ANNEXURE IIANNEXURE II
Transmission elements Schedule Revised Constraints/ Remarks
System Strengthening –XVII in SR Grid ( PGCIL SR II portion of Narendra‐KolhapurTransmission elements Schedule
d CODRevised
Target dateConstraints/ Remarks
765 kV D/C Narendra (New Kudgi)- Kolhapur line (initially
Mar’15 Sep’15 Completion matching withreadiness of Kudgi S/S (Landudg ) o apu e ( t a y
charged at 400 kV)ead ess o udg S/S ( a dAcquisition in Feb 2014). Effortsbeing made to complete earlier.
400 kV D/C Narendra (New Kudgi) Sep’15 Completion matching with ( g )– Narendra (existing) line (Quad) S/stn
LILO of both ckt at 400 kV D/C Kolhapur‐Mapusa line at Kolhapur
Sep’15 Completion matching with S/stn
765/400 kV Narendra (New Kudgi) SS (GIS) (charged at 400 kV)
Apr’15 Sep’15 Award placed in Mar’14. Land acquired in Feb’14. Supply, civil works & errection under works & errection under progress
765/400 kV Kolhapur SS(GIS) (charged at 400 kV)
Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress
Extn. At 400/220 kV Narendra S/stn Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress
Implement-ing CKM Sch. COD Ant COD/ Act COD
Constraints/ Remarks
Wardha - Nizamabad 765 kV D/C line
Wardha-Nizamabad-Hyderabad (Maheswaram)765kV D/C
PGCIL 1094 May’18Award placed in Mar’15. Towererrection commenced from Jul’15
Wardha – Raipur PS 765 kV D/C PGCIL 713 Dec’15 Commissioned on 15-11-2014
Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed
Extn. of Wardha 765 kV S/S PGCIL May’18 May’18 Award under progress.
Wardha Aurangabad 765 kV Line 1 commissioned in July 14 Line IIWardha – Aurangabad 765 kVD/C
PGCIL 701 Dec’15 Fe b’15Line 1 commissioned in July 14. Line IIby Feb’15
Extn. of Aurangabad 765 kV S/S PGCIL Mar’16 Mar’16Award placed in May’ 2014 and underprogress
Nizamabad-Dichipalli 400 kVD/C
PGCIL May’18Award placed in Mar’15. Towererrection commenced from Jul’15.
Nizamabad-YeddumailaramThis along with “Maheshwaram PG -Mahboobnagar 400 kV D/C line” was
(Shankarapalli) 400 kV D/C through based (TBCB) route. wasrecommended GoI for
Maheshwaram PG 765/400 kV,2x1500 MVA S/S
PGCIL Mar’18 Mar’18 Award placed in Ma’152x1500 MVA S/S
Nizamabad 765/400 kV, 2x1500MVA S/S
PGCIL May’18Award placed in Mar’15. Engg. Inprogress
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 1: Raigarh‐Pugalur 6000 MW HVDC System . This system Scheme # 1: Raigarh Pugalur 6000 MW HVDC System . This system would be designed with normal 20% overload for 30 minutes and 10% overload for 2 hours The scheme
had beenawarded to
1. Establishment of Raigarh HVDC Station 8 kV ith 6 MW HVDC t i l awarded toPGCIL(GoI
circular dated10.12.2014)as informed
h
+800kV with 6000 MW HVDC terminals. This Raigarh Station would be implemented with extended bus of Raigarh(Kotra) existing 400kV S/S. The
in 26th SRPCmeeting.
Regulatedtariff
g ( ) g 4HVDC Station would have GIS for 400kV part and AIS for HVDC part.
2 Establishment of Pugalur HVDC Stn mechanismvide MoPletter dated03-03-2015.
2. Establishment of Pugalur HVDC Stn+800kV with 6000 MW HVDC terminals. The HVDC Station would have GIS for 400kV part and AIS for HVDC part.3. ± 800 kV Raigarh (HVDC Stn) – Pugalur(HVDC Stn) HVDC Bipole link with 6000 MW capacity.
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 2: AC System strengthening at Pugalur endScheme # 2: AC System strengthening at Pugalur end
The schemehad beenawarded to
1. Pugalur HVDC Station – Pugalur (Existing) 400kV (quad) D/c line2. Pugalur HVDC Station – Arasur 400kV (quad) D/c line awarded to
PGCIL(GoIcircular dated10.12.2014)as informed
(quad) D/c line.3. Pugalur HVDC Station – Thiruvalam 400kV(quad) D/c line with 2x80 MVAR line reactor atPugalur HVDC Station end and 2x63 MVAR line
h l k das informedin 26th SRPCmeeting.
Regulatedtariff
reactor at Thiruvalam 400kV end.3. Pugalur HVDC Station – Edayarpalayam400kV (quad) D/c line with 63 MVAR switchable line reactor at Edayarpalayam end.
d l d l k ( d) tariffmechanismvide MoPletter dated03-03-2015.
4.Edayarpalayam – Udumulpeta 400kV (quad) D/c line.(Establishment of 400/220kV substation at Edayarpalayamwith 2x500 MVA transformers
d MVAR b ld b d and 2x125 MVAR bus reactors would be under the scope of TANTRANSCO. The bay for ISTS transmission lines at Edayarpalayamwould be implemented as ISTS.)
Transmission ElementImple-
mentingLine
length COD Constraints/
WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System
Transmission Element mentingAgency
length (ckm)/ MVA
Capacity
COD Constraints/ Remarks
Sch. Ant / Act
Scheme # 3: Pugalur‐ Trichur 2000 MW VSC Based HVDC SystemScheme # 3: Pugalur Trichur 2000 MW VSC Based HVDC System
The schemehad been
1.+320kV, 2000 MW VSC based HVDC terminal at Pugalur. The HVDC Station would have GIS for 400kV part and AIS for HVDC awarded to
PGCIL(GoIcircular dated10.12.2014)
i f d
HVDC part.2. +320kV, 2000 MW VSC based HVDC terminal at North Trichur. The HVDC Station would have GIS for 400kV part and as informed
in 26th SRPCmeeting.
