2015 TGA Safety Roundtable

DIGGING DANGERS: THE POWER OF PIPELINES -

FINAL PROOF

http://www.youtube.com/watch?v=VUtrzxJIEbE

Top Ten Root Causesas Reported to TDRF

January 2014 - December 2014

29%

16%

14%

13%

10%

4%

3%3%

3%3%

No notification made to the One-Call center - 29%

Facility was not located or marked - 16%

Facility marking or location not suf-ficient - 15%

Other - 13%

Failure to maintain clearance - 10%

Failure to use hand tools where required - 4%

Facility could not be found or located - 4%

Failure to maintain marks - 3%

Data Not Collected - 3%

Other insufficient excavation practices - 3%

70.8%

11.3%

7.7%

4.1%3.7%

0.76%0.71%0.47%

0.35%0.18%

Contractor - 70.8%

Municipality - 11.3%

Utility - 7.7%

Home Owner - 4.1%

Unknown/Other - 3.7%

Occupant - 0.76%

Data Not Collected - 0.71%

County - 0.47%

Developer - 0.35%

Farmer - 0.18%

Top Ten by Type of Excavatoras Reported to TDRF

January 2014 - December 2014

Top Ten Damages by Type of Work Performedas Reported to TDRF

January 2014 - December 2014

23%

20%

11%

11%

9%

7%

6%

5%

4%4%

Sewer (Sanitary/Storm) - 23%Water - 20%

Electric - 11%

Unknown/Other - 11%

Fencing - 9%

Telecommuni-cations - 7%

Natural Gas - 6%

Bldg. Construction - 5%

Landscaping - 4%

Road Work - 4%

Top Ten Damages by Type of Equipment as Reported to TDRF

January 2014 - December 2014

50%

22%

8%

6%

5%

4%2%

1%1%

1%

Backhoe/Trackhoe - 50%

Hand Tools - 22%

Unknown/Other - 8%

Trencher - 6%

Boring - 5%

Auger - 4%

Grader/Scraper - 2%

Probing Device - 1%

Directional Drilling - 1%

Drilling - 1%

NPMS (National Pipeline Mapping System)

• Advance Notice Required (At Least 2 working days, not more Than 14-Days, excluding Sat, Sun, Holidays)

• Class “A” Operators must join Notification Center(Electric, Telephone, Cable, Gas, Oil, Steam, Co2, etc.)

Texas Utility Code-Title 5, Chapter 251

• Class “B” Operators may participate voluntarily(Water, Sewer, Slurry)

• Each Operator Notified must respond within 2 working days (Positive Response)

National 811 Number

LSNCLSNC

TX811

Simply put, it is a speed-dial number to get in touch with a One Call Center.

All calls are rotated between the two One Call Centers operating in the

State.

Facility/Utility Response

Martin County, September 2014

Midland County, May 2014

1.Call-Click BEFORE You Dig

811 OR REMOTE APPLICATION

2.Wait the required amount of time

3.Respect the locate marks• Identify your construction zone in white.• Observe the Uniform Color Code.• If marks are removed or altered, call for a re-mark

4.Dig with care

• Follow safe excavation practices and hand dig when appropriate.

Four Steps to Safer Excavation

• Texas law requires at least 2 working days notice

DAMAGE PREVENTION COUNCILS of TEXAS