County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ADAIR KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704
(11.909) OVER PETTY'S FORK. (001B00078N)
(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
490,000
0 175,000 490,000
1068
ADAIR KY 55 CONGESTION MITIGTN(O) KY 55 NEW TURNING LANE AT BETTY'S OK
COUNTRY COOKING
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 0 250,000
80003
Total for ADAIR county PL
Total Amounts:
CN
UT
RW
DN
490,000
175,000 250,000
0 175,000 740,000
ALLEN KY-100 RECONSTRUCTION(O) IMPROVEMENTS TO KY 100: CURVE, BRIDGE,
AND INTERSECTION IMPROVEMENTS FROM
NEAR THE STONY POINT ROAD INTERSECTION
TO EAST OF THE ALONZO LONG HOLLOW
ROAD INTERSECTION (12CCR)CN
Project Cost:
UT
RW
DN
PL
SPP 1,880,000
0 0 1,880,000
320
ALLEN KY-100 RECONSTRUCTION(O) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM
SOUTH OF KY-2160 TO KY-980. (06CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 1,250,000
1,250,000 0 0
8305
Page 3 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ALLEN ECONOMIC DEVEL(O) IMPROVE ACCESS ROAD ON EACH END OF
INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE
CN
Project Cost:
UT
RW
DN
PL
SPP 300,000
0 0 300,000
8901
ALLEN KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE
OVER BAYS FORK. (002B00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
525,000
0 175,000 525,000
10000
ALLEN KY-585 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585 BRIDGE
OVER MIDDLE FORK DRAKES CREEK.
(002B00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
822,500
0 245,000 822,500
10011
ALLEN US 231 AIR QUALITY(P) CONSTRUCT A NEW TURN LANE ON US 231 AT
JOHNSON ROAD TO IMPROVE ACCESS TO
INDUSTRIAL PARK
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 0 250,000
80004
Total for ALLEN county PL
Total Amounts:
CN
UT
RW
DN
1,250,000 1,897,500
420,000
1,880,000
1,250,000 420,000 3,777,500
Page 4 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ANDERSON US-62 SPOT IMPROVEMENTS(O) IMPROVE US-62 (VERSAILLES RD.) FROM
HILLTOP DR. TO WEST END OF BRIDGE OVER
KENTUCKY RIVER AT TYRONE
CN
Project Cost:
UT
RW
DN
PL
SPP 1,200,000
0 0 1,200,000
80001
Total for ANDERSON county PL
Total Amounts:
CN
UT
RW
DN 1,200,000
0 0 1,200,000
BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM
STAFFORD ROAD TO BETHEL CHURCH ROAD
(INCLUDES KEVIL BYPASS)(TO BE LET WITH
1-115.10) (06CCR)(12CCR)(14CCR).
CN
Project Cost:
UT
RW
DN
PL
NH 2,500,000
0 0 2,500,000
115
BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT
OF CAIRO BRIDGE AT OR BESIDE EXISTING
LOCATION. (004B00021N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 2,500,000
0 0 2,500,000
1140.01
BALLARD US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
275,000
2,750,000
0 0 3,025,000
20000
Page 5 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for BALLARD county PL
Total Amounts:
CN
UT
RW
DN
2,750,000
2,775,000
2,500,000
0 0 8,025,000
BARREN LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE
PAINTING, CLEANING, AND MINOR REPAIRS ON
BRIDGE OVER I-65 IN BARREN CO. KY.
005B00067R, 005B00067L (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
NH 500,000
500,000 0 0
195
BARREN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE
OVER WATER STREET. (005B00058N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
945,000
0 245,000 945,000
10001
BARREN I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH
DIRECTION(S) FROM MILEPOINT 42.89 TO
MILEPOINT 43.307
CN
Project Cost:
UT
RW
DN
PL
PM
PM
50,000
500,000
0 550,000 0
20000
BARREN LN-9008 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF LOUIE B.
NUNN CUMBERLAND PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 16.117 TO
MILEPOINT 20.1
CN
Project Cost:
UT
RW
DN
PL
PM
PM
320,000
3,200,000
0 3,520,000 0
20003
Page 6 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BARREN LN-9008 NEW INTERCHANGE(O) NEW INTERCHANGE ON THE LOUIE NUNN
CUMBERLAND PARKWAY AT KY-249 IN
GLASGOW
CN
Project Cost:
UT
RW
DN
PL
SPP 1,500,000
0 0 1,500,000
80002
Total for BARREN county PL
Total Amounts:
CN
UT
RW
DN
500,000 3,700,000 945,000
615,000 1,500,000
500,000 4,315,000 2,445,000
BATH US-60 SAFETY(P) IMPROVE SAFETY AND EFFICIENCY AT THE
KY-211 AND US-60 INTERSECTION IN SALT LICK.
(14CCN)
CN
Project Cost:
UT
RW
DN
PL
STP 1,000,000
0 0 1,000,000
8813
BATH KY-1106 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1106 BRIDGE
OVER FLAT CREEK. (006B00069N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
595,000
2,258,000
0 595,000 2,258,000
10000
BATH KY-1944 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1944 BRIDGE
OVER WHITE OAK CREEK. (006B00076N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
473,000
1,015,000
0 473,000 1,015,000
10001
Page 7 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BATH KY-211 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211 BRIDGE
OVER COW CREEK. (006B00043N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
717,500
0 315,000 717,500
10017
BATH US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM 410,000
0 410,000 0
20001
Total for BATH county PL
Total Amounts:
CN
UT
RW
DN
4,990,500
1,793,000
0 1,793,000 4,990,500
BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE
OVER RED BIRD CREEK. (007B00071N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
441,000
0 175,000 441,000
10000
BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE
OVER RED BIRD CREEK. (007B00072N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
791,000
0 175,000 791,000
10001
Page 8 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BELL CR-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE
OVER YORK BRANCH. (007C00003N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
193,000
595,000
0 193,000 595,000
10002
BELL KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER
GREASY CREEK. (007B00040N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
490,000
0 175,000 490,000
10038
BELL KY-2012 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT, SCHOOL BUS SAFETY ISSUE.
CN
Project Cost:
UT
RW
DN
PL
PM
PM
61,000
610,000
0 671,000 0
20000
Total for BELL county PL
Total Amounts:
CN
UT
RW
DN
610,000 2,317,000
779,000
0 1,389,000 2,317,000
BOONE I-75 I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION ROAD)
INTERCHANGE. (14CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 5,430,000
5,430,000 0 0
14
Page 9 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE I-75 MINOR WIDENING(O) ADD AUXILIARY LANES ON I-71/75 FROM
KY-536 TO US-42 (NB & SB) AS PER THE
INTERCHANGE JUSTIFICATION STUDY (IJS).
(10CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 1,060,000
1,060,000 0 0
14.5
BOONE I-275 NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-275 AND
GRAVES ROAD (CONTINUATION OF 6-8953:
INTERCHANGE JUSTIFICATION STUDY ON
I-275/GRAVES RD).
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
NH
3,000,000
4,000,000
3,000,000
5,000,000
0 3,000,000 12,000,000
78
BOONE I-75 CONGESTION MITIGTN(O) IMPROVE SAFETY, MOBILITY, OPERATIONS, AND
GEOMETRICS AT THE JUNCTION OF I-75 AND
I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.
CN
Project Cost:
UT
RW
DN
PL
NH 2,000,000
0 2,000,000 0
79
BOONE US-25 MINOR WIDENING(O) MINOR WIDENING AND CONSTRUCT A
SOUTHBOUND LEFT TURN LANE ON US-25 (DRY
RIDGE-FLORENCE ROAD) AT MUBEA.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,100,000
0 1,100,000 0
351.45
BOONE US-42 SAFETY(P) IMPROVE MOBILITY AT THE INTERSECTION OF
KY-842 AND US-42. (12CCR)(16CCN)
CN
Project Cost:
UT
RW
DN
PL
STP 2,500,000
2,500,000 0 0
367
Page 10 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 414,000
414,000 0 0
400.03
BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 44,000
0 44,000 0
400.14
BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 44,000
0 0 44,000
400.15
BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 280,000
280,000 0 0
401.09
BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 56,000
0 56,000 0
401.14
Page 11 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SNK 56,000
0 0 56,000
401.15
BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY18 AIR QUALITY, FIAM, LAND
USE, RIDESHARE. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL SNK 150,000
150,000 0 0
401.18
BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2019 AIR QUALITY, FIAM,
LAND USE, RIDESHARE. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL SNK 150,000
0 150,000 0
401.19
BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2020 AIR QUALITY, FIAM,
LAND USE, RIDESHARE.
CN
Project Cost:
UT
RW
DN
PL SNK 150,000
0 0 150,000
401.2
BOONE KY-237 MATCHED FED FUNDS(O) INCREASE THROUGH LANE CAPACITY ON KY
237 FROM I-275 RAMPS TO CARDINAL WAY AND
IMPROVE WORLDWIDE BLVD WITH TWO-WAY
LEFT TURN AND ADDITIONAL RIGHT TURN TO SB
KY 237. (2012BOP)(ADM. BY KYTC)CN
Project Cost:
UT
RW
DN
PL
SNK 3,000,000
3,000,000 0 0
415
Page 12 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE CR-1002 MATCHED FED FUNDS(O) RECONSTRUCTION OF THE INTERSECTION OF
CAMP ERNST ROAD AND LONGBRANCH ROAD.
WIDENING OF 1,900 FEET OF LONGBRANCH
ROAD. (2012BOP)
CN
Project Cost:
UT
RW
DN
PL
SNK 524,640
524,640 0 0
422
BOONE KY-3060 MATCHED FED FUNDS(O) CORRECT GEOMETRIC DEFICIENCIES AND ADD
LEFT TURN LANES ON FROGTOWN ROAD AT
TRIPLE CROWN BLVD AND CEDARWOOD.
(2012BOP)(ADM. BY KYTC)
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
200,000
120,000
1,200,000
1,520,000 0 0
423
BOONE KY-717 SAFETY(P) IMPROVE SAFETY ALONG KY 717 AT THE 90
DEGREE BEND NEAR THE CIN/NKY AIRPORT,
0.337 MI N OF KY 1017. (FUNDING SUBJECT TO
FISCAL CONSTRAINT PENDING MPO TIP)
(2014BOP)CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
1,500,000
250,000
1,000,000
2,750,000 0 0
433
BOONE KY-3159 MATCHED FED FUNDS(O) WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM
DOERING DRIVE TO KY 1017 (AERO PARKWAY)
TO PROVIDE A TWO-WAY LEFT TURN LANE TO
IMPROVE TRAFFIC FLOW FOR FUTURE
DEVELOPMENT (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SNK 1,000,000
1,000,000 0 0
439
BOONE KY-237 MATCHED FED FUNDS(O) CONSTRUCT A MULTI-MODAL PATH ALONG KY
237 FROM STEPHENS ELEMENTARY SCHOOL
NORTH TO KY 20/PETERSBURG ROAD
(2016BOP).
CN
Project Cost:
UT
RW
DN
PL
SNK 1,786,400
1,786,400 0 0
440
Page 13 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE KY-3076 BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE
LANES AND RETAINING WALLS ALONG
DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC
BLVD IN THE CITY OF ERLANGER. (2016 BOP)
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
80,000
200,000
1,576,000
280,000 1,576,000 0
441
BOONE CR-1001 MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP ERNST
ROAD AT LONGBRANCH ROAD (2016BOP).
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
400,000
69,271
461,809
469,271 461,809 0
442
BOONE KY-236 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION
ALONG KY-236 (DONALDSON ROAD) FROM
KY-842 (HOUSTON ROAD) TO KY-3076
(MINEOLA PIKE).
CN
Project Cost:
UT
RW
DN
PL STP
STP
2,000,000
5,000,000
0 2,000,000 5,000,000
444
BOONE KY-3076 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE
CONGESTION ON KY-3076 (MINEOLA PIKE)
FROM KY-236 TO I-275.
CN
Project Cost:
UT
RW
DN
PL
STP 1,500,000
0 1,500,000 0
445
BOONE US-42 NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY AND
IMPROVED MOBILITY FROM KY-237 (PLEASANT
VALLEY ROAD) THRU KY-842 (HOPEFUL
CHURCH ROAD) TO MALL ROAD/I-75
INTERCHANGE.CN
Project Cost:
UT
RW
DN
PL
NH 1,500,000
0 0 1,500,000
446
Page 14 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE -0 SAFETY(P) SPOT IMPROVEMENTS AND CONGESTION
MITIGATION IN BOONE COUNTY FOR AMAZON
DEVELOPMENT.
CN
Project Cost:
UT
RW
DN
PL
SPP 2,000,000
2,000,000 0 0
937
BOONE -0 PREFINANCD CONVRSN(O) SPOT IMPROVEMENTS AND CONGESTION
MITIGATION IN BOONE COUNTY FOR AMAZON
DEVELOPMENT. (ADDITIONAL FUNDING FOR
6-937.00)
CN
Project Cost:
UT
RW
DN
PL
SPP 2,000,000
0 2,000,000 0
937.01
BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR NKY URBANIZED AREA AND
SUBJECT TO MPO CONTROL FOR FY 2018.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SNK 35,140,000
35,140,000 0 0
966
BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR NKY URBANIZED AREA AND
SUBJECT TO MPO CONTROL FOR FY 2019
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SNK 9,100,000
0 9,100,000 0
966.07
BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR NKY URBANIZED AREA AND
SUBJECT TO MPO CONTROL FOR FY 2020.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SNK 9,200,000
0 0 9,200,000
966.08
Page 15 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE KY-842 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS
(CNO&TP)RR ON RICHARDSON ROAD (KY 842)
0.14 MI E OF US 25 NEAR INDEPENDENCE
(008B00092N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
480,000
2,800,000
350,000
0 480,000 3,150,000
1087
BOONE KY-338 TRANSP ENHANCEMENT(P) PHASE II: IMPROVE INTERSECTION OPERATIONS
AT THE INTERSECTIONS OF IDLEWILD RD.
(KY-338)/JEFFERSON ST./TEMPERATE ST. AND
IMPROVE PEDESTRIAN SAFETY ALONG
IDLEWILD RD. AND JEFFERSON ST. (AS PER CN
Project Cost:
UT
RW
DN
PL
STP 500,000
500,000 0 0
3019.1
BOONE KY-237 RECONSTRUCTION(O) IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO
ROGERS LANE. (14CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 22,180,000
22,180,000 0 0
8001.21
BOONE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 169.439 TO
MILEPOINT 183.08
CN
Project Cost:
UT
RW
DN
PL
PM
PM
2,180,000
21,800,000
0 0 23,980,000
20002
BOONE KY-18 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
225,000
2,250,000
0 2,475,000 0
20008
Page 16 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOONE KY-237 RECONSTRUCTION(O) RECONSTRUCT GUNPOWDER RD. FROM US-42
TO KY-536
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 1,000,000 0
80000
BOONE KY-237 CONGESTION MITIGTN(O) EXPANSION OF ROUNDABOUTS ALONG KY-237
AT CARDINAL COVE AND GRAVES RD
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
500,000
250,000
250,000
0 1,000,000 0
80001
BOONE US 42 AIR QUALITY(P) INCREASE CAPACITY AND REDUCE CONGESTION
ON US 42 AT I 71/75
CN
Project Cost:
UT
RW
DN
PL
SPP 650,000
0 650,000 0
80003
Total for BOONE county PL
Total Amounts:
CN
UT
RW
DN
71,525,040 16,587,809 36,100,000
9,355,000 8,680,000
150,000 2,150,000 150,000
2,180,000 250,000 6,800,000
7,129,271 250,000 3,350,000
80,984,311 28,592,809 55,080,000
BOURBON KY-3364 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRUCTURE OVER
SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH
OF US 460 AT NORTH MIDDLETOWN (BRIDGE
IMPROVEMENTS). (03KYDN)(2012BOP) (16CCN)
CN
Project Cost:
UT
RW
DN
PL
KYD 1,568,000
1,568,000 0 0
365.1
Page 17 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOURBON US-460 RECONSTRUCTION(O) IMPROVE US-460 FROM RUSSELL CAVE ROAD
TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP
STP
1,000,000
1,000,000
0 2,000,000 0
8705
BOURBON CR-1205 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH
RO BRIDGE OVER HOUSTON CREEK.
(009C00031N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
143,500
325,500
0 143,500 325,500
10007
BOURBON CR-1320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD
BRIDGE OVER CSX RR. (009R00605N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
220,500
518,000
0 220,500 518,000
10008
BOURBON US-68 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
250,000
2,500,000
0 2,750,000 0
20002
Total for BOURBON county PL
Total Amounts:
CN
UT
RW
DN
2,500,000 843,500
1,568,000 614,000
1,000,000
1,000,000
1,568,000 5,114,000 843,500
Page 18 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HUNTINGTON-ASHLAND MPO FOR FY 2018.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SAH 6,265,000
6,265,000 0 0
208.04
BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HUNTINGTON-ASHLAND MPO FOR FY 2019.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SAH 1,200,000
0 1,200,000 0
208.05
BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HUNTINGTON-ASHLAND MPO FOR FY 2020.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SAH 1,200,000
0 0 1,200,000
208.06
BOYD -0 MATCHED FED FUNDS(O) PLANNING STUDY/ENVIRONMENTAL
ASSESSMENT FOR RUSH OFF ROAD (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
SAH 48,000
48,000 0 0
404
BOYD US-60 CONGESTION MITIGTN(O) IMPROVE US-60 FROM I-64 AT INTERCHANGE
181 TO THE KY-180 INTERSECTION AT
CANNONSBURG. (08CCN) (10CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 5,000,000
0 0 5,000,000
8400
Page 19 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOYD US-23 SAFETY(P) SAFETY UPGRADES AND CONSTRUCT TURN
LANES ON US-23 AT 12TH STREET -
CATLETTSBURG. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 920,000
920,000 0 0
8801
BOYD US-23 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH STREET
BRIDGE OVER THE OHIO RIVER. JOINT PROJECT
WITH OHIO. (010B00040N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR 1,750,000
1,750,000 0 0
10014
BOYD US-60 AM-BRIDGE (P) PAINTING AND PREVENTIVE MAINTENANCE ON
CATLETTSBURG KENOVA BRIDGE ON 35TH ST.
OVER THE OHIO RIVER. JOINT PROJECT WITH
OHIO. (010B00062N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR 1,200,000
0 0 1,200,000
10015
BOYD I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY GENTRY
BRIDGES OVER THE BIG SANDY RIVER. JOINT
PROJECT WITH WEST VIRGINIA. (010B00046L
AND 010B00046R)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 1,500,000
0 0 1,500,000
10016
BOYD KY-854 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854 BRIDGE
OVER GARNER CREEK. (010B00045N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
525,000
1,085,000
0 525,000 1,085,000
10018
Page 20 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BOYD I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064 BOTH
DIRECTION(S) FROM MILEPOINT 180.812 TO
MILEPOINT 183.95
CN
Project Cost:
UT
RW
DN
PL
PM
PM
250,000
2,500,000
0 2,750,000 0
20002
Total for BOYD county PL
Total Amounts:
CN
UT
RW
DN
8,935,000 3,700,000 9,985,000
48,000 775,000
8,983,000 4,475,000 9,985,000
BOYLE US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 AND US 150
BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.
(SEE 7-242.01 FOR HPP FUNDS)
(2005HPP-KY134)(011B00042N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 1,253,000
0 0 1,253,000
242
BOYLE US-68 AM-BRIDGE (P) REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER
CHAPLIN RIVER, PERRYVILLE. 011B00042N
(2005HPP-KY134)(EARMARK DOES NOT COVER
TOTAL PROJECT COST OF $1,790,000).(SD)
CN
Project Cost:
UT
RW
DN
PL
HPP 487,797
487,797 0 0
242.01
Total for BOYLE county PL
Total Amounts:
CN
UT
RW
DN
487,797 1,253,000
487,797 0 1,253,000
Page 21 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BRACKEN KY-8 FERRY OPERATION(P) OPERATION OF AUGUSTA FERRY FOR FY 2019.
(12CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 190,000
0 190,000 0
355.21
BRACKEN KY-8 FERRY OPERATION(P) OPERATION OF AUGUSTA FERRY FOR FY 2020.
(12CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 190,000
0 0 190,000
355.22
BRACKEN KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER
HOLTS CREEK AT FOSTER. (012B00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
455,000
3,325,000
0 455,000 3,325,000
10008
Total for BRACKEN county PL
Total Amounts:
CN
UT
RW
DN
190,000 3,515,000
455,000
0 645,000 3,515,000
BREATHITT KY-15 MAJOR WIDENING(O) IMPROVE KY-15 FROM THE INTERSECTION OF
NEW KY-15/30 TO INTERSECTION OF KY-1812.
CN
Project Cost:
UT
RW
DN
PL
NH 1,500,000
0 1,500,000 0
376
Page 22 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BREATHITT KY-378 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812.
(013B00050N)
CN
Project Cost:
UT
RW
DN
PL
BR 735,000
0 0 735,000
1110
BREATHITT CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MORRIS FORK ROAD
BRIDGE OVER BURTON FORK. (013C00050N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
315,000
0 140,000 315,000
10000
BREATHITT CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LITTLE BUCKHORN
ROAD BRIDGE OVER BUCKHORN CREEK.
(013C00016N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
350,000
0 140,000 350,000
10001
BREATHITT KY-1812 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1812 BRIDGE
OVER JOHNSON FORK. (013B00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
507,500
0 175,000 507,500
10010
BREATHITT CR-1104 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BIG BRANCH ROAD
BRIDGE OVER BIG BRANCH CREEK.
(013C00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
385,000
0 175,000 385,000
10011
Page 23 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for BREATHITT county PL
Total Amounts:
CN
UT
RW
DN
2,292,500
2,130,000
0 2,130,000 2,292,500
BRECKINRIDGE CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
SINKING CREEK ON DENTS BRIDGE ROAD (CR
1021) 1.4 MI W OF KY 333 (014C00003N)
CN
Project Cost:
UT
RW
DN
PL
BR 406,000
0 0 406,000
1090
Total for BRECKINRIDGE county PL
Total Amounts:
CN
UT
RW
DN
406,000
0 0 406,000
BULLITT KY-44 RECONSTRUCTION(O) SECTION 5 - FROM US-31EX TO US-31E
BYPASS. (2008BOPC).
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 1,000,000 0
150.5
BULLITT KY-44 SAFETY(P) NEW TURN LANES IN FRONT OF BULLITT EAST
HIGH SCHOOL. BREAKOUT FROM 347.5
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
500,000
100,000
0 500,000 100,000
347.51
Page 24 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BULLITT I-65 NEW INTERCHANGE(O) CONSTRUCT NEW I-65 INTERCHANGE BETWEEN
KY-480 AND KY-245.
CN
Project Cost:
UT
RW
DN
PL
NH 18,720,000
18,720,000 0 0
538
BULLITT KY-44 BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS AND
REHABILITATION OF EXISTING SIDEWALKS TO
FIX GAPS IN THE PEDESTRIAN NETWORK ALONG
KY 44 FROM FRANK E. SIMON DRIVE (CITY PARK
DRIVE) EAST TO KY 61 IN SHEPHERDSVILLE. CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
60,000
60,000
220,000
120,000 220,000 0
544
BULLITT I-65 MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61
(PRESTON HIGHWAY) IN LEBANON JUNCTION TO
I-265 (GENE SNYDER FREEWAY)
CN
Project Cost:
UT
RW
DN
PL NH 250,000
0 0 250,000
550
BULLITT -0 NEW ROUTE(O) STUDY NEW CONNECTION BETWEEN I-65 IN
BULLITT COUNTY TO I-64 IN SHELBY COUNTY
TO I-71 IN OLDHAM COUNTY.
CN
Project Cost:
UT
RW
DN
PL STP 2,000,000
0 2,000,000 0
564
Total for BULLITT county PL
Total Amounts:
CN
UT
RW
DN
18,720,000 220,000
1,500,000
2,000,000 250,000
60,000 100,000
60,000
18,840,000 3,720,000 350,000
Page 25 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BUTLER KY-269 FERRY OPERATION(P) OPERATION OF REED'S FERRY AT LOGANSPORT
FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 157,200
0 157,200 0
125.14
BUTLER KY-269 FERRY OPERATION(P) OPERATION OF REED'S FERRY AT LOGANSPORT
FOR FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 157,200
0 0 157,200
125.15
BUTLER WN-9007 RECONSTRUCTION(O) I-65 SPUR CORRIDOR; MODERNIZATION OF
EXISTING NATCHER PARKWAY FROM I-65
INTERCHANGE (EXIT 2) EXTENDING NORTH TO
THE BUTLER-OHIO COUNTY LINE. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
NH 18,250,000
0 18,250,000 0
2042.1
BUTLER KY-369 FERRY OPERATION(P) OPERATION OF THE ROCHESTER FERRY BY THE
BUTLER AND OHIO COUNTY FERRY AUTHORITY
FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 157,200
0 157,200 0
8504.09
BUTLER KY-369 FERRY OPERATION(P) OPERATION OF THE ROCHESTER FERRY BY THE
BUTLER AND OHIO COUNTY FERRY AUTHORITY
FOR FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 157,200
0 0 157,200
8504.1
Page 26 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
BUTLER KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER
PANTHER CREEK. (016B00019N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
889,000
0 245,000 889,000
10003
BUTLER CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY SCHOOL
ROAD BRIDGE OVER LITTLE BULL CREEK.
(016C00031N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
266,000
0 157,500 266,000
10004
BUTLER WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT ON WILLIAM H. NATCHER PARKWAY
BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO
MILEPOINT 37.143
CN
Project Cost:
UT
RW
DN
PL
PM
PM
240,000
2,400,000
0 2,640,000 0
20010
Total for BUTLER county PL
Total Amounts:
CN
UT
RW
DN
20,964,400 1,469,400
642,500
0 21,606,900 1,469,400
CALDWELL KY-126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-126 BRIDGE
OVER DREEN CREEK. (017B00023N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,312,500
0 245,000 1,312,500
10000
Page 27 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for CALDWELL county PL
Total Amounts:
CN
UT
RW
DN
1,312,500
245,000
0 245,000 1,312,500
CALLOWAY US-641 MAJOR WIDENING(O) MAJOR WIDENING FROM TENN. STATE LINE TO
MURRAY PRIORITY SECTION 1; FROM CLARKS
RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING
4-LANE.(SEE 1-8852.00)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 6,040,000
6,040,000 0 0
314.1
CALLOWAY US-641 MAJOR WIDENING(O) IMPROVE US-641 FROM THE TENNESSEE STATE
LINE TO MURRAY PRIORITY SECTION 2; FROM
TENN. STATE LINE TO CLARKS RIVER BRIDGE.
(SEE 1-8852.00)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
2,000,000
2,000,000
3,000,000
2,000,000 5,000,000 0
314.2
CALLOWAY KY-280 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 280 BRIDGE
OVER PANTHER CREEK. (018B00054N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
735,000
0 140,000 735,000
10008
CALLOWAY KY-1327 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
175,000
1,750,000
0 1,925,000 0
20001
Page 28 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for CALLOWAY county PL
Total Amounts:
CN
UT
RW
DN
6,040,000 1,750,000 735,000
2,000,000 315,000
2,000,000
3,000,000
8,040,000 7,065,000 735,000
CAMPBELL I-471 RECONSTRUCTION(O) STUDY AND REHABILITATE THE I-471 CORRIDOR,
CAMPBELL COUNTY, KENTUCKY. (SEE ALSO
6-8104.00)(2005HPP-KY120)
CN
Project Cost:
UT
RW
DN
PL
HPP 1,439,840
1,439,840 0 0
183
CAMPBELL I-275 AM-BRIDGE (P) BRIDGE REHABILITATION ON EXISTING COMBS
HEHL BRIDGE CARRYING I-275 OVER THE OHIO
RIVER. 019B00040L/R (LET BY ODOT)
(2016BOP)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR 4,500,000
0 4,500,000 0
369
CAMPBELL KY-1892 MATCHED FED FUNDS(O) ROADWAY REHABILITATION ON CAROTHERS
ROAD FROM MONMOUTH STREET (US 27) TO
RIGHT TURN LANE INTO NEWPORT SHOPPING
CENTER.
CN
Project Cost:
UT
RW
DN
PL
SNK 1,005,052
1,005,052 0 0
427
CAMPBELL -0 MATCHED FED FUNDS(O) NEWPORT RIVERFRONT COMMONS -
CONSTRUCT TWO NEW PEDESTRIAN/BICYCLE
BRIDGES TO CONNECT BOTH SIDES OF THE
TAYLOR SOUTHGATE BRIDGE TO THE TRAILS
ON TOP OF THE LEVEE (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SNK 1,097,427
1,097,427 0 0
434
Page 29 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CAMPBELL US-27 MATCHED FED FUNDS(O) ADD LANE ON US 27 TO PROVIDE THREE
CONTINUOUS SOUTHBOUND THROUGH-LANES
FROM MARSHALL LANE TO JOHNS HILL ROAD
(KY 3490). (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
200,000
100,000
500,000
300,000 500,000 0
443
CAMPBELL US-27 BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1. IMPROVE/ADD
SIDEWALKS, ACCESS MANAGEMENT, STREET
LIGHTING, IMPROVE SAFETY FROM
NEWPORT/SOUTHGATE CITY LIMITS TO
CAROTHERS ROAD.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
SNK
454,960
61,600
1,496,000
1,200,000
454,960 1,557,600 1,200,000
451
CAMPBELL US-27 BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH UNDERPASS.
