Minutes of 35th SOAP Meeting held on 28.11.2017 Page 1

SSLLDDCC

MMIINNUUTTEESS OOFF 3355tthh

MMEEEETTIINNGG OOFF SSOOAAPP

HHEELLDD OONN 2288..1111..22001177

Page 2: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2

Minutes of 35th

meeting of Sub Committee for Operation and Protection (SOAP)

held at SLDC, Raipur on 28.11.2017

The 35th

meeting of Chhattisgarh State Operation and Protection Sub

Committee of SGCC was held on 28th

November 2017 at SLDC Conference

Hall. The list of participants is enclosed in Annexure-I.

Shri B.R.Soni, Chief Engineer welcomed all the participants of 35th

SOAP meeting.

Confirmation of minutes

No comments have been received from any office. Therefore

minutes of 34th

SOAP meeting is hereby confirmed.

Sub Committee agreed and noted.

Item no. 1 Review of system operation during the month of November 2017:

Presentation and the performance of Thermal Stations and

Transmission System by SLDC, is enclosed in Annexure-II.

Sub Committee noted.

Item no. 2 State Energy Account (SEA) Data:

It is requested to the O/o CE(S/s:O&M) CSPTCL and O/o CE

(RA&PM) CSPDCL to submit the required data by 25th of every

month for the calculation of Transmission Loss and the same can be

discussed during the meeting. The data for the month of October 17

was received on 28th and after the meeting as such the loss of oct17

could not be calculated & discussed in the meeting.

As regard the revised Transmission loss for Mar17, SE (S/s:O&M)

has confirmed that the data of their end has been again verified &

found in order.

Item no. 3 Outage planning for the month of January 2018 & February 2018:

Outage planning of Transmission feeders, Power transformers for

the month January 2018 & February 2018, submitted by O/o CE

(S/s: O&M) is enclosed in Annexure III.

Page 3: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Minutes of 35th SOAP Meeting held on 28.11.2017 Page 3

The members of the committee were apprised that

RLDC has exempted the following transmission elements of

Chhattisgarh state for shutdowns in OCCM but WRLDC needs to

be intimated before the shut down.

S.No Voltage Level Transmission Element

1 400 KV 315 MVA, ICT at 400 KV S/s Marwa.

2 400 KV 315 MVA ICT-I at 400 KV S/s Raita

3 400 KV 315 MVA ICT-II at 400 KV S/s Raita

4 220 KV 220 KV Khedamara-BSP – I at 400 KV S/s

Khedamara.

5 220 KV 220 KV Khedamara-BSP – II at 400 KV S/s

Khedamara.

Sub Committee agreed and noted.

Item no.4. Status of FGMO { Free Governor Mode Operation } in thermal

units as on 28.11.2017:

The FGMO of unit no.3 of KWB is out from a long time. The

necessary action being taken by the authorities of KWB shall be

appraised in next meeting.

SE(ET&I) Marwa TPS has confirmed that RGMO in both units has

been put in service.

For providing signal for Monitoring of Restricted Governor Mode

Operation (RGMO) at SLDC for ensuring grid security and proper

operational guide lines by concerned grid operators, no reply has been

received from any of the stations. In Marwa TPS, their representative

has intimated that this information can be provided to SLDC in OPC

protocol. SLDC has expressed their inability to accept signal in this

format as SLDC SCADA system accepts only in IEC 870-5-101 or IEC

870-5-104 only. However the was discussed with WRLDC and other

Page 4: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Minutes of 35th SOAP Meeting held on 28.11.2017 Page 4

generators of NTPC and IPPs. They have extended the RGMO/FGMO

contact/signal from the C&I panel to any of BCUs spare contacts, This

way the signal can be extended to SLDC. Similarly for Generator unit

generation MW/MVAR can be fetched from energy meters over

MODBUS protocol to the gateway DS400 already working.

Other stations of CSPGCL are also requested to come out with their

plans for extending signal of RGMO/FGMO to SLDC without much

delay.

