21st CCLC FY 2010Request for Proposals

Technical Assistance Workshops

January 22, 23, and Feb 2, 2009

Page 2: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

General Information (pp.1, 2) Title IV, Part B, NCLB

$17.8 million in FY 2010

Minimum grant award-- $50,000

Maximum grant award--$150,000 per site

5 year award, based on sufficient funding from USDE

Final grant award to be negotiated by ISBE

Page 3: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Eligible Applicants ( p. 1)

LEAs public school districts public lab schools approved by ISBE charter schools area vocational centers

Community based organizations

Faith based organizations

Page 4: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Eligible Applicants

Public and private entities

Consortium of eligible organizations

ROE/ISC offices that coordinate activities for LEAS or others

Page 5: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Population to be Served (p. 2)

Students who attend schools with at least 40% low income families, i.e., schools eligible for Title I schoolwide programs (not necessarily receiving Title I funds)—REQUIRED AS ABSOLUTE PRIORITY

Students in prekindergarten through grade 12

Students in low performing schools, i.e., identified for state or federal improvement status

Families of students served in the program Includes homeless and their caretakers/guardians

Page 6: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

One Competition

One Competition for $17.8 Million No specific amount set aside for any

category of applicant

Classification based on the schools applicant wishes to serve New Applicants Previously funded applicants

Differing criteria Differing award amounts

Page 7: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

New Applicants ( p. 1)

An entity that has never received a grant under the 21st CCLC Program 

An entity that currently has a 21st CCLC grant or had received a grant in the past and wishes to apply for new funds to serve only schools for which the applicant has not received 21st CCLC funds during any other grant cycle; or  

An entity that has a current 21st CCLC grant and is applying for funds to expand or enhance services (i.e., new grade levels or age ranges of students) in schools that it now serves.

Page 8: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Previously Funded Applicants (p. 2)

  An applicant that is an entity whose grant has

expired or will expire at the end of FY09 and that is applying for funds to serve one or more schools to which it has provided services under a previous grant.

 

Page 9: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Previously Funded Applicants (p. 2)

May also provide services to new schools but will be limited by amount of funds that a previously funded applicant may receive.

Any new school added to a grant of a previously funded applicant must be in improvement status.

Page 10: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Applicant Experience (p. 1)

New applicant: If the applicant has had no previous experience, demonstrate the likelihood that it will successfully

implement the program and

its capability to provide educational and related activities that will complement and enhance the academic performance, achievement, and positive youth development of the students.

Page 11: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Applicant Experience (p.1)

Previously funded applicants: Describe any successful results the applicant has had during the previously funded grant period and

include data from the most recent program evaluation that describe the high-quality programming that has been provided.

indicate how the partnerships the applicant has had in place specifically contributed to the quality and success of the previously funded project

Page 12: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Previously Funded Applicants Describe the roles these and other partners

will play in the continued efforts of the grantee.

Include any changes that were made to previously provided programming that resulted from the evaluation.

Submit a copy of the most recent program evaluation with the application.

Page 13: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Previously Funded

No continuation or “automatic” funding; competitive

Schools that were previously served but are no longer in status can be proposed for services as long as at least one school in the proposal is in academic status

Any new schools to be served must be in academic improvement status

Page 14: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Declining Funding ModelNew Grants (p. 2 and 13)

Year 1--negotiated amount $50,000 minimum $150,000 maximum per site

Year 2--level funding Year 3--level funding Year 4--90% of FY 2010 Year 5--75% of FY 2010

Page 15: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Declining Funding ModelPreviously Funded (p. 13)

Year 1 award equals Year 5 of previously funded grant

Years 2 and 3—level funded Year 4—75% of FY 2010 funded amount Year 5—50% of FY 2010 funded amount

Rationale: This is to validate the need for continued sustainability planning over the lifetime of the grants.

Page 16: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

21st CCLC Grant Period Begin date: July 1, 2009

End Date: June 30, 2010, or

August 31, 2010, if includes a summer program

Continued funding based on completion of Continuation Application and successful progress toward meeting goals and objectives

FY 2014 last year of funding

Page 17: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Continuation

No automatically renewable grants--

Annual application for continuation of funds

ISBE provides applications, forms, etc.