Regulatedt iff
4 pAIS for HVDC part.3. Establishment of VSC based 2000 MW HVDC link between Pugalur and North T i h * (K l ) (* t/ t f thi li k tariff
mechanismvide MoPletter dated03-03-2015
Trichur* (Kerala). (*part/parts of this link, in the Kerala portion, may be implemented as underground cable where implementation as overhead transmission 03-03-2015.pline is difficult because of RoW issues).4. LILO of North‐Trichur – Cochin 400 kV (Quad) D/c line at North Trichur HVDC Stn
Transmission Element ImplementingLine length (ckm)/ MVA COD Constraints / Remarks
Angul - Srikakulam PS 765 kV D/C line
Transmission Element Implementing Agency
(ckm)/ MVA Capacity
COD Constraints / Remarks
Sch.Ant / Act
Angul - Srikakulam PS 765 PGCIL 552 Jun'15 Aug’16
St-1 forest clearance awaited(99Ha). )1 package re tendered& awarded in June ‘15.Completion matching with
kV D/C line 552 Srikakulam-Vemagiri beingexecuted under TBCB(Sch:Aug’16)
Extn. 765/400 kV Angul Sub PGCIL 1 1500 J ’15 J '16Award placed in Aug’13. Engg.S l i il k & tigstation PGCIL 1x1500 Jun’15 Jun'16 Supply, civil works & erectionunder progress
765 kV D/C Angul-Jharsuguda line PGCIL 570 Dec'15 Jun’16
RoW being faced. Huge forestinvolvement clearance awiated.Huge forest involvement765 kV D/C Jharshuguda-
Dharamjayagarh line PGCIL 230 Dec'15 Jun’16Huge forest involvement.Critical
Extn. of 765/ 400 kV Angul PGCIL D '15 A ’16
Completion matching withSrikakulam-Vemagiri beingg
SS PGCIL Dec'15 Aug’16g g
executed under TBCB(Sch:Aug’16)
Extn. of 765/ 400 kVJharshuguda SS PGCIL Dec'15 Jun’16
Engineering & Civil worksunder progress
Srikakulam P P- Vemagiri- IIP li t ti 765 kV D/C
M/s Vizag Transmission
Li it d 30.08.201 A ’16 U d P
Angul - Srikakulam PS 765 kV D/C line
Pooling station 765 kV D/Cline
Limited(A subsidiary of
PGCIL)
6 Aug’16 Under Progress
Srikakulam Pooling Station 765/ Completion matching withSrikakulam Pooling Station 765/400 kV, 2x1500 MVA PS (400kV - AIS & 765 kV – GIS)
PGCIL 2x1500 Aug’16Completion matching with
Srikakulam-Vemagiri TBCB line(sch: Aug’16)
Srikakulam Pooling StationSrikakulam Pooling Station –Garividi 400 kV (Quad) D/Cline with 80 MVAR switchableline reactor at Garividi end.
PGCIL RFQ has been issued on12.04.2017 by RECTPCL
400/220 KV S/S at Maradam(Garividi) along with 2 Nos. 400KV Quad Bays at the existing400/220 KV Kalpaka S/S
APTRANSCO Feb’16Purchase order issued on15.11.2014Levelling work under progress
Behrampur- Gazuwaka 400kV D/C line M/s Talcher
TransmissionCompany Limited(Subsidiary of M/s
290 CERC ROP (for 18.11.2014)enclosedCEA letter 17.11.2014 : Nophysical progress visible on
Talcher II – Behrampur 400 kVD/C line 220
T l h II R k l 400 kV (Subsidiary of M/sReliance PowerTransmissionCompany Limited)
ground.The scheme needed to beimplemented without any furtherdelay
Talcher II- Rourkela 400 kVD/C Quad line 161
Behrampur 400/220 kV, 2x315MVA S/S 2x315
Additional inter‐Regional AC link for import into Southern Region, i.e., Warora‐Warangal ‐Hyderabad‐ Kurnool 765 kV link
CEA Notification dated 06.02.2015, CEA appointed PFC CL as BPCTransmission Elements Line Length
(ckm)/ MVA Capacity
Implementing
Agency
Sch COD
Constraints/ Remarks
Establishment of 765/400 kV substations at Bidding yet to a Warangal (New) with 2x1500 MVA transformer and
2x240 MVAR bus reactors.
g ycommence.RfQ inputs communicated by CTU
bWarora Pool -Warangal (New) 765 kV D/C line with240 MVAR switchable line reactor at both ends.
CTU.
The transmission element at(g) was identified for
cWarangal (New) –Hyderabad 765 kV D/C line with330 MVAR switchable line reactor at Warangal end.
dWarangal (New) – Warangal (existing) 400 kV
(quad) D/C line.Hyderabad– Kurnool 765 kV D/C line with 240 (g)
implementation undercompressed time schedulethrough regulated tariffmecha nism by PGCIL.
eHyderabad Kurnool 765 kV D/C line with 240MVAR switchable line reactor at Kurnool end.
fWarangal (New) – Chilakaluripeta 765 kV D/C line
with 240 MVAR switchable line reactor at bothends.
g LILO of Kurnool-Thiruvalam 765 kV D/C atCuddapah
PGCIL
h Cuddapah- Hoody 400 kV (quad) D/C line with 63MVAR switchable line reactor at both ends.
T i i El t Li L th I l S h C t i t / R k
System strengthening within SR for transmitting power beyond VemagiriCEA Notification dated 06.02.2015, CEA appointed RECTPCL as BPC
Transmission Elements Line Length (ckm)/ MVA
Capacity
Implementing
Agency
Sch COD
Constraints/ Remarks
a Vemagiri II – Chilakaluripeta 765 kV D/C line with(i) SPV has been incorporatedVemagiri II Chilakaluripeta 765 kV D/C line with
240 MVAR switchable line reactor at both ends.incorporatedon 06.04.2015.(ii) RFQ has been issued on
b Chilakaluripeta – Cuddapah 765 kV D/C line with 240 MVAR switchable line reactor at both ends.
12.04.2015.
The transmission elements at(e) and (h) were identified forimplementation under
c Chilakaluripeta – Narsaraopeta 400 kV (quad) D/C line
dCuddapah – Madhugiri 400 kV (quad) D/C line with 80 MVAR switchable line reactor at both implementation under
compressed time schedulethrough regulated tariffmechanism by PGCIL.
d with 80 MVAR switchable line reactor at both ends.
e Cuddapah-Hindupur 400 kV (quad) D/C line with 80 MVAR switchable line reactor at Hindupur end.
