OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.1EXISTING FACILIT Y CONDITIONS
the focus of this chapter is on the marquam Hill campus where most of oHSu’s buildings are located. the process of building condition assessment is discussed, and each building is rated to enable assessment of its future uses. in addition to the physical condition of a building, its historical significance and its location also play a part in deciding upon its future. definitions of twenty-year facilities needs in the next chapter are used in conjunction with this assessment of building conditions to suggest logical scenarios for the use, adaptation or replacement of each building.
3. ExiSting facility conditionS
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.2 EXISTING FACILIT Y CONDITIONS
Campus Development Timeline
1900 302010 40 501931
the university’s first outpatient clinic building opens, now Sam Jackson Hall.
1939
oHSu library is opened (now oHSu auditorium).
third and final phase of mackenzie Hall completed (the western wing).
State tuberculosis Hospital opens (now campus Services Building).
1949
Baird Hall opens to house the department of physiology and administrative offices.
1954
crippled children’s division opens, now the child development and rehabilitation center (cdrc).
1956
the university of oregon dental School moves from northeast oregon Street to its present location on marquam Hill.
medical School Hospital opens (currently the western wing of oHSu Hospital). doernbecher children’s Hospital moved to the top three floors.
1913
Willamette university and the university of oregon merge programs to form the university of oregon medical School.
1919
the university of oregon medical School moves from downtown portland to its present location on marquam Hill in southwest portland.
the first building, mackenzie Hall, was named after Kenneth a.J. mackenzie, md, the railroad’s surgeon who had convinced the railroad company to donate the worthless land on top of the hill. the first class had 66 students, and a volunteer faculty of more than 40 instructors. the university of oregon in Eugene begins offering courses in nursing.
1922
Second phase of mackenzie Hall is completed.
1923
the new multnomah county Hospital, built for $1.1 million, opens. (the building is now called multnomah Hall.)
1924
oregon Journal publisher Sam Jackson donates 88 acres adjacent to the university for “healing of the sick and crippled and recreation of the public and play of children.”
1926
25 acres of the Sam Jackson donation is deeded to the united States government as the site for a veterans hospital.
doernbecher children’s Hospital opens in what is now dillehunt Hall. the first children’s hospital in the northwest is funded from a $200,000 donation from furniture manufacturer frank doernbecher.
1927
Emma Jones Hall opens as a dormitory for nursing students.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.3EXISTING FACILIT Y CONDITIONS
2000807060 901960
Student activities center is built, now the oHSu Student center. an indoor pool was added in 1980.
1962
medical research Building (mrB) complete.
1963
oregon regional primate research center opens on 163 acres west of portland.
1969
multnomah county Hospital adds a six-story wing to the north.
1972
Basic Science Building is completed.
the East wing of oHSu Hospital opens.
1973
multnomah county Hospital is transferred from the county to the state and becomes multnomah pavilion (mnp) and the medical School Hospital becomes university Hospital (south), now oHSu Hospital (oHS).
1983
Shriners children’s Hospital opens on land leased from oHSu.
1987
construction is completed on the vollum institute for advanced Biomedical research.
1990
dotter institute is established at oHSu to honor the pioneer of interventional radiology.
1991
casey Eye institute opens on marquam Hill.
the Biomedical information communication center (Bicc) is completed.
1992
the vamc skybridge is completed.
the School of nursing building opens.
1993
physicians pavilion opens on marquam Hill.
1995
oHSu becomes a public corporation and separates from the oregon State System of Higher Education.
1998
the mark o. Hatfield research center is dedicated.
doernbecher children’s Hospital is opened.
2003
marquam Hill is designated a “plan district” by the portland city council.
2004
the Schnitzer investment corporation donates nearly 20 acres of riverfront property in South Waterfront to oHSu.
2005
Biomedical research Building (BrB) opens on marquam Hill.
2006
center for Health & Healing (cHH), one of oregon’s greenest buildings, opens on the South Waterfront.
city of portland’s aerial tram begins operating between oHSu’s marquam Hill campus and South Waterfront.
peter o. Kohler pavilion opens as state-of-the-art patient care facility on marquam Hill.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.4 EXISTING FACILIT Y CONDITIONS
Facilities Condition Assessment
FACiliTieS COnDiTiOnoHSu facilities staff tracks the extent of outstanding maintenance on each building relative to core-and-shell insured replacement values. this information has been used to create a facilities condition index (fci). under the fci, the condition of each building is classified as ‘good’ if the cost of outstanding maintenance is less than 5% of the replacement value of a building; ‘fair’ if between 5% and 30%; and ‘poor’ if greater than 30% of replacement value.
although a helpful guide to the useful life of a building, the facilities condition index must be tempered by considerations of historical significance, and a building’s role, if any, in campus infrastructure systems. overall investment priorities will influence decisions to improve, remodel or replace a building. another consideration is the intrinsic flexibility of each building; its capacity for adaptation of its spaces to other uses.
poor (>30%)good fair 1 fair 2
5% 10% 30%
eXiSTing BUilDingS DeemeD DeFiCienTmarquam Hill campus buildings that received an fci score that rated as ‘poor’ are as follows: dillehunt, multnomah pavilion, Sam Jackson, Emma Jones, medical research Building, School of dentistry, mackenzie Hall, Baird Hall, gaines Hall, auditorium, and the physical plant.
this scoring was based on the total value of necessary maintenance yet to be implemented, and includes mechanical, electrical, and structural improvements related to the physical operation of the building. the building inventory was classified under the categories shown on the “facilities condition” plan.
Outstanding maintenance as a percentage of building value.
Facilities Condition index
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.5EXISTING FACILIT Y CONDITIONS
Facilities Condition (index score)
poor (>30%)
fair 2 (10-30%)
fair 1 (5-10%)
good (0-5%)
not applicable
historical significance, to be validated
architect evaluation of building FCI, to be validated*
*
*
*
*
*
*
*
0 300’N
SON
CSBBTE
GH CDRC
VA
DCH
OSC
SOD CEI
OHS
KPV
PPVSJH
MNP
EJH
HRCBICC
PP
BH
BRB
MRB
VIABR
AUD
RJH
sw ca
mpus drive
sw campus drive
sw us veterans hospital road
sw gaines street
sw sa
m jackso
n park ro
ad
sw terwilliger boulevard
MAC
DH
CDW
MBS
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.6 EXISTING FACILIT Y CONDITIONS
Hospital Ancillary Space these are spaces for the review, evaluation, diagnosing, and treatment of patients at oHSu requiring a stay in excess of 24 hours. Hospital ancillary space includes examination rooms, diagnostic imaging rooms, surgical suites, laboratories supporting surgery and diagnostic services, post anesthesia care unit space, mother-baby patient rooms, short stay rooms, and support spaces related to these uses.
Faculty faculty offices and any related support spaces are included.
Research research related laboratories with their associated offices and support spaces are included.
Central Services Spaces for the management and administration spaces include the office of the university president, legal department, real estate, design, construction, facilities maintenance, and traffic departments. also included are any departments working on the development and maintenance of oHSu campuses.
Student Space Student space includes classroom, laboratories, and office spaces for the four schools. limited examination, treatment and research spaces related to student instruction are also covered in this category.
Summary Assessments of Buildings
in the following pages is a summary of the condition of each building pertinent to the 20-year plan for marquam Hill campus, noting year of construction, size given in gross Square feet (gSf) or assignable Square feet (aSf) as appropriate, principal uses, fci rating and anticipated future actions.
Inpatient Space inpatient space consists of bedrooms for overnight patients at oHSu, with the exception of the mother-Baby patient rooms. also included are support spaces related to patient bedrooms, such as bathrooms, nurse’s stations, and waiting areas on patient floors.
Outpatient Space these are spaces for the review, evaluation, diagnosing, and treatment of patients not requiring a stay longer than 24 hours during the course of their treatment. outpatient space includes examination rooms, diagnostic imaging rooms, surgical suites, laboratories supporting surgery and diagnostic services, and offices for staff in each of these areas.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.7EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
originally constructed in 1949, Baird Hall contains approximately 45,715 gSf on four floors. it was built to house the university’s administration and it continues to include the office of the president and senior executive leadership. other than administration, the main uses are: dermatology, obstetrics & gynecology, perinatology, and Student Services/affairs.
overall condition of the facility indicates normal wear for a building of its age. With a fci rating of 44%, Baird Hall has the fourth worst rating of university buildings. given its age and condition. Baird Hall will need extensive renovation if it is not replaced.
Baird Hall (BH)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
45,715 Gross Exterior Square Footage8,294,000$ 2011-2020 Deferred Maintenance Event Cost
19,064,150$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
43.51% FCI
33,368 Square Footage4,065,000$ 2011-2020 Deferred Maintenance Event Cost8,917,364$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot45.59% FCI
90,627 Square Footage6,124,000$ 2011-2020 Deferred Maintenance Event Cost
13,115,246$ Core & Shell Insured Replacement Value145$ Replacement Cost / Square Foot
46.69% FCI
31,134 Square Footage4,237,000$ 2011-2020 Deferred Maintenance Event Cost
Physical Plant
Gaines Hall
Old Library & Auditorium
Baird Hall
4,237,000$ 2011-2020 Deferred Maintenance Event Cost8,304,187$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot51.02% FCI
44 % FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.8 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1991, this facility contains 85,583 gSf on six floors. Serving as the main campus library, Bicc accommodates: medical informatics, Educational communications, information technology group and the library Services for students, faculty and staff. overall condition of the facility is rated ‘good’ with a fci rating of 2.5% reflecting some wear and tear.
