FOR
Integrated Cement Plant
Clinker Production 2.4 Million TPA,
Cement Production 4.0 Million TPA,
Captive Power Plant 25 MW
&
Waste Heat Recovery Power Generation 15 MW
Near village –Pedagarlapad,
Mandal - Karempudi,
District-Guntur,
Andhra Pradesh
PROPOSED BY
M/s SHREE CEMENT LIMITED
APRIL 2014
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
1 Shree Cement Limited
APPENDIX I
(See paragraph – 6)
FORM 1
(I) Basic Information
S. No. Item Details
1. Name of the project/s Integrated Cement Project, Clinker 2.4
Million TPA, Cement 2x2.0 Million TPA,
Captive Thermal Power Plant 25 MW &
Waste Heat Recovery Power Generation
15 MW
2. S. No. in the schedule As per EIA Notification, 2006 the project
falls under S. No. ‘3’ (Cement Plant),
Project Activity ‘3 (b)’.
3. Proposed capacity / area /
length /tonnage to be
handled / command area /
lease area / number of wells
to be drilled
Project Capacity:
Unit Proposed
Capacity
Clinker Capacity 2.4 Million MTPA
Cement 2x2.0Million MTPA
CPP 25 MW
WHRB 15 MW
Project area:
Plant area : 100.49 ha
Staff Colony Area : 42.70 ha
4. New/Expansion/Modernization New Project
5. Existing Capacity/Area etc. Not Applicable
6. Category of Project i.e. 'A' or
'B'
As per New EIA Notification, 2006 this
project falls under Category ‘A’.
7. Does it attract the general
condition? If yes, please
specify.
No
8. Does it attract the specific No
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
2 Shree Cement Limited
condition? If yes, please
specify.
9. Location
Plot/Survey/Khasra No. Description Village Land Survey Nos.
Cement
Plant
Total Land
100.49 ha
Pedagarlapad
645-647, 650, 652-
658, 898-902, 910-
920, 922-925, 930-
946, 963
Colony
Total Land
: 42.30 ha
Pedagarlapad
660-665, 691-694,
696, 699-702,876-
877,896
Village Pedagarlapad
Tehsil Karempudi
District Guntur
State Andhra Pradesh
10. Nearest railway
station/airport along with
distance in kms.
Nearest railway station: Nadikudi 4.5
Km in North direction.
Nearest Airport: Vijayawada 114 Km.
11. Nearest Town, city, District
Headquarters along with
distance in kms.
Nearest Town & City: Nadikudi 6.0 Km
Distt. Headquarter: Guntur: 90 km
12. Village Panchayats, Zila
Parishad, Municipal
Corporation, Local body
(complete postal addresses
with telephone nos. to be
given)
Village Panchayat:
Kachavaram & Inuparajupalli
Zila Parishad Guntur
Phone No.(O): 91 863 2258310
13. Name of the applicant M/s. Shree Cement Limited
14. Registered Address M/s. Shree Cement Limited
Bangur Nagar, post Box No.- 33, Beawar,
Rajasthan.
15. Address for correspondence : As above
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
3 Shree Cement Limited
Name Mr. Rakesh Bhargava
Designation
(Owner/Partner/CEO)
Vice President (Environment)
Address M/s. Shree Cement Limited
Bangur Nagar, post Box No.- 33, Beawar,
Rajasthan.
Pin Code 305901
E-mail [email protected]
Telephone No. 01462-228101 to 228106
Fax No. 01462-228117
16. Details of Alternative Sites
examined, if any. Location of
these sites should be shown on
a topo sheet.
The proposed site for cement plant
meets the siting criteria guidelines
The site is adjacent to Limestone Mines,
which shall be transported using
conveyor.
Land is under private ownership. No
forest land is present. No houses are
present. Villagers are willing to sell their
land, Hence no other / alternative site
has been explored.
17. Interlinked Projects 3.6 Million TPA Captive Limestone
Mining (283.585 ha) near village
Kachavaram & Inuparajupalli,
Mandal-Karempudi, District-Guntur
(Andhra Pradesh)
18. Whether separate application
of interlinked project has been
submitted?
Yes
19. If yes, date of submission 15-4-2014
20. If no, reason Not Applicable
21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given.
(a) The Forest (Conservation)
No
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
4 Shree Cement Limited
Act, 1980 ?
(b) The Wildlife (Protection) Act, 1972 ?
(c) The CRZNotification, 1991
No
No
22. Whether there is any Government Order/Policy relevant/relating to the site?
Govt of Andhra Pradesh Issued LOI
for the Limestone Mines vide letter
dated 19-5-2010 (which is adjacent
to the cement plant).
23. Forest land involved (hectares) None
24. Whether there is any litigation
pending against the project
and/or land in which the
project is propose to be set
up?
(a) Name of the Court
(b) Case No.
(c) Orders/directions of the
Court, if any and its
relevance with the proposed
project.
No litigation pending against the
project
(II) Activity
1. Construction, operation or decommissioning of the Project involving
actions, which will cause physical changes in the locality (topography,
land use, changes in water bodies, etc.)
S.
No.
Information/Checklist
confirmation
Yes/No Details thereof (with approximate
quantities / rates, wherever possible)
with source of information data
1.1 Permanent or temporary
change in land use, land
cover or topography
including increase in
intensity of land use (with
respect to local land use
plan)
Yes The proposed Cement Plant, Captive
Thermal Power Plant, WHRB and
Residential colony will be set up in
the area of 142.79 ha. Land is
agriculture land under private
ownership.
The setting up of cement plant and
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
5 Shree Cement Limited
township will result in change of and
use pattern to industrial land.
1.2 Clearance of existing
land, vegetation and
buildings?
Yes Few thorny busges and shrubs are
present, which shall be cleared. No
land and building present on the site
1.3 Creation of new land
uses?
Yes New land use will be created.
1.4 Pre-construction
investigations e.g. bore
houses, soil testing?