PGCIL
fSrikaukulam Pooling Station – Garividi 400 kV (Quad) D/C line with 80 MVAR switchable line reactor at Garividi end.
gEstablishment of 2x1500 MVA, 765/400 kV substation at Chilakaluripeta with 2x240 MVARg substation at Chilakaluripeta with 2x240 MVAR bus reactors.
hEstablishment of 2x1500 MVA, 765/400 kV substation at Cuddapah with 2x240 MVAR bus reactors.
PGCIL
ANNEXURE IIIANNEXURE IIISRLDC
Delayed Transmission AdditionDelayed Transmission Addition
S. No. Transmission CorridorProposed
Commissioning Date
Actual/ Likely Commissioning
DateTransmission Constraint Caused
Date Date
1 400kV Edamon‐Cochin DC line Held up Mar‐16 220kV North ‐ South corridor of Kerala
2 400kV Mysore‐Kozhikode DC line ‐‐‐ Dec‐15Congestion on North Kerala connected lines
like 220kV Kadakola‐Kaniyampet.NCTPS‐II Evacuation: Alamathy‐Thiruvalam DC Congestion on 400kV Vallur evacuation
3NCTPS‐II Evacuation: Alamathy‐Thiruvalam DC
lineFeb‐11 Sep‐15
Congestion on 400kV Vallur evacuation system
4Stage‐1 Wind evacuation system of TNEB: 400kv Kanarapatty SS, 400kV Kanarapatty‐
Kayathar DC line‐ ‐
Congestion on 400/230kV Tirunelveli ICTs, 230kV Kayathar‐Tirunelveli, 230kV
Udayathur‐Tirunelvelli, 230kV Veerannam‐Kayathar DC line
Tirunelvelli etc
5400kV Gooty‐Madhugiri Dc &
400kV Madhugiri‐Yelhanka DC lineJun‐14 Uncertain
Constraints on Import from New grid toSR through 765kV Raichur‐Sholapur DC
line.
6400kV Salem pooling Station‐Salem
DC lineSep‐14 Sep‐15
Congestion on S1‐S2 Corridor7
400kV Somnahally ‐ Salem poolingStation DC line
Aug‐14 Dec‐15
Constraint on existing 400kV8 400kV Vijayawada‐Nellore DC line Nov‐14 Sep‐15
gVijayawada‐Nellore DC line, if Vemagiri
complex generation increases.
9 400kV Thiruvallam ‐Mettur D/c line Dec‐14 05.05.2015 Congestion on S1‐S2 Corridor
PLANNED TRANSMISSION SYSTEM TO RELIEVE CONGESTION IN SR
Wardha Angul
Sholapur
KhammamHyderabad
Kolhapur Srikakulam
Dec15
NunnaKarnool
Raichur
Vemagiri PS
Narendra New June15
Nov15
Nellore
GootyBTPS
Mar15
June16TBCB
Tiruvalam
Somanahalli
Dharmapuri
Madugiri YelahankaMar15
July 15 RowJul15June15
Mysore
Kojhikode
Nagapattinam PSSalemMTPS
Cochin
Dec15
Tuticorin PSRow
RowEdaman
Tirunelvelli
Planned Evacuation Scheme of Yeramarus(2x800MW) and Edlapur(1x800MW) Thermal power generation
GULBARGA
(2X800 MW)
To be constructed by KPTCL
(2X500MW)
( )YERAMARUS(1X800MW)
EDLAPUR RTPS• As informed in 27th SRPC meeting
held on 12.05.2015, most of the lines are in tendering stage
• Yeramarus TPS First Unit is in
BTPS PS
(2X500MW)BTPS
TALAGUPPA
(4X300 MW)JINDAL
GUTTUR
Yeramarus TPS First Unit is in advanced stage of commissioning
C.N.HALLIHASSAN NELAMANGALA
MADHUGIRI
GUTTUR
HASSAN NELAMANGALA
MYSORE
Generation DelayedGeneration Delayed
S. No Generating Unit Area/ StateProposed
Commissioning Date
Actual/ Likely Commissioning Date
Transmission Constraint Caused
1 Kudankulam Unit‐2 Tamilnadu Dec‐08Unit‐1 commissioned on 31.12.14 , Unit expected
in June‐15
Transmission congestion on North‐South corridor and S1‐
S2 corridor2 Neyveli TPSII Expn Unit‐1 Tamilnadu Feb‐09 05.07.2015
3 Neyveli TPSII Expn Unit‐2 Tamilnadu Jun‐09 22.04.2015
Transmission constraintsTransmission constraints
400kV Kolar‐Hosur DC line
North Chennai TPS St‐II both units and Vallur TPS 3 Units are synchronized & Declared CoD.Kadamparai Pump mode operation, Mettur area low generation and Drawal/Allocation to TamilNadu and Kerala is also causing high flow on these lines. S1‐S2 TTC is limited by N‐1 of theseNadu and Kerala is also causing high flow on these lines. S1 S2 TTC is limited by N 1 of theselines. This is a constraint for whole year.
1400Load Duration Curve of 400 kV Kolar‐Hosur D/C Line
APR 2015 MAY 2015 JUN 2015
1000
1100
1200
1300APR‐2015 MAY‐2015 JUN‐2015
Large quantum of LTA and MTOA i
500
600
700
800
900
MW
MTOA is granted to S2 constituents
100
200
300
400
500
00% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%
% of Time
400kV Hiriyur‐Nelamangala DC liney gWith Full generation at Jindal TPS, Bellary TPS, Low generation at UPCL and high windgeneration, the flow on 400kV Hiriyur‐Nelamangala D/C line is above 550MW. Also the 765kVSholapur‐Raichur D/C line commissioned without downstream network (400kV Gooty‐Sholapur Raichur D/C line commissioned without downstream network (400kV GootyMadhugiri‐Yelhanka D/C line and its associated downstream 220kV network) is creating furtherincrease in the line flow. This is a constraint for whole year.
Load Duration Curve of 400 kV Hiriyur‐Nelamangala D/C Line
1100
1200
1300
1400Load Duration Curve of 400 kV Hiriyur Nelamangala D/C Line
APR‐2015 MAY‐2015 JUN‐2015
700
800
900
1000
MW
300
400
500
600
0
100
200
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time
400kV Udumalpet‐Palakkad DC line
Kerala drawl is mainly through 400kV Udumalpet‐Palakkad D/C line. Presently the loadingon these lines is in the range of 450‐500 MW. This is a constraint for whole year.
