  • ANNEXURE IIANNEXURE II

  • Transmission elements Schedule Revised Constraints/ Remarks

    System Strengthening –XVII in SR Grid ( PGCIL SR II portion of Narendra‐KolhapurTransmission elements Schedule

    d CODRevised

    Target dateConstraints/ Remarks

    765 kV D/C Narendra (New Kudgi)- Kolhapur line (initially

    Mar’15 Sep’15 Completion matching withreadiness of Kudgi S/S (Landudg ) o apu e ( t a y

    charged at 400 kV)ead ess o udg S/S ( a dAcquisition in Feb 2014). Effortsbeing made to complete earlier.

    400 kV D/C Narendra (New Kudgi)  Sep’15 Completion matching with ( g )– Narendra (existing) line (Quad) S/stn

    LILO of both ckt at 400 kV D/C Kolhapur‐Mapusa line at Kolhapur

    Sep’15 Completion matching with S/stn

    765/400 kV Narendra (New Kudgi) SS (GIS) (charged at 400 kV)

    Apr’15 Sep’15 Award placed in Mar’14. Land acquired in Feb’14. Supply, civil works & errection under works & errection under progress

    765/400 kV Kolhapur  SS(GIS) (charged at 400 kV)

    Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress

    Extn. At 400/220 kV Narendra S/stn Sep’15 Award placed in Mar’14. Supply,civil works & errection under progress

  • Implement-ing CKM Sch. COD Ant COD/ Act COD

    Constraints/ Remarks

    Wardha - Nizamabad 765 kV D/C line

    Wardha-Nizamabad-Hyderabad (Maheswaram)765kV D/C

    PGCIL 1094 May’18Award placed in Mar’15. Towererrection commenced from Jul’15

    Wardha – Raipur PS 765 kV D/C PGCIL 713 Dec’15 Commissioned on 15-11-2014

    Extn. of Raipur 765 kV S/S PGCIL Dec’15 Completed

    Extn. of Wardha 765 kV S/S PGCIL May’18 May’18 Award under progress.

    Wardha Aurangabad 765 kV Line 1 commissioned in July 14 Line IIWardha – Aurangabad 765 kVD/C

    PGCIL 701 Dec’15 Fe b’15Line 1 commissioned in July 14. Line IIby Feb’15

    Extn. of Aurangabad 765 kV S/S PGCIL Mar’16 Mar’16Award placed in May’ 2014 and underprogress

    Nizamabad-Dichipalli 400 kVD/C

    PGCIL May’18Award placed in Mar’15. Towererrection commenced from Jul’15.

    Nizamabad-YeddumailaramThis along with “Maheshwaram PG -Mahboobnagar 400 kV D/C line” was

    (Shankarapalli) 400 kV D/C through based (TBCB) route. wasrecommended GoI for

    Maheshwaram PG 765/400 kV,2x1500 MVA S/S

    PGCIL Mar’18 Mar’18 Award placed in Ma’152x1500 MVA S/S

    Nizamabad 765/400 kV, 2x1500MVA S/S

    PGCIL May’18Award placed in Mar’15. Engg. Inprogress

  • Transmission ElementImple-

    mentingLine

    length COD Constraints/

    WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System

    Transmission Element mentingAgency

    length (ckm)/ MVA

    Capacity

    COD Constraints/ Remarks

    Sch. Ant / Act

    Scheme # 1: Raigarh‐Pugalur 6000 MW HVDC System . This system Scheme # 1: Raigarh Pugalur 6000 MW HVDC System . This system would be designed with normal 20% overload for 30 minutes and 10% overload for 2 hours The scheme

    had beenawarded to

    1. Establishment of Raigarh HVDC Station 8 kV  ith 6  MW HVDC t i l   awarded toPGCIL(GoI

    circular dated10.12.2014)as informed

    h

    +800kV with 6000 MW HVDC terminals. This Raigarh Station would be implemented with extended bus of Raigarh(Kotra) existing 400kV S/S. The 

    in 26th SRPCmeeting.

    Regulatedtariff

    g ( ) g 4HVDC Station would have GIS for 400kV part and AIS for HVDC part.

    2  Establishment of Pugalur HVDC Stn mechanismvide MoPletter dated03-03-2015.

    2. Establishment of Pugalur HVDC Stn+800kV with 6000 MW HVDC terminals. The HVDC Station would have GIS for 400kV part and AIS for HVDC part.3. ± 800 kV Raigarh (HVDC Stn) – Pugalur(HVDC Stn) HVDC Bipole link with 6000 MW capacity.

  • Transmission ElementImple-

    mentingLine

    length COD Constraints/

    WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System

    Transmission Element mentingAgency

    length (ckm)/ MVA

    Capacity

    COD Constraints/ Remarks

    Sch. Ant / Act

    Scheme # 2: AC System strengthening at Pugalur endScheme # 2: AC System strengthening at Pugalur end

    The schemehad beenawarded to

    1. Pugalur HVDC Station – Pugalur (Existing) 400kV (quad) D/c line2. Pugalur HVDC Station – Arasur 400kV (quad) D/c line awarded to

    PGCIL(GoIcircular dated10.12.2014)as informed

    (quad) D/c line.3. Pugalur HVDC Station – Thiruvalam 400kV(quad) D/c line with 2x80 MVAR line reactor atPugalur HVDC Station end and 2x63 MVAR line

    h l k das informedin 26th SRPCmeeting.