Yes Soil testing shall be done to know the
lithology and estimate load bearing
capacity. Borehole shall be dug to
estimate draw down recovery test.
1.5 Construction works? Yes Construction will be done for various
plant installations and set up. It is
proposed to construct a Cement
Plant, Captive Power Plant (CPP) and
WHRB.
1.6 Demolition works? No No demolition work is proposed.
1.7 Temporary sites used for
construction works or
housing of construction
workers?
Yes
Temporary sites will be developed for
construction workers. Proper sanitary
facility will be provided in order to
avoid contamination to the soil,
surface and ground water in the
nearby area.
1.8 Above ground buildings,
structures or earthworks
including linear
structures, cut and fill or
excavations.
Yes Administrative building, Store,
workshop, canteen, first aid station,
and weighbridge along with plant
installation will be constructed.
1.9 Underground works
including mining or
No
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
6 Shree Cement Limited
tunneling?
1.10 Reclamation works? No Not applicable
1.11 Dredging? No Not applicable
1.12 Offshore structures? No Not applicable
1.13 Production and
manufacturing
processes?
Yes In the cement plant, the production
and manufacturing processes
involves crushing, blending, grinding
and heating is done for clinker
manufacturing. Coal and pet coke
will be used as fuel.
Clinker along with fly ash and
gypsum will be ground in ball mill /
VRM to manufacture OPC and PPC
cements.
High Efficiency ESP, Bag House and
Bag Filters will be installed in the
proposed Cement Plant and CPP to
maintain dust emission (PM /SPM)
well within the norms.
In the Captive power plant, pet coke
and coal will be fed in the boiler,
where steam will be generated which
will move turbine to produce
electrical energy.
1.14 Facilities for storage of
goods or materials?
Yes Covered storage shed for gypsum
Silos for clinker, cement and fly
ash storage
Boundary wall and water
sprinkling arrangement for
storage of laterite, limestone and
petcoke / coal
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
7 Shree Cement Limited
1.15 Facilities for treatment or
disposal of solid waste or
liquid effluents?
Yes In proposed Cement Plant, dust
particles will be collected from
various pollution control
equipments & recycled back to
the system.
In the CPP, entire fly ash
generated will be utilized in
cement manufacturing process.
Domestic wastewater generated
will be treated in STP and reused
for green belt development.
RO reject water will be used for
ash quenching.
1.16 Facilities for long term
housing of operational
workers?
Yes Residential colony will be established
in 42.7 ha land which will be
common for plant and mines.
1.17 New road, rail or sea
traffic during
construction or
operation?
No The existing approach road from
Nadikudi shall be ungraded to cater
to additional traffic load. Railway line
will be constructed from nearest
railway line to site.
1.18 New road, rail, air
waterborne or other
transport infrastructure
including new or altered
routes and stations,
ports, airports etc?
Yes Existing approach road will be
strengthened.
Railway line will be constructed from
nearest railway line to site.
1.19 Closure or diversion of
existing transport routes
or infrastructure leading
to changes in traffic
movements?
No -
1.20 New or diverted No Not required
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
8 Shree Cement Limited
transmission lines or
pipelines?
1.21 Impoundment,
damming, culverting,
realignment or other
changes to the
hydrology of
watercourses or
aquifers?
Yes Nalla passing through the site shall be
diverted
1.22 Stream crossings? No No stream is passing through the
project site.
1.23 Abstraction or transfers
of water from ground or
surface waters?
Yes The water requirement for the plant,
colony and CPP has been estimated
to as about 1350 KLD.
Project
Activity
Water requirement
(KLD)
Cement Plant 550
CPP & WHRB 300
Drinking, Utility
& Plantation
500
Total 1350
The water requirement will be met
from ground water and CGWA. NOC
obtained.
1.24 Changes in water bodies
or the land surface
affecting drainage or
run-off?
Yes Land and water surface alterations
will impact the runoff.
1.25 Transport of personnel or
materials for
construction, operation
or decommissioning?
Yes Transportation of coal/ petcoke and
construction materials
1.26 Long-term dismantling or
decommissioning or
No Not envisaged
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
9 Shree Cement Limited
restoration works?
1.27 Ongoing activity during
decommissioning which
could have an impact
on the environment?
No Not envisaged
1.28 Influx of people to an
area in either temporarily
or permanently?
Yes
Temporary influx during plant construction and permanent influx during plant operation
1.29 Introduction of alien
species? No Not envisaged
1.30 Loss of native species or
genetic diversity?
No Not envisaged
1.31 Any other actions? No -
2. Use of Natural resources for construction or operation of Project (such as
land, water, materials or energy, especially any resources which are non-
renewable or in short supply).
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
2.1 Land specially
undeveloped or
agricultural land (ha)
Yes The proposed project site is private
agriculture land. Total land of 142.79 ha
will be required for setting up of
cement plant, CPP, WHRB and colony.
2.2 Water (expected
source & competing
users) unit KLD
Yes The water requirement for the plant,
colony and CPP has been estimated to
as about 1350 KLD.
Project
Activity
Water requirement
(KLD)
Cement Plant 550
CPP and
WHRS
300
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
10 Shree Cement Limited
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
Drinking, Utility
& Plantation
500
Total 1350
The water requirement will be met from
ground and CGWA NOC is enclosed.
2.3 Minerals (MT) Yes Raw materials Requirement for cement
plant:
Raw
Material
Basis Million
MTPA
Lime Stone 1.5
T/ T of clinker 3.6
Iron Ore 0.015 T/ T of
clinker 0.036
Bauxite 0.044T/ T of
clinker 0.105
Coal or
Pet coke
0.1616 T/ T of
clinker 0.387
0.10 T pet
coke / T of
clinker
0.24
Gypsum 0.05 T / T of
cement 0.2
Fly Ash 0.35 T/T of
cement 1.4
Fuel Requirement for 25 MW CPP
Raw
Material
Basis Million
MTPA
Lime Stone
76% Purity
and 80%
absorption
0.032
Pet coke 3500
Kcal/KWH 0.1
2.4 Construction material –
stone, aggregates,
Yes Construction material available locally
will be used for construction work of
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
11 Shree Cement Limited
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
and/ soil (expected
source-MT)
proposed plant and colony etc.