1200
1300Load Duration Curve of 400kV Udumalpet‐Palakkad D/C Line
APR‐2015 MAY‐2015 JUN‐2015
800
900
1000
1100
400
500
600
700
MW
100
200
300
400
00% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%
% of Time
400kV Nellore Pooling Station ‐ Nellore DC lineWith Full Generation at SEPL (600 MW) MEPL (300 MW) & TPCIL (660 MW) theWith Full Generation at SEPL (600 MW), MEPL (300 MW) & TPCIL (660 MW), the400kV NPS‐ Nellore D/C is usually around 1200 MW and it has reached up to1760 MW. With further commissioning of Units at MEPL and TPCIL, the problemwill aggravate In case of any outage on this line the N‐1 would be violated Thewill aggravate. In case of any outage on this line the N‐1 would be violated. TheThermal Limit of this line is 1748 MW. This is a new constraint which is not thereearlier.
Load Duration Curve of 400kV Nellore Pooling Station Nellore DC
14001500160017001800
Load Duration Curve of 400kV Nellore Pooling Station ‐ Nellore DC LineApr‐2015 May‐2015 Jun‐2015
800900
1000110012001300
MW
300400500600700800
0100200
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time
400kV Jindal ‐ BTPS SC Line
With the full generation at Jindal TPS, 400kV Jindal‐BTPS S/C line is getting loadedbeyond 650 MW. Other evacuation paths are 400kV Jindal‐Guttur S/C line and TwoICTs But at 220kV side also generation (2 X 130 MW) is available This is a constraint forICTs. But at 220kV side also generation (2 X 130 MW) is available. This is a constraint forwhole year.
800Load Duration Curve of 400 kV Jindal‐BTPS S/C Line
APR‐2015 MAY‐2015 JUN‐2015
550
600
650
700
750APR 2015 MAY 2015 JUN 2015
350
400
450
500
550
MW
100
150
200
250
300
0
50
100
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time
ICT constraintsICT constraints
600650
Load Duration Curve of 400/220kV Gazuwaka ICTs Flow (2x315 MVA) APR‐2015 MAY‐2015 JUN‐2015 N‐1 Contingency
250300350400450500550
MW
050
100150200250
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time
800
Load Duration Curve of 400/220kV Vemagiri ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015
400450500550600650700750800
MW
050
100150200250300350
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
M
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
% of Time
650700
Load Duration Curve of 400/220kV Nellore ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015
N‐1 Contingency
300350400450500550600650
MW
050
100150200250
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
% of Time
Load Duration Curve of 400/220kV Somanahalli ICTs Flow (2x500 MVA)
500550600650700750800850
/ ( )APR‐2015 MAY‐2015 JUN‐2015
N‐1 Contingency
100150200250300350400450500
MW
050
100
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time
700
Load Duration Curve of 400/220kV Mysore ICTs Flow (2x315 MVA)
APR‐2015 MAY‐2015 JUN‐2015
350400450500550600650
MW
APR 2015 MAY 2015 JUN 2015N‐1 Contingency
050
100150200250300
0% 10% 20% 30% 40% 0% 60% 0% 80% 90% 100%
M
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time
550
600 Load Duration Curve of 400/220kV Hiriyur ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015
300
350
400
450
500
MW
N‐1 Contingency
50
100
150
200
250
300M
0
50
0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time
Low Voltage nodesLow Voltage nodes
S. No NodesSeason/ Antecedent
ConditionsDescription of the constraints
Has the constraint occurred in
earlier quarter?
1 400kV Somnahally SS During peak load
conditionVoltages are low during the peak load condition Yes
2 400kV Nelamangala SS During peak load
conditionVoltages are low during the peak load condition Yes
3 400kV MDuring peak load
V lt l d i th k l d diti N3 400kV Mysoreg p
conditionVoltages are low during the peak load condition No
4 400kV Bidadi SSDuring peak load
condition Voltages are low during the peak load condition Yes
5 400kV Ud l SDuring peak load di i & hi h i d
Voltages are low during the peak load condition & high Y5 400kV Udumalpet Ss condition & high wind
period
g g p gwind period
Yes
6 400kV Salem SSDuring peak load
condition & high wind period
Voltages are low during the peak load condition & high wind period
Yesperiod
7 400kV Hosur SSDuring peak load
condition Voltages are low during the peak load condition Yes
8 400kV Palakkad SsDuring peak load
condition Voltages are low during the peak load condition Yes
9 400kV Trichur SSDuring peak load
condition Voltages are low during the peak load condition Yes
10 400kV Cochin SSDuring peak load
condition Voltages are low during the peak load condition Yes
435440
Duration Curve of 400 kV Somnahally VoltageAPR‐2015 MAY‐2015 JUN‐2015
405410415420425430
KV
375380385390395400
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time
435440
Duration Curve of 400 kV Nelamangala VoltageAPR‐2015 MAY‐2015 JUN‐2015
405410415420425430
KV
375380385390395400
3750% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%
% of Time
High Voltage nodesHigh Voltage nodes
S. No NodesSeason/ Antecedent
ConditionsDescription of the constraints
Has the constraint occurred in earlier quarter?quarter?
1 400kV Vijayawada SS Whole Year Voltages remain very high most of the time Yes2 400kV Vemagiri SS Whole Year Voltages remain very high most of the time Yes
3 400kV Gooty SS Monsoon period and off peak period
Voltages at Gooty, Karnool and Srisailam remain very high during monsoon period and off peak condition.