    Regulatedtariff

    reactor at Thiruvalam 400kV end.3. Pugalur HVDC Station – Edayarpalayam400kV (quad) D/c line with 63 MVAR switchable line reactor at Edayarpalayam end.

    d l d l k ( d) tariffmechanismvide MoPletter dated03-03-2015.

    4.Edayarpalayam – Udumulpeta 400kV (quad) D/c line.(Establishment of 400/220kV substation at Edayarpalayamwith 2x500 MVA transformers 

    d   MVAR b     ld b   d  and 2x125 MVAR bus reactors would be under the scope of TANTRANSCO. The bay for ISTS transmission lines at Edayarpalayamwould be implemented as ISTS.)

  • Transmission ElementImple-

    mentingLine

    length COD Constraints/

    WR‐SR Raigarh‐Pugalur‐ Kerala 6000 MW HVDC System

    Transmission Element mentingAgency

    length (ckm)/ MVA

    Capacity

    COD Constraints/ Remarks

    Sch. Ant / Act

    Scheme # 3: Pugalur‐ Trichur 2000 MW VSC Based HVDC SystemScheme # 3: Pugalur Trichur 2000 MW VSC Based HVDC System

    The schemehad been

    1.+320kV, 2000 MW VSC based HVDC terminal at Pugalur. The HVDC Station would have GIS for 400kV part and AIS for HVDC  awarded to

    PGCIL(GoIcircular dated10.12.2014)

    i f d

    HVDC part.2. +320kV, 2000 MW VSC based HVDC terminal at North Trichur. The HVDC Station would have GIS for 400kV part and  as informed

    in 26th SRPCmeeting.

    Regulatedt iff

    4 pAIS for HVDC part.3. Establishment of VSC based 2000 MW HVDC link between Pugalur and North T i h * (K l )  (* t/ t   f thi  li k   tariff

    mechanismvide MoPletter dated03-03-2015

    Trichur* (Kerala). (*part/parts of this link, in the Kerala portion, may be implemented as underground cable where implementation as overhead transmission  03-03-2015.pline is difficult because of RoW issues).4. LILO of North‐Trichur – Cochin 400 kV (Quad) D/c line at North Trichur HVDC Stn

  • Transmission Element ImplementingLine length (ckm)/ MVA COD Constraints / Remarks

    Angul - Srikakulam PS 765 kV D/C line

    Transmission Element Implementing Agency

    (ckm)/ MVA Capacity

    COD Constraints / Remarks

    Sch.Ant / Act

    Angul - Srikakulam PS 765 PGCIL 552 Jun'15 Aug’16

    St-1 forest clearance awaited(99Ha). )1 package re tendered& awarded in June ‘15.Completion matching with

    kV D/C line 552 Srikakulam-Vemagiri beingexecuted under TBCB(Sch:Aug’16)

    Extn. 765/400 kV Angul Sub PGCIL 1 1500 J ’15 J '16Award placed in Aug’13. Engg.S l i il k & tigstation PGCIL 1x1500 Jun’15 Jun'16 Supply, civil works & erectionunder progress

    765 kV D/C Angul-Jharsuguda line PGCIL 570 Dec'15 Jun’16

    RoW being faced. Huge forestinvolvement clearance awiated.Huge forest involvement765 kV D/C Jharshuguda-

    Dharamjayagarh line PGCIL 230 Dec'15 Jun’16Huge forest involvement.Critical

    Extn. of 765/ 400 kV Angul PGCIL D '15 A ’16

    Completion matching withSrikakulam-Vemagiri beingg

    SS PGCIL Dec'15 Aug’16g g

    executed under TBCB(Sch:Aug’16)

    Extn. of 765/ 400 kVJharshuguda SS PGCIL Dec'15 Jun’16

    Engineering & Civil worksunder progress

  • Srikakulam P P- Vemagiri- IIP li t ti 765 kV D/C

    M/s Vizag Transmission

    Li it d 30.08.201 A ’16 U d P

    Angul - Srikakulam PS 765 kV D/C line

    Pooling station 765 kV D/Cline

    Limited(A subsidiary of

    PGCIL)

    6 Aug’16 Under Progress

    Srikakulam Pooling Station 765/ Completion matching withSrikakulam Pooling Station 765/400 kV, 2x1500 MVA PS (400kV - AIS & 765 kV – GIS)

    PGCIL 2x1500 Aug’16Completion matching with

    Srikakulam-Vemagiri TBCB line(sch: Aug’16)

    Srikakulam Pooling StationSrikakulam Pooling Station –Garividi 400 kV (Quad) D/Cline with 80 MVAR switchableline reactor at Garividi end.

    PGCIL RFQ has been issued on12.04.2017 by RECTPCL

    400/220 KV S/S at Maradam(Garividi) along with 2 Nos. 400KV Quad Bays at the existing400/220 KV Kalpaka S/S

    APTRANSCO Feb’16Purchase order issued on15.11.2014Levelling work under progress

    Behrampur- Gazuwaka 400kV D/C line M/s Talcher

    TransmissionCompany Limited(Subsidiary of M/s

    290 CERC ROP (for 18.11.2014)enclosedCEA letter 17.11.2014 : Nophysical progress visible on

    Talcher II – Behrampur 400 kVD/C line 220

    T l h II R k l 400 kV (Subsidiary of M/sReliance PowerTransmissionCompany Limited)

    ground.The scheme needed to beimplemented without any furtherdelay

    Talcher II- Rourkela 400 kVD/C Quad line 161

    Behrampur 400/220 kV, 2x315MVA S/S 2x315

  • Additional inter‐Regional AC link for import into Southern Region, i.e., Warora‐Warangal ‐Hyderabad‐ Kurnool 765 kV link 

    CEA Notification dated 06.02.2015, CEA appointed PFC CL as BPCTransmission Elements Line Length

    (ckm)/ MVA Capacity

    Implementing

    Agency

    Sch COD

    Constraints/ Remarks

    Establishment of 765/400 kV substations at Bidding yet to a Warangal (New) with 2x1500 MVA transformer and

    2x240 MVAR bus reactors.

    g ycommence.RfQ inputs communicated by CTU

    bWarora Pool -Warangal (New) 765 kV D/C line with240 MVAR switchable line reactor at both ends.

