Project Title : Reduce Transport Services Cost
Project No. : OAS-06-010 (2W)
Champion : R. Rajan
Team Leader : Eleazer Bernabe
Lead Member : Galileo DizonMembers : Gloria Tria
Eligio Pregillano Jr.
Date : 23 October 2006
2
PROBLEM STATEMENT: OAIS-LM serves an average of 15,000 vehicle requests at ADB headquarters a year using 15 ADB vehicles and 4 contracted vehicles at an average yearly cost of US$250,000 arising in budget constraint in 2006, and there is a need to reduce the operating costs.
DEFINE
GOAL STATEMENT: To reduce the cost of transport services by 20% by end 2006.
3
DEFINE
Business Case•Transport Unit serve some 15,000
transportationrequests a year at ADB headquarters.
•This service use up an average yearly budget of
US$250,000 that includes vehicle depreciation,maintenance, labor, and fuel costs.
•The project will help us determine the right size
of fleet to maintain and is aiming to reduce thecost of transport services by 20% by end 2006.
4
StartStaff Request
Vehicle
On-Line Vehicle Request System
Approved
Acknowledgement Receipt
For Endorsement Approving Officer
VehicleDispatcher
Yes
No
VehicleAssignment
Service Providers
Support Staff Rendering Overtime
(Nissan Car Lease)/(Taxi Fare Reimbursemnt)
Airport Transfers Mission Travel
(Alamo Transport)
Bank Car
Airport Transfers for Home Leave, Official Guests, Appointment,
Repatriation, Relocation.Business Trip Within Metro Manila
Local Mission Outside Metro Manila
(Staff Drivers, and JRS Agency Drivers)
Trip Ticket For ADB Driver
Trip Ticket forJRS Driver
Trip Ticket for Alamo Driver
Trip Ticket for Nissan Car Lease
Fax Copy
CompleteVehicle
RequestsArchive
A
A
Confirmation
Completed Request
DEFINE Detailed Processing
5
CTQ S I P O CCorrect data and clear instructions for Transport Requirements
Staff from HQ and RMs
Fill-up Electronic Request
START1. Received Vehicle Request
Transport RequirementInformation
Transport Unit, OAIS-LM
Vehicle Request System
OIST Processing and archiving of data
2. Data processed, Staff, Approving Officer, and Vehicle Dispatcher notified
ElectronicData
Transport Unit,OAIS-LM
SIPOC
6
SIPOC
CTQ S I P O CTimely endorsement of request
AOs & ACs
ApprovingOfficer from HQ and RMs
OASBPMSD
Electronic Approval of Request
3.Endorsement and Approval of Request
ApprovedRequest
OAIS-LMVehicle Dispatcher
Availability of Vehicles and DriversTransport ServicesBudget
OAIS-LMVehicle Dispatcher
OASBPMSD
Schedule of Assignments
4. ProcessTransport Requests
Transport Services
ADB Staff, and Official Guests
7
SIPOC
CTQ S I P O CClear instructions, Timely arrival of Vehicles and Drivers
OAIS-LMADB Vehicles & Drivers, and Service Providers
Transport Requests Trip Tickets, Vehicles and Drivers
5. ServeTransport Requests
Vehicles and Drivers
ADB Staff, and Official Guests
Complete data
Drivers and Passengers
Input data and signature of passengers
6. Completes Service
Transport Unit
Transport Unit
Correct DataData Input and Confirmation of Vehicle Dispatcher
OAIS-LMADB Drivers,Service ProvidersVehicle Dispatcher
Data from Hard Copy of TransportRequestsServed
7. Archiving of Data of Completed Requests
Transport ServicesRecords
OAIS-LM, OGA, BPMSD and Concerned Departments
8
Define Measure Analyze
Improve
Control
1Feb to 6 Apr
7 Apr to 14 Jul
15 Jul to 15 Sep
16 Sep to 15 Oct
15Jan to 30Jan
65 days 69 days 60 days 30 days15 days
9
DEFINE
- Strong Relationship
- Moderate Relationship
- Weak Relationship
No Symbol - No Relationship
Reduce transportation cost A
vaila
bili
ty o
f V
ehic
les
Cat
ego
ry o
f R
equ
est
Mai
nte
nan
ce o
f V
ehic
les
Sal
ary
of
Dri
vers
Gas
olin
e
Ove
rtim
e o
f D
rive
rs
POTENTIAL OUTPUT MEASURES
10
DEFINE
- Strong Relationship
- Moderate Relationship
- Weak Relationship
No Symbol - No Relationship
Optimize use of resources
Ag
e o
f V
ehic
les
Typ
e o
f V
ehic
les
No
. of
Pas
sen
ger
s
Vo
lum
e &
Fre
qu
ency
of
Req
ues
ts
Ro
ute
s T
aken
Dri
vers
POTENTIAL OUTPUT MEASURES
11
CTQ
High-Level Need
Reduce Cost of Transportation Services
Output Unit Transportation cost
Output Characteristic
Reduced cost by 20%
Process starts when a vehicle request is submitted by the staff.
How process will be measured
Deviation from cost reduction target.