IMPROVE FOR PEDESTRIANS BY REPLACING
OBSOLETE STAIRS/WALKWAY WITH 10'
SIDEWALK, LIGHTING BUS STOPS AT THE
UNDERPASS OF THE CSX RAILROAD BRIDGE CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
378,400
32,000
24,000
0 0 434,400
452
CAMPBELL -0 BIKE/PED FACIL(O) RIVERFRONT COMMONS. CONSTRUCT A 15'
WIDE CONCRETE BICYCLE/PEDESTRIAN TRAIL
AND CONDUIT FOR FUTURE LIGHTING FROM
BERRY STREET TO FOURTH AVENUE. PART OF
11.5 MILE PROJECT.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
126,000
760,000
0 126,000 760,000
453
CAMPBELL KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES
ROAD (CR 1009). (019B00003N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
50,000
150,000
2,500,000
0 200,000 2,500,000
1085
Page 30 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CAMPBELL CR-1363 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON COVERT
RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY
TO TAYLOR CREEK. 019C00069N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
122,500
630,000
0 122,500 630,000
1095
CAMPBELL I-275 NEW ROUTE(O) TRANSPORTATION IMPROVEMENTS TO AA-I-275
CONNECTOR, CAMPBELL COUNTY.
(2005HPP-KY155)(SEE 6-8105.00 FOR "KYD"
COMPONENT)(06CCR)(10CCR)
CN
Project Cost:
UT
RW
DN
PL
HPP 690,401
690,401 0 0
8105.01
CAMPBELL -0 NEW ROUTE(O) CONSTRUCT NEW TECHNOLOGY TRIANGLE
ACCESS ROAD, CAMPBELL COUNTY,
KENTUCKY. (2005HPP-KY126)(2006BOPC).
(10CCR)
CN
Project Cost:
UT
RW
DN
PL
HPP 1,439,840
1,439,840 0 0
8105.03
CAMPBELL KY-2238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON ROAD
BRIDGE OVER THREEMILE CREEK. (019B00060N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
318,500
0 140,000 318,500
10000
CAMPBELL US-27 AM-BRIDGE (P) SAFETY CABLE REPAIR AND PREVENTIVE
MAINTENANCE ON TAYLOR SOUTHGATE BRIDGE
OVER THE OHIO RIVER. JOINT PROJECT WITH
OHIO. (019B00076N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR 250,000
250,000 0 0
10007
Page 31 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CAMPBELL US-27 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
75,000
750,000
0 825,000 0
20016
Total for CAMPBELL county PL
Total Amounts:
CN
UT
RW
DN
5,922,560 5,750,000 5,408,500
454,960 463,500 378,400
200,000 111,600 32,000
100,000 1,646,000 24,000
6,677,520 7,971,100 5,842,900
CARLISLE US-51 SAFETY(P) CORRECT GEOMETRIC DEFICIENCIES AT
INTERSECTION OF US-51/US-62/FRONT ST/ELM
ST IN BARDWELL TO ADDRESS FLOW, SAFETY,
AND ACCESS ISSUES.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 0 250,000
333
CARLISLE US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON US-51
FROM MILEPOINT 7.86 TO MILEPOINT 12.66
CN
Project Cost:
UT
RW
DN
PL
PM 746,000
0 0 746,000
20027
Total for CARLISLE county PL
Total Amounts:
CN
UT
RW
DN
996,000
0 0 996,000
Page 32 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CARROLL US-42 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
KENTUCKY RIVER ON US 42 IN
PRESTONSVILLE/CARROLLTON 0.13 MI E OF KY
55. (021B00043N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
1,460,000
1,218,000
476,000
0 1,460,000 1,694,000
1084
CARROLL KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER
MAJORS RUN CREEK. (021B00019N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
980,000
0 140,000 980,000
10009
Total for CARROLL county PL
Total Amounts:
CN
UT
RW
DN
980,000
1,600,000
1,218,000
476,000
0 1,600,000 2,674,000
CARTER I-64 CONGESTION MITIGTN(O) IMPROVE MOBILITY AND REDUCE CONGESTION
AT THE KY 1/I-64 WESTBOUND OFF-RAMP
INTERSECTION.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
NH
80,000
80,000
80,000
500,000
0 740,000 0
62
CARTER KY-67 SAFETY(P) SAFETY, SPOT IMPROVEMENTS AND
CONGESTION MITIGATION FOR INDUSTRIAL
PARKWAY (KY 67) IN CARTER, BOYD, AND
GREENUP COUNTIES FOR BRAIDY INDUSTRIES
ALUMINUM PLANT DEVELOPMENT.CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
NH
2,000,000
2,500,000
2,500,000
2,000,000
2,000,000 5,000,000 2,000,000
397
Page 33 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CARTER US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US-60
(MP 4.111) OVER TYGARTS CREEK; .75 MI E OF
JCT KY 1662; 022B00037N
CN
Project Cost:
UT
RW
DN
PL
BR 693,000
693,000 0 0
1075
CARTER KY-1 SAFETY(P) IMPROVE SAFETY AT THE EAST CARTER HIGH
SCHOOL. (06CCN)(08CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 720,000
0 0 720,000
8311
CARTER KY-773 AM-BRIDGE (P) REPLACEMENT OF TWO TRUSS BRIDGES ON KY
773 OVER THE LITTLE SANDY RIVER.
(022B00074N)(022B00075N)
CN
Project Cost:
UT
RW
DN
PL
BR 5,019,000
0 5,019,000 0
8506
CARTER KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER
POWELL BRANCH. (022B00006N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
525,000
1,015,000
0 525,000 1,015,000
10002
CARTER KY-182 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-182 BRIDGE
OVER SINKING CREEK. (022B00140N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
490,000
1,750,000
0 490,000 1,750,000
10003
Page 34 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for CARTER county PL
Total Amounts:
CN
UT
RW
DN
693,000 5,519,000 4,765,000
2,000,000 1,095,000
2,580,000 720,000
2,580,000
2,693,000 11,774,000 5,485,000
CASEY CR-1169 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1169 (0.059) OVER
SOUTH FORK CREEK. (023C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
532,000
0 175,000 532,000
1067
CASEY KY-49 RECONSTRUCTION(O) RECONSTRUCT BRUSHY CREEK HILL FROM MP
1.8 TO MP 2.8.(12CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 1,250,000
0 1,250,000 0
8704
CASEY KY-2310 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2310 BRIDGE
OVER LUTTRELL CREEK. (023B00066N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
927,500
0 192,500 927,500
10000
CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE
OVER BR OF BRUSH CREEK. (023B00061N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
266,000
0 70,000 266,000
10006
Page 35 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE
OVER LONG BRANCH. (023B00062N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
266,000
0 70,000 266,000
10007
CASEY KY-3270 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3270 BRIDGE
OVER HOWE BRANCH. (023B00077N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
234,500
0 70,000 234,500
10008
CASEY KY-70 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION
CN
Project Cost:
UT
RW
DN
PL
PM
PM
375,000
3,750,000
0 4,125,000 0
20001
Total for CASEY county PL
Total Amounts:
CN
UT
RW
DN
3,750,000 2,226,000
2,202,500
0 5,952,500 2,226,000
CHRISTIAN KY-911 MAJOR WIDENING(O) IMPROVE KY-911 FROM US-41A TO OAK
GROVE.(12CCR).
CN
Project Cost:
UT
RW
DN
PL
STP 2,530,000
0 0 2,530,000
180
Page 36 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CHRISTIAN KY-1007 RECONSTRUCTION(O) RECONSTRUCT KY 1007 FROM US 68 TO
SANDERSON ROAD IN HOPKINSVILLE.(12CCR)
(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,250,000
0 0 3,250,000
227
CHRISTIAN US-41 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM US 41
NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH
OF PEMBROKE.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 0 1,000,000
381
CHRISTIAN EB-9004 RECONSTRUCTION(O) RECONSTRUCT THE BREATHITT PARKWAY
INTERCHANGE AT KY 1682 NORTH OF
HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE
INTERSTATE SPUR PROJECT)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
250,000
1,000,000
0 250,000 1,000,000
898
CHRISTIAN CR-1116 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SUB
STATION RD (CR 1116) OVER CSX RR 0.04 MILE E
OF US 41 024C00034N
CN
Project Cost:
UT
RW
DN
PL
BR 880,000
880,000 0 0
1085
CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CSX
RR ON WALNUT STREET (US 41A) IN
HOPKINSVILLE 475 FT NE OF EAST 21ST STREET
(CS 1016) (024B00112N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
385,000
2,002,000
0 385,000 2,002,000
1089
Page 37 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CHRISTIAN CS-1262 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER N
FORK LITTLE RIVER ON MILBROOKE DRIVE (CS
1262) 500 FT SW OF KAREN DRIVE (CS 1268)
024C00081N
CN
Project Cost:
UT
RW
DN
PL
BR 1,470,000
0 0 1,470,000
1094
CHRISTIAN KY-189 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-189 BRIDGE
OVER BRANCH OF BUCK FORK. (024B00064N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,032,500
0 245,000 1,032,500
10001
CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER
NORTH FORK LITTLE RIVER. (024B00005N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
35,000
175,000
0 35,000 175,000
10022
CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF EDWARD T.
BREATHITT PENNYRILE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT
4.719
CN
Project Cost:
UT
RW
DN
PL
PM
PM
400,000
4,000,000
0 400,000 4,000,000
20005
CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF EDWARD T.
BREATHITT PENNYRILE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 12.13 TO
MILEPOINT 16.5 (16.7 NON-CARDINAL)
CN
Project Cost:
UT
RW
DN
PL
PM 4,120,000
0 0 4,120,000
20006
Page 38 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CHRISTIAN KY 115 RESURFACING(P) RESURFACING ON KY 115 FROM CARNEAL
LANE TO US 41
CN
Project Cost:
UT
RW
DN
PL
PM 730,000
0 730,000 0
80000
CHRISTIAN US 41A NEW INTERCHANGE(O) US 41A NEW TURNING LANE NORTHBOUND AT
EXISTING MEDIAN CROSSOVER NEAR MILEPOST
11.4. CITY TO CONSTRUCT AND BE
REIMBURSED.
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
8,000
67,000
0 75,000 0
80001
CHRISTIAN KY 1026 RESURFACING(P) RESURFACING ON KY 1026 FROM GRACEY
SINKING FORK ROAD TO SHURDAN CREEK
ROAD
CN
Project Cost:
UT
RW
DN
PL
PM 200,000
0 200,000 0
80002
Total for CHRISTIAN county PL
Total Amounts:
CN
UT
RW
DN
880,000 997,000 15,329,500
1,323,000 1,000,000
1,000,000
3,250,000
880,000 2,320,000 20,579,500
CLARK KY-1958 NEW ROUTE(O) EXTEND THE WINCHESTER EAST BYPASS (KY
1958) FROM IRVINE ROAD (KY 89) TO KY 627
SOUTH OF WINCHESTER. (08CCN)(10CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
250,000
7,000,000
0 250,000 7,000,000
8401
Page 39 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CLARK I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064 BOTH
DIRECTION(S) FROM MILEPOINT 98.1 TO
MILEPOINT 101.78
CN
Project Cost:
UT
RW
DN
PL
PM
PM
430,000
4,300,000
0 0 4,730,000
20006
Total for CLARK county PL
Total Amounts:
CN
UT
RW
DN
4,300,000
250,000 430,000
7,000,000
0 250,000 11,730,000
CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
OTTER CREEK ON OTTER CREEK ROAD (CR
1160) AT JUNCTION WITH MAY FORK ROAD (CR
1158)(026C00031N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
364,000
0 105,000 364,000
1099
CLAY US-421 MINOR WIDENING(O) IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO
KY-149 (LOCKARTS CREEK ROAD). (00CCN)
(10CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 20,000,000
0 0 20,000,000
8003
CLAY CR-1263 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
CURRY BRANCH ROAD IN CLAY COUNTY.
(12CCN)
CN
Project Cost:
UT
RW
DN
PL
BR 960,000
0 960,000 0
8711
Page 40 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CLAY KY-66 RECONSTRUCTION(O) IMPROVE GEOMETRICS ON THE S-CURVE FROM
NORTHEAST OF KY-3135 (COLLEGE STREET)
TO NORTHEAST OF PR-1006 (MULBERRY
STREET).(14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 405,000
0 405,000 0
8856
CLAY KY-638 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ALONG
KY 638 (MP 6.7 TO MP 7.1) AND ITS
INTERSECTION WITH KY 3476. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
250,000
650,000
0 0 900,000
8861
CLAY KY-1850 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1850 BRIDGE
OVER PHILLIPS FORK. (026B00087N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
595,000
0 175,000 595,000
10003
CLAY KY-577 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-577 BRIDGE
OVER LITTLE SEXTON CREEK. (026B00093N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
424,000
0 175,000 424,000
10004
CLAY CR-1055 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1055 BRIDGE
OVER WILES BRANCH. (026C00010N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
400,000
0 175,000 400,000
10005
Page 41 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CLAY CR-1117 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ARNETTS FORK
ROAD BRIDGE OVER DOUBLE CREEK.
(026C00018N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
364,000
0 140,000 364,000
10006
CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OTTER CREEK ROAD
BRIDGE OVER GOOSE CREEK. (026C00032N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
595,000
0 175,000 595,000
10007
CLAY CR-1255 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1255 BRIDGE
OVER HORSE CREEK. (026C00070N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
371,000
0 175,000 371,000
10008
CLAY CR-1118 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD HIGHWAY 66
BRIDGE OVER RED BIRD RIVER. (026C00099N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
2,177,000
0 350,000 2,177,000
10009
CLAY US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 421 BRIDGE
OVER BRANCH OF ISLAND CREEK.
(026B00002N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10039
Page 42 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL
ROGERS DANIEL BOONE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 19.527 TO
MILEPOINT 28.4
CN
Project Cost:
UT
RW
DN
PL
PM
PM
350,000
3,500,000
0 3,850,000 0
20003
CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL
ROGERS DANIEL BOONE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 28.4 TO
MILEPOINT 31
CN
Project Cost:
UT
RW
DN
PL
PM
PM
100,000
1,000,000
0 1,100,000 0
20004
CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL
ROGERS DANIEL BOONE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT
35.08
CN
Project Cost:
UT
RW
DN
PL
PM
PM
160,000
1,600,000
0 1,760,000 0
20005
Total for CLAY county PL
Total Amounts:
CN
UT
RW
DN
7,465,000 25,937,500
2,255,000
250,000
650,000
0 9,720,000 26,837,500
CLINTON KY-738 AM-BRIDGE (P) REPLACE BRIDGE OVER CLEAR FORK CREEK ON
KY 738 0.2 MI S OF US 127X. (027B00011N)
(SR=31.5)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
525,000
0 175,000 525,000
1062
Page 43 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for CLINTON county PL
Total Amounts:
CN
UT
RW
DN
525,000
175,000
0 175,000 525,000
CRITTENDEN KY-91 FERRY OPERATION(P) OPERATION OF CAVE-IN-ROCK FERRY AT OHIO
RIVER FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 402,000
0 402,000 0
326.16
CRITTENDEN KY-91 FERRY OPERATION(P) OPERATION OF CAVE-IN-ROCK FERRY AT OHIO
RIVER FOR FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 402,000
0 0 402,000
326.17
CRITTENDEN CR-1085 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085
(0.048) OVER HUGHES BRANCH 028C00053N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
546,000
0 210,000 546,000
1159
CRITTENDEN KY-91 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER
CROOKED CREEK. (028B00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
980,000
0 245,000 980,000
10000
Page 44 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for CRITTENDEN county PL
Total Amounts:
CN
UT
RW
DN
402,000 1,928,000
455,000
0 857,000 1,928,000
CUMBERLAND KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF
BRIDGE OVER CUMBERLAND RIVER ON KY 61
0.1 MI N OF COLD SPRINGS ROAD (CR 1204).
(029B00012N)
CN
Project Cost:
UT
RW
DN
PL
BR 3,640,000
0 0 3,640,000
1060
CUMBERLAND KY-90 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF
BRIDGE OVER CUMBERLAND RIVER ON KY 90
0.27 MI SE OF KY 61 AT THE SCL OF
BURKESVILLE. (029B00027N)
CN
Project Cost:
UT
RW
DN
PL
BR 5,200,000
0 0 5,200,000
1061
CUMBERLAND KY-90 RECONSTRUCTION(O) IMPROVE KY-90 FROM NORRIS BRANCH ROAD
EXTENDING WESTERLY TO PA DUERSON ROAD
NEAR MARROWBONE. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,500,000
0 0 3,500,000
8852
CUMBERLAND CR-1012 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHETSTONE ROAD
BRIDGE OVER BIG WHETSTONE CREEK.
(029C00057N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
556,500
0 175,000 556,500
10001
Page 45 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
CUMBERLAND KY-379 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 379 BRIDGE
OVER BIG WILLIS CREEK. (029B00005N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
129,500
952,000
0 129,500 952,000
10009
Total for CUMBERLAND county PL
Total Amounts:
CN
UT
RW
DN
10,348,500
304,500 3,500,000
0 304,500 13,848,500
DAVIESS KY-298 SAFETY(P) RECONSTRUCT INTERSECTION AT FAIRVIEW
DRIVE (KY 3143) AND KY 298. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 1,800,000
0 1,800,000 0
229
DAVIESS US-60 RECONSTRUCTION(O) RECONSTRUCT ON US 60 BETWEEN OAKFORD
RD LOOP (CR 1370) TO ADDRESS FLOODING
PROBLEM IN THE VICINITY OF THE
KIMBERLY-CLARK PLANT (14CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 2,000,000
0 2,000,000 0
237
DAVIESS WN-9007 RECONSTRUCTION(O) I-65 SPUR CORRIDOR; MODERNIZATION OF
EXISTING NATCHER PARKWAY FROM THE
OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE
US-60 INTERCHANGE (MP 72.264) IN
OWENSBORO. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
NH
NH
200,000
4,750,000
200,000 0 4,750,000
2092.1
Page 46 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
DAVIESS KY-54 MAJOR WIDENING(O) IMPROVE KY-54 FROM WEST OF THE US-60
BYPASS TO CR-1021 (JACK HINTON ROAD).
(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 10,540,000
0 10,540,000 0
8300
DAVIESS CR-1053 AM-BRIDGE (P) GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E
JCT KY 405 (MM 1.005-1.009) OVER ALLGOOD
DITCH. (14CCN) 030C00016N
CN
Project Cost:
UT
RW
DN
PL
BR 619,500
0 0 619,500
8813
DAVIESS KY-81 MINOR WIDENING(O) EXTEND THE CURRENT 4 LANES TO THE
ROUNDABOUT AT KY-56/KY-81. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,750,000
3,750,000 0 0
8851
DAVIESS CR-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCKPORT FERRY
RD BRIDGE OVER KELLY CREEK. (030C00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10002
DAVIESS CR-1129 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE
OVER BR OF N FK PANTHER CREEK.
(030C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10003
Page 47 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
DAVIESS CR-1257 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S
BRIDGE OVER FLAT LICK CREEK. (030C00069N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
717,500
0 175,000 717,500
10004
DAVIESS KY-2262 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH GLOVER CARY
BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH
INDIANA. (030B00118N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
200,000
2,250,000
0 200,000 2,250,000
10020
DAVIESS US-231 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH NATCHER BRIDGE
OVER OHIO RIVER. JOINT PROJECT WITH
INDIANA. (030B00164N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
10,000,000
0 175,000 10,000,000
10021
DAVIESS KY-764 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 764 BRIDGE
OVER UNNAMED STREAM. (030B00111N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
350,000
0 70,000 350,000
10023
DAVIESS KY-2155 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
150,000
1,500,000
0 1,650,000 0
20019
Page 48 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
DAVIESS WN-9007 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.
NATCHER PARKWAY BOTH DIRECTION(S) FROM
MILEPOINT 61.553 TO MILEPOINT 66.08
CN
Project Cost:
UT
RW
DN
PL
PM 4,238,000
0 0 4,238,000
20020
DAVIESS WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.
NATCHER PARKWAY BOTH DIRECTION(S) FROM
MILEPOINT 66.08 TO MILEPOINT 72.26
CN
Project Cost:
UT
RW
DN
PL
PM 5,768,000
0 0 5,768,000
20021
Total for DAVIESS county PL
Total Amounts:
CN
UT
RW
DN
3,750,000 5,300,000 29,988,000
1,120,000
200,000 10,540,000
3,950,000 16,960,000 29,988,000
EDMONSON KY-259 SPOT IMPROVEMENTS(O) RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE
NORTH GREEN RIVER BRIDGE AT BROWNSVILLE
TO 0.42 MILE NORTH OF THE KY-70/KY-259
INTERSECTION.(06CCR)(2004BOPC)(12CCR)
(14CCR)CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,540,000
1,470,000
0 1,540,000 1,470,000
7030.1
EDMONSON KY-743 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 743 BRIDGE
OVER BEAVER DAM CREEK. (031B00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
402,500
0 157,500 402,500
10012
Page 49 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
EDMONSON I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH
DIRECTION(S) FROM MILEPOINT 43.307 TO
MILEPOINT 43.6
CN
Project Cost:
UT
RW
DN
PL
PM
PM
40,000
400,000
0 440,000 0
20011
Total for EDMONSON county PL
Total Amounts:
CN
UT
RW
DN
400,000 402,500
197,500
1,540,000
1,470,000
0 2,137,500 1,872,500
ELLIOTT CR-1206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR 1206 BRIDGE
OVER OVER LITTLE SANDY. (030C00032N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
455,000
1,663,000
0 455,000 1,663,000
10004
Total for ELLIOTT county PL
Total Amounts:
CN
UT
RW
DN
1,663,000
455,000
0 455,000 1,663,000
ESTILL KY-2459 SPOT IMPROVEMENTS(O) IMPROVE SAFETY ON KY-2459 (CARHARTT
AVE.) FROM KY-89 TO THE RAILROAD BRIDGE.
CN
Project Cost:
UT
RW
DN
PL
STP 250,000
0 0 250,000
206
Page 50 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ESTILL KY-1645 RECONSTRUCTION(O) IMPROVE SAFETY AND MOBILITY ON KY-1645
(KIRKLAND AVE) NEAR CR-1087 (LOCK 12
ROAD).
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
STP
100,000
100,000
50,000
320,000
0 100,000 470,000
208
ESTILL KY-794 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 794 BRIDGE
OVER WHITE OAK CREEK. (033B00038N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
735,000
0 245,000 735,000
10012
Total for ESTILL county PL
Total Amounts:
CN
UT
RW
DN
1,055,000
345,000 250,000
100,000
50,000
0 345,000 1,455,000
FAYETTE CS-4174 MINOR WIDENING(O) CLAYS MILL ROAD; WIDEN FROM
HARRODSBURG ROAD TO NEW CIRCLE ROAD
(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH)
(ALL WORK BY LFUCG) (CONSTRUCTION SEQU.
2) (SUBJECT TO FISCAL CONSTRAINT PENDING CN
Project Cost:
UT
RW
DN
PL
SLX
SLX
1,900,000
11,000,000
0 12,900,000 0
224.1
FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM
PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY
PLANNING, TRAFFIC SIGNAL) FOR FY 2018.
(LOCAL MATCH) (ALL WORK BY LFUCG)
(FUNDING SUBJECT TO FISCAL CONSTRAINT CN
Project Cost:
UT
RW
DN
PL
SLX 730,000
730,000 0 0
227.07
Page 51 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM
PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY
PLANNING, TRAFFIC SIGNAL) FOR FY 2019.
(LOCAL MATCH) (ALL WORK BY LFUCG)
(FUNDING SUBJECT TO FISCAL CONSTRAINT CN
Project Cost:
UT
RW
DN
PL
SLX 756,000
0 756,000 0
227.08
FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM
PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY
PLANNING, TRAFFIC SIGNAL) FOR FY 2020.
(LOCAL MATCH) (ALL WORK BY LFUCG)
(FUNDING SUBJECT TO FISCAL CONSTRAINT CN
Project Cost:
UT
RW
DN
PL
SLX 756,000
0 0 756,000
227.09
FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR LEXINGTON URBANIZED AREA
AND SUBJECT TO MPO CONTROL FOR FY 2018.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SLX 12,400,000
12,400,000 0 0
227.1
FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR LEXINGTON URBANIZED AREA
AND SUBJECT TO MPO CONTROL FOR FY 2019.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SLX 8,000,000
0 8,000,000 0
227.13
FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS
EARMARKED FOR LEXINGTON URBANIZED AREA
AND SUBJECT TO MPO CONTROL FOR FY 2020.
(FUNDING SUBJECT TO FISCAL CONTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SLX 8,200,000
0 0 8,200,000
227.14
Page 52 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL IN LEXINGTON
(PRIORITY SECTION 2); FROM JOSEPH BRYAN
WAY THROUGH NS RAILROAD TUNNEL TO
WAVELAND HISTORIC SITE (ALL WORK BY
LFUCG). (FUNDING SUBJECT TO FISCAL CN
Project Cost:
UT
RW
DN
PL
SLX 400,000
400,000 0 0
229.2
FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL(PRIORITY SECTION 3);
FROM LOCHDALE TERRACE, EXTENDING
NORTHERLY UNDER MAN O' WAR BOULEVARD
TO SHILLITO PARK.(LOCAL MATCH)(DESIGN BY
LFUCG)(ALL WORK BY LFUCG)(2004BOPC)CN
Project Cost:
UT
RW
DN
PL
SLX 625,000
625,000 0 0
229.3
FAYETTE KY-922 MAJOR WIDENING(O) IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75.
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
2,000,000
3,000,000
0 5,000,000 0
252
FAYETTE KY-169 FERRY OPERATION(P) OPERATION OF VALLEY VIEW FERRY AT KY
RIVER FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 330,000
0 330,000 0
357.16
FAYETTE KY-169 FERRY OPERATION(P) OPERATION OF VALLEY VIEW FERRY AT KY
RIVER FOR FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 330,000
0 0 330,000
357.17
Page 53 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FAYETTE KY-4 MAJOR WIDENING(O) WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM
GEORGETOWN ROAD TO BOARDWALK AVENUE
INCLUDING INTERCHANGE RECONSTRUCTION AT
NEWTOWN PIKE.(2002BOPC)(2004BOPP)
(10CCR)(12CCR)(14CCR)CN
Project Cost:
UT
RW
DN
PL
NH 10,000,000
0 0 10,000,000
366
FAYETTE US-27 RECONSTRUCTION(O) REPLACE L&N RAILROAD BRIDGE OVERPASS
(MP 8.378), IMPROVE DRAINAGE AND TYPICAL
SECTION ON US 27 (NORTH BROADWAY)
(12CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 2,440,000
0 0 2,440,000
412
FAYETTE CS-4524 RECONSTRUCTION(O) CONSTRUCT TURN LANES AT THE INTERSECTION
OF MAN O' WAR BLVD (CS-4524) AND
RICHMOND ROAD (US-25).
CN
Project Cost:
UT
RW
DN
PL
SLX 262,000
262,000 0 0
428
FAYETTE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 421
OVER FORK OF TOWN BRANCH AT
INTERSECTION OF US 421 AND BRACKTOWN RD
(CS 4008) (034B00018N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 800,000
0 800,000 0
1129
FAYETTE CS-3605 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MALABU
DRIVE (CS 3605) OVER BRANCH HICKMAN
CREEK AT JCT WITH TATES CREEK ROAD (KY
1974) 034C00038N
CN
Project Cost:
UT
RW
DN
PL
BR 427,000
427,000 0 0
1132
Page 54 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FAYETTE CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BRANCH OF NORTH ELKHORN CREEK ON HUME
ROAD (CR 1001) 0.7 MI NW OF US 60
(034C00001N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
735,000
0 210,000 735,000
1141
FAYETTE CS-7038 MATCHED FED FUNDS(O) REPLACE DETERIORATED WEST BOUND LANE
BRIDGE SECTION OF WILSON DOWNING ROAD
BRIDGE ACROSS WEST HICKMAN CREEK.
CN
Project Cost:
UT
RW
DN
PL
SLX
SLX
75,000
275,000
350,000 0 0
1145
FAYETTE CS-2548 NEW ROUTE(O) COMPLETE CONSTRUCTION ON POLO CLUB
BOULEVARD AT DEERHAVEN LANE AND TODDS
ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL
CONSTRAINT PENDING MPO TIP)(LET BY CITY)
CN
Project Cost:
UT
RW
DN
PL
SLX 1,600,000
1,600,000 0 0
8507
FAYETTE KY-4 TRANSP ENHANCEMENT(P) SOUND BARRIERS ALONG OUTER LOOP OF NEW
CIRCLE ROAD BETWEEN TATES CREEK ROAD
AND NICHOLASVILLE ROAD. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 2,300,000
0 0 2,300,000
8801
FAYETTE CR-1121 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MCCALLS MILL RD
BRIDGE OVER BOGGS FORK. (034C00009N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
360,500
0 157,500 360,500
10009
Page 55 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FAYETTE I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064
CARDINAL DIRECTION(S) FROM MILEPOINT 73.94
TO MILEPOINT 74.729
CN
Project Cost:
UT
RW
DN
PL
PM
PM
30,000
3,000,000
0 3,030,000 0
20009
FAYETTE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 111.82 TO
MILEPOINT 120.792
CN
Project Cost:
UT
RW
DN
PL
PM
PM
1,080,000
10,800,000
0 0 11,880,000
20015
FAYETTE US-421 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
50,000
500,000
0 550,000 0
20016
Total for FAYETTE county PL
Total Amounts:
CN
UT
RW
DN
16,719,000 24,386,000 33,481,500
75,000 447,500 1,080,000
2,000,000 2,440,000
4,900,000
16,794,000 31,733,500 37,001,500
FLEMING KY-32 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 32
OVER MUD LICK CREEK 0.2 MILES W OF
CRAINTOWN RD (CR 1302)035B00038N
CN
Project Cost:
UT
RW
DN
PL
BR 560,000
0 0 560,000
1084
Page 56 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
ALLISON CREEK ON KY 111 1.2 MI N OF KY 156.