RGMO/FGMO response for 4 events has to be

submitted for CG State generator. The same was forwarded to the

representatives of respective stations on dated 17.11.2017.on

22.11.2017, pictures from DSPM stations have been received but from

these pictures the exact amount of relief cannot be ascertained. All

stations are requested to submit the Load Vs Freq in excel sheet with

minimum resolution of 1-Min or less.

ACTION: ED (O&M: Gen), CSPGCL Raipur, ED (Gen) DSPMTPS

CSPGCL Korba & CE (Gen) HTPS CSPGCL Korba. CE (Gen) MTTPS

CSPGCL Marwa

Item no. 5. Status of AUFLS {Automatic Under Frequency Load Shedding} and

df/dt relays as on 28.11.2017:

The present availability of relays for AUFLS needs to be certified

by one circle for others. E.g, Bhilai circle will certify the relays in

Raipur circle, Raipur circle will certify the relays of Bilaspur circle

and similarly Bilaspur circle will certify the relays of Bhilai circle.

The certificate from Bilaspur circle has only been submitted.

Certificates from Raipur and Bhilai circle are still pending.

In the meeting it was decided that if due to any reason, certification

of inter circle is not possible then certificate for own circle can be

submitted.

CSPDCL will have to provide the telemetry of 33 KV/11 KV

feeders at their stations.

Sub Committee noted.

ACTION: CE (S/s: O&M), CSPTCL

Page 5: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Minutes of 35th SOAP Meeting held on 28.11.2017 Page 5

Item no.6. Details of new transmission lines, transformer or any other

transmission elements to be charged in January 2018 & February

2018:

The representative from O/o CE (S/s: O&M) has intimated that an

additional transformer of 160 MVA at 220 KV S/s Bishrampur in

January 2018.

Sub Committee noted.

Item no.7. Status of Protection Audit report:

It was requested to the O/o C.E. (S/s: O&M), CSPTCL, Raipur, O/o

ED (O&M: Gen), CSPGCL, Raipur, O/o ED (Gen) DSPMTPS,

CSPGCL, Korba East, O/o CE (Gen),CSPGCL, Korba East for the

timely submission of compliance of Protection Audit

Deficiencies/Observations.

It was also decided in the meeting to conduct

protection audit at 400 KV S/s Marwa in last week of December

2017 with a group consisting of following :-

1. M.L Prajapati EE(Testing) O/o CE(Gen) Korba East,CSPGCL

2. Manish Banchor EE(MRT) O/o SE (S/s: O&M) Bilaspur,

CSPTCL

3. A representative from NTPC KSTPS

Miscellaneous : EE(Raita)400 KV S/s has reported

1. High loss in 400 KV Marwa- Raita lines due to problem

suspected in CVT at Marwa. This issue needs to be resolved

by CE(Gen) MTTPS Marwa.

2. Auto reclosing of 400 KV Raita-Marwa not operated .

Date & Venue of next meeting :

The 36th

SOAP meeting is proposed to be held on 28th December

2017 (Thursday) at SLDC Raipur. The time of meeting will be

from 12:00 hrs sharp.

*******

Page 6: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Annexure-I

S.No. Participants Designation Office Name Mobile No E-mail ID

1 Shri.Balram Soni CE O/o CE(SLDC), CSPTCL 9425188807 [email protected]

2 Shri.D.K.Khicharya SE(MO) O/o CE(SLDC), CSPTCL 9827117925 [email protected]

3 Shri.S.K.Tiwari SE(SO) O/o CE(SLDC), CSPTCL 9827117925 ……..

4 Shri H.K Deota SE (Backup LD) O/o CE(SLDC), CSPTCL 9893150920 [email protected]

5 Shri.J.K.Vaidya SE O/o ED(O&M), CSPGCL 9425382836 [email protected]

6 Shri.G.P.Rai SE (ET&C) O/o CE(Gen),MTTPS, CSPGCL 9425227905 [email protected]

7 Shri.G.K.Mandavi SE O/o CE(S/s:O&M), CSPTCL [email protected] ,

[email protected] ,

8 Shri.Y.K.Rao EE O/o CE(SLDC), CSPTCL 9826518820 [email protected]

9 Shri.U.M Gulechha EE O/o CE(SLDC), CSPTCL 9406260965 [email protected]

10 Shri.Shashank Dhabre EE O/o ED(O&M:),CSPGCL 9329296556 [email protected]

11 Shri.Ashish Roy EE O/o EE(400 KV S/s Raita), CSPTCL 8435177900 [email protected]

12 Shri.V.P.Kaushal EE O/o CE(RA&PM),CSPDCL 7000778452 [email protected]

13 Shri.K.K.Shrivastav AE O/o CE(RA&PM),CSPDCL 9425580094 [email protected]

14 Shri.G.P.Singh AE O/o CE(SLDC), CSPTCL [email protected] ,

[email protected]