Yes
4 400kV Kurnool SS Yes4 400kV Kurnool SS Yes
5400kV Nellore Pooling Station
SSMonsoon period
and off peak periodVoltages remain very high most of the time Yes
6 400kV Satenapally Whole Year Voltages remain very high most of the time Yes7 400kV VTPS Stage 4 Whole Year Voltages remain very high most of the time Yes
8 400kV Ghanapur SSMonsoon period
and off peak periodVoltages remain very high most of the time Yes
9 400kV Mamidipally SS During off peak Voltages remain very high most of the time Yes10 400kV Srisailam LB SS During off peak Voltages remain very high most of the time Yes11 400kV Warangal SS During off peak Voltages remain very high most of the time Yesg g p g y g12 400kV Malkaram SS During off peak Voltages remain very high most of the time Yes
13 400kV Narendra SS Whole YearDuring Low generation period and off peak period 400kV Narendra
Voltage are High.Yes
14 400kV Trichy SS During off peakDuring Low wind condition and off peak condition Voltages are
No14 400kV Trichy SS During off peakvery High
No
15 400kV Sriperumbudur SS During off peak Voltages remain very high most of the time Yes16 400kV Thiruvallam SS During off peak Voltages remain very high most of the time Yes
17 400kV Karaikudi SS During off peakDuring Low wind condition and off peak condition Voltages are
very HighNo
very High
18 400kV Pugalur SS During off peakDuring Low wind condition and off peak condition Voltages are
very HighNo
19 765kV Raichur SSDuring off peak Voltages remain very high most of the time
Yes20 765kV Kurnool SS Yes21 765kV N ll PS Y
Complete Station outage for the month May
Status of Installation of reactors at certain 400kV Substations by APTRANSCO/TSTRANSCOAPTRANSCO/TSTRANSCO
Voltages from 10‐08‐2015 to 23‐08‐2015
430435
VTPS SDSTPS VEMAGIRI KTPS 410kV
415420425430
395400405410
395
5 00:00:28
5 11:00:28
5 22:00:28
5 09:00:28
5 20:00:28
5 07:00:28
5 18:00:28
5 05:00:28
5 16:00:28
5 03:00:28
5 14:00:28
5 01:00:28
5 12:00:28
5 23:00:28
5 10:00:28
5 21:00:28
5 08:00:28
5 19:00:28
5 06:00:28
5 17:00:28
5 04:00:28
5 15:00:28
5 02:00:28
5 13:00:28
5 00:00:28
5 11:00:28
5 22:00:28
5 09:00:28
5 20:00:28
5 07:00:28
5 18:00:28100% time Voltage > 410 kV
10‐08‐201
10‐08‐201
10‐08‐201
11‐08‐201
11‐08‐201
12‐08‐201
12‐08‐201
13‐08‐201
13‐08‐201
14‐08‐201
14‐08‐201
15‐08‐201
15‐08‐201
15‐08‐201
16‐08‐201
16‐08‐201
17‐08‐201
17‐08‐201
18‐08‐201
18‐08‐201
19‐08‐201
19‐08‐201
20‐08‐201
20‐08‐201
21‐08‐201
21‐08‐201
21‐08‐201
22‐08‐201
22‐08‐201
23‐08‐201
23‐08‐201
Voltages on 27‐08‐2015
420
425SEPL SDSTPS NTPL
415
420
405
410
100% ti V lt 410 kV
395
400100% time Voltage > 410 kV
15 00:00:00
15 00:46:00
15 01:32:00
15 02:18:00
15 03:04:00
15 03:50:00
15 04:36:00
15 05:22:00
15 06:08:00
15 06:54:00
15 07:40:00
15 08:26:00
15 09:12:00
15 09:58:00
15 10:44:00
15 11:30:00
15 12:16:00
15 13:02:00
15 13:48:00
15 14:34:00
15 15:20:00
15 16:06:00
15 16:52:00
15 17:38:00
15 18:24:00
15 19:10:00
15 19:56:00
15 20:42:00
15 21:28:00
15 22:14:00
15 23:00:00
15 23:46:00
27‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐27
‐Aug
‐
Augmentation of Transformer Capacities in SR
Sl Name of the Applicant Location of Generating Station Region LTA granted for Allocation in SR
NEW grid to SR LTA for June‐2016 (Tentative)Sl. No.
Name of the Applicant Location of Generating Station Region LTA granted for (MW)
Allocation in SR
(MW)
1 BALCO (1200 MW) Dharamjaigarh, Chhattisgarh WR 100 TN
2 Jindal Power Ltd. (2400 MW) Raigarh (Tamnar), Chhatisgarh WR 400 TN
3 KSK Mahanadi Power Co. Ltd (3600 MW)
Champa PS, Chhattisgarh WR 500 TN
4 DB Power Ltd. (500 MW) Raigarh (Kotra), Chhattisgarh WR 208 TN
5 Ind‐Bharat (Utkal) Power Limited Jharsuguda Pooling Station WR 500 TN
6 GMR EMCO Energy Ltd. ** Bhardravati, Maharashtra WR 150 TN
7 BALCO Dharamjaigarh, Chattisgarh WR 100 TN
8 Dhariwal Power LILO of Bhadravati‐Parli, Maharashtra WR 100 TN
9 KSEB(from Maithon Power) Maithon Power, Jharkhand ER 140.5 Kerala
10 Adhunik Power & Natural Resources Ltd.
Adhunik Power & Natural Resources Ltd.Jharkhand
ER100
TN
11 BESCOM West Bengal and Jharkhand ER 450 BESCOM
12 KSEB West Bengal ER 141.5 KSEB
Talcher Firm Share 1773
DVC Allocation 33
Solar Allocation 85Total 4781
Sl. Name of the Applicant Injection of Power MTOA Drawl of Power
NEW grid to SR MTOA for June‐2016 (Tentative)No.
pp jgranted for (MW)
Entity / Location of Gen. Station Region Entity / Location of Loads Region
1 SAIL ‐ VISP NSPCL, Bhilai, Chhattisgarh WR 4.55 SAIL‐VISP, Karnataka SR
2 SAIL VISP NSPCL Bhil i Chh i h WR 13 65 SAIL S l S l Pl T il N d SR2 SAIL ‐ VISP NSPCL, Bhilai, Chhattisgarh WR 13.65 SAIL, Salem Steel Plant, Tamil Nadu SR3 NTPC Vidyut Vyapar
Nigam LimitedCSPDCL, Chhattisgarh WR 297 KSEB, Kerala SR
4 Facor Power Ltd Facor Power Ltd., Bhadrak, Odisha
ER 10 Facor Alloys Ltd., Gariv idi, Andhra Pradesh
SR
5 Jindal Power Ltd Jindal Power Ltd WR 165 KSEB Ltd, Kerala SR
6 KSEB Ltd Maithon Power Ltd, ER 122 KSEB Ltd, Kerala SR
7 KSK Mahanadi Power KSK Mahandi Power Company WR 347 APEPDCL & APSPDCL, AP SRCompany Ltd Ltd, Chhattisgarh
8 PTC India Limited BALCO, Korba, Chhattisgarh WR 100 KSEB Ltd, Kerala SR
9 Jindal Power Limited Jindal Power Limited, Chh tti h
WR 59.5 TANGEDCO, Tamil Nadu SRChhattisgarh
Total 1118.7
Annexure - IV
Uravakonda Wind - AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
Uravakonda 400kV S/s 4x315 MVA
+
80 MVAR BR
Jun-15 Aug-15 Work awarded to M/s.