2.5 Forests and timber
(source-MT)
No Not Applicable
2.6 Energy including
electricity and fuels
(source, competing
users) Unit: fuel (MT),
energy (MW)
Yes The estimated power requirement for
the plant, mine and colony will be
about 32.25 MW for which a captive
thermal power plant of 25 MW and
waste heat recovery power plant of 15
MW capacities are proposed to be set
up.
2.7 Any other natural
resources (use
appropriate standard
units)
No
Not envisaged
3.0 Use, storage, transport, handling or production of substances or materials,
which could be harmful to human health or the environment or raise
concerns about actual or perceived risks to human health
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
3.1 Use of substances or
materials, which are
hazardous (as per
MSIHC rules) to human
health or the
environment (flora,
fauna, and water
supplies)
Yes Diesel (for use in power plant) shall be
stored in tanks.
3.2 Changes in
occurrence of disease
or affect disease
vectors (e.g. insect or
No N.A
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
12 Shree Cement Limited
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
water borne diseases)
3.3 Affect the welfare of
people e.g. by
changing living
conditions?
Yes Better employment opportunities will
enhance the living standards of the
local people.
3.4 Vulnerable groups of
people who could be
affected by the
project e.g. hospital
patients, children, the
elderly etc.,
No Vulnerable targets like hospital or
school are not present in the vicinity of
project site
3.5 Any other causes No -
4.0 Production of solid wastes during construction or operation or
decommissioning (MT/month)
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
4.1 Spoil, overburden or
mine wastes
No Not Applicable
4.2 Municipal waste
(domestic and or
commercial wastes)
Yes Kitchen waste (biodegradable)
generation from plant & colony will be
converted in compost
Other wastes shall be handled as per
norms
4.3 Hazardous wastes (as
per hazardous waste
management rules)
Yes Used oil generated from the plant
machineries will be sold to CPCB /
SPCB authorized recycler.
4.4 Other industrial
process wastes
No Not Applicable
4.5 Surplus product No No surplus product will be generated.
4.6 Sewage sludge or
other sludge from
Yes STP Sludge will be used for green belt
development.
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
13 Shree Cement Limited
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
effluent treatment
4.7 Construction or
demolition wastes
Yes Construction wastes will be reused at
the site
4.8 Redundant
machinery or
equipment
No Not envisaged
4.9 Contaminated soils or
other materials
No No contaminated soil will be
generated.
4.10 Agricultural wastes No No agricultural waste will be
generated.
4.11 Other solid wastes No No other waste will be generated.
5.0 Release of pollutants or any hazardous, toxic or noxious substances to air
(kg/hr)
Sr.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
5.1 Emissions from
combustion of fossil
fuels from stationary or
mobile sources
Yes In the CPP, the emission of SO2
NOx and PM will be liberated on
account of use of fuel. Sulfur
dioxide will be neutralized with
lime to minimize the SO2 emission.
Low Nox burner will be used.
PM emissions will be minimized
using high efficiency ESP.
ESP and bag filters will be
provided in the cement plant to
control fugitive dust emissions.
Silo for fly ash, clinker and cement
storage.
Covered shed for gypsum storage
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
14 Shree Cement Limited
Sr.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
water sprinkling arrangement in
lime and coal storage
Concreting roads with vacuum
sweeping
5.2 Emission from
production processes
Yes Particulate matter will be emitted
from the cement making process.
As mentioned above all measures
will be taken to control the
emission.
5.3 Emissions from
materials handling
including storage or
transport
Yes In the cement plant and CPP, the
fugitive emission of dust particles
resulting in increase in SPM / RSPM
will be there due to the material
storage, handling and
transportation activity also due to
vehicular movements.
ESP and bag filters will be
provided in the cement plant and
CPP for control of dust emission.
Silo for fly ash, clinker and cement,
gypsum in covered shed, water
sprinkling arrangement in lime and
coal storage and concreting
roads will be provided to maintain
fugitive dust emission.
5.4 Emissions from
construction activities
including plant and
equipment
Yes Fugitive dust will be generated from
construction activities; however care
will be taken to reduce emissions by
water spraying.
5.5 Dust or odours from
handling of materials
including construction
materials, sewage and
waste
Yes/No The construction activities may cause
increase in SPM levels locally. No
odour generating substance will be
handled in the premises.
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
15 Shree Cement Limited
Sr.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
5.6 Emissions from
incineration of waste
No -
5.7 Emissions from burning
of waste in open air
(e.g. slash materials,
construction debris)
No -
5.8 Emissions from any
other sources
No -
6.0 Generation of Noise and vibration, and emissions of Light and heat
Sr.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
6.1 From operation of
equipment e.g.
engines, ventilation
plant, crushers
Yes In the cement plant and CPP, noise
pollution will be generated from
turbine, fans, compressors, motors,
and grinding mills.
Adequate measures includes
closed buildings for turbine &
compressor and proper
maintenance of plant machineries
will maintain noise level below the
permissible level.
Proper noise abatement measures
will be taken and persons working
just close to machine and machine
operators will be provided with
personal protective equipment viz.
Ear plugs / Ear muffs etc. for further
protection.
6.2 From industrial or
similar processes
Yes In the cement plant and CPP, there
will be noise generation due to the
running of the machinery.
Adequate measures includes
closed buildings for turbine and
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
16 Shree Cement Limited
Sr.
No
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
compressor and proper
maintenance of plant machineries
will maintain noise level below the
permissible level
The workers will be provided with
personal protective equipment.
6.3 From construction or
demolition
yes Construction activities will generate
noise pollution for a brief period due
to use of Machineries and Vehicles.