    CTU.

    The transmission element at(g) was identified for

    cWarangal (New) –Hyderabad 765 kV D/C line with330 MVAR switchable line reactor at Warangal end.

    dWarangal (New) – Warangal (existing) 400 kV

    (quad) D/C line.Hyderabad– Kurnool 765 kV D/C line with 240 (g)

    implementation undercompressed time schedulethrough regulated tariffmecha nism by PGCIL.

    eHyderabad Kurnool 765 kV D/C line with 240MVAR switchable line reactor at Kurnool end.

    fWarangal (New) – Chilakaluripeta 765 kV D/C line

    with 240 MVAR switchable line reactor at bothends.

    g LILO of Kurnool-Thiruvalam 765 kV D/C atCuddapah

    PGCIL

    h Cuddapah- Hoody 400 kV (quad) D/C line with 63MVAR switchable line reactor at both ends.

  • T i i El t Li L th I l S h C t i t / R k

    System strengthening within SR for transmitting power beyond VemagiriCEA Notification dated 06.02.2015, CEA appointed RECTPCL as BPC

    Transmission Elements Line Length (ckm)/ MVA

    Capacity

    Implementing

    Agency

    Sch COD

    Constraints/ Remarks

    a Vemagiri II – Chilakaluripeta 765 kV D/C line with(i) SPV has been incorporatedVemagiri II Chilakaluripeta 765 kV D/C line with

    240 MVAR switchable line reactor at both ends.incorporatedon 06.04.2015.(ii) RFQ has been issued on

    b Chilakaluripeta – Cuddapah 765 kV D/C line with 240 MVAR switchable line reactor at both ends.

    12.04.2015.

    The transmission elements at(e) and (h) were identified forimplementation under

    c Chilakaluripeta – Narsaraopeta 400 kV (quad) D/C line

    dCuddapah – Madhugiri 400 kV (quad) D/C line with 80 MVAR switchable line reactor at both implementation under

    compressed time schedulethrough regulated tariffmechanism by PGCIL.

    d with 80 MVAR switchable line reactor at both ends.

    e Cuddapah-Hindupur 400 kV (quad) D/C line with 80 MVAR switchable line reactor at Hindupur end.

    PGCIL

    fSrikaukulam Pooling Station – Garividi 400 kV (Quad) D/C line with 80 MVAR switchable line reactor at Garividi end.

    gEstablishment of 2x1500 MVA, 765/400 kV substation at Chilakaluripeta with 2x240 MVARg substation at Chilakaluripeta with 2x240 MVAR bus reactors.

    hEstablishment of 2x1500 MVA, 765/400 kV substation at Cuddapah with 2x240 MVAR bus reactors.

    PGCIL

  • ANNEXURE IIIANNEXURE IIISRLDC

  • Delayed Transmission AdditionDelayed Transmission Addition

    S. No. Transmission CorridorProposed 

    Commissioning Date

    Actual/ Likely Commissioning 

    DateTransmission Constraint Caused

    Date Date

    1 400kV Edamon‐Cochin DC line Held up Mar‐16 220kV North ‐ South corridor of Kerala

    2 400kV Mysore‐Kozhikode DC line ‐‐‐ Dec‐15Congestion on North Kerala connected lines 

    like 220kV Kadakola‐Kaniyampet.NCTPS‐II Evacuation: Alamathy‐Thiruvalam DC Congestion on 400kV Vallur evacuation

    3NCTPS‐II Evacuation:  Alamathy‐Thiruvalam DC 

    lineFeb‐11 Sep‐15

    Congestion on 400kV Vallur evacuation system

    4Stage‐1 Wind evacuation system of TNEB: 400kv Kanarapatty SS, 400kV Kanarapatty‐

    Kayathar DC line‐ ‐

    Congestion on 400/230kV Tirunelveli ICTs, 230kV Kayathar‐Tirunelveli, 230kV 

    Udayathur‐Tirunelvelli, 230kV Veerannam‐Kayathar DC line

    Tirunelvelli etc

    5400kV Gooty‐Madhugiri Dc &

    400kV Madhugiri‐Yelhanka DC lineJun‐14 Uncertain

    Constraints on Import from New grid toSR through 765kV Raichur‐Sholapur DC

    line.

    6400kV Salem pooling Station‐Salem

    DC lineSep‐14 Sep‐15

    Congestion on S1‐S2 Corridor7

    400kV Somnahally ‐ Salem poolingStation DC line

    Aug‐14 Dec‐15

    Constraint on existing 400kV8 400kV Vijayawada‐Nellore DC line Nov‐14 Sep‐15

    gVijayawada‐Nellore DC line, if Vemagiri 

    complex generation increases.

