1
Introduction to the
2014 NEHRP Recommended Seismic Provisions
David Bonneville Chair
2015 Provisions Update Committee
Building Seismic Safety Council Provision Update Committee
2
Building Seismic Safety Council Provision Update Committee
2015 Provisions Update Committee Robert Bachman Philip Line David Bonneville (Chair) James Malley Kelly Cobeen Bonnie Manley C.B. Crouse Robert Pekelnicky Dan Dolan Rafael Sabelli John Gillengerten John Silva S.K. Ghosh Greg Soules Ron Hamburger Jason Thompson Jim Harris John Hooper Non-voting Technical Members: Gyimah Kasali Robert Hanson (FEMA) Dominic Kelly Jay Harris (NIST) Charlie Kircher Nico Luco (USGS)
3
Building Seismic Safety Council Provisions Update Committee
2015 Provisions Support Mike Tong – FEMA Liaison Philip Schneider – BSSC Executive Director Bryan Bindrich – Degenkolb Chad Closs – Degenkolb Andrew Shuck - WJE
4
Building Seismic Safety Council Provisions Update Committee
NEHRP Provisions Part 1: Provisions Part 2: Commentary Part 3: Resource Papers
5
Building Seismic Safety Council Provisions Update Committee
Provisions Update Committee
Issue Teams PUC Members ASCE 7 SSC
Member Organizations
NEHRP Provisions - Proposal Development
6
ASCE 7-10
PUC/Issue Team Proposal Groups
2009 Provisions
2015 Provisions
MO Ballot Packages
ASCE 7-16
2015 Provisions Development
A
E
B C D
F G
1 2 3 4
Building Seismic Safety Council Provision Update Committee
7
Building Seismic Safety Council Provision Update Committee
2015 PUC Issue Teams FEMA P695/795 Ron Hamburger Performance Objectives Jim Harris, John Hooper Seismic Anchorage Kevin Moore NLRH Analysis Curt Haselton Diaphragm Design S.K. Ghosh, Kelly Cobeen Liquefaction/Site Factors Bob Bachman/C.B. Crouse Foundation Strength Martin Johnson Design Maps (USGS) Nico Luco Soil Structure Interaction Bob Pekelnicky Base Isolation & Damping Bob Pekelnicky, Ron Mayes MRS Analysis Jim Malley RWFD Design Dominic Kelly Simplified Analysis Bill Holmes, Jim Harris, Curt Haselton
8
Building Seismic Safety Council Provisions Update Committee
Issues Selected by the PUC based on the degree to which they affect or advance practice, or fix something Types of Issues: • Those related to seismic performance • Those that improve analysis/design provisions • Those that affect/change seismic demand
9
Building Seismic Safety Council Provisions Update Committee
Related to Seismic Performance: • Intent of Provisions – Performance Objectives (Harris) • Seismic Qualification using FEMA P695/P795 (Hamburger)
Related to Seismic Demand: • USGS Hazard Maps and NEHRP Design Maps (Luco) • New Site Soil Coefficients (Crouse) • Site Specific Design Requirements & Parameters (Kircher)
2015 Provisions Update Committee Major Topics
10
Building Seismic Safety Council Provisions Update Committee
Related to Analysis/Design: • Modal Response Spectrum Analysis (Malley) * • Nonlinear Response History Analysis (Haselton) • Diaphragm Analysis and Design (Ghosh) • Rigid Wall/Flexible Diaphragm Buildings (Kelly) • Strength-Based Foundation Design (Johnson) • Foundations on Liquefiable Sites (Bachman) • Base Isolation and Energy Dissipation (Button) • Soil-Structure Interaction (Pekelnicky) * • Simplified Seismic Design for SDC B (Hooper)
2015 Provisions Update Committee Major Topics
11
Building Seismic Safety Council Provisions Update Committee
The objectives of these provisions are to provide reasonable assurance of seismic performance that will: 1. Avoid serious injury and life loss due to
a. structural collapse, b. failure of nonstructural components or systems, c. release of hazardous materials
2. Avoid loss of function in critical or essential facilities, and 3. Reduce structural and nonstructural repair costs where
practical to do so.