Substantial progress in meeting objectives will be required (APR and other data)

Page 18: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Goals (pp. 3, 4)

Programs must: help students meet the Illinois Learning

Standards help students meet local standards be aligned with/complement the curriculum

of school (esp. important for CBO/FBOs) be scientifically based be secular, neutral, and non ideological

Page 19: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Competitive Priorities (pp. 4, 5)

25 additional points will be awarded to applicants who propose to:

Serve students in schools that are at least 40% poverty;

and

Submit a joint application with at least one LEA and one public or private community organization;

and

Page 20: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Priority Points

New Applicants: Propose to serve only schools that are

identified for federal or state academic improvement status

Previously funded:Serve at least one school that is in status; may serve previously funded schools that are not in status, but all new schools must be in status.

Page 21: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Additional Priority (p. 5)

Based on guidance from USDE: An additional 15 points will be awarded to an

applicant that proposes services to at least one middle or high school.

Middle School—includes the following grades exclusively

5-8 6-8 7-8

High School Any school that serves a combination of

grades 9-12 and grants a diploma

Page 22: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Additional Information

Don’t propose services to schools already being funded.

Lists of schools currently being served by the grant are posted on line at http://www.isbe.net/21cclc/PDF/schools_served.pdf

Lists of schools “in status” are posted at http://www.isbe.net/research/htmls/improvement.htm.

Page 23: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Specifications (p. 6)

Provide students with academic enrichment opportunities as well as additional opportunities to complement regular academic programs

Offer academic, artistic, and cultural enrichment programs when school is not in session

Page 24: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

New Requirements for Programming(p. 6)

12 hours per week 28 weeks per year Parental services required

GED classes Citizenship classes Literacy Parenting Social services ESL classes Other

Page 25: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Service Times (p. 6)

After school Before school Weekends Vacations Summer Days when school is not in session

Page 26: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Locations of Programs

Elementary, middle, secondary schools; or

Locations as safe and accessible as schools Describe how students will travel safely to

and from the site and home Funds (reasonable amounts) from grant

can be used for transportation, including public transportation

Page 27: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Programs Not Allowed (p. 6 )

No Saturday or summer school only programs

No programs during the regular school day unless for preschool or family members

No noon or recess programs No drop in programs; attendees must be

registered

Page 28: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Allowable Activities (pp. 6, 7)

Remedial education services and academic enrichment

Reading, math, and science activities

Arts and music education

Entrepreneurial education programs

Tutoring and mentoring

Page 29: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Allowable Activities (pp. 6, 7)

Activities for ELL students

Recreational activities

Expanded library hours

Technology education

Page 30: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Collaboration (p. 7)

No application from an entity other than a school district will be accepted without letters of collaboration from the school(s) to be served

School districts must have letters of collaboration from partners

Systems must be put into place to gather information from schools—especially important with CPS schools

Description of collaborator(s) required in app

Page 31: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Principles of Effectiveness (pp.7, 8)

Community Learning Center Programs must be based on

an assessment of objective data regarding the need for before-and after-school programs and activities in the schools and communities

an established set of performance measures aimed at ensuring the availability of high quality academic enrichment opportunities

If appropriate, scientifically based research that provides evidence that the program or activity will help students meet the Illinois Learning standards and local student academic achievement standards

Page 32: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Activities Based on Scientific Research (p. 8)

Cite these in the text of the narrative—no works cited page.

Research that is systematic, empirical using methods that draw on observation and experiment

Applicants base proposed strategies on such research, especially when providing services in core academic areas where it is available-- math, reading, and science (cite research in the narrative)

Page 33: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Evaluation Requirements (p.8) Annual evaluation required

Results used to refine, improve, and strengthen the program

Document made available to public and ISBE upon request—will be required as part of the Continuation Application each year

Participate in state and federal evaluation

Copy of Program Evaluation required from previously funded applicants

Page 34: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Evaluation (p. 9 and Attachment 6)

Used to refine, improve, and strengthen the program

Submitted to ISBE annually

Made available to the public upon request

Page 35: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Evaluation –Previously Funded

In addition to other requirements:

Describe and indicate whether maintaining or modifying the previously used evaluation plan and why this decision was made.