    9 400kV Thiruvallam ‐Mettur D/c line Dec‐14 05.05.2015 Congestion on S1‐S2 Corridor

  • PLANNED TRANSMISSION SYSTEM TO RELIEVE CONGESTION IN SR

    Wardha Angul

    Sholapur

    KhammamHyderabad

    Kolhapur Srikakulam

    Dec15

    NunnaKarnool

    Raichur

    Vemagiri  PS

    Narendra New June15

    Nov15

    Nellore

    GootyBTPS

    Mar15

    June16TBCB

    Tiruvalam

    Somanahalli

    Dharmapuri

    Madugiri YelahankaMar15

    July 15 RowJul15June15

    Mysore

    Kojhikode

    Nagapattinam PSSalemMTPS

    Cochin

    Dec15

    Tuticorin PSRow

    RowEdaman

    Tirunelvelli

  • Planned Evacuation Scheme of Yeramarus(2x800MW) and Edlapur(1x800MW) Thermal power generation

    GULBARGA

    (2X800 MW)

    To be constructed by KPTCL

    (2X500MW)

    ( )YERAMARUS(1X800MW)

    EDLAPUR RTPS• As informed in 27th SRPC meeting 

    held on 12.05.2015, most of the lines are in tendering stage

    • Yeramarus TPS First Unit is in

    BTPS PS

    (2X500MW)BTPS

    TALAGUPPA

    (4X300 MW)JINDAL

    GUTTUR

    Yeramarus TPS First Unit is in advanced stage of commissioning

    C.N.HALLIHASSAN NELAMANGALA

    MADHUGIRI

    GUTTUR

    HASSAN NELAMANGALA

    MYSORE

  • Generation DelayedGeneration Delayed

    S. No Generating Unit Area/ StateProposed 

    Commissioning Date

    Actual/ Likely Commissioning Date

    Transmission Constraint Caused

    1 Kudankulam Unit‐2 Tamilnadu Dec‐08Unit‐1 commissioned on 31.12.14 , Unit expected 

    in June‐15

    Transmission congestion on North‐South corridor and S1‐

    S2 corridor2 Neyveli TPSII Expn Unit‐1 Tamilnadu Feb‐09 05.07.2015

    3 Neyveli TPSII Expn Unit‐2 Tamilnadu Jun‐09 22.04.2015

  • Transmission constraintsTransmission constraints

  • 400kV Kolar‐Hosur DC line

    North Chennai TPS St‐II both units and Vallur TPS 3 Units are synchronized & Declared CoD.Kadamparai Pump mode operation, Mettur area low generation and Drawal/Allocation to TamilNadu and Kerala is also causing high flow on these lines. S1‐S2 TTC is limited by N‐1 of theseNadu and Kerala is also causing high flow on these lines. S1 S2 TTC is limited by N 1 of theselines. This is a constraint for whole year.

    1400Load Duration Curve of 400 kV Kolar‐Hosur D/C Line

    APR 2015 MAY 2015 JUN 2015

    1000

    1100

    1200

    1300APR‐2015 MAY‐2015 JUN‐2015

    Large quantum of LTA and MTOA i

    500

    600

    700

    800

    900

    MW

    MTOA is granted to S2 constituents

    100

    200

    300

    400

    500

    00% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%

    % of Time

  • 400kV Hiriyur‐Nelamangala DC liney gWith Full generation at Jindal TPS, Bellary TPS, Low generation at UPCL and high windgeneration, the flow on 400kV Hiriyur‐Nelamangala D/C line is above 550MW. Also the 765kVSholapur‐Raichur D/C line commissioned without downstream network (400kV Gooty‐Sholapur Raichur D/C line commissioned without downstream network (400kV GootyMadhugiri‐Yelhanka D/C line and its associated downstream 220kV network) is creating furtherincrease in the line flow. This is a constraint for whole year.

    Load Duration Curve of 400 kV Hiriyur‐Nelamangala D/C Line

    1100

    1200

    1300

    1400Load Duration Curve of 400 kV Hiriyur Nelamangala D/C Line

    APR‐2015 MAY‐2015 JUN‐2015

    700

    800

    900

    1000

    MW

    300

    400

    500

    600

    0

    100

    200

    0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time

  • 400kV Udumalpet‐Palakkad DC line

    Kerala drawl is mainly through 400kV Udumalpet‐Palakkad D/C line. Presently the loadingon these lines is in the range of 450‐500 MW. This is a constraint for whole year.

    1200

    1300Load Duration Curve of 400kV Udumalpet‐Palakkad D/C Line

    APR‐2015 MAY‐2015 JUN‐2015

    800

    900

    1000

    1100

    400

    500

    600

    700

    MW

    100

    200

    300

    400

    00% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%

    % of Time

  • 400kV Nellore Pooling Station ‐ Nellore DC lineWith Full Generation at SEPL (600 MW) MEPL (300 MW) & TPCIL (660 MW) theWith Full Generation at SEPL (600 MW), MEPL (300 MW) & TPCIL (660 MW), the400kV NPS‐ Nellore D/C is usually around 1200 MW and it has reached up to1760 MW. With further commissioning of Units at MEPL and TPCIL, the problemwill aggravate In case of any outage on this line the N‐1 would be violated Thewill aggravate. In case of any outage on this line the N‐1 would be violated. TheThermal Limit of this line is 1748 MW. This is a new constraint which is not thereearlier.

    Load Duration Curve of 400kV Nellore Pooling Station Nellore DC

    14001500160017001800

    Load Duration Curve of 400kV Nellore Pooling Station ‐ Nellore DC LineApr‐2015 May‐2015 Jun‐2015

    800900

    1000110012001300

    MW

    300400500600700800

    0100200

    0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time

  • 400kV Jindal ‐ BTPS SC Line

    With the full generation at Jindal TPS, 400kV Jindal‐BTPS S/C line is getting loadedbeyond 650 MW. Other evacuation paths are 400kV Jindal‐Guttur S/C line and TwoICTs But at 220kV side also generation (2 X 130 MW) is available This is a constraint forICTs. But at 220kV side also generation (2 X 130 MW) is available. This is a constraint forwhole year.

