Document Produced Under Loan Project Number: 43906-014 October 2015 Visayas Base Load Power Project (Philippines) First Semi-annual KSPC Stakeholders’ Forum Minutes 2015 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

  • Upload
    others

  • View
    7

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

Document Produced Under Loan Project Number: 43906-014 October 2015

Visayas Base Load Power Project (Philippines) First Semi-annual KSPC Stakeholders’ Forum Minutes 2015 Prepared by KEPCO SPC Power Corporation for the Asian Development Bank. This report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “Terms of Use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area.

Page 2: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

Mf,nutes of the Semi-Annual Stakeholders' Forum

Date: September LE,2O1,5 Time: 1000H-1200H Location: People's Hall Naga Citv Ha[l

Conducted by: E&C and C&PR DepartmentActivity: Semi-Annual Stakeholders'ForumFacilitator: Joanne claire T. supnet-sinrrbajon - E&c / Klayd del carmen - c&pR

Facilitating Attendees:

No. KSPC Representatives

1 Joanne Claire T. Supnet-Simbajon/ E&C

2 Farra-Jane Asaral/ E&C

3 Glaclys S. Auxilio/ E&C

4 Victorio Naval/ C&PR

5 Jasnrin Sumaoy/ C&PR

6 Klayd del Carmen/C&PR

The First Semi-Annual Stakeholder's Forum conducted in coordination with the C&PR Department at the people,s Hall ofNaga City Hall generally went well. We have provided the general public an overview and a deeper look into thr: powerplant's operations as well as an update of the company's efforts to continuously cater the needs and concerns of thesurrounding community. The following items below were discussed:

Agenda Topics

No. Topic Details

I Rationale

Conduct IEC (lnformation and Education Campaign) for the stakeholders incompliance with the ECC (Environmental compliance certificate) conditionrsand KSPC's commitment to the City of Naga.

Transparency requirement of KSPC's financing institution.

To further improve KSPC's environmental per{ormance and de',relooharmonious relationship with stakehrrkJers.

zGeneral Busirress andTechnicalSpecif ications

Plant location, Owner, Business Type,, rnajor facilities of the plantType of Technology used and its Pollution Control DevicesAnnual Power Generation Capacity, fuel daily rate, ash production rate

J

KSPCs Drive toEnviron mentalExcellence andCommunity Synergy

Working in synergy with the MMT, DTENR-EMB and the stakeholders inpromoting environmentally s'cund plant operation

Environmental monitoring (air emission, water effluents, social & legalcompliance)

lmpact Preventing Measures (complaints management in coorriination with opand C&PR)

lmpact Mitigating Measures (lmmediate actions in coordinatiorr withcontractor, LGU & community)

Environmental Programs (Tree plantirrg, coral rehab, coastal clean-up & solidwaste management)

Page 3: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

No. Topic Details

4First Half 2015EnvironmentalPerformance Review

First Half 2015 Summary of Operation Status

Air Emission Data (CEMS ancl 3'd Party); all results are within D'ENR-EMBstandard.

TCLP results for fly and bed ash. Results show that both flv and bed are nron-hazardous.

Water effluent results for firr;t half 201.5. All are within standard,Temperature difference at the mixing zone of the cooling watr-'r effluent is;

within iloC.

- Other monitoring activities for ambir:nt air, marine water, groundwater anomarine life study.

5EnvironmentalActivities

Quarterly Third Party MonitoringQuarterly Adopt an Estero and Tree planting ActivityQuarterly MMT Technical Committee MeetingsQuarterly Public Consultation Meeting with the 3 BarangaysSemi-Annual Marine Life Monitoring

6 SDP and CSR Activities

Medical MissionFeedin6; ProgramDonation of Toothbrush, toothpaste,, vitamins and medicinesScholarship ProgramDonation of Food Counters, Computers and Trash BinsFinancial Assistance - Anak Naga Program

Other ActivitiesMorupule-B delegation site v'isit.

Department of Energy and cebu Provincial Government site visit in preparationfor the APEC conference.

