PROPOSEDDWELLING
-19.00 m-
PROPOSED SITE PLAN
SCALE 1:200 @ A3
GENERAL NOTES:
THIS DRAWING IS TO BE READ INCONJUNCTION WITH ALL OTHERDRAWINGS, DOCUMENTATION,SCHEDULES AND SPECIFICATIONS
BUILDER TO CHECK AND CONFIRM ALLPLAN AND SITE SET OUT DIMENSIONSPRIOR TO COMMENCEMENT OFCONSTRUCTION
WRITTEN DIMENSION TAKESPREFERENCE TO SCALE
GROUND LEVELS AND FINISHED FLOORLEVELS INDICATED ARE APPROXIMATEONLY AND ARE TO BE CONFIRMED ONSITE
NO VARIATION MAY BE MADE TO THISDRAWING WITHOUT PRIOR APPROVALOF THE PROPRIETOR OR DESIGNERS
ALL STEEL LINTELS ARE TO BE HOTDIPPED GALVANISED, SIZES AS PERENGINEERS DETAILS AND DESIGN
REFER TO ENGINEERS DESIGN,DOCUMENTATION, CALCULATIONAND SPECIFICATION FOR STRUCTURAL,ELECTRICAL, HYDRAULIC AND CIVILDETAILS (IF APPLICABLE)
ALL MATERIALS AND EQUIPMENTSHALL BE NEW, FREE OF BLEMISHES ORDAMAGE. ANY DEFECTIVE OR FAULTYEQUIPMENT SHALL BE REPLACED ATTHE CONTRACTORS EXPENSE
ALL WORK SHALL BE CARRIED OUT INA NEAT TRADESMAN LIKE MANNERAND TO BE CARRIED OUT BY FULLYQUALIFIED AND LICENSETRADESPERSONS
ANY DISCREPANCIES IN DOCUMENTSAND/OR ON SITE TO BE REPORTED TOTHE DESIGNER BEFORE ANY WORK ISCOMMENCED
BUILDING TERMITE PROTECTION INACCORDANCE WITH AS 3660.1-2014
ALL GLAZING WILL BE SELECTED ANDINSTALLED IN ACCORDANCE WITH AS1288-2006 AND/OR AS 2047-2014ALL GLAZING IN WET AREA MUSTCOMPLY WITH BCA 3.6.4.5BATHROOM, ENSUITE AND SPA ROOMGLAZING REQUIREMENTS
ALL WATERPROOFING IN WET AREASWILL BE IN ACCORDANCE WITH AS3740-2010 AND BCA-TABLE 3.8.1.1
SELF CONTAINED SMOKE ALARMS WILLCOMPLY WITH AS 3786, CONNECTEDTO CONSUMER MAINS POWER ANDWILL BE INTERCONNECTED (IF MORETHAN 1)
TIMBER FRAME CONSTRUCTION WITHBRICK VENEER OUTER WALL AS PERSPECIFICATIONS.
DOOR TO THE FULLY ENCLOSEDSANITARY COMPARTMENT WILL OPENOUTWARD, SLIDE OR BE EASILYREMOVED FROM OUTSIDE OF THECOMPARTMENT - TO COMPLY WITHTHE BCA PERFORMANCE REQUIREMENT2.4.3
ALL WINDOWS & SLIDING DOOR(EXCLUDE WET AREAS) TREATMENT ASPER SELECTION SHEET
BUILT IN ROBES PROVISIONAL INSECONDARY BED ROOMS
SOME ITEMS SHOWN IN THE DRAWINGMAY NOT BE PART OF STANDARDINCLUSION. PLEASE REFER TOQUOTATION FOR FURTHER DETAILS
HWS SHALL BE RINNAI B16INSTANTANEOUS NATURAL GAS HOTWATER UNIT 5 STAR RATING
ENERGY REPORT NOTE:CONSTRUCTION OF HOME NEED TOACHIEVE A 6-STAR LEVEL OF ENERGYEFFICIENCY. INSULATION TO EXTERNALWALLS & CEILING TO CORRESPONDWITH ENERGY REPORT. ALL WINDOWSAND SLIDING DOORS ARE TO BEREFERRED TO ENERGY REPORT.WEATHER STRIPPING by owner, TO ALLEXT DOORS