    800Load Duration Curve of 400 kV Jindal‐BTPS S/C Line

    APR‐2015 MAY‐2015 JUN‐2015

    550

    600

    650

    700

    750APR 2015 MAY 2015 JUN 2015

    350

    400

    450

    500

    550

    MW

    100

    150

    200

    250

    300

    0

    50

    100

    0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time

  • ICT constraintsICT constraints

  • 600650

    Load Duration Curve of 400/220kV Gazuwaka ICTs Flow (2x315 MVA)   APR‐2015 MAY‐2015 JUN‐2015 N‐1 Contingency

    250300350400450500550

    MW

    050

    100150200250

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time

    800

    Load Duration Curve of 400/220kV Vemagiri ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015

    400450500550600650700750800

    MW

    050

    100150200250300350

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

    M

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

    % of Time

  • 650700

    Load Duration Curve of 400/220kV Nellore ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015

    N‐1 Contingency

    300350400450500550600650

    MW

    050

    100150200250

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%

    % of Time

    Load Duration Curve of 400/220kV Somanahalli ICTs Flow (2x500 MVA)

    500550600650700750800850

    / ( )APR‐2015 MAY‐2015 JUN‐2015

    N‐1 Contingency

    100150200250300350400450500

    MW

    050

    100

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time

  • 700

    Load Duration Curve of 400/220kV Mysore ICTs Flow (2x315 MVA)

    APR‐2015 MAY‐2015 JUN‐2015

    350400450500550600650

    MW

    APR 2015 MAY 2015 JUN 2015N‐1 Contingency

    050

    100150200250300

    0% 10% 20% 30% 40% 0% 60% 0% 80% 90% 100%

    M

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time

    550

    600 Load Duration Curve of 400/220kV Hiriyur ICTs Flow (2x315 MVA)APR‐2015 MAY‐2015 JUN‐2015

    300

    350

    400

    450

    500

    MW

    N‐1 Contingency

    50

    100

    150

    200

    250

    300M

    0

    50

    0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%% of Time

  • Low Voltage nodesLow Voltage nodes

  • S. No NodesSeason/ Antecedent 

    ConditionsDescription of the constraints

    Has the constraint occurred in 

    earlier quarter?

    1 400kV Somnahally SS During peak load 

    conditionVoltages are low during the peak load condition Yes

    2 400kV Nelamangala SS During peak load 

    conditionVoltages are low during the peak load condition Yes

    3 400kV MDuring peak load 

    V lt l d i th k l d diti N3 400kV Mysoreg p

    conditionVoltages are low during the peak load condition No

    4 400kV Bidadi SSDuring peak load 

    condition Voltages  are low during the peak load condition  Yes

    5 400kV Ud l SDuring peak load di i & hi h i d

    Voltages  are low during the peak load condition & high Y5 400kV Udumalpet Ss condition & high wind 

    period

    g g p gwind period

    Yes

    6 400kV Salem SSDuring peak load 

    condition & high wind period

    Voltages are low during the peak load condition & high wind period

    Yesperiod

    7 400kV Hosur SSDuring peak load 

    condition Voltages are low during the peak load condition  Yes

    8 400kV Palakkad SsDuring peak load 

    condition Voltages are low during the peak load condition  Yes

    9 400kV Trichur SSDuring peak load 

    condition Voltages  are low during the peak load condition  Yes

    10 400kV Cochin SSDuring peak load 

    condition Voltages  are low during the peak load condition  Yes

  • 435440

    Duration Curve of 400 kV Somnahally VoltageAPR‐2015 MAY‐2015 JUN‐2015

    405410415420425430

    KV

    375380385390395400

    0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%% of Time

    435440

    Duration Curve of 400 kV Nelamangala VoltageAPR‐2015 MAY‐2015 JUN‐2015

    405410415420425430

    KV

    375380385390395400

    3750% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 55% 60% 65% 70% 75% 80% 85% 90% 95% 100%

    % of Time

  • High Voltage nodesHigh Voltage nodes

  • S. No NodesSeason/ Antecedent 

    ConditionsDescription of the constraints

    Has the constraint occurred in earlier quarter?quarter?

    1 400kV Vijayawada SS Whole Year Voltages remain very high most of the time Yes2 400kV Vemagiri SS Whole Year Voltages remain very high most of the time Yes

    3 400kV Gooty SS Monsoon period and off peak period

    Voltages at Gooty, Karnool and Srisailam remain very high during monsoon period and off peak condition.

    Yes

    4 400kV Kurnool SS Yes4 400kV Kurnool SS Yes

    5400kV Nellore Pooling Station 

    SSMonsoon period 

    and off peak periodVoltages remain very high most of the time Yes

    6 400kV Satenapally Whole Year Voltages remain very high most of the time Yes7 400kV VTPS Stage 4 Whole Year Voltages remain very high most of the time Yes

    8 400kV Ghanapur SSMonsoon period 

    and off peak periodVoltages remain very high most of the time Yes

    9 400kV Mamidipally SS During off peak Voltages remain very high most of the time Yes10 400kV Srisailam LB SS During off peak Voltages remain very high most of the time Yes11 400kV Warangal SS During off peak Voltages remain very high most of the time Yesg g p g y g12 400kV Malkaram SS During off peak Voltages remain very high most of the time Yes