An open forum followed after the presentation. The following items were discussed:

Attachments: A. Photos taken during the meetingB. Attendance Sheet

C. Presentation Material

No. Queries/Comments KSPC's ResponseResponsiible

Entilt'rr

7

Include health reoort(each barangay withsponsored monthlydoctor's check-up)

FDC

Suggestion is noted, will include summary ofhealth report in the next stakeholders'forum.RHU representative will be invited to explainbetter the report.

KSPC tE&C

2

How to avail orrequest for barangayproject sponsorship,medical assistance,burial assistance orfinancial assistance

Brgy. Naalad,Tinaan, Langtadand Tuyan

Submit letter ofrequest with address to:Mr. Chang Yrong Cho - PresidentKEPCO SPC Power CorporationRequest should be thru/endorsed by theBarangay

KSPC CSiPR

SIMBAJON, J.C.S. MIRAL, N.L.V.

Page 4: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

Attachment A: Photos taken during the meeting:

Page 5: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra
Page 6: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra
Page 7: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

j

WATTENDANCE SHEET

SEMI-ANNUAL STAKEHOLDERS' FORUM18, 2Ot5; People's Hall N

No. Name Agency/Company Contact No. Sigrtature

1

Aanlrl ,A P*"h^tlla P'PC N*-',t Vl| 0q|"ilk*qvz(

2 f i:da ,9alas N,ortu f.h e?V,Wq(l (

3 $,,tlptcio (atan.j,N, nt,n \av I

4 [\uhs,,t V orlrla N u"ttn loh

5 lv4ryttl' lrLart w(wc"I 'i"'lcvg+t',goy

'1ut,ft

5 AA lNar-po T&16p, Patr Arc-zKfo7 JfS\Kr 3. 1,,ggapqq Ctrurz() -J * \

_ty=

8 (Xftnr Nev6 trDc-Gkt sV{t(oct- /,tV/',

9 I,1V|-Dy NA/ua- Fpt - futnr frffiVttra 9t {,e tu10 Ern^^ourr^.r\ V, \lorrl *" SJ',\ \eJ"

/(,<11 $l,l"it, Cru"or^^40 Tinzu-ctn o4lt't b(1"{,

r\. // $

\

127i0tJtric, v. @AsAtJ") TlFlt\ -A|r) fural nM /Ntu)

1

!.3T-f rtu l\ (, *+* ArtL^J fa ffl%,Iattltg

t4 A)N-d"" I\ i Mnw 0'"l r-u f nl, I \

15 Uo+dufl,/,O 04 tt

16 /b.W t'.b-y AqLq VtrJ, vL7 (': ,, ,i ll n rrro

'F. (u ,,- .i41o* '- /f$ ? ?"s( c #,

18 i'ia' Av',to ltlr'';,t- | l.rtt'r til {ta.l,"rl Agq- w,-) tflr19

/'l ! ,^r

W- | il l'ar/otrr)D lxlaala/ wTp20

ir , I J

lYv ma UIly< l,laa,'U 4w,tu Il,[nrv^

"U:w

Page 8: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

WATTENDANCE SHEET

SEM I-AN N UAL STAKEHOLDERS' FORUMber 18, 20L5; s Hall

No. Name Agency/Company Contact No. Sigr ature

2Lfun4o^o D-Q*1* )lo"o/ /yq -W

22 lrc{xv* 7 fiTkvuoJ (. te6/ ,09+H? Lt$'il

23 koigg'n,,,-,, A[h;o n E uk ?"b' ffirgonp ,lYs

24 V/\ ?*Vort [=. €ce>' b7\qr hcS, ,&,425

l%rt-l+r-ro Eb_ M4iR_ V-a .€+ F116^

26 IYbuppl= rau*-io bz+ Cr Foe. I

27 f\tot++vt- F ea<o* WW Fctr.f

28 1?4n, Srttcrt tt m lT E fuJn$ AW-eZa,l n29 RnKtco ^r@,

tfl\sq(irR fur' ntrQrag-'{47G}

(- ---

A p,,,..-)