Biomedical information and Communications Center (BiCC)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 74 0%
Faculty 8,953 20%Research 6,991 16%Central 4,137 9%Student 23,919 54%
100%Assignable Square Footage 44,075 sfCirculation, wall area, etc. 41,507 sf
Gross Bldg Area 85,583 sf
BIOMEDICAL INFORM COMMUNITY CTR
23,91925,000
30,000Assignable Square Footage by Category
20%
16%
10%54%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 74
8,953
6,991
4,137
23,919
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
20%
16%
10%54%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 74 0%
Faculty 8,953 20%Research 6,991 16%Central 4,137 9%Student 23,919 54%
100%Assignable Square Footage 44,075 sfCirculation, wall area, etc. 41,507 sf
Gross Bldg Area 85,583 sf
BIOMEDICAL INFORM COMMUNITY CTR
23,91925,000
30,000Assignable Square Footage by Category
20%
16%
10%54%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 74
8,953
6,991
4,137
23,919
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
20%
16%
10%54%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
85,583 Square Footage910,000$ 2011-2020 Deferred Maintenance Event Cost
35,691,534$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
2.55% FCI
339,694 Square Footage177,000$ 2011-2020 Deferred Maintenance Event Cost
106,080,000$ Core & Shell Insured Replacement Value312$ Replacement Cost / Square Foot
0.17% FCI
99,149 Square Footage1,088,000$ 2011-2020 Deferred Maintenance Event Cost
41,492,561$ Core & Shell Insured Replacement Value418$ Replacement Cost / Square Foot
2.62% FCI
10,443 Square Footage331,000$ 2011-2020 Deferred Maintenance Event Cost
BICC
BRB
Modular Building Structure
School of Nursing
331,000$ 2011-2020 Deferred Maintenance Event Cost3,551,951$ Core & Shell Insured Replacement Value
340$ Replacement Cost / Square Foot9.32% FCI
50,964 Square Footage3,158,000$ 2011-2020 Deferred Maintenance Event Cost
21,223,166$ Core & Shell Insured Replacement Value416$ Replacement Cost / Square Foot
14.88% FCI
98,169 Square Footage4,817,000$ 2011-2020 Deferred Maintenance Event Cost
40,940,400$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
11.77% FCI
Campus Services Building
Vollum Institute
2.5% FCI
© Cyril “Kent” Anderson
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.9EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 85 0%
Faculty 10,001 9%Research 93,644 80%Central 7,861 7%Student 4,980 4%
100%Assignable Square Footage 116,570 sfCirculation, wall area, etc. 223,124 sf
Gross Bldg Area 339,694 sf
BIOMEDICAL RESEARCH BUILDING (BRB)
93,644
70,000
80,000
90,000
100,000Assignable Square Footage by Category
9%
80%
7% 4%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 85
10,001
93,644
7,8614,980
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
9%
80%
7% 4%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
Biomedical Research Building (BRB)
85,583 Square Footage910,000$ 2011-2020 Deferred Maintenance Event Cost
35,691,534$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
2.55% FCI
339,694 Square Footage177,000$ 2011-2020 Deferred Maintenance Event Cost
106,080,000$ Core & Shell Insured Replacement Value312$ Replacement Cost / Square Foot
0.17% FCI
99,149 Square Footage1,088,000$ 2011-2020 Deferred Maintenance Event Cost
41,492,561$ Core & Shell Insured Replacement Value418$ Replacement Cost / Square Foot
2.62% FCI
50,964 Square Footage3,158,000$ 2011-2020 Deferred Maintenance Event Cost
21,223,166$ Core & Shell Insured Replacement Value416$ Replacement Cost / Square Foot
14.88% FCI
BICC
BRB
Campus Services Building
School of Nursing
Built in 2005, the Biomedical research Building contains 339,694 gSf of total area over 7 usable floors. the building consists of over 162,000 sf of research/laboratory space and an advanced imaging research center that is 16,000 sf. a few of the multidisciplinary teams of scientists and clinicians that work together in this building are from Knight cancer institute, comparative medicine, pediatric and neurology departments.
With a fci rating of .17%, this lEEd certified research facility is in excellent condition.
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 85 0%
Faculty 10,001 9%Research 93,644 80%Central 7,861 7%Student 4,980 4%
100%Assignable Square Footage 116,570 sfCirculation, wall area, etc. 223,124 sf
Gross Bldg Area 339,694 sf
BIOMEDICAL RESEARCH BUILDING (BRB)
93,644
70,000
80,000
90,000
100,000Assignable Square Footage by Category
9%
80%
7% 4%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 85
10,001
93,644
7,8614,980
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
90,000
100,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
9%
80%
7% 4%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
0.17% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.10 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in1962 and previously named the Hearing & Speech institute, this building was purchased in 2005. BtE contains 17,828 gSf on three floors. review of the facility indicates that this building could be demolished and it’s programs backfilled into other buildings.
Building 28 (BTe)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,574 37%
Faculty 2,798 29%Research 874 9%
Central 1,532 16%Student 925 10%
100%Assignable Square Footage 9,703 sf
Circulation, wall area, etc. 8,125 sfGross Bldg Area 17,828 sf
BUILDING 28 (BTE)
3,574
2,7983,000
3,500
4,000Assignable Square Footage by Category
37%
29%9%
16%
9%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0
2,798
874
1,532
925
0
500
1,000
1,500
2,000
2,500
3,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
37%
29%9%
16% AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,574 37%
Faculty 2,798 29%Research 874 9%
Central 1,532 16%Student 925 10%
100%Assignable Square Footage 9,703 sf
Circulation, wall area, etc. 8,125 sfGross Bldg Area 17,828 sf
BUILDING 28 (BTE)
3,574
2,7983,000
3,500
4,000Assignable Square Footage by Category
37%
29%9%
16%
9%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0
2,798
874
1,532
925
0
500
1,000
1,500
2,000
2,500
3,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
37%
29%9%
16% AncillaryFaculty
Research
Central
Student
*
* no fci review/ rating done for BtE. architect evaluation shown.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.11EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1939 as an isolated hospital for tuberculosis patients, this facility contains 50,964 gSf on seven floors. this building houses central service functions of design & construction as well as the public Health & preventative medicine department and itg. With a fci rating of 15%, the building is considered to be in ‘fair’ condition, but given its age, it could be demolished and its programs backfilled into other buildings.
Campus Services Building (CSB)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 135 0%
Faculty 4,167 15%Research 5,954 22%
Central 11,244 41%Student 5,712 21%
100%Assignable Square Footage 27,212 sf
Circulation, wall area, etc. 18,503 sfGross Bldg Area 45,715 sf
BAIRD HALL (BH)
11,244
10,000
12,000Assignable Square Footage by Category
15%
22%
21%
Inpatient
Outpatient
Hospital Ancillary
Faculty
0 0 135
4,167
5,9545,712
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
15%
22%
41%
21%Hospital Ancillary
Faculty
Research
Central
Student
85,583 Square Footage910,000$ 2011-2020 Deferred Maintenance Event Cost
35,691,534$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
2.55% FCI
339,694 Square Footage177,000$ 2011-2020 Deferred Maintenance Event Cost
106,080,000$ Core & Shell Insured Replacement Value312$ Replacement Cost / Square Foot
0.17% FCI
99,149 Square Footage1,088,000$ 2011-2020 Deferred Maintenance Event Cost
41,492,561$ Core & Shell Insured Replacement Value418$ Replacement Cost / Square Foot
2.62% FCI
10,443 Square Footage331,000$ 2011-2020 Deferred Maintenance Event Cost
BICC
BRB
Modular Building Structure
School of Nursing
331,000$ 2011-2020 Deferred Maintenance Event Cost3,551,951$ Core & Shell Insured Replacement Value
340$ Replacement Cost / Square Foot9.32% FCI
50,964 Square Footage3,158,000$ 2011-2020 Deferred Maintenance Event Cost
21,223,166$ Core & Shell Insured Replacement Value416$ Replacement Cost / Square Foot
14.88% FCI
98,169 Square Footage4,817,000$ 2011-2020 Deferred Maintenance Event Cost
40,940,400$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
11.77% FCI
Campus Services Building
Vollum Institute
15% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.12 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 17,033 40%Hospital Ancillary 5,343 13%
Faculty 10,270 24%Research 7,934 19%
Central 928 2%Student 1,007 2%
100%Assignable Square Footage 42,515 sf
Circulation, wall area, etc. 51,136 sfGross Bldg Area 93,651 sf
CASEY EYE INSTITUTE (CEI)
17,033
14,000
16,000
18,000Assignable Square Footage by Category
40%
24%
19%
2% 2%
0
5,343
10,270
7,934
928 1,007
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
40%
13%24%
19%
Built in 1991, casey Eye institute contains 93,650 gSf on six floors and serves as the gateway to the marquam Hill campus from terwilliger Blvd. cEi is a world-recognized academic regional eye center that attracts top specialists from around the globe. cEi primarily houses ophthalmological research, adult and pediatric eye clinics. review of the facility indicates that this building is in fair condition with a rating of 14%
Casey eye institute (Cei)
265,289 Square Footage456,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.29% FCI
291,055 Square Footage6,175,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.27% FCI
501,064 Square Footage3,785,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.64% FCI
93,650 Gross Exterior Square Footage5,484,000$ 2011-2020 Deferred Maintenance Event Cost
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Doernbecher Childrens Hospital
5,484,000$ 2011-2020 Deferred Maintenance Event Cost39,055,796$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot14.04% FCI
Category ASF %Inpatient 0 0%
Outpatient 17,033 40%Hospital Ancillary 5,343 13%
Faculty 10,270 24%Research 7,934 19%
Central 928 2%Student 1,007 2%
100%Assignable Square Footage 42,515 sf
Circulation, wall area, etc. 51,136 sfGross Bldg Area 93,651 sf
CASEY EYE INSTITUTE (CEI)
17,033
14,000
16,000
18,000Assignable Square Footage by Category
40%
24%
19%
2% 2%
0
5,343
10,270
7,934
928 1,007
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
40%
13%24%
19%
14% FCI
© Laura Zeigen
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.13EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
located in the central district on portland’s South Waterfront at the foot of the aerial tram, cHH was built in 2005 and contains 421,000 gSf on sixteen floors. many oHSu Hospital and School of medicine faculty clinics and services are located in this building. the main lobby includes the casey optical Studio, a pharmacy, the daily café and coffee stand. the march Wellness spa and fitness center is located on the second floor. cHH has no fci rating because of its leased status when the fci was conducted.