(035B00016N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
455,000
2,135,000
0 455,000 2,135,000
1091
FLEMING CR-1240 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
FLEMING CREEK ON MCINTIRE ROAD (CR 1240)
AT THE JCT WITH PIKE BLUFF (CR 1305)
(035C00065N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
75,000
50,000
600,000
0 125,000 600,000
1092
FLEMING KY-111 BRIDGE REHAB(P) RESTORATION OF GRANGE CITY COVERED
BRIDGE LOCATED ON KY-111 BETWEEN
FLEMINGSBURG AND GRANGE CITY. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
TE 1,200,000
0 1,200,000 0
8804
FLEMING KY-11 SAFETY(P) IMPROVE ACCESS AND RESPONSE TIMES FOR
THE FLEMINGSBURG FIRE DEPARTMENT TO THE
BYPASS AT MP 11.574.
CN
Project Cost:
UT
RW
DN
PL
SPP 80,000
0 80,000 0
8902
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-111 BRIDGE
OVER BR OF HILLSBORO CREEK. (035B00018N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
455,000
1,015,000
0 455,000 1,015,000
10005
Page 57 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FLEMING KY-367 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-367 BRIDGE
OVER JOHNSON CREEK. (035B00074N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
375,000
980,000
0 375,000 980,000
10006
FLEMING KY-2508 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2508 BRIDGE
OVER TOWN BRANCH. (035B00030N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
875,000
0 315,000 875,000
10019
FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 111 BRIDGE
OVER DAVIS BRANCH. (035B00075N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
752,500
0 315,000 752,500
10020
FLEMING KY-681 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 681 BRIDGE
OVER DELANEY CREEK. (035B00103N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
822,500
0 315,000 822,500
10021
FLEMING KY-32 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
1,250,000
12,500,000
0 13,750,000 0
20009
Page 58 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FLEMING US-32 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ON
KY-32 BEGINNING AT 0.4 MILES WEST OF
FLEMING/ROWAN CO LINE AND ENDING 0.3
MILES EAST OF THE LINE.
CN
Project Cost:
UT
RW
DN
PL SPP 50,000
0 0 50,000
80051
Total for FLEMING county PL
Total Amounts:
CN
UT
RW
DN
13,780,000 7,740,000
3,480,000
50,000
75,000
50,000
0 17,385,000 7,790,000
FLOYD US-23 SAFETY(P) IMPROVE SAFETY AND ACCESS ON US-23
BETWEEN KY-80 AND KY-3384.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
420,000
520,000
0 940,000 0
191
FLOYD KY-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100
OVER LITTLE PAINT CREEK NEAR
FLOYD/JOHNSON COUNTY LINE 036B00002N
CN
Project Cost:
UT
RW
DN
PL
BR 322,000
322,000 0 0
1111
FLOYD KY-2557 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
LEVISA FORK ON KY 2557 AT JCT US 23 IN
JUSTELL. (036B00040N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
525,000
3,010,000
0 525,000 3,010,000
1119
Page 59 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FLOYD KY-550 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BRUSH CREEK ON KY 550 AT JCT WITH KY 850.
(036B00015N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,050,000
0 210,000 1,050,000
1121
FLOYD KY-122 SAFETY(P) CURVE REVISION TO INCLUDE IMPROVED SIGHT
DISTANCE AND A LEFT TURN LANE ON KY-122
AT THE KY-680 INTERSECTION IN MCDOWELL.
(02CCN)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,950,000
0 3,950,000 0
8100
FLOYD CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRYANT BRANCH
LEFT FORK OF CLEAR CREEK ROAD BRIDGE
OVER LEFT FK OF BEAVER CREEK.
(036C00017N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
384,000
0 175,000 384,000
10000
FLOYD KY-466 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 466 BRIDGE
OVER LEFT FORK BEAVER CREEK.
(036B00032N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
274,750
0 140,000 274,750
10014
FLOYD KY-80 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
1,225,000
12,250,000
0 13,475,000 0
20000
Page 60 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FLOYD US-23 SAFETY(P) CONSTRUCT NEW INTERSECTION ON US-23 AT
THE ENTRANCE TO BETSY LANE HIGH SCHOOL
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 0 250,000
80000
Total for FLOYD county PL
Total Amounts:
CN
UT
RW
DN
322,000 16,200,000 4,718,750
2,275,000 250,000
420,000
520,000
322,000 19,415,000 4,968,750
FRANKLIN KY-3506 AM-BRIDGE (P) DEMOLITION OF THE CLOSED ROADWAY
SECTION OF THE BROADWAY BRIDGE IN
FRANKFORT.
CN
Project Cost:
UT
RW
DN
PL
BR 300,000
0 300,000 0
805
FRANKLIN CR-1230 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BENSON CREEK ON CRAB ORCHARD ROAD (CR
1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48
(037C00010N) (EBRP)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
633,500
105,000 633,500 0
1078
FRANKLIN KY-420 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 420 BRIDGE
OVER CEDAR RUN CREEK. (037B00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
350,000
0 210,000 350,000
10000
Page 61 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FRANKLIN KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE
OVER TRIB TO N. ELKHORN CREEK.
(037B00034N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
332,500
0 210,000 332,500
10001
Total for FRANKLIN county PL
Total Amounts:
CN
UT
RW
DN
933,500 682,500
105,000 420,000
105,000 1,353,500 682,500
FULTON KY-1354 FERRY OPERATION(P) OPERATION OF HICKMAN FERRY AT MISSISSIPPI
RIVER FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 126,000
0 126,000 0
320.16
FULTON KY-1354 FERRY OPERATION(P) OPERATION OF HICKMAN FERRY AT MISSISSIPPI
RIVER FOR FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 126,000
0 0 126,000
320.17
FULTON KY-1909 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1909 BRIDGE
OVER LITTLE BAYOU DE CHIEN CR.
(038B00075N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
490,000
0 175,000 490,000
10009
Page 62 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
FULTON JC-9003 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF JULIAN M.
CARROLL PURCHASE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT
1.78
CN
Project Cost:
UT
RW
DN
PL
PM
PM
175,000
1,750,000
0 1,925,000 0
20002
Total for FULTON county PL
Total Amounts:
CN
UT
RW
DN
1,876,000 616,000
350,000
0 2,226,000 616,000
GARRARD US-27 RELOCATION(O) IMPROVE US-27 FROM WEST LANCASTER
BYPASS TO KY-34. (2006BOPC) (16CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
500,000
10,000,000
0 500,000 10,000,000
196.3
GARRARD KY-563 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-563
(MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39;
040B00034N
CN
Project Cost:
UT
RW
DN
PL
BR 406,000
406,000 0 0
1122
GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
GILBERTS CREEK ON KY 1972 1.4 MI E OF CRAB
ORCHARD ROAD (CR 1226) AT SECL OF
LANCASTER. (040B00024N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
647,500
0 210,000 647,500
1138
Page 63 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1972 BRIDGE
OVER BRANCH OF GILBERTS CREEK.
(040B00025N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
416,500
0 175,000 416,500
10010
Total for GARRARD county PL
Total Amounts:
CN
UT
RW
DN
406,000 1,064,000
885,000
10,000,000
406,000 885,000 11,064,000
GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH
END OF BLANCHET ROAD 0.3 MILES
NORTHEAST OF US 25. 041C00012N (12CCN)
CN
Project Cost:
UT
RW
DN
PL
BR 1,141,000
0 1,141,000 0
8714
GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH
END OF BLANCHET ROAD 0.2 MILES
SOUTHEAST OF THE JUNCTION WITH US 25.
041C00014N (12CCN)
CN
Project Cost:
UT
RW
DN
PL
BR 2,604,000
0 0 2,604,000
8715
GRANT CR-1142 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH
END OF DELANEY ROAD 0.1 MILE NORTH OF
THE JUNCTION WITH US 25. 041C00016N
(12CCN)
CN
Project Cost:
UT
RW
DN
PL
BR 2,240,000
0 0 2,240,000
8716
Page 64 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER
CLARKS CRK+BATON ROUGE R. (041B00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,732,500
0 210,000 1,732,500
10001
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGES
OVER EAGLE CREEK (041B00014N) AND
RATTLESNAKE CREEK (041B00013N).
CN
Project Cost:
UT
RW
DN
PL
BR
BR
577,500
4,165,000
0 577,500 4,165,000
10002
GRANT CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CYNTHIANA ROAD
BRIDGE OVER COOPERTOWN CREEK.
(041C00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
367,500
0 175,000 367,500
10003
GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER
CLARKS CRK+BATON ROUGE R. (041B00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
420,000
2,940,000
0 420,000 2,940,000
10010
GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075
NON-CARDINAL DIRECTION(S) FROM MILEPOINT
143.239 TO MILEPOINT 145.5
CN
Project Cost:
UT
RW
DN
PL
PM
PM
90,000
900,000
0 0 990,000
20023
Page 65 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 152.112 TO
MILEPOINT 157.7
CN
Project Cost:
UT
RW
DN
PL
PM
PM
970,000
9,700,000
0 10,670,000 0
20025
GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 162.52 TO
MILEPOINT 164.4
CN
Project Cost:
UT
RW
DN
PL
PM
PM
220,000
2,200,000
0 2,420,000 0
20027
Total for GRANT county PL
Total Amounts:
CN
UT
RW
DN
13,041,000 14,949,000
2,572,500 90,000
0 15,613,500 15,039,000
GRAVES KY-80 NEW ROUTE(O) MURRAY-MAYFIELD RD; EXTEND MAYFIELD
SOUTHERN BYPASS FROM KY-303 SOUTH OF
MAYFIELD, NORTHWEST TO JULIAN M.
CARROLL PARKWAY (PURCHASE PARKWAY).
(EXTENSION OF 1-181.30)(00CCR)(12CCR)CN
Project Cost:
UT
RW
DN
PL
SPP 7,280,000
0 0 7,280,000
181.5
GRAVES CR-1088 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
PANTHER CREEK ON MCKENDREE CHURCH RD
(CR 1088) 0.3 MI E OF KY 301 042C00010N
CN
Project Cost:
UT
RW
DN
PL
BR 280,000
0 280,000 0
1157
Page 66 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GRAVES KY-1890 AM-BRIDGE (P) REPLACE KY-1890 BRIDGE OVER LITTLE
MAYFIELD CREEK. (042B00191N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
507,500
0 140,000 507,500
10001
GRAVES CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MARTIN ROAD
BRIDGE OVER BRANCH-OBION CREEK.
(042C00250N)
CN
Project Cost:
UT
RW
DN
PL
BR 200,000
0 200,000 0
10002
GRAVES KY-1485 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1485 BRIDGE
OVER TERRAPIN CREEK. (042B00136N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
875,000
0 210,000 875,000
10010
Total for GRAVES county PL
Total Amounts:
CN
UT
RW
DN
8,662,500
830,000
0 830,000 8,662,500
GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM LEITCHFIELD BYPASS
(KY3155) TO JUST EAST OF BEEHIVE CURVE.
CONSTRUCTION SEGMENT 1.
CN
Project Cost:
UT
RW
DN
PL
STP 2,000,000
0 0 2,000,000
8502.1
Page 67 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GRAYSON KY-3155 NEW ROUTE(O) EXTEND THE WILLIAM THOMASON BYWAY (KY
3155) FROM THE SOUTHERN INTERSECTION AT
KY 259 WESTERLY TO KY 54
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 1,000,000 0
8954
GRAYSON CR-1161 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HORNTOWN RD
BRIDGE OVER ROCK CREEK. (043C00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
100,000
220,000
0 100,000 220,000
10000
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 108.00 TO
MILEPOINT 111.25 (110.50 NON-CARDINAL)
CN
Project Cost:
UT
RW
DN
PL
PM
PM
230,000
2,300,000
0 0 2,530,000
20000
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 88.433 TO
MILEPOINT 91.2
CN
Project Cost:
UT
RW
DN
PL
PM 2,590,000
0 0 2,590,000
20004
GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY
NON-CARDINAL DIRECTION(S) FROM MILEPOINT
91.2 TO MILEPOINT 95
CN
Project Cost:
UT
RW
DN
PL
PM
PM
150,000
1,500,000
0 0 1,650,000
20006
Page 68 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for GRAYSON county PL
Total Amounts:
CN
UT
RW
DN
8,610,000
1,100,000 380,000
0 1,100,000 8,990,000
GREEN US-68 RECONSTRUCTION(O) ADDRESS SAFETY, GEOMETRIC DEFICIENCIES
AND MAINTENANCE ISSUES ALONG US 68 FROM
1600 FEET WEST OF SOUTH THURLOW RD. (MP
9.682) EXTENDING TO THE RUSSELL CREEK
BRIDGE (MP 10.775) (3-203.00 STUDY CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
250,000
720,000
2,740,000
0 970,000 2,740,000
397.12
GREEN CR-1347 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JONES SCHOOL RD
BRIDGE OVER BRUSH CREEK. (044C00023N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
100,000
203,000
0 100,000 203,000
10001
GREEN US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER
GREASY CREEK. (044B00013N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
402,500
0 105,000 402,500
10009
Total for GREEN county PL
Total Amounts:
CN
UT
RW
DN
3,345,500
205,000
250,000
720,000
0 1,175,000 3,345,500
Page 69 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GREENUP CS-3060 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS-PHASE B ALONG
GESLING RD (CS-3060) FROM INTERSECTION OF
CARDINAL RD (CS-3061) & SEATON DR
(KY-750) TO KENWOOD DR (CS-3054/KY-1093)
& PHASE C ALONG KENWOOD DR BEGINNING CN
Project Cost:
UT
RW
DN
PL
SAH
SAH
SAH
SAH
68,000
20,000
80,000
444,000
88,000 524,000 0
401
GREENUP KY-750 MATCHED FED FUNDS(O) DESIGN AND CONSTRUCTION OF SIDEWALKS
ALONG POWELL LANE (KY-750) IN
FLATWOODS, KY BEGINNING AT END OF THE
EXISTING SIDEWALK AT MP 1.74 AND
EXTENDING APPROXIMATELY 0.7 MILES EAST TO CN
Project Cost:
UT
RW
DN
PL
SAH
SAH
SAH
32,000
64,000
370,000
466,000 0 0
402
GREENUP KY-244 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-244
(MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF
JCT US 23; 045B00039N (16CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 11,655,000
11,655,000 0 0
1073
GREENUP CS-4041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POND
RUN ON WILLIAMS AVE (CS 4041) IN RACELAND
250 FT NW OF POND RUN ROAD (CS 4001)
(045C00119N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
840,000
0 245,000 840,000
1094
GREENUP KY-503 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-503 BRIDGE
OVER INDIAN RUN CREEK. (045B00033N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
753,000
0 245,000 753,000
10007
Page 70 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
GREENUP CR-1018 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SMITH BRANCH RD
BRIDGE OVER LEFT FK SMITH BRANCH.
(045C00114N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
595,000
0 280,000 595,000
10008
GREENUP LA-1000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MUSKETEER DRIVE
BRIDGE OVER SLASH BRANCH. (045C00150N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
300,000
0 245,000 300,000
10009
GREENUP KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER
LOST CREEK. (045B00006N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
1,015,000
0 350,000 1,015,000
10022
Total for GREENUP county PL
Total Amounts:
CN
UT
RW
DN
12,025,000 444,000 3,503,000
68,000 1,365,000
52,000
64,000 80,000
12,209,000 1,889,000 3,503,000
HANCOCK US-60 MINOR WIDENING(O) IMPROVE THE WESTBOUND LANES OF US-60
FROM KY-1957 TO 0.2 MILE WEST OF KY-6106.
(12CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
90,000
960,000
0 90,000 960,000
226
Page 71 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for HANCOCK county PL
Total Amounts:
CN
UT
RW
DN
90,000
960,000
0 90,000 960,000
HARDIN KY-251 PHASE I DESIGN(O) KY 251 IMPROVEMENTS FROM KY 3005 TO KY
434.
CN
Project Cost:
UT
RW
DN
PL
BR2 4,200,000
0 4,200,000 0
153.01
HARDIN KY-313 MAJOR WIDENING(O) WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT
PARKWAY (MP 10.598) AND THE BULLION
BOULEVARD CONNECTOR (MP 14.534).
(2016BOP)
CN
Project Cost:
UT
RW
DN
PL
BR2
BR2
750,000
12,000,000
0 750,000 12,000,000
170
HARDIN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER P&L
AND CSX RAILROADS (MP 36.4 TO 36.8 IN WEST
POINT) (047B00007N).(16CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 10,500,000
0 10,500,000 0
199
HARDIN US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62
OVER ROLLING FORK AT THE HARDIN-NELSON
CO LINE. 047B00023N
CN
Project Cost:
UT
RW
DN
PL
BR 3,381,000
0 0 3,381,000
1093
Page 72 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARDIN KY-361 SAFETY(P) RELOCATE INTERSECTION OF WOODLAND
DRIVE AT US-31W. (98CCN)(06CCR)(REMAINING
FUNDS FOR AGREEMENT)(12CCR)(LET BY
KYTC)
CN
Project Cost:
UT
RW
DN
PL
BR2 2,500,000
0 0 2,500,000
7020
HARDIN KY-1357 SAFETY(P) IMPROVE SAFETY, GEOMETRICS, DRAINAGE
AND MAINTENANCE ISSUES ALONG KY-1357
(ST. JOHNS RD) FROM US-31W BYPASS TO
KY-3005 (RING ROAD). (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,000,000
0 0 3,000,000
8801
HARDIN KY-220 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 220 BRIDGE
OVER MARTINS BRANCH CREEK. (047B00080N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
87,500
192,500
0 87,500 192,500
10010
HARDIN KY-2212 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2212 BRIDGE
OVER PAWLEY CREEK. (047B00134N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
91,000
206,500
0 91,000 206,500
10011
HARDIN KY-2800 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2800 BRIDGE
OVER SANDY CREEK. (047B00137N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
87,500
206,500
0 87,500 206,500
10012
Page 73 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARDIN CR-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEWLEY HOLLOW
RD BRIDGE OVER MILL CREEK. (047C00014N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
91,000
227,500
0 91,000 227,500
10013
HARDIN BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA
LAYNE COLLINS BLUEGRASS PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 5.82 TO
MILEPOINT 8.837
CN
Project Cost:
UT
RW
DN
PL
PM
PM
240,000
2,400,000
0 2,640,000 0
20007
HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION
CN
Project Cost:
UT
RW
DN
PL
PM
PM
550,000
5,500,000
0 6,050,000 0
20011
HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION
CN
Project Cost:
UT
RW
DN
PL
PM
PM
250,000
2,500,000
0 2,750,000 0
20012
HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
25,000
250,000
0 0 275,000
20014
Page 74 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARDIN WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY CARDINAL
DIRECTION(S) FROM MILEPOINT 132.4 TO
MILEPOINT 134.923
CN
Project Cost:
UT
RW
DN
PL
PM
PM
200,000
2,000,000
0 2,200,000 0
20018
Total for HARDIN county PL
Total Amounts:
CN
UT
RW
DN
22,900,000 18,964,000
1,597,000 25,000
3,000,000
4,950,000
0 29,447,000 21,989,000
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF
SCL OF WALLINS CREEK. (048B00047N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
510,000
0 175,000 510,000
1097
HARLAN US-119 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 119
OVER KY 160/MAIN ST IN HARLAN COUNTY, KY.
048B00126N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
560,000
5,460,000
0 560,000 5,460,000
1101
HARLAN CR-1328 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SWEET
BALL RD (CR-1328) (0.175) OVER AGES
BRANCH. 048C00072N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
455,000
0 175,000 455,000
1107
Page 75 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE
OVER WALLINS CREEK. (048B00046N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
490,000
0 175,000 490,000
10010
HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE
OVER WALLINS CREEK. (048B00048N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
367,500
0 175,000 367,500
10011
HARLAN KY-72 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER
CLOVER FK CUMBERLAND RVR. (048B00095N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
910,000
0 245,000 910,000
10012
HARLAN KY-179 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-179 BRIDGE
OVER FUGETT CREEK. (048B00097N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
612,500
0 175,000 612,500
10013
HARLAN KY-3451 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3451 BRIDGE
OVER EWING CREEK. (048B00146N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
525,000
0 175,000 525,000
10014
Page 76 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARLAN KY-2007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2007 BRIDGE
OVER WALLINS CREEK. (048B00179N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
469,000
0 192,500 469,000
10015
HARLAN CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE
OVER POOR FK CUMBERLAND RVR.
(048C00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
630,000
0 192,500 630,000
10016
HARLAN CR-1218 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BLUE LN BRIDGE
OVER PATH FK OF PUCKETT CREEK.
(048C00043N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
581,000
0 175,000 581,000
10017
HARLAN CS-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KENTUCKY AV
BRIDGE OVER MARTINS FK CUMBERLAND RV.
(048C00067N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10018
HARLAN CR-1082 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PRICE LN BRIDGE
OVER CLOVER FK CUMBERLAND RVR.
(048C00094N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
598,500
0 192,500 598,500
10019
Page 77 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HARLAN CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BANNER FORK RD
BRIDGE OVER WALLINS CREEK. (048C00138N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
427,000
0 175,000 427,000
10020
HARLAN KY-1604 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1601 BRIDGE
OVER JONES CREEK. (048B00073N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
740,600
0 175,000 740,600
10040
Total for HARLAN county PL
Total Amounts:
CN
UT
RW
DN
13,423,600
3,132,500
0 3,132,500 13,423,600
HART KY-335 ECONOMIC DEVEL(O) IMPROVE MOBILITY, CONNECTIVITY AND
SAFETY BY ADDRESSING COMMERCIAL AND
INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W
SOUTH OF KY-218 TO I-65. (16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 1,500,000
0 0 1,500,000
441
Total for HART county PL
Total Amounts:
CN
UT
RW
DN
1,500,000
0 0 1,500,000
Page 78 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HENDERSON US-60 RECONSTRUCTION(O) WATHEN LANE: UPGRADE WITH WIDENED
LANES, CURB, GUTTER AND SIDEWALK FROM
US 60 TO CITY LIMITS.
CN
Project Cost:
UT
RW
DN
PL
SHN 304,000
304,000 0 0
382
HENDERSON CS-1372 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION
ON CS-1372 (WATSON LANE)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
400,000
1,400,000
0 400,000 1,400,000
383
HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HENDERSON FOR FY 2018. (FUNDING SUBJECT
TO FISCAL CONSTRAINT PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SHN 1,176,000
1,176,000 0 0
700.13
HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HENDERSON FOR FY 2019. (FUNDING SUBJECT
TO FISCAL CONSTRAINT PENDING MPO TIP).
CN
Project Cost:
UT
RW
DN
PL
SHN 700,000
0 700,000 0
700.14
HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO
HENDERSON FOR FY 2020. (FUNDING SUBJECT
TO FISCAL CONSTRAINT PENDING MPO TIP).
CN
Project Cost:
UT
RW
DN
PL
SHN 700,000
0 0 700,000
700.15
Page 79 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HENDERSON US-41 SAFETY(P) US 41/KY 812 INTERSECTION UPGRADE: ADD
RIGHT TURN AND LEFT TURN LANES INCLUDING
SIGNAL PHASING. KYTC PROJECT WITH KYTC
PROVIDING 20% MATCH.(TOLL CREDITS)
(FUNDING SUBJECT TO FISCAL CONSTRAINT CN
Project Cost:
UT
RW
DN
PL
SHN
SHN
SHN
50,000
100,000
950,000
1,100,000 0 0
711
HENDERSON CS-1453 AM-BRIDGE (P) WATHEN BRIDGE REPLACEMENT: REPLACE
EXISTING BRIDGE WITH 6FT PRECAST
CONCRETE BOX CULVERT, PAVEMENT AND
GUARDRAIL. LPA PROJECT. CITY TO PROVIDE
MATCH.(FUNDING SUBJECT TO FISCAL CN
Project Cost:
UT
RW
DN
PL
SHN
SHN
20,000
160,000
180,000 0 0
713
HENDERSON KY-2183 MATCHED FED FUNDS(O) KY 2183 / KY 1539 INTERSECTION AND
UPGRADE: PROJECT WILL RECONSTRUCT THE
INTERSECTION AND MAKE IMPROVEMENTS TO
THE SOUTHBOUND APPROACH. (2012BOP)
CN
Project Cost:
UT
RW
DN
PL
SHN
SHN
SHN
150,000
400,000
600,000
550,000 600,000 0
714
HENDERSON US-41 MATCHED FED FUNDS(O) US 41/ WOLF HILLS ROAD INTERSECTION
UPGRADE: PROJECT WILL ADD DEDICATED
RIGHT TURN AND LEFT TURN LANES INCLUDING
SIGNAL PHASING TO BE MODIFIED OR ADDED TO
EACH LEG OF THE INTERSECTION. (2012BOP)CN
Project Cost:
UT
RW
DN
PL
SHN
SHN
SHN
50,000
100,000
500,000
150,000 500,000 0
715
HENDERSON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60
OVER GREEN RIVER AT INTERSECTION WITH KY
1078 051B00015N.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 6,000,000
0 6,000,000 0
1080
Page 80 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HENDERSON US-60 PREFINANCD CONVRSN(O) ADDRESS DEFICIENCIES OF BRIDGE ON US 60
OVER GREEN RIVER AT INTERSECTION WITH KY
1078. (SR 39) 051B00015N (ADDITIONAL
FUNDING FOR C PHASE)
CN
Project Cost:
UT
RW
DN
PL
BR 6,000,000
0 0 6,000,000
1080.01
HENDERSON I-69 NEW ROUTE(O) DEVELOP ALIGNMENT FOR I-69
HENDERSON/EVANSVILLE OHIO RIVER
CROSSING (TO BE DEVELOPED IN CONCERT
WITH 2-1088.00).(16CCR)(C-COST=$1.0 BILLION;
KYTC SHARE $600 MILLION)CN
Project Cost:
UT
RW
DN
PL
NH 500,000
0 500,000 0
1088.1
Total for HENDERSON county PL
Total Amounts:
CN
UT
RW
DN
2,286,000 7,800,000 6,700,000
304,000 900,000
250,000 1,400,000
620,000
3,460,000 8,700,000 8,100,000
HENRY KY-146 RECONSTRUCTION(O) MAJOR RECONSTRUCTION OF KY-146 BETWEEN
NEW CASTLE AT US-421 AND PENDLETON AT
KY-153. SEGMENT 1: PENDLETON ROAD (KY
153) TO LOST CREEK (1/2 MILE EAST OF
SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO CN
Project Cost:
UT
RW
DN
PL
SPP 6,930,000
0 6,930,000 0
8300
HENRY KY-997 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 997 BRIDGE
OVER WHITE SULPHUR CREEK. (052B00060N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
266,000
0 192,500 266,000
10002
Page 81 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HENRY KY-3175 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3175 BRIDGE
OVER WHITE SULPHUR FORK. (052B00064N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
262,500
574,000
0 262,500 574,000
10003
HENRY KY-3320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3320 BRIDGE
OVER TRIB OF HARRODS CREEK. (052B00070N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
287,000
0 210,000 287,000
10004
HENRY CR-1027 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GULLION RUN RD
BRIDGE OVER TRIB OF GULLION RUN.
(052C00045N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
231,000
0 175,000 231,000
10006
HENRY KY-1606 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1606 BRIDGE
OVER WHITE SULPHUR FORK. (052B00048N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,022,000
0 245,000 1,022,000
10017
HENRY I-71 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-071 BOTH
DIRECTION(S) FROM MILEPOINT 24.727 TO
MILEPOINT 28.173.
CN
Project Cost:
UT
RW
DN
PL
PM
PM
450,000
4,500,000
0 4,950,000 0
20002
Page 82 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HENRY I-71 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-071
CARDINAL DIRECTION(S) FROM MILEPOINT
37.183 TO MILEPOINT 38.086
CN
Project Cost:
UT
RW
DN
PL
PM
PM
40,000
400,000
0 0 440,000
20007
Total for HENRY county PL
Total Amounts:
CN
UT
RW
DN
11,430,000 2,780,000
1,535,000 40,000
0 12,965,000 2,820,000
HICKMAN KY-1826 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND
APPROACHES ON KY-1826 OVER TOWN CREEK
(B79) IN CLINTON. (053B00079N)
CN
Project Cost:
UT
RW
DN
PL
BR 1,400,000
0 1,400,000 0
1062
HICKMAN CR-1011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR
ON BALTIMORE RD (CR 1011) 0.3 MI NW OF
HICKMAN/GRAVES CO LINE 053C00003N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
266,000
1,613,500
0 266,000 1,613,500
1156
HICKMAN KY-2206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2206 BRIDGE
OVER CANE CR FK -OBION CRK. (053B00090N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
875,000
0 210,000 875,000
10011
Page 83 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for HICKMAN county PL
Total Amounts:
CN
UT
RW
DN
1,400,000 2,488,500
476,000
0 1,876,000 2,488,500
HOPKINS US-41 MAJOR WIDENING(O) US 41A PHASE II DESIGN AND RIGHT-OF-WAY.