If changing, provide rationale for proposed changes.

Page 36: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Private School Participation (p. 10)

Students, teachers, and other ed personnel are eligible to participate on an equitable basis

Must provide comparable opportunities for the participation of both public and private school students in the area served by the grant

Page 37: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Private School Participation (p.10)

Must consult with private school officials during the design and development of the services described in the application

Program services must be secular, neutral, and non ideological

Sign off is required—Attachment11

Page 38: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Sustainability (p. 10 and Attachments 7A/B )

How will you maintain the size and scope of the program including the minimum number of hours per day and weeks per year as the funding declines in years 4 and 5?

Predict and include as part of plan other sources of fund that will be available in years 4 and 5.

Page 39: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Allowable Uses of Funds (p. 13)

Parental involvement and literacy

Assistance to truants, suspended, or expelled to allow academic achievement

Drug and violence prevention, counseling, and character education

Page 40: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Non-allowable Use of Funds( pp.14, 15 )

Proposal preparation costs

Pre award costs

Overnight or out of state travel for students

Food for professional development events, faculty, staff, or administrative meetings for staff in any setting except at Family Nights, etc.

Page 41: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Non-allowable Uses of Funds

Clothing

Incentives of cash, clothing, or other unreasonable costs

Purchase of equipment—computers, printers, scanners, telephones, etc., regardless of cost

Daily snack/meal costs (ISBE nutrition, www.isbe.net/nutrition or 217/782-2491)

Page 42: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Non-allowable Uses of funds

Furniture

Staff events that include retreats, lock-ins, or other events of a similar nature

Field trips that are purely recreational in nature (have no academic support)

Promotional or marketing items (mugs, pens, totes, banners, etc.)

Page 43: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Non-allowable Uses of Funds

Decorative items

Facility construction, remodeling, or renovation

Classes previously offered and paid for by district or other fund sources

Supplanting

Page 44: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Reporting Requirements

Collect and submit required annual performance report

Demonstrate substantial progress being made toward meeting goals and objectives of project

Participate in state-wide evaluation

Participate in the federal evaluation

Page 45: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

RFP Appendices (A-C)

A. List of Resources—not all inclusive

B. Statewide Objectives

C. Function and Object Descriptors to assist with budget preparation

Page 46: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

State Objectives (Appendix B)

Objective 1: Participants will demonstrate an increased involvement in school activities and in participating in other subject areas such as technology, arts, music, theater, and sports and other recreation activities.

Objective 2: Participants in the programs will demonstrate increased academic achievement.

Page 47: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Objectives, cont.

Objective 3: Participants in the programs will demonstrate social benefits and exhibit positive behavioral changes.

Objective 4: The 21st CCLCs will work toward services that benefit the entire community by including families of participants and collaborating with other agencies and non-profit organizations.

Page 48: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Objectives, cont.

Objective 5: These programs will serve children and community members with the greatest needs for expanded learning opportunities.

Objective 6: 21st CCLC Program personnel will participate in professional development and training that will enable them to implement an effective program. Professional development activities must be aligned with the No Child Left Behind Act definitions and National Staff Development Council’s professional development standards.

Page 49: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Objectives, cont.

Objective 7: 21st CCLC Program projects will use the funding most efficiently by coordinating and collaborating with other federal and state funding sources, agencies, and other community projects to supplement the program and not supplant the funds, and to eventually become self-sustaining.