Center For Health and Healing (CHH)
Category ASF %Inpatient 35 0%
Outpatient 61,448 28%Hospital Ancillary 70,035 32%
Faculty 18,025 8%Research 32,112 14%
Central 6,875 3%Student 33,181 15%
100%Assignable Square Footage 221,711 sf
Circulation, wall area, etc. 228,816 sfGross Bldg Area 450,527 sf
CENTER FOR HEALTH AND HEALING (CHH)
61,448
70,035
56,000
64,000
72,000
80,000Assignable Square Footage by Category
0%
28%14%
3% 15%
Inpatient
Outpatient
Hospital AncillaryFaculty
35
61,448
18,025
32,112
6,875
33,181
0
8,000
16,000
24,000
32,000
40,000
48,000
56,000
64,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
28%
32%8%
14%
3% 15% Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 35 0%
Outpatient 61,448 28%Hospital Ancillary 70,035 32%
Faculty 18,025 8%Research 32,112 14%
Central 6,875 3%Student 33,181 15%
100%Assignable Square Footage 221,711 sf
Circulation, wall area, etc. 228,816 sfGross Bldg Area 450,527 sf
CENTER FOR HEALTH AND HEALING (CHH)
61,448
70,035
56,000
64,000
72,000
80,000Assignable Square Footage by Category
0%
28%14%
3% 15%
Inpatient
Outpatient
Hospital AncillaryFaculty
35
61,448
18,025
32,112
6,875
33,181
0
8,000
16,000
24,000
32,000
40,000
48,000
56,000
64,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
28%
32%8%
14%
3% 15% Hospital AncillaryFaculty
Research
Central
Student
no fci review/ rating done for cHH. architect evaluation shown.*
*
© Cyril “Kent” Anderson
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.14 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1968, child development & rehabilitation center contains 119, 834 gSf on four floors. cdrc primarily houses pediatrics and child development & rehabilitation department offices as well as some inpatient space. review of the facility indicates that this building is in fair condition with a fci rating of 16%.
Child Development and Rehabilitation Center (CDRC)
Category ASF %Inpatient 924 2%
Outpatient 7,142 12%Hospital Ancillary 4,361 7%
Faculty 33,220 56%Research 6,887 12%
Central 1,730 3%Student 5,265 9%
100%Assignable Square Footage 59,529 sf
Circulation, wall area, etc. 60,305 sfGross Bldg Area 119,834 sf
CHILD DEVELOPMENT REHAB. CENTER (CDRC)
33,220
25,000
30,000
35,000Assignable Square Footage by Category
2% 12%7%
56%
12%
3% 9%Inpatient
Outpatient
Hospital AncillaryFaculty
924
7,142
4,361
6,887
1,730
5,265
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
56%
AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 924 2%
Outpatient 7,142 12%Hospital Ancillary 4,361 7%
Faculty 33,220 56%Research 6,887 12%
Central 1,730 3%Student 5,265 9%
100%Assignable Square Footage 59,529 sf
Circulation, wall area, etc. 60,305 sfGross Bldg Area 119,834 sf
CHILD DEVELOPMENT REHAB. CENTER (CDRC)
33,220
25,000
30,000
35,000Assignable Square Footage by Category
2% 12%7%
56%
12%
3% 9%Inpatient
Outpatient
Hospital AncillaryFaculty
924
7,142
4,361
6,887
1,730
5,265
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
56%
AncillaryFaculty
Research
Central
Student
265,289 Square Footage167,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.11% FCI
291,055 Square Footage6,118,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.23% FCI
501,064 Square Footage2,464,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.07% FCI
93,650 Gross Exterior Square Footage5,458,000$ 2011-2020 Deferred Maintenance Event Cost
39,055,796$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
13.97% FCI
119,833 Square Footage7,989,000$ 2011-2020 Deferred Maintenance Event Cost
49,975,571$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
15.99% FCI
31,513 Square Footage4,873,000$ 2011-2020 Deferred Maintenance Event Cost
13,342,325$ Core & Shell Insured Replacement Value423$ Replacement Cost / Square Foot
36.52% FCI
Child Development Rehab (CDRC)
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Dillehunt
Doernbecher Childrens Hospital
16% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.15EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
$$$
Facilities Condition Index
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1954, child development & rehabilitation center West contains 15,801 gSf on two floors. faculty offices for the Emergency medicine department occupy most of this space. review of the facility indicates this building will remain useful with moderate maintenance and repairs.
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 1,116 11%
Faculty 6,651 65%Research 0 0%
Central 286 3%Student 2,254 22%
100%Assignable Square Footage 10,308 sf
Circulation, wall area, etc. 5,494 sfGross Bldg Area 15,801 sf
CHILD DEVELOPMENT REHABILITATION WEST
6,651
5,000
6,000
7,000Assignable Square Footage by Category
11%
65%
3%22%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
1,116
0286
2,254
0
1,000
2,000
3,000
4,000
5,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
65%
3%22% Hospital
AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 1,116 11%
Faculty 6,651 65%Research 0 0%
Central 286 3%Student 2,254 22%
100%Assignable Square Footage 10,308 sf
Circulation, wall area, etc. 5,494 sfGross Bldg Area 15,801 sf
CHILD DEVELOPMENT REHABILITATION WEST
6,651
5,000
6,000
7,000Assignable Square Footage by Category
11%
65%
3%22%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
1,116
0286
2,254
0
1,000
2,000
3,000
4,000
5,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
65%
3%22% Hospital
AncillaryFaculty
Research
Central
Student
Child Development and Rehabilitation Center West (CDW)
* no fci review/ rating done for cdW. architect evaluation shown.
*
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.16 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1924 as the original doernbecher children’s Hospital, dillehunt Hall contains 31,513 gSf on six floors. dillehunt houses clinical laboratories and associated administrative offices. With a fci rating of nearly 37%, dillehunt Hall is considered to be in ‘poor’ condition and is a candidate for demolition.
Dillehunt Hall (DH)
Category ASF %Inpatient 0 0%
Outpatient 1,270 7%Hospital Ancillary 13,997 81%
Faculty 1,718 10%Research 0 0%
Central 238 1%Student 0 0%
100%Assignable Square Footage 17,222 sf
Circulation, wall area, etc. 14,291 sfGross Bldg Area 31,513 sf
DILLEHUNT HALL (DH)
13,997
12,500
15,000
7%
10%
2%
Inpatient
Outpatient
Hospital Ancillary
0
1,2701,718
0 238 00
2,500
5,000
7,500
10,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
7%
81%
10%
2%
Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 1,270 7%Hospital Ancillary 13,997 81%
Faculty 1,718 10%Research 0 0%
Central 238 1%Student 0 0%
100%Assignable Square Footage 17,222 sf
Circulation, wall area, etc. 14,291 sfGross Bldg Area 31,513 sf
DILLEHUNT HALL (DH)
13,997
12,500
15,000
7%
10%
2%
Inpatient
Outpatient
Hospital Ancillary
0
1,2701,718
0 238 00
2,500
5,000
7,500
10,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
7%
81%
10%
2%
Hospital Ancillary
Faculty
Research
Central
Student
265,289 Square Footage167,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.11% FCI
291,055 Square Footage6,118,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.23% FCI
501,064 Square Footage2,464,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.07% FCI
93,650 Gross Exterior Square Footage5,458,000$ 2011-2020 Deferred Maintenance Event Cost
39,055,796$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
13.97% FCI
119,833 Square Footage7,989,000$ 2011-2020 Deferred Maintenance Event Cost
49,975,571$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
15.99% FCI
31,513 Square Footage4,873,000$ 2011-2020 Deferred Maintenance Event Cost
13,342,325$ Core & Shell Insured Replacement Value423$ Replacement Cost / Square Foot
36.52% FCI
Child Development Rehab (CDRC)
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Dillehunt
Doernbecher Childrens Hospital
37% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.17EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1998, doernbecher contains 291,055 gSf on seven floors. dcH houses pediatric inpatient and outpatient services. the fci rating is ‘good’ with a rating of 4%.
