7/27/2019 21Aumund : firm products presentation
1/22
Solutions for modification and upgrade
of existing material handling equipment
in a cement plant
By Peter Mueller / Sebastian Maerz
AUMUND Foerdertechnik GmbH
7/27/2019 21Aumund : firm products presentation
2/22
W E C O N V E Y Q U A L I T Y
Introduction
Daily Business
Cost Efficiency
Continous Improvement
7/27/2019 21Aumund : firm products presentation
3/22
W E C O N V E Y Q U A L I T Y
Introduction
Cost EfficiencyEquipment requiring high
maintenance efforts?
Expensive spare parts / not
available?
Equipment with poor availability?
7/27/2019 21Aumund : firm products presentation
4/22
W E C O N V E Y Q U A L I T Y
Introduction
Continous ImprovementKiln UpgradeAdditional Production Line
Different Product
7/27/2019 21Aumund : firm products presentation
5/22
W E C O N V E Y Q U A L I T Y
Introduction
Continous ImprovementAdditional Raw Materials / Additives
7/27/2019 21Aumund : firm products presentation
6/22
W E C O N V E Y Q U A L I T Y
Introduction
Continous ImprovementAdditional Clinker Receipt
7/27/2019 21Aumund : firm products presentation
7/22
W E C O N V E Y Q U A L I T Y
Introduction
Continous Improvement
Higher plant output?
New product brands with
different specifications?
Higher / different demands for
certain raw materials?
Changed process specifications?
7/27/2019 21Aumund : firm products presentation
8/22
W E C O N V E Y Q U A L I T Y
Conversion Advantages
30 80% reduced
Investment
Less Dis- &
Reassembly
Newest Technology
Updated Safety
Standard
Lower Maintenance
Costs
Higher Availabilty
7/27/2019 21Aumund : firm products presentation
9/22
W E C O N V E Y Q U A L I T Y
Bucket Elev. Case Study
What is the cost benefit?
Case Study BW-Z
Analysis Cost Structure
Small Version CC 10mLarge Version CC 75m
7/27/2019 21Aumund : firm products presentation
10/22
W E C O N V E Y Q U A L I T Y
Bucket Elev. Case Study
Head
Steelwork
Casing
BootSteelwork Tension
Axle comp.
Drive Unit
comp.
Drive Shaftcomp. Chain &
Bucket
7/27/2019 21Aumund : firm products presentation
11/22
W E C O N V E Y Q U A L I T Y
Bucket Elev. Case Study
4.2%17.4%Head Steelwork
29.5%11.4%Casing
2,7%13.5%Boot Steelwork
LargeSmallItem
Head
Steelwork
Casing
BootSteelwork
Sample Calculation BW-Z 400/320 CC 10 / 75 m Capacity: 50 / 400 t/h @ 1,3 t/m
7/27/2019 21Aumund : firm products presentation
12/22
W E C O N V E Y Q U A L I T Y
58%
14%
11%
17%
64%
3%
30%
4%
CC 10 m 50 t/h CC 75 m 400 t/h
Cost Portion / Item
Head Steelwork
Casing
Boot Steelwork
Other
Bucket Elev. Case Study
Reuse
7/27/2019 21Aumund : firm products presentation
13/22
W E C O N V E Y Q U A L I T Y
58%
42%
64%
36%
CC 10 m 50 t/h CC 75 m 400 t/h
Cost Portion / Item
Casing/Steelwork
Other
Bucket Elev. Case Study
Saving
7/27/2019 21Aumund : firm products presentation
14/22
W E C O N V E Y Q U A L I T Y
58% 64%
CC 10 m 50 t/h CC 75 m 400 t/h
Cost Portion / Item
Casing/Steelwork
Other
Bucket Elev. Case Study
7/27/2019 21Aumund : firm products presentation
15/22
W E C O N V E Y Q U A L I T Y
Bucket Elev. Case StudyIncrease plus
potential furthersavings
Motor?
Gearbox?
Hubs?
Driveshaft?
Bearings?
.
Tension
Axle comp.
Drive Unit
comp.
Drive Shaftcomp.
4,9 - 7,5 %
12,4 - 20,7 %
1,8 - 5,7 %
7/27/2019 21Aumund : firm products presentation
16/22
W E C O N V E Y Q U A L I T Y
Bucket Elev. Case Study
Further Advantages
Cost advantage when
saving one week of
erection time?
Cost impact when
having a higher
availability and less
maintenancenecessary?
7/27/2019 21Aumund : firm products presentation
17/22
W E C O N V E Y Q U A L I T Y
Example of Reference
7/27/2019 21Aumund : firm products presentation
18/22
W E C O N V E Y Q U A L I T Y
Capacity Increase
The Situation:
CC 73.5m
Lift 40 m
7/27/2019 21Aumund : firm products presentation
19/22
W E C O N V E Y Q U A L I T Y
Capacity Increase
The Situation:
7.500 t/day
9.000 t/day
Increase to
7/27/2019 21Aumund : firm products presentation
20/22
W E C O N V E Y Q U A L I T Y
Power supply unit (1) Rotary control switch (2) Error LED / red (3)
Pot ent io meter ( 4) T erm inal str ip (5 )LCD-Display (6) LED fast mode green (7)
Example of Reference
7/27/2019 21Aumund : firm products presentation
21/22
W E C O N V E Y Q U A L I T Y
Current Limitations
noconversionsforgreenfieldprojects
7/27/2019 21Aumund : firm products presentation
22/22
Solutions for modification and upgrade
of existing equipment in a cement plant
By Peter Mueller / Sebastian Maerz
AUMUND Foerdertechnik GmbH