6.4 From blasting or piling No Not applicable
6.5 From construction or
operational traffic
Yes Noise generation will be minimized by
proper planning and management
6.6 From lighting or
cooling systems
No -
6.7 From any other
sources
No -
7.0 Risks of contamination of land or water from releases of pollutants into the
ground or into sewers, surface waters, groundwater, coastal wasters or the
sea.
S.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
17 Shree Cement Limited
7.1 From handling,
storage, use or
spillage of hazardous
materials
Yes Diesel handling and storage.
Risk mitigation measures shall be
provided.
DMP shall be prepared
7.2 From discharge of
sewage or other
effluents to water or
the land (expected
mode and place of
discharge)
No No effluent will be generated during
the cement making process.
Domestic wastewater from plant and
colony will be treated in STP and
treated wastewater will be used in
green belt development. The STP
sludge will be used as manure for
green belt development within the
premises. RO reject water will be
used in ash quenching.
Hence there will be no discharge of
wastewater outside the plant
premises (except during monsoon)
7.3 By deposition of
pollutants emitted to
air into the land or
into water
Yes Increase in Particulate matter will
deposit on land and water .
Adequate pollution control
equipment’s will be installed for
reduction in emissions to air.
Besides this, other mitigation
measures followed for control of
air pollution are mentioned
below:
Bag filters at all material transfer
points
Covered unloading hoppers
Concreted roads and vacuum
sweeping.
7.4 From any other
sources
No -
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
18 Shree Cement Limited
7.5 Is there a risk of long
term build up of
pollutants in the
environment from
these sources?
No -
8.0 Risk of accidents during construction or operation of the project, which
could affect human health or the environment
Sr.
No.
Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible)
with source of information data
8.1 From explosions,
spillages, fires etc and
from storage,
handling, use or
production of
hazardous substances
Yes Fire hazard from diesel tanks and coal
storage. Risk mitigation and DMP shall
be provided.
8.2 From any other causes No
Not envisaged
8.3 Could the project be
affected by natural
disasters causing
environmental
damage (e.g. floods,
earthquakes,
landslides, could burst
etc)?
No The site is located in flood free plains
and located in Seismic Zone-III as per IS
1893 (Part-I)-2002.
9.0 Factors which should be considered (such as consequential development)
which could lead to environmental effects or the potential for cumulative
impacts with other existing or planned activities in the locality
Sr.
No. Information/Checklist
Confirmation
Yes/No Details thereof (with approximate
quantities/ rates, wherever possible) with
source of information data
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
19 Shree Cement Limited
9.1 Lead to development of
supporting, facilities,
ancillary development or
development stimulated
by the project which
could have impact on
the environment e.g.:
Supporting infrastructure
(roads, power supply,
waste or waste water
treatment, etc)
Housing development
Extractive industries
Supply industries
Other
Yes Around the project site, there will be
development of few small shops and
small market. Residential facilities will
be provided to the staff and workers
in township.
Employment opportunities will
increase due to the requirement of
workers for the proposed project.
Local people will be preferred for
employment. This will contribute in
raising the socio-economic status and
standard of living of the nearby
villagers.
9.2 Lead to after use of the
site, which could have an
impact on the
environment
No -
9.3 Set a precedent for later
developments
Yes The proposed project will make
employment opportunity for the local
people and will improve the economy of
the area.
9.4 Have cumulative effects
due to proximity to other
existing or planned
projects with similar
effects
No -
(III) Environmental Sensitivity
Sr.
No.
Areas Name/
Identity
Aerial distance (within 15 km)
Proposed project location boundary
1 Areas protected under
international
conventions, national or
local legislation for their
None No forest is present in the 10 Km area
of site.
Forest present between 10-15 km of
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
20 Shree Cement Limited
Sr.
No.
Areas Name/
Identity
Aerial distance (within 15 km)
Proposed project location boundary
ecological, landscape,
cultural or other related
value
the sire are as follows:
Kakirala Reserved Forest: 11 km in S
direction.
Madinapadu Reserved Forest: 11.5
km in NNW direction.
Daida Reserved Forest: 13.5 km in
SW direction.
Fairly dance mixed forest: 12 km in
SSE direction
2 Areas which are
important or sensitive of
ecological reasons –
wetlands, water courses
or other water bodies,
coastal zone,
biospheres, mountains,
forests
Yes Nagarjuna Sagar right bank canal
(Jawahar Canal): About 7.5km
south direction.
3 Areas used by
protected, important or
sensitive species of flora
or fauna for breeding,
nesting, foraging,
resting, over wintering,
migration
None
4 Inland, coastal, marine
or underground waters
None
5 State, national
boundaries
None
6 Routes or facilities used
by the public for access
to recreation or other
tourist, pilgrim areas
SH-39
7 Defence installations None
8 Densely populated or
built-up area
None
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
21 Shree Cement Limited
Sr.
No.
Areas Name/
Identity
Aerial distance (within 15 km)
Proposed project location boundary
9 Areas occupied by
sensitive man made
land uses (hospitals,
schools, places of
worship, community
facilities)
- Schools, dispensaries, hospitals, places
of worship of general nature exists
within 15 km of the project site.
10 Areas containing
important, high quality
or scarce resources
(ground water resource,
surface resources,
forestry, agriculture,
fisheries, tourism,
minerals)
None Nothing important, high quality or
scares resources exists.
Limestone (Cement making grade
after appropriate blending) exists.
11 Areas already
subjected to pollution or
environmental
damage. (those where
existing legal
environmental
standards are
exceeded)
None -
12 Areas susceptible to
natural hazard which
could cause the project
to present
environmental problems
(earthquakes,
subsidence, landslides,
erosion, flooding or
extreme or adverse
climatic conditions)
None Area falls under Seismic Zone-III as per
IS 1893 (Part-I)-2002.
(IV) Proposed Terms of Reference for EIA studies: Attached
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
22 Shree Cement Limited
UNDERTAKING
"I hereby given undertaking that the data and information given in the
application and enclosures are true to the best of my knowledge and
belief and I am aware that if any part of the data and information
submitted is found to be false or misleading at any stage, the project will
be rejected and clearance give, if any to the project will be revoked at
our risk and cost.