Doernbecher Children’s Hospital (DCH)
Category ASF %Inpatient 50,881 40%
Outpatient 37,909 30%Hospital Ancillary 32,296 25%
Faculty 3,446 3%Research 0 0%
Central 2,055 2%Student 565 0%
100%Assignable Square Footage 127,153 sf
Circulation, wall area, etc. 163,902 sfGross Bldg Area 291,055 sf
DOERNBECHER CHILDREN'S HOSPITAL (DCH)
50,88150,000
60,000Assignable Square Footage by Category
3%
0% 2%0%
Inpatient
Outpatient
Hospital Ancillary
37,909
32,296
3,446
02,055
5650
10,000
20,000
30,000
40,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
40%
30%
25%
3% 0%
Hospital Ancillary
Faculty
Research
Central
Student
Category ASF %Inpatient 50,881 40%
Outpatient 37,909 30%Hospital Ancillary 32,296 25%
Faculty 3,446 3%Research 0 0%
Central 2,055 2%Student 565 0%
100%Assignable Square Footage 127,153 sf
Circulation, wall area, etc. 163,902 sfGross Bldg Area 291,055 sf
DOERNBECHER CHILDREN'S HOSPITAL (DCH)
50,88150,000
60,000Assignable Square Footage by Category
3%
0% 2%0%
Inpatient
Outpatient
Hospital Ancillary
37,909
32,296
3,446
02,055
5650
10,000
20,000
30,000
40,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
40%
30%
25%
3% 0%
Hospital Ancillary
Faculty
Research
Central
Student
265,289 Square Footage456,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.29% FCI
291,055 Square Footage6,175,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.27% FCI
501,064 Square Footage3,785,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.64% FCI
93,650 Gross Exterior Square Footage5,484,000$ 2011-2020 Deferred Maintenance Event Cost
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Doernbecher Childrens Hospital
5,484,000$ 2011-2020 Deferred Maintenance Event Cost39,055,796$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot14.04% FCI
4% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.18 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Established in 1990 when the university purchased and renovated a former fire station, dotter institute contains 9,506 gSf on two floors. this small building comprises faculty offices and a few laboratories for the study of interventional therapy. dotter has a fci rating of approximately 9% and is considered to be in ‘fair’ condition.
Dotter interventional institute (DOT)
13,960 Square Footage1,783,000$ 2011-2020 Deferred Maintenance Event Cost6,769,942$ Core & Shell Insured Replacement Value
485$ Replacement Cost / Square Foot26.34% FCI
9,506 Square Footage336,000$ 2011-2020 Deferred Maintenance Event Cost
3,695,533$ Core & Shell Insured Replacement Value389$ Replacement Cost / Square Foot
9.09% FCI
120,412 Square Footage16,224,000$ 2011-2020 Deferred Maintenance Event Cost50,216,620$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.31% FCI
299,103 Square Footage25,580,000$ 2011-2020 Deferred Maintenance Event Cost
Medical Research Building
Dotter Memorial Building
Energy Management Center
Basic Science
25,580,000$ 2011-2020 Deferred Maintenance Event Cost87,347,355$ Core & Shell Insured Replacement Value
292$ Replacement Cost / Square Foot29.29% FCI
147,916 Square Footage20,100,000$ 2011-2020 Deferred Maintenance Event Cost61,686,889$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.58% FCI
112,017 Square Footage15,711,000$ 2011-2020 Deferred Maintenance Event Cost46,715,570$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot33.63% FCI
School of Dentistry
MacKenzie Hall
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 108 2%
Faculty 3,829 54%Research 0 0%
Central 509 7%Student 2,701 38%
100%Assignable Square Footage 7,147 sf
Circulation, wall area, etc. 2,359 sfGross Bldg Area 9,506 sf
DOTTER RESEARCH LAB (DOT)
3,829
3,500
4,000
4,500Assignable Square Footage by Category
2%
54%
38%
0 0108
0
509
2,701
0
500
1,000
1,500
2,000
2,500
3,000
3,500
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
54%
7%
38%
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 108 2%
Faculty 3,829 54%Research 0 0%
Central 509 7%Student 2,701 38%
100%Assignable Square Footage 7,147 sf
Circulation, wall area, etc. 2,359 sfGross Bldg Area 9,506 sf
DOTTER RESEARCH LAB (DOT)
3,829
3,500
4,000
4,500Assignable Square Footage by Category
2%
54%
38%
0 0108
0
509
2,701
0
500
1,000
1,500
2,000
2,500
3,000
3,500
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
54%
7%
38%
9% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.19EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1926 as a residence hall for nursing students, EJH contains 27,970 gSf on five floors. Emma Jones Hall houses family medicine faculty offices and classrooms. With a fci rating of nearly 60%, EJH has the highest (worst) rating of any oHSu building. this is a prime candidate for demolition.
emma Jones Hall (eJH)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 320 2%
Faculty 9,400 57%Research 1,111 7%
Central 208 1%Student 5,406 33%
100%Assignable Square Footage 16,445 sf
Circulation, wall area, etc. 11,524 sfGross Bldg Area 27,970 sf
EMMA JONES HALL (EJH)
9,400
7,000
8,000
9,000
10,000Assignable Square Footage by Category
2%
57%
7%1%
33%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0320
1,111
208
5,406
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
57%
7%1%
Faculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 320 2%
Faculty 9,400 57%Research 1,111 7%
Central 208 1%Student 5,406 33%
100%Assignable Square Footage 16,445 sf
Circulation, wall area, etc. 11,524 sfGross Bldg Area 27,970 sf
EMMA JONES HALL (EJH)
9,400
7,000
8,000
9,000
10,000Assignable Square Footage by Category
2%
57%
7%1%
33%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0320
1,111
208
5,406
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
57%
7%1%
Faculty
Research
Central
Student
210,910 Square Footage32,498,000$ 2011-2020 Deferred Maintenance Event Cost93,814,455$ Core & Shell Insured Replacement Value
445$ Replacement Cost / Square Foot34.64% FCI
144,915 Square Footage23,653,000$ 2011-2020 Deferred Maintenance Event Cost60,435,352$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot39.14% FCI
27,969 Square Footage5,086,000$ 2011-2020 Deferred Maintenance Event Cost8,477,582$ Core & Shell Insured Replacement Value
303$ Replacement Cost / Square Foot59.99% FCI
Emma Jones Hall
Multnomah Pavilion
Sam Jackson
60% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.20 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1931, gaines Hallcontains 33,368 gSf on four floors. it houses allied Health faculty and staff offices. With a fci rating of 46%, gH has the third worst rating of university buildings. gaines Hall will need extensive renovation if it is not demolished.
gaines Hall (gH)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 89 1%Hospital Ancillary 0 0%
Faculty 11,227 68%Research 1,147 7%
Central 154 1%Student 3,938 24%
100%Assignable Square Footage 16,555 sf
Circulation, wall area, etc. 16,813 sfGross Bldg Area 33,368 sf
GAINES HALL (GH)
11,227
10,000
12,000Assignable Square Footage by Category
68%7%1%
24%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 89 0
1,147
154
3,938
0
2,000
4,000
6,000
8,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
68%7%1%
24% AncillaryFaculty
Research
Central
Student
45,715 Gross Exterior Square Footage8,294,000$ 2011-2020 Deferred Maintenance Event Cost
19,064,150$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
43.51% FCI
33,368 Square Footage4,065,000$ 2011-2020 Deferred Maintenance Event Cost8,917,364$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot45.59% FCI
90,627 Square Footage6,124,000$ 2011-2020 Deferred Maintenance Event Cost
13,115,246$ Core & Shell Insured Replacement Value145$ Replacement Cost / Square Foot
46.69% FCI
31,134 Square Footage4,237,000$ 2011-2020 Deferred Maintenance Event Cost
Physical Plant
Gaines Hall
Old Library & Auditorium
Baird Hall
4,237,000$ 2011-2020 Deferred Maintenance Event Cost8,304,187$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot51.02% FCI
46% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.21EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1997, Hatfield research center contains 303,471 gSf on 12 floors. Hrc houses the Emergency department and offices for a variety of departments including Knight cancer institute, the department of neurology, and the Jungers center for neurosciences research. Hrc has the best fci rating (less than 1%) of hospital buildings and is in ‘good’ condition.
Hatfield Research Building (HRC)
Category ASF %Inpatient 0 0%
Outpatient 15,683 13%Hospital Ancillary 19,767 16%
Faculty 21,480 17%Research 55,191 45%
Central 4,273 3%Student 6,445 5%
100%Assignable Square Footage 122,840 sf
Circulation, wall area, etc. 180,631 sfGross Bldg Area 303,471 sf
HATFIELD RESEARCH CENTER (HRC)
55,191
48,000
56,000
64,000Assignable Square Footage by Category
0% 13%
16%
17%45%
3% 5%Inpatient
Outpatient
Hospital AncillaryFaculty
0
15,683
19,76721,480
4,2736,445
0
8,000
16,000
24,000
32,000
40,000
48,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
16%
17%45%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 15,683 13%Hospital Ancillary 19,767 16%
Faculty 21,480 17%Research 55,191 45%
Central 4,273 3%Student 6,445 5%
100%Assignable Square Footage 122,840 sf
Circulation, wall area, etc. 180,631 sfGross Bldg Area 303,471 sf
HATFIELD RESEARCH CENTER (HRC)
55,191
48,000
56,000
64,000Assignable Square Footage by Category
0% 13%
16%
17%45%
3% 5%Inpatient
Outpatient
Hospital AncillaryFaculty
0
15,683
19,76721,480
4,2736,445
0
8,000
16,000
24,000
32,000
40,000
48,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
16%
17%45%
Hospital AncillaryFaculty
Research
Central
Student
265,289 Square Footage456,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.29% FCI
291,055 Square Footage6,175,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.27% FCI
501,064 Square Footage3,785,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.64% FCI
93,650 Gross Exterior Square Footage5,484,000$ 2011-2020 Deferred Maintenance Event Cost
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Doernbecher Childrens Hospital
5,484,000$ 2011-2020 Deferred Maintenance Event Cost39,055,796$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot14.04% FCI
0.3% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.22 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 2005, Kohler pavilion contains 382,823 gSf on 13 floors. Kpv houses inpatient and outpatient facilities for a variety of departments including neurology/Ent, oncology, and cardiac care. no fci rating is available for this building but given its age, it is considered to be in very good condition.