'1ul"'1 f.-1a )M

30 krn rqco , .t e19(R NlnrJ:$itr,l"' '{lr-:l

31 OV d(Rcr6, OCuof..€s tu YnJ *vt- qtGrttv

JlJt u32 q4g tAp zA@L4op 14Pr-,Fe33 qUIPT{tra U I{4.ARIP TAF,6F4 t444W+;#34 ttt at-K<+, aasTqp* 14:4pa d

t\--Y

35 KbHac IgAm6Avk '1rr-pa-F<ftPw lrl'be

35 6AWb DE.azAaa TAPAF€ [h>\37 dose tAgerDN fiR fteape- M#)38 5fl7fi*r(9, ]frNuiFrK ffttltdVhj

t"

tnzu[Er&Bo 4,1

39 tft/.*0nao, 5i,t+tnlnA 'Ffttil'r0ft{D q ot" 6ll h J<1

l'r'^-/1L11

40 REt r. , hftvfrrr.lfl ptt'.ltr0t\r"t0 q 2, (,,9,Sa rl g ry

Page 9: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

W *rfiATTENDANCE SHEET

SEMI-AN NUAL STAKEHOLDERS' FORUM8, 2QI5; People's Hall Naga

No. Name Agency/Company Contact No. Sigr iature

41. LuOuL,. CL;L<flllfl PF\LC l'n l')c'10$lt 4r0X-

r,t Il- VU ,/.{,

42 lflU)rE i<x&ai? ,ilfrl u{il/(43 JAqil({ ";uunol Kqlt- l& v-ry44 Aoqd k) Oww lGvc etu45

t

J0ctnqe U4l,{- S. tWalWt K5PC 4NM46 >k{l/\43 U -re^ V\rWKo ( 14,D47 Ar.vlaiu, fr*r<a -\Fw6 x.

48/,r:li'lo , GUW '1 " tJPL

-t I49 t41tV tJW i>it{,{. c.J.o{ /

'/-Ar-

50 fir,*t lt lr,'^.,ttle tMrrl ttvdoi/

51 Antla /vt -V,ldtqaht flKqg c,o Ltrl ,Lg.v-tr--.-z

f1t4h 552

Itt0[o^^r a L. p"q4r h q,a

llr1v1, [* P' L,l /, 9111t

53 Mruttn Gua',t\ fuwx l/Mafu{J f4zl Gllsla/l.tL

54 Kl'{Wata t Vnntt-vnho LPqMN*O l"?-.\-b'1c 1r/

55ll.furrnot f' \ahawnq,t S6l,t+n Fohl6qrl on Ao ruu,1,xnt W l?rz----'r*Y

56 f,u7,wo e .Sd'e u"4L L €a t/Jaglgz z, = -fztil4t"t

57 I

58

59

50

Page 10: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

9t21t2015

reP@ sPPOWER CORPORATI

Forum Outlinet Rationale

| 2015 Environmental Performance Review

o Environmental Activities

i CSR Activities

t Open Forum

Page 11: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

I

Page 12: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

a

Page 13: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

4

Page 14: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

POWER CORPORATION

Social Developrment Plan &Corporate Social Responsibilities

Program

Aside from providing 200 MW of reliable andaffordable power supply to the Visayas, KSPC i

s also committed lo promote sustainable developnrent in its host communitiBs and among stakehol

ders

5

Page 15: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

?i,;#'iiFd"'H,iIQel!,! nnily..&,F.r.1bl a

Thonk Your

Page 16: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

e12112015

Page 17: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

Page 18: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

1 0 pcs Mamsa (1 0-lOcean Slde Naga Clty Cebu

Aususr t5.20t+

a

Page 19: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

912112015

PakoUUkos (3.5-4.5 ko) caught @ Baywatk ArJuns5,2015

4

Page 20: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

9/2t/2OLs

reP@ SPPOWER CORPORATI

POWER CORPORATION

Social Development plan &Corporate Social Responsibilities

Program

Aside from providing 200 MW of reliable andafiordable power supply to th6 Visayas, KSpC

is also committed to promote sustainabledevelopment in its host communities and amono

stakeholders

Page 21: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

s/21/20rs

Page 22: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

9/2L/2?ts

Page 23: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

e/2L/21ts

Page 24: 43906-014: Visayas Base Load Power Project: First Semi ... · KEPCO SPC Power Corporation Request should be thru/endorsed by the Barangay KSPC CSiPR ... -Dy NA/ua-Fpt - futnr frffiVttra

e/2t/2ots