(2005HPP-KY135)(SEE 2-137.01 FOR "STP"
COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
HPP 2,879,680
2,879,680 0 0
137.02
HOPKINS US-41 MAJOR WIDENING(O) IMPROVE US-41A FROM INDUSTRIAL DRIVE TO
YORKWOOD PLACE. (SECTION 1) (2012BOP)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 5,000,000
0 0 5,000,000
137.1
HOPKINS US-41 MAJOR WIDENING(O) WIDEN US-41A FROM YORKWOOD PLACE TO
US-41 / KY-281. (SECTION 2) (2012BOP)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 8,000,000
8,000,000 0 0
137.2
HOPKINS -0 NEW ROUTE(O) CONSTRUCTION OF THE CENTER STREET
CONNECTOR ROAD BEGINNING AT CENTER
STREET AND PROCEEDING TO THE CSX
RAILROAD, SECTION 1, A DISTANCE 5,173
LINEAR FEET, THENCE PROCEEDING THROUGH A CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
400,000
200,000
800,000
0 600,000 800,000
804
Page 84 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
HOPKINS KY-260 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-260
(MP 2.14) OVER OTTER CREEK; .20 MI EAST OF
PENNYRILE PARKWAY; 054B00022N (14CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 1,085,000
1,085,000 0 0
1072
HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER
SUGAR CREEK. (054B00088N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,242,500
0 210,000 1,242,500
10005
HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER
CLEAR CREEK. (054B00182N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,295,000
0 210,000 1,295,000
10006
HOPKINS KY-138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 138 BRIDGE
OVER POND RIVER. (054B00009N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
35,000
245,000
0 35,000 245,000
10024
HOPKINS KY-109 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 109 BRIDGE
OVER TRADEWATER RIVER. (054B00079N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
35,000
175,000
0 35,000 175,000
10025
Page 85 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for HOPKINS county PL
Total Amounts:
CN
UT
RW
DN
11,964,680 7,957,500
890,000
200,000
800,000
11,964,680 1,090,000 8,757,500
JACKSON KY-30 RECONSTRUCTION(O) IMPROVE KY-30 FROM US-421 TO THE OWSLEY
COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE &
ENVIR)(16CCR)(TO BE LET WITH 10-279.61)
CN
Project Cost:
UT
RW
DN
PL
STP 18,500,000
0 18,500,000 0
278.3
JACKSON KY-89 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER
HORSE LICK CREEK. (055B00028N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
1,820,000
0 175,000 1,820,000
10041
Total for JACKSON county PL
Total Amounts:
CN
UT
RW
DN
18,500,000 1,820,000
175,000
0 18,675,000 1,820,000
JEFFERSON I-71 RECONSTRUCTION(O) ADDITION OF NB AND SB AUXILIARY LANES ON
I-71 NEAR KENNEDY, INCLUDING OPERATIONAL
IMPROVEMENTS TO THE ZORN INTERCHANGE.
(2004BOPC)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
800,000
1,500,000
1,000,000
0 800,000 2,500,000
48.1
Page 86 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 SHERMAN
MINTON BRIDGE OVER THE OHIO RIVER. (JOINT
PROJECT WITH INDIANA)(056B00279N)(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
2,000,000
5,000,000
0 2,000,000 5,000,000
64
JEFFERSON CS-1001 MAJOR WIDENING(O) WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM
EAST OF BEARGRASS CREEK NEAR POPE
AVENUE TO ZORN AVENUE. TO INCLUDE BIKE
LANES. PROJECT LENGTH 1.3 MILES.
CN
Project Cost:
UT
RW
DN
PL
SLO 11,500,000
0 11,500,000 0
91.02
JEFFERSON CS-1001 NEW ROUTE(O) EXTENSION OF RIVER ROAD, LOUISVILLE.
(2006KYD)(SEE 5-512.00 FOR PROJECT
INFORMATION)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
550,000
540,000
540,000
550,000 540,000 540,000
91.08
JEFFERSON I-64 RECONSTRUCTION(O) IMPROVE RAMP CAPACITY OF THE I-64
WESTBOUND RAMP TO I-264 WESTBOUND
FROM ONE TO TWO LANES FOR ENTIRE LENGTH
AND OTHER NEEDED IMPROVEMENTS TO
ADDRESS WEAVE ISSUES AT MERGE ON I-264. CN
Project Cost:
UT
RW
DN
PL
NH 10,130,000
0 10,130,000 0
159
JEFFERSON KY-1450 MAJOR WIDENING(O) WIDEN BLUE LICK ROAD FROM SNYDER
FREEWAY NORTH TO KY-61 (LOU T.I.P.)
(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 4,500,000
0 0 4,500,000
247.1
Page 87 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON CR-1006 MINOR WIDENING(O) WIDEN ENGLISH STATION ROAD FROM 2 TO 3
LANES (3RD LANE WILL BE A CENTER TURN
LANE) FROM AIKEN ROAD TO AVOCA ROAD.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP).CN
Project Cost:
UT
RW
DN
PL
SLO 6,408,000
0 0 6,408,000
353
JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT GOOSE CREEK ROAD.
(06CCN) (2004BOPC)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 1,320,000
0 0 1,320,000
371.13
JEFFERSON I-65 RECONSTRUCTION(O) EXTEND AND RECONSTRUCT I-65 SB RAMP TO
BROOK STREET AND FLOYD STREET. (FUNDING
SUBJECT TO FISCAL CONSTRAINT PENDING MPO
TIP)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
750,000
750,000
750,000 750,000 0
378.1
JEFFERSON -0 NEW ROUTE(O) PHASE 3.EXTEND AND CONSTRUCT 2 LANE
ROADWAY WITH CONTINUOUS CENTER-TURN
LANE FROM KY 864 (BEULAH CHURCH RD) TO
US 31E (BARDSTOWN RD) AT BARDSTOWN
FALLS RD. PROJECT WILL INCORPORATE CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
3,200,000
1,500,000
4,700,000 0 0
404.01
JEFFERSON US-150 SAFETY(P) ALIGN INTERSECTION OF BROADWAY AND 18TH
STREET BY MOVING THE SOUTH LEG OF 18TH
STREET TO THE EAST. (FUNDING SUBJECT TO
FISCAL CONSTRAINT PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SLO 1,000,000
1,000,000 0 0
413
Page 88 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON -0 BIKE/PED FACIL(O) REHABILITATION AND CONSTRUCTION OF
VARIOUS SIDEWALK PROJECTS IN LOUISVILLE
METRO. (2006BOPC) (FUNDING SUBJECT TO
FISCAL CONSTRAINT PENDING MPO TIP).
CN
Project Cost:
UT
RW
DN
PL
SLO 100,000
100,000 0 0
439.05
JEFFERSON CS-1014 RECONSTRUCTION(O) CONVERSION OF ONE-WAY STREETS IN
DOWNTOWN LOUISVILLE TO TWO-WAY
TRAFFIC (MAIN,JEFFERSON,LIBERTY,
MUHAMMAD ALI, CHESTNUT,3RD STREETS).
PHASE 1CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
195,000
4,000,000
4,195,000 0 0
470
JEFFERSON CS-1049 RECONSTRUCTION(O) CONVERSION OF ONE-WAY STREETS IN
DOWNTOWN LOUISVILLE TO TWO-WAY
TRAFFIC (8TH, 7TH, SHELBY, CAMPBELL
STREETS). PHASE 2
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
60,000
600,000
60,000 600,000 0
470.1
JEFFERSON US-31 SAFETY(P) DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS.
IMPROVE DIXIE HIGHWAY BETWEEN CRUMS
LANE (KY 2049) AND ROCKFORD LANE (KY
2051)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SLO 4,000,000
4,000,000 0 0
478
JEFFERSON CR-1005 RECONSTRUCTION(O) WIDEN HUBBARDS LANE FROM 2 TO 3 LANES
(3RD LANE WILL BE A CENTER TURN LANE)
FROM US 60 (SHELBYVILLE ROAD) TO KY 1447
(WESTPORT ROAD). ADD BIKE LANES TO
HUBBARDS LANE FROM KRESGE WAY TO KY CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
260,000
350,000
2,900,000
610,000 2,900,000 0
479
Page 89 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON KY-864 MATCHED FED FUNDS(O) KY 864 - WIDEN BEULAH CHURCH ROAD FROM
2 TO 3 LANES FROM I-265 TO CEDAR CREEK
ROAD.(2010BOP)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
2,950,000
1,975,000
2,950,000 1,975,000 0
481
JEFFERSON I-71 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN
I-265 AND KY-329.(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
500,000
500,000
15,000,000
1,000,000 15,000,000 0
483
JEFFERSON I-71 PREFINANCD CONVRSN(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN
I-265 AND KY-329.(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 15,000,000
0 0 15,000,000
483.01
JEFFERSON -0 BIKE/PED FACIL(O) GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL
CONNECTOR:CONSTRUCT A MULTI-USE BICYCLE
& PEDESTRIAN TRAIL ALONG OLD
TAYLORSVILLE ROAD & JEFFERSON ST IN
DOWNTOWN JEFFERSONTOWN CONNECTING CN
Project Cost:
UT
RW
DN
PL
SLO 1,300,000
1,300,000 0 0
486
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN & CONSTRUCT SHARED USE PATH &
LOUISVILLE LOOP TRAILHEAD FACILITIES THRU
JEFFERSON MEMORIAL FOREST FROM NORTH
END OF SAND QUARRY TUNNEL AT GENE
SNYDER FWY TO WEST TERMINUS OF EXISTING CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
100,000
55,000
2,000,000
155,000 2,000,000 0
489
Page 90 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON -0 BIKE/PED FACIL(O) MISCELLANEOUS SIDEWALKS AND HANDICAP
RAMPS: CONSTRUCT AND REPLACE VARIOUS
SIDEWALKS AND HANDICAP RAMPS
THROUGHOUT THE CITY ON A REOCCURRING
ANNUAL BASIS.CN
Project Cost:
UT
RW
DN
PL
SLO 37,800
37,800 0 0
493
JEFFERSON KY-1020 BIKE/PED FACIL(O) OLMSTED PARKWAYS MULTI-USE PATH
SYSTEM-SOUTHERN PKWY: CONSTRUCTION OF
A 2.5 MILE SHARED USE PATH SYSTEM ALONG
SOUTHERN PARKWAY BETWEEN SOUTH 3RD
AND NEW CUT ROAD.CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
400,000
100,000
400,000 100,000 0
495
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.5 MILE SHARED USE
PATH SYSTEM ALONG ALGONQUIN PARKWAY
BETWEEN WILSON AVENUE AND CYPRESS
STREET.
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
160,000
80,000
1,500,000
160,000 80,000 1,500,000
496
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.45 MILE SHARED USE
PATH SYSTEM ALONG ALGONQUIN PARKWAY
BETWEEN CYPRESS STREET AND DIXIE HWY.
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
160,000
80,000
1,148,945
240,000 1,148,945 0
497
JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 1.2 MILE SHARED USE
PATH SYSTEM ALONG ALGONQUIN PARKWAY
BETWEEN DIXIE HIGHWAY AND SHARP AVE.
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
200,000
160,000
3,063,854
200,000 160,000 3,063,854
498
Page 91 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON CR-1001 BIKE/PED FACIL(O) RIVER ROAD BICYCLE AND PEDESTRIAN
IMPROVEMENTS FROM DOWNTOWN LOUISVILLE
TO THE CITY OF PROSPECT (US 42), 8.5 MILES.
(SEE 5-3036.00)
CN
Project Cost:
UT
RW
DN
PL
SLO 200,000
0 0 200,000
499
JEFFERSON -0 BIKE/PED FACIL(O) OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT
BICYCLE/PEDESTRIAN FACILITIES ALONG
CAMPGROUND ROAD FROM END OF SHARED
USE PATH AT THE RAILROAD CROSSING ON
CAMPGROUND ROAD NEAR I-264 TO LEES LANE CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
800,000
750,000
3,000,000
800,000 750,000 3,000,000
505
JEFFERSON CR-1004 MINOR WIDENING(O) WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES
FROM RUCKRIEGEL PARKWAY TO MAPLE ROAD,
AND WIDEN WATTERSON TRAIL FROM 2 TO 3
LANES FROM OLD TAYLORSVILLE ROAD TO
RUCKRIEGEL PARKWAY. PROJECT TO INCLUDE CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
264,000
352,000
1,232,000
616,000 1,232,000 0
518
JEFFERSON I-64 AM-BRIDGE (P) REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE
OVER N.S. RAILROAD AND THE LEVEE AND
REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 400,000
0 0 400,000
521
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH
AND LOUISVILLE LOOP TRAILHEAD FACILITIES
THROUGH JEFFERSON MEMORIAL FOREST
FROM BLEVINS GAP ROAD TO NORTH END OF
SAND QUARRY TUNNEL AT GENE SNYDER FWY CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
55,000
60,000
2,000,000
115,000 2,000,000 0
523
Page 92 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH
AND LOUISVILLE LOOP TRAILHEAD FACILITIES
THROUGH JEFFERSON MEMORIAL FOREST
FROM PENDLETON RD AT MEDORA RD TO THE
BEGINNING OF JEFFERSON MEMORIAL FOREST CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
100,000
1,000,000
100,000 1,000,000 0
524
JEFFERSON KY-2841 MATCHED FED FUNDS(O) NORTHEAST LOUISVILLE LOOP SECTION II.
CONSTRUCT A SHARED USE PATH ALONG US 60
FROM EASTWOOD CUTOFF TO EASTWOOD
RECREATION CENTER. (METRO PARKS PROJECT)
(2014BOP)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
533,333
45,000
450,000
578,333 450,000 0
525
JEFFERSON -0 BIKE/PED FACIL(O) CONST MULTIUSE PATH THRU AB SAWYER PK
CONNECT TO SURROUNDING NEIGHBORHOODS
INCLUDE: UNDERPASS/BRIDGE/SITE
AMENITIES/CONSTRUCTION OF PEDESTRIAN
FACILITIES ALONG HURSTBOURNE PKWY FR CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
50,000
300,000
1,500,000
350,000 1,500,000 0
529
JEFFERSON KY-1932 MATCHED FED FUNDS(O) IMPROVE THE SAFETY AND CONGESTION OF KY
1932 (CHENOWETH LANE) FROM US 60
(SHELBYVILLE ROAD) TO US 42
(BROWNSBORO ROAD) APPROXIMATELY 1.07
MILES (2014BOP).CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
650,000
215,000
865,000 0 0
531
JEFFERSON KY-1931 MINOR WIDENING(O) WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3
LANES FROM US 31W (DIXIE HWY) TO DOSS
HIGH SCHOOL. 1.7 MILES (2014BOP)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
3,000,000
6,000,000
3,000,000 6,000,000 0
536
Page 93 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON I-265 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-265 BETWEEN
TAYLORSVILLE ROAD AND I-71.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
5,800,000
1,580,000
2,080,000
5,800,000 0 3,660,000
537
JEFFERSON I-71 RECONSTRUCTION(O) PROVIDE COLLECTOR-DISTRIBUTOR LANE ON
SOUTHBOUND I-71 TO FACILITATE RAMP
MOVEMENTS TO AND FROM I-265.
CN
Project Cost:
UT
RW
DN
PL
NH 5,400,000
0 5,400,000 0
539
JEFFERSON CS-1002 MATCHED FED FUNDS(O) BLUEGRASS COMMERCE PARK
BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE II
ALONG BLUEGRASS PARKWAY FROM
WATTERSON TRAIL TO TUCKER STATION ROAD
AND ALONG TUCKER STATION ROAD FROM CN
Project Cost:
UT
RW
DN
PL
SLO 1,300,000
1,300,000 0 0
543
JEFFERSON I-265 I-CHANGE RECONST(O) RECONSTRUCTION OF THE I-265/I-64
INTERCHANGE. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
NH
1,000,000
1,000,000
1,000,000
10,000,000
1,000,000 2,000,000 10,000,000
549
JEFFERSON I-64 CONGESTION MITIGTN(O) IMPROVEMENTS WITHIN THE I-64 CORRIDOR
FROM THE KENNEDY INTERCHANGE TO I-264
(WATTERSON EXPRESSWAY) ADDRESSING
SAFETY AND CONGESTION ISSUES. THE
IMPROVEMENTS MAY INCLUDE BUT ARE NOT CN
Project Cost:
UT
RW
DN
PL NH 250,000
0 250,000 0
553
Page 94 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON KY-1747 CONGESTION MITIGTN(O) REDUCE CONGESTION AND IMPROVE SAFETY
ALONG KY-1747 (HURSTBOURNE PARKWAY)
FROM STONY BROOK DRIVE TO I-64.
CN
Project Cost:
UT
RW
DN
PL NH 250,000
0 250,000 0
555
JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION
ON I-71 FROM I-264 TO I-265.
CN
Project Cost:
UT
RW
DN
PL NH 2,000,000
0 2,000,000 0
557
JEFFERSON I-65 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION AT
THE I-65/I-264 (WATTERSON EXPRESSWAY)
INTERCHANGE.
CN
Project Cost:
UT
RW
DN
PL NH 500,000
0 500,000 0
559
JEFFERSON -0 RECONSTRUCTION(O) INTERSECTION RE-BUILD AT MAIN STREET/
STORY AVENUE / BAXTER AVENUE INCLUDING
TRANSITIONS BETWEEN WENTZEL STREET TO
THE WEST AND JOHNSON STREET TO THE EAST.
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
176,000
176,000
176,000 176,000 0
561
JEFFERSON -0 SCOPING STUDY DD (O) A COMPREHENSIVE OPERATIONAL ANALYSIS
(COA) TO ANALYZE AND EVALUATE EXISTING
TARC SERVICE IN COMPARISON WITH
COMMUNITY GROWTH, ECONOMIC AND LAND
USE DEVELOPMENT, AND CURRENT AND CN
Project Cost:
UT
RW
DN
PL SLO 354,000
354,000 0 0
562
Page 95 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON -0 SCOPING STUDY DD (O) PLANNING STUDY:EXAMINE NEED FOR
BICYCLE/PED/VEHICULAR ACCESS
IMPROVEMENTS TO PROPOSED DIXIE BRT IN
CORRIDORS: KY 907 FR US 31W TO
STONESTREET RD, ROCKFORD LN FR CANE RUN CN
Project Cost:
UT
RW
DN
PL SLO 352,000
352,000 0 0
563
JEFFERSON KY-155 DESIGN ENGINEERING(O) SAFETY PROJECT FOR RECONSTRUCTION OF
TAYLORSVILLE ROAD AND SOUTH POPE LICK
ROAD INTERSECTION AND BRIDGE OVER POPE
LICK CREEK. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
180,000
150,000
1,800,000
0 2,130,000 0
808
JEFFERSON -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL AID STP FUNDS
EARMARKED FOR LOUISVILLE URBANIZED AREA
AND SUBJECT TO MPO CONTROL FOR FY 2018
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)CN
Project Cost:
UT
RW
DN
PL
SLO 24,007,000
24,007,000 0 0
965.16
JEFFERSON CR-1038 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
CR-1038L OVER BEE LICK CREEK 056C00104N
CN
Project Cost:
UT
RW
DN
PL
BR 231,000
231,000 0 0
1061
JEFFERSON US-150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E
BROADWAY (US 150) OVER SOUTH FORK
BEARGRASS CREEK AT INTERSECTION WITH
BRENT STREET (CS 1312G)056B00348N (SD)
CN
Project Cost:
UT
RW
DN
PL
BR 850,000
0 850,000 0
1067
Page 96 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON CS-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E
KENTUCKY ST (CS 1017G) OVER SOUTH FORK
BEARGRASS CREEK 0.01 MILE E OF SCHILLER
AVE (CS 1138G) 056C00083N
CN
Project Cost:
UT
RW
DN
PL
BR 497,000
0 497,000 0
1070
JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
NORTHERN DITCH ON GRADE LANE (CR 1001G)
0.34 MI S OF KY 1747 (FERN VALLEY ROAD)
(056C00064N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
20,000
50,000
850,000
0 70,000 850,000
1077
JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2
MI N OF LIME KILN ROAD (CR 1002B)
(056C00130N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
917,000
0 315,000 917,000
1079
JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 1
BECKLEY WOODS TO BECKLEY STATION.
CONSTRUCT A SHARED USE PATH ALONG US 60
FROM BECKLEY WOODS TO BECKLEY STATION,
0.5 MILE. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
50,000
700,000
750,000 0 0
3030.1
JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 2
BECKLEY STATION TO BIRCHAM ROAD.
CONSTRUCT A SHARED USE PATH ALONG US 60
FROM BECKLEY STATION TO BIRCHAM ROAD.
0.7 MILE (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
300,000
200,000
800,000
300,000 1,000,000 0
3030.2
Page 97 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 3
BIRCHAM ROAD TO BECKLEY CREEK PARK.
CONSTRUCT A SHARED USE PATH ALONG US 60
FROM BIRCHAM ROAD TO BECKLEY CREEK
PARK, 0.5 MILE. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
50,000
75,000
2,000,000
125,000 2,000,000 0
3030.3
JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 4
BECKLEY CREEK PARK TO EASTWOOD CUTOFF.
CONSTRUCT A SHARED USE PATH ALONG US 60
FROM BECKLEY CREEK PARK TO EASTWOOD
CUT OFF, 0.6 MILE. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
350,000
150,000
350,000 150,000 0
3030.4
JEFFERSON CS-1073 TRANSP ENHANCEMENT(P) WATTERSON TRAIL PHASE I- IMPROVE
STREETSCAPE, RECONSTRUCT SIDEWALKS AND
ENHANCE LANDSCAPING FROM MAPLE ROAD
TO OLD TAYLORSVILLE ROAD IN
JEFFERSONTOWN. (BOPC2012)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
792,000
1,856,800
792,000 1,856,800 0
3031
JEFFERSON CS-1367 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS ALONG KRATZ LANE
FOR .35 MILES BETWEEN SHELBYVILLE RD. AND
OLD SHELBYVILLE RD./MAIN ST., INCLUDING
SOME DRAINAGE IMPROVEMENTS (2016BOP).
CN
Project Cost:
UT
RW
DN
PL
SLO 234,382
234,382 0 0
3039
JEFFERSON CS-2048 BIKE/PED FACIL(O) CONSTRUCT A SIDEWALK ALONG CANNONS
LANE BETWEEN WILLIS AVE. AND BOWMAN
FIELD (SENECA LOOP), 1.0 MILES (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
100,000
100,000
100,000 100,000 0
3212
Page 98 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON I-265 TRANSP ENHANCEMENT(P) ERECT SOUND WALL ON NORTH SIDE OF GENE
SNYDER FREEWAY FROM MP 15.3 TO MP 16.1.
(14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,000,000
0 3,000,000 0
8855
JEFFERSON I-71 TRANSP ENHANCEMENT(P) DESIGN AND CONSTRUCT A SOUND BARRIER
WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5
TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 2,304,000
0 0 2,304,000
8860
JEFFERSON KY-155 MINOR WIDENING(O) WIDEN TAYLORSVILLE RD. TO 3 LANES FROM
I-265 TO KY-148
CN
Project Cost:
UT
RW
DN
PL SPP
SPP
915,000
1,495,000
0 915,000 1,495,000
8908
JEFFERSON I-64 SPOT IMPROVEMENTS(O) DESIGN AND CONSTRUCT A SOUND BARRIER
WALL ON I-64 WESTBOUND BETWEEN
MILEPOINTS 13.7 AND 14.2
CN
Project Cost:
UT
RW
DN
PL
SPP 2,100,000
0 2,100,000 0
8951
JEFFERSON US-60 MINOR WIDENING(O) WIDEN US-60 TO THREE LANES FROM
EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST
WAY (MP 15.1). (16CCN) (LOCALS WILL DO
DESIGN FOR $330,000)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
410,000
460,000
0 410,000 460,000
8952
Page 99 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON I-265 SPOT IMPROVEMENTS(O) DESIGN AND BUILD A NOISE BARRIER WALL ON
THE NORTH SIDE OF I-265 BETWEEN MP 15.3
AND MP 16.1 FOR APPROXIMATELY 4700 FEET.
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
250,000 0 0
8957
JEFFERSON CR-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLARK STATION RD
BRIDGE OVER S LONG RUN. (056C00091N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
350,000
0 280,000 350,000
10007
JEFFERSON CS-1079 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD WESTPORT RD
BRIDGE OVER GOOSE CREEK. (056C00113N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
301,000
0 175,000 301,000
10008
JEFFERSON CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PENDLETON RD
BRIDGE OVER POND CREEK. (056C00118N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,106,000
0 245,000 1,106,000
10009
JEFFERSON CR-1005 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF S WATTERSON TRL
BRIDGE OVER FERN CREEK. (056C00159N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
301,000
0 245,000 301,000
10010
Page 100 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STONEBRIDGE RD
BRIDGE OVER TRIB MUDDY FK BEARGRASS.
(056C00240N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
266,000
0 210,000 266,000
10011
JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 RIVERSIDE
EXPRESSWAY BRIDGES.
(056B00298N,056B00299N,056B00300N,056B00
301N,056B00302N,056B00285N,056B00292N,05
6B00293N,056B00142N)(SD)CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
4,600,000
0 4,950,000 0
10015
JEFFERSON US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31E BRIDGE
OVER S FK BEARGRASS CREEK. (056B00137N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
966,000
0 350,000 966,000
10018
JEFFERSON CS-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SCENIC LOOP
BRIDGE OVER MID FK BEARGRASS CREEK.
(056C00027N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
406,000
0 140,000 406,000
10019
JEFFERSON CS-3396 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARK BOUNDARY
RD BRIDGE OVER MID FK BEARGRASS CREEK.
(056C00033N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
441,000
0 140,000 441,000
10020
Page 101 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CHAMPIONS TRACE
LN BRIDGE OVER S FK BEARGRASS CREEK.
(056C00096N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
1,190,000
0 280,000 1,190,000
10021
JEFFERSON CS-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD CLARK
STATION BRIDGE OVER BRUSH RUN.
(056C00167N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
357,000
0 140,000 357,000
10022
JEFFERSON CS-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KIMBERLY WAY
BRIDGE OVER LITTLE CEDAR CREEK.
(056C00182N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
217,000
0 140,000 217,000
10023
JEFFERSON I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT ON I-064 CARDINAL DIRECTION(S)
FROM MILEPOINT 0.65 TO MILEPOINT 0.828
CN
Project Cost:
UT
RW
DN
PL
PM
PM
10,000
100,000
0 110,000 0
20010
JEFFERSON I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH
DIRECTION(S) FROM MILEPOINT 128.13 TO
MILEPOINT 131.24
CN
Project Cost:
UT
RW
DN
PL
PM
PM
620,000
6,200,000
0 0 6,820,000
20012
Page 102 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON I-264 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-264
CARDINAL DIRECTION(S) FROM MILEPOINT 0 TO
MILEPOINT 0.46
CN
Project Cost:
UT
RW
DN
PL
PM
PM
30,000
300,000
0 330,000 0
20015
JEFFERSON I-264 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT ON I-264 BOTH DIRECTION(S) FROM
MILEPOINT 0.46 TO MILEPOINT 12.7
CN
Project Cost:
UT
RW
DN
PL
PM
PM
1,220,000
12,200,000
0 0 13,420,000
20018
JEFFERSON I-265 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT ON I-265 BOTH DIRECTION(S) FROM
MILEPOINT 18.8 TO MILEPOINT 23.364
CN
Project Cost:
UT
RW
DN
PL
PM
PM
460,000
4,600,000
0 5,060,000 0
20020
JEFFERSON KY-864 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
325,000
3,250,000
0 3,575,000 0
20023
JEFFERSON KY-1065 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
200,000
2,000,000
0 2,200,000 0
20026
Page 103 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
75,000
750,000
0 0 825,000
20032
JEFFERSON KY-1531 NEW INTERCHANGE(O) EASTWOOD FISHERSVILLE CONNECTOR TO I-64
CN
Project Cost:
UT
RW
DN
PL SPP 750,000
750,000 0 0
80000
JEFFERSON US-60 MAJOR WIDENING(O) WIDEN US-60 TO 6 LANES FROM OLD
SHELBYVILLE RD. TO NORTH ENGLISH STATION
RD.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,255,000
0 1,255,000 0
80001
JEFFERSON AIR QUALITY(P) EXTEND PLANTSIDE DRIVE FROM REHL ROAD
TO TAYLORSVILLE ROAD
CN
Project Cost:
UT
RW
DN
PL
SPP 750,000
0 0 750,000
80003
JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM
FIRST ST TO JOHNSON ST TO IMPROVE
PEDESTRIAN SAFETY AND ENHANCE ECONOMIC
DEVELOPMENT
CN
Project Cost:
UT
RW
DN
PL
STP 5,000,000
0 5,000,000 0
80053
Page 104 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM
FIRST ST TO JOHNSON ST TO IMPROVE
PEDESTRIAN SAFETY AND ENHANCE ECONOMIC
DEVELOPMENT
CN
Project Cost:
UT
RW
DN
PL
STP 5,000,000
0 0 5,000,000
80053.1
Total for JEFFERSON county PL
Total Amounts:
CN
UT
RW
DN
36,910,182 87,614,745 84,313,854
9,431,000 8,090,000 4,360,000
1,456,000 3,915,000
13,647,333 2,150,000 3,080,000
4,259,000 11,641,000 4,080,000
65,703,515 113,410,745 95,833,854
JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL
SECTION, AND ROADWAY HAZARDS ON KY
1980 (BRANNON RD) FROM US 68
(HARRODSBURG RD) TO US 27
(NICHOLASVILLE RD)(12CCR) - BEGIN RIGHT OF CN
Project Cost:
UT
RW
DN
PL
SPP 2,000,000
0 0 2,000,000
414.1
JESSAMINE US-68 SAFETY(P) IMPROVE INTERSECTION OF KY-29 NORTH OF
WILMORE.(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP
STP
650,000
1,080,000
0 650,000 1,080,000
915
JESSAMINE KY-39 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
HICKMAN CREEK AT BLACK BRIDGE ON KY 39
1.3 MI N OF KY 1268. (057B00002N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
1,365,000
0 350,000 1,365,000
1136
Page 105 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JESSAMINE CR-1238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238
(0.88) OVER NS SYSTEM. 057R00605N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
260,000
805,000
0 260,000 805,000
1144
JESSAMINE KY-169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BRIDGE
ON KY 169 (NORTH 3RD STREET) BETWEEN
MEADOWLARK LANE & ILHARDT AVENUE.
