-~- r-'t. Basin

I

A 1-~1 - , " ....I A :.-ro---11-10--

, -El. 3193.0-,

~-17'-10'--

I " ,--4 -4 .. :-~ '- "~t-' •' I El.3174.0--, _J::]6,_r''' ,6 6 . ·. 6--6 :-,--, ---~-re_r-t ~:-~ _J-~s'-s"

"f· ·1·. . •c

El.3150.:_~::_'--i:: •.... ·

S EC TIO N B-B

:a ~ ... o-21 GI -le :,: "' ~"' ,. ~ ::i

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 15: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

!! lo

" 't. Valves-<'.-,

I

I ' ' :,<-----------61-5.8 I

-k---~ B I I ------ __ _

,-_y ,:

"'' _-==£ii-,-'_-J t y-

1 t ,_'f _\Q_

1=1~-1 I <O

+ I

I I I I I I

: I

------115'- 8 11 __ _

I I

------->i I

AL t t I ~~ ~---bo - ,-o,r-:t-' I = r--­l_'f I

0

-::, v I I

,-<t, Valves

~-

10

T I I I I I I I I I I I I

I I

I

_L) '--El. 3191.38

I

_\Q_ y J.

I

~B

--T-1 I

= I

P LAN

I

=' "'. I

"' v

,,--El. 3147.5

"o I

i ___ J ___ ~~-.. -.·.-'::;>:/: b. "'.'·.'·:·:-~-:·:·,:: .... ,. ·,::.(:.·-·,)(: ... , .. 1 I I I I I II I ,<--- -- --- 61 -5.8---- --- -- ---------- -- -

I

I I) I 11 5 - 8 - - - - - - - - - - - - -- - - - - - - - - - - -7 eo 30

SE CT ION A-A SCALE OF FEET

YELLOWTAIL DAM RIVER OUTLETS 1:28 SCALE MODEL STUDIES

RECOMMENDED STILLING BASIN

El. 3203.2~_:_,1_ :CH 1-'t. Basin

jA --t:I. 3193.o---,

,f-:1 10: .-~

1'1~:

El.3147. 5-,,

_:Lf .·,:-!, e· 'f'·.·.,·.:'· . .-:/.-:.·.~,j

SECTION B-B

"' "' .., 'Tl o­"' G) -, C :,: ::a ~"' "'"' a,

"'

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 16: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

212co" To axis of dam

-- of reference plane

~ "§

"" 0 ~ ,<! t, '°'

., " Q Cl.

~

~ ~ ~ ~ 1-.. ~ ci,

ti g~-r,.._:.C:::: c:::::

0, - "' - C) ~.t~ '.,-ti ., C)

~~c:: ~~ <:,

~/

A¼ ------44'-o" -----

f ._,

-,.,_,,- - Power plant--'_,... ,_,

Sewoge treatment

,< ':,

_ H

r+1

,, _'.I,,?..,

,::..\

-c-.8,--.--Concrefe weir-El. 3162.00

Floor-El 314750----c,.._ J ,, Stilling basm- --"-~

-Contraction joints.------->

~---- :• I Floor-El. 3147.50---'--'

(,;-- --Excavate to rack or El. 3160.0 whichever is higher

~.§.'.!._

plant-,, I I ~- ·-0 I ' ' ~ L~ _______ _J@ . 9_ .. '

I I ! \

~

~ 0

~

0

"' ~ 0 .J .,

',

/ ,:

-.... .......... -...., DETAIL Y

,-Remove '-,,--_ overburden---' '--<·Or1gmal ground surface

r------22~0~-~---32'- o"----+---21!. o"- - --~ I : '---.. i.!'· 3202 50-, : !Et320250, i6"Layerofgrad~aver-....._ . \i

, Y ,--Serwce area--' I ""f..,_Q/

K

Slope to drain 1 -....j_

l

-- -3' Riprap wlfh 12" graded __ I gravel blanket ---

El.3202.50-, he ~' ''1 '-----!;----------...:'L ____ :_--,,._____ I ). I I I 1\.i \, _ u'1 ii} S.3~1~ -----~~==-:::..:..:. ., 1-<------s ,,, ' ' 1 R d "' -- ~- ' T y lope

4 ,,, 12~--' : ! :"- aa Sta. 35+07.34 ·

Hr~-

I .... t I

I l HL:j I DL I

}i t i Remo,e ~,.,,_, :~ "~''[ ···· · 11

____ ~~:..._

I I

~- 4!.d~~ ~--11!.1Q'.!.--'>i

-24" C.M.P.