LSL - USL - $200,000
TargetReduce cost by $50,000 or reduce cost to $200,000
No. of Defect Opportunities
Per Unit
1 oppurtunity for defect
Total transportation cost of more than $200,000
CTQ
Project Y (Little y) Measure
Specification Limits
Defect
DEFINEDEFINE
12
MEASURE
Completed Vehicle Requests
Data Collection
Provider PurposeNo. of
Trips 2004No. of Trips
2005
1 Bank Car For travel on official Bank business and functions within the Metro Manila area. 2,763 2,504
2 Bank Car For official missions outside Metro Manila where road is the most convenient and cost effective mode of transport 63 64
3 Bank Car For airport transfers in Manila for ADB personnel either in commencement or continuation of travel funded by the Bank relating to the appointment repatriation, emergency. 140 166
4 Bank Car For airport transfers in Manila for ADB personnel home country travel. 1,198 1,307
5 Bank Car For airport transfers of official ADB guests and member country delegations including other travel on official business of these delegation members. 1,558 1,906
6 Bank Car For airport transfers of Bank personnel from Resident Missions/Regional Offices visiting ADB headquarters 231 275
13
MEASURE Data Collection
Provider PurposeNo. of
Trips 2004No. of Trips
2005
6 Bank Car For airport transfers of Bank personnel from Resident Missions/Regional Offices visiting ADB headquarters 231 275
7 Bank Car For airport transfer of staff living outside Metro Manila who are going on official mission. 221 230
8 Bank Car For airport transfers of ADB Vice Presidents, Directors and Alternates for official travel, including home leave. In case of education travel, service is extended up to their dependents. 320 329
9 Bank Car For conveyance of assigned Bank personnel liaising with government agencies, such as Department of Foreign Affairs, Dept. of Finance, for visa, passport, and travel document processing, including other government liaison activities 527 509
10 Bank Car For delivery and pick up of official documents. 29 45
11 Alamo For airport transfers of Bank personnel for mission travel, seminar partipants for Bank sponsored seminars including guests for interview 8,921 7,981
12 Nissan Car Lease
For conveyance of support staff rendering overtime 934 1,143
16,905 16,459
Completed Vehicle Requests
14
MEASURE
No.o
f Tr
ips
Perc
ent
Category
CountPercent 52.8 16.3 9.2 7.1 5.5 3.1 1.9 4.0Cum %
8921
52.8 69.1 78.3 85.4 90.9 94.1 96.0 100.0
2763 1558 1198 934 527 320 684
1800016000
140001200010000800060004000
20000
100
80
60
40
20
0
Completed Vehicle Requests in 2004
15
MEASURE
No.o
f Tr
ips
Perc
ent
Category
CountPercent 48.5 15.2 11.6 7.9 6.9 3.1 2.0 4.7Cum %
7981
48.5 63.7 75.3 83.2 90.2 93.3 95.3 100.0
2504 1906 1307 1143 509 329 780
1800016000
140001200010000800060004000
20000
100
80
60
40
20
0
Completed Vehicle Requests in 2005
MEASURE
Cost Drivers in Transport Operations
Data Collection
Bank Cars
Salary of Regular Drivers 54,473 54,430
Overtime of Regular Driver 19,612 16,162
Salary of Agency Drivers 12,350 13,179
Overtime of Agency Drivers 6,650 7,097
Vehicle Maintenance 5,573 5,465
Gasoline & Oil Consumption 11,821 21,015
Vehicle Depreciation 51,000 51,000
Sub-total 161,479 168,348
2004US$
2005US$
17
MEASURE
Cost Drivers in Transport Operations
Data Collection
2004US$
2005US$
Alamo Transport
Fixed Monthly Rental 75,664 56,185
Back-up vehicles 20,964 15,729
Sub-total 96,628 71,914
Nissan Car Lease
Monthly Rental 12,093 11,794
Sub-total 12,093 11,794
Total 270,199 252,056
18
MEASURE
Am
ount
in U
S $
Perc
ent
Cost Drivers
Count 12.3Percent 28.0 20.2 18.9 7.8 7.2 4.6 4.5 4.4
75.74.5
Cum % 28.0 48.2 67.0 74.8 82.0 86.6 91.1 95.5
54.5
100.0
51.0 21.0 19.6 12.4 12.1 11.8
300
250
200
150
100
50
0
100
80
60
40
20
0
Cost Drivers of Vehicle Requests in 2004
19
MEASURE
Am
ount
in U
S $
Per
cent
Cost Drivers
Count 12.6Percent 22.3 21.6 20.2 8.3 6.4 6.2 5.2 4.7
56.25.0
Cum % 22.3 43.9 64.1 72.4 78.9 85.1 90.3 95.0
54.4
100.0
51.0 21.0 16.2 15.7 13.2 11.8
250
200
150
100
50
0
100
80
60
40
20
0
Cost Drivers of Vehicle Requests in 2005
20
MEASURE
Cost per Kilometer for Airport Transfers
Type of VehicleCost / 15 Km
in US$ Cost/Km in US$
Alamo Sedan Car 9 0.6
Alamo Coaster 61 4.1
BC Driver / Land Cruiser 19 1.3
BC Driver / Hi-Ace 17 1.1
BC Driver / Camry 16 1.1
BC Driver / Coaster 33 2.2
Agency Driver / LandCruiser 14 0.9
Agency Driver / Hi-Ace 12 0.8
Agency Driver / Camry 10 0.7
Agency Driver / Coaster 26 1.7
21
MEASUREUS$
Perc
ent
Vehicle
Count 0.7 0.6Percent 28.3 15.2 11.7 9.0 7.6 7.6 6.2
4.15.5 4.8 4.1
Cum % 28.3 43.4 55.2 64.1 71.7 79.3
2.2
85.5 91.0 95.9 100.0
1.7 1.3 1.1 1.1 0.9 0.8
16
14
12
10
8
6
4
2
0
100
80
60
40
20
0
Cost Per Kilometer per Vehicle for Airport Transfers
22
MEASURE
Cost
Frequency
43210-1
4
3
2
1
0
Mean 1.45StDev 1.050N 10
Histogram (with Normal Curve) of Cost
23
MEASURE
43210-1
USL
10987654321
1000000
100000
10000
1000
100
10
1
Date:
Lower Spec:Nominal: 1.16 Opportunity:
Reported by:Project:Department:Process:Characteristic:Units:Upper Spec: 1.45
Actual (LT)
Process Performance Process Demographics
Actual (LT) Potential (ST)
Sigma(Z.Bench)
DPMO