(057R00603N)(14CCN)(16CCR)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 1,500,000
0 0 1,500,000
8851
JESSAMINE KY-1268 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1268 BRIDGE
OVER HICKMAN CREEK. (057B00022N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
308,000
1,232,000
0 308,000 1,232,000
10011
Total for JESSAMINE county PL
Total Amounts:
CN
UT
RW
DN
5,982,000
918,000
2,000,000
650,000
0 1,568,000 7,982,000
JOHNSON KY-172 RECONSTRUCTION(O) FEDERAL HIGHWAY FUNDS DEDICATED TO
RECONSTRUCT STONE COAL ROAD IN
JOHNSON COUNTY. ("KYD" FUNDS NOT
AVAILABLE FOR ADDITIONAL AMOUNT NEEDED
TO COVER COST)CN
Project Cost:
UT
RW
DN
PL
KYD 203,005
203,005 0 0
134.02
Page 106 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
JOHNSON KY-40 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 40
OVER BRANCH OF LITTLE PAINT CREEK 0.38
MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE
058B00012N
CN
Project Cost:
UT
RW
DN
PL
BR 665,000
665,000 0 0
1114
Total for JOHNSON county PL
Total Amounts:
CN
UT
RW
DN
868,005
868,005 0 0
KENTON I-75 AM-BRIDGE (P) KY 143 HPP EARMARK "ADDRESS DEFICIENCIES
OF BRENT SPENCE BRIDGE, KENTON COUNTY,
KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR
ADDITIONAL 2005HPP FUNDING)(SD)
CN
Project Cost:
UT
RW
DN
PL
HPP 1,439,840
1,439,840 0 0
17.05
KENTON I-75 AM-BRIDGE (P) BRENT SPENCE BRIDGE PROJECT (ADDITIONAL
PROJECT FUNDS FOR MAINTENANCE, REPAIR
AND PAINTING). (10CCR)(12CCR)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 30,000,000
0 30,000,000 0
17.09
KENTON KY-536 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION
ON KY-536 FROM THE WEST END OF THE NS
RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY
SECTION 1). DESIGN PHASE UNDER PARENT
NO. 6-162.01. (16CCN)CN
Project Cost:
UT
RW
DN
PL
STP
STP
1,000,000
5,410,000
0 1,000,000 5,410,000
162.2
Page 107 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON KY-536 AIR QUALITY(P) IMPROVE SAFETY AND REDUCE CONGESTION
ON KY-536 FROM KY 1303 TO WILLIAMSWOOD
ROAD/CALVARY DRIVE (PRIORITY SECTION 2).
DESIGN PHASE UNDER PARENT NO. 6-162.01
(2012BOP)CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
3,000,000
1,500,000
0 0 4,500,000
162.3
KENTON CR-1316 MATCHED FED FUNDS(O) PHASE I MULTI-USE PATH ALONG BROMLEY
CRESCENT SPRINGS RD FROM ANDERSON
ROAD TO AMSTERDAM ROAD. (2012BOP)
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
400,000
800,000
4,045,000
1,200,000 4,045,000 0
419
KENTON CS-3806 MATCHED FED FUNDS(O) PHASE 2 BROMLEY CRESCENT SPRINGS ROAD
BETWEEN THE TWO SEGMENTS OF AMSTERDAM
ROAD. RECONSTRUCT BROMLEY CRESCENT
SPRINGS ROAD AND IMPROVE INTERSECTION
WITH ST. JOHNS ROAD.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
SNK
269,600
504,000
560,000
276,000
269,600 1,064,000 276,000
419.01
KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM
WINDING TRAILS TO THOMAS MORE PARKWAY
(PHASE 1). (2014BOPC)(MOA WITH CITY OF
EDGEWOOD).
CN
Project Cost:
UT
RW
DN
PL
SNK 1,044,000
1,044,000 0 0
428.1
KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM
THOMAS MORE PARKWAY TO CATHERINE DRIVE
(PHASE 2). (2014BOPC)(MOA WITH CITY OF
EDGEWOOD).
CN
Project Cost:
UT
RW
DN
PL
SNK 924,000
924,000 0 0
428.2
Page 108 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 3. ROADWAY
RESURFACING AND STABILIZATION. CONSTRUCT
CONSISTENT 11' TRAVEL LANE IN EACH
DIRECTION FROM CATHERINE DRIVE TO THE
SUMMIT HILLS COUNTRY CLUB ENTRANCE.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
178,000
1,080,000
178,000 1,080,000 0
428.3
KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 4. ROADWAY
RESURFACING AND STABILIZATION. CONSTRUCT
CONSISTENT 11' TRAVEL LANE IN EACH
DIRECTION FROM SUMMIT HILLS COUNTRY CLUB
ENTRANCE TO DIXIE HIGHWAY.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
271,000
1,636,800
0 271,000 1,636,800
428.4
KENTON CS-2023 RECONSTRUCTION(O) WIDEN SIDEWALK FOR ADA COMPLIANCE AND
ROADWAY RECONSTRUCTION ON JOHNSON ST
& W RIVERCENTER BLVD FROM 3RD STREET TO
THE EXISTING CONCRETE SECTION HEADING
TOWARDS MADISON AVENUE IN COVINGTON. CN
Project Cost:
UT
RW
DN
PL
SNK 677,800
677,800 0 0
430
KENTON US-25 SAFETY(P) CONSTRUCT LEFT TURN LANE ON NB
APPROACH AT THE INTERSECTION OF US 25
AND BEECHWOOD RD JUST S OF I-75. (FUNDING
SUBJECT TO FISCAL CONSTRAINT PENDING MPO
TIP) (2014BOP)CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
100,000
250,000
1,600,000
1,950,000 0 0
432
KENTON -0 MATCHED FED FUNDS(O) LUDLOW RIVERFRONT COMMONS TRAIL-
CONSTRUCT A ONE-MILE MULTI-USE PATH
ALONG THE OHIO RIVER FROM HOOPER STREET
TO ASH STREET IN THE CITY OF LUDLOW
(2016BOP).CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
5,000
240,133
245,133 0 0
435
Page 109 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON CS-6142 SAFETY(P) IMPROVE SAFETY, TRAFFIC FLOW AND
DRAINAGE ISSUES ALONG BUTTERMILK PIKE
(CS 6142) FROM ROGERS ROAD TO COLLINS
ROAD IN THE CITY OF VILLA HILLS. A DISTANCE
OF 0.527 MILES (2016BOP).CN
Project Cost:
UT
RW
DN
PL
SNK 313,857
313,857 0 0
437
KENTON CS-9004 RECONSTRUCTION(O) RECONSTRUCT AMSTERDAM ROAD FROM
GENERAL DRIVE TO REDWOOD DRIVE WITH
CURB, GUTTER, STORM SEWERS AND
SIDEWALK (2016BOP).
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
56,000
32,000
2,080,000
88,000 2,080,000 0
438
KENTON KY-17 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCE CONGESTION
ON KY-17 AT THE I-275 INTERCHANGE.
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
450,000
200,000
350,000
0 450,000 550,000
449
KENTON KY-1303 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCE CONGESTION
ALONG KY-1303 (TURKEYFOOT RD) FROM
DUDLEY RD TO US-25 (DIXIE HWY).
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
1,500,000
2,000,000
1,000,000
0 3,500,000 1,000,000
450
KENTON CS-1560 RESURFACING(P) ADELA AVENUE. CURB-LINE MILLING, ASPHALT
RESURFACING, REPLACE SIDEWALK/CURBING
AND NEW SIDEWALK AS NEEDED FROM KY 1072
(SLEEPY HOLLOW ROAD/DEVERILL STREET) TO
KY 8 (ELM STREET).CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
35,000
20,000
200,000
255,000 0 0
454
Page 110 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON CS-1045 DRAINAGE IMPROVE(P) CODY ROAD. REPLACE CULVERT FOR
BANKLICK CREEK. MILL AND OVERLAY WITH
NEW ASPHALT FROM BANKLICK CREEK TO
INDEPENDENCE STATION ROAD.
CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
57,000
120,000
346,000
57,000 466,000 0
455
KENTON -0 TRANSP ENHANCEMENT(P) MADISON AVENUE. UNDERGROUND UTILITIES,
STREET TREES, MAST ARM POLES,
STREETLIGHTS, RESURFACING, SIGNAL
IMPROVEMENTS FROM 11TH STREET TO 8TH
STREET.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
280,000
240,000
1,650,000
280,000 1,890,000 0
456
KENTON CS-2217 TRANSP ENHANCEMENT(P) 7TH STREET. SIDEWALK REPLACEMENT,
UNDERGROUND UTILITIES, STREET TREES, MAST
ARM TRAFFIC SIGNALS, LIGHTING,
RESURFACING FROM WASHINGTON STREET TO
GREENUP STREET.CN
Project Cost:
UT
RW
DN
PL
SNK
SNK
SNK
280,000
240,000
2,450,000
280,000 2,690,000 0
457
KENTON CS-2097 AM-BRIDGE (P) WEST 15TH STREET; ADDRESS DEFICIENCIES OF
BRIDGE AND APPROACHES OVER CSX RR IN
COVINGTON. (059C00029N)(12CCR)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
830,000
550,000
2,110,000
3,490,000 0 0
1070
KENTON KY-1120 AM-BRIDGE (P) EVALUATE BRIDGE ON KY-1120 (MP 0.621)
OVER CSX RAILROAD; 11TH ST E OF RUSSELL
ST; 059B00083N
CN
Project Cost:
UT
RW
DN
PL
BR 520,000
520,000 0 0
1075
Page 111 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON KY-1501 RECONSTRUCTION(O) IMPROVE HANDS PIKE (KY-1501) FROM KY-17
TO CRYSTAL LAKE DRIVE.(12CCR)(14CCR)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 8,010,000
0 8,010,000 0
8307.1
KENTON NEW ROUTE(O) EXTEND HOUSTON ROAD TO CINEMA PROPERTY
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 250,000 0
8916
KENTON US-25 REALIGNMENT IMPROVE EXISTING ALIGNMENT WITH
BUTTERMILK PIKE, ORPHANAGE ROAD, AND US
25. FT. MITCHELL WILL PAY $50,000 TOWARD
DESIGN.
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 250,000 0
8951
KENTON KY-17 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON JOHN A. ROEBLING
BRIDGE OVER OHIO RIVER. (059B00048N)
(BSBP)
CN
Project Cost:
UT
RW
DN
PL
BR 1,200,000
0 1,200,000 0
10005
KENTON US-25 AM-BRIDGE (P) JOINT REPLACEMENT AND PREVENTIVE
MAINTENANCE ON CLAY WADE BAILEY BRIDGE
OVER THE OHIO RIVER. JOINT PROJECT WITH
OHIO. (059B00049N)
CN
Project Cost:
UT
RW
DN
PL
BR 350,000
350,000 0 0
10006
Page 112 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON KY-177 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 177 BRIDGE
OVER BOWMAN CREEK. (059B00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
420,000
2,695,000
0 420,000 2,695,000
10011
KENTON KY-2045 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2045 BRIDGE
OVER BRUSHY CREEK. (059B00025N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
3,605,000
0 350,000 3,605,000
10012
KENTON I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075
NON-CARDINAL DIRECTION(S) FROM MILEPOINT
190.68 TO MILEPOINT 191.22
CN
Project Cost:
UT
RW
DN
PL
PM
PM
30,000
300,000
0 330,000 0
20033
KENTON I-275 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC
PAVEMENT ON I-275 BOTH DIRECTION(S) FROM
MILEPOINT 0 TO MILEPOINT 1.582 (1.05
NON-CARDINAL)
CN
Project Cost:
UT
RW
DN
PL
PM
PM
1,420,000
14,200,000
0 15,620,000 0
20035
KENTON I-275 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC
PAVEMENT ON I-275 BOTH DIRECTION(S) FROM
MILEPOINT 82.475 TO MILEPOINT 83.78
CN
Project Cost:
UT
RW
DN
PL
PM
PM
200,000
2,000,000
0 2,200,000 0
20039
Page 113 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KENTON KY 236 AIR QUALITY(P) RECONSTRUCT KY 236 (STEVENSON ROAD)
FROM ALICE STREET TO JACQUELINE DRIVE
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
800,000
1,000,000
0 800,000 1,000,000
80002
Total for KENTON county PL
Total Amounts:
CN
UT
RW
DN
9,419,630 67,361,000 13,622,800
1,104,600 5,941,000
1,406,000 2,504,000 4,200,000
1,632,000 2,160,000 2,850,000
13,562,230 77,966,000 20,672,800
KNOTT CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
FISHTRAP RD (KY 1441) OVER RACCOON
CREEK AT INTERSECTION WITH COON CREEK (CR
1371) (060C00006N)
CN
Project Cost:
UT
RW
DN
PL
BR 420,000
420,000 0 0
1116
KNOTT CS-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT
FORK TROUBLESOME CREEK ON FIELDWOOD
DRIVE (CS1016) IN HINDMAN (060C00060N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
455,000
0 210,000 455,000
1124
KNOTT KY-3209 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BALLS FORK ON KY 3209. (16CCN) 060B00053N
CN
Project Cost:
UT
RW
DN
PL
BR 700,000
700,000 0 0
8904
Page 114 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KNOTT KY-1098 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1098 BRIDGE
OVER LAUREL FK OF QUICKSAND C.
(060B00035N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
680,000
0 175,000 680,000
10001
KNOTT CR-1130 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF COLLINS BRANCH
RD BRIDGE OVER CARR FORK. (060C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
398,650
0 157,500 398,650
10002
KNOTT CR-1565 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FRANKIE JANE DR
BRIDGE OVER CANEY CREEK. (060C00071N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
337,890
0 175,000 337,890
10015
Total for KNOTT county PL
Total Amounts:
CN
UT
RW
DN
1,120,000 1,871,540
717,500
1,120,000 717,500 1,871,540
KNOX US-25 MAJOR WIDENING(O) IMPROVE SAFETY AND ACCESS MANAGEMENT,
AND REDUCE CONGESTION ON US-25E FROM
CORBIN BYPASS TO KNOX/LAUREL COUNTY
LINE.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 2,300,000
0 0 2,300,000
188
Page 115 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KNOX CR-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD
HWY 25 (CR 1325) JUST WEST OF US 25E.
061C00063N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
350,000
0 175,000 350,000
1102
KNOX CR-1353 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SPIDER CREEK RD
BRIDGE OVER EAST FORK LYNN CAMP CREEK.
(061C00048N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
469,000
0 192,500 469,000
10021
KNOX CR-1162 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DETHERAGE
CEMETERY BRIDGE OVER BRUSH CREEK.
(061C00056N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
367,500
0 157,500 367,500
10022
KNOX CR-1065 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BURTON BRANCH
RD BRIDGE OVER BURTON BRANCH.
(061C00086N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
360,000
0 175,000 360,000
10023
KNOX KY-6 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
30,000
300,000
0 0 330,000
20007
Page 116 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
KNOX US-25 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
125,000
1,250,000
0 1,375,000 0
20008
KNOX US 25E AIR QUALITY(P) US 25E VARIOUS TURNING LANES.
CROSSOVER AND TURNING LANE AT THE
PALLET STORE. LEFT TURNING LANE AT THE
SAWMILL AT THE KNOX/BELL COUNTY LINE.
RIGHT TURNING LANE AT DOLLAR GENERAL. CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
30,000
270,000
0 300,000 0
80000
KNOX US 25E AIR QUALITY(P) CONDUCT A TRAFFIC SAFETY STUDY ON US
25E AT HEIDRICK, KY IN KNOX COUNTY
CN
Project Cost:
UT
RW
DN
PL SPP 50,000
0 50,000 0
80009
Total for KNOX county PL
Total Amounts:
CN
UT
RW
DN
1,520,000 4,146,500
855,000 30,000
50,000
0 2,425,000 4,176,500
LARUE KY-222 CONGESTION MITIGTN(O) CONNECTOR IMPROVEMENTS HODGENVILLE TO
I-65
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
125,000
50,000
100,000
400,000
0 175,000 500,000
8909
Page 117 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LARUE KY-84 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON KY 84 FROM
HODGENVILLE TO I-65.
CN
Project Cost:
UT
RW
DN
PL
PM
PM
50,000
450,000
0 0 500,000
8911
LARUE KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER
SOUTH FORK BRANCH. (062B00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
87,500
605,500
0 87,500 605,500
10002
Total for LARUE county PL
Total Amounts:
CN
UT
RW
DN
1,455,500
212,500 50,000
50,000
100,000
0 262,500 1,605,500
LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM US-25E TO THE LITTLE
LAUREL RIVER (16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
70,000
50,000
10,000,000
0 120,000 10,000,000
9.1
LAUREL KY-363 MAJOR WIDENING(O) ADDRESS SAFETY, CAPACITY, AND ACCESS
MANAGEMENT ON KY-363 FROM KY-1006 TO
KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,000,000
3,000,000 0 0
147.1
Page 118 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LAUREL US-25 MAJOR WIDENING(O) IMPROVE SAFETY, IMPROVE ACCESS
MANAGEMENT, AND REDUCE CONGESTION ON
US-25E FROM THE KNOX/LAUREL COUNTY LINE
TO KY-770 (12CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 4,580,000
0 0 4,580,000
185
LAUREL KY-192 MAJOR WIDENING(O) IMPROVE SAFETY, ACCESS MANAGEMENT, AND
FREIGHT MOBILITY; AND REDUCE CONGESTION
ON KY-192 NEAR KY-1006 TO US-25 IN
LONDON. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,000,000
2,500,000
3,500,000 0 0
187
LAUREL CR-1341 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON DOG
BRANCH SCHOOL RD (CR 1341) OVER SINKING
CREEK 0.56 MILE NW OF SINKING CREEK RD (FD
781) 063C00025N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
770,000
0 175,000 770,000
1094
LAUREL KY-312 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
CRAIG CREEK ON KY 312 1.8 MILE SE OF KY
192. (063B00053N)(14CCR)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 1,200,000
1,200,000 0 0
1096
LAUREL I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER
LAUREL RIVER (SR 34.1) (B00043R AND
B00043L)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 2,800,000
2,800,000 0 0
1105.01
Page 119 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LAUREL US-25 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEEN CORBIN AND
LONDON FROM KY-1006 TO US-25E. (08CCN)
CN
Project Cost:
UT
RW
DN
PL STP 500,000
0 0 500,000
8515
LAUREL CR-1221 BRIDGE REPLACEMENT(P) REPLACE BRIDGE LOCATED ON LILY ROAD (CR
1221) (MP 1.045) (AREA ADJACENT TO
FARISTON INDUSTRIAL PARK WITH NEW
ROADWAY ALIGNMENT). (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 1,343,900
0 1,343,900 0
8811
LAUREL KY-1223 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1223 BRIDGE
OVER HORSE CREEK. (063B00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
378,000
0 175,000 378,000
10024
LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER
LICK FORK CREEK. (063B00013N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
525,000
0 210,000 525,000
10025
LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER
HOOPPOLE CREEK. (063B00017N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
507,500
0 175,000 507,500
10026
Page 120 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LAUREL KY-490 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 490 BRIDGE
OVER ROCKCASTLE RIVER. (063B00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
2,492,000
0 245,000 2,492,000
10042
LAUREL KY-638 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 638 BRIDGE
OVER BIG RACCOON CREEK. (063B00061N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
829,500
0 192,500 829,500
10043
LAUREL HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL
ROGERS DANIEL BOONE PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT
3.877
CN
Project Cost:
UT
RW
DN
PL
PM
PM
310,000
3,100,000
0 3,410,000 0
20009
LAUREL I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC
PAVEMENT ON I-075 CARDINAL DIRECTION(S)
FROM MILEPOINT 32.485 TO MILEPOINT 32.9
CN
Project Cost:
UT
RW
DN
PL
PM
PM
120,000
1,200,000
0 1,320,000 0
20011
LAUREL I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 50.524 (49.87
NON-CARDINAL) TO MILEPOINT 50.714
CN
Project Cost:
UT
RW
DN
PL
PM
PM
100,000
1,000,000
0 1,100,000 0
20013
Page 121 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for LAUREL county PL
Total Amounts:
CN
UT
RW
DN
7,000,000 6,643,900 20,082,000
1,702,500
500,000
1,000,000 70,000
2,500,000 50,000
10,500,000 8,466,400 20,582,000
LAWRENCE KY-2565 RECONSTRUCTION(O) RECONSTRUCT KY 2565 FROM APPROX. 550'
NW OF CR 1529/KY2565/KY2563 INTERSECTION
TO APPROX. 1150' SE OF THE INTERSECTION
(SECTION 2). (2014BOP)
CN
Project Cost:
UT
RW
DN
PL
SPP 790,000
790,000 0 0
196.1
LAWRENCE CR-1044 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON SPANKEM BRANCH
ROAD (CR 1044).
CN
Project Cost:
UT
RW
DN
PL
SPP 500,000
0 500,000 0
8951
LAWRENCE CR-1234 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MAXIE BRANCH RD
BRIDGE OVER RT FORK-BLAINE CREEK.
(064C00076N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
478,000
0 140,000 478,000
10003
LAWRENCE KY-644 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 644 BRIDGE
OVER LEVISA FORK OF BIG SANDY.
(064B00038N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
560,000
2,880,500
0 560,000 2,880,500
10016
Page 122 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for LAWRENCE county PL
Total Amounts:
CN
UT
RW
DN
790,000 500,000 3,358,500
700,000
790,000 1,200,000 3,358,500
LEE CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GOOSE CREEK RD
BRIDGE OVER CSX RAILROAD. (065R00604N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
770,000
0 245,000 770,000
10013
Total for LEE county PL
Total Amounts:
CN
UT
RW
DN
770,000
245,000
0 245,000 770,000
LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND
APPROACHES ON US-421 OVER STINNET CREEK
0.028 MILE SOUTH OF KY-406 NEAR
STINNETT(10CCR)(066B00008N)
CN
Project Cost:
UT
RW
DN
PL
BR 2,128,000
0 2,128,000 0
1078
LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
MUNCY CREEK ON US 421 0.5 MILE SOUTH OF
TAYLOR MORGAN ROAD (CR 1090).
(066B00006N)
CN
Project Cost:
UT
RW
DN
PL
BR 612,500
0 0 612,500
1095
Page 123 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LESLIE CR-1528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF
CREEK ON COON CREEK ROAD (CR 1528) AT
JCT WITH KY 3427 (066C00039N) (EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
123,000
445,000
0 123,000 445,000
1100
LESLIE CR-1219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MILE
BRANCH RD (CR 1219) (MP 0.022) OVER BEECH
FORK. 066C00048N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
613,000
0 245,000 613,000
1104
LESLIE CR-1207 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
WILLIAMS BRANCH RD (CR-1207) (0.028) OVER
MIDDLE FORK KENTUCKY RIVER. 066C00020N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
560,000
0 245,000 560,000
1106
LESLIE KY-1780 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1780 BRIDGE
OVER BEECH FORK. (066B00027N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
857,500
0 210,000 857,500
10027
LESLIE KY-699 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-699 BRIDGE
OVER MAGGARDS BRANCH. (066B00031N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
525,000
0 175,000 525,000
10028
Page 124 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LESLIE CR-1006 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1006 BRIDGE
OVER RACCOON CREEK. (066C00002N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
451,500
0 192,500 451,500
10030
LESLIE CR-1271 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1271 BRIDGE
OVER MIDDLE FK KENTUCKY RVR.
(066C00023N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
525,000
0 210,000 525,000
10031
Total for LESLIE county PL
Total Amounts:
CN
UT
RW
DN
2,128,000 4,589,500
1,400,500
0 3,528,500 4,589,500
LETCHER US-119 RECONSTRUCTION(O) IMPROVE US-119 FROM NORTH OF KY-15 TO
THE KY 2034/COUGAR DRIVE INTERSECTION.
(16CCN)(SEE 12-199.10 FOR D, R, U)
CN
Project Cost:
UT
RW
DN
PL
NH 1,000,000
1,000,000 0 0
199.11
LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY
2034C OVER N FORK KY RIVER 0.02 E OF US
119 067B00121N
CN
Project Cost:
UT
RW
DN
PL
BR 973,000
973,000 0 0
1113
Page 125 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LETCHER KY-3404 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POOR
FORK OF CUMBERLAND RIVER ON KY 3404 100
FT SOUTH OF US 119. (067B00114N)
CN
Project Cost:
UT
RW
DN
PL
BR 420,000
0 0 420,000
1120
LETCHER CR-1226 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
HAMPTON BRANCH (CR 1226) (MP 0.01) OVER
COWAN CREEK. 067C00021N
CN
Project Cost:
UT
RW
DN
PL
BR 385,000
0 0 385,000
1125
LETCHER CR-1225 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225
(0.034) OVER COWAN CREEK. 067C00020N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
420,000
385,000
0 420,000 385,000
1126
LETCHER KY-805 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-805 BRIDGE
OVER POTTERS FORK. (067B00022N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
616,840
0 210,000 616,840
10004
LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2034 BRIDGE
OVER CRAFTS COLLY CREEK. (067B00069N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
406,105
0 140,000 406,105
10005
Page 126 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LETCHER CR-1433 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CORNFIELD DR
BRIDGE OVER BOONE FORK. (067C00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
427,840
0 140,000 427,840
10006
LETCHER CR-1386 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF TURKEY CRK
BRIDGE OVER TURKEY CREEK. (067C00050N)
(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
697,000
0 175,000 697,000
10007
LETCHER KY-7 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER
CSX RR & N FK KY RIVER. (067B00038N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
525,000
4,900,000
0 525,000 4,900,000
10017
LETCHER KY-343 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 343 BRIDGE
OVER WRIGHT FORK. (067B00078N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
378,560
0 175,000 378,560
10018
LETCHER CS-3000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF E POTTER RD
BRIDGE OVER YONTS FORK. (067C00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
372,400
0 157,500 372,400
10019
Page 127 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LETCHER CR-1149 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOLBROOK TOWN
BRIDGE OVER N.FK.KENTUCKY RVR.
(067C00017N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
516,810
0 210,000 516,810
10020
LETCHER CR-1799 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARADISE LN
BRIDGE OVER KINGDOM COME CREEK.
(067C00051N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
269,500
0 140,000 269,500
10021
LETCHER CR-1737 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ORCHARD RD
BRIDGE OVER NORTH FORK KY RIVER.
(067C00065N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
655,900
0 210,000 655,900
10022
Total for LETCHER county PL
Total Amounts:
CN
UT
RW
DN
1,973,000 10,430,955
2,502,500
1,973,000 2,502,500 10,430,955
LEWIS KY-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
LAUREL FORK ON KY 1068 30 FT S OF DEEP
HOLE BRANCH ROAD (CR 1125).(068B00057N)
(16CCR)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
75,000
75,000
900,000
150,000 900,000 0
1090
Page 128 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LEWIS KY-57 AM-BRIDGE (P) CONSTRUCT A NEW BRIDGE CROSSING THE
NORTH FORK OF THE LICKING RIVER AT THE
LEWIS-FLEMING COUNTY LINE. (08CCN):
(068B00027N)
CN
Project Cost:
UT
RW
DN
PL
BR 3,640,000
0 3,640,000 0
8507
LEWIS KY-344 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-344 BRIDGE
OVER GRASSY BRANCH. (068B00015N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
1,540,000
0 350,000 1,540,000
10010
LEWIS KY-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1021 BRIDGE
OVER BRIERY CREEK. (068B00075N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
315,000
857,500
0 315,000 857,500
10023
Total for LEWIS county PL
Total Amounts:
CN
UT
RW
DN
4,540,000 2,397,500
665,000
75,000
75,000
150,000 5,205,000 2,397,500
LINCOLN US-27 MAJOR WIDENING(O) IMPROVE US-27 FROM KY-590 TO BELL STREET
IN STANFORD. (INCLUDES NEW GOSHEN
CUT-OFF ROAD)(2005HPP-KY115)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
1,400,000
1,100,000
3,250,000
0 2,500,000 3,250,000
196
Page 129 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LINCOLN KY-1247 AM-BRIDGE (P) REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH
CREEK 0.044 S OF KY 78(SR 45.4) 069B00055N
CN
Project Cost:
UT
RW
DN
PL
BR 567,000
567,000 0 0
1055
LINCOLN CR-1043 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1043 (0.643) OVER
LOGAN CREEK. (SR=20.2) 069C00008N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
497,000
0 175,000 497,000
1066
LINCOLN US 127 NEW INTERCHANGE(O) NEW TURNING LANE AT ARCADIA VIEW DRIVE
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
100,000
50,000
50,000
800,000
0 1,000,000 0
80000
LINCOLN US 150 NEW INTERCHANGE(O) US 150 NEW TURNING LANE NEAR HOBBLE
ROAD AND CRAWFORD LANE
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
100,000
50,000
350,000
500,000 0 0
80001
LINCOLN US 127 NEW INTERCHANGE(O) US 127 NEW TURNING LANE AT KY 1194
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
100,000
50,000
50,000
800,000
0 1,000,000 0
80002
Page 130 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LINCOLN US 150 AIR QUALITY(P) ADD A TURNING LANE ON US 150 AT
WILDERNESS TRAIL ROAD
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
100,000
50,000
350,000
0 500,000 0
80008
Total for LINCOLN county PL
Total Amounts:
CN
UT
RW
DN
917,000 1,950,000 3,747,000
100,000 475,000
1,500,000
50,000 1,250,000
1,067,000 5,175,000 3,747,000
LIVINGSTON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60
OVER THE CUMBERLAND RIVER 0.27 MILE N OF
KY 70 070B00017N.