Page 50: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Specifications-Attachment 13

A-S--Read carefully E. Notice of intent to submit F. Active collaboration with schools the

students attend H. Keep attendance records I. Conduct criminal background checks J. Train for and report suspected child abuse

and neglect K. Get permission to use students for public

relations purposes

Page 51: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Specific Terms of the Grant

L. Not be delinquent in debts to State M. Conduct needs assessments, parent and

student satisfaction surveys, and self-assessments for APR

N. Attend mandated workshops and trainings provided by ISBE

P. Provide reviewers for application review Q. Evaluate programs R. Course Credit

Page 52: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Proposal Style (p. 15)

Typed, using 1-inch margins, double-spacing and 12- point font;

Pages must be numbered and contain headers on each identifying the applicant;

No spiral binding or binders; and

No supplementary materials should be included and will not be reviewed.

Page 53: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Criteria for Review (pp.23-27)

Need 10 points Quality of Project Services 30 points Quality of Management Plan 15 points Adequacy of Resources 15 points Quality of Evaluation 10 points Sustainability 10 points Cost Effectiveness 10 points

Rubric used for scoring follows these criteria

Page 54: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Proposal Format (p. 16) Cover Page Abstract—1 page

Narrative—25 pages double spaced, 12 point font

Evaluation

Attachments-1-18

Appendices A-D

Page 55: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Required Appendices to Accompany Proposals

Appendix A--Principals’ Letters Appendix B—Partner Letters Appendix D--Detailed Job Descriptions for

positions included in the budget

For Previously Funded Applicants Appendix C-- Most recent written program

evaluation

Page 56: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Incomplete/Ineligible Applications

Missing signatures Missing RCDT codes (if applicant has one) Missing attachments Missing appendices

Will not be reviewed or scored!

Page 57: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Disallowed

Works cited pages (cite in text)

Attaching information not requested: Letters of endorsement/testimonials Newsletters CDs or DVDs Other

Will not be reviewed

Page 58: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Cover Page (Attachment 1)

Complete fully RCDT code

New grantees may have no code if non-school districts

Code will be issued if successful Applicant name, address, etc.

A. Applicants’ original signatures

Page 59: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Cover Page (Attachment 1)

B. Fiscal Agent original signature Entity that is non school district cannot

submit to work with a school without permission and signoff from district superintendent

Applicants working with CPS schools need signature of district designee—call

Page 60: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Summary (Attachment 2)

A. Applicant Name(s)

B. Non-public Consultation Submit Attachment 11

C. Priority points check Check if new or previously funded applicant

D. Second competitive priority check off (type of school)

Page 61: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Attachment 2

E. Total Funds Requested

F. Total Number of After School Sites G. Total Number of Partners

H. Partner Information (Provide letter from each explaining role and contributions

in Appendix B and as describe in the narrative

Page 62: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

After School Sites (Attachment 3) Complete all information requested Very important to have contact information for

main contact Complete a sheet for each site (duplicate as

needed) Multiple schools may be served at each site Complete all information for each school

Mark “yes” or “no” if served previously by this applicant

Give projected enrollments Provide the grades to be served

Page 63: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Proposal Abstract (Attachment 4)

RCDT code must be entered if known

Fiscal agent is applicant

Limit abstract to one page, double spaced

Describe the overall objectives and activities of the project

Page 64: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Proposal Narrative—No Attachment (pp. 16, 20)

Limit to 25 pages, double spaced

Content Describe need—what is the need and how will

this proposal meet the need? Estimate the number of students and families

to be served Describe recruitment and retention of students Describe consultation with private schools

Page 65: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Narrative (p. 20)

Describe the activities to be conducted for parents

Describe how activities will improve student achievement, esp. in math and reading

Reference scientifically based research

Identify other funding sources

Page 66: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Narrative

Describe partnership and collaboration efforts

Describe previous experience with after school programming or the likelihood of success

Describe any volunteers to be used

Page 67: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Project Services Chart (Attachment 5)

Complete the required information regarding

School Year Services

Summer Services

Page 68: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Evaluation (Attachment 6)

Limit to 2 pages, double spaced

Describe evaluation to be conducted to show success of program

Include quantitative and qualitative measures

Show how evaluation will be used for continuous improvement

Indicate the methods to be used and data to be collected (minimum is for objectives in Appendix B)

