I-81 Viaduct Project Would replace the I-81 viaduct with a new viaduct that meets the latest engineering design standards Full reconstruction of I-81 between approximately Colvin Street and Hiawatha Boulevard Reconstruction of I-690 from Leavenworth Avenue to Lodi Street, including all connections between I-81 and I-690 New viaduct would have at least four 12-foot travel lanes (two in each direction) and full shoulders Cost: $2.2 billion Construction duration: 6 years Viaduct Alternative Almond Street at East Adams Street, looking north The new viaduct from Harrison Street would be approximately 10 to 15 feet higher than the existing viaduct (right), which is approximately 20 feet tall Before After Before After South of Harrison Street, the new viaduct generally would be approximately 10 to 20 feet wider, depending on the section, than the 66-foot-wide existing viaduct. Between Harrison and Genesee Streets, the viaduct would begin to split into separate structures for the northbound and southbound roadways. Multiple structures would carry mainline travel lanes connecting to the local street and interstate network. As a result of these connections, wider shoulders, and other improvements, the footprint of the new viaduct would be substantially wider than the existing viaduct footprint (above in red).

$2.2 billion · Landscape Unit: Urban Institutional Campus Sheet 1 of 3 I-81 Viaduct Project Onondaga County, New York 2017 Appendix C: Visual Simulations Note: These visualizations

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: $2.2 billion · Landscape Unit: Urban Institutional Campus Sheet 1 of 3 I-81 Viaduct Project Onondaga County, New York 2017 Appendix C: Visual Simulations Note: These visualizations

I-81 Viaduct Project

Would replace the I-81 viaduct with a new viaduct that meets the latest engineering design standards

Full reconstruction of I-81 between approximately Colvin Street and Hiawatha Boulevard

Reconstruction of I-690 from Leavenworth Avenue to Lodi Street, including all connections between I-81 and I-690

New viaduct would have at least four 12-foot travel lanes (two in each direction) and full shoulders

Cost:

$2.2 billionConstruction duration:

6 years

Viaduct Alternative

I-81 Viaduct ProjectOnondaga County, New York

2017

Appendix C: Visual Simulations

Original Photograph

Direction of View: North

Viewpoint 18Almond Street at East Adams Street

Landscape Unit:Transportation Corridor - Highway

Sheet 1 of 3

I-81 Viaduct ProjectOnondaga County, New York

2017

Appendix C: Visual Simulations

Note: These visualizations are representative of design intent and the preliminary layout of site elements. These elements will be further refined as the design progresses. The final selection of site elements such as lighting, planting, and paving, as well as materials, colors and finishes, will be determined during final design. Trees and plantings are shown in an established and mature state.

Visual Simulation: Viaduct Alternative

Direction of View: North

Landscape Unit:Transportation Corridor - Highway

Sheet 2 of 3

Viewpoint 18Almond Street at East Adams Street

Almond Street at East Adams Street,

looking north

I-81 Viaduct ProjectOnondaga County, New York

2017

Appendix C: Visual Simulations

Original Photograph

Direction of View: West

Viewpoint 7Harrison Street at Almond Street

Landscape Unit:Urban Institutional Campus

Sheet 1 of 3

I-81 Viaduct ProjectOnondaga County, New York

2017

Appendix C: Visual Simulations

Note: These visualizations are representative of design intent and the preliminary layout of site elements. These elements will be further refined as the design progresses. The final selection of site elements such as lighting, planting, and paving, as well as materials, colors and finishes, will be determined during final design. Trees and plantings are shown in an established and mature state.

Visual Simulation: Viaduct Alternative

Direction of View: West

Viewpoint 7Harrison Street at Almond Street

Landscape Unit:Urban Institutional Campus

Sheet 2 of 3

The new viaduct from Harrison

Street would be approximately 10 to 15 feet higher than the existing viaduct

(right), which is approximately 20

feet tall

Before

After

Before

After

South of Harrison Street, the new viaduct generally would be approximately 10 to 20 feet wider, depending on the section, than the 66-foot-wide existing viaduct.

Between Harrison and Genesee Streets, the viaduct would begin to split into separate structures for the northbound and southbound roadways. Multiple structures would carry mainline travel lanes connecting to the local street and interstate network. As a result of these connections, wider shoulders, and other improvements, the footprint of the new viaduct would be substantially wider than the existing viaduct footprint (above in red).