    13 400kV Narendra SS Whole YearDuring Low generation period and off peak period 400kV Narendra

    Voltage are High.Yes

    14 400kV Trichy SS During off peakDuring Low wind condition  and off peak  condition Voltages are 

    No14 400kV Trichy  SS During off peakvery High

    No

    15 400kV Sriperumbudur SS During off peak Voltages remain very high most of the time Yes16 400kV Thiruvallam SS During off peak Voltages remain very high most of the time Yes

    17 400kV Karaikudi  SS During off peakDuring Low wind condition  and off peak  condition Voltages are 

    very HighNo

    very High

    18 400kV Pugalur  SS During off peakDuring Low wind condition  and off peak  condition Voltages are 

    very HighNo

    19 765kV Raichur SSDuring off peak Voltages remain very high most of the time

    Yes20 765kV Kurnool SS Yes21 765kV N ll PS Y

  • Complete Station outage for the month May

  • Status of Installation of reactors at certain 400kV Substations by APTRANSCO/TSTRANSCOAPTRANSCO/TSTRANSCO

  • Voltages from 10‐08‐2015 to 23‐08‐2015

    430435

    VTPS SDSTPS VEMAGIRI KTPS 410kV

    415420425430

    395400405410

    395

    5 00:00:28

    5 11:00:28

    5 22:00:28

    5 09:00:28

    5 20:00:28

    5 07:00:28

    5 18:00:28

    5 05:00:28

    5 16:00:28

    5 03:00:28

    5 14:00:28

    5 01:00:28

    5 12:00:28

    5 23:00:28

    5 10:00:28

    5 21:00:28

    5 08:00:28

    5 19:00:28

    5 06:00:28

    5 17:00:28

    5 04:00:28

    5 15:00:28

    5 02:00:28

    5 13:00:28

    5 00:00:28

    5 11:00:28

    5 22:00:28

    5 09:00:28

    5 20:00:28

    5 07:00:28

    5 18:00:28100% time Voltage > 410 kV

    10‐08‐201

    10‐08‐201

    10‐08‐201

    11‐08‐201

    11‐08‐201

    12‐08‐201

    12‐08‐201

    13‐08‐201

    13‐08‐201

    14‐08‐201

    14‐08‐201

    15‐08‐201

    15‐08‐201

    15‐08‐201

    16‐08‐201

    16‐08‐201

    17‐08‐201

    17‐08‐201

    18‐08‐201

    18‐08‐201

    19‐08‐201

    19‐08‐201

    20‐08‐201

    20‐08‐201

    21‐08‐201

    21‐08‐201

    21‐08‐201

    22‐08‐201

    22‐08‐201

    23‐08‐201

    23‐08‐201

  • Voltages on 27‐08‐2015

    420

    425SEPL SDSTPS NTPL

    415

    420

    405

    410

    100% ti V lt 410 kV

    395

    400100% time Voltage > 410 kV

    15 00:00:00

    15 00:46:00

    15 01:32:00

    15 02:18:00

    15 03:04:00

    15 03:50:00

    15 04:36:00

    15 05:22:00

    15 06:08:00

    15 06:54:00

    15 07:40:00

    15 08:26:00

    15 09:12:00

    15 09:58:00

    15 10:44:00

    15 11:30:00

    15 12:16:00

    15 13:02:00

    15 13:48:00

    15 14:34:00

    15 15:20:00

    15 16:06:00

    15 16:52:00

    15 17:38:00

    15 18:24:00

    15 19:10:00

    15 19:56:00

    15 20:42:00

    15 21:28:00

    15 22:14:00

    15 23:00:00

    15 23:46:00

    27‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

    ‐27

    ‐Aug

  • Augmentation of Transformer Capacities in SR

  • Sl Name of the Applicant Location of Generating Station Region LTA granted for Allocation in SR

    NEW grid to SR LTA for June‐2016 (Tentative)Sl. No.

    Name of the Applicant Location of Generating Station Region LTA granted for (MW)

    Allocation in SR 

    (MW)

    1 BALCO (1200 MW)  Dharamjaigarh, Chhattisgarh WR 100 TN

    2 Jindal Power Ltd. (2400 MW) Raigarh (Tamnar), Chhatisgarh WR 400 TN

    3 KSK Mahanadi Power Co. Ltd  (3600 MW)

    Champa PS, Chhattisgarh WR 500 TN

    4 DB Power Ltd. (500 MW) Raigarh (Kotra), Chhattisgarh WR 208 TN

    5 Ind‐Bharat (Utkal) Power Limited Jharsuguda Pooling Station WR 500 TN

    6 GMR EMCO Energy Ltd. ** Bhardravati, Maharashtra WR 150 TN

    7 BALCO Dharamjaigarh, Chattisgarh WR 100 TN

    8 Dhariwal Power LILO of Bhadravati‐Parli, Maharashtra WR 100 TN

    9 KSEB(from Maithon Power) Maithon Power, Jharkhand ER 140.5 Kerala

    10 Adhunik Power & Natural Resources Ltd.

    Adhunik Power & Natural Resources Ltd.Jharkhand

    ER100

    TN

    11 BESCOM West Bengal and Jharkhand ER 450 BESCOM

    12 KSEB West Bengal  ER 141.5 KSEB

    Talcher Firm Share 1773

    DVC Allocation 33

    Solar Allocation 85Total 4781

  • Sl.  Name of the Applicant Injection of Power MTOA  Drawl of Power

    NEW grid to SR MTOA for June‐2016 (Tentative)No.

    pp jgranted for (MW)