15 Shri.Santosh Soni AE O/o SE (ET&I),DSPTPS 9630605901 [email protected]

16 Ms.Pratibha Khunte AE O/o CE(SLDC), CSPTCL 8305447363 [email protected]

17 Ms. Juvena Gomes AE O/o SE(Back-up SLDC), CSPTCL 9827495849 [email protected]

18 Ms. Namita Vibha Lakra AE O/o CE(SLDC), CSPTCL 9406122692 [email protected]

List of participants attended the 35th SOAP (Sub-committee of Operation & Protection) Meeting.

Page 7: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

1

Agenda-1:

Review of system operation during

the month of October 2017, by

SLDC.

Page 8: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

2

1.1 Performance of CSPGCL THERMAL & HYDEL Power Plant :

Generation (in MU)PLANT AVAILABILITY FACTOR

PAF (in %)

PLANT LOAD

FACTOR PLF

(in %)

Gener

atorCapacity OCT-17

Prog.

from

Apr-17

Gross

Gen.

Target*

OCT-

17

Prog.

from

Apr-17

Normative

Target *OCT-17

Prog.

from

Apr-

17

KTPS440 MW

{4X50 +

2X120}173.10 1058.72 2325.00 52.66 45.73

60%- PH2

70%- PH352.88 46.85

DSPM500 MW

{2X250}356.38 2325.05 3723.00 97.77 94.02 85.00 95.80 90.54

HTPS 840 MW

{4X210}395.92 3148.33 6107.47 62.34 75.55 83.00 63.35 72.98

KWB

Extn500 MW

{1X500}306.12 2346.96 3723.00 81.54 91.71 85.00 82.29 91.39

MTPP500 MW

{2X500}416.48 3060.84 --- 55.29 59.94 --- 55.97 59.59

Thermal 3280 MW 1648.0 11939.91 --- --- --- --- 67.53 70.87

Bango

HPS120 MW

{3X40}30.98 162.84 274 --- --- --- --- ---

1.2 Performance of CSPGCL

Generating

StationCapacity

Auxiliary Consumption (in %) No. of Forced Outage

OCT-17Progressive

from Apr-17

Target*OCT-17

Progressive

from Apr-17

KTPS440 MW {4X50 + 2X120}

12.70 13.88 11.25 4 62

DSPM500 MW {2X250} 8.11 7.98 9.00 0 7

HTPS840 MW {4X210} 10.81 10.08 9.70 4 35

KWB

Extn.500 MW {1X500} 4.81 4.48 5.25 1 4

MTPP500 MW {2X500} 8.11 7.20 5.25 4 23

Thermal 3280 MW 8.63 8.12 --- 13 131

Bango120 MW {3X40} 0.26 0.25

1.00--- ---

Page 9: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

3

1.3 Frequency ParticularsFrequency status during Sep-17, Oct-17and Oct-16 (As per WRLDC)

Other Frequency parameters during the month of October- 2017.

Frequency Status SEP-17 OCT-17 OCT-16

% of time % of time % of time

Between

49.90 & 50.05 Hz78.50 77.18 74.78

< 49.90 Hz 11.77 13.61 5.43

> 50.05 Hz 9.73 9.21 19.80

Frequency Status Frequency {Hz} Time

{ h:mm}

Date

Average Freq. 49.97 -- --

Max Instantaneous Freq.50.20 13:03:30 11.10.2017

Min Instantaneous Freq.49.65 18:10:20 13.10.2017

1.4 Demand Pattern.

SEP-17 OCT-17 OCT-16% Change

compared to

previous year

Max. Demand Met

4093 MW

26-09-2017

18:30

3832 MW

13-10-2017

19:00

3436 MW

05-10-16

19:00

12%

Max. Unrestricted

Demand at the

time of Max.