0.00
500000.0
1.50
66807.2
Process Benchmarks
Report 1: Executive Summary
24
MEASURE
10987654321
4
2
0
_X=1.45
UCL=4.435
LCL=-1.535
Observation10987654321
4
2
0
__MR=1.122
UCL=3.667
LCL=0
ST
* 0.00Z.LSL * *Z.Bench 1.50 0.00Z.Shift 1.50
LT
1.50P.USL * 0.5P.LSL * *P.Total 0.0668072 0.5
Mean
Yield 93.32 50.00DPMO 66807.2 500000.0Cp * *Cpk
1.16
* *CCpk * *Pp * *Ppk *
1.45
0.00
StDev * 1.080Z.USL
1.45 1.45
4.68895-1.78895
I and MR Chart
Process Tolerance
Specifications
Potential (ST) Capability
Process Tolerance
Specifications
Actual (LT) Capability
Data Source:Time Span:Data Trace:
Capability I ndices
Report 2: Process Capability for Cost
25
MEASURE
Cost/ km
Frequency
2.01.51.00.50.0
3.0
2.5
2.0
1.5
1.0
0.5
0.0
Mean 1.156StDev 0.5151N 9
A Camry
A Hi-Ace
A Land Cruiser
B/C T. Coaster
B/C Camry
B/C T. Hi-Ace
B/C Land Cruiser
Alamo Car
Cost of Airport Transfer Per KilometerNormal
26
MEASURE
2.01.51.00.50.0
USL
987654321
1000000
100000
10000
1000
100
10
1
Date:
Lower Spec:Nominal: 0.9248 Opportunity:
Reported by:Project:Department:Process:Characteristic:Units:Upper Spec: 1.156
Actual (LT)
Process Performance Process Demographics
Actual (LT) Potential (ST)
Sigma(Z.Bench)
DPMO
0.00
499666.3
1.50
66698.9
Process Benchmarks
Report 1: Executive Summary
27
MEASURE
987654321
2
1
0
_X=1.156
UCL=2.652
LCL=-0.340
Observation987654321
2
1
0
__MR=0.563
UCL=1.838
LCL=0
ST
* 0.00Z.LSL * *Z.Bench 1.50 0.00Z.Shift 1.50
LT
1.50P.USL * 0.499666P.LSL * *P.Total 0.0666989 0.499666
Mean
Yield 93.33 50.03DPMO 66698.9 499666.3Cp * *Cpk
0.9248
* *CCpk * *Pp * *Ppk *
1.15556
0.00
StDev * 0.531Z.USL
1.156 1.156
2.74963-0.438519
I and MR Chart
Process Tolerance
Specifications
Potential (ST) Capability
Process Tolerance
Specifications
Actual (LT) Capability
Data Source:Time Span:Data Trace:
Capability I ndices
Report 2: Process Capability for Cost/ km
28
ANALYZE
CAUSE AND EFFECT
FACTORS THAT IMPACT TRANSPORTATION COST
•People
•Vehicles
•Policies & Procedures
•Processes
29
ANALYZE
Reduce Transportation Service Cost by 20%
& Optimize Resources
PeopleVehices
Policies and Procedures Processes
Bank Drivers
Bank Policies & AOs
Bank Vehicles
Contracted Vehicles
Service Requests
Agency Drivers
SalaryOvertime
Meal AllowanceE-Cola
CC
C
SalaryOvertime
Shift Premium
C
Type/Make Fuel Consumption
Repairs
Fixed RentalOvertime
Back-up cars
Coverage of ServiceRestrictions
C
Time of Requests Drivers Schedule
Cancellation
C
CAUSE AND EFFECT DIAGRAM
30
ANALYZEANALYZE
• People
Regular drivers
– Salary – Overtime– Shift Premium
Agency Drivers
– Salary – Overtime– Meal Allowance– E-Cola
CAUSE AND EFFECT
31
ANALYZEANALYZECAUSE AND EFFECT
Agency Drivers
Personnel Appointment Age
Agency Driver 1 04-Mar-99 43
Agency Driver 2 28-Nov-01 34
Agency Driver 3 29-Nov-01 33
Agency Driver 4 01-Aug-05 26
Agency Driver 5 01-Aug-05 40
Agency Driver 6 01-Aug-05 34
Agency Driver 7 04-Aug-05 42
Agency Driver 8 05-Oct-05 36
Agency Driver 9 19-Apr-06 27
Agency Driver 10 08-Jun-06 34
Agency Driver 11 08-Jun-06 29
32
ANALYZEANALYZECAUSE AND EFFECT
Agency Drivers 2005
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total $
No. of Drivers 6 6 6 6 6 6 6 9 9 9 9 9
Salary
49,676
41,128
51,048 48,894
49,292
46,536
49,031
82,355
82,354
83,616
78,890
80,060
742,881
13,507
Overtime
43,800
37,940
42,277 38,657
36,621
54,579
64,432
64,134
59,061
69,233
76,337
72,505
659,577
11,992
Meal Allowance
11,880
10,920
12,160
11,400
11,640
11,680
11,800
19,480
20,396
19,160
19,840
19,560
179,916
3,271
E. Cola 7,425
6,465
7,175
7,125
6,896
7,228
7,925
13,366
12,756
12,222
12,531
12,281
113,395
2,062
Total 112,782
96,454
112,660
106,076
104,449
120,023
133,188
179,335
174,567
184,231
187,598
184,406
1,511,362
30,832
33
ANALYZEANALYZECAUSE AND EFFECT
Agency Drivers 2006
Jan Feb Mar Apr May Jun Total $
No. of Drivers 9 9 9 9 11 11
Salary 89,443 73,595 93,282 76,844 96,203 95,514 524,881 10,094
Overtime 36,253 40,199 57,310 67,701 72,165 55,598 329,226 6,331
Meal Allowance 18,880 15,280 22,590 22,242 26,469 20,000 125,461 2,413
E. Cola 11,802 10,475 12,291 11,266 13,391 13,375 72,600 1,396
Total 156,378 139,549 185,473 178,053 208,228 184,487 1,052,168 20,234
34
ANALYZEANALYZE
CAUSE AND EFFECT
Regular Drivers 2005 2006
Salary $56,221
PHP3,092,148
$51,123
PHP2,658,397
Overtime 2,494 hours
$ 15,308
PHP841,931
Jan to Jun
450 hours
$3,386
PHP176,077
Shift Premium Pay 4,289 hours
$ 5,643
PHP301,422
832 hours
$ 1,320
PHP68,638
Total $77,172
PHP4,235,501
$55,829
PHP2,903,112
35
ANALYZEANALYZE
CAUSE AND EFFECT
Agency Drivers 2005 Jan to Jun 2006
Salary $13,507
PHP742,881
Jan – July 6 drivers
Aug –Dec 9 drivers
$10,094
PHP524,881
Jan –Apr 9 drivers
May - Jun 11 drivers
Overtime $11,992
PHP659,577
8,973 hours
$6,331
PHP329,226
3,480 hours
Meal Allowance
E-Cola
$3,271
PHP179,916
$2,062
PHP113,395
$2,413
PHP125,461
$1,396
PHP72,600
Total $30,832
PHP1,695,768
$20,234
PHP1,052,461
36
ANALYZEANALYZE
• Vehicles
Bank Vehicles
– Type/Model/Cost
– Fuel consumption
– Maintenance and Repair
Contracted Vehicles
– Fix Rental
– Overtime
– Back-up cars
CAUSE AND EFFECT
37
ANALYZEANALYZE
CAUSE AND EFFECT
NO. PLATE NO. DESCRIPTION MODEL US $ AMT.