I r- 99'-3" To

!;~± #4@6~-: __

SECTION L-L

,,-Remove overburden

I-<----------------->->··

I \

I PLAN \

1,., ___ ':'r--- ·---~-~--,,.Slope .!";n 12"---.f..r_D_!.!_n_c/._d[~tn~ ;: 4 I ......... " I I I 1 4 ' ~I ~ ,, .. --- I I ......... I i \

I reference plane

'·Gutter ,

6" Excavation refill\\ on rock excavation--' \

5" Crushed rock base-! ' I

3" Grovel or crushed ,/ rock surfacing.---"

I

)-- El. 3187.00 Assumed rock surface-/ J

,,,-El 3162.00 :,,:_'2_···

~-'"""':;,, i \._ Concrete weir I

'-Assumed roe~ surface

---fl" Split-sewer-pipe drams

bond 6'' C.I. effluent pipe

sewage treatment

-< 44 ~o" _To _long//udinal __ If. Units

' __ ,., I

t<

El. 3150.50----,

,,,,-+ " ' -', ,,-,- t ,, ,, 7 l'-~f :';;''' r~==-ri L:~E:__l.~3::.18~7-~0~0+--~M~,c_-~,i ____ i . DE;A,t: I 1/ Sf op-lag guide

,---Contraction joints- --

FIGURE 6 REPORT HYO. 482

I ·"_:.--_,. ,. j-·· g .. :"?-.. :~ :· .. ::./ Stop-log /

guide ______ _,,

SECTION P-P

L.--------- 3180

-8" Perforated . . --, ( sewer-pipe drain ,-Construction joint

1-------------.3185 · _·,: (~-£4'f ·;,---8" Sewer-pipe drain outlets

:r ~~=r ~:t;r:~.\: ·::/./~:::;0 c~<o_c 'Ji~/i ·=

~

\ /

V:£l=45'oo· (\ I R=93.00'

\ \ ~ ',' T =38. 52'

\L=73.04'

\ \ \

24"CMP.--r-'1 t, 1 S=0.05 :' I l,~~j

...;Jo DETAIL Z

r-4'-o" '

0.7-1-

111, = /II""»- , , '-13" Splil-sewer-p1pe dram 'Sp1 ----di,--··, -·· · --·· ····-· -·-· 24"Min---, possible. Porous concrete ~-"-~

I ~-24'' El 3169 50------·.:_,~~ ___

3

, Riprap

to be used under splif-drr1~ 4,_0,,:..._ _ Elev varies-~+-,,--L p!fJe only where nesessary ; 1 1 _ ,, os:t--~~ 1 __ 1 : \

to provide swtable support ,-~ ~ 24 b,,,.t)] 1-~ -Assumed rock surface ___ ,/ ~

<°~-,,.,,. \12"Gradevdel ' gra

ofp,pes. l7l ~~11 : , :

29"-?

0.1,1-,, SECTION J-J

--24"Min. 0.5• /', 1 _/" I

Elev varies-~-~1--1~- -: . I:\\

'·.,.- I

SECTION H-H

# II Anchor bars @ 5'-0" crs t each way. 8' Mm embed men

SECTION N-N

El. 3186.00------,,

.·o:_ 6" C. I. effluent pip~e_-_-,-"'e--1--~c+

:6.:Jo··· 6.---: ,l . .O._ ·,._· o·. ~i

-~~~~-# ,, k,c,

6@12---~:(~: ·o _.

_t/'6@12"

::iJ_. _!!11@12" ~-.·.\j_ # @6" ;~:.ti:- __ JI

L}'~>ll # "

• cyi---11@6

-~o~

. ··o .· .o

-~-\ ,_slope 5,1 ... -\-

\ .~~5'-0" I ~r=-1- .i__

\See

TYPICAL CONTRACTION JOINT DETAIL

info sound rock and _ _, --

grouted in place,----, _____ #6@1rdl U,, r . . .,~ ;~, ,~ ·:-:·;-.:,:,_'1_·1 .·.f:Hi.•p·_-_ -:. ~ {._rJ.i--iii.

: Detail Y __ l---

,,-~1.32~6~5 , \ I,'. # I,, ~I II I' ¾,F-:' , ,<---4-0---.. r·-19@12-· ,,# ~

-r- fl: ::>-Slope {'m 12" ,-Downstream face of dam ~ ---1...., I , { 1 I ' ' /" ' 1 I '-6@/2

" '--!!9@12" _1.~-'.-1~- 2 1 . --- '#1/@l2"

: · ~ ( ~24'!~ ,Metal I I i,.1/ #5@6'--': j,J 't. -~ ~-3" ~18'.'--\i gratmg #11Anchar bars @4'-o"crs. each j: I I I I I

'1'·8'" Spllf-sewer­pipe drains

_L_ ~,.. ·~1.--EI 3203 25 / -, : ,)- 0_5_1 way. 12' Mm embedment mfo ) #5@9'c-- l"R_>:':\ r-EI 3202 50 E/320250-

0 i /(: -Elev varies sound rock and grouted in place:' SECTION M-M

G

# 6 @ 12 '!......,, o .. ':'..,~\(( 11

Elev. vanes----;,--- .... _ 11 , ,1

• __

\ i-::'.'~"': __ 0 ~ j Sponge rubber >,"'-}.:'. · , :6',""; 0 <:::i .·;._.- _0 ?:/ Joint filler--_.,. #4.@12".-L-. ·.~t,r_::-;-;"'!j"?,~-