Kohler pavilion (Kpv)
Category ASF %Inpatient 56,649 41%
Outpatient 13,769 10%Hospital Ancillary 58,858 42%
Faculty 2,596 2%Research 29 0%
Central 7,430 5%Student 0 0%
100%Assignable Square Footage 139,330 sf
Circulation, wall area, etc. 243,493 sfGross Bldg Area 382,823 sf
KOHLER PAVILION (KPV)
56,64958,858
48,000
56,000
64,000Assignable Square Footage by Category
41%
42%
2% 0%
5%
0%Inpatient
Outpatient
Hospital AncillaryFaculty
13,769
2,59629
7,430
00
8,000
16,000
24,000
32,000
40,000
48,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
41%
10%
42%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 56,649 41%
Outpatient 13,769 10%Hospital Ancillary 58,858 42%
Faculty 2,596 2%Research 29 0%
Central 7,430 5%Student 0 0%
100%Assignable Square Footage 139,330 sf
Circulation, wall area, etc. 243,493 sfGross Bldg Area 382,823 sf
KOHLER PAVILION (KPV)
56,64958,858
48,000
56,000
64,000Assignable Square Footage by Category
41%
42%
2% 0%
5%
0%Inpatient
Outpatient
Hospital AncillaryFaculty
13,769
2,59629
7,430
00
8,000
16,000
24,000
32,000
40,000
48,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
41%
10%
42%
Hospital AncillaryFaculty
Research
Central
Student
144,915 Square Footage23,680,000$ 2011-2020 Deferred Maintenance Event Cost60,435,352$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot39.18% FCI
27,969 Square Footage5,086,000$ 2011-2020 Deferred Maintenance Event Cost8,477,582$ Core & Shell Insured Replacement Value
303$ Replacement Cost / Square Foot59.99% FCI
408,652 Square FootageNA 2011-2020 Deferred Maintenance Event Cost
187,200,000$ Core & Shell Insured Replacement ValueNA Replacement Cost / Square Foot
0.00% FCI
Kohler Pavilion
Emma Jones Hall
Sam Jackson
*
© Cyril “Kent” Anderson
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.23EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1919, mackenzie Hall contains 112,018 gSf on five floors. mac primarily houses the School of medicine dean’s office, research development administration, classrooms, laboratories, and faculty offices for a variety of departments including Surgery, neurology, molecular and medical genetics. mac has a fci rating of 34% and is considered to be in ‘poor’ condition. moderate to extensive renovation will be needed in the future. given mackenzie Hall’s historic significance, it is doubtful that it would be demolished.
mackenzie Hall (mAC)
Category ASF %Inpatient 0 0%
Outpatient 98 0%Hospital Ancillary 12,020 18%
Faculty 21,358 32%Research 17,481 26%
Central 6,297 9%Student 9,465 14%
100%Assignable Square Footage 66,718 sf
Circulation, wall area, etc. 45,300 sfGross Bldg Area 112,018 sf
MACKENZIE HALL (MAC)
21,358
17,481
15,000
20,000
25,000Assignable Square Footage by Category
18%
32%26%
10%
14%
0 98
12,020
6,297
9,465
0
5,000
10,000
15,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
26%
Category ASF %Inpatient 0 0%
Outpatient 98 0%Hospital Ancillary 12,020 18%
Faculty 21,358 32%Research 17,481 26%
Central 6,297 9%Student 9,465 14%
100%Assignable Square Footage 66,718 sf
Circulation, wall area, etc. 45,300 sfGross Bldg Area 112,018 sf
MACKENZIE HALL (MAC)
21,358
17,481
15,000
20,000
25,000Assignable Square Footage by Category
18%
32%26%
10%
14%
0 98
12,020
6,297
9,465
0
5,000
10,000
15,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
26%
13,960 Square Footage1,783,000$ 2011-2020 Deferred Maintenance Event Cost6,769,942$ Core & Shell Insured Replacement Value
485$ Replacement Cost / Square Foot26.34% FCI
9,506 Square Footage336,000$ 2011-2020 Deferred Maintenance Event Cost
3,695,533$ Core & Shell Insured Replacement Value389$ Replacement Cost / Square Foot
9.09% FCI
120,412 Square Footage16,224,000$ 2011-2020 Deferred Maintenance Event Cost50,216,620$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.31% FCI
299,103 Square Footage25,580,000$ 2011-2020 Deferred Maintenance Event Cost
Medical Research Building
Dotter Memorial Building
Energy Management Center
Basic Science
25,580,000$ 2011-2020 Deferred Maintenance Event Cost87,347,355$ Core & Shell Insured Replacement Value
292$ Replacement Cost / Square Foot29.29% FCI
147,916 Square Footage20,100,000$ 2011-2020 Deferred Maintenance Event Cost61,686,889$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.58% FCI
112,017 Square Footage15,711,000$ 2011-2020 Deferred Maintenance Event Cost46,715,570$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot33.63% FCI
School of Dentistry
MacKenzie Hall
34% FCI
© Bill Niemeyer
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.24 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
the macadam Warehouse (oHSu logistics center) is a leased building in the South Waterfront district and contains 33,827 gsf of total area over multiple floors. mWc primarily houses support and warehouse space for hospital and clinic supplies for both the marquam Hill campus and cHH. offices for the logistics and facilities departments are also located at mWc. due to the building being leased, no fci review or rating has been done for mWc.
macadam Warehouse/ OHSU logistics Center (mCW)
* no fci review/ rating done for mcW. architect evaluation shown.
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 18,280 54%
Faculty 0 0%Research 0 0%
Central 15,547 46%Student 0 0%
100%Assignable Square Footage 33,827 sf
Circulation, wall area, etc. 3,840 sfGross Bldg Area 37,667 sf
Macadam Warehouse (MCW)
18,280
15,547
10,000
12,000
14,000
16,000
18,000
20,000
54%46%
0 0 0 0 00
2,000
4,000
6,000
8,000
10,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 18,280 54%
Faculty 0 0%Research 0 0%
Central 15,547 46%Student 0 0%
100%Assignable Square Footage 33,827 sf
Circulation, wall area, etc. 3,840 sfGross Bldg Area 37,667 sf
Macadam Warehouse (MCW)
18,280
15,547
10,000
12,000
14,000
16,000
18,000
20,000
54%46%
0 0 0 0 00
2,000
4,000
6,000
8,000
10,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
*
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.25EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1961 as the university’s first dedicated research building, the medical research Building contains 120,413 gSf on nine floors. mrB houses research laboratories and office space for a variety of departments including Behavioral neuroscience, Biochemistry, otolaryngology, molecular Biology, and the vollum institute. mrB has a fci rating of 32% and is considered to be in ‘poor’ condition. the building will need moderate to extensive renovation.
medical Research Building (mRB)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 214 0%
Faculty 6,058 9%Research 52,341 82%Central 1,338 2%Student 4,223 7%
100%Assignable Square Footage 64,173 sfCirculation, wall area, etc. 56,239 sf
Gross Bldg Area 120,413 sf
MEDICAL RESEARCH BUILDING (MRB)
52,341
40,000
50,000
60,000Assignable Square Footage by Category
0% 9%
82%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
0 0 214
6,058
52,341
1,3384,223
0
10,000
20,000
30,000
40,000
50,000
60,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
0% 9%
82%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 214 0%
Faculty 6,058 9%Research 52,341 82%Central 1,338 2%Student 4,223 7%
100%Assignable Square Footage 64,173 sfCirculation, wall area, etc. 56,239 sf
Gross Bldg Area 120,413 sf
MEDICAL RESEARCH BUILDING (MRB)
52,341
40,000
50,000
60,000Assignable Square Footage by Category
0% 9%
82%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
0 0 214
6,058
52,341
1,3384,223
0
10,000
20,000
30,000
40,000
50,000
60,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
0% 9%
82%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
13,960 Square Footage1,783,000$ 2011-2020 Deferred Maintenance Event Cost6,769,942$ Core & Shell Insured Replacement Value
485$ Replacement Cost / Square Foot26.34% FCI
9,506 Square Footage336,000$ 2011-2020 Deferred Maintenance Event Cost
3,695,533$ Core & Shell Insured Replacement Value389$ Replacement Cost / Square Foot
9.09% FCI
120,412 Square Footage16,224,000$ 2011-2020 Deferred Maintenance Event Cost50,216,620$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.31% FCI
299,103 Square Footage25,580,000$ 2011-2020 Deferred Maintenance Event Cost
Medical Research Building
Dotter Memorial Building
Energy Management Center
Basic Science
25,580,000$ 2011-2020 Deferred Maintenance Event Cost87,347,355$ Core & Shell Insured Replacement Value
292$ Replacement Cost / Square Foot29.29% FCI
147,916 Square Footage20,100,000$ 2011-2020 Deferred Maintenance Event Cost61,686,889$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.58% FCI
112,017 Square Footage15,711,000$ 2011-2020 Deferred Maintenance Event Cost46,715,570$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot33.63% FCI
School of Dentistry
MacKenzie Hall
32% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.26 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
9% FCI
Built in 1988 for staging construction, the modular Building Structure contains 10,443 gSf on two floors. these temporary structures accommodate offices for the Hospital’s medical affairs, Business development, and managed care. mBS has a fci rating of approximately 9% and is considered to be in ‘fair’ condition. these temporary structures occupy an important site and should be removed.