Demand Met

4139 MW 3910 MW 3431 MW 14%

Min. Demand Met2460 MW

20-09-2017

14:00

2274 MW

28-10-2017

12:45

2009 MW

31-10-16

14:00

13%

Max. Unrestricted

Demand

4318 MW

26-09-2017

18:45

3910 MW

13-10-2017

19:00

3431 MW

05-10-16

19:00

14%

Page 10: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

4

2700

2800

2900

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

4000

4100

4200

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

MW

Date

Daily Max Demand met in the month of Sep-17, Oct-17 & Oct-16.

MAX 3832 MW on 13.10.2016 at 19:00 hrs.

Average increase of 12 % compared to last year.

Sep-2017

Oct-2016

Oct-2017

4093 MW on 26.09.17 at 18:30 hrs

3436 MW on

05.10.16 at 19 hrs

3832 MW on 13.10.17 at 19:00 hrs

2200

2400

2600

2800

3000

3200

3400

3600

3800

4000

MW

Date

Daywise Min and Max Demand met in the month of OCT-17,

[ Difference : Max 1240 MW on 28 Oct 17 & Min 481 MW on 1 Oct17 ]

481

MW 1240 MW

Page 11: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

5

3000

3100

3200

3300

3400

3500

3600

3700

3800

3900

40001-

Oct

-17

2-O

ct-1

7

3-O

ct-1

7

4-O

ct-1

7

5-O

ct-1

7

6-O

ct-1

7

7-O

ct-1

7

8-O

ct-1

7

9-O

ct-1

7

10-O

ct-1

7

11-O

ct-1

7

12-O

ct-1

7

13-O

ct-1

7

14-O

ct-1

7

15-O

ct-1

7

16-O

ct-1

7

17-O

ct-1

7

18-O

ct-1

7

19-O

ct-1

7

20-O

ct-1

7

21-O

ct-1

7

22-O

ct-1

7

23-O

ct-1

7

24-O

ct-1

7

25-O

ct-1

7

26-O

ct-1

7

27-O

ct-1

7

28-O

ct-1

7

29-O

ct-1

7

30-O

ct-1

7

31-O

ct-1

7

Daily Max. Resticted V/s Unrestricted Demand in OCT-2017

Resticted Demand Unrestricted Demand

Break-Up of Generation / Injection at the time of

monthly Peak Demand :

(3832 MW on 13-10-2017 at 19:00 hrs)

MW %

CSPGCL Thermal

(Ex Bus)2425 63%

CSPGCL Hydel 107 3%

CPP/IPP's (STOA+PPA)

Injection + Inter state STOA75 2%

Other Injection 67 2%

CS Share including BSP share in

NSPCL1104 29%

Net Import / Export -87 2%

OD(+) / UD(-) 141 4%

Demand Met (MW) 3832

Page 12: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

6

CSPGCL Thermal

, 2425

CSPGCL Hydel, 107

CPP/IPP's

(STOA+PPA)

Injection + Inter state

STOA, 75

Other Injection, 67

CS Share including

BSP share in NSPCL

, 1104

Net Import(+) /

Export (-), -87 OD(+) / UD(-) , 141

Break-up of Generation/Injection at the time of monthly peak demand

(3832 MW on 13-10-2017 at 19:00 hrs).

Total Import at the

time of Max

Demand Met, 713

Total Export at the

time of Max

Demand Met, -800

Import and Export at the time of Max. Demand met

(3832 MW on 13-10-2017 at 19:00 hrs).

Page 13: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

7

1.5 LOAD SHEDDING

Load Shedding during Oct-17:

Load Shedding Duration

(in HH:MM)

Equivalent

Load Relief

(in MU/Day)

Max Load

Shedding

Done.