    Entity / Location of Gen. Station Region Entity / Location of Loads Region

    1 SAIL ‐ VISP  NSPCL, Bhilai, Chhattisgarh WR 4.55 SAIL‐VISP, Karnataka SR

    2 SAIL VISP NSPCL Bhil i Chh i h WR 13 65 SAIL S l S l Pl T il N d SR2 SAIL ‐ VISP  NSPCL, Bhilai, Chhattisgarh WR 13.65 SAIL, Salem Steel Plant, Tamil Nadu SR3 NTPC Vidyut Vyapar

    Nigam LimitedCSPDCL, Chhattisgarh WR 297 KSEB, Kerala SR

    4 Facor Power Ltd Facor Power Ltd., Bhadrak, Odisha

    ER 10 Facor Alloys Ltd., Gariv idi, Andhra Pradesh

    SR

    5 Jindal Power Ltd Jindal Power Ltd WR  165 KSEB Ltd, Kerala SR

    6 KSEB Ltd Maithon Power Ltd,  ER 122 KSEB Ltd, Kerala SR

    7 KSK Mahanadi Power  KSK Mahandi Power Company  WR  347 APEPDCL & APSPDCL, AP SRCompany Ltd Ltd, Chhattisgarh

    8 PTC India Limited BALCO, Korba, Chhattisgarh WR 100 KSEB Ltd, Kerala SR

    9 Jindal Power Limited Jindal Power Limited, Chh tti h

    WR 59.5 TANGEDCO, Tamil Nadu SRChhattisgarh

    Total 1118.7

  • Annexure - IV

    Uravakonda Wind - AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    Uravakonda 400kV S/s 4x315 MVA

    +

    80 MVAR BR

    Jun-15 Aug-15 Work awarded to M/s.

    TEEECL in 20.08.2013 &

    work under progress

    400 kV (Q) Uravakonda - Jammalmadugu

    Jul-15 Oct-15 Work awarded on

    23.01.2014 & under

    progress

    400 kV (Q) Uravakonda - Mahaboobnagar

    190 kM Oct 15 35 SCPSPSR : Wind

    project in Uravakonda

    (1361 MW)

    KfW funding 36th

    SCPSPSR

    400 kV (Q) Uravakonda– Hindupur

    130 kM Tenders will be floated

    shortly.

    KfW funding 36th

    SCPSPSR

    400 kV Kondapur - Kurnool

    35 SCPSPSR : Wind

    project in Kondapur (1109

    MW)

    400 kV Uravakonda - Kondapur

    35 SCPSPSR : Wind

    project in Kondapur (1109

    MW) &vUravakonda

    (1361 MW)

    Solar Power Park at Ghani/Panyam (1000 MW )Phase-I Works - AP Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    Phase-I ( 500 MW)

    400/220kV Substation at Gani/Panyam

    3x500 MVA APTRAN

    SCO

    Tenders opened on

    20.04.2015 and under

    analysis

    2X125 MVAR BR

    APTRAN

    SCO

    400 kV Kurnool -Gani/Panyam (Q) D/C

    35 kM APTRAN

    SCO

    Tenders opened on

    20.04.2015 and

    under analysis 220 kV sub-pooling APTRAN

    SCO

    38th SCPSPSR – Details

    to be furnished

  • Annexure - IV

    Phase-II (500 MW)

    Jammalamadugu/ Kondapuram - Gani/Panyam (Q) D/C

    90 kM APTRAN

    SCO

    1000 MW Wind Power at Aspiri- AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/220kV Substation Aspiri

    3x315 MVA APTRAN

    SCO

    2X125 MVAR BR

    APTRAN

    SCO

    400kV Aspiri - Uravakonda(Q) D/C

    APTRANSCO

    220 kV sub-pooling APTRAN

    SCO

    38th SCPSPSR – Details

    to be furnished

    1500 MW NP Kunta Solar Project- AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    Phase-I 250 MW (NP Kunta) Dec 15

    400/220 kV Substation NP

    Kunta

    3x500 MVA, May

    2016

    1x125 MVAR BR

    ±100 MVAR

    STATCOM

    LILO of 400KV

    Kadapa(Cuddapah) - Kolar

    S/c line at NP Kunta

    May

    2016

    2 nos. 220kV line bays at NP

    Kunta Pooling Station

    May

    2016

    Phase-II 750 MW (NP Kunta) Sep 16

    LILO of Kadapa(Cuddapah)

    – Hindupur 400kV D/c (Q)

    line at NPKunta

    Aug 16

    6 nos. 220kV line bays at NP

    Kunta Pooling Station Aug 16

    Phase-III500 MW (Galiveedu) Dec 16

    Augmentation of

    transformation capacity at

    NP Kunta station

    1x500 MVA Aug 16

    4 nos. 220kV line bays at NP

    Kunta Pooling Station

    Aug 16

  • Annexure - IV

    Kamuthi Solar(Max 100 MW injection)-TN

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/230 – 110 kV Substation

    Kamuthi

    3x315 MVA,

    400/230 kV

    TANTRAN

    SCO

    Sep 2016

    2 x 200 MVA,

    400/110 kV

    400 kV Kamuthi – Karaikudi

    (PG) (Q) D/C

    230 kV Kamuthi –

    Muthuramalingapuram

    230 kV Kamuthi-Kavanoor

    Samugarengapuram Wind (1800 MW existing + 300 MW) - TN

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/230 – 110 kV Substation

    Samugarengapuram

    3x315 MVA,

    400/230 kV

    Land to be identified

    2 x 200 MVA,

    400/110 kV

    400 kV Samugarengapuram

    – Udangudi D/C

    LILO of 230 kV Kudankulam

    – SR Pudur S/C at

    Samugarengapuram

    LILO of 230 kV Udayathur –

    Sankaneri at

    Samugarengapuram

    230 kV Samugarengapuram

    – Muppandal D/C

    GREEN ENERGY CORRIDORS:- Inter State Transmission Scheme (ISTS) - Part – A

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    ISTS Part-A

    400KV D/C Tirunelveli PS-

    Tuticorin PS line-1 (Q)

    11 kM PGCIL April 17

    400KV D/C Tirunelveli PS-

    Tuticorin PS line-2 (Q)

    11 kM PGCIL April 17

    400/220KV Tiruneveli PS.