CN
Project Cost:
UT
RW
DN
PL
BR 16,000,000
0 16,000,000 0
1142
LIVINGSTON US-60 PREFINANCD CONVRSN(O) ADDRESS DEFICIENCIES OF BRIDGE ON US 60
OVER THE CUMBERLAND RIVER 0.27 MILE N OF
KY 70 (SR 32.7) 070B00017N (ADDITIONAL
FUNDING FOR C PHASE)
CN
Project Cost:
UT
RW
DN
PL
BR 16,000,000
0 0 16,000,000
1142.01
Total for LIVINGSTON county PL
Total Amounts:
CN
UT
RW
DN
16,000,000 16,000,000
0 16,000,000 16,000,000
Page 131 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
LOGAN US-79 AM-BRIDGE (P) IMPROVE SAFETY AND BRIDGE CONDITION ON
WHIPPORWILL CREEK BRIDGE NEAR KY-1151.
BRIDGE ID 071B00025 (SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
250,000
1,715,000
0 250,000 1,715,000
10010
Total for LOGAN county PL
Total Amounts:
CN
UT
RW
DN
1,715,000
250,000
0 250,000 1,715,000
LYON US-641 RELOCATION(O) RELOCATE US-641 FROM US-62 NEAR
EDDYVILLE TO SOUTH OF THE LYON/CALDWELL
COUNTY LINE.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
2,500,000
2,000,000
500,000
0 2,500,000 2,500,000
187.5
LYON US-641 RELOCATION(O) RELOCATE US-641 FROM SOUTH OF THE
LYON/CALDWELL COUNTY LINE TO FREDONIA,
4.5 MILES.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
1,800,000
2,000,000
800,000
0 1,800,000 2,800,000
187.6
LYON I-24 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-024
CARDINAL DIRECTION(S) FROM MILEPOINT
45.133 TO MILEPOINT 51.886
CN
Project Cost:
UT
RW
DN
PL
PM
PM
270,000
2,700,000
0 0 2,970,000
20009
Page 132 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for LYON county PL
Total Amounts:
CN
UT
RW
DN
2,700,000
4,300,000 270,000
4,000,000
1,300,000
0 4,300,000 8,270,000
MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION
2; FROM 150' EAST OF US-25, SE TO KY-21.
(2004BOPC)(08CCR)(12CCR) PHASE 1 - BEREA
BYPASS FROM US-25 TO KY-1016.
CN
Project Cost:
UT
RW
DN
PL
SPP 12,000,000
0 12,000,000 0
192.2
MADISON KY-52 RECONSTRUCTION(O) IMPROVE KY-52 FROM WALLACE MILL ROAD TO
INTERSTATE 75 AT THE DUNCANNON ROAD
INTERCHANGE. (02CCR)(12CCN)(14CCR)
(DESIGN/BUILD)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
4,000,000
4,000,000
4,000,000
0 4,000,000 8,000,000
235
MADISON KY-595 SCOPING STUDY(O) COMPREHENSIVE TRAFFIC STUDY FOR
INTERSECTION OF MAIN STREET AND BEREA
COLLEGE CAMPUS, BEREA. (2005HPP-KY112)
(MOA WITH BEREA). (16CCR)(LET BY CITY)
CN
Project Cost:
UT
RW
DN
PL
HPP 266,952
266,952 0 0
236
MADISON US-25 MAJOR WIDENING(O) WIDEN US-25 FROM US-421 NORTH TO KY-876.
STATE TO PROVIDE DESIGN AND PLANS, AND
FUNDS FOR THIS PROJECT ARE REQUESTED TO
BE PAID TO THE MADISON COUNTY FISCAL
COURT, WHICH SHALL COORDINATE THE CN
Project Cost:
UT
RW
DN
PL
HPP 719,921
719,921 0 0
251.01
Page 133 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MADISON US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
BATTLEFIELD MEMORIAL HWY (US 421) OVER
COWBELL CREEK AT JCT WITH HIGHWAY 21 E
(KY 21)076B00021
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
90,000
90,000
625,000
805,000 0 0
1130
MADISON CR-1158 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD
HAYS FORK LN (CR 1158) OVER BRANCH OF
HAYS FORK 0.2 MILE SE OF BATTLEFIELD
MEMORIAL HWY (US 421) 076C00023N
CN
Project Cost:
UT
RW
DN
PL
BR 336,000
0 336,000 0
1131
MADISON KY-3376 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
TERRILL BRANCH ROAD ON KY 3376 IN BEREA
200 FT N OF PEACHTREE DRIVE (CS 2072).
(076B00085N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
857,500
0 210,000 857,500
1137
MADISON CR-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017
(3.405) OVER MUDDY CREEK. 076C00004N (SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
190,000
420,000
0 190,000 420,000
1142
MADISON CR-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044
(0.007) OVER BR OF MUDDY CREEK.
076C00066N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
455,000
0 210,000 455,000
1143
Page 134 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MADISON KY-627 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT
THE KY-627 BRIDGE OVER I-75. (INCLUDES
7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 5,000,000
5,000,000 0 0
8403
MADISON KY-627 PREFINANCD CONVRSN(O) IMPROVE SAFETY AND REDUCE CONGESTION AT
THE KY-627 BRIDGE OVER I-75. (INCLUDES
7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 5,000,000
0 5,000,000 0
8403.01
MADISON US-25 SAFETY(P) IMPROVE ROADWAY, SIDEWALKS, AND BIKE
PATHS ON US-25 BETWEEN ELLIPSE STREET TO
GLADES ROAD AND THEN CONTINUES ON TO
THE BEREA BYPASS. (08CCN)(10CCR)(12CCR)
(LET BY KYTC)CN
Project Cost:
UT
RW
DN
PL
SPP 7,200,000
7,200,000 0 0
8505
MADISON KY-2881 SPOT IMPROVEMENTS(O) PROPOSED ROADWAY IMPROVEMENTS FROM
DUNCANNON RD TO THE MADISON CO AIRPORT
TO INCLUDE CALEAST RD (KY 2881 MP.783-MP
2.780), JOHN BALLARD RD (KY 2877 MP
0-MP.806 & CR 1236 MP0-MP.429) FROM CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,000,000
500,000
0 1,000,000 500,000
8853
MADISON KY-1984 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1984 BRIDGE
OVER TATES CREEK. (076B00071N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
665,000
0 210,000 665,000
10001
Page 135 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MADISON CR-1056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD
BRIDGE OVER E. FK. OTTER CREEK.
(076C00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
665,000
0 210,000 665,000
10002
Total for MADISON county PL
Total Amounts:
CN
UT
RW
DN
13,811,873 17,336,000 7,062,500
2,030,000
90,000 4,000,000 500,000
90,000 4,000,000
13,991,873 23,366,000 11,562,500
MAGOFFIN KY-9009 MAJOR WIDENING(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE
MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI
W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE
FORK LICKING RIVER BRIDGE (69.6). (2012BOP)
(14CCR)(16CCR)CN
Project Cost:
UT
RW
DN
PL
NH 15,000,000
0 15,000,000 0
126.4
MAGOFFIN KY-9009 PREFINANCD CONVRSN(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE
MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI
W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE
FORK LICKING RIVER BRIDGE (69.6). (2012BOP)
(14CCR)(16CCN)CN
Project Cost:
UT
RW
DN
PL
NH 10,000,000
0 0 10,000,000
126.41
MAGOFFIN KY-1635 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1635 BRIDGE
OVER OAKLEY CREEK. (077B00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
595,000
0 140,000 595,000
10002
Page 136 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MAGOFFIN KY-30 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER
LICKING RIVER. (077B00059N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
945,000
0 175,000 945,000
10003
MAGOFFIN KY-3049 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3049 BRIDGE
OVER JOHNSON CREEK. (077B00069N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
402,500
0 175,000 402,500
10014
MAGOFFIN CR-1032 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE BRANCH
BRIDGE OVER STATE ROAD FORK.
(077C00036N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
437,500
0 175,000 437,500
10015
MAGOFFIN KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.
COMBS MOUNTAIN PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 63.123 TO
MILEPOINT 69.98
CN
Project Cost:
UT
RW
DN
PL
PM
PM
400,000
4,000,000
0 0 4,400,000
20000
Total for MAGOFFIN county PL
Total Amounts:
CN
UT
RW
DN
15,000,000 16,380,000
665,000 400,000
0 15,665,000 16,780,000
Page 137 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MARION KY-49 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO
MP 21.830) AS PER THE KY-49 PLANNING
STUDY. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 800,000
0 0 800,000
8802
MARION KY-49 SPOT IMPROVEMENTS(O) IMPROVE SAFETY, MOBILITY AND GEOMETRICS
ON KY-49 NEAR SOUTHERN KY-52
INTERSECTION. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,300,000
0 0 3,300,000
8803
MARION KY-84 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 84
OVER HARDINS CREEK. (16CCN)(078B00025N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
94,500
616,000
94,500 616,000 0
8914
MARION KY-55 RECONSTRUCTION(O) HEARTLAND PARKWAY: IMPROVE MOBILITY
FROM THE LEBANON BYPASS TO BOOKER
ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
350,000
350,000
0 700,000 0
8916
MARION CR-1127 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE OAK CRK RD
BRIDGE OVER WHITE OAK CREEK.
(078C00035N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
98,000
217,000
0 98,000 217,000
10003
Page 138 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for MARION county PL
Total Amounts:
CN
UT
RW
DN
616,000 3,517,000
94,500 98,000
350,000 800,000
350,000
94,500 1,414,000 4,317,000
MARSHALL KY-1949 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1949 BRIDGE
OVER SMITH CREEK. (079B00110N)
CN
Project Cost:
UT
RW
DN
PL
BR 250,000
0 250,000 0
10003
MARSHALL US-641 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
75,000
750,000
0 825,000 0
20016
Total for MARSHALL county PL
Total Amounts:
CN
UT
RW
DN
750,000
325,000
0 1,075,000 0
MARTIN CR-1324 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND
APPROACHES ON PR-1015 OVER ROCKCASTLE
CREEK (C26) 275 FEET WEST JCT. KY-3 JUST
SOUTH OF CROOKED RUN ROAD.
(080C00026N)CN
Project Cost:
UT
RW
DN
PL
BR 60,000
60,000 0 0
1092
Page 139 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MARTIN CR-1120 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WILLIS DIALS RD
BRIDGE OVER PIGEONROOST FORK.
(080C00053N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
467,880
0 157,500 467,880
10023
Total for MARTIN county PL
Total Amounts:
CN
UT
RW
DN
60,000 467,880
157,500
60,000 157,500 467,880
MASON US-68 AM-BRIDGE (P) REPAIR BRIDGE ON US 68 OVER LAWRENCE
CREEK 0.13 MI SW OF KY 3056. (081B00067N)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 1,400,000
1,400,000 0 0
1095
MASON KY-3056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056
OVER SOUTH FORK LAWRENCE CREEK.
(16CCN)(081B00020N)
CN
Project Cost:
UT
RW
DN
PL
BR 1,120,000
0 0 1,120,000
8906
MASON CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON
DAVIS LANE. (16CCN)(081C00022N)
CN
Project Cost:
UT
RW
DN
PL
BR 875,000
0 0 875,000
8910
Page 140 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MASON CR-1019 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON
KENNEDY CREEK ROAD. (16CCN)(081C00009N)
CN
Project Cost:
UT
RW
DN
PL
BR 560,000
0 0 560,000
8911
MASON CR-1122 AM-BRIDGE (P) REPAIR BRIDGE (081C00018N) ON DIXIE PIKE.
(16CCN)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 60,000
60,000 0 0
8916
MASON US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON WILLIAM HARSHA
BRIDGE OVER THE OHIO RIVER. JOINT PROJECT
WITH OHIO. (081B00069N)(BSBP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
100,000
2,800,000
0 100,000 2,800,000
10013
MASON US-68 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
825,000
8,250,000
0 0 9,075,000
20011
Total for MASON county PL
Total Amounts:
CN
UT
RW
DN
1,460,000 13,605,000
100,000 825,000
1,460,000 100,000 14,430,000
Page 141 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCCRACKEN I-24 AM-BRIDGE (P) I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH
(B100); JOINT PROJECT WITH ILLINOIS TO
MITIGATE SCOUR (073B00100N)(BSBP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 260,000
0 0 260,000
2
MCCRACKEN US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM
BETHEL CHURCH ROAD TO KY-1154 (MARTIN
MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).
(10CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 1,320,000
0 1,320,000 0
115.1
MCCRACKEN US-60 PREFINANCD CONVRSN(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM
BETHEL CHURCH ROAD TO KY-1154 (MARTIN
MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).
(10CCR)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 1,320,000
0 1,320,000 0
115.11
MCCRACKEN US-62 MAJOR WIDENING(O) MAJOR WIDENING OF US-62 FROM KY-998 TO
PADUCAH INFORMATION AGE PARK. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 2,340,000
0 2,340,000 0
152
MCCRACKEN KY-1286 RECONSTRUCTION(O) IMPROVE KY-1286 (FRIENDSHIP ROAD) FROM
MP 3.6 TO MP 6.4 IN PADUCAH. (PRELIMINARY
ENGINEERING) (12CCR)(14CCR)(16CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,500,000
2,480,000
0 1,500,000 2,480,000
153
Page 142 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCCRACKEN US-60 I-CHANGE RECONST(O) CONSTRUCT A DOUBLE-CROSSOVER DIAMOND
INTERCHANGE ON US-60 AT THE I-24
INTERCHANGE NEAR KENTUCKY OAKS MALL.
CN
Project Cost:
UT
RW
DN
PL
NH 3,960,000
0 3,960,000 0
154
MCCRACKEN KY-1954 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF
KY 348 (073B00096N) .
CN
Project Cost:
UT
RW
DN
PL
BR 574,000
0 0 574,000
1152
MCCRACKEN KY-994 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI
NW OF KY 348 (073B00015N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
168,000
791,000
0 168,000 791,000
1154
MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER
OHIO RIVER. JOINT PROJECT WITH ILLINOIS.
(073B00100N)(BSBP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 2,000,000
0 0 2,000,000
10006
MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING
ON I-24 BRIDGE OVER THE OHIO RIVER. JOINT
PROJECT WITH ILLINOIS. (073B000100N)(BSBP)
(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 375,000
0 375,000 0
10007
Page 143 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCCRACKEN KY-339 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 339 BRIDGE
OVER MASSAC CREEK. (073B00058N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
892,500
0 210,000 892,500
10012
MCCRACKEN US-45 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
100,000
1,000,000
0 1,100,000 0
20019
Total for MCCRACKEN county PL
Total Amounts:
CN
UT
RW
DN
5,335,000 4,517,500
1,978,000
2,640,000 2,480,000
2,340,000
0 12,293,000 6,997,500
MCCREARY KY-92 RELOCATION(O) IMPROVE KY-92 FROM WEST OF KY-592 TO
EAST OF THE WHITLEY/MCCREARY COUNTY
LINE (SECTION 2).(2014BOP)(SAME AS
11-184.20)
CN
Project Cost:
UT
RW
DN
PL
STP 8,000,000
0 8,000,000 0
261.3
MCCREARY KY-92 PREFINANCD CONVRSN(O) IMPROVE KY-92 FROM WEST OF KY-592 TO
EAST OF THE WHITLEY/MCCREARY COUNTY
LINE (SECTION 2).(2014BOP)(SAME AS
11-184.20)
CN
Project Cost:
UT
RW
DN
PL
STP 7,000,000
0 0 7,000,000
261.31
Page 144 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCCREARY CR-1239 AM-BRIDGE (P) BRIDGE OVER ROCK CREEK ON OLD
FIDELITY-BELL FARM ROAD (CR 1239) 0.25 MI W
OF ROCK CREEK ROAD (CR 1236) (074C00008N)
(SR=22)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
196,000
448,000
0 196,000 448,000
1065
MCCREARY KY-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1044 BRIDGE
OVER MARSH CREEK. (074B00023N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
451,500
0 175,000 451,500
10002
MCCREARY KY-700 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-700 BRIDGE
OVER INDIAN CREEK. (074B00026N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,155,000
0 210,000 1,155,000
10003
MCCREARY KY-478 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-478 BRIDGE
OVER MARSH CREEK. (074B00027N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
521,500
0 175,000 521,500
10004
Total for MCCREARY county PL
Total Amounts:
CN
UT
RW
DN
8,000,000 9,576,000
756,000
0 8,756,000 9,576,000
Page 145 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OVERFLOW
STRUCTURE ON US-431 AT THE
MUHLENBERG-MCLEAN CO LINE B00056N.
CN
Project Cost:
UT
RW
DN
PL
BR 2,500,000
2,500,000 0 0
1078
MCLEAN KY-2385 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BRANCH OF POND DRAIN CREEK ON KY 2385
0.9 MI SW OF KY 81 (075B00066N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
308,000
784,000
0 308,000 784,000
1090
MCLEAN US-431 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS AT THE INTERSECTION OF
US-431 AND KY-250. (08CCN)(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
200,000
180,000
500,000
0 380,000 500,000
8400
MCLEAN KY-56 RECONSTRUCTION(O) CORRECT LINE OF SIGHT WITH INTERSECTION
OF KY 56 & KY 1233. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 450,000
0 0 450,000
8852
MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US-431 BRIDGE
OVER DRAIN TO CYPRESS CREEK.
(075B00019N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
3,010,000
0 280,000 3,010,000
10007
Page 146 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MCLEAN KY-81 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER
SLOUGH. (075B00026N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
892,500
0 245,000 892,500
10008
Total for MCLEAN county PL
Total Amounts:
CN
UT
RW
DN
2,500,000 5,636,500
833,000
200,000
180,000
2,500,000 1,213,000 5,636,500
MEADE KY-823 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CULVERT OVER
UNNAMED STREAM ON KY 823 0.5 MILE WEST
OF KY 2734.(082B00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
560,000
0 105,000 560,000
1088
Total for MEADE county PL
Total Amounts:
CN
UT
RW
DN
560,000
105,000
0 105,000 560,000
MENIFEE KY-77 FOREST HIGHWAY(P) RESURFACING AND WIDENING EXISTING GRAVEL
PARKING PULL-OFFS AND INSTALLATION OF
GUARDRAIL ALONG KY 77 AND KY 715 IN THE
RED RIVER GORGE AREA IN MENIFEE, POWELL,
AND WOLFE COUNTIES. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
FH 765,000
765,000 0 0
371
Page 147 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY
1274 NORTH OF THE LONG BOW BOAT RAMP IN
MENIFEE COUNTY. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
FH
FH
FH
100,000
100,000
2,625,000
2,825,000 0 0
372
MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY
1274 SOUTH OF THE MENIFEE/ROWAN COUNTY
LINE. (2016BOP)
CN
Project Cost:
UT
RW
DN
PL
FH
FH
FH
250,000
250,000
4,010,000
4,510,000 0 0
373
MENIFEE US-460 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS ON US-460
FROM THE END OF ROTHWELL HILL
IMPROVEMENTS TO THE BRIDGE OVER BEAVER
CREEK. (14CCN)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
2,180,000
1,000,000
0 0 3,180,000
8802
Total for MENIFEE county PL
Total Amounts:
CN
UT
RW
DN
7,400,000
350,000 2,180,000
350,000 1,000,000
8,100,000 0 3,180,000
MERCER US-127 SAFETY(P) SAFETY IMPROVEMENTS ON US 127 IN
SALVISA. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 200,000
0 200,000 0
8858
Page 148 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MERCER KY-1941 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1941 BRIDGE
OVER CHAPLIN RIVER. (084B00030N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
300,000
682,000
0 300,000 682,000
10003
MERCER CR-1322 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRATTON RD
BRIDGE OVER BRUSH CREEK. (084C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
595,000
0 192,500 595,000
10004
Total for MERCER county PL
Total Amounts:
CN
UT
RW
DN
1,277,000
692,500
0 692,500 1,277,000
METCALFE KY-496 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OIL
WELL BRANCH ON KY 496 0.5 MILE SE OF KY
533.(085B00025N) EBRP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
287,000
0 175,000 287,000
1087
METCALFE KY-163 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND
APPROACHES OVER ROGERS CREEK AT MP
7.307. (DESIGN HANDLED UNDER 3-8506.00)
085B00010N (2014BOP)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 3,000,000
3,000,000 0 0
8506.2
Page 149 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
METCALFE KY-163 RECONSTRUCTION(O) RECONSTRUCT KY 163 AS A NEW ROUTE ON
THE WEST SIDE OF EDMONTON FROM KY 163 AT
GARY BELL RD (MP 10.0) S OF EDMONTON,
CROSSING US 68 (STOCKTON ST) 2000 FT
WEST OF THE COURTHOUSE SQ, TO US 68 CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 0 1,000,000
8859
METCALFE KY-1243 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1243 BRIDGE
OVER KNOB LICK SPRINGS. (085B00034N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
262,500
0 157,500 262,500
10005
METCALFE CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOSBY RIDGE RD
BRIDGE OVER E FORK LITTLE BARREN RVR.
(085C00005N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
896,000
0 210,000 896,000
10006
Total for METCALFE county PL
Total Amounts:
CN
UT
RW
DN
3,000,000 1,445,500
542,500 1,000,000
3,000,000 542,500 2,445,500
MONROE KY-214 FERRY OPERATION(P) OPERATION OF TURKEY NECK BEND FERRY FOR
FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 444,000
0 444,000 0
128.1
Page 150 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MONROE KY-214 FERRY OPERATION(P) OPERATION OF TURKEY NECK BEND FERRY FOR
FY 2020.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 444,000
0 0 444,000
128.11
MONROE -0 NEW ROUTE(O) CONSTRUCT NEW ROUTE FOR THE EAST
TOMPKINSVILLE BYPASS "SURFACING ONLY".
(98CCN)(02CCR) (2002BOPC)(DESIGN "STP"
FUNDING SHALL BE SUPPLEMENTAL TO THE
AUTHORIZED AMOUNT ALREADY EXPENDED ON CN
Project Cost:
UT
RW
DN
PL
STP 730,000
0 730,000 0
7020.17
MONROE -0 PREFINANCD CONVRSN(O) CONSTRUCT NEW ROUTE FOR THE EAST
TOMPKINSVILLE BYPASS "SURFACING ONLY".
(98CCN)(02CCR) (2002BOPC)(DESIGN "STP"
FUNDING SHALL BE SUPPLEMENTAL TO THE
AUTHORIZED AMOUNT ALREADY EXPENDED ON CN
Project Cost:
UT
RW
DN
PL
STP 6,580,000
0 0 6,580,000
7020.18
MONROE KY-100 BRIDGE REPLACEMENT(P) REPLACE BRIDGE ON KY-100 BETWEEN MP 14.7
AND 14.9
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
250,000
150,000
500,000
0 250,000 650,000
80003
Total for MONROE county PL
Total Amounts:
CN
UT
RW
DN
1,174,000 7,024,000
250,000
150,000
500,000
0 1,424,000 7,674,000
Page 151 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MONTGOMERY KY-1991 MAJOR WIDENING(O) WIDEN KY 1991 FROM MAYSVILLE ROAD TO
MIDLAND TRAIL INDUSTRIAL PARK,
MONTGOMERY COUNTY (SEE 7-8501.00 FOR
"SPB" FUNDS)(2005HPP-KY129)
CN
Project Cost:
UT
RW
DN
PL
HPP 559,899
559,899 0 0
240.01
MONTGOMERY US-460 RECONSTRUCTION(O) IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 9,450,000
9,450,000 0 0
250.1
MONTGOMERY KY-1991 MINOR WIDENING(O) UPGRADE HINKSTON PIKE IN MT. STERLING
FROM NEW MIDLAND TRAIL TO THE NEW
INDUSTRIAL PARK ENTRANCE (INCLUDES
EXTENSION OF INDUSTRIAL ACCESS ROAD TO
HINKSTON PIKE). (12CCR)CN
Project Cost:
UT
RW
DN
PL
SPP 4,010,000
0 4,010,000 0
411
MONTGOMERY US-60 MAJOR WIDENING(O) WIDEN EXISTING PAVEMENT AND IMPROVE
VERTICAL AND HORIZONTAL CURVES FROM
EXISTING MOUNT STERLING BYPASS (KY 686)
TO 500' WEST OF BENTBROOK SUBDIVISION.
ADD FULL WIDTH SHOULDERS AND A CENTER CN
Project Cost:
UT
RW
DN
PL
SPP 800,000
0 0 800,000
8810
Total for MONTGOMERY county PL
Total Amounts:
CN
UT
RW
DN
10,009,899 4,010,000
800,000
10,009,899 4,010,000 800,000
Page 152 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
MORGAN KY-7 RECONSTRUCTION(O) RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN
WEST LIBERTY BEGINNING AT RIVERSIDE DR.
(CS 1058) AND EXTENDING NORTH TO 0.159
MILES NORTH OF INTERSECTION WITH CEDAR
RD (CS 1053). (2014BOP)(D,R,U COMPLETED CN
Project Cost:
UT
RW
DN
PL
STP 3,300,000
3,300,000 0 0
293.1
MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE
OAK CREEK ON US 460 0.5 MILE NW OF KY
1000. (088B00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
224,000
1,239,000
0 224,000 1,239,000
1111
MORGAN KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 191
OVER CANEY CREEK .5 MILES WEST OF KY
1162. (16CCN)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
182,000
756,000
0 182,000 756,000
8902
MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 460 BRIDGE
OVER BIG SPRING BRANCH. (088B00022N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
472,500
0 175,000 472,500
10016
MORGAN KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.
COMBS MOUNTAIN PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 57.72 TO
MILEPOINT 63.08
CN
Project Cost:
UT
RW
DN
PL
PM
PM
210,000
2,100,000
0 2,310,000 0
20001
Page 153 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for MORGAN county PL
Total Amounts:
CN
UT
RW
DN
3,300,000 2,100,000 2,467,500
791,000
3,300,000 2,891,000 2,467,500
MUHLENBERG US-62 MAJOR WIDENING(O) WIDEN US-62 FROM WAL-MART TO US-431.
(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES
2-8301)
CN
Project Cost:
UT
RW
DN
PL
SPP 7,500,000
7,500,000 0 0
8506
MUHLENBERG KY-181 MINOR WIDENING(O) WIDEN KY-181 BY FOUR FEET ON EACH SIDE
FROM INTERSECTION 601 TO WENDELL FORD
CENTER. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 530,000
0 0 530,000
8802
MUHLENBERG KY-2533 RECONSTRUCTION(O) STRAIGHTEN DEAN ROAD INTERSECTION OF 189
BYPASS TO KY 181 NORTH NEAR THE
INTERSECTION WITH THE WKY PARKWAY,
WENDELL FORD NATIONAL GUARD CENTER,
AND JOB CORP. (14CCN)CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
780,000
500,000
0 780,000 500,000
8803
MUHLENBERG CR-1141 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF UNION RIDGE RD
BRIDGE OVER ROCKY CREEK. (089C00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10009
Page 154 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for MUHLENBERG county PL
Total Amounts:
CN
UT
RW
DN
7,500,000 647,500
955,000
1,030,000
7,500,000 955,000 1,677,500
NELSON US-150 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, AND GEOMETRICS
ON US-150 FROM THE BLUEGRASS PARKWAY
TO THE NELSON/WASHINGTON COUNTY LINE.
(2016BOP)
CN
Project Cost:
UT
RW
DN
PL
STP 600,000
0 0 600,000
396.1
NELSON US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGES ON US 62
(HINKLE CREEK) AND KY 48 IN BLOOMFIELD
090B00096N (SR 28.2) 090B00095N (12CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 1,260,000
1,260,000 0 0
1078
NELSON KY-509 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
FROMAN CREEK ON KY 509 0.9 MI W OF US 31E
(090B00068N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
756,000
0 105,000 756,000
1089
NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245
THROUGH THE BLUEGRASS PARKWAY
INTERCHANGE TO EAST OF LESLIE BALLARD LN
(CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)
(16CCR)CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,000,000
4,000,000
0 1,000,000 4,000,000
8309.1
Page 155 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
NELSON -0 NEW ROUTE(O) NEW ROUTE BETWEEN US 62 AND KY 245 WEST
OF BARDSTOWN.
CN
Project Cost:
UT
RW
DN
PL
SPP 500,000
0 0 500,000
8809
NELSON KY-52 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER
MONKS CREEK. (090B00033N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
1,015,000
0 105,000 1,015,000
10004
NELSON CS-4003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE
OVER SIMPSON CREEK. (090C00045N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
98,000
406,000
0 98,000 406,000
10005
NELSON CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF POTTERSHOP LOOP
BRIDGE OVER ROWAN CREEK. (090C00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
91,000
227,500
0 91,000 227,500
10014
NELSON BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA
LAYNE COLLINS BLUEGRASS PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 8.837 TO
MILEPOINT 10.172
CN
Project Cost:
UT
RW
DN
PL
PM
PM
110,000
1,100,000
0 1,210,000 0
20023
Page 156 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
NELSON US-62 CONGESTION MITIGTN(O) CONSTRUCT A ROUNDABOUT AT THE
INTERSECTION OF US-31E AND US-62. (NELSON
COUNTY FISCAL COURT WILL DO DESIGN AND
BUILD ROUNDABOUT)
CN
Project Cost:
UT
RW
DN
PL
SPP 1,500,000
0 0 1,500,000
80050
Total for NELSON county PL
Total Amounts:
CN
UT
RW
DN
1,260,000 1,100,000 7,904,500
509,000 1,100,000
1,000,000
1,260,000 2,609,000 9,004,500
NICHOLAS KY-36 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER
BRUSHY FORK. (091B00018N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
525,000
1,610,000
0 525,000 1,610,000
10011
NICHOLAS CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DORSEY AVE
BRIDGE OVER BRUSH FORK. (091C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
595,000
0 280,000 595,000
10012
Total for NICHOLAS county PL
Total Amounts:
CN
UT
RW
DN
2,205,000
805,000
0 805,000 2,205,000
Page 157 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62
OVER BRANCH OF THREE LICK FORK 0.23 MILE
E OF GREEN MEADOWS DR (CS
6068)092B00032 (SD)
CN
Project Cost:
UT
RW
DN
PL
BR 1,148,000
1,148,000 0 0
1083
OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
THREELICK FORK ON US 62 0.4 MILE E OF
GREEN MEADOWS DRIVE (CS 6068) IN BEAVER
DAM. (092B00033N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
308,000
1,029,000
0 308,000 1,029,000
1091
OHIO WN-9007 I-CHANGE RECONST(O) I-65 SPUR CORRIDOR; RECONSTRUCT THE
EXISTING NATCHER PARKWAY/KY-69
INTERCHANGE (EXIT 50) IN OHIO COUNTY.