In Groups

Feeders16:27:00 0.05

283 MW

on 14.10.2017

at 19:00 Hrs

In Industrial

feeders6:04:00 0.01

TOTAL 22:31:00 0.06

1.6 - SOLAR POWER INJECTION (At 132 KV)M/s ACME Raipur Solar

Private Limited

M/s Azure power

Dhamdha

APR-17 MU 4.624 4.650

MAY-17 MU 4.595 4.107

JUN-17 MU 3.680 3.335

JUL-17 MU 2.894 2.991

AUG-17 MU 3.288 3.243

SEP-17 MU 3.43 3.62

OCT-17 MU 3.677 4.045

Page 14: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

8

27

45 47

3027

2320

1511

40 40

46 45

39

46 48 48 47

0

4247

3941

48 47

66 6661

66 6869

1-O

ct-1

7

2-O

ct-1

7

3-O

ct-1

7

4-O

ct-1

7

5-O

ct-1

7

6-O

ct-1

7

7-O

ct-1

7

8-O

ct-1

7

9-O

ct-1

7

10-O

ct-1

7

11-O

ct-1

7

12-O

ct-1

7

13-O

ct-1

7

14-O

ct-1

7

15-O

ct-1

7

16-O

ct-1

7

17-O

ct-1

7

18-O

ct-1

7

19-O

ct-1

7

20-O

ct-1

7

21-O

ct-1

7

22-O

ct-1

7

23-O

ct-1

7

24-O

ct-1

7

25-O

ct-1

7

26-O

ct-1

7

27-O

ct-1

7

28-O

ct-1

7

29-O

ct-1

7

30-O

ct-1

7

31-O

ct-1

7

PATTERN OF DAILY MAX. SOLAR GENERATION IN

OCT-2017SOLAR GENERATION

1.7 - Percentage of BDI Compliance Percentage Status of Compliances of Backing Down Instruction issued by

SLDC to Generating Stations of CSPGCL from APR 2017 to OCT 2017:

Month

Total no of

BDI issued

by SLDC

Compliance % by Generators/Generating Stations

Total Non

Compliance< 25% 25 to 50% 50 to 90% > 90%

APR-17 143 5 6 7 74 51

MAY-17 144 0 5 18 80 41

JUN-17 96 0 2 3 75 16

JUL-17 48 0 2 3 35 8

AUG-17 25 0 0 0 24 1

SEP-17 65 1 7 7 30 21

OCT-17 59 3 3 9 32 12

Page 15: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

9

1.8 - TRANSMISSION LOSS

Performance of CSPTCL : Transmission Loss(%) as per data

provided by O/o of CSPGCL, CSPTCL & CSPDCL.

2017-18 2016-17% Change

compared to

previous year

APR 3.33% 2.99% 11%

MAY 2.88% 2.96% -3%

JUN 2.89% 2.84% 2%

JUL 2.88% 2.65% 9%

AUG 2.97% 2.36% 26%

SEP 3.11% 2.32% 34%

OCT DATA AWAITED

FROM O/o CE(S/s:O&M)

& O/o CE(RA&PM)2.83% ---

1.8 - TRANSMISSION LOSS

Performance of CSPTCL : Transmission Loss(%) as per data

provided by O/o of CSPGCL, CSPTCL & CSPDCL.

2016-17

[Revised]2016-17

% Change

compared to

previous year

MARCH 3.30% 2.59% 27%

ANNUAL 2.81% 2.75% 2%

The meter reading of 220 KV Khedamara-BSP – I & II for

month of March-2017 has been revised and after incorporating

this data, the transmission Loss of March-2017 as well as annual

loss for FY: 2016-17 has changed.

Page 16: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

12/11/2017

10

Page 17: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Annexure III

Maintenance / Shutdown programme of Transmission Elements for the month of JAN-2018 & FEB-2018.

Date Time Date Time

1 400400 KV Raita-Korba west

feeder at 400 KV S/s Raita.8/1/2018 8:00 9/1/2018 17:00 Continuous

For attending oil leakage in reactor and

NGR.CSPTCL ---

2 400

400 KV Bay No-408, Marwa-Raita

Feeder No.1 at 400KV switchyard

Marwa.

