I-81 Viaduct Project
Would replace the I-81 viaduct with a new viaduct that meets the latest engineering design standards
Full reconstruction of I-81 between approximately Colvin Street and Hiawatha Boulevard
Reconstruction of I-690 from Leavenworth Avenue to Lodi Street, including all connections between I-81 and I-690
New viaduct would have at least four 12-foot travel lanes (two in each direction) and full shoulders
Cost:
$2.2 billionConstruction duration:
6 years
Viaduct Alternative
I-81 Viaduct ProjectOnondaga County, New York
2017
Appendix C: Visual Simulations
Original Photograph
Direction of View: North
Viewpoint 18Almond Street at East Adams Street
Landscape Unit:Transportation Corridor - Highway
Sheet 1 of 3
I-81 Viaduct ProjectOnondaga County, New York
2017
Appendix C: Visual Simulations
Note: These visualizations are representative of design intent and the preliminary layout of site elements. These elements will be further refined as the design progresses. The final selection of site elements such as lighting, planting, and paving, as well as materials, colors and finishes, will be determined during final design. Trees and plantings are shown in an established and mature state.
Visual Simulation: Viaduct Alternative
Direction of View: North
Landscape Unit:Transportation Corridor - Highway
Sheet 2 of 3
Viewpoint 18Almond Street at East Adams Street
Almond Street at East Adams Street,
looking north
I-81 Viaduct ProjectOnondaga County, New York
2017
Appendix C: Visual Simulations
Original Photograph
Direction of View: West
Viewpoint 7Harrison Street at Almond Street
Landscape Unit:Urban Institutional Campus
Sheet 1 of 3
I-81 Viaduct ProjectOnondaga County, New York
2017
Appendix C: Visual Simulations
Note: These visualizations are representative of design intent and the preliminary layout of site elements. These elements will be further refined as the design progresses. The final selection of site elements such as lighting, planting, and paving, as well as materials, colors and finishes, will be determined during final design. Trees and plantings are shown in an established and mature state.
Visual Simulation: Viaduct Alternative
Direction of View: West
Viewpoint 7Harrison Street at Almond Street
Landscape Unit:Urban Institutional Campus
Sheet 2 of 3
The new viaduct from Harrison
Street would be approximately 10 to 15 feet higher than the existing viaduct
(right), which is approximately 20
feet tall
Before
After
Before
After
South of Harrison Street, the new viaduct generally would be approximately 10 to 20 feet wider, depending on the section, than the 66-foot-wide existing viaduct.
Between Harrison and Genesee Streets, the viaduct would begin to split into separate structures for the northbound and southbound roadways. Multiple structures would carry mainline travel lanes connecting to the local street and interstate network. As a result of these connections, wider shoulders, and other improvements, the footprint of the new viaduct would be substantially wider than the existing viaduct footprint (above in red).