Date: ____/_____/_____ (Rakesh Bhargava)
Place: Beawar Vice President
(Environment)
(Authorized Signatory)
For, M/s Shree Cement Limited,
Bangur Nagar, Post Box. No.- 33,
Beawar-305 901, Rajasthan, India
Note:
1. The projects involving clearance under Coastal Regulation Zone Notification, 1991
shall submit with the application a C.R.Z. map duly demarcated by one of the
authorized agencies, showing the project activities, w.r.t. C.R.Z. (at the stage of
ToR) and the recommendations of the State Coastal Zone Management Authority
(at the stage of EC). Simultaneous action shall also be taken to obtain the requisite
clearance under the provisions of the C.R.Z. Notification, 1991 for the activities to
be located in the CRZ.
2. The projects to be located within 10 km of the National Parks, Sanctuaries,
Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall
submit the map duly authenticated by Chief Wildlife Warden showing these
features vis-à-vis the project location and the recommendations or comments of
the Chief Wildlife Warden thereon (at the stage of EC).
3. All correspondence with the Ministry of Environment & Forests including submission
of application for ToR/Environmental Clearance, subsequent clarifications, as may
be required from time to time, participation in the EAC Meeting on behalf of the
project proponent shall be made by the authorized signatory only. The authorized
signatory should also submit a document in support of his claim of being an
authorized signatory for the specific project.
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
23 Shree Cement Limited
PROPOSED TERMS AND REFERENCE FOR EIA STUDY 1.0 INTRODUCTION
Shree Cement Limited proposes to establish a greenfield cement plant comprising 2.4 MTPA
clinker and 4.0 MTPA cement production, 15 MW Waste Heat Recovery Power Generation
and Captive Thermal Power Plant of 25 MW near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh).. The company also proposes to develop and operate Captive
Limestone Mine of 3.6 MTPA production capacity. The mining lease area is 283.585 ha. The
limestone mines will supply limestone to the proposed cement plant. The cement plant is
located southeast of limestone mines. The proposed staff colony is located east of cement
plant. The location map of the mines, plant and colony is provided in Figure 1. Toposheet
(1:50000 scale) showing the mines boundary, cement plant boundary and staff colony boundary
and 10 km physiographical features around the project is shown in Figure 2.
TOR for the integrated project was issued vide MoEF letter no. J-11011/563/2010- IA II (I),
dated 31st Dec., 2010 (EAC meeting dated 14.12.10). The TOR was extended till 31-12-2013
vide letter dated 22-3-2013. Thereafter MOEF asked Shree Cement Limited to apply for fresh
TOR. The EIA study was conducted during the winter season period December 2010 to March
2011. The proposed fresh TOR is designed in such manner that the primary data generated this
time shall be compared with previous primary data generated for one full season. Monitoring
shall be done at same locations where done earlier. Since no industry has come up in the study
area in the past 3 years, the baseline data generated three years back is unlikely to change.
Therefore met data and ambient air quality data generated for one month (representative winter
season; like December) shall be considered adequate for EIA Purpose. .
Manufacturing Process
The cement plant will be operated on dry basis, which offers more advantages, particularly in
fuel consumption. The proposed plant comprises of rotary kiln, preheater and precalciner.
Cement manufacturing principally involves grinding and blending of raw materials in a definite
proportion - a material containing calcium oxide (such as limestone, chalk, marl) with a siliceous
material (such as clay, shale, sand) along with certain additive or corrective materials (such as
laterite) and then calcining the mixture at high temperatures in a kiln. The resulting ‘clinker’ is
cooled and then ground with gypsum to produce the finished product, Ordinary Portland Cement
(OPC). Gypsum is added to control the setting time of cement. Portland Pozzolona Cement
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
24 Shree Cement Limited
(PPC) will be manufactured by adding approximately 30 - 35% fly ash to clinker and gypsum
during the grinding operation.
Captive Power Plant: The CPP will be having Steam Turbine Generating Sets with adequately
sized AFBC/CFBC boilers for generating 25 MW of power. Some of the equipment and system
taken into consideration for process and environment protection are listed below:
AFBC/CFBC Boiler for steam generator.
Air cooled condenser.
SO2, O2 and NOx analyzer to monitor proper combustion of coal.
Highly sophisticated Digital Process Control system for Boiler and Turbine
Operation.
High efficiency Electrostatic Precipitator to virtually eliminate Particulate Matter
Emission from the Boiler stack.
Waste Heat Recovery Boiler: In the proposed project 15 MW power will be generated by
utilization of waste heat of the proposed cement plant. For re-utilization of this wasted heat from
the exhaust gases of the PH & AQC this Waste Heat Recovery System is used to generate the
electrical power. In this system, one Waste Heat Recovery Boiler (WHRB) will be installed near
Kiln Pre-heater. and one at AQC..
The total land required for the implementation of the project is 426.375 hectares (142.79 ha for
Cement Plant / CTPP /Colony+ 283.585 ha for Limestone Mine), out of which, 150.58 ha of the
total project area has been proposed for greenbelt. The project will generate employment for
500 persons during operation phase.
Raw Materials for Cement Plant
S. No. Raw Material Basis Million
TPA
Source (Approx. distance from
plant)
Means / Mode of Transport
No. of trips (To & Fro)
1. Lime Stone 1.5
T/ T of clinker 3.6
Captive Mine (adjacent to plant)
Conveyor belt 300m or km)
N.A.