1 NUD-500 Water Tank Trailer 1983 591
2 DC6358 Toyota Land Cruiser SW VX 4.8 1994 26,948
3 DC6361 Chevrolet Suburban 1998 124,550
4 DC6373 Toyota Coaster 2000 35,644
5 DC6300 Mercedes Benz - S600 2001 152,060
6 OEV 21969 Toyota Hi-Ace Ambulance 2.0 2001 27,134
7 DC6367 Toyota Camry GXE 2.0 A/T 2001 14,390
8 DC6369 Toyota Camry GXE 2.0 A/T 2001 14,390
9 DC6356 Toyota Hi-Ace GL 2.0 2001 15,228
10 DC6370 Toyota Land Cruiser SW VX 4.8 2002 35,666
11 DC6354 Toyota Land Cruiser SW GX 4.5 2002 24,347
12 DC6353 Toyota Land Cruiser SW GX 4.5 2002 24,347
13 DC6360 Toyota Hi-Ace GL 2.0 2002 14,342
14 DC6359 Toyota Camry 2.0 A/T 2003 16,010
15 DC6363 Toyota Camry 2.0 A/T 2003 16,010
16 DC6364 Toyota Camry 2.0 A/T 2003 16,010
17 DC6355 Toyota Camry 2.0 A/T 2003 16,010
18 DC6365 Toyota Hi-Ace GL 2.0 2003 15,141
19 DC6357 Toyota Hi-Ace GL 2.0 2004 16,203
20 DC6371 Toyota Hi-Lux Pick-Up 4 X 2 2004 11,513
21 DC6352 Toyota Camry 2.4V A/T 2004 21,789
22 DC6366 Toyota Land Cruiser GX 4.5 2005 32,218
23 OEV17672 Toyota Hi-Ace Van 2.0 2005 18,316
24 DC6368 Toyota Camry 2.4V A/T 2006 22,285
25 DC6351 Toyota Camry 2.4V A/T 2006 22,285
$ 733,425
Bank Vehicles
38
ANALYZEANALYZE
CAUSE AND EFFECT
SUMMARY ALLOCATION NO. OF VEHICLES
Dedicated Vehicles
President's Vehicles 2
Non-Pool Vehicles
Building Maintenance & Communication 2
Engineering Emergency Response Vehicle 1
Ambulance 1
PhCO 1
Pool Vehicles 17
Total 24
Bank Vehicles
39
ANALYZEANALYZE
CAUSE AND EFFECT
Bank VehiclesGASOLINE CONSUMPTION AND REPAIR 2005 2006
Plate No. Yr Model/Make Liters Amount Repair Liters Amount Repair
DC6300 2001 Mercedes Benz 2,393 69,308 230,475 1,552 50,098 110,048
DC6351 2006 T. Camry - - - 1,301 40,239 2,477
DC6352 2005 T. Camry 1,906 56,152 - 1,389 43,850 3,600
DC6353 2002 T. Land Cruiser 3,920 114,019 400 2,104 67,330 8,299
DC6354 2002 T. Land Cruiser 4,451 127,141 21,764 2,538 81,809 1,227
DC6355 2003 T. Camry 2,827 79,490 3,600 1,657 51,121 13,530
DC6356 2001 T. Hi-Ace 2,068 60,903 53,007 1,129 36,730 9,336
DC6357 2004 T. Hi-Ace 2,879 83,519 - 1,587 49,901 300
DC6358 1994 T. Land Cruiser - 3,306 - - 1,725 -
DC6359 2003 T. Camry 2,520 71,954 8,767 1,738 52,273 5,500
DC6360 2002 T. Hi-Ace 2,280 67,785 15,969 1,513 48,216 400
DC6361 1998 C.Suburban 1,176 32,441 30,655 225 8,129 456
DC6363 2003 T. Camry 2,758 78,179 20,321 1,543 47,382 14,271
DC6364 2003 T. Camry 3,315 93,638 14,086 1,653 51,653 26,280
DC6365 2003 T. Hi-Ace 2,417 67,718 11,723 1,268 40,498 222
DC6366 2005 T. Land Cruiser 2,162 64,659 - 1,114 37,447 7,673
DC6367 2001 T. Camry 3,036 45,363 4,511 1,450 45,363 89,465
DC6368 2006 T. Camry - - - 1,687 52,631 6,571
DC6369 2001 T. Camry 1,691 50,301 2,481 1,100 35,220 100
DC6370 2001 T. Land Cruiser 4,435 123,119 19,312 - - -
DC6371 2004 T. Hi-Lux 523 15,544 - 268 9,174 -
DC6373 2000 T. Coaster 1,532 45,703 34,173 671 22,808 -
OEV17672 2005 T. Close Van 1,264 38,547 9,786 907 29,421 1,400
OEV21969 2001 T. Ambulance 409 13,261 - 201 7,360 -
49,962 1,402,049 481,030 28,596 910,377 301,157
25,492 8,746 16,552 5,476
40
ANALYZEANALYZE
CAUSE AND EFFECT
Bank Vehicles 2005 2006
Vehicle Depreciation
$46,376
15 Vehicles
PHP2,550,680
$49,694
17 Vehicles
PHP1,292,044
Fuel Consumption 45,896 liters
$ 23,290
PHP1,280,935
Jan to Jun
25,937 liters
$14,973
PHP823,499
Vehicle Repairs $ 4,378
PHP240,768
$ 3,449
PHP189,709
Total $74,044
PHP4,072,383
$68,116
PHP2,305,252
41
ANALYZEANALYZE
CAUSE AND EFFECT
Particular Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
Fixed Rental 342,000
342,000
342,000
342,000
342,000
228,000
228,000
228,000
228,000
228,000 2,850,000
Overtime
Dispatchers 20,200
22,800
19,650
17,100
19,050
13,500
9,250
9,600
10,300
10,950 152,400
Drivers 50,070
52,710
43,410
41,520
43,008
28,090
34,290
35,130
40,620
33,600 402,448
Back-up Cars 26,135
208,837
40,825
21,232
14,810
12,700
12,250
20,587
30,846
21,020 409,242
MO. TOTAL PHP
438,405
626,347
445,885
421,852
418,868
282,290
283,790
293,317
309,766
293,570 3,814,090
MO. TOTAL
$ 7,971
11,388
8,107
7,670
7,616
5,133
5,160
5,333
5,632
5,338 69,347
Contracted Vehicles2005
42
ANALYZEANALYZE
CAUSE AND EFFECT
Particulars Jan Feb Mar Apr May Jun Total
Fixed Rental
228,000
228,000
228,000
228,000
228,000
228,000
1,368,000
Overtime
Dispatchers 7600 5950
5,250 10,500
5,650
5,000
39,950
Drivers 22120 26110 29,460
28,930
25,510
25,000
157,130
Back-up Cars 9330 18260
8,790 18,510
47,530
3,180
105,600
MO. TOTAL PHP
267,050
278,320
271,500
285,940
306,690
261,180
1,670,680
MO. TOTAL$
5,136
5,352
5,221
5,499
5,898
5,023
32,128
Contracted Vehicles2006
43
ANALYZEANALYZE
CAUSE AND EFFECT
Contracted Vehicles
2005 2006
Jan to Jun
Alamo
Fixed Rental
$51,818
PHP2,850,000
$26,308
PHP1,368,000
Alamo Dispatchers & Drivers Overtime
$ 10,089
PHP554,848
$3,790
PHP197,080
Alamo
Back-up cars
$ 7,440
PHP409,242
$ 2,030
PHP105,600
Total $69,347
PHP3,814,090
$32,128
PHP1,670,680
44
ANALYZEANALYZE
• Policies and Procedures
Coverage of Service
– Types of Services Covered
– Restrictions
CAUSE AND EFFECT
45
ANALYZEANALYZE
CAUSE AND EFFECT
AO4.14
SCOPE OF TRANSPORT SERVICE
3.1 Bank vehicles may be used, subject to availability, for the following purposes:
(a) For travel on official Bank business within the Metro Manila area. For official missions outside Metro Manila, vehicles may be used for destinations not serviced by domestic airline companies and where road travel is the most convenient and cost effective mode of travel, subject to clearance by the Bank's Security Unit;
(b) For Bank-sponsored seminars, meetings and conferences, the need for additional vehicles may be satisfied, in case the requirement cannot be met by Bank vehicles, by leasing the necessary units from the outside, with the cost chargeable to the special budget allocated for the function;
(c) Airport transfers in Manila for Bank personnel either in commencement or continuation of travel funded by the Bank relating to the appointment, repatriation, emergency and home leave of personnel;
(d) Airport transfers of official Bank guests and member country delegations including other travel on official Bank business of these guests and delegation members;
(e) For delivery and pick-up of official documents; and
(f) Other official uses, subject to the approval of Head, OASS-TS.