4/1/201808:30

Hrs5/1/2018

17:30

HrsContinuous

(1).Annual testing of Relays,CT,Circuit Breaker and

CVT. (2).Cleaning and Terminal tightness of CT

JB,Breaker Mar box,control and relay

panel.(3).General checking,cleaning and lubrication

of operating mechanism of CB and isolator.

CSPTCL ---

3 400

400 KV Bay No-409, Marwa-Raita

Feeder No.2 at 400KV switchyard

Marwa.

16/1/201808:30

Hrs17/01/2018

17:30

HrsContinuous

(1).Annual testing of Relays,CT,Circuit Breaker and

CVT. (2).Cleaning and Terminal tightness of CT

JB,Breaker Mar box,control and relay

panel.(3).General checking,cleaning and lubrication

of operating mechanism of CB and isolator.

CSPTCL ---

SL.

NO. Date Time

1 06.01.2018 10.00 to 17.00 hrs

Name of feeder/ Xmer

63 MVA Xmer

Name of S/s

132 KV S/s Sector-

C

post mansoon &

general maintenance

Remarks

EE (S/S) Dn.-I, Raipur

RemarksSl.

No.KV Lines/ ICT Particulars

From To Daily /

Continuous Reason Agency

Page 18: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Annexure III

From To

1220 KV S/s

Thelkadih40 MVA-I 03.01.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

II X-mer

2132 kv S/s

Dongargaon40 MVA 09.01.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

Load will be managed by

another adjacent EHV S/s.

3220 KV S/s

Bemetara40 MVA-I 12.01.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

II X-mer

4132 KV S/s

Dongargarh40 MVA 17.01.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 20 MVA

X-mer and other adjacent EHV

S/s

5132 KV S/s

Gandai40 MVA 24.01.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

Load will be managed by

another adjacent EHV S/s.

6220 KV S/s

Thelkadih40 MVA-II 01.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

I X-mer

7220 KV S/s

Bemetara40 MVA-II 03.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

I X-mer

8132 KV S/s

Kawardha63 MVA X-MER 06.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by another

40 MVA x-mer and other

adjacent EHV S/s.

9220 KV S/s

Thelkadih160 MVA-I 08.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 160

MVA-II X-mer

10220 KV S/s

Bemetara160 MVA-II 13.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 160

MVA-I X-mer

OUTAGE PLANNING OF TRANSMISSION FEEDER / POWER TRANSFORMER OF S/S

DN.,CSPTCL, RAJNADGAON DURING THE PERIOD (01.01.2018 to 28.02.2018)

S.No.Name of

Substation

Name of feeder

/X-mer Bay

Proposed /

Tentetive Date

Duration of

Shutdown BasisPurpose of

ShutdownSystem Remarks

Page 19: SSLLDDCCsldccg.com/wif-for-website/unifam/635-minutesof35thsoap... · 2017-12-12 · Minutes of 35th SOAP Meeting held on 28.11.2017 Page 2 Minutes of 35 th meeting of Sub Committee

Annexure III

From To

OUTAGE PLANNING OF TRANSMISSION FEEDER / POWER TRANSFORMER OF S/S

DN.,CSPTCL, RAJNADGAON DURING THE PERIOD (01.01.2018 to 28.02.2018)

S.No.Name of

Substation

Name of feeder

/X-mer Bay

Proposed /

Tentetive Date

Duration of

Shutdown BasisPurpose of

ShutdownSystem Remarks

11220 KV S/s

Thelkadih

132 KV Thelkadih-

Dongargarh-I15.02.2018 9:00 12:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 132 KV

Thelkadih-Dongargarh-II feeder

12220 KV S/s

Thelkadih

132 KV Thelkadih-

Dongargarh-II15.02.2018 13:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 132 KV

Thelkadih-Dongargarh-I feeder

13220 KV S/s

Bemetara

220 KV Bemetara-

Khedamara20.02.2018 10:00 15:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by adjacent

EHV S/s

14132 KV S/s

Rajnandgaon40 MVA-I 23.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

II X-mer

15132 KV S/s

Rajnandgaon40 MVA-II 27.02.2018 10:00 16:00 Daily

General

MaintenanceCSPTCL

This shutdown will be taken

only if load manged by 40 MVA-

I X-mer