(2016BOP)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
1,350,000
1,250,000
0 2,600,000 0
2092.2
OHIO KY-85 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER
BR OF W FK LEWIS CREEK. (092B00053N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
962,500
0 210,000 962,500
10010
OHIO CR-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST HALLS CREEK
R BRIDGE OVER BRANCH OF HALLS CREEK.
(092C00001N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
630,000
0 175,000 630,000
10011
Page 158 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OHIO CR-1067 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SUNNYDALE RD
BRIDGE OVER BRANCH OF ROUGH RIVER.
(092C00020N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
630,000
0 175,000 630,000
10012
OHIO CR-1036 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BED RD
BRIDGE OVER WFK ADAMS CREEK.
(092C00067N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
735,000
0 210,000 735,000
10013
OHIO CR-1414 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JOHNSON SCHOOL
RD BRIDGE OVER BARASS DITCH.
(092C00080N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
647,500
0 175,000 647,500
10014
OHIO CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCK CREEK LN
BRIDGE OVER BR-S.FK PANTHER CK.
(092C00097N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
840,000
0 210,000 840,000
10015
OHIO CR-1510 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF QUARTERHORSE LN
BRIDGE OVER N FK PANTHER CREEK.
(092C00133N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
892,500
0 245,000 892,500
10016
Page 159 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OHIO WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 65.68 TO
MILEPOINT 83.3
CN
Project Cost:
UT
RW
DN
PL
PM 16,596,000
0 0 16,596,000
20039
OHIO WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL
H. FORD WESTERN KY PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 83.3 TO
MILEPOINT 87.544
CN
Project Cost:
UT
RW
DN
PL
PM 4,282,000
0 0 4,282,000
20040
OHIO WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.
NATCHER PARKWAY BOTH DIRECTION(S) FROM
MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553
NON-CARDINAL)
CN
Project Cost:
UT
RW
DN
PL
PM 11,064,000
0 0 11,064,000
20041
Total for OHIO county PL
Total Amounts:
CN
UT
RW
DN
1,148,000 38,308,500
1,708,000
1,350,000
1,250,000
1,148,000 4,308,000 38,308,500
OLDHAM -0 BIKE/PED FACIL(O) OLDHAM COUNTY BICYCLE & PEDESTRIAN
TRAIL - OLD LAGRANGE RD. CONSTRUCT A
BICYCLE AND PEDESTRIAN TRAIL ALONG OLD
LAGRANGE ROAD FROM KY 146 TO THE
INTERSECTION WITH KY 329 BYPASS. (FUNDING CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
250,000
500,000
0 250,000 500,000
410.01
Page 160 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OLDHAM CR-1002 SAFETY(P) CONSTRUCT A 4-LANE UNINTERRUPTED RAIL
UNDERPASS WEST OF LAGRANGE. (LOCAL
MATCH)(ALL WORK BY OLDHAM COUNTY)
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP). (14CCR)CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
100,000
10,000,000
100,000 10,000,000 0
434
OLDHAM KY-1793 SAFETY(P) CONSTRUCT SIDEWALKS ON KY 1793 FROM
RIDGEVIEW DRIVE TO SETTLERS POINT TRAIL.
(FUNDING SUBJECT TO FISCAL CONSTRAINT
PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SLO 100,000
100,000 0 0
440.1
OLDHAM US-42 RECONSTRUCTION(O) RECONSTRUCT US 42 AND WIDEN FROM 2
LANES TO 3 LANES (3RD LANE WILL BE A
CENTER TURN LANE) FROM
JEFFERSON/OLDHAM COUNTY LINE TO
RIDGEMOOR DRIVE. PROJECT WILL INCLUDE THE CN
Project Cost:
UT
RW
DN
PL
SLO 5,320,000
5,320,000 0 0
441.01
OLDHAM KY-22 RECONSTRUCTION(O) INTERSECTION IMPROVEMENT AT KY 22 AND KY
329 IN CRESTWOOD. (ALL WORK BY KYTC)
(2006BOPC)(FUNDING SUBJECT TO FISCAL
CONSTRAINT PENDING MPO TIP)
CN
Project Cost:
UT
RW
DN
PL
SLO 300,000
300,000 0 0
449
OLDHAM CS-2102 CONGESTION MITIGTN(O) CONSTRUCTION OF A PARK AND RIDE FACILITY
INCLUDING A PARKING LOT, SHELTER,
PLAYGROUND, BIKE LOCKERS, WALKWAYS,
AND A 1000' ACCESS ROAD LOCATED ON APPLE
PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 CN
Project Cost:
UT
RW
DN
PL
SLO 1,174,800
1,174,800 0 0
468.1
Page 161 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM
KY-329 (MP 14.1) TO KY-393 (MP 18.0). (16CCN)
CN
Project Cost:
UT
RW
DN
PL
NH 3,500,000
0 3,500,000 0
483.1
OLDHAM I-71 NEW INTERCHANGE(O) CONSTRUCT NEW I-71 INTERCHANGE BETWEEN
KY-393 AND KY-53 TO RELIEVE CONGESTION IN
LAGRANGE.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
NH
1,500,000
3,000,000
1,900,000
6,000,000
1,500,000 4,900,000 6,000,000
483.3
OLDHAM CR-1209 SAFETY-HAZARD ELIM(P) OLD FLOYDSBURG ROAD SAFETY
IMPROVEMENTS: REPLACE NARROW ONE-LANE
CULVERT CROSSING; CLEAR TREES AND
VEGETATION OUT OF RIGHT-OF-WAY; ADD
SHOULDER TO THE ROAD, AND ADD SIGNAGE CN
Project Cost:
UT
RW
DN
PL
SLO 700,000
700,000 0 0
494
OLDHAM KY-329 RECONSTRUCTION(O) INTERSECTION REALIGNMENT/RECONSTRUCTION
AT KY 329 AND KY 329 BYPASS (2016BOP).
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
120,000
100,000
100,000
120,000 100,000 100,000
542
OLDHAM -0 NEW ROUTE(O) CONSTRUCTION OF A NEW CONNECTION FROM
OLD LAGRANGE ROAD TO KY 393 AT
BUCKNER. LPA CONTRACT. (BOP2012)
CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
SLO
714,500
228,000
2,300,000
714,500 2,528,000 0
754
Page 162 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OLDHAM CS-2030 BIKE/PED FACIL(O) CONSTRUCT 5' CONCRETE SIDEWALKS IN THE
EXISTING RIGHT-OF-WAY ALONG BOTH SIDES
OF SPRING HILL TRACE FROM KY 329 TO THE
END OF THE EXISTING SUBDIVISION, SLIGHTLY
BEYOND SPRING HILL COURT (2014BOP).CN
Project Cost:
UT
RW
DN
PL
SLO
SLO
75,000
445,000
75,000 445,000 0
757
OLDHAM KY-1488 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1488 BRIDGE
OVER ORGAN CREEK. (093B00048N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
343,000
0 280,000 343,000
10012
OLDHAM KY 329 AIR QUALITY(P) IMPROVE THE INTERCHANGE OF I 71 AND KY
329
CN
Project Cost:
UT
RW
DN
PL
SPP 250,000
0 250,000 0
80005
Total for OLDHAM county PL
Total Amounts:
CN
UT
RW
DN
7,594,800 12,745,000 6,343,000
1,720,000 4,280,000
714,500 3,100,000 500,000
75,000 2,128,000 100,000
10,104,300 22,253,000 6,943,000
OWEN KY-22 RECONSTRUCTION(O) IMPROVE SAFETY ON KY-22 FROM KY-227 TO
KY-845. (06CCR)(08CCN)(12CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 3,500,000
0 0 3,500,000
198
Page 163 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
OWEN CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
CEDAR CREEK ON SAWDRIDGE CREEK W ROAD
(CR 1214) 0.2 MI N OF US 127 (094C00011N)
CN
Project Cost:
UT
RW
DN
PL
BR 672,000
0 0 672,000
1088
OWEN KY-3102 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3102 BRIDGE
OVER BRUSH CREEK. (094B00034N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
1,942,500
0 280,000 1,942,500
10013
Total for OWEN county PL
Total Amounts:
CN
UT
RW
DN
6,114,500
280,000
0 280,000 6,114,500
OWSLEY KY-30 RECONSTRUCTION(O) IMPROVE KY-30 FROM KY-847 IN OWSLEY
COUNTY TO JACKSON COUNTY LINE.(LET W/
JACKSON CO. SECTION UNDER 11-278.30)(SEE
10-279.60 FOR PE & ENVIR)(AR/W)(14CCR)
(16CCR)CN
Project Cost:
UT
RW
DN
PL
STP 14,500,000
0 14,500,000 0
279.61
Total for OWSLEY county PL
Total Amounts:
CN
UT
RW
DN
14,500,000
0 14,500,000 0
Page 164 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PENDLETON US-27 MAJOR WIDENING(O) IMPROVE SAFETY ON US-27 FROM BUTLER IN
PENDLETON COUNTY TO SOUTH OF KY-154 IN
CAMPBELL COUNTY.(12CCN)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 5,000,000
0 0 5,000,000
8706
PENDLETON KY-159 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-159 BRIDGE
OVER NORTH LITTLE KINCAID CRE.
(096B00006N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
490,000
0 210,000 490,000
10004
Total for PENDLETON county PL
Total Amounts:
CN
UT
RW
DN
5,490,000
210,000
0 210,000 5,490,000
PERRY KY-15 RECONSTRUCTION(O) IMPROVE SAFETY, UPGRADE GEOMETRICS, AND
ADDRESS CAPACITY ISSUES FOR KY-15 IN
PERRY COUNTY FROM MORTON BOULEVARD
TO KY-15 BYPASS
CN
Project Cost:
UT
RW
DN
PL
NH 47,000,000
47,000,000 0 0
158
PERRY CR-1114 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
NORTH FORK KENTUCKY RIVER ON KENMONT
ROAD (CR 1114) 380 FT SE OF KY 7
(097C00005N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
224,000
1,400,000
0 224,000 1,400,000
1113
Page 165 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PERRY CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
STRAIGHT FORK ON LITTLE LEATHERWOOD
CREEK ROAD (CR 1140) AT JCT WITH KY 3348
(097C00013N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
182,000
504,000
0 182,000 504,000
1114
PERRY HR-9006 NEW INTERCHANGE(O) NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL
ROGERS PARKWAY
CN
Project Cost:
UT
RW
DN
PL
STP
STP
1,200,000
320,000
0 1,200,000 320,000
8903
PERRY KY-80 SAFETY(P) SAFETY IMPROVEMENTS ON KY-80 FROM
LESLIE COUNTY LINE TO KY-451. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
700,000
350,000
280,000
0 700,000 630,000
8906
PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166
OVER RT. FK. MACES CREEK. (16CCN)
097B00110N
CN
Project Cost:
UT
RW
DN
PL
BR 938,000
0 0 938,000
8910
PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166
OVER MACES CREEK. (16CCN) 097B00072N
(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
BR
155,000
103,000
742,000
155,000 103,000 742,000
8913
Page 166 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PERRY CR-1150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
LEATHERWOOD CREEK. (16CCN) 097C00021N
CN
Project Cost:
UT
RW
DN
PL
BR 455,000
0 0 455,000
8915
PERRY CR-1115 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GEORGES BRANCH
RD BRIDGE OVER GEORGES BRANCH.
(097C00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
390,000
0 140,000 390,000
10004
PERRY CR-1145 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OWENS BR RD
BRIDGE OVER OWENS BRANCH. (097C00018N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
340,000
0 140,000 340,000
10005
PERRY CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HALL OLD HOME
PLACE BRIDGE OVER BIG CREEK. (097C00084N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
613,000
0 175,000 613,000
10006
PERRY KY-476 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 476 BRIDGE
OVER BALL FORK. (097B00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
840,000
0 210,000 840,000
10017
Page 167 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PERRY KY-80 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
100,000
100,000
0 200,000 0
20003
Total for PERRY county PL
Total Amounts:
CN
UT
RW
DN
47,000,000 100,000 6,222,000
1,871,000
155,000 1,200,000 350,000
103,000 600,000
47,155,000 3,274,000 7,172,000
PIKE -0 NEW ROUTE(O) MARION BRANCH INDUSTRIAL PARK ACCESS
ROAD.
CN
Project Cost:
UT
RW
DN
PL
SPP 7,000,000
0 7,000,000 0
347
PIKE -0 PREFINANCD CONVRSN(O) MARION BRANCH INDUSTRIAL PARK ACCESS
ROAD. (ADDITIONAL FUNDING FOR 12-347.00)
CN
Project Cost:
UT
RW
DN
PL
SPP 7,000,000
0 0 7,000,000
347.01
PIKE KY-610 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-610
(MP 8.146) OVER LONG FORK; .1 MI S OF JCT
KY-1469; (AR/W)098B00069N
CN
Project Cost:
UT
RW
DN
PL
BR 770,000
770,000 0 0
1104
Page 168 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PIKE KY-1441 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
FISHTRAP RD (KY 1441) OVER RACCOON
CREEK AT INTERSECTION WITH COON CREEK (CR
1371) 098B00093N
CN
Project Cost:
UT
RW
DN
PL
BR 665,000
665,000 0 0
1115
PIKE CR-1181 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
LEVISA FORK ON SOUTH RIVER ROAD
CONNECTOR (CR 1181-70) AT JCT WITH US 460
NEAR VIRGINIA STATE LN (098C00088N)
CN
Project Cost:
UT
RW
DN
PL
BR 980,000
0 980,000 0
1122
PIKE CR-1801 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER
BLACKBERRY CREEK ON BIG BLUE SPRINGS
ROAD (CR 1801) AT JCT WITH KY 1056
(098C00028N)
CN
Project Cost:
UT
RW
DN
PL
BR 210,000
0 210,000 0
1123
PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE
OVER PINSONS CREEK. (098B00032N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
484,400
0 175,000 484,400
10008
PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE
OVER POND CREEK. (098B00036N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
331,100
0 140,000 331,100
10009
Page 169 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PIKE KY-3419 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3419 BRIDGE
OVER LEFT FK BLACKBERRY CR. (098B00180N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
618,450
0 210,000 618,450
10010
PIKE CR-1517 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PIGEON ROOST RD
BRIDGE OVER BIG CREEK. (098C00005N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
389,200
0 157,500 389,200
10011
PIKE CR-1545 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE
OVER POND CREEK. (098C00021N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
567,280
0 140,000 567,280
10012
PIKE CR-1906 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEEFHIDE CRK
BRIDGE OVER BEEFHIDE CREEK. (098C00119N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
506,100
0 175,000 506,100
10013
PIKE CR-1789 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE
OVER SHELBY CREEK. (098C00080N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
930,580
0 192,500 930,580
10024
Page 170 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PIKE CR-1360 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIGHT FORK OF
BRUS BRIDGE OVER LEFT FK.BRUSHY FORK.
(098C00091N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
444,500
0 157,500 444,500
10025
PIKE CR-1911 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CANEY HWY #1
BRIDGE OVER CANEY CREEK. (098C00113N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
530,250
0 140,000 530,250
10026
PIKE CR-1460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE
OVER JOHNS CREEK. (098C00170N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
227,500
875,000
0 227,500 875,000
10027
PIKE US-23 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
525,000
5,250,000
0 0 5,775,000
20002
Total for PIKE county PL
Total Amounts:
CN
UT
RW
DN
1,435,000 8,190,000 17,926,860
1,715,000 525,000
1,435,000 9,905,000 18,451,860
Page 171 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
POWELL KY-213 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS, AND
REDUCE CONGESTION KY-213 FROM KY-11 TO
BOTTOM OF MOUNTAIN. (12CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
4,000,000
1,100,000
2,000,000
0 5,100,000 2,000,000
163
POWELL KY-2026 RECONSTRUCTION(O) CORRECT FLOODING ISSUES ON KY-2026 FROM
KY-11 TO THE RED RIVER IN CLAY CITY.
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
500,000
200,000
150,000
0 500,000 350,000
211
POWELL KY-599 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-599 BRIDGE
OVER CANE CREEK. (099B00069N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
770,000
0 175,000 770,000
10007
POWELL KY-2026 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2026 BRIDGE
OVER RED RIVER. (099B00090N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,120,000
0 210,000 1,120,000
10008
POWELL KY-3354 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3354 BRIDGE
OVER CAT CREEK. (099B00081N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
560,000
0 175,000 560,000
10018
Page 172 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
POWELL KY-9000 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.
COMBS MOUNTAIN PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 22.307 TO
MILEPOINT 27.376
CN
Project Cost:
UT
RW
DN
PL
PM
PM
410,000
4,100,000
0 4,510,000 0
20006
POWELL KY-9000 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.
COMBS MOUNTAIN PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 27.376 TO
MILEPOINT 32.788
CN
Project Cost:
UT
RW
DN
PL
PM 5,416,000
0 0 5,416,000
20007
Total for POWELL county PL
Total Amounts:
CN
UT
RW
DN
4,100,000 9,866,000
1,470,000
4,000,000 200,000
1,100,000 150,000
0 10,670,000 10,216,000
PULASKI KY-461 MAJOR WIDENING(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK
BRIDGE, INCLUDING INTERCHANGE AT KY-80.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
3,000,000
1,500,000
0 3,000,000 1,500,000
59.25
PULASKI KY-461 PREFINANCD CONVRSN(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK
BRIDGE, INCLUDING INTERCHANGE AT KY-80.
CN
Project Cost:
UT
RW
DN
PL
NH
NH
3,000,000
1,500,000
0 3,000,000 1,500,000
59.26
Page 173 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
PULASKI KY-635 SAFETY-RR SEPARATN(P) SAFETY PROJECT TO RECONSTRUCT KY 635 TO
ELIMINATE AT GRADE RAILROAD CROSSING AND
REPLACE WITH RAILROAD SEPARATION
CROSSING AT SCIENCE HILL, KENTUCKY IN
PULASKI COUNTY. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
RRS
RRS
1,800,000
1,300,000
0 0 3,100,000
9010
Total for PULASKI county PL
Total Amounts:
CN
UT
RW
DN
6,000,000 1,800,000
4,300,000
0 6,000,000 6,100,000
ROBERTSON KY-616 RECONSTRUCTION(O) IMPROVE CURVE ON KY 616 AND IMPROVE
ROADWAY FROM THE NEW ROBERTSON
COUNTY SCHOOL TO MT OLIVET. (12CCN)
(14CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
250,000
210,000
0 0 460,000
8711
Total for ROBERTSON county PL
Total Amounts:
CN
UT
RW
DN
250,000
210,000
0 0 460,000
ROCKCASTLE I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6
LANES FROM 1MI N SAND HILL ROAD
UNDERPASS N TO 1.1 MILES N OF THE US-25
I-CHNG AT MT. VERNON. (16CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 41,110,000
41,110,000 0 0
6.1
Page 174 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ROCKCASTLE KY-461 RECONSTRUCTION(O) IMPROVE KY-461 FROM US-150 TO THE
EXISTING FOUR LANE APPROACH AT US-25.
(16CCN)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
1,200,000
1,450,000
0 1,200,000 1,450,000
8952
ROCKCASTLE KY-1326 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1326 BRIDGE
OVER LITTLE RENFRO CREEK. (102B00026N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
210,000
0 70,000 210,000
10010
ROCKCASTLE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 52.05 TO
MILEPOINT 55.295
CN
Project Cost:
UT
RW
DN
PL
PM
PM
390,000
3,900,000
0 4,290,000 0
20003
ROCKCASTLE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 71.668 TO
MILEPOINT 73.408
CN
Project Cost:
UT
RW
DN
PL
PM
PM
210,000
2,100,000
0 0 2,310,000
20004
ROCKCASTLE US-25 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION
CN
Project Cost:
UT
RW
DN
PL
PM
PM
175,000
1,750,000
0 0 1,925,000
20005
Page 175 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for ROCKCASTLE county PL
Total Amounts:
CN
UT
RW
DN
41,110,000 3,900,000 4,060,000
1,660,000 385,000
1,450,000
41,110,000 5,560,000 5,895,000
ROWAN KY-32 RECONSTRUCTION(O) IMPROVE KY-32 FROM PARK HILLS DRIVE TO
VIKING DRIVE NORTH. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 5,500,000
0 0 5,500,000
204
ROWAN US-60 SAFETY(P) CONSTRUCT TURN LANES INTO LAKESIDE
CHRISTIAN ACADEMY TO IMPROVE SAFETY.
(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 520,000
520,000 0 0
227
ROWAN KY-377 RECONSTRUCTION(O) IMPROVE SAFETY AND CONNECTIVITY AND
REDUCE CONGESTION ON KY-377 FROM KY-32
TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 2,600,000
0 0 2,600,000
8406
ROWAN CR-1025 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE
PERRY ROAD OVER TRIPLETT CREEK.(16CCN)
CN
Project Cost:
UT
RW
DN
PL
BR 822,500
0 0 822,500
8914
Page 176 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ROWAN KY-801 MAJOR WIDENING(O) WIDEN KY 801 FROM NEAR MMRC REGIONAL
PARK TO KY 158 IN FLEMING CO.
CN
Project Cost:
UT
RW
DN
PL STP 100,000
0 100,000 0
8915
Total for ROWAN county PL
Total Amounts:
CN
UT
RW
DN
520,000 822,500
100,000
8,100,000
520,000 100,000 8,922,500
RUSSELL LN-9008 NEW INTERCHANGE(O) CONSTRUCT A NEW INTERCHANGE AT THE
CUMBERLAND PARKWAY INTERSECTION WITH
KY-910 AT WINDSOR. (08CCN)(10CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 6,740,000
6,740,000 0 0
8502
RUSSELL US-127 RELOCATION(O) RELOCATE US-127 FROM EAST OF THE KY-1730
AND MANNTOWN RD INTERSECTION, AND
EXTENDING NORTHERLY TO NORTH BANK OF
CUMBERLAND RIVER. POTENTIAL DESIGN
BUILD. (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)CN
Project Cost:
UT
RW
DN
PL
NH 9,320,000
0 9,320,000 0
8601.21
RUSSELL US-127 PREFINANCD CONVRSN(O) RELOCATE US-127 FROM EAST OF THE KY-1730
AND MANNTOWN RD INTERSECTION, AND
EXTENDING NORTHERLY TO NORTH BANK OF
CUMBERLAND RIVER (SEE 8-108&8-115 FOR
PE/PH.2)(12CCR)(14CCR)CN
Project Cost:
UT
RW
DN
PL
NH 8,280,000
0 0 8,280,000
8601.23
Page 177 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
RUSSELL US 127 AIR QUALITY(P) ADD A RIGHT TURNING ON US 127
SOUTHBOUND BEGINNING AT THE EASTBOUND
EXIT OF THE CUMBERLAND PARKWAY FOR 0.2
MILES
CN
Project Cost:
UT
RW
DN
PL
SPP 400,000
0 400,000 0
80007
Total for RUSSELL county PL
Total Amounts:
CN
UT
RW
DN
6,740,000 9,720,000 8,280,000
6,740,000 9,720,000 8,280,000
SCOTT -0 BYPASS(O) GEORGETOWN NORTHWEST BYPASS: IMPROVE
CONNECTIVITY AND MOBILITY NORTHWEST
AROUND GEORGETOWN FROM KY-32 TO I-75.
(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP"
COMPONENT)(10CCR)(12CCR)(16CCR)CN
Project Cost:
UT
RW
DN
PL
STP 5,000,000
0 0 5,000,000
102.5
SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689
OVER LECOMPTES RUN 0.46 MILE W OF KY
227105B00038N
CN
Project Cost:
UT
RW
DN
PL
BR 462,000
462,000 0 0
1127
SCOTT CR-1022 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS
(CNO&TP)RR ON FIELDS ROAD (CR 1022) AT
SCOTT/HARRISON CO LINE (105R00607N)
(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
1,120,000
210,000 1,120,000 0
1139
Page 178 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
SCOTT KY-227 RECONSTRUCTION(O) RECONSTRUCT KY-227 FROM MP 2.98 TO MP
3.34 TO IMPROVE HORIZONTAL CURVE. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
STP 200,000
200,000 0 0
8907
SCOTT KY-620 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-620 BRIDGE
OVER ROGERS GAP CREEK. (105B00095N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
665,000
0 210,000 665,000
10005
SCOTT CS-1010 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LEMONS MILL RD
BRIDGE OVER NS (CNO&TP) SYSTEM.
(105C00112N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
350,000
1,295,000
0 350,000 1,295,000
10006
SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE
OVER LOCUST FORK. (105B00039N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
133,000
308,000
0 133,000 308,000
10012
SCOTT CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HINTON RD BRIDGE
OVER NS (CNO&TP) SYSTEM. (105R00605N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
238,000
511,000
0 238,000 511,000
10013
Page 179 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
SCOTT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 120.792 TO
MILEPOINT 121.117
CN
Project Cost:
UT
RW
DN
PL
PM
PM
40,000
400,000
0 0 440,000
20019
Total for SCOTT county PL
Total Amounts:
CN
UT
RW
DN
662,000 1,120,000 8,179,000
210,000 931,000 40,000
872,000 2,051,000 8,219,000
SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST
OF THE KY-55 INTERCHANGE TO THE KY-1790
UNDERPASS. (2006BOPC)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
2,000,000
2,000,000
0 2,000,000 2,000,000
65.4
SHELBY KY-53 RECONSTRUCTION(O) WIDEN KY-53 TO FOUR LANES FROM I-64 TO
US-60.(08CCN)(10CCN) (12CCR)(14CCR)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 3,000,000
0 3,000,000 0
8511
SHELBY KY-53 PREFINANCD CONVRSN(O) WIDEN KY-53 TO FOUR LANES FROM I-64 TO
US-60.(08CCN)(10CCN) (12CCR)(14CCR)
(16CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 7,700,000
0 0 7,700,000
8511.01
Page 180 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
SHELBY CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE
OVER FOX RUN CREEK. (106C00004N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
217,000
0 140,000 217,000
10024
SHELBY CR-1009 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLORE JACKSON RD
BRIDGE OVER FOX RUN CREEK. (106C00007N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
406,000
0 140,000 406,000
10025
SHELBY KY 55X AIR QUALITY(P) FOUR RIGHT TURNING LANES AT THE
INTERSECTION OF KY 55X AND KY 43 AND TWO
LEFT TURNING LANES FROM KY 55X ONTO KY
43.
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
150,000
22,000
22,000
500,000
0 194,000 500,000
80004
Total for SHELBY county PL
Total Amounts:
CN
UT
RW
DN
3,000,000 8,823,000
2,430,000
22,000
22,000 2,000,000
0 5,474,000 10,823,000
SIMPSON -0 NEW ROUTE(O) GARVIN LANE EXTENSION TO HENDERSON
INDUSTRIAL PARK. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 300,000
0 300,000 0
8810
Page 181 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
SIMPSON KY-621 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-621 BRIDGE
OVER SINKING CREEK. (107B00018N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
332,500
0 157,500 332,500
10007
SIMPSON CR-1126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PLEASANT HILL
ROAD BRIDGE OVER MAYS BRANCH.
(107C00011N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
280,000
0 157,500 280,000
10008
Total for SIMPSON county PL
Total Amounts:
CN
UT
RW
DN
300,000 612,500
315,000
0 615,000 612,500
SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK
CREEK ON KY 1169 75 FT EAST OF YODER
TIPTON ROAD (CR 1142). (108B00022N)(EBRP)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
497,000
0 245,000 497,000
1076
SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1169 BRIDGE
OVER ELK CREEK. (108B00040N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
490,000
0 210,000 490,000
10013
Page 182 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
SPENCER CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WASHBURN LANE
BRIDGE OVER ELK CREEK. (108B00017N)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
248,500
0 192,500 248,500
10014
SPENCER CR-1155 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FEATHERBED HOLW
RD BRIDGE OVER LITTLE PLUM CREEK.
(108C00019N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
567,000
0 777,000 0
10026
Total for SPENCER county PL
Total Amounts:
CN
UT
RW
DN
567,000 1,235,500
857,500
0 1,424,500 1,235,500
TAYLOR KY-555 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVE MOBILITY
AND CONNECTIVITY VIA NEW CAMPBELLSVILLE
BYPASS FROM KY-55 SOUTH OF
CAMPBELLSVILLE TO KY-70. SECTION 1.
(2010BOP)(14CCR)(16CCR)CN
Project Cost:
UT
RW
DN
PL
NH 7,600,000
0 0 7,600,000
142.21
TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY
AND CONNECTIVITY VIA NEW CAMPBELLSVILLE
BYPASS FROM KY-70 TO US-68 EAST OF
CAMPBELLSVILLE. SECTION 2. (2010BOP)
(16CCR)CN
Project Cost:
UT
RW
DN
PL
NH 1,000,000
0 1,000,000 0
142.3
Page 183 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
TAYLOR KY-55 RECONSTRUCTION(O) HEARTLAND PARKWAY: IMPROVE MOBILITY ON
KY-55 FROM SOUTH OF THE TAYLOR/ADAIR
COUNTY LINE TO THE CAMPBELLSVILLE
BYPASS. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
500,000
1,000,000
1,000,000
0 1,500,000 1,000,000
8920
TAYLOR KY-55 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVE MOBILITY ON
KY-55 FROM SOUTH OF THE TAYLOR/ADAIR
COUNTY LINE TO THE CAMPBELLSVILLE
BYPASS. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
NH 7,000,000
0 0 7,000,000
8920.01
TAYLOR KY-323 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST MAIN STREET
BRIDGE OVER BUCKHORN CRK.. (109B00051N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
805,000
0 157,500 805,000
10006
TAYLOR CS-1241 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SOUTH JACKSON ST
BRIDGE OVER BUCKHORN CREEK.