46
ANALYZEANALYZE
CAUSE AND EFFECT
A01.05
TRANSPORTATION SCHEME
7.1 All national officers and administrative staff in ADB Headquarters who render overtime continuously for at least four (4) hours until 7:30 p.m. or later during regular workdays of ADB are entitled to avail of either of the following transportation options:
Option 1: Reimbursement of taxi transportation expensesOption 2: Contracted vehicle service
7.2 Only Option 1 will be available for overtime work rendered during weekends and ADB holidays when staff members have worked at least 12 hours of work until 7:30 p.m. or later. (including meal breaks). For staff members who are shift workers who render overtime on such weekdays or ADB holidays, only Option 1 will be available on completion of 8 hours of overtime work, which should conclude between 7:30 p.m. and 5:00 a.m. The guidelines and procedures governing the implementation of this scheme are provided in detail in Appendix 1.
47
ANALYZEANALYZE
• Processes
Service Requests
– Type & Time Request
– Schedule of drivers
– Cancellation of Requests
CAUSE AND EFFECT
48
ANALYZEANALYZE
CAUSE AND EFFECT
CATEGORY ALAMO BC B/UP TOTAL
Mission Travel 3457 852 353 4662
HOMELEAVE 2 637 0 639
OTHERS 31 568 6 605
APPOINTMENT 0 0 0 0
INTERVIEW 61 8 0 69
EMERGENCY 3 5 0 8
3554 2070 359 5983
2005 TRIPS FOR DEPARTURE AIRPORT TRANSFER
49
ANALYZEANALYZE
CAUSE AND EFFECT
CATEGORY ALAMO BC B/UP TOTAL
MISSION 3462 809 498 4769
HOMELEAVE 6 664 5 675
OTHERS 46 426 29 501
APPOINTMENT 5 115 1 121
INTERVIEW 58 8 0 66
EMERGENCY 1 5 0 6
3578 2027 533 6138
2005 TRIPS FOR ARRIVAL AIRPORT TRANSFER
50
ANALYZEANALYZE
CAUSE AND EFFECT
2006 AIRPORT TRANSFERS TRIPS
PARTICULAR ALAMO BC B/UP TOTAL
DEPARTURE
MISSION 986 775 42 1,803
HOME LEAVE - 204 - 204
OTHERS 6 210 - 216
INTERVIEW 20 14 1 35
TOTAL 1,012 1,203 43 2,258
PARTICULAR ALAMO BC B/UP TOTAL
ARRIVAL
MISSION 1,028 603 43 1,674
HOMELEAVE - 282 5 287
OTHERS 4 201 - 205
APPOINTMENT 5 30 - 35
EMERGENCY 1 2 - 3
INTERVIEW 20 10 - 30
TOTAL 1,058 1,128 48 2,234
51
ANALYZEANALYZE
CAUSE AND EFFECT
2005 VEHICLE REQUEST FOR BUSINESS TRIPS
Particular JAN. FEB. MAR. APR. MAY JUN JUL AUG SEPT OCT. NOV. DEC. Total
BANK GUEST 1 3 0 11 7 2 0 2 11 9 4 7 57
EMBASSY 11 15 12 8 13 24 19 5 15 10 19 8 159
GOV'T. OFFICES 45 51 43 60 58 40 68 70 66 77 5 57 640
LOAN NEGOTIATION 4 2 19 19 6 10 9 21 31 37 5 22 185
MEETING 71 49 100 86 72 70 61 69 76 73 73 39 839
NAIA 6 8 8 7 0 12 0 0 0 0 0 0 41
OFFICIAL 13 3 20 13 10 12 0 5 6 2 4 1 89
SERVICE 34 44 42 30 29 21 18 25 32 13 27 18 333
SEMINAR 17 59 71 70 66 38 23 47 90 98 50 34 663
3006
52
ANALYZEANALYZE
CAUSE AND EFFECT
2006 VEHICLE REQUEST FOR BUSINESS TRIPS
PARTICULAR JAN. FEB. MAR. APR. MAY JUN TOTAL
BANK GUEST 2 8 6 3 5 48 72
EMBASSY 3 22 12 13 4 8 62
GOV'T. OFFICES 37 99 40 94 45 23 338
LOAN NEGOTIATION 1 29 3 21 15 21 90
MEETING 36 72 51 68 21 29 277
NAIA 0 3 0 0 0 0 3
OFFICIAL 1 7 22 4 10 21 65
SERVICE 5 25 15 23 11 10 89
SEMINAR 12 78 15 64 31 37 237
97 343 164 290 141 197 1232
53
ANALYZEANALYZE
CAUSE AND EFFECT
LOCAL MISSION OUTSIDE METRO MANILA
JAN. FEB. MAR. APR. MAY JUN JUL AUG SEPT OCT. NOV. DEC. Total
2005 1 2 2 3 8 11 2 4 4 18 6 3 64
2006 6 7 7 8 6 34
CONVEYANCE OF SUPPORT STAFF RENDERING OVERTIME
YearNo. of
request Amount
2005 1,143 $11,794
2006 331 $4,263
54
ANALYZEANALYZE
• Quick Wins
– Schedule & shifting of drivers.