STORMWATER DISPOSAL BY OWNER
WET AREAS TO BE CONSTRUCTED INACC WITH AS 3740 IN LIEU OFMINISTERS SPEC SA F1.7 WATERPROOFING OF WET AREAS WITHINBUILDINGS
M U R R E L L R O A D
ALFRESCO
-32.0
0 m
-
GARAGE
PORCH
-19.00 m-
-32.0
0 m
-
900 WIDE PAVING TO HAVEPOSITIVE FALL AWAY FROMHOUSE - AS SELECTED
RAINWATER TANK AS PERCOUNCIL REQUIREMENTS
8105 -
UP
PE
R F
LO
OR
BO
UN
DA
RY
SE
TB
AC
K13625 U
PP
ER
FL
OO
RB
OU
ND
AR
Y S
ET
BA
CK
900
4600
1070
2020
1050
P.O.S= 184.49m²
8500
RWT
LANDSCAPING ASREQUIRED
1.8m HIGH COLORBOND GOOD NEIGHBOURFENCE (GREY RIDGE COLOUR) TO SIDE ANDREAR BOUNDARIES AS PER SPECIFICATIONS
4630
LANDSCAPING ASREQUIRED
DRIVEWAY TO COUNCILREQUIREMENTS
8105 -
UP
PE
R F
LO
OR
BO
UR
ND
AR
Y S
ET
BA
CK
13620 -
UP
PE
R F
LO
OR
BO
UN
DA
RY
SE
TB
AC
K
3850 - UPPER FLOORBOUNDARY SETBACK
2000 - UPPER FLOORBOUNDARY SETBACK
2000 - UPPER FLOORBOUNDARY SETBACK
3850 - UPPER FLOORBOUNDARY SETBACK
31985
5500
3010
7260
6590
1500
7260
3010
12003460
19000
5990
1670
4380
3460 5500
38002750
6300
6555
1700
1070
1700 3190
3190
4550 2900
9110
4605
1500
10050
1070
5655
7310
10050
1500
N
490
6590
4955
3600
WORKING DRAWINGS
UP
1m HIGH FEATURERETAINING WALLS
1m HIGH RETAINING WALL
500
6555
600
1260
360
1200
5504
1950
1070
LOWER LIVINGSITE
PORCH
607.77 m²
AREA SCHEDULE
ALFRESCO
SITE COVERAGEP.O.S.
TOTAL
GARAGE
197.50 m²
12.12 m²40.20 m²
395.79 m²
184.50 m² 30%
13.94 m²
UPPER LIVING
BALCONY 12.56 m²
119.47 m²
263.76 m² 43%
1
0112
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
ENERGY EFFICIENCY NOTES
- R2.5 BULK INSULATION PLUS REFLECTIVE SARKING TOALL EXTERNAL WALLS
- R2.0 BULK INSULATION TO ALL INTERNAL WALLS- R6.0 BULK INSULATION ABOVE ALL ROOFED CEILINGS- R2.0 BULK INSULATION BELOW THE UPPER LEVEL
FLOOR- BUILDING FABRIC THERMAL INSULATION TO COMPLY
WITH B.C.A. 3.12.1.1.- STEGBAR ALUMINIUM FRAMED LOW-E SINGLE GLAZING
THROUGHOUT.- ALL EXHAUST FANS TO BE SEALED WITH SELF-CLOSING
DAMPERS.- SEALED DOWNLIGHTS AS FOLLOWS: 50- WEATHER STRIP DRAFT PROTECTION DEVICE TO
BOTTOM OF EXTERNAL HINGED DOORS WITH SEALS TOHEADS AND JAMBS
- FLOORING: WET AREAS TILED, REMAINING LOWERLEVEL TIMBER, REMAINING UPPER LEVEL CARPET
- ROOF COLOUR: MONUMENT
AAW 2424
PANEL LIFT DOOR2700H x 4810W
PORCH
2700x1120
720
PSHR
820
820
820DESK
FR
DW
S
2400
H x
1540
WO
PENI
NG24
00H
x 10
00W
OPE
NING
S
ASD 2736-3
AAW 2427FG 2410
820
ASW 2118
ASW
210
9
CPBD
BENC
H
ASW 2118
720
FAMILY ALFRESCO
PRAY