.'v ". · o . . · ., ,,,._,_..,._:._:.-_ Compacted 0 ~M..2 • ///~ backfill

o _o ·o

SECTION F-F

l.. -4' o"---~ 24''~ :..C-8'-o"-t· -10'-o''-~ , I' " I I I ,11 -~ k-24

~

' ' Original ground surfa-ce-,. ·J. :Slope.• , ,El 32025oi ! I ,;-Jv__... I i in 1211-r l..... I I': \"

6''- -6" _ // : I .__,L..,. ~ ... 1 1 : \ j

Compacted backfill "j;:,~._,.\, .. :;;~·-=..:F~<:i:;;,.;1.t~ ~_,./~_<l:..,_,~~,.,.._. .,#' ,

#4@6'.-·C , ,,,,,.=-,f=""aas- · ·,: ,1/~'~111~' '~~ ~-24''x 36'-t4Gaqe C. M. p\ \ .!.catch basin see

SECTION Q-Q '· 5"Crushed rack base-' \ Detail z '

SECTION G-G

3" Gravel or crushed rack surfacing_.'

SECTION E-E

\'-"~'W 'compacted backfdl\ ·, 3"Gravel or crushed rock surfacmg.

'-5" Crushed rock base ',-Assumed rack surface

SECTION D-D

CONCRETE FINISHES Unexposed surfaces _________________________ -Fl or u1

Inferior surfaces ofst,Jling bosin below El.3l93 ____ J4orU3 All other surfaces ___________________________ _F2 or U2

NOTE

Chamfer all exposed earners {unless otherwise specified

UNITED STATES DEPARTMENT OF THE INTERIOR

BUREAU OF RECLAMATION

MISSOURI RtVER BASIN PROJECT LOWER BIGHORN DIVISION- YELLOWTAIL UNIT-MONTANA

YELLOW TAIL DAM POWER PLANT AREA -RIGHT SIDE

SERVICE AREA, RIVER OUTLET STILLING BASIN,AND RETAINING WALLS

:::::~~~~:!"_~~------SUBMOTTED_e~, __ APPfltOVEO _____ _

SECTION B-B SECTION C-C

CHECKEDJi•---"iifi;.~-- RECOMMENOEO ___ a~ CHJff D.

DENVER, COLORADO. JANUARY 3 0 /9fJI

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 17: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

T. W. Elev. 3175. 0 T. W. Elev. 3189. 5

YELLOWTAIL DAM RIVER OUTLETS 1 :28 Scale Model

Recommended Stilling Basin Operation at low discharge (2. 000 cfs)

(No flow through spillway or powerplant)

~1%j CD ,_.,

-g~ l~ ::r:-:i a ti=>,. co N

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 18: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

Maximum T. W. Elev� 3191. 3 (3,000 cfs through powerplant and 12,000 through spillway)

Minimum T. W. Elev. 3177. 5 (No flow through spillway or powerplant)

YELLOWTAIL DAM RIVER OUTLETS 1 :28 Scale Model

Recommended Stilling Basin Operation at maximum discharge (5, 000 cfs)

through outlet works

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 19: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

Discharge = 2, 500 cfs T. W. Elev. = 3175. 5

YELLOWT AIL DAM RIVER OUTLETS 1 :28 Scale Model

Recommended Stilling Basin Unsymmetrical operation

N~ flow in pow.-,rplant or spillway

Figure 9 Report Hyd 482

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 20: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

A.

B.

Top of left wall at elev. 318 7. 0 Top of center wall at elev. 3186. 0

Top of left wall at elev. 3190. 0 Top of center wall at elev. 3186. 0

Discharge = 5, 000 cfs T. W. Elev. = 3191. 3

YELLOWTAIL DAM RIVER OUTLETS 1 :28 Scale Model

Flow conditions with different training wall heights

Figure 10 Report Hyd 482

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 21: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the

430

6

5

I-LLJ w lL

I I

I

1;

.,,.AT POWERHOUSE

.,. -7DOWNSTREAM CHANNEL /I / I ~ii~/

I I I I I I I

~- AT POWERHOUSE I I

I I I I I ~ I I

I I I I 4

0 I I I r,.:

CD

ro

I I ' I I

..J w LLJ > 3 0 OJ <t I-:I: (!)

I I

I \ \ I I

1\I \ \ \ ,. \

UJ :I: 2

~ ..J ..J <t ~

0 I

\ \

\\ \

\ I , \ ' \ \ \

I

\ ' \ \ 2

WAVE HEIGHT- FEET

NOTES DISCHARGE = 2500 CFS EACH VALVE

----- = T.W. EL. 3191.3 = T. W. EL. 3188.0

\ \

YELLOW TA IL DAM RIVER OUTLETS 1:28 SCALE MODEL STUDIES

TRAINING WALL STUDIES WAVE HEIGHTS VS. WALL HEIGHTS

FIGURE II REPORT HYO. 482

3

Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Sam Peng
Sticky Note
None set by Sam Peng
Sam Peng
Sticky Note
MigrationNone set by Sam Peng
Sam Peng
Sticky Note
Unmarked set by Sam Peng
Page 22: 482 UNITED STATES DEPARTMENT OF THE INTERIOR BUREAU OF RECLAMATION ... · hydraulic jump swept from the basin. To determine how much the basin floor should be lowered to retain the