– Utilize agency drivers.
– Reduce utilization of back-up cars
CAUSE AND EFFECT
55
IMPROVEIMPROVE
NEW DATA
Dispatcher &
Regular Drivers
Mar to Aug 2005
(PHP)
Mar to Aug 2006
(PHP)
Salary 1,562,500
1 OIC Dispatcher
6 Drivers
1,349,995
1 OIC Dispatcher
5 Drivers
Overtime 1,527 hours
515,405
446 hours
174,779
Shift Premium Pay 3,054 hours
189,662
868 hours
59,821
Total 2,267,567 1,584,595
56
IMPROVEIMPROVE
NEW DATA
Agency Drivers Mar to Aug 2005
(PHP)
Mar to Aug 2006
(PHP)
Salary 327,156
Mar– July 6 drivers
Aug - 9 drivers
551,376
Mar - Apr 9 drivers
May – Aug 11 drivers
Overtime 300,700
4,623hours
340,783
4,275 hours
Meal Allowance
E-Cola
78,160
49,715
129,941
76,399
Total 775,731 1,098,499
57
IMPROVEIMPROVE
NEW DATA
Bank Vehicles Mar to Aug 2005
(PHP)
Mar to Aug 2006
(PHP)
Vehicle Depreciation
1,275,340
15 Vehicles
1,292,044
17 Vehicles
Fuel Consumption 557,004
21,142 liters
26/liter
821,610
25,231 liters
32/liter
Maintenance & Repairs
141,345 348,969
Total 1,973,689 2,462,623
2001 Land Cruiser replacement of transmission2001 T. Camry replacement of under chassis
58
IMPROVEIMPROVE
NEW DATA
Contracted Vehicles
Mar to Aug 2005
(PHP)
Mar to Aug 2006
(PHP)
Alamo Transport
Fixed Rental
1,938,000 1,368,000
Overtime of Dispatchers & Drivers
371,108 195,060
Back-up cars 324,089 126,410
Total 2,633,197 1,689,470
59
IMPROVEIMPROVE
NEW DATA
Contracted Vehicles
Mar to Aug 2005
(PHP)
Mar to Aug 2006
(PHP)
Nissan Car Lease
Rental Charges
399,514 305,357
60
IMPROVEIMPROVE
NEW DATA
Am
ount
in P
HP (
,000)
Perc
ent
Cost Drivers
Count 324 301 190 269Percent 24.1 19.5 15.9 6.9 6.4
19385.0 4.6 4.1 4.0 3.7 2.4 3.4
Cum % 24.1 43.6
1563
59.5 66.4 72.8 77.8 82.4 86.5 90.5 94.3 96.6 100.0
1275 557 515 399 371 327
9000
8000
7000
6000
5000
4000
3000
2000
1000
0
100
80
60
40
20
0
Cost Drivers of Vehicle Trips from Mar to Aug 2005
61
IMPROVEIMPROVE
Am
ount
in P
HP (
,000)
Perc
ent
Cost Drivers
Count 195 175 130 262Percent 19.2 18.9 18.1 11.5 7.7
13684.9 4.8 4.3 2.7 2.5 1.8 3.7
Cum % 19.2 38.1
1350
56.2 67.7 75.4 80.3 85.1 89.3 92.1 94.5 96.3 100.0
1292 822 551 349 341 305
Other
Agency
Driv
ers M
eal A
llowan
ce
Regul
ar Staf
f Ove
rtime
Alamo OT
of disp
tache
rs an
d dr
ivers
Nissan
Car
Lease
Agency
Driv
ers O
vertime
Main
tenan
ce &
Rep
air
Agency
Driv
ers S
alary
Fuel
Consu
mption
Vehic
le Dep
recia
tion
Regul
ar Staf
f Sala
ry
Alamo fix
rental
charges
8000
7000
6000
5000
4000
3000
2000
1000
0
100
80
60
40
20
0
Cost Drivers of Vehicle Trips from Mar to Aug 2006
NEW DATA
62
IMPROVEIMPROVE
NEW DATA
Category Alamo Bank cars Back up Total
Mission 1,898 270 209 2,377
Home Leave 1 375 - 376
Others (Bank guests, Loan negotiation) 16 269 - 285
Appointment - - - -
Interview 36 5 - 41
Emergency 3 4 - 7
1,954 923 209 3,086
Summary of Departure Trips March to August 2005
63
IMPROVEIMPROVE
NEW DATA
Summary of Departure Trips March to August 2006
Category Alamo Bank cars Back-up Total
Mission 1,157 1,006
63
2,226
Home Leave - 428 -
428
Others (Bank guests, Loan negotiation) 7 273
-
280
Interview 21 19
3
43
Emergency - 17 -
17
Repatriation - 1 -
1
993 1,231
55
2,995
64
IMPROVEIMPROVE
NEW DATA
Category Alamo Bank cars Back-up Total
Mission 1897 255 342 2494
Home Leave 5 357 5 367
Others (Bank guests, Loan negotiation) 35 189 12 236
Appointment 1 69 0 70
Interview 32 1 0 33
Emergency 0 4 0 4
1970 875 359 3204
Summary of Arrival Trips March to August 2005
65
IMPROVEIMPROVE
NEW DATA
Summary of Arrival Trips March to August 2006
Category Alamo Bank cars Back-up Total
Mission 1,376 970 54 2,400
Home Leave 3 322 3 328
Others (Bank guests, Loan negotiation) 5 259 -
264
Appointment 10 44 - 54
Emergency 3 3 - 6
For interview 24 20 - 44
1,421 1,618 57 3,096
66
IMPROVEIMPROVE
NEW DATA
Summary of Business Trips March to August 2005
Category Mar Apr May Jun Jul Aug Total
Bank guests 2 7 17 2 9 18 55
Visa filing at embassy 13 8 7 31 16 4 79
Visit to Philippine government offices (DFA,DOF, BOC) 43 32 36 34 27 40 212
Loan negotiations, signing 20 32 21 16 9 36 134
Official meetings 124 156 126 95 111 98 710
Training, Seminar & Conferences 69 34 34 28 19 33 217
Service for inspection, site visits, & liaison work at NAIA 21 7 12 6 4 4 54
Delivery & pick-up of equipment & document, house moving 24 28 9 5 3 11 80
Local mission outside Metro Manila 2 3 8 11 2 4 30
318 307 270 228 200 248 1,571
67
IMPROVEIMPROVE
NEW DATA
Summary of Business Trips March to August 2006
Category Mar Apr May Jun Jul Aug Total
Bank guests 11 3 9 5 4 9 84
Visa & passport filing at embassy 15 8 9 11 6 14 63
Visit to Philippine government offices (DFA,DOF, BOC) 35 31 36 37 20 44 203
Loan negotiations & signing 9 2 33 47 13 29 133
Official meetings 158 102 103 82 63 139 647
Training, Seminar & Conferences 15 11 50 33 15 34 158
Service for inspection, site visits, & liaison work at NAIA 9 3 9 5 4 8 38
Delivery & pick-up of equipment & document, house moving 5 8 16 5 5 11 50
Local mission outside Metro Manila7 7 8 6 1 6 35
264 175 273 231 131 294 1,376
68
IMPROVEIMPROVE
NEW DATA
Summary of Trips for Conveyance of Support Staff After Overtime
Year Mar Apr May Jun Jul Aug Total
Mar to Aug 2005 224 141 78 88 92 55 678
Mar to Aug 2006 98 66 61 70 54 26 375
69
IMPROVEIMPROVE
• Quick Wins
– Schedule & shifting of drivers
1. We discontinued the regular pool drivers to work on shift schedule and were scheduled to work from 8:00am to 4:30pm. This reduced the overtime of regular drivers by 70%.