Page 69: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Sustainability Plan

(Attachments 7A/B, 10 points) Limit to 3 pages, double spaced, including chart

Describe the amounts and sources of additional funding that will used to maintain the size and scope in years 4 and 5 Complete chart

Describe the preliminary plan for how the proposed program will continue to exist when all 21st CCLC funds cease

Page 70: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Sustainability Plan (Attachments 7)

Previously funded: Describe previous measures taken to

maintain size and scope in years 4 and 5 in previous grant, including the funding sources that were used

Describe how the size and scope will be maintained in years 4 and 5 of this grant

Complete sustainability chart for this grant

Page 71: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Budget Summary and Payment Schedule (Attachment 8)

Refer to fiscal handbook at www.isbe.net/finance/default.htm, click on publications; see Appendix C

Get assistance from ROE, ISBE, or others

administrative cap—Function 2300

Payments must be requested monthly in amounts that are needed to meet expenses

Page 72: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Budget Breakdown (Attachment 9) Be sure to complete as accurately as possible

Get help

Refer to fiscal handbook (from previous page)

Describe expenditures completely and put into correct function and object codes

Refer to budget PowerPoint online at www.isbe.net/21cclc

Make sure costs are reasonable

Page 73: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

A Word about BudgetsBe practical—

Don’t ask for more funds than needed

Make sure instructional costs are adequate and a major component of the budget

Don’t pay exorbitant salaries

Don’t overload with staff—esp. admin staff

Don’t send in a budget that is exorbitant per pupil amount

Don’t include indirect costs unless are representing a university

Page 74: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Budget Tips

Do what is required—

Limit administrative cost to 5%

Include funds for staff development

Include funds for evaluation

Include transportation funds, if needed

Page 75: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Subcontractors (Attachment 10)

If subcontractors are to be used for any purpose, complete Attachment 10.

Subcontractors must be approved by ISBE

Details of subcontracting budgets must be included in budget

Contracts are always budgeted in Object 300 of the budget

Page 76: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Equitable Participation of Private Schools (Attachment 11)

Private school official and applicant must sign off that this has been done

Original signatures required

One attachment needed for each school

Duplicate as necessary

Page 77: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

State Required Graduation Courses(Attachment 12)

If program is to offer credit for courses that are required for graduation, this attachment must be signed and attached with proposal.

If courses are to be provided that are not required, this does not have to be completed, but a complete description should be provided in the application.

Page 78: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Specific Terms of the Grant(Attachment 13)

A-S--Read carefully E. Notice of intent to submit F. Active collaboration with schools the

students attend H. Keep attendance records I. Conduct criminal background checks J. Train for and report suspected child abuse

and neglect K. Get permission to use students for public

relations purposes

Page 79: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Program Specific

L. Not be delinquent in debts to State M. Conduct needs assessments, parent and

student satisfaction surveys, and self-assessments for APR

N. Attend mandated workshops and trainings provided by ISBE

P. Provide reviewers for application review Q. Evaluate programs R. Course Credit

Page 80: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Certificate and Assurances (Attachments 14-18)

Complete with required signatures

Co- applicants must sign also; make copies

for each and submit

Attachment 13—read carefully for program specific terms of the grant

Attachment 18—GEPA This is the “nondiscrimination” statement that

districts and other entities have on file

Page 81: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Proposal Reviewers

Readers will be knowledgeable about after school programs and issues Teachers Administrators Retired educators Non grantees but in after school

programming

Non conflict of interest statements will be signed

Training will be held Assignments will be made geographically, etc.

Page 82: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

New Grantee Workshop

Held in late summer to provide guidance as program is implemented

Page 83: 21 st CCLC FY 2010 Request for Proposals Technical Assistance Workshops January 22, 23, and Feb 2, 2009

Questions??

In Springfield, 217-524-4832

Marci Johnson [email protected] Gail Meisner [email protected] Carol McCue [email protected] Gary Miller [email protected]

In Chicago, 312/814-2282

Joe Banks [email protected]

ISBE 21st CCCLC website, www.isbe.net/21cclc