TEEECL in 20.08.2013 &
work under progress
400 kV (Q) Uravakonda - Jammalmadugu
Jul-15 Oct-15 Work awarded on
23.01.2014 & under
progress
400 kV (Q) Uravakonda - Mahaboobnagar
190 kM Oct 15 35 SCPSPSR : Wind
project in Uravakonda
(1361 MW)
KfW funding 36th
SCPSPSR
400 kV (Q) Uravakonda– Hindupur
130 kM Tenders will be floated
shortly.
KfW funding 36th
SCPSPSR
400 kV Kondapur - Kurnool
35 SCPSPSR : Wind
project in Kondapur (1109
MW)
400 kV Uravakonda - Kondapur
35 SCPSPSR : Wind
project in Kondapur (1109
MW) &vUravakonda
(1361 MW)
Solar Power Park at Ghani/Panyam (1000 MW )Phase-I Works - AP Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
Phase-I ( 500 MW)
400/220kV Substation at Gani/Panyam
3x500 MVA APTRAN
SCO
Tenders opened on
20.04.2015 and under
analysis
2X125 MVAR BR
APTRAN
SCO
400 kV Kurnool -Gani/Panyam (Q) D/C
35 kM APTRAN
SCO
Tenders opened on
20.04.2015 and
under analysis 220 kV sub-pooling APTRAN
SCO
38th SCPSPSR – Details
to be furnished
Annexure - IV
Phase-II (500 MW)
Jammalamadugu/ Kondapuram - Gani/Panyam (Q) D/C
90 kM APTRAN
SCO
1000 MW Wind Power at Aspiri- AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/220kV Substation Aspiri
3x315 MVA APTRAN
SCO
2X125 MVAR BR
APTRAN
SCO
400kV Aspiri - Uravakonda(Q) D/C
APTRANSCO
220 kV sub-pooling APTRAN
SCO
38th SCPSPSR – Details
to be furnished
1500 MW NP Kunta Solar Project- AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
Phase-I 250 MW (NP Kunta) Dec 15
400/220 kV Substation NP
Kunta
3x500 MVA, May
2016
1x125 MVAR BR
±100 MVAR
STATCOM
LILO of 400KV
Kadapa(Cuddapah) - Kolar
S/c line at NP Kunta
May
2016
2 nos. 220kV line bays at NP
Kunta Pooling Station
May
2016
Phase-II 750 MW (NP Kunta) Sep 16
LILO of Kadapa(Cuddapah)
– Hindupur 400kV D/c (Q)
line at NPKunta
Aug 16
6 nos. 220kV line bays at NP
Kunta Pooling Station Aug 16
Phase-III500 MW (Galiveedu) Dec 16
Augmentation of
transformation capacity at
NP Kunta station
1x500 MVA Aug 16
4 nos. 220kV line bays at NP
Kunta Pooling Station
Aug 16
Annexure - IV
Kamuthi Solar(Max 100 MW injection)-TN
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/230 – 110 kV Substation
Kamuthi
3x315 MVA,
400/230 kV
TANTRAN
SCO
Sep 2016
2 x 200 MVA,
400/110 kV
400 kV Kamuthi – Karaikudi
(PG) (Q) D/C
230 kV Kamuthi –
Muthuramalingapuram
230 kV Kamuthi-Kavanoor
Samugarengapuram Wind (1800 MW existing + 300 MW) - TN
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/230 – 110 kV Substation
Samugarengapuram
3x315 MVA,
400/230 kV
Land to be identified
2 x 200 MVA,
400/110 kV
400 kV Samugarengapuram
– Udangudi D/C
LILO of 230 kV Kudankulam
– SR Pudur S/C at
Samugarengapuram
LILO of 230 kV Udayathur –
Sankaneri at
Samugarengapuram
230 kV Samugarengapuram
– Muppandal D/C
GREEN ENERGY CORRIDORS:- Inter State Transmission Scheme (ISTS) - Part – A
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
ISTS Part-A
400KV D/C Tirunelveli PS-
Tuticorin PS line-1 (Q)
11 kM PGCIL April 17
400KV D/C Tirunelveli PS-
Tuticorin PS line-2 (Q)
11 kM PGCIL April 17
400/220KV Tiruneveli PS.
(GIS)
2 x 500 MVA PGCIL April 17
400 kV Tirunelveli Pooling
Station
3x125 MVAR,
BR
PGCIL Agreed in 37th SCPSPSR
Annexure - IV
LTA to Wind Generators in Tirunelveli Area - Tamil Nadu
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/230 kV Tirunelveli
Pooling Station (GIS)
2x500 MVA PGCIL Work to
be
impleme
nted
after
LTA
Agreed in 37th SCPSPSR
2x125 MVAR,
BR
PGCIL Agreed in 37th SCPSPSR
400 kV Tirunelveli PS –
Tuticorin PS 2 x D/C (Q)
PGCIL Agreed in 37th SCPSPSR
Charging of Tuticorin –
Salem & Salem – Madhugiri
765kV lines &substationsat
its rated voltage 765 kV level
As discussed in 36th
SCPSPSR
230 kV Mytrah wind farms
300 MW –
Tirunelveli PS D/C
It was also decided that
after the Wind
Developers apply for
LTA as per the
CERCRegulations, 2009,
for at least 25% quantum
of their installed
capacity,connectivity and
LTA shall be granted and
transmission system
shall be taken upfor
implementation.
For connectivity as
discussed in 36th
SCPSPSR
230 kV Samimeru wind farms (4 x 48.5 MW) – Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
230 kV RS India wind farms (270 MW) – Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
400 kV Suzlon wind farms – Tirunelveli PS D/C
For connectivity as
discussed in 36th
SCPSPSR
Connectivity to Wind Generators in Coimbatore Area -Tamil Nadu
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
230 kV Suzlon (200 MW) switchyard –Pugalur D/C
It was also decided that
after the Wind
Developers apply for
LTA as per the
CERCRegulations, 2009,
for at least 25% quantum
of their installed
capacity,connectivity and
LTA shall be granted and
transmission system
shall be taken upfor
implementation.