2. Increased the agency drivers from 6 to 11 to work on shift to serve the requirements that entail overtime. This reduced the shift premium pay of regular drivers by 73%.
3. Agency drivers were assigned on 3 shifts during weekends to monitor transport operations. Put regular drivers working on shift on weekends in the regular pool on weekdays.
70
IMPROVEIMPROVE
• Quick Wins
4. Reduced the number of contracted vehicles in August 2005 from 6 to 4 and utilized ADB vehicles and drivers for additional requirements for mission airport transfers. This increased the number of mission airport transfers served by ADB vehicles by 60%
5. Reduced the use of back-up vehicles for mission airport transfers by 80%.
71
IMPROVEIMPROVE
NEW DATA
VehiclesMar-Aug
2005Mar-Aug
2006Increase/
(Decrease)
Contracted VehiclesAlamo Transport & Nissan Car Lease
3,032,711 1,994,827
(1,037,884)
Bank Vehicles4,998,992
5,147,723 148,731
Total 8,029,698 7,140,544(889,154)
Summary of Cost for Transportation Services
72
IMPROVEIMPROVE
Cost per Kilometer for Airport Transfers March to August 2005
Vehicle Used SalaryVehicle
Depreciation Fuel Maintenance Cost/Trip Cost/Km
Alamo Contracted Vehicles 494 32
Bank Vehicles w/ Staff Driver 641 176.7 77 20 895 60
Bank Vehicles w/ Agency Driver 201 176.7 77 20 455 30
Nissan Car Lease 575 38
73
IMPROVEIMPROVE
Cost per Kilometer for Airport Transfers March to August 2006
Vehicle Used SalaryVehicle
Depreciation Fuel Maintenance Cost/Trip Cost/Km
AlamoContracted Vehicles 567 38
Bank Vehicles w/ Staff Driver 619 149.9 95 41 904 60
Bank Vehicles w/ Agency Driver 207 149.9 95 41 493 33
Nissan Car Lease 675 45
74
IMPROVEIMPROVE
Cost per Kilometer for Airport Transfers Sept to Dec 2006 (projected)
Vehicle Used SalaryVehicle
Depreciation Fuel Maintenance Cost/Trip Cost/Km
AlamoContracted Vehicles 567 38
Bank Vehicles w/ Staff Driver 619 149.9 95 41 904 60
Bank Vehicles w/ Agency Driver 207 149.9 95 41 493 33
Nissan Car Lease 675 45
75
NEW DATA
60555045403530
Median
Mean
6050403020
Anderson-Darling Normality Test
Variance 189.333Skewness 1.65822Kurtosis 2.69024N 4
Minimum 30.000
A-Squared
1st Quartile 30.500Median 35.0003rd Quartile 54.500Maximum 60.000
95% Confidence I nterval for Mean
18.105
0.44
61.895
95% Confidence I nterval for Median
30.000 60.000
95% Confidence I nterval for StDev
7.795 51.304
P-Value 0.129
Mean 40.000StDev 13.760
95% Confidence I ntervals
Mar-Aug 2005 Cost Per Km
Mean is P40 per Km.
Normal Distribution
76
Indiv
idual V
alu
e
4321
100
50
0
_X=40
UCL=98.5
LCL=-18.5
Movin
g R
ange
4321
80
40
0
__MR=22
UCL=71.88
LCL=0
Observation
Valu
es
4321
60
45
30
75604530150
LSL USL
SpecificationsLSL 30USL 60
100500
Within
Overall
Specs
WithinStDev 19.5035Cp 0.26Cpk 0.17
OverallStDev 14.935Pp 0.33Ppk 0.22Cpm *
Process Capability Sixpack of Cost Per Km Mar-Aug 2005I Chart
Moving Range Chart
Last 4 Observations
Capability Histogram
Normal Prob PlotAD: 0.439, P: 0.129
Capability Plot
Ppk is 0.22
Sigma Level is 2.16.
77
605550454035
Median
Mean
6050403020
Anderson-Darling Normality Test
Variance 138.000Skewness 1.04865Kurtosis 0.76066N 4
Minimum 33.000
A-Squared
1st Quartile 34.250Median 41.5003rd Quartile 56.250Maximum 60.000
95% Confidence I nterval for Mean
25.307
0.24
62.693
95% Confidence I nterval for Median
33.000 60.000
95% Confidence I nterval for StDev
6.655 43.801
P-Value 0.523
Mean 44.000StDev 11.747
95% Confidence I ntervals
Cost Per Km Mar-Aug 2006
Mean is P44/Km.
Distribution is Normal.
78
Indiv
idual V
alu
e
4321
100
50
0
_X=44
UCL=98.1
LCL=-10.1M
ovin
g R
ange
4321
50
25
0
__MR=20.33
UCL=66.43
LCL=0
Observation
Valu
es
4321
60
50
40
7560453015
LSL USL
SpecificationsLSL 30USL 60
100500
Within
Overall
Specs
WithinStDev 18.026Cp 0.28Cpk 0.26
OverallStDev 12.7506Pp 0.39Ppk 0.37Cpm *
Process Capability Sixpack of Cost per Km 2006 NewI Chart
Moving Range Chart
Last 4 Observations
Capability Histogram
Normal Prob PlotAD: 0.245, P: 0.523
Capability Plot
Ppk is 0.37
Sigma level is 2.61.