modular Building Structure (mBS)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 7,336 100%
Faculty 0 0%Research 0 0%
Central 27 0%Student 0 0%
100%Assignable Square Footage 7,363 sf
Circulation, wall area, etc. 3,080 sfGross Bldg Area 10,443 sf
MODULAR BLDG. STRUCTURE (MBS)
7,336
4,000
5,000
6,000
7,000
8,000Assignable Square Footage by Category
100%
0 0 0 0 27 00
1,000
2,000
3,000
4,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 7,336 100%
Faculty 0 0%Research 0 0%
Central 27 0%Student 0 0%
100%Assignable Square Footage 7,363 sf
Circulation, wall area, etc. 3,080 sfGross Bldg Area 10,443 sf
MODULAR BLDG. STRUCTURE (MBS)
7,336
4,000
5,000
6,000
7,000
8,000Assignable Square Footage by Category
100%
0 0 0 0 27 00
1,000
2,000
3,000
4,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
85,583 Square Footage910,000$ 2011-2020 Deferred Maintenance Event Cost
35,691,534$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
2.55% FCI
339,694 Square Footage177,000$ 2011-2020 Deferred Maintenance Event Cost
106,080,000$ Core & Shell Insured Replacement Value312$ Replacement Cost / Square Foot
0.17% FCI
99,149 Square Footage1,088,000$ 2011-2020 Deferred Maintenance Event Cost
41,492,561$ Core & Shell Insured Replacement Value418$ Replacement Cost / Square Foot
2.62% FCI
10,443 Square Footage331,000$ 2011-2020 Deferred Maintenance Event Cost
BICC
BRB
Modular Building Structure
School of Nursing
331,000$ 2011-2020 Deferred Maintenance Event Cost3,551,951$ Core & Shell Insured Replacement Value
340$ Replacement Cost / Square Foot9.32% FCI
50,964 Square Footage3,158,000$ 2011-2020 Deferred Maintenance Event Cost
21,223,166$ Core & Shell Insured Replacement Value416$ Replacement Cost / Square Foot
14.88% FCI
98,169 Square Footage4,817,000$ 2011-2020 Deferred Maintenance Event Cost
40,940,400$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
11.77% FCI
Campus Services Building
Vollum Institute
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.27EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1919 as the original hospital on marquam Hill (aka the county Hospital), multnomah pavilion contains 210,910 gSf on seven floors. mnp now houses inpatient psychiatry, outpatient departments including ambulatory Surgery and adult Bone marrow transplant as well as offices for medical school faculty. mnp has a fci rating of 35% and is considered to be in ‘poor’ condition. given its historic significance and size, full demolition of mnp is unlikely; moderate to extensive renovations will be necessary.
multnomah pavilion (mnp)
Category ASF %Inpatient 5,735 6%
Outpatient 23,420 23%Hospital Ancillary 17,238 17%
Faculty 31,341 30%Research 12,010 12%
Central 9,298 9%Student 4,411 4%
100%Assignable Square Footage 103,453 sf
Circulation, wall area, etc. 107,457 sfGross Bldg Area 210,910 sf
MULTNOMAH PAVILION (MNP)
23,420
31,341
25,000
30,000
35,000Assignable Square Footage by Category
6%
23%
17%30%
12%
9%4%
5,735
23,420
17,238
12,010
9,298
4,411
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
23%
17%30%
12%
Category ASF %Inpatient 5,735 6%
Outpatient 23,420 23%Hospital Ancillary 17,238 17%
Faculty 31,341 30%Research 12,010 12%
Central 9,298 9%Student 4,411 4%
100%Assignable Square Footage 103,453 sf
Circulation, wall area, etc. 107,457 sfGross Bldg Area 210,910 sf
MULTNOMAH PAVILION (MNP)
23,420
31,341
25,000
30,000
35,000Assignable Square Footage by Category
6%
23%
17%30%
12%
9%4%
5,735
23,420
17,238
12,010
9,298
4,411
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
23%
17%30%
12%
119,833 Square Footage7,989,000$ 2011-2020 Deferred Maintenance Event Cost
49,975,571$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
15.99% FCI
10,443 Square Footage331,000$ 2011-2020 Deferred Maintenance Event Cost
3,551,951$ Core & Shell Insured Replacement Value340$ Replacement Cost / Square Foot
9.32% FCI
31,513 Square Footage4,873,000$ 2011-2020 Deferred Maintenance Event Cost
13,342,325$ Core & Shell Insured Replacement Value423$ Replacement Cost / Square Foot
36.52% FCI
210,910 Square Footage
Modular Building Structure
Child Development Rehab (CDRC)
Multnomah Pavilion
Dillehunt
210,910 Square Footage32,818,000$ 2011-2020 Deferred Maintenance Event Cost93,814,455$ Core & Shell Insured Replacement Value
445$ Replacement Cost / Square Foot34.98% FCI 35% FCI
© Liz Lynch
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.28 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1939 as the university’s original library, oHSu auditorium contains 90,629 gSf on four floors. aud continues to house library stacks, the main auditorium on campus, and student assembly rooms. receiving dock 4 was added to the south side of the building but is functionally inadequate and needs to be relocated. aud has a fci rating of 47%, which is the second worst rated university building. given aud’s historic significance, demolition is unlikely; extensive renovation will be necessary.
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 4,406 13%Research 0 0%Central 6,776 20%Student 21,923 66%
100%Assignable Square Footage 33,106 sfCirculation, wall area, etc. 57,523 sf
Gross Bldg Area 90,629 sf
OHSU AUDITORIUM (AUD)
21,923
20,000
25,000Assignable Square Footage by Category
13%
21%
66%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 0
4,406
0
6,776
21,923
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
13%
21%
66%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
OHSU Auditorium (AUD)
45,715 Gross Exterior Square Footage8,294,000$ 2011-2020 Deferred Maintenance Event Cost
19,064,150$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
43.51% FCI
33,368 Square Footage4,065,000$ 2011-2020 Deferred Maintenance Event Cost8,917,364$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot45.59% FCI
90,627 Square Footage6,124,000$ 2011-2020 Deferred Maintenance Event Cost
13,115,246$ Core & Shell Insured Replacement Value145$ Replacement Cost / Square Foot
46.69% FCI
31,134 Square Footage4,237,000$ 2011-2020 Deferred Maintenance Event Cost
Physical Plant
Gaines Hall
Old Library & Auditorium
Baird Hall
4,237,000$ 2011-2020 Deferred Maintenance Event Cost8,304,187$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot51.02% FCI
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 4,406 13%Research 0 0%Central 6,776 20%Student 21,923 66%
100%Assignable Square Footage 33,106 sfCirculation, wall area, etc. 57,523 sf
Gross Bldg Area 90,629 sf
OHSU AUDITORIUM (AUD)
21,923
20,000
25,000Assignable Square Footage by Category
13%
21%
66%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 0
4,406
0
6,776
21,923
0
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
13%
21%
66%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
47% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.29EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1956, oHSu Hospital contains 501,064 gSf on fifteen floors. oHS houses inpatient Services as well as Surgery and intensive care. the building has a fci rating of 2% and is considered to be in ‘good’ condition. Extensive recent upgrades have prolonged the expected life of oHS for another 50 years.
OHSU Hospital (OHS)
Category ASF %Inpatient 87,179 39%
Outpatient 3,167 1%Hospital Ancillary 116,221 52%
Faculty 3,467 2%Research 146 0%
Central 10,709 5%Student 2,559 1%
100%Assignable Square Footage 223,448 sf
Circulation, wall area, etc. 277,616 sfGross Bldg Area 501,064 sf
OHSU HOSPITAL (OHS)
116,221
100,000
120,000
140,000Assignable Square Footage by Category
39%
52%
2%0%
5%
1%
87,179
3,167 3,467146
10,709
2,5590
20,000
40,000
60,000
80,000
100,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
39%
1%
52%
Category ASF %Inpatient 87,179 39%
Outpatient 3,167 1%Hospital Ancillary 116,221 52%
Faculty 3,467 2%Research 146 0%
Central 10,709 5%Student 2,559 1%
100%Assignable Square Footage 223,448 sf
Circulation, wall area, etc. 277,616 sfGross Bldg Area 501,064 sf
OHSU HOSPITAL (OHS)
116,221
100,000
120,000
140,000Assignable Square Footage by Category
39%
52%
2%0%
5%
1%
87,179
3,167 3,467146
10,709
2,5590
20,000
40,000
60,000
80,000
100,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
39%
1%
52%
265,289 Square Footage456,000$ 2011-2020 Deferred Maintenance Event Cost
155,090,675$ Core & Shell Insured Replacement Value585$ Replacement Cost / Square Foot
0.29% FCI
291,055 Square Footage6,175,000$ 2011-2020 Deferred Maintenance Event Cost
144,771,927$ Core & Shell Insured Replacement Value497$ Replacement Cost / Square Foot
4.27% FCI
501,064 Square Footage3,785,000$ 2011-2020 Deferred Maintenance Event Cost
230,241,301$ Core & Shell Insured Replacement Value460$ Replacement Cost / Square Foot
1.64% FCI
93,650 Gross Exterior Square Footage5,484,000$ 2011-2020 Deferred Maintenance Event Cost
Mark O Hatfield Research Center
OHSU Hospital
Casey Eye Institute
Doernbecher Childrens Hospital
5,484,000$ 2011-2020 Deferred Maintenance Event Cost39,055,796$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot14.04% FCI
2% FCI
© Photo courtesy of OHSU Digital Resources Library
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.30 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1959 and expanded in 1990, the oHSu Student center contains 33,634 gSf on two floors. oSc houses the student bookstore, pool and gymnasium. as teaching facilities are removed to the Schnitzer campus, oSc functions may also move there incrementally. this building is in ‘fair’ condition and does not need to be demolished unless the site is needed for other uses.