LOUNGEGUEST
KITCHEN
MEALS
EN
TR
Y /
HA
LL
WA
Y
STUDY
LAUNDRY
BATH
WIR
ENSUITE
P
ASW
150
6O
BS
RECESS
BP
DOUBLE GARAGE
UPSHR
CORNERNICHE
CPBD
OT
270
0x62
0
AAW2406
AAW2406
CSD 720
FR
PWD
DP
DPDP
DP
DP
S
S
MB
AC
HW
S
GT
GT
RW
P
MH
WORKING DRAWINGS
PROPOSED LOWER FLOOR PLAN
SCALE 1:100 @ A3
BUILDING SCHEDULE
ROOFCOLORBOND CUSTOM ORB ROOF. PITCH22.5° AND 450 EAVES
WALLSTIMBER FRAME CONSTRUCTION WITHBRICK OUTER WALL TO GROUND FLOORAND HEBEL OUTER WALL TO UPPERFLOOR
CEILING HEIGHT3.0m TO GROUND FLOOR AND 2.7m TOUPPER FLOOR
FLOORCONCRETE SLAB
WINDOWSPOWDER COATED ALUMINIUM AWNINGAND SLIDING AS SPECIFIEDWINDOW HEAD HEIGHT - 2.7m TOFRONT ELEVATION AND 2.4m TO ALLOTHER ELEVATIONS
ALL INTERNAL DOORS ARE 2.4m HIGH
19930
470
1030
500
6590
7260
2660
350
1070
1500
500
350
6000
240
7260
3010
1070
1500
500
350
6000
90
1500
90
1700
90
3190
240
3010
1070
1070
350
2660
4260
850
470
6590
500
1030
470
470
1030
240
5000
90
1650
90
1970
90
1700
90
1000
90
2100
240
2660
350
1070
17740
950
550
10050
7310
1070
1500
10050
240
2600
90
4140
240
1070
1070
240
4140
90
4950
90
1200
90
1590
90
4640
240
1500
1500
240
4640
90
1500
90
1290
90
4950
90
5210
240
1500
240
4640
90
2280
90 5
10
90
10250
240
1500
600
240
13270
240
3010
1070
1700 2750 1670 3920 710 3190 3800
240 1460 240 2270 240 1430 240 4280 350 3190 3800
249090
7690 90 3100 240 3800
2401800 90 3110
904490 90 3100
860 610230
470 1810 470 230610 830 3610 1810 1810 590 800 2410 590
3460 470 1550 1200 3430 950 5990
240 5000 240 1200 240 3900 240 5990
240 160090
3310 90 150090
1810 90 2000 90 5900 240
2000
90
240 50090
211090
2210 90 190090
141090
2000 90 5900 240
240 3000 90 1910 90 4490 90 2010 90 1000 240
690
690
950 2410 800 970350
1200 710 2650 1020 590 4810 590
1500
7120
610
2320
350
1450
230
700
4580
1070
600
600
500
2100
600
600
470
300
600
600
600
600
500
300
600
1290 600
600 1200 900
300
300 600
240
1050
2400
2050
850
2000
1740
N
DP
90
510
RAINWATERHEAD
SMOKE DETECTOR
INTERCONNECTED
HARDWIRED WITH B/BACKUP
FLOOR WASTE
HWS
MB
METER BOX
HOT WATER SERVICE
LEGEND
GT
GARDEN TAP
ACAC UNIT
GP
RWP
RAIN WATER PUMP
DOWN PIPEDP
S
GAS POINT
NBNNATIONAL BROADBAND
NETWORK
ESSELECTRICITY SAFETY SWITCH
EXHAUST FAN
300
1100600
900
3890
90
300
90
FL 102.20
FL 101.82
AFW
151
5
2700
x 72
0GL
ASS D
OO
R
2
0212
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
WM TR
LINEN/BR
LAUNDRYCHUTE 8
80
800
ROLLER DOOR2700H x 2410W
180
EQ
.
90S
Q. L
OSP
POST
S
180EQ.