79
656055504540
Median
Mean
706050403020
Anderson-Darling Normality Test
Variance 167.583Skewness 1.89485Kurtosis 3.68412N 4
Minimum 38.000
A-Squared
1st Quartile 38.750Median 41.5003rd Quartile 60.000Maximum 66.000
95% Confidence I nterval for Mean
26.151
0.60
67.349
95% Confidence I nterval for Median
38.000 66.000
95% Confidence I nterval for StDev
7.333 48.268
P-Value 0.040
Mean 46.750StDev 12.945
95% Confidence I ntervals
Summary for Cost Per Km Sep-Dec 2006
Mean is P46.75/Km.
Distribution is Non-normal.
80
Ppk is 0.37
Sigma level is 2.61.
Indi
vidu
al V
alue
4321
2
0
-2
_X=-0.009
UCL=3.164
LCL=-3.182
Mov
ing
Ran
ge
4321
4
2
0
__MR=1.193
UCL=3.898
LCL=0
Observation
Val
ues
4321
1
0
-1
210-1-2
LSL* USL*
Specifications
LSL* -1.33887USL* 0.95972
40-4
Overall
Specs
Overall
Location -0.00883964Scale 0.865475Pp 0.44
Ppk 0.37
Process Capability Sixpack of Cost Per Km Sep-Dec 2006Johnson Transformation with SU Distribution Type-0.255 + 0.241 * Asinh( ( X - 41.026 ) / 0.248 )
I Chart
Moving Range Chart
Last 4 Observations
Capability Histogram
Normal Prob PlotAD: 0.155, P: 0.872
Transformed Capa Plot
81
SummaryMar-Aug
2005
Mar-Aug
2006
Sept - Dec
2006 (Projected)
Mean 40 44 46.75
Sigma Level 2.16 2.61 2.61
Operating Cost
P8,029,698
($156,068)
P7,140,544
($138,786)
P4,358,873
($87,177)
Cost Savings P889,154
($17,282)
P9,530
($190)
Improvement in Process capability.Target – Reduce cost to $200,000 for 2006 (budgeted amount) or reduce cost by $50,000.Cost reduction for Mar-Aug 2006 is $17,282.
82
IMPROVEIMPROVE
• Major Proposed Solutions: With Timeline
– Termination of contract with Alamo Transport - Implemented 1 September 2006.
– To optimize use of available ADB vehicles and hire additional agency drivers to serve mission airport transfers.
– Implementation of revised Administrative Order on Transportation Services – Implemented 1 September 2006
83
CONTROLCONTROL
• From 1 September 2006, airport transfers are provided with ADB vehicles driven agency drivers. This will optimize the use of ADB vehicles which is estimated to serve some 8,000 trips annually and eliminate the need for contracted vehicles.
• Agency drivers will replace regular drivers who will retire in the last quarter of 2006. This will further reduce cost on regular staff salaries in 2006 and 2007.
• From 1 September 2006, an estimated 7.5% reduction on vehicle trips for home leave airport transfers is expected with the implementation of the new AO on Transportation Services.
• Further review to determine fleet size, type of vehicles to maintain will be conducted in the last quarter of 2006. This will also include the retention period of each vehicles.
Project Implementation
84
Revised Specification LimitsCONTROLCONTROL
LSL USL Target
Reduce Transport Services Costby 20%
2005 Budget PHP 14,466,412
2006 Budget PHP 11,573,130 11,573,130
85
CONTROLCONTROL
Regular Drivers 2005
PHP
2006
Jan to Aug
PHP
Projected
Sep to Dec 2006
PHP
Salary 3,092,148 1,799,994 712,500
Overtime 2,494 hours
841,931
602 hours
176,077
301
78,894
Shift Premium Pay 4,289 hours
301,422
868 hours
59,821
434 hours
39,881
Total 4,235,501 2,035,892 831,275
Total 2006 2,867,167
Increase/(Decrease) (1,368,334)
86
CONTROLCONTROL
Agency Drivers 2005
PHP
2006
Jan to Aug
PHP
Projected
Sep to Dec 2006
PHP
Salary 742,881 717,414 735,168
Overtime 659,577 329,226 454,377
Meal Allowance
E-Cola
179,916
113,395
164,101
98,676
173,255
101,865
Total 1,695,768 1,394,426 1,464,665
Total for 2006 2,859,091
Increase/(Decrease) 1,163,323
87
CONTROL CONTROL
Bank Vehicles 2005
PHP
2006
Jan to Aug
PHP
Projected
Sep to Dec
PHP
Vehicle Depreciation 15 Vehicles
2,550,680
17 Vehicles
1,722,725
17 Vehicles
861,363
Fuel Consumption 45,896 liters
1,280,935
36,100 liters
1,155,200
24,000 liters
888,000
Vehicle Repairs 240,768 395,729 110,000
Total 4,072,383 3,273,654 1,859,363
Total for 2006 5,133,017
Increase/(Decrease) 1,060,634
88
CONTROLCONTROL
Contracted Vehicles
2005
PHP
2006
Jan to Aug
PHP
Projected
Sep to Dec
PHP
Alamo Fixed Rental 2,850,000 1,368,000 0
Alamo Overtime of Dispatchers & Drivers
554,848 258,690 0
Alamo Back-up cars 409,242 129,910 0
Nissan Car Lease 648,670 367,245 184,000
Total 4,462,760 2,123,845 184,000
Total for 2006 2,307,845
Savings 2,154,915
89
Cost Drivers 2005
PHP
2006
PHP
Increase/
(Decrease)
Regular Drivers 4,235,501 2,867,167 (1,368,334)
Agency Drivers 1,695,768 2,859,091 1,163,323
Bank Vehicles 4,072,383 5,133,017 1,060,634
Contracted Vehicles 4,462,760 2,307,845 (2,154,915)
Total 14,506,026 13,167,120 (1,299,292)
9% of the Target
Or Savings of US$ 25,986
Summary
90
CONTROLCONTROLBenefits
• With the implementation of proposed solutions, projected cost reduction for Transport Services is estimated at $26,000
• Process Sigma improved from 2.16 to 2.61. More improvement in the process is envisaged with the implementation of proposed solutions.
91
CONTROLCONTROL
Soft Savings
•Increased customer satisfaction – staff enjoy ADB cars that are bigger, cleaner, and well maintained.
• Optimized staff productivity previously spent on waiting for trips with the discontinuation of contracted vehicles.
• Optimized used of bank vehicles.
92
Lessons Learned
1. Six Sigma process is a powerful tool in analyzing data and making decisions.
2. Although controlling cost drivers is possible, some factors like price increases in vehicle maintenance and fuel cost that are beyond our control may affect the cost reduction.
3. Every member in the project is important, we were able to communicate ideas and learn from each others’ experience and in the process develop a team project.