(109C00028N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
105,000
367,500
0 105,000 367,500
10007
Total for TAYLOR county PL
Total Amounts:
CN
UT
RW
DN
16,772,500
262,500
500,000
2,000,000
0 2,762,500 16,772,500
Page 184 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
TODD CR-1333 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RATTLESNAKE RD
BRIDGE OVER BUCK FORK. (110C00059N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
192,500
294,000
0 192,500 294,000
10009
TODD CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROGER Q MILL RD.
BRIDGE OVER RED RIVER W FORK BRANCH.
(110C00061N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
385,000
0 157,500 385,000
10013
TODD US 79 AIR QUALITY(P) US 79 WIDENING FROM MP 0 TO MP 3
CN
Project Cost:
UT
RW
DN
PL
SPP 1,200,000
0 1,200,000 0
80001
Total for TODD county PL
Total Amounts:
CN
UT
RW
DN
679,000
1,550,000
0 1,550,000 679,000
TRIGG CR-1380 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380
(0.014) OVER DYERS CREEK 111C00027N
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
381,500
0 140,000 381,500
1160
Page 185 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
TRIGG I-24 AM-BRIDGE (P) OVERLAY BRIDGE DECK AND ADDRESS
DEFICIENCIES OF EXPANSION JOINTS ON
EASTBOUND I-24 BRIDGE OVER TRW RAILROAD
EAST OF US 68 AT (MP 66.515). (111B00027R)
(2012BOP)(SD)CN
Project Cost:
UT
RW
DN
PL
BR 250,000
250,000 0 0
2039
TRIGG KY-139 REALIGNMENT REALIGN KY 124 APPROACH TO KY 139 TO
IMPROVE INTERSECTION ANGLE AND SIGHT
DISTANCE
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
200,000
150,000
150,000
600,000
0 200,000 900,000
8951
TRIGG KY-139 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-139 BRIDGE
OVER BURGE CREEK. (111B00012N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
997,500
0 280,000 997,500
10005
Total for TRIGG county PL
Total Amounts:
CN
UT
RW
DN
250,000 1,979,000
620,000
150,000
150,000
250,000 620,000 2,279,000
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359
(MP 0.971) OVER LOST CREEK; .95 MI N.E. OF
JCT US-60; 113B00006N (LET W/ 2-1074)
CN
Project Cost:
UT
RW
DN
PL
BR 434,000
434,000 0 0
1073
Page 186 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359
(MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF
JCT US-60; 113B00007N (LET W/ 2-1073)
CN
Project Cost:
UT
RW
DN
PL
BR 511,000
511,000 0 0
1074
UNION US-60 RECONSTRUCTION(O) IMPROVE ROADWAY TO REDUCE FLOODING ON
US-60 FROM EAST OF HOUSE BRIDGE ROAD
(CR-1027) TO UNION/HENDERSON COUNTY LINE.
(16CCN)
CN
Project Cost:
UT
RW
DN
PL
STP 300,000
0 300,000 0
8955
UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-359 BRIDGE
OVER LITTLE MASON CREEK. (113B00008N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
682,500
0 210,000 682,500
10017
UNION KY-492 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 492 BRIDGE
OVER WASH CREEK. (113B00054N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
70,000
350,000
0 70,000 350,000
10026
Total for UNION county PL
Total Amounts:
CN
UT
RW
DN
945,000 1,032,500
580,000
945,000 580,000 1,032,500
Page 187 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WARREN KY-185 RECONSTRUCTION(O) IMPROVE KY-185 FROM NORTH OF THE
JUNCTION WITH KY-263 NEAR RICHARDSVILLE
TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)
(06CCR)(10CCR)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 5,000,000
0 0 5,000,000
110
WARREN KY-526 MINOR WIDENING(O) IMPROVE KY-526 FROM NEAR KY-2630 TO
US-31W. (2014BOP)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
70,000
180,000
160,000
0 250,000 160,000
322
WARREN WN-9007 SIGNING(P) I-65 SPUR CORRIDOR SIGNING; EXISTING
NATCHER PARKWAY FROM I-65 INTERCHANGE
(EXIT 2) IN WARREN CO. EXTENDING NORTH TO
THE US 60 INTERCHANGE IN DAVIESS CO. TO
MEET INTERSTATE STANDARDS. (2016BOP)CN
Project Cost:
UT
RW
DN
PL
NH 2,150,000
0 2,150,000 0
2042.11
WARREN US-231 MAJOR WIDENING(O) IMPROVE US-231 FROM PASCOE BLVD. TO
NORTH OF CAVE MILL ROAD. (12CCN)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
2,500,000
2,600,000
2,500,000 2,600,000 0
8702
WARREN KY-884 NEW ROUTE(O) THREE SPRINGS ROAD EXTENSION FROM
FLEALAND TO THE NATCHER PARKWAY
INCLUDING BRIDGE OVER PARKWAY. (14CCN)
CN
Project Cost:
UT
RW
DN
PL
SPP 4,000,000
0 4,000,000 0
8818
Page 188 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM CAMPBELL LANE
(US-231) TO UNIVERSITY BOULEVARD
(US-231X). (14CCN)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
1,750,000
2,000,000
0 3,750,000 0
8857
WARREN US-31W MINOR WIDENING(O) WIDEN US-31W FROM PARK AVE. TO FAIRVIEW
AVE MP 13.7-14.25
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
500,000
1,500,000
1,750,000
0 500,000 3,250,000
8904.1
WARREN US-31 RECONSTRUCTION(O) IMPROVE MOBILITY AND REDUCE CONGESTION
ON US-31W FROM US-68 TO MIZPAH. (16CCN)
CN
Project Cost:
UT
RW
DN
PL
STP
STP
STP
800,000
900,000
400,000
0 0 2,100,000
8905
WARREN KY-2632 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HAMMET HILL ROAD
BRIDGE OVER SALT LICK CREEK. (114B00071N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
157,500
350,000
0 157,500 350,000
10014
WARREN KY-1435 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1435 BRIDGE
OVER GASPER RIVER. (114B00074N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
280,000
1,172,500
0 280,000 1,172,500
10015
Page 189 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WARREN I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH
DIRECTION(S) FROM MILEPOINT 35.616 TO
MILEPOINT 42.89
CN
Project Cost:
UT
RW
DN
PL
PM
PM
870,000
8,700,000
0 9,570,000 0
20017
WARREN WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.
NATCHER PARKWAY BOTH DIRECTION(S) FROM
MILEPOINT 0 TO MILEPOINT 2.473
CN
Project Cost:
UT
RW
DN
PL
PM
PM
200,000
2,000,000
0 200,000 2,000,000
20018
WARREN WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.
NATCHER PARKWAY BOTH DIRECTION(S) FROM
MILEPOINT 9.2 TO MILEPOINT 20.246
CN
Project Cost:
UT
RW
DN
PL
PM 11,083,000
0 0 11,083,000
20019
WARREN US-68 NEW ROUTE(O) SOUTHWEST PARKWAY - NEW CONSTRUCTION
FROM US-68 TO A CONNECTION AT KOBE WAY
IN BOWLING GREEN
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
200,000
280,000
200,000
3,870,000
0 4,550,000 0
80000
WARREN KY 242 AIR QUALITY(P) ADD LEFT TURNING LANE ON KY 242 INTO
RICHPOND ELEMENTARY SCHOOL AT MP 3.8 TO
3.95
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
50,000
125,000
250,000
200,000
0 50,000 575,000
80005
Page 190 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WARREN KY-3225 SAFETY(P) SAFETY IMPROVEMENTS AND REHABILITATION
ON KY-3225. KEEP EXISTING FOOTPRINT BY
REPLACING CURBLINE IN SAME LOCATION FROM
MP 0 TO MP 1
CN
Project Cost:
UT
RW
DN
PL
SPP 200,000
0 0 200,000
80051
Total for WARREN county PL
Total Amounts:
CN
UT
RW
DN
17,320,000 19,965,500
2,257,500 1,000,000
6,100,000 2,525,000
2,500,000 2,380,000 2,400,000
2,500,000 28,057,500 25,890,500
WASHINGTON US-150 RECONSTRUCTION(O) IMPROVE US-150 FROM SPRINGFIELD TO
BARDSTOWN.
CN
Project Cost:
UT
RW
DN
PL
STP 3,000,000
0 0 3,000,000
396
WASHINGTON KY-528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 528
(MP 1.437) OVER ROAD RUN BRANCH.
(115B00043N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
1,302,000
0 175,000 1,302,000
1094
WASHINGTON CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON
TEXAS-MACKVILLE ROAD (CR 1140) AT MP
0.349 OVER LONG LICK CREEK.(115C00039)
(16CCN)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 175,000
0 0 175,000
8957
Page 191 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WASHINGTON US-150 SAFETY(P) ADDRESS SAFETY, MOBILITY, AND GEOMETRIC
ISSUES ALONG US 150 IN WASHINGTON
COUNTY FROM 400 FEET WEST OF OLD
FREDERICKTOWN-BARDSTOWN ROAD (KY
1872) TO 0.7 MILES EAST OF GRUNDY HOME CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
700,000
900,000
0 700,000 900,000
8958
WASHINGTON KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER
SEIBERT CREEK. (115B00026N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
87,500
511,000
0 87,500 511,000
10008
WASHINGTON KY-1920 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1920 BRIDGE
OVER DEEP CREEK. (115B00061N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
87,500
262,500
0 87,500 262,500
10015
Total for WASHINGTON county PL
Total Amounts:
CN
UT
RW
DN
2,250,500
1,050,000 3,000,000
900,000
0 1,050,000 6,150,500
WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD
TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 4,220,000
0 0 4,220,000
109.1
Page 192 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WAYNE CR-1136 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136
(MP 0.225) OVER LITTLE SOUTH FORK RIVER;
0.25 MI SE OF JCT CR-5137; 116C00007N
CN
Project Cost:
UT
RW
DN
PL
BR 455,000
0 455,000 0
1050
WAYNE CR-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DODSON HOLLOW
RD BRIDGE OVER MEADOW CREEK.
(116C00028N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
466,000
0 175,000 466,000
10005
WAYNE KY-92 PLANNING-OKI(O) PRELIMINARY ENGINEERING AND
ENVIRONMENTAL CORRIDOR STUDY FOR
IMPROVING SAFETY AND MAKING KY-92 A
SCENIC ROUTE FROM MONTICELLO TO STEARNS
(FLEXIBLE SOLUTIONS)CN
Project Cost:
UT
RW
DN
PL SPP 1,500,000
0 0 1,500,000
80004
WAYNE KY 1275 AIR QUALITY(P) IMPROVE CURVE ON KY 1275 AT KY
833/ROGERS GROVE ROAD AND RESURFACE
FROM KY 1275 FROM BELL LANE TO KY
833/ROGERS GROVE ROAD
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
SPP
60,000
3,500
60,000
200,000
0 123,500 200,000
80005
WAYNE KY 1275 AIR QUALITY(P) WIDEN KY 1275 TO FOUR LANES WITH FOUR
FOOT SHOULDERS AND FIVE FOOT SIDEWALKS
FROM KY 90 TO BELL LANE
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
490,000
200,000
500,000
0 490,000 700,000
80006
Page 193 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Total for WAYNE county PL
Total Amounts:
CN
UT
RW
DN
455,000 4,886,000
725,000
1,500,000
3,500 200,000
60,000 500,000
0 1,243,500 7,086,000
WEBSTER KY-138 RECONSTRUCTION(O) RECONSTRUCT BETWEEN KY 120 AND RR
BRIDGE AT SLAUGHTERS TO ALLEVIATE
FLOODING. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP
SPP
SPP
100,000
250,000
1,200,000
0 350,000 1,200,000
228
WEBSTER KY-1835 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1835 BRIDGE
OVER SUGAR CAMP CREEK. (117B00023N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
210,000
665,000
0 210,000 665,000
10018
WEBSTER KY-132 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-132 BRIDGE
OVER NALL DITCH. (117B00064N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,102,500
0 245,000 1,102,500
10019
Total for WEBSTER county PL
Total Amounts:
CN
UT
RW
DN
2,967,500
455,000
100,000
250,000
0 805,000 2,967,500
Page 194 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WHITLEY I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8
LANES FROM MP 20.2 IN WHITLEY COUNTY TO
MP 28.85, US-25E NORTH OF CORBIN
(C-COST=$87,500,000)
CN
Project Cost:
UT
RW
DN
PL
NH
NH
NH
500,000
500,000
10,000,000
0 1,000,000 10,000,000
14.8
WHITLEY KY-92 RELOCATION(O) RECONSTRUCT KY-92 FROM 500 FT WEST OF
THE WHITLEY/MCCREARY COUNTY LINE TO
1200 FT EAST OF OLD JELLICO CREEK ROAD.
(SECTION 1)(14CCR)
CN
Project Cost:
UT
RW
DN
PL
STP 10,000,000
0 10,000,000 0
184.1
WHITLEY I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER
LYNN CAMP CREEK (SR 34.1) (B00063R AND
B00063L)(SD)
CN
Project Cost:
UT
RW
DN
PL
BR 2,800,000
2,800,000 0 0
1105
WHITLEY KY-904 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-904 BRIDGE
OVER TYES FK OF BENNETTS BR. (118B00070N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
493,500
0 175,000 493,500
10032
WHITLEY KY-779 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-779 BRIDGE
OVER BROWNS CREEK. (118B00079N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
448,000
0 175,000 448,000
10033
Page 195 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WHITLEY KY-204 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-204 BRIDGE
OVER YOUNGS CREEK. (118B00084N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
262,500
910,000
0 262,500 910,000
10034
WHITLEY KY-2996 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2996 BRIDGE
OVER WOLF CREEK. (118B00101N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
455,000
0 175,000 455,000
10035
WHITLEY CR-1275 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BETHEL ROAD
BRIDGE OVER PATTERSON CREEK.
(118C00029N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
140,000
315,000
0 140,000 315,000
10036
WHITLEY CR-1461 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE
OVER SANDERS CREEK. (118C00039N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
406,000
0 175,000 406,000
10037
WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE
OVER CLEAR FORK RVR. (118B00041N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,890,000
0 245,000 1,890,000
10044
Page 196 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE
OVER CLEAR FORK RIVER. (118B00042N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
245,000
1,645,000
0 245,000 1,645,000
10045
WHITLEY I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH
DIRECTION(S) FROM MILEPOINT 23.0 (25.26
NON-CARDINAL) TO MILEPOINT 28.872
CN
Project Cost:
UT
RW
DN
PL
PM
PM
340,000
3,400,000
0 3,740,000 0
20019
WHITLEY KY 204 AIR QUALITY(P) INSTALL GUARDRAIL ON KY 204 BETWEEN MP
10.7 AND 10.8
CN
Project Cost:
UT
RW
DN
PL
SPP 15,000
0 15,000 0
80001
Total for WHITLEY county PL
Total Amounts:
CN
UT
RW
DN
2,800,000 13,415,000 16,562,500
1,932,500
500,000
500,000
2,800,000 16,347,500 16,562,500
WOLFE KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-191 BRIDGE
OVER LACEY CREEK. (119B00001N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
150,000
564,000
0 150,000 564,000
10009
Page 197 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WOLFE KY-2491 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2491 BRIDGE
OVER SWANGO FORK. (119B00058N)
CN
Project Cost:
UT
RW
DN
PL
BR
BR
175,000
525,000
0 175,000 525,000
10019
WOLFE KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.
COMBS MOUNTAIN PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 55.434 TO
MILEPOINT 57.72
CN
Project Cost:
UT
RW
DN
PL
PM
PM
90,000
900,000
0 990,000 0
20012
Total for WOLFE county PL
Total Amounts:
CN
UT
RW
DN
900,000 1,089,000
415,000
0 1,315,000 1,089,000
WOODFORD CR-1015 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE WEISENBURG
MILL ROAD BRIDGE AT THE WOODFORD/SCOTT
COUNTY LINE. (10CCN)(120C00006N)
CN
Project Cost:
UT
RW
DN
PL
BR 966,000
0 0 966,000
8642
WOODFORD US-60 CONGESTION MITIGTN(O) ACCESS MANAGEMENT IMPROVEMENTS ON US
60 FROM LEXINGTON ROAD AT WOODFORD
FEED TO MARSAILLES DRIVE (MP 9.38 TO MP
9.70)
CN
Project Cost:
UT
RW
DN
PL
SPP 400,000
0 0 400,000
8905
Page 198 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
WOODFORD BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA
LAYNE COLLINS BLUEGRASS PARKWAY BOTH
DIRECTION(S) FROM MILEPOINT 61.95 (62.05
NON-CARDINAL) TO MILEPOINT 70.70 (70.91
NON-CARDINAL)CN
Project Cost:
UT
RW
DN
PL
PM
PM
700,000
7,000,000
0 7,700,000 0
20022
WOODFORD US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC
PAVEMENT
CN
Project Cost:
UT
RW
DN
PL
PM
PM
350,000
3,500,000
0 0 3,850,000
20023
Total for WOODFORD county PL
Total Amounts:
CN
UT
RW
DN
7,000,000 4,466,000
700,000 750,000
0 7,700,000 5,216,000
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY
2018. (2009BOPP)
CN
Project Cost:
UT
RW
DN
PL
BR 2,000,000
2,000,000 0 0
65.15
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY
2019.
CN
Project Cost:
UT
RW
DN
PL
BR 2,000,000
0 2,000,000 0
65.16
Page 199 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY
2020.
CN
Project Cost:
UT
RW
DN
PL
BR 2,000,000
0 0 2,000,000
65.17
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN
KENTUCKY FOR FY 2018.
CN
Project Cost:
UT
RW
DN
PL
NH 2,000,000
2,000,000 0 0
66.13
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN
KENTUCKY FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
NH 2,000,000
0 2,000,000 0
66.14
ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN
KENTUCKY FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
NH 2,000,000
0 0 2,000,000
66.15
ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT
FOR FY 2018. (98CCR)
CN
Project Cost:
UT
RW
DN
PL
TE 12,800,000
12,800,000 0 0
195.14
Page 200 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT
FOR FY 2019. (98CCR)
CN
Project Cost:
UT
RW
DN
PL
TE 13,700,000
0 13,700,000 0
195.15
ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT
FOR FY 2020 (98CCR)
CN
Project Cost:
UT
RW
DN
PL
TE 13,700,000
0 0 13,700,000
195.16
ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ
FUNDED PROJECTS FOR FY 2018.
CN
Project Cost:
UT
RW
DN
PL
CM 13,100,000
13,100,000 0 0
219.16
ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ
FUNDED PROJECTS FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
CM 13,100,000
0 13,100,000 0
219.17
ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ
FUNDED PROJECTS FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
CM 13,100,000
0 0 13,100,000
219.18
Page 201 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT REHAB ON STATE (NON RS) SYSTEM
ROUTES IN KENTUCKY FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 2,000,000 0
224.13
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2018.
CN
Project Cost:
UT
RW
DN
PL
BR 2,600,000
2,600,000 0 0
327.14
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 2,600,000
0 2,600,000 0
327.15
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
BR 2,600,000
0 0 2,600,000
327.16
ZVARIOUS -0 AM-PAVEMENT (INT)(P) STATEWIDE I-STATE ROUTES FOR FY 2019.
(14CCR)
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 2,000,000 0
337.14
Page 202 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION
FOR FY 2018
CN
Project Cost:
UT
RW
DN
PL
BR 1,100,000
1,100,000 0 0
346.14
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION
FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 1,100,000
0 1,100,000 0
346.15
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION
FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
BR 1,100,000
0 0 1,100,000
346.16
ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR
FY 2018.
CN
Project Cost:
UT
RW
DN
PL
RRP 3,600,000
3,600,000 0 0
352.14
ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR
FY 2019.
CN
Project Cost:
UT
RW
DN
PL
RRP 3,600,000
0 3,600,000 0
352.15
Page 203 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR
FY 2020.
CN
Project Cost:
UT
RW
DN
PL
RRP 3,600,000
0 0 3,600,000
352.16
ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT REHABILITATION FOR VARIOUS NHS
ROUTES IN KENTUCKY FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 2,000,000 0
369.09
ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR
FY 2018. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
BR 1,600,000
1,600,000 0 0
388.08
ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR
FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 1,600,000
0 1,600,000 0
388.09
ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR
FY 2020.
CN
Project Cost:
UT
RW
DN
PL
BR 1,600,000
0 0 1,600,000
388.1
Page 204 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 DESIGN ENGINEERING(O) STATEWIDE STP HIGHWAY PROJECT ACTIVITIES.
CN
Project Cost:
UT
RW
DN
PL
STP 2,000,000
0 2,000,000 0
391.04
ZVARIOUS -0 AM-PAVEMENT (INT)(P) PAVEMENT REPAIR AT INTERSECTIONS FOR
VARIOUS ROADWAYS FOR FY 2019.(12CCR)
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 2,000,000 0
395.07
ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR
BRIDGES OVER MAJOR STREAMS AND
WATERWAYS FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 1,000,000 0
400.06
ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR
EXISTING BRIDGES(CANNOT BE MOVED).
CN
Project Cost:
UT
RW
DN
PL
BR 3,500,000
0 3,500,000 0
510.03
ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR
EMBANKMENT STABILIZATION FOR FY 2018.
CN
Project Cost:
UT
RW
DN
PL
STP 5,000,000
5,000,000 0 0
511.02
Page 205 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR
EMBANKMENT STABILIZATION FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
STP 2,000,000
0 2,000,000 0
511.03
ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR
EMBANKMENT STABILIZATION FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
STP 1,000,000
0 0 1,000,000
511.04
ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE
STRUCTURES FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 3,000,000
0 3,000,000 0
514
ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCKFALL OR
EMBANKMENT STABILIZATION ON NH ROUTES
FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
NH 6,000,000
0 6,000,000 0
518
ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCKFALL OR
EMBANKMENT STABILIZATION ON NH ROUTES
FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
NH 1,000,000
0 0 1,000,000
518.01
Page 206 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 SAFETY-HAZARD ELIM(P) STATEWIDE SAFETY PROGRAM FOR FY 2019.
(HSIP)
CN
Project Cost:
UT
RW
DN
PL
SAF 38,500,000
0 38,500,000 0
911.08
ZVARIOUS -0 SAFETY-HAZARD ELIM(P) STATEWIDE SAFETY PROGRAM FOR FY 2020.
(HSIP)
CN
Project Cost:
UT
RW
DN
PL
SAF 38,500,000
0 0 38,500,000
911.09
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION
FOR FY 2018
CN
Project Cost:
UT
RW
DN
PL
BR 500,000
500,000 0 0
1063.14
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION
FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 500,000
0 500,000 0
1063.15
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION
FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
BR 500,000
0 0 500,000
1063.16
Page 207 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR
COUNTER-MEASURES FOR STATE-MAINTAINED
BRIDGES FOR FY 2018.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,500,000
1,500,000 0 0
1071.06
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR
COUNTER-MEASURES FOR STATE-MAINTAINED
BRIDGES FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,500,000
0 1,500,000 0
1071.07
ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR
COUNTER-MEASURES FOR STATE-MAINTAINED
BRIDGES FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,500,000
0 0 1,500,000
1071.08
ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM
FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
BR 3,000,000
0 3,000,000 0
1074.07
ZVARIOUS -0 ECONOMIC DEVEL(O) ECONOMIC DEVELOPMENT TRANSPORTATION
IMPROVEMENT FACILITIES.
CN
Project Cost:
UT
RW
DN
PL
SPP 1,000,000
0 0 1,000,000
1084
Page 208 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT PREVENTATIVE MAINTENANCE
PROGRAM FOR FY 2019.
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 2,000,000 0
2700.13
ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT PREVENTATIVE MAINTENANCE
PROGRAM FOR FY 2020.
CN
Project Cost:
UT
RW
DN
PL
PM 2,000,000
0 0 2,000,000
2700.14
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA)
TRANSITION PLAN IMPLEMENTATION PROJECTS.
CN
Project Cost:
UT
RW
DN
PL
STP 1,000,000
0 1,000,000 0
3011
ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA)
TRANSITION PLAN IMPLEMENTATION PROJECTS.
CN
Project Cost:
UT
RW
DN
PL
STP 1,000,000
0 0 1,000,000
3011.01
ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)
(12CCR)
CN
Project Cost:
UT
RW
DN
PL
SPP 4,700,000
0 4,700,000 0
8500.15
Page 209 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75;
AND I-64 FOR FY 2018. (JM03-FD53 "IM"
COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
NH 44,500,000
44,500,000 0 0
9050.08
ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75;
AND I-64 FOR FY 2019. (JM03-FD53 "IM"
COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
NH 44,500,000
0 44,500,000 0
9050.1
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (NH) FOR
FY 2018. (079B00023N, 111B00020N)
CN
Project Cost:
UT
RW
DN
PL
NH 9,100,000
9,100,000 0 0
9068.03
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (NH) FOR
FY 2019. (079B00023N, 111B00020N)
CN
Project Cost:
UT
RW
DN
PL
NH 9,100,000
0 9,100,000 0
9068.05
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (NH) FOR
FY 2020. (12CCR)
CN
Project Cost:
UT
RW
DN
PL
NH 9,100,000
0 0 9,100,000
9068.61
Page 210 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (STP) FOR
FY 2018.
CN
Project Cost:
UT
RW
DN
PL
STP 9,100,000
9,100,000 0 0
9068.64
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (STP) FOR
FY 2019.
CN
Project Cost:
UT
RW
DN
PL
STP 9,100,000
0 9,100,000 0
9068.65
ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY
LAKE GARVEE BOND DEBT SERVICE (STP) FOR
FY 2020.
CN
Project Cost:
UT
RW
DN
PL
STP 9,100,000
0 0 9,100,000
9068.66
ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE
BRIDGES PROJECT FOR FY 2018. (JZ1-FD53
"NH" COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
NH 34,300,000
34,300,000 0 0
9659.18
ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE
BRIDGES PROJECT FOR FY 2019. (JZ1-FD53
"NH" COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
NH 34,300,000
0 34,300,000 0
9659.21
Page 211 of 214
County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE
BRIDGES PROJECT FOR FY 2020. (JZ1-FD53
"NH" COMPONENT)
CN
Project Cost:
UT
RW
DN
PL
NH 62,800,000
0 0 62,800,000
9659.23
Total for ZVARIOUS county PL
Total Amounts:
CN
UT
RW
DN
142,800,000 211,400,000 167,200,000
2,000,000
142,800,000 213,400,000 167,200,000
Page 212 of 214
Biennium Fund SummaryDescriptionFund FY 2019 FY 2020 Total
BR FEDERAL BRIDGE REPLACEMENT 178,066,500 315,800,085 493,866,585
BR2 BRAC BOND PROJECTS SECOND PROGRAM 4,950,000 14,500,000 19,450,000
CM FEDERAL CONGESTION MITIGATION FUNDS 13,100,000 13,100,000 26,200,000
NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 247,370,000 226,060,000 473,430,000
PM PAVEMENT MANAGEMENT 180,456,000 176,043,000 356,499,000
RRP SAFETY-RAILROAD PROTECTION 3,600,000 3,600,000 7,200,000
RRS SAFETY-RAILROAD SEPARATION 0 3,100,000 3,100,000
SAF FEDERAL SAFETY FUNDS 38,500,000 38,500,000 77,000,000
SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND 1,724,000 1,200,000 2,924,000
SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON 1,800,000 700,000 2,500,000
SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 53,511,745 15,311,854 68,823,599
SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON 21,656,000 8,956,000 30,612,000
SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 27,157,409 13,757,200 40,914,609
SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS 123,907,800 162,970,400 286,878,200
STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 94,460,000 85,840,000 180,300,000
TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 14,900,000 13,700,000 28,600,000
Total Amount 1,005,159,454 1,093,138,539 2,098,297,993
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Page 213 of 214
Fund Summary
2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN
Fund Description FY 2018 FY 2019 FY 2020 Total 54,023,500 178,066,500 315,800,085 547,890,085BR FEDERAL BRIDGE REPLACEMENT
0 4,950,000 14,500,000 19,450,000BR2 BRAC BOND PROJECTS SECOND PROGRAM
13,100,000 13,100,000 13,100,000 39,300,000CM FEDERAL CONGESTION MITIGATION FUNDS
8,100,000 0 0 8,100,000FH FEDERAL FOREST HIGHWAY FUNDS
9,924,170 0 0 9,924,170HPP HIGH PRIORITY PROJECTS
1,771,005 0 0 1,771,005KYD FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY
235,170,000 247,370,000 226,060,000 708,600,000NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS
0 180,456,000 176,043,000 356,499,000PM PAVEMENT MANAGEMENT
3,600,000 3,600,000 3,600,000 10,800,000RRP SAFETY-RAILROAD PROTECTION
0 0 3,100,000 3,100,000RRS SAFETY-RAILROAD SEPARATION
0 38,500,000 38,500,000 77,000,000SAF FEDERAL SAFETY FUNDS
6,867,000 1,724,000 1,200,000 9,791,000SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND
3,460,000 1,800,000 700,000 5,960,000SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON
65,396,815 53,511,745 15,311,854 134,220,414SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE
16,367,000 21,656,000 8,956,000 46,979,000SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON
57,934,140 27,157,409 13,757,200 98,848,749SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY
54,210,000 123,907,800 162,970,400 341,088,200SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS
42,780,000 94,460,000 85,840,000 223,080,000STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS
12,800,000 14,900,000 13,700,000 41,400,000TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS
Totals 585,503,630 1,005,159,454 1,093,138,539 2,683,801,623
Page 214 of 214