CONTRACT DOCUMENTS
The National Building Code (2006) defines contract documents as
including the following:
i. Contract drawings and specifications prepared b registered architects
and registered engineers!
ii. "riced bill of #uantities prepared b a registered #uantit sur$eor!
iii. Construction programme% pro&ect #ualit management plan% pro&ect
health and safet plan prepared b a registered builder!
i$. Conditions of contract!
$. 'll ris insurance for the building wors% personnel and e#uipment.
Contract Drawings:
The contract drawings include the architectural drawings% the
structuralgeotechnical engineering drawings and the building ser$icesengineering drawings. These drawings pro$ide information regarding the
arrangement of spaces% structural components% electrical and mechanical
installations.
Specifications:
This amplifies the information gi$en in the contract drawings and bill of
#uantities. *t describes in details the wor to be e+ecuted under the
contract and the nature and #ualit of materials% components and
wormanship.
Priced Bill of Quantities:
8/18/2019 46 Contract Documents
2/3
' priced Bill of ,uantities is a Bill of ,uantities that has its rate and
amount column filled b a contractor. ' Bill of ,uantities consists of a
schedule of items of wor to be carried out under the contract with
#uantities entered against each item% prepared in accordance with the-tandard ethod of easurement of Building /ors (-eele and /infield%
200)
Construction programme:
This is a document that is prepared in order that the pro&ect participants
ma ha$e a thorough appreciation of the wor in$ol$ed% to allow the site
production team to sort out its main constituent and decide how% in what
order and at what time to do them! and to ensure ade#uate co1ordination
of the labour% materials and machiner re#uirements (Bamisile% 200)
Project Quality Management Plan:
The "ro&ect ,ualit anagement "lan defines the $arious #ualit related
acti$ities and procedures which will be implemented on the pro&ect. *t
sets down re#uirements% gi$es guidelines% pro$ides information and
indicates to appropriate personnel% the procedures to be followed with
respect to the "ro&ect ,ualit anagement "lan. ' sample outline of the
"ro&ect ,ualit anagement "lan is referred in the appendi+.
Project Health and Safety Plan:
The "ro&ect 3ealth and -afet "lan is a document de$eloped to secure the
health% safet and welfare of persons who will wor or $isit the site. *t
was also de$eloped to control the emission of to+ic substances into the
atmosphere and control the eeping and use of substances that might be
ha4ardous to health. 'n outline of the "ro&ect 3ealth and -afet "lan is
contained in the appendi+.
8/18/2019 46 Contract Documents
3/3
Conditions of Contract:
The conditions of contract define the terms% under which the wor is to be
undertaen% the relationship between the client% architect and contractor%
the duties of the architect and contractors% and the terms of pament
(-eele and /infield% 200)
All is! "nsurance:
This is a contract document that is de$eloped and shows that all the
personnel and e#uipment associated with a construction pro&ect has been
insured against loss or damage. B insurance% all the riss associated
with personnel and e#uipment in a construction pro&ect is transferred to a
third part.