OHSU Student Center (OSC)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 0 0%Research 0 0%Central 334 1%Student 23,926 99%
100%Assignable Square Footage 24,261 sfCirculation, wall area, etc. 9,374 sf
Gross Bldg Area 33,634 sf
OHSU STUDENT CENTER (OSC)
23,92625,000
30,000Assignable Square Footage by Category
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0 0 0 0 334
23,926
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
99%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 0 0%Research 0 0%Central 334 1%Student 23,926 99%
100%Assignable Square Footage 24,261 sfCirculation, wall area, etc. 9,374 sf
Gross Bldg Area 33,634 sf
OHSU STUDENT CENTER (OSC)
23,92625,000
30,000Assignable Square Footage by Category
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
0 0 0 0 0 334
23,926
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
99%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
*
* no fci review/ rating done for oSc. architect evaluation shown.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.31EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
the physical plant Building contains 31,134 gsf over two floors. physical plant primarily houses offices for the facilities department. pp has a fci rating of approximately 51% and is considered to be in poor condition. this building could be demolished and its office backfilled into other buildings.
physical plant (pp)
31,134 Square Footage
3,850,961$ Executive Summary Deferred Maintenance Current Need8,304,854$ Executive Summary Replacement Cost
46.37% Executive Summary FCI
4,237,000$ 2011-2020 Deferred Maintenance Event Cost8,304,187$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot51.02% FCI
Physical Plant
31,134 Square Footage
3,850,961$ Executive Summary Deferred Maintenance Current Need8,304,854$ Executive Summary Replacement Cost
46.37% Executive Summary FCI
4,237,000$ 2011-2020 Deferred Maintenance Event Cost8,304,187$ Core & Shell Insured Replacement Value
267$ Replacement Cost / Square Foot51.02% FCI
Physical Plant
51% FCI
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 673 3%
Faculty 1,800 8%Research 481 2%
Central 18,685 85%Student 408 2%
100%Assignable Square Footage 22,046 sf
Circulation, wall area, etc. 9,088 sfGross Bldg Area 31,134 sf
PHYSICAL PLANT (PP)
18,685
14,000
16,000
18,000
20,000
3%
8%2%
2%
0 0673
1,800
481 408
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
85%
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.32 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1992, physicians pavilion contains 84,635 gSf on four floors. ppv houses outpatient facilities and clinics for a variety of departments including internal medicine, Surgery, Ear nose & throat, and perinatal care. due to ppv being a leased building, it does not have an fci rating but is considered to be in good condition.
physician’s pavilion (ppv)
Category ASF %Inpatient 0 0%
Outpatient 31,597 68%Hospital Ancillary 12,555 27%
Faculty 1,913 4%Research 0 0%
Central 538 1%Student 143 0%
100%Assignable Square Footage 46,745 sf
Circulation, wall area, etc. 37,890 sfGross Bldg Area 84,635 sf
PHYSICIANS PAVILION (PPV)
31,597
25,000
30,000
35,000Assignable Square Footage by Category
68%
27%
4% 1%
0
12,555
1,913
0 538 1430
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
68%
27%
Category ASF %Inpatient 0 0%
Outpatient 31,597 68%Hospital Ancillary 12,555 27%
Faculty 1,913 4%Research 0 0%
Central 538 1%Student 143 0%
100%Assignable Square Footage 46,745 sf
Circulation, wall area, etc. 37,890 sfGross Bldg Area 84,635 sf
PHYSICIANS PAVILION (PPV)
31,597
25,000
30,000
35,000Assignable Square Footage by Category
68%
27%
4% 1%
0
12,555
1,913
0 538 1430
5,000
10,000
15,000
20,000
25,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
68%
27%
* no fci review/ rating done for ppv architect evaluation shown.
*
© Photo courtesy of OHSU Digital Resources Library
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.33EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1967 and later expanded in 1992, richard Jones Hall contains 299,103 gSf on eight floors. it is essentially two buildings joined as one, the original Basic Science Building and the Basic Science addition/croEt which opened 20 years later. rJH primarily houses research laboratory space for a variety of departments including the center for research on occupational and Environmental toxicology (croEt), anatomic pathology, and Biochemistry and molecular Biology. rJH has a fci rating of approxi-mately 30% and is considered in fair condition; moderate renovations will be necessary.
Richard Jones Hall for Basic medical Sciences (RJH)
Category ASF %Inpatient 0 0%
Outpatient 105 0%Hospital Ancillary 3,014 2%
Faculty 29,287 19%Research 80,009 53%
Central 5,306 3%Student 34,445 23%
100%Assignable Square Footage 152,167 sf
Circulation, wall area, etc. 146,936 sfGross Bldg Area 299,103 sf
RICHARD T. JONES HALL (RJH)
80,009
70,000
80,000
90,000Assignable Square Footage by Category
2%
19%3%
23%
0 1053,014
29,287
5,306
34,445
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
19%
53%
3%23%
Category ASF %Inpatient 0 0%
Outpatient 105 0%Hospital Ancillary 3,014 2%
Faculty 29,287 19%Research 80,009 53%
Central 5,306 3%Student 34,445 23%
100%Assignable Square Footage 152,167 sf
Circulation, wall area, etc. 146,936 sfGross Bldg Area 299,103 sf
RICHARD T. JONES HALL (RJH)
80,009
70,000
80,000
90,000Assignable Square Footage by Category
2%
19%3%
23%
0 1053,014
29,287
5,306
34,445
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
19%
53%
3%23%
299,103 Square Footage25,580,000$ 2011-2020 Deferred Maintenance Event Cost87,347,355$ Core & Shell Insured Replacement Value
292$ Replacement Cost / Square Foot29.29% FCI
147,916 Square Footage20,100,000$ 2011-2020 Deferred Maintenance Event Cost61,686,889$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.58% FCI
112,017 Square Footage15,711,000$ 2011-2020 Deferred Maintenance Event Cost46,715,570$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot33.63% FCI
45,715 Gross Exterior Square Footage8,294,000$ 2011-2020 Deferred Maintenance Event Cost
19,064,150$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
43.51% FCI
School of Dentistry
MacKenzie Hall
Baird Hall
Basic Science
30% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.34 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1929 as the hospital’s original outpatient building, Sam Jackson Hall contains 144,915 gSf on eight floors. SJH houses various hospital support departments as well as faculty and staff offices for a number of School of medicine departments including neurology and the Jungers center for neurosciences research, diagnostic radiology, and the department of medicine. SJH has a fci rating of 40%, which is the third worst. review of this building suggests that it is a candidate for demolition.
Sam Jackson Hall (SJH)
Category ASF %Inpatient 0 0%
Outpatient 3,531 5%Hospital Ancillary 27,822 42%
Faculty 21,490 33%Research 2,004 3%
Central 5,398 8%Student 5,743 9%
100%Assignable Square Footage 65,990 sf
Circulation, wall area, etc. 78,925 sfGross Bldg Area 144,915 sf
SAM JACKSON HALL (SJH)
27,822
21,490
25,000
30,000Assignable Square Footage by Category
0% 5%
42%33%
3%
8%9%
0
3,531
21,490
2,004
5,398 5,743
0
5,000
10,000
15,000
20,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
42%33%
3%
Category ASF %Inpatient 0 0%
Outpatient 3,531 5%Hospital Ancillary 27,822 42%
Faculty 21,490 33%Research 2,004 3%
Central 5,398 8%Student 5,743 9%
100%Assignable Square Footage 65,990 sf
Circulation, wall area, etc. 78,925 sfGross Bldg Area 144,915 sf
SAM JACKSON HALL (SJH)
27,822
21,490
25,000
30,000Assignable Square Footage by Category
0% 5%
42%33%
3%
8%9%
0
3,531
21,490
2,004
5,398 5,743
0
5,000
10,000
15,000
20,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
42%33%
3%
144,915 Square Footage23,680,000$ 2011-2020 Deferred Maintenance Event Cost60,435,352$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot39.18% FCI
27,969 Square Footage5,086,000$ 2011-2020 Deferred Maintenance Event Cost8,477,582$ Core & Shell Insured Replacement Value
303$ Replacement Cost / Square Foot59.99% FCI
408,652 Square FootageNA 2011-2020 Deferred Maintenance Event Cost
187,200,000$ Core & Shell Insured Replacement ValueNA Replacement Cost / Square Foot
0.00% FCI
Kohler Pavilion
Emma Jones Hall
Sam Jackson
40% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.35EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1954, the School of dentistry contains 147,916 gSf on nine floors. Sod houses the School of dentistry classrooms, laboratories, and faculty offices as well as the outpatient dental clinic. the building has a fci rating of 33% and is considered to be in ‘poor’ condition. this building is a candidate for demolition.