For connectivity as
discussed in 36th
SCPSPSR
230kV Vestas wind farms (150 MW) – Udumalpet D/C
For connectivity as
discussed in 36th
SCPSPSR
Annexure - IV
Connectivity to Wind Generators in Anantpur Area – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
220 kV Suzlon wind farms – Gooty D/C
It was also decided that
after the Wind
Developers apply for
LTA as per the
CERCRegulations, 2009,
for at least 25% quantum
of their installed
capacity,connectivity and
LTA shall be granted and
transmission system
shall be taken upfor
implementation.
For connectivity as
discussed in 36th
SCPSPSR
Renewables (KfW) Hindupur – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch
COD
Ant COD/
Act COD
Constraints/ Remarks
400/220kV Substation at Hindupur
3x315 MVA As agreed in 36th
SCPSPSR
80 MVAR As agreed in 36th
SCPSPSR 400kV DC Hindupur - Uravakonda
130 kM As agreed in 36th
SCPSPSR 220kV Hindupur-PenukondaD/C
50 kM As agreed in 36th
SCPSPSR 220/132 kV Substations at Penukonda
2x100 MVA As agreed in 36th
SCPSPSR 220kV Hindupur to PampanurTanda ( TM ) D/C
90 kM As agreed in 36th
SCPSPSR 220/132 kV Substation at PampanurTanda
2x100 MVA As agreed in 36th
SCPSPSR
Renewables (KfW) Jammalamadugu – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/220/132kV Substation at Jammalamadugu
4x315 MVA As agreed in 36th
SCPSPSR
2X160 MVA As agreed in 36th
SCPSPSR 80 MVAR BR As agreed in 36
th
SCPSPSR
Annexure - IV
400kV Jammalamadugu - Kurnool (Q) D/C
125 kM As agreed in 36th
SCPSPSR
400kV DC Jammalamadugu -Uravakonda (Q) D/C
110 kM As agreed in 36th
SCPSPSR
220kV Jammalamadugu- TirumalaipallyD/C
17kM As agreed in 36th
SCPSPSR
220/132 kV Substation at Tirumalaipally
2x160 MVA As agreed in 36th
SCPSPSR
220kV Jammalamadugu- Betamcherla D/C
68 kM As agreed in 36th
SCPSPSR
220/132/33 kV Substation at Betamcherla
2x100 MVA As agreed in 36th
SCPSPSR
2x31.5 MVA As agreed in 36th
SCPSPSR
220kV Jammalamadugu- Chakrayapet SS D/C
70 kM As agreed in 36th SCPSPSR
220/132/33 kV Substation at Chakrayapet
2x100 MVA As agreed in 36th
SCPSPSR
2x31.5 MVA As agreed in 36th
SCPSPSR
220kV Jammalamadugu- Porumamilla SS D/C
75 kM As agreed in 36th
SCPSPSR
220/132 kV Substation at Porumamilla
2x100 MVA As agreed in 36th
SCPSPSR
Renewables (KfW) Uravakonda – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
400/220kV Substation at Uravakonda
4x315 MVA As agreed in 36th
SCPSPSR
80 MVAR BR As agreed in 36th
SCPSPSR
400kV Uravakonda - Mahaboobnagar D/C
190 Km As agreed in 36th
SCPSPSR
220kV Uravakonda -Vajrakarur SS ( TM ) D/C
13 kM As agreed in 36th
SCPSPSR
220/132 kV Substation at Vajrakarur
1x100 MVA As agreed in 36th
SCPSPSR 220kV Uravakonda- Borampalli( TM ) D/C
68kM As agreed in 36th
SCPSPSR 220/132 kV Substation at Borrampalli
1x100 MVA As agreed in 36th
SCPSPSR
Annexure - IV
Renewables (KfW) 220 kV Interconnectivities – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
220kV Hindupur 400kV -Hindupur220kV D/C
20kM As agreed in 36th
SCPSPSR 220kV Uravakonda SS -KalyanDurgD/C
50kM As agreed in 36th
SCPSPSR LILO of both the circuits of 220kVUravakonda–KalyanDurgat 220kV Borampalli SS
10 kM As agreed in 36th
SCPSPSR
220kV Jammalamadugu- TadipatriD/C
40 kM As agreed in 36th
SCPSPSR
Renewables (KfW) 132 kV Interconnectivities – AP
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
Penukonda- 132/33 kV Penukonda SS
10kM As agreed in 36th
SCPSPSR Jammalamadugu - 132/33 kVJammalamadugu SS
12kM As agreed in 36th
SCPSPSR Porumamilla to 132/33 kV Porumamilla SS
10 kM As agreed in 36th
SCPSPSR 220kV Jammalamadugu- TadipatriD/C
40 kM As agreed in 36th
SCPSPSR
Renewables (KfW) Intra-state – Karnataka
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch
COD
Ant COD/
Act COD
Constraints/ Remarks
400/220 kV Dhoni S/S 2x500 MVA 36 SCPSPSR: Line survey is underprogress Earlier agreed in 3 SCPSP SR (16.04.2012)
LILO of S/C400 KV line Davanagere- Guddadahally at Dhoni
52kM As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012) LILO of 220KV D/C Gadag-Lingapur at Dhoni
6 kM As agreed in 36th
SCPSPSR 220/66 kV Shivanasamudram S/S
2x100 MVA As agreed in 36th
SCPSPSR
Annexure - IV
LILO of 220KV D/C T.K.Hally and Madhuvinahallyat Shivanasamudram S/S
4 kM 36 SCPSPSR: Line survey to betaken up
Conversion of existing 220 kV Hootagally –Vajamangala – T.K. Halli S/Cline to D/C line with Drakeconductor
130 kM As agreed in 36th
SCPSPSR
220/66 kV Hosadurga S/S 2x100 MVA As agreed in 36th
SCPSPSR By extending 220 KV D/C line from the existing 400/220KV station at Hiriyur to Hosadurga
84 kM 36 SCPSPSR: Line survey
to betaken up
220kV D/C Gadag-Bagalkote& LILO of one of the220kV D/C line Bidnal - Lingapur.
191.4 kM 36 SCPSPSR: DPR ready
Conversion of 220kV SC to DC Guttur-Chitradurga.