90SQ. LOSPPOSTS
GAS P
OIN
TW
ATER
PO
INT
STAIRS AS PER MANUFACTURER'S SPECIFICATIONS
12 GOINGS AT 250mm EACH19 RISERS AT 178.95mm EACH6 WINDERS FORMING 180° TURN
SLIP RESISTANCE TREATMENT TO STAIR TREADS INACCORDANCE WITH AS4586 AND BCA TABLE 3.9.1.3
AAW 2124
VOIDRO
BE
720
820
820
820
FG 2113
BALCONY
2040 x 920GLAZEDOOR
LINEN
B
720
ROBE
P
MASTER BED
BED 2
BED 3
HA
LL
WA
Y
HALLWAY
BATHWIR
ENS
HA
LL
WA
Y
ASW 0715 ASW 0727 ASW 0709
ASW
072
4
DN
SHR
75mm RAISED FLFOR BATH
CSD 720
CSD 720
CPBD
AAW
070
6
NICH
E
S
S
DP
DP
DP
WORKING DRAWINGS
PROPOSED UPPER FLOOR PLAN
SCALE 1:100 @ A3
BUILDING SCHEDULE
ROOFCOLORBOND CUSTOM ORB ROOF. PITCH22.5° AND 450 EAVES
WALLSTIMBER FRAME CONSTRUCTION WITHBRICK OUTER WALL TO GROUND FLOORAND HEBEL OUTER WALL TO UPPERFLOOR
CEILING HEIGHT3.0m TO GROUND FLOOR AND 2.7m TOUPPER FLOOR
FLOORCONCRETE SLAB
WINDOWSPOWDER COATED ALUMINIUM AWNINGAND SLIDING AS SPECIFIEDWINDOW HEAD HEIGHT - 2.7m TOFRONT ELEVATION AND 2.4m TO ALLOTHER ELEVATIONS
ALL INTERNAL DOORS ARE 2.4m HIGH
N
DP
DP
RAINWATERHEAD
11810
470
1080
6700
3560
1550
6700
190
190
470
1080
190
3650
90
4000
90
2050
190
1550
190
3650
90
1900
90
1000
190
950
600
10260
1550
190
6000
90
3190
190
90 5
10
2150
190
1990
50
4100
90
3050
190
1550
6425
610
3225
1550
4140
2410
150
3560
13150
1902100
904990
902210903200
190
1902100
90910
903610901800
190
3410 470 1500 1300 3380 950
1905000
1901300
1903900
190
1905000
901500
901000
902810
190
900 2410 780 1000290
1300 660 2650 970
1800
800
600
600
300
600
600
2110
1310
250
600
300600
500
300
SMOKE DETECTOR
INTERCONNECTED
HARDWIRED WITH B/BACKUP
FLOOR WASTE
HWS
MB
METER BOX
HOT WATER SERVICE
LEGEND
GT
GARDEN TAP
ACAC UNIT
GP
RWP
RAIN WATER PUMP
DOWN PIPEDP
S
GAS POINT
NBNNATIONAL BROADBAND
NETWORK
ESSELECTRICITY SAFETY SWITCH
EXHAUST FAN
1901800
903110
901800
903600
190
903990
1902900
902510
903990
50950
902100
190
50
2000
90
1010
1550
190
6000
90
2300
90
1400
190
1550
190
6000
90
900
90
2800
190
P
SHR
LA
UN
DR
Y C
HU
TE
TH
RO
UG
H V
AN
ITY
CA
BIN
ET
TO
LA
UN
DR
Y B
EL
OW
3
0312
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
MH
3180
ACUNIT
ASD 2127-3(STACKER)
600
WORKING DRAWINGS
MURRELL ROAD
ELEVATION
SCALE 1:100 @ A3
SOUTH
ELEVATION
SCALE 1:100 @ A3
4
0412
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
WH
WH
CL
CL
2700
3000
2100 2700
PANEL LIFTDOOR
950x470mm BRICK PIER WITH 'SCYON MATRIX' OR SIMILAR
COLORBOND CUSTOM ORBROOF PITCH 22.5° 450 EAVES
ALUMINUMAWNING WINDOW
470x950mm BRICK PIER WITH STACKERSTONE CLADDING AS SELECTED
BRICK VENEER WALL WITHRENDERED FINISH AS SELECTED
HEBEL VENEER WALL WITHRENDERED FINISH AS SELECTED
ALUMINUMAWNING WINDOWS
COLORBOND CUSTOM ORBROOF PITCH 22.5° 450 EAVES
ALUMINUM FIXEDWINDOW
ALUMINUMFIXED WINDOW
ALUMINUM SLIDINGDOOR (STACKER)
ALUMINUMGLAZED DOOR
1000mm HIGH GLASSBALUSTRADE AS SELECTED
WH
WH
CL
CL
FL
FL
ALUMINUMSLIDING WINDOWS
ALUMINUM SLIDINGDOOR (STACKER)
ALUMINUMAWNING WINDOWS
ALUMINUMSLIDING WINDOWS
BRICKVENEER WALL
HEBEL VENEER WALL WITHRENDERED FINISH AS SELECTED
COLORBOND CUSTOM ORBROOF PITCH 22.5° 450 EAVES
4Nos 150. SQ. TIMBER POSTS
2700
2400
2700
3000
COLORBONDROLLER DOOR
PARAPET
3400
FIXEDOBS
1700
350SQ. BRICK PIER
FLFL
GDCL
FL2700
3000
FL
3000
2700
210027003400
WH
CLPARAPET
FL
GD
CL
FL
380
CEILING LINING
70 x 45 MGP10 PURLINS AT 1200mm MAXCTS (900mm MAX END CTS)
ROOF TRUSSES AT 1200mm MAX CTS AS PERTRUSS MANUFACTURERS SPECIFICATIONS
BRICKOUTER WALL
300mm WIDE BOX GUTTER ON 20mm MINIMUM 100DEEP GUTTER BOARD WITH FALL TO SUMP.