School of Dentistry (SOD)
Category ASF %Inpatient 0 0%
Outpatient 5,726 7%Hospital Ancillary 2,422 3%
Faculty 18,844 22%Research 11,267 13%
Central 1,896 2%Student 47,031 54%
100%Assignable Square Footage 87,187 sf
Circulation, wall area, etc. 60,729 sfGross Bldg Area 147,916 sf
SCHOOL OF DENTISTRY (SOD)
47,031
35,000
40,000
45,000
50,000Assignable Square Footage by Category
0% 7% 3%
22%54%
0
5,726
2,422
18,844
11,267
1,896
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
22%
13%2%
54%
Category ASF %Inpatient 0 0%
Outpatient 5,726 7%Hospital Ancillary 2,422 3%
Faculty 18,844 22%Research 11,267 13%
Central 1,896 2%Student 47,031 54%
100%Assignable Square Footage 87,187 sf
Circulation, wall area, etc. 60,729 sfGross Bldg Area 147,916 sf
SCHOOL OF DENTISTRY (SOD)
47,031
35,000
40,000
45,000
50,000Assignable Square Footage by Category
0% 7% 3%
22%54%
0
5,726
2,422
18,844
11,267
1,896
0
5,000
10,000
15,000
20,000
25,000
30,000
35,000
40,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
22%
13%2%
54%
13,960 Square Footage1,783,000$ 2011-2020 Deferred Maintenance Event Cost6,769,942$ Core & Shell Insured Replacement Value
485$ Replacement Cost / Square Foot26.34% FCI
9,506 Square Footage336,000$ 2011-2020 Deferred Maintenance Event Cost
3,695,533$ Core & Shell Insured Replacement Value389$ Replacement Cost / Square Foot
9.09% FCI
120,412 Square Footage16,224,000$ 2011-2020 Deferred Maintenance Event Cost50,216,620$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.31% FCI
299,103 Square Footage25,580,000$ 2011-2020 Deferred Maintenance Event Cost
Medical Research Building
Dotter Memorial Building
Energy Management Center
Basic Science
25,580,000$ 2011-2020 Deferred Maintenance Event Cost87,347,355$ Core & Shell Insured Replacement Value
292$ Replacement Cost / Square Foot29.29% FCI
147,916 Square Footage20,100,000$ 2011-2020 Deferred Maintenance Event Cost61,686,889$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.58% FCI
112,017 Square Footage15,711,000$ 2011-2020 Deferred Maintenance Event Cost46,715,570$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot33.63% FCI
School of Dentistry
MacKenzie Hall
33% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.36 EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Built in 1991, the School of nursing contains 99,149 gSf on seven floors. Son houses the School of nursing classrooms and faculty offices as well as the center for Evidence Based policy. it has a fci rating of 3% and is considered to be in ‘good’ condition.
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 184 0%
Faculty 25,935 58%Research 5,229 12%
Central 791 2%Student 12,307 28%
100%Assignable Square Footage 44,446 sf
Circulation, wall area, etc. 54,703 sfGross Bldg Area 99,149 sf
SCHOOL OF NURSING (SON)
25,935
25,000
30,000Assignable Square Footage by Category
58%2%
28%
0 0 184
5,229
791
12,307
0
5,000
10,000
15,000
20,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
58%
12%
2%
28%
School of nursing (SOn)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 184 0%
Faculty 25,935 58%Research 5,229 12%
Central 791 2%Student 12,307 28%
100%Assignable Square Footage 44,446 sf
Circulation, wall area, etc. 54,703 sfGross Bldg Area 99,149 sf
SCHOOL OF NURSING (SON)
25,935
25,000
30,000Assignable Square Footage by Category
58%2%
28%
0 0 184
5,229
791
12,307
0
5,000
10,000
15,000
20,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
58%
12%
2%
28%
85,583 Square Footage910,000$ 2011-2020 Deferred Maintenance Event Cost
35,691,534$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
2.55% FCI
339,694 Square Footage177,000$ 2011-2020 Deferred Maintenance Event Cost
106,080,000$ Core & Shell Insured Replacement Value312$ Replacement Cost / Square Foot
0.17% FCI
99,149 Square Footage1,088,000$ 2011-2020 Deferred Maintenance Event Cost
41,492,561$ Core & Shell Insured Replacement Value418$ Replacement Cost / Square Foot
2.62% FCI
10,443 Square Footage331,000$ 2011-2020 Deferred Maintenance Event Cost
BICC
BRB
Modular Building Structure
School of Nursing
331,000$ 2011-2020 Deferred Maintenance Event Cost3,551,951$ Core & Shell Insured Replacement Value
340$ Replacement Cost / Square Foot9.32% FCI
50,964 Square Footage3,158,000$ 2011-2020 Deferred Maintenance Event Cost
21,223,166$ Core & Shell Insured Replacement Value416$ Replacement Cost / Square Foot
14.88% FCI
98,169 Square Footage4,817,000$ 2011-2020 Deferred Maintenance Event Cost
40,940,400$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
11.77% FCI
Campus Services Building
Vollum Institute
3% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.37EXISTING FACILIT Y CONDITIONS
poor (>30%)good fair 1 fair 2
5% 10% 30%
Assignable Square Footage by Category
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Facilities Condition Index
$$$
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 3,787 14%
Faculty 3,835 14%Research 625 2%
Central 17,615 63%Student 1,979 7%
100%Assignable Square Footage 27,842 sf
Circulation, wall area, etc. 23,122 sfGross Bldg Area 50,964 sf
CAMPUS SERVICES BUILDING (CSB)
17,615
14,000
16,000
18,000
20,000Assignable Square Footage by Category
14%
14%
2%
7%Inpatient
Outpatient
Hospital AncillaryFaculty
0 0
3,787 3,835
625
1,979
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
2%
63%
Hospital AncillaryFaculty
Research
Central
Student
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 6,775 17%Research 27,459 70%Central 433 1%Student 4,316 11%
100%Assignable Square Footage 38,982 sfCirculation, wall area, etc. 59,188 sf
Gross Bldg Area 98,169 sf
VOLLUM INSTITUTE (VIABR)
27,459
25,000
30,000Assignable Square Footage by Category
17%1%
11%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 0
6,775
27,459
433
4,316
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
17%
70%
1%11%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
Built in 1986, the vollum institute contains 98,169 gSf on six floors. viaBr houses research laboratories, support spaces, and offices for the vollum institute. the building has a fci rating of 12% and is considered to be in ‘fair’ condition, indicating that some renovation will be necessary.
vollum institute (viABR)
Category ASF %Inpatient 0 0%
Outpatient 0 0%Hospital Ancillary 0 0%
Faculty 6,775 17%Research 27,459 70%Central 433 1%Student 4,316 11%
100%Assignable Square Footage 38,982 sfCirculation, wall area, etc. 59,188 sf
Gross Bldg Area 98,169 sf
VOLLUM INSTITUTE (VIABR)
27,459
25,000
30,000Assignable Square Footage by Category
17%1%
11%
Inpatient
Outpatient
Hospital AncillaryFaculty
0 0 0
6,775
27,459
433
4,316
0
5,000
10,000
15,000
20,000
25,000
30,000
Inpatient Outpatient Hospital Ancillary
Faculty Research Central Student
Assignable Square Footage by Category
17%
70%
1%11%
Inpatient
Outpatient
Hospital AncillaryFaculty
Research
Central
Student
98,169 Square Footage4,817,000$ 2011-2020 Deferred Maintenance Event Cost
40,940,400$ Core & Shell Insured Replacement Value417$ Replacement Cost / Square Foot
11.77% FCI
13,960 Square Footage1,783,000$ 2011-2020 Deferred Maintenance Event Cost6,769,942$ Core & Shell Insured Replacement Value
485$ Replacement Cost / Square Foot26.34% FCI
9,506 Square Footage336,000$ 2011-2020 Deferred Maintenance Event Cost
3,695,533$ Core & Shell Insured Replacement Value389$ Replacement Cost / Square Foot
9.09% FCI
120,412 Square Footage16,224,000$ 2011-2020 Deferred Maintenance Event Cost50,216,620$ Core & Shell Insured Replacement Value
417$ Replacement Cost / Square Foot32.31% FCI
Vollum Institute
Dotter Memorial Building
Energy Management Center
Medical Research Building
12% FCI
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.38 EXISTING FACILIT Y CONDITIONS
Historically Significant Buildings
the university of oregon Schools of medicine, dentistry, and nursing were created in 1913 when Willamette university and the university of oregon merged their medical programs. in 1974, they became a single, freestanding state university. in 1880, during the western expansion of the railroad system, much of the marquam Hill campus had been bought, sight unseen, to build a railroad yard. the land was subsequently donated to the city for a beneficial public use: 20 acres from the oregon-Washington railroad and navigation company, and 88 acres from the owners of the oregon Journal. two years later, in 1919, the university of oregon medical center moved from downtown portland to the new campus, to a new building named to commemorate Kenneth a.J. mackenzie, md, the railroad’s surgeon who had suggested donation of the hilltop land for a hospital.
in 1923, the multnomah county Hospital joined mackenzie Hall to provide services to indigent patients. in 1926, the doernbecher memorial Hospital for children was built, and the next year a dormitory for nurses was added. in 1931 an outpatient clinic was established on the hill, and the following year, the department of nursing Education accepted its first students.
Within a dozen years of its establishment on marquam Hill, a substantial medical campus was in place. Survivors of that first building effort are the mackenzie Hall east wing completed in 1919 and the main hall added in 1922; the multnomah county Hospital, now known as multnomah pavilion, 1923; the first doernbecher children’s Hospital, now dillehunt Hall, 1926; Emma Jones Hall opened as a dormitory for nurses in 1927; and the first outpatient clinic, now Sam Jackson Hall, 1931.
OHSU 20-Year Facilities Master Plan: 2011–2030 I ZGF Architects I PKA Architects 3.39EXISTING FACILIT Y CONDITIONS
three buildings have been identified during this master plan process as possessing historic significance that distinguishes them from other buildings on campus due to their age, archi-tectural character, and importance within the context of the campus’ early development. it should be noted that the historical significance is from oHSu’s perspective and that none of these buildings are on the State Historical preservation office’s list of historical buildings.
mackenzie Hall (i.e. medical Sciences Building). opened in 1919.
multnomah pavilion (multnomah county Hospital) opened in 1923.
auditorium Building (old library). opened in 1939.