Provisions Intent and Seismic Performance Considerations
(Provisions Section 1.1)
12
Building Seismic Safety Council Provisions Update Committee
Risk Category Collapse Given MCER Collapse in 50 Years
I ** ** II 10% 1%
III 5% Less than 1%
IV 2.5% Less than 1%
Provisions Intent
Collapse:
Other Performance Objectives: Nonstructural Failure Hazardous Materials Functionality of Essential Facilities Repair Costs
13
Building Seismic Safety Council Provisions Update Committee
Incorporation of FEMA P-695/P-795
Invokes FEMA P695 as a basis for justification of new seismic systems (Section 12.2.1.1 – Alternative Structural Systems)
Example: Cold Formed Steel Bolted Moment Frame
FEMA P-695 – Quantification of Building Seismic Performance Factors
14
FEMA P-795 – Component Equivalency Method
Incorporation of FEMA P-695/P-795
Example: Simpson Steel Strong-Wall
Building Seismic Safety Council Provision Update Committee
Invokes FEMA P795 as a preferred means of justifying substitute components in a defined system (Section 12.2.1.1 – Alternative Structural Systems)
15
Building Seismic Safety Council Provisions Update Committee
Update of Risk-Targeted MCE Design Maps
Based on USGS update of national hazard maps (+/- 10-15% changes)
16
Building Seismic Safety Council Provisions Update Committee
Site Coefficients (Fa and Fv)
Modification of site factors (around since the 1990’s) to reflect NGA GMPE’s expressed at B-C boundary. Based on GM data set consisting of 1000’s of recordings.
17
Building Seismic Safety Council Provisions Update Committee
+20%
Site Specific Analysis Requirements
Require a site-specific for certain site classes and spectral values
18
Building Seismic Safety Council Provisions Update Committee
Modal Response Spectrum Analysis
Changes: • Scaling forces
and drifts • Modeling (3-D) • Combining modes
(addressing high frequency modes)
19
Building Seismic Safety Council Provisions Update Committee
Nonlinear Response History Analysis
GM Selection and Scaling
20
Building Seismic Safety Council Provisions Update Committee
Analysis and Modeling
Nonlinear Response History Analysis
21
Building Seismic Safety Council Provisions Update Committee
Diaphragm Analysis and Design
22
Building Seismic Safety Council Provisions Update Committee
Rigid Wall – Flexible Diaphragm Buildings
Examine and refine seismic design provisions and performance expectations for RWFD buildings – Part 3
23
Building Seismic Safety Council Provisions Update Committee
EQ motion
Overturning moment
Address structure/foundation and foundation/soil interfaces considering ultimate strength design and stiffness modeling
24
Foundations on Liquefiable Sites
Address liquefaction and other site seismic soils-related issues to prevent collapse and quantify performance
Building Seismic Safety Council Provisions Update Committee
25
Building Seismic Safety Council Provisions Update Committee
Base Isolation Provisions
26
Building Seismic Safety Council Provisions Update Committee
Structures with Dampers (Chapter 18)
27
Building Seismic Safety Council Provisions Update Committee
Soil-Structure Interaction
Foundation Deformations Inertial Interaction Effects Radiation Damping Hysteric Damping Kinematic Effects Base Slab Averaging Embedment
Considerations:
28
Building Seismic Safety Council Provisions Update Committee
Simplified Provisions
Seismic Design Categories
29
Building Seismic Safety Council Provisions Update Committee
BaseShear
DesignMaps
SiteClass
SiteSpecific
MRS SSI
+/- +/- + +
-
Effects of Certain Changes on Seismic Demand
Base Shear
30
Building Seismic Safety Council Provisions Update Committee
Questions/Discussion