170 kM 36 SCPSPSR: DPR ready
Conversion of 220kV SC to DC Chitradurga-Hiriyurand 2nd 220 KV S/C line between 400/220 KV & 220/66 KVstations at Hiriyur.
120 kM 36 SCPSPSR: DPR ready
LILO of one of the circuit 220KV D/C Narendra - Haveri atBidnal.
24 kM 36 SCPSPSR: Line survey to betaken up
Conversion 66kV DC line‘Coyote ACSR’ to ‘Drake ACSR’ Sakalespura-Hassan.
72 kM 36 SCPSPSR: DPR under progress
Renewables (KfW) Phase I – Tamil Nadu
Transmission Elements Line
Length
(ckm)/
MVA
Capacity
Implementing
Agency
Sch
COD
Anticipat
ed COD
Constraints/ Remarks
Thappugundu400/110 KV SS in Theni area
5 x 200 MVA
M/s BHEL,
New Delhi
04.12.14
/
30.09.15
March
2016
Works under progress.
63 MVAR Reactor
As agreed in 36th SCPSPSR
Anaikadavu400/230-110 KV SS in Udumalpet area
400/230 kV 2 x 315 MVA
M/s BHEL,
New Delhi
04.12.14
/30.09.1
5
March
2016
Works under progress.
400/110 kV 2 x 200 MVA
Annexure - IV
Rasipalayam400/230-110 kV SS in Udumalpet area
400/230 kV 2 x 315 MVA
M/s Alstom T
& D India
Limited,
Chennai
15.11.15
March
2016
Works under progress.
400/110 kV 2 x 200 MVA
63 MVAR Reactor
As agreed in 36th SCPSPSR
Kanarpatty400/230-110 KV SS in Tirunelveliarea
400/230 kV 2 x 315 MVA
March
2016
As agreed in 36th SCPSPSR
400/110 kV 2 x 200 MVA
March
2016
As agreed in 36th SCPSPSR
LILO of one circuit of Thappagundu -Anikadavu 400KV D /C Line at Udumalpet(PGCIL)
25 kM As agreed in 36th SCPSPSR
Tendering activities underway.
Agreement signed for bay
provision with PGCIL . Thappagundu- Anaikadavu 400 KV Twin DC
358 ckm M/s. KEC
International
Ltd, Gurgaon
31.05.15 March
2016
Works are under progress.
Anaikadavu- Rasipalayam 400 KV Twin DC
86 ckm M/s. KEC
International
Ltd, Gurgaon
13.08.14
/31.05.1
5
March
2016
Works are under progress.
Rasipalayam - Palvadi (SS) 400 KV Quad DC
386 ckm M/s Larsen
and Toubro
Ltd, Chennai
31.05.15 March
2016
Work under progress
Kanarpatti – Tirunelveli(PGCIL) 400 KV Quad S/C
15 kM March 2016
Work under progress
As agreed in 36th SCPSPSR Kanarpatty – Kayathar 400 KV D/C Twin line
12 kM March 2016
Work under progress
As agreed in 36th SCPSPSR
Renewables (KfW) Phase II – Tamil Nadu
Transmission Elements Line Length
(ckm)/ MVA
Capacity
Implemen
ting
Agency
Sch COD Ant COD/
Act COD
Constraints/ Remarks
Thenampatty400/230 KV SS inTirunelveli area
400/230 kV 4 x 315 MVA
18
months
from
date of
award
Price bid opened on
20.08.2015
As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012)
Annexure - IV
Vagarai400/230-110 KV SS in Udumalpetarea
400/230 kV 4 x 315 MVA
Not
consider
ed at
present
As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012) 400/110 kV 2 x 200 MVA
As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012) Thenampatty-Kayathar 400 KV Quad D/C
112 ckm Techno
Commer
cial
tender
analysis
under
progress
As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012) Thenampatty-Koilpatty 400 KV Quad D/C
110 ckm As agreed in 36th
SCPSPSR
Vagarai - Rasipalayam 400 KV Twin D/C
100 kM Not
consider
ed at
present
As agreed in 36th
SCPSPSR
Vagarai – Udumalpet (PGCIL) 400 KV Twin D/C
40 kM Not
consider
ed at
present
As agreed in 36th
SCPSPSR
Salem – Palvadi (Singarapet) 400 KV D/C Quad Line
90 kM Subject to availability of bays at Salem PS PGCIL
As agreed in 36th
SCPSPSR
Rasipalayam- Palvadi (Singarapet) 400 KV D/C Quad line
390 ckm Board note for placing order submitted
As agreed in 36th
SCPSPSR
Earlier agreed in 3 SCPSP
SR (16.04.2012)
Kayathar – Tuticorin Auto 230 KV D/C Line
110 ckm Work awarded on 30.06.15 Fifteen months from date of award
Sep 2016 As agreed in 36th
SCPSPSR Veeranam-Tirunelveli 230 KVDC Line
30 km As agreed in 36th
SCPSPSR Veeranam- Kodikurichi 230 KV D/C Line
25 km As agreed in 36th
SCPSPSR Ingur-Thiruppur 230 KV D/C Line
60 km As agreed in 36th
SCPSPSR
Arasur- Thiruppur 230 KV D/C line
As agreed in 36th
SCPSPSR Arasur- Gobi (MC patty) 230 KV DCline
95 km As agreed in 36th
SCPSPSR Cuddalore- Neyveli 230 KV DC line
360 ckm As agreed in 36th
SCPSPSR
Annexure - IV
Neyveli- SP Koil 230 KV DCline
As agreed in 36th
SCPSPSR OK Mandapam- Thudiyalur 230 KV DC Line
28 kM As agreed in 36th
SCPSPSR Sembatti-Madurai 230 KV DCline
40 kM As agreed in 36th
SCPSPSR Villupuram - Neyveli 230 KVDC line
40 kM As agreed in 36th
SCPSPSR Sembatty SS 2X100 MVA Contract
awarded on 25.08.2015 Eighteen months from date of award
Feb 2017 As agreed in 36th
SCPSPSR Anupankulam SS 2X100 MVA As agreed in 36th
SCPSPSR Cuddalore SS 2X100 MVA As agreed in 36th
SCPSPSR Pudhukottai SS 2X150 MVA As agreed in 36th
SCPSPSR Tiruvanamalai SS 2X150MVA As agreed in 36th
SCPSPSR Villupuram SS 2X100MVA As agreed in 36th
SCPSPSR