    CE-415-Lecture 4

    Lecturer Ms RabiyaSemester 6

    7 Feb 11 10 Jun 11

    I saw the angel in themarble and carved until Iset him free.Michelangelo

  • 8/12/2019 3- Road Const

    2/27

    3/15/2011

    oa cons ruc on anConstruction equipmentConstruction of road

  • 8/12/2019 3- Road Const

    3/27

    3/15/2011

    Roman & Greek roads

    HISTORY OF ROADSHISTORY OF ROADS

    The oldest road was constructed from Knossues to Leben

    Stone slab

    Longitudinaldrain

    Limeconcrete

    throungh Crete in 2000 BC.

    The Romans built Britain's first proper roads. After the Romansleft they were allowed to decay because people forgot how torebuild and repair them.

    Laid well above the ground levelStraight, cambered and composed of multiple layers, wellcompacted Lime as a stabilization agentWidth was 5.5 m

    Trsa uet's work

    Broken stone ,25 mmEdge stone

    Longitudinaldrain

    Chamber

    building his roads in trenches, so that they could be accessed from the sides, which undermineddrainage principle.Random use of large stones result in differential settlementsintroduced a system of continuous maintenance, where a roadman was allocated a section of roadto be kept up to a standard

  • 8/12/2019 3- Road Const

    4/27

    3/15/2011

    HISTORY OF ROADSHISTORY OF ROADS

    Modern tarred roads were the result of the work of two Scottishengineers, Thomas Telford and John Loudon McAdam. Telford designed the system of raising the foundation of the road in thecenter to act as a drain for water.

    Thomas Telford born 1757 im roved the method of buildinroads with broken stones by analyzing stone size/thickness , road traffic, road alignment and gradient slopes. Eventually his

    design became the norm for all roads everywhere.

    broken stones laid in symmetrical, tight patterns and covered with small stones to create a hard surface. McAdam's design,called "macadam roads," provided the greatest advancement inroad construction.

  • 8/12/2019 3- Road Const

    5/27

    3/15/2011

    HISTORY OF ROADSHISTORY OF ROADS broken stone,60 mmGravel/broken stone ,20mm

    John Loudon McAdamUse of angular aggregates strong interlockingWell graded material used CompactionIdea of impermeable ,durable binder

    broken stone,20 mm

    broken stone, 75mm

  • 8/12/2019 3- Road Const

    6/27

    3/15/2011

    Crawler Bulldozer HoeRotary Tiller Disc harrows

  • 8/12/2019 3- Road Const

    7/27

    3/15/2011

    Truck mountedTruck propelled Self propelled

  • 8/12/2019 3- Road Const

    8/27

  • 8/12/2019 3- Road Const

    9/27

    3/15/2011

    Core cutter Sand cone

    Nuclear guage

  • 8/12/2019 3- Road Const

    10/27

    3/15/2011

    Hydraulic Sweeping Machine

  • 8/12/2019 3- Road Const

    11/27

    3/15/2011

    Constant rate/volume/pressure

    Suitable distribution mechanism

    Smooth surface finish, blemish free

  • 8/12/2019 3- Road Const

    12/27

    3/15/2011

    Pulverization stabilization purposes degree of pulv.Mixing in place method or stationary plant - manualBinder spraying spray rate & pattern

    Check for double overlap (d) Check for triple overlap

  • 8/12/2019 3- Road Const

    13/27

    3/15/2011

    Rolling & compaction Normal camber, R start from outer edge towards central lineSuper elevated stretch, R start from inner to outer edgeGrade/cross slopeIn situ densities

    Curing time for concrete /bitumen , no loading allowLimitations extreme weather is not suitable

    Foggy, rainy, windy, low temperatureConstruction technique / practices matters

  • 8/12/2019 3- Road Const

    14/27

    3/15/2011

    Cut/fillo Cleaning & grubbing -150mm , vegetation & existing

    structureso Excavation for road & draino m an men cons ruc on orrow p so Replacement of weak soils replaced by quality soil/higher

    CBR underlying weak layers not disturbed / replaced soilcompacted

  • 8/12/2019 3- Road Const

    15/27

    3/15/2011

    Invo ve eart wor vo ume, a ancing cuts i s, p anning economicamaterial hauls

    End area determination : subdivision of areas into geometric figuresrectangular, triangular, trapezoidal etc, precision =+/- 0.5%

    Average end area : precision =+/- 1.0%

  • 8/12/2019 3- Road Const

    16/27

    3/15/2011

  • 8/12/2019 3- Road Const

    17/27

    3/15/2011

  • 8/12/2019 3- Road Const

    18/27

    3/15/2011

    Conversion factor from compacted to bank cubic yards =0.9

  • 8/12/2019 3- Road Const

    19/27

    3/15/2011

    Information

    materialsAve haul distance

    Type of equipmentconsidered

  • 8/12/2019 3- Road Const

    20/27

    3/15/2011

    on ro s unwan e proper es o su gra e, excess vecompressibility, permeability, frost susceptibility, settlement,volume change and so on.

    Mechanical soil stabil. : soils of diff. plasticity indicesor aggregates of desired gradation ,mixed with existingmateria .

    Stabil. With cement additives & chemicals:

    using lime, concrete or ash to convert poorer soils into astrong impermeable medium.

    suspended in a finely divided condition in an aqueous mediumand stabilised by suitable materialChemicals like: phosphoric acid, calcium chloride , sodiumchloride etc

  • 8/12/2019 3- Road Const

    21/27

    3/15/2011

    Thermal stabilization

    Geotextiles : to provide drainage, reinforcement insurface dressing, erosion control & prevent crack

  • 8/12/2019 3- Road Const

    22/27

    3/15/2011

    In a batch plant (Figure) , the aggregates are heated and sorted (by screening) into different sizes. They are thenrecombined (batched) in a pugmill in precise proportions(by weight) according to a mix design. A measured quantityof asphalt cement is added and mixed with the aggregate.

  • 8/12/2019 3- Road Const

    23/27

    3/15/2011

    In a drum plant (Figure ), a cold feed

    system of individual bins and precisefeeders proportion the aggregates. Thecombined aggregates, along with asphaltcement are continuously fed into a drumdryer where the aggregates are dried and mixed with the asphalt. The resultantmixture is conveyed to a holding silowhere it is then loaded into haulingvehicles.

  • 8/12/2019 3- Road Const

    24/27

    3/15/2011

  • 8/12/2019 3- Road Const

    25/27

    3/15/2011

    Heavy duty fourbin feeder unit

    Inclined Sliner beltconveyer

  • 8/12/2019 3- Road Const

    26/27

  • 8/12/2019 3- Road Const

    27/27

    3/15/2011

    Truck Mounted Concrete Batching Mixing Plant

    Concrete Batching Mixing Plant with Radial

    Scrapper