2. Iron Ore 0.015 T/ T of
clinker 0.036
Bellary, Kamatgi, Bagalkot ( ~470 km)
Rail / road 3 trucks
3. Bauxite 0.044T/ T of
clinker 0.105
Kadapa , Warangal (A.P)(~410km)
By road 10 trucks
4. Indian and Imported Coal or Pet coke
0.1616 T coal / T of clinker
0.387
Singarini Coal deposits ~220 km, Indian and imported coal)
By road/rail 35 trucks
5. 0.10 T pet coke /
T of clinker 0.24
Jamnagar pet coke / Pet coke ~1300 km)/ other Indian refineries and
by road/rail 22 trucks
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
25 Shree Cement Limited
S. No. Raw Material Basis Million
TPA
Source (Approx. distance from
plant)
Means / Mode of Transport
No. of trips (To & Fro)
imported pet coke
6. Gypsum 0.05 T / T of
cement 0.2
Salem (750 km)& Coimbator, Tamilnadu & Nagaur (Raj.) (~1700 Km)
by road 20 trucks
7. Fly Ash 0.35 T/T of
cement 1.4 Vijayawada (~130 km) by road 135 trucks
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
26 Shree Cement Limited
Figure 1: Location Map
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
27 Shree Cement Limited
Figure 2: Toposheet Showing 10 km Area Around the Project
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 28
2.0 PROPOSED TOR OF EIA REPORT
The purpose of Environmental Impact Assessment (EIA) is to determine as precisely as
possible, within the present limits of knowledge and expertise, the likely environmental
impacts of the proposed project. The objective will be to establish a clean unit whose
waste, if any, can be recycled / reused to the maximum extent feasible. Technical options
of reuse and disposal of liquid and solid wastes generated from the project will be
explored.
M/s Shree Cements Limited retained EMTRC Consultants Private Limited, Delhi to conduct the
EIA Study. EMTRC is accredited by the NABET to conduct EIA study in Mining Sector. The
following TORs are suggested by EMTRC.
1. The study area covers an area of 10 km radius around the proposed site. Baseline
environmental quality of the study area shall be assessed based on secondary data collected
from various sources supplemented by data generated at site during the period 1st Oct 2014
to 31st December 2014.
a) Land Environment: Data on land use of the study area shall be generated from secondary
information collected from district / tehsil statistical records and using recent satellite
imagery.
b) Meteorology: Meteorological data for wind speed, wind direction, relative humidity and
ambient temperature shall be generated at one location inside the study area for the entire
duration of AAQ data generation. Readings shall be noted on hourly basis. Historical met
data from nearest IMD shall be obtained to assess the climatic trend. Data on mixing height
and stability class obtained from CPCB / IMD publication and used for mathematical
modeling.
c) Ambient Air: AAQ data shall be generated by following the guidelines for ambient air quality
monitoring published by CPCB (Guidelines for Ambient Air Quality Monitoring:
NAAQMS/25/2003-04-July 2003). Particulate Matter (PM10 & PM2.5), sulphur dioxide and
nitrogen dioxide, CO, Pb, As, Ni shall be monitored for one month. The data shall be
compared with AAQ data already generated for one full season. Monitoring same be done at
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 29
same location where done earlier (core zone, buffer zone covering upwind, crosswind and
downwind direction).
d) Noise: Baseline noise levels will be monitored at locations where AAQ monitoring will be
done. Noise readings shall be taken once during the study period using sound level meter as
per CPCB procedure. Monitoring same be done at same location where done earlier
(covering all the area category).
e) Water Quality: Surface water and groundwater of the study area shall be identified based on
drainage pattern, water utilization and location of borewells / dugwells. Ground water quality
of surrounding villages shall be tested. Parameters recommended by CPCB / IS 10500 shall
be analyzed by following the standard methods (APHA Procedure). Sampling shall be done
once during the study period.
f) Soil: Soil samples will be collected from surrounding agriculture fields that are likely to be
impacted from the project. Soil quality analysis done for parameters like texture, moisture,
organic matter, conductivity, pH, bulk density, water holding capacity and NPK values.
Infiltration rate of soil samples collected from the site will be analyzed. Sampling shall be
done once during the study period.
g) Flora and Fauna: The listing of flora and fauna of study area shall be obtained from Forest
Department. Primary data generation shall be done at core zone and buffer zone.
h) Socio-economic Environment: Baseline information will be collected through secondary
sources, namely the Census Data / District Statistics Handbook / Tehsildar’s Office. Data on
population distribution, occupational pattern, agriculture and cropping pattern, educational
facility, health care facilities, literacy rate, infrastructure facility, etc shall be collected by
primary survey. Social impact assessment of the project affected people will be done.
4. Quantification of air pollution load from the proposed project shall be done. Potential
environmental impacts shall be assessed qualitatively and quantitatively. The changes in
the quality of the environment shall be predicted using ISCST3 Model.
5. Greenery development plan will be prepared. The plan shall concentrate on measures that
will be helpful in attenuating air and noise pollution levels from the project. CPCB
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 30
guidelines shall be followed to design the green belt. Indigenous species and those having
long-term economic value considered for greenbelt development.
6. Rainwater harvesting strategies within the project premises and surrounding areas
suggested as a measure to augment the available water resources of the area.
7. Based on standard procedures prescribed by the National Safety Council and provisions
mentioned in the Factories Act, occupational health and safety aspects of the project
identified and discussed.
8. Environmental Management Plan shall be drawn up to maintain and enhance the
environmental quality in and around the project area. The EMP shall earmarked specific
staff, instruments and finances for routine environmental management as well as
collection, collation and examination of various environmental data. Post-project
monitoring plan shall be suggested to monitor the changes in the environmental quality
after implementation of the project. All necessary administrative measures shall be
incorporated in the EMP to achieve the following objectives:
Reduction of adverse environmental impacts
Improvement of environmental quality of the surrounding area
Waste minimization, reuse and resource recovery
Waste segregation to make the treatment and disposal cost-effective
Establish proper monitoring mechanism with adequate infrastructure
13. Risk and hazard assessment study shall be undertaken to tackle any accident that may
occur due to the plant.
14. Social impact assessment shall be carried out by assessing the various developmental
potential of the proposed project in the field of employment generation, improvement in
physical and social infrastructure base. CSR activities with budget and timeframe shall be
provided.
15. All environmental concerns directly related to the project activity, when raised by the
General Public, State Administration and NGO during the public hearing process would be
duly addressed in the Final EIA along with the commitments of the project promoter.