SUPPORTED VIA GALV STRAPS AT 600mm MAX CTS.
FOLDED METAL FLASHING
COLORBOND CUSTOM ORB ROOFSHEETING AT 22.5° SLOPE
R2.0 BLANKET LAPPED OVER PERLINS
CEILING LEVEL
TYPICAL BOX
GUTTER DETAIL
SCALE 1:20 @ A3
WORKING DRAWINGS
WEST ELEVATION
SCALE 1:100 @ A3
EAST ELEVATION
SCALE 1:100 @ A3
5
0512
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
WH
WH
CL
CL
FL
FL
WH
WH
CL
CL
FL
FL
GLASSDOOR
ALUMINUMSLIDING WINDOWS
COLORBOND CUSTOM ORBROOF PITCH 22.5° 450 EAVES
COLORBOND CUSTOM ORBROOF PITCH 22.5° 450 EAVES
ALUMINIUM SLIDING WINDOW WITH OBSCURED GLAZING
ALUMINUMFIXED WINDOW
BOUNDARYWALL
HEBEL VENEER WALL WITHRENDERED FINISH AS SELECTED
950x470mm BRICK PIER WITH 'SCYON MATRIX' OR SIMILAR
1000mm HIGH GLASSBALUSTRADE AS SELECTED
BRICKVENEER WALL
BRICKVENEER WALL
HEBEL VENEER WALL WITHRENDERED FINISH AS SELECTED
ALUMINUMAWNING WINDOW
1000mm HIGH GLASSBALUSTRADE AS SELECTED
470x950mm BRICK PIER WITH STACKERSTONE CLADDING AS SELECTED
4Nos 150. SQ. STEEL POSTS
2700
3000
2700
3000
3501SQ. BRICK PIER
2400
2700FIXED
OBS
1700
2400
2700FIXED
OBS
1700
CL
FL
24003000
GD
FL
380
RAINWATERHEAD
PIT
CH
22.5
°
PIT
CH
22.5
°
PIT
CH
22.5
°
PITCH 22.5°
PITCH 22.5°
PITCH 22.5°
PIT
CH
22.5
°P
ITC
H 2
2.5
°
PITCH 22.5°PITCH 22.5°
PITCH 22.5°
DP
DPDP
DP
DP
DP
DP
WORKING DRAWINGS
LOWER FLOOR ROOF LAYOUT PLAN
SCALE 1:100 @ A3
SMOKE DETECTOR
INTERCONNECTED
HARDWIRED WITH B/BACKUP
FLOOR WASTE
HWS
MB
METER BOX
HOT WATER SERVICE
LEGEND
GT
GARDEN TAP
ACAC UNIT
GP
RWP
RAIN WATER PUMP
DOWN PIPEDP
S
GAS POINT
NBNNATIONAL BROADBAND
NETWORK
ESSELECTRICITY SAFETY SWITCH
EXHAUST FAN
6
0612
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
300 WIDE BOX GUTTER
SAFETY GLAZING REQUIRED FOR HUMAN IMPACT AREASINCLUDING ADJACENT TO BATHS OR SHOWERS TO BE INACCORDANCE WITH BCA CLAUSE 3.6.4 (TO COMPLY WITH THEBCA PERFORMANCE REQUIREMENT 2.1.1)
BRICK MASONRY
- TO COMPLY WITH AS3700 / AS4773.1 AND AS4773.2- DPC TO BE IN ACCORDANCE WITH SECTION 3.3.5- MASONRY UNITS, MORTAR MIX, MORTAR JOINTS,
CAVITIES, WEEP HOLES, WALL TIES TO BE INACCORDANCE WITH SECTION 3.3.5
- (TO COMPLY WITH BCA PERFORMANCE REQUIREMENT2.1.1, 2.2.2)
- EXHAUST DISCHARGE INTO ROOF SPACE TOCOMPLY WITH BCA CLAUSE 3.8.7.3 ANDVENTILATION OF ROOF SPACE TO BE INACCORDANCE WITH BCA CLAUSE 3.8.7.4 (TO COMPLYWITH BCA PERFORMANCE REQUIREMENT 2.4.7)
