    CONTRACT DOCUMENTS

    The National Building Code (2006) defines contract documents as

    including the following:

    i. Contract drawings and specifications prepared b registered architects

    and registered engineers!

    ii. "riced bill of #uantities prepared b a registered #uantit sur$eor!

    iii. Construction programme% pro&ect #ualit management plan% pro&ect

    health and safet plan prepared b a registered builder!

    i$. Conditions of contract!

    $. 'll ris insurance for the building wors% personnel and e#uipment.

    Contract Drawings:

    The contract drawings include the architectural drawings% the

    structuralgeotechnical engineering drawings and the building ser$icesengineering drawings. These drawings pro$ide information regarding the

    arrangement of spaces% structural components% electrical and mechanical

    installations.

    Specifications:

    This amplifies the information gi$en in the contract drawings and bill of

    #uantities. *t describes in details the wor to be e+ecuted under the

    contract and the nature and #ualit of materials% components and

    wormanship.

    Priced Bill of Quantities:

  • 8/18/2019 46 Contract Documents

    2/3

    ' priced Bill of ,uantities is a Bill of ,uantities that has its rate and

    amount column filled b a contractor. ' Bill of ,uantities consists of a

    schedule of items of wor to be carried out under the contract with

    #uantities entered against each item% prepared in accordance with the-tandard ethod of easurement of Building /ors (-eele and /infield%

    200)

    Construction programme:

    This is a document that is prepared in order that the pro&ect participants

    ma ha$e a thorough appreciation of the wor in$ol$ed% to allow the site

    production team to sort out its main constituent and decide how% in what

    order and at what time to do them! and to ensure ade#uate co1ordination

    of the labour% materials and machiner re#uirements (Bamisile% 200)

    Project Quality Management Plan:

    The "ro&ect ,ualit anagement "lan defines the $arious #ualit related

    acti$ities and procedures which will be implemented on the pro&ect. *t

    sets down re#uirements% gi$es guidelines% pro$ides information and

    indicates to appropriate personnel% the procedures to be followed with

    respect to the "ro&ect ,ualit anagement "lan. ' sample outline of the

    "ro&ect ,ualit anagement "lan is referred in the appendi+.

    Project Health and Safety Plan:

    The "ro&ect 3ealth and -afet "lan is a document de$eloped to secure the

    health% safet and welfare of persons who will wor or $isit the site. *t

    was also de$eloped to control the emission of to+ic substances into the

    atmosphere and control the eeping and use of substances that might be

    ha4ardous to health. 'n outline of the "ro&ect 3ealth and -afet "lan is

    contained in the appendi+.

  • 8/18/2019 46 Contract Documents

    3/3

    Conditions of Contract:

    The conditions of contract define the terms% under which the wor is to be

    undertaen% the relationship between the client% architect and contractor%

    the duties of the architect and contractors% and the terms of pament

    (-eele and /infield% 200)

    All is! "nsurance:

    This is a contract document that is de$eloped and shows that all the

    personnel and e#uipment associated with a construction pro&ect has been

    insured against loss or damage. B insurance% all the riss associated

    with personnel and e#uipment in a construction pro&ect is transferred to a

    third part.