16. In addition to above standard TOR prescribed by EAC-MOEF (New Delhi) for other similar
projects shall be covered (detailed in Table below)
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 31
S. No. Proposed ToR for EIA Study
1 An EIA-EMP Report shall be prepared as per the MoEF recommended generic structure
2 An EIA-EMP Report shall cover the impacts and management plan for the project specific activities on the environment of the region, and the environmental quality- air, water, land, biotic community, etc. through collection of data and information, generation of data on impacts including prediction modelling The primary data shall be compared with primary data already generated for one full season. Monitoring same be done at same location where done earlier.
3
A map specifying locations of the State, District and Project location shall be provided.
4 A S Study area map of the core zone and 10km area of the buffer zone (1: 50,000 scale) clearly delineating the major topographical features such as the land use, surface drainage of rivers/streams/nalas/canals, locations of human habitations, major constructions including railways, roads, pipelines, major industries/mines and other polluting sources shall be provided.
5
Land use map (1: 50,000 scale) based on a recent satellite imagery of the study area shall be provided with explanatory note of the land use.
6 Map showing the core zone delineating the agricultural land (irrigated and unirrigated, uncultivable land (as defined in the revenue records), forest areas (as per revenue records), along with other physical features such as water bodies, etc shall be furnished.
7 A contour map showing the area drainage of the core zone and buffer zone (where the water courses of the core zone ultimately join the major rivers/ streams outside the lease/project area) shall be indicated as a separate map. Impact of diverting the nalla passing through the plant site shall be provided with details of diversion.
8 (vii) A detailed Site Plan of the plant shall be provided. (viii)
9 Collection of one-season (non-monsoon) primary baseline data on environmental quality - air (PM10, PM2.5, SOx, NOx and heavy metals such as Pb, As, Ni,), noise,
water (surface and groundwater), soil along with met data coinciding with the same season for AAQ collection period. The data shall be compared with compared with data already generated for one full season. Monitoring same be done at same location where done earlier. Silica content of the PM10 shall be also analysed.
10 The number and location of the stations in both core zone and buffer zone to be selected on the basis of size of lease/project area, the proposed impacts in the downwind (air)/downstream (surface water)/groundwater regime (based on flow). One station shall be in the upwind/upstream/non-impact/non-polluting area as a control station. The monitoring should be as per CPCB guidelines and parameters for water testing for both ground water and surface water as per ISI standards and CPCB classification wherever applicable. Values should be provided based on desirable limits.
11 Study on the existing flora and fauna in the study area (10 km) shall be carried out.
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 32
12 Detailed water balance shall be provided. Source of water and sanction of the competent authority and impacts vis-à-vis the competing users shall be provided. Details of rainwater harvesting and measures for recharge of groundwater shall be provided.
13 Impacts predictive modelling using the ISCST-3 model shall be provided.
14 Occupational health issues. Baseline data on the health of the population in the impact zone and measures for occupational health and safety of the personnel and manpower shall be provided.
15
Risk Assessment and Disaster Preparedness and Management Plan.
16 Integrating in the Env. Management Plan with measures for minimising use of natural resources - water, land, energy, etc.
17 Cost of EMP (capital and recurring) shall be provided.
18 CSR Plan along with details of villages and specific budgetary provisions (capital and recurring) for specific activities over the life of the project.
Publi
19
In built mechanism of self-monitoring of compliance of environmental regulations.
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 33
3.0 STRUCTURE OF EIA REPORT
The EIA report follow the list of contents prescribed in the Gazette Notification issued by Ministry
of Environment & Forests, Govt. of India vide no. SO 1533 dated 14th September 2006. The
various components of the study are presented in respective chapters as described below.
Chapter 1. Introduction (This chapter will describe the purpose of the report, Identification of
nature, size and location of the project (with latitude and longitude) and its proponent, Description
of site and surrounding environment, Location maps, Importance of project to the country and
region and finally the Scope of the EIA study, as per TOR approved by MOEF)
Chapter 2. Project Description (This chapter will describe the Type and Need of the project,
Magnitude of operation, Schedule for approval and implementation, Land requirement, Water
requirement and flow scheme, Technology and Process description, Site plan, Layout of project
location, boundary and site, Description of mitigation measures to meet the environmental
standards)
Chapter 3. Description of the Existing Environment (This chapter will describe the study area,
period of study, components and methodology, Establishment of baseline data for valued
environmental components and base maps of all environmental component like Meteorology,
Ambient air quality, Ambient noise quality, Hydrology and water quality, Land use, Agriculture, Soil
quality, Ecology, Demography, Occupational pattern and Socio-economics.)
Chapter 4. Anticipated Environmental Impacts and Mitigation Measures (This chapter will
describe the details of investigated impacts due to project location, Possible accidents, Project
design and construction, regular operation, Measures for minimizing and / or offsetting adverse
impacts identified, Irreversible and Irretrievable commitments of environmental components,
Assessment of significance of impacts and Mitigation Measures.
Chapter 5. Environmental Monitoring Program (This chapter will include the technical aspects
of monitoring the effectiveness of mitigation measures including measurement methodologies,
frequency, location, data analysis, reporting schedules, emergency procedures)
Chapter 6. Additional Studies (This chapter will describe outcome of Public Hearing, Risk
Assessment and DMP, Social Impact Assessment and Rehabilitation and Resettlement Action
Plan)
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 34
Chapter 7. Project Benefits (This chapter will include improvement in physical infrastructure,
Improvement in social infrastructure, Employment potential of skilled, semi-skilled and unskilled
persons, other tangible benefits derived from the proposed project)
Chapter 8. Environmental Management Plan (This chapter will describe the administrative
aspects of ensuring that mitigation measures are implemented and their effectiveness monitored
after approval of the EIA).