- PLIABLE BUILDING MEMBRANE INSTALLED IN THEEXTERNAL WALL
-- TO COMPLY WITH AS/NZS 4200.1-- IS INSTALLED TO AS4200.2-- TO BE LOCATED ON THE EXTERIOR SIDE OF
THE PRIMARY INSULATION LAYER OF WALLASSEMBLIES THAT FORM THE EXTERNALENVELOPE OF A BUILDING (TO COMPLY WITHTHE BCA PERFORMANCE REQUIREMENT 2.4.7)
- THE FLOW RATE AND DISCHARGE OF EXHAUSTSYSTEMS SHOULD BE
-- NOT LESS THAN 25 l/s FOR BATHROOM /SANITARY COMPARTMENT
-- NOT LESS THAN 40 l/s FOR KITCHEN ORLAUNDRY
-- THE DISCHARGE FROM THE BATHROOM /SANITARY COMPARTMENT OR LAUNDRY MUSTBE DIRECTLY OR VIA A SHAFT / DUCT TOOUTDOOR AIR OR TO A ROOF SPACE WHICHCOMPLIES WITH SECTION 3.7.8.4 (TO COMPLYWITH THE BCA PERFORMANCE REQUIREMENT2.4.7.)
VENTILATION OF ALL ROOMS INCLUDING- SIZE AND LOCATION OF ALL NATURAL OPENINGS- EXHAUST FROM THE SANITARY COMPARTMENTS- THE AIR LOCK REQUIRED FOR ANY SANITARY
COMPARTMENT OPENING INTO A KITCHEN ORPANTRY
TO COMPLY WITH BCA PERFORMANCE REQUIREMENT2.4.5
PIT
CH
22.5
°
PITCH 22.5°
PITCH 22.5°
PITCH 22.5°
PIT
CH
22.5
°
PIT
CH
22.5
°
PIT
CH
22.5
°
PITCH 22.5°
DP
DP
DP
DP
RAINWATERHEAD
WORKING DRAWINGS
UPPER FLOOR ROOF LAYOUT PLAN
SCALE 1:100 @ A3
SMOKE DETECTOR
INTERCONNECTED
HARDWIRED WITH B/BACKUP
FLOOR WASTE
HWS
MB
METER BOX
HOT WATER SERVICE
LEGEND
GT
GARDEN TAP
ACAC UNIT
GP
RWP
RAIN WATER PUMP
DOWN PIPEDP
S
GAS POINT
NBNNATIONAL BROADBAND
NETWORK
ESSELECTRICITY SAFETY SWITCH
EXHAUST FAN
7
0712
CONTRACTORS ARE TO VERIFY ALL DIMENSIONS AND LEVELS ON THE DRAWING BEFORECOMMENCING ANY WORK. ANY DISCREPANCIES OR CONTRADICTIONS WILL BE REPORTED TOTHE BUILDER / DESIGNER IMMEDIATELY. FIGURED DIMENSIONS WILL TAKE PREFERENCE TOSCALE. THESE PLANS SHALL BE READ IN CONJUNCTION WITH ALL OTHER RELEVANTDOCUMENTATION, i.e.: SPECIFICATIONS, SCHEDULES, CONSULTANTS AND AUTHORITIES'REPORTS ETC.
SITE ADDRESS
DATE
DRAWING No.
SHEET OF
105 MURRELL ROAD, MODBURYHEIGHTS SA
PROJECT / DRAWING PARTICULARS
PROPOSED 1 No. DOUBLESTOREY RESIDENCE
REV PARTICULARS DATE
REV
KCW-RDH-18004 - 0
05 SEPTEMBER 2019
6
ROCKDALEHOMES
23.04.20190 For planning approval15.05.20191 Front windows amended
05.06.20192 Set backs revised as perdiscussion with client
12.07.20193 Total wall height reduced as perCouncil comments.
01.08.20194 Working drawings12.08.20195 WD revised as per client
comments05.09.20196 Energy efficiency notes added
300 WIDE BOX GUTTER