1
No: 3.1.7 Design Engineering and Construction Effective Date: Sept., 2014 Procedure Reference Revision Date: n/a Subject: Project Procurement – Procedure Reference Distribution: DEC Approved: Dan MacLachlan, Director, Design, Engineering and Construction Page 1 of 1 Procedure For detail regarding procurement policy guidelines within the Physical Resources Purchasing Centre to solicit bids and award contracts on construction projects refer to 1.2.11 – Physical Resources Project Procurement Policy.

3 1 7 Project Procurement Policy Ref Doc 2014

Embed Size (px)

DESCRIPTION

3 1 7 Project Procurement Policy Ref Doc 2014

Citation preview

  • No: 3.1.7 Design Engineering and Construction Effective Date: Sept., 2014 Procedure Reference Revision Date: n/a Subject: Project Procurement Procedure Reference Distribution: DEC Approved: Dan MacLachlan, Director, Design, Engineering and Construction Page 1 of 1 Procedure For detail regarding procurement policy guidelines within the Physical Resources Purchasing Centre to solicit bids and award contracts on construction projects refer to 1.2.11 Physical Resources Project Procurement Policy.