Chapter 9. Summary and Conclusion (This chapter will describe the overall justification for
implementation of the project, and explain methods by which adverse affects of the proposed
action have been mitigated)
Chapter 10. Disclosure of Consultant Engaged
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 35
4.0 ENVIRONMENTAL MONITORING LOCATIONS
1. Meteorological Data (Source- nearest IMD Khammam, Andhra Pradesh)
Month Temperature (deg C)
Relative Humidity, %
Rainfall Wind speed
Direction (from)
Cloud cover
Max Min Max Min (mm) kmph (from ) (Oktas)
January 30.8 17.9 80 44 4.6 4.3 E, SE 2.1
February 33.7 20.4 77 38 6.0 5.6 E, SE 2.6
March 36.8 23.1 76 35 9.8 6.8 SE, E 3.0
April 39.0 25.9 73 36 20.7 7.6 SE, E 3.4
May 40.9 27.9 64 36 43.6 7.8 SE, E 3.7
June 37.0 26.9 70 52 153.3 9.0 W, SW 5.6
July 32.6 25.0 81 67 260.2 7.6 W, SW 6.5
August 32.0 24.7 83 70 200.4 6.5 W, SW 6.2
September 32.7 24.5 82 69 184.7 4.5 W, SW 5.3
October 32.5 23.3 81 63 114.3 3.1 E, N 3.9
November 30.9 19.9 77 54 29.1 3.3 E, N 3.2
December 29.9 17.1 78 46 4.9 3.0 E, N 2.5
2. Ambient Air Quality Monitoring Locations
S. No. Location Direction from Project
Site
Distance from Project Site
(in km)
Remarks
SA1 Project Site Core zone
SA2 Near propose colony in SE direction
SE 1.0 km Location in upwind direction
SA3 Near Naguleru Vegu Canal
NW 0.5 Location in downwind
direction
SA4 Budawada NW 1.25
Location in downwind direction
SA5 Dachepalle N 5.1 Urban location
SA6 Modinapadu RF N 9.5 RF Boundary
SA7 Godewaripalle
SW 1.0
Residential location near mine site & second
dominant downwind direction
SA8 Karempudi S 9.0 Residential location
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 36
3. Ambient Noise Quality Monitoring Locations S. No. Location Direction
from Project Site
Distance from Project Site
(in km)
Remarks
SA1 PROJECT SITE Core zone
SA2 Near propose colony in SE direction
SE 1.0 km Location in upwind direction
SA3 Near NaguleruVegu Canal
NW 0.5 Location in downwind
direction
SA4 Budawada NW 1.25
Location in downwind direction
SA5 Dachepalle N 5.1 Urban location
SA6 Modinapadu RF N 9.5 RF Boundary
SA7 Godewaripalle
SW 1.0
Residential location near mine site & second
dominant downwind direction
SA8 Krempudi S 9.0 Residential location
4. Surface Water Quality Monitoring Locations
S. No.
Sampling Location Direction from project site
Distance (km) from project site
1. Kesanupalli Major Canal West of proposed plant area
Within the lease area (core zone)
2. Naguleruvagu canal NW 0.8
3. Nadikodi major canal WNW 2.8
4. Dandivagu canal W 8.0
5. Ramapuram major canal W 6.0
6. Tangeda major canal E 4.0
7. Jawahar canal SSE 7.5
5. Ground Water Quality Monitoring Locations
S. No. Location Direction from project site
Distance from project site
(in km)
Remarks
GW1 Project Site - - Core zone
GW2 Kachavaram W 0.1 km
Nearest habitation from mine site
GW3 Dachepalle N 5.1 km Nearest town area
GW4 Nadikudi NNW 5.7 km Town area
GW5 Pedda Garlapada E 1.8 km
Residential location near mine
site
GW6 Godewaripalle SSW 1.0 km
Residential location near mine
site
GW7 Boduwada NW 1.25 km -
GW8 Chintapalle SSE 8.1 km
Near Jawahar Canal
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 37
6. Soil Quality Monitoring Locations S. No. Location Direction from the
Project site Distance from the Project site
(in km)
SS1 Project Site --- --
SS2 Kachavaram W 0.1 km
SS3 Dachepalle N 5.1 km
SS4 Nadikudi NNW 5.7 km
SS5 PeddaGarlapada E 1.8 km
SS6 Gogulapadu W 2.4 km
SS7 Budawada NW 1.25 km
SS8 Chintapalle SSE 8.1 km
7. Land Use Pattern of the 10 km radius Study Area
S.No. Legend Area (in ha) Area (in %)
1. Water Bodies 249.13 0.57
2. Forest Land 177.76 0.41
3. Crop land 17325.36 39.83
4. Fallow Land 20696.00 47.58
5. Plantation / Vegetation 1066.79 2.45
6. Scrub Land 522.27 1.20
7. Stone / Mine Quarry 117.04 0.27
8. Stony Waste 1233.31 2.84
9. Industrial Area 27.97 0.06
10. Human Settlement 875.66 2.01
11. Open Waste Land 1209.94 2.78
Total 43501.23 100.00
Land Use Pattern of the Core Zone (Plant Area)
S.No. Legend Area (in ha) Area (in %)
1. Crop land 102.92 72.06
2. Fallow Land 39.87 27.92
Total 142.79 100.00
Land Use Pattern of the Core Zone (Mining Lease area)
S.No. Legend Area (in ha) Area (in %)
1. Crop land 190.188 67.70
2. Fallow Land 93.397 32.93
Total 283.585 100.00
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 38
Figure 3: Ambient Air & Noise Quality Monitoring Locations
Figure 4: Ground Water and Soil Quality Monitoring Locations
2.4 Million TPA Clinker, 4.0 Million TPA Cement, 25 MW Captive Power Plant & 15 MW
Waste Heat Recovery Power Generation Near village Pedagarlapad, Mandal-Karempudi,
District- Guntur (Andhra Pradesh)
Form – I / Appendix I
M/s. Shree Cement Limited. 39
Figure 5 : Surface Water Quality Monitoring Location
Figure 5: Surface Water Quality Monitoring Location
Figure 6 : Land Use Map of Study Area