    (GIS)

    2 x 500 MVA PGCIL April 17

    400 kV Tirunelveli Pooling

    Station

    3x125 MVAR,

    BR

    PGCIL Agreed in 37th SCPSPSR

  • Annexure - IV

    LTA to Wind Generators in Tirunelveli Area - Tamil Nadu

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/230 kV Tirunelveli

    Pooling Station (GIS)

    2x500 MVA PGCIL Work to

    be

    impleme

    nted

    after

    LTA

    Agreed in 37th SCPSPSR

    2x125 MVAR,

    BR

    PGCIL Agreed in 37th SCPSPSR

    400 kV Tirunelveli PS –

    Tuticorin PS 2 x D/C (Q)

    PGCIL Agreed in 37th SCPSPSR

    Charging of Tuticorin –

    Salem & Salem – Madhugiri

    765kV lines &substationsat

    its rated voltage 765 kV level

    As discussed in 36th

    SCPSPSR

    230 kV Mytrah wind farms

    300 MW –

    Tirunelveli PS D/C

    It was also decided that

    after the Wind

    Developers apply for

    LTA as per the

    CERCRegulations, 2009,

    for at least 25% quantum

    of their installed

    capacity,connectivity and

    LTA shall be granted and

    transmission system

    shall be taken upfor

    implementation.

    For connectivity as

    discussed in 36th

    SCPSPSR

    230 kV Samimeru wind farms (4 x 48.5 MW) – Tirunelveli PS D/C

    For connectivity as

    discussed in 36th

    SCPSPSR

    230 kV RS India wind farms (270 MW) – Tirunelveli PS D/C

    For connectivity as

    discussed in 36th

    SCPSPSR

    400 kV Suzlon wind farms – Tirunelveli PS D/C

    For connectivity as

    discussed in 36th

    SCPSPSR

    Connectivity to Wind Generators in Coimbatore Area -Tamil Nadu

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    230 kV Suzlon (200 MW) switchyard –Pugalur D/C

    It was also decided that

    after the Wind

    Developers apply for

    LTA as per the

    CERCRegulations, 2009,

    for at least 25% quantum

    of their installed

    capacity,connectivity and

    LTA shall be granted and

    transmission system

    shall be taken upfor

    implementation.

    For connectivity as

    discussed in 36th

    SCPSPSR

    230kV Vestas wind farms (150 MW) – Udumalpet D/C

    For connectivity as

    discussed in 36th

    SCPSPSR

  • Annexure - IV

    Connectivity to Wind Generators in Anantpur Area – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    220 kV Suzlon wind farms – Gooty D/C

    It was also decided that

    after the Wind

    Developers apply for

    LTA as per the

    CERCRegulations, 2009,

    for at least 25% quantum

    of their installed

    capacity,connectivity and

    LTA shall be granted and

    transmission system

    shall be taken upfor

    implementation.

    For connectivity as

    discussed in 36th

    SCPSPSR

    Renewables (KfW) Hindupur – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch

    COD

    Ant COD/

    Act COD

    Constraints/ Remarks

    400/220kV Substation at Hindupur

    3x315 MVA As agreed in 36th

    SCPSPSR

    80 MVAR As agreed in 36th

    SCPSPSR 400kV DC Hindupur - Uravakonda

    130 kM As agreed in 36th

    SCPSPSR 220kV Hindupur-PenukondaD/C

    50 kM As agreed in 36th

    SCPSPSR 220/132 kV Substations at Penukonda

    2x100 MVA As agreed in 36th

    SCPSPSR 220kV Hindupur to PampanurTanda ( TM ) D/C

    90 kM As agreed in 36th

    SCPSPSR 220/132 kV Substation at PampanurTanda

    2x100 MVA As agreed in 36th

    SCPSPSR

    Renewables (KfW) Jammalamadugu – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/220/132kV Substation at Jammalamadugu

    4x315 MVA As agreed in 36th

    SCPSPSR

    2X160 MVA As agreed in 36th

    SCPSPSR 80 MVAR BR As agreed in 36

    th

    SCPSPSR

  • Annexure - IV

    400kV Jammalamadugu - Kurnool (Q) D/C

    125 kM As agreed in 36th

    SCPSPSR

    400kV DC Jammalamadugu -Uravakonda (Q) D/C

    110 kM As agreed in 36th

    SCPSPSR

    220kV Jammalamadugu- TirumalaipallyD/C

    17kM As agreed in 36th

    SCPSPSR

    220/132 kV Substation at Tirumalaipally

    2x160 MVA As agreed in 36th

    SCPSPSR

    220kV Jammalamadugu- Betamcherla D/C

    68 kM As agreed in 36th

    SCPSPSR

    220/132/33 kV Substation at Betamcherla

    2x100 MVA As agreed in 36th

    SCPSPSR

    2x31.5 MVA As agreed in 36th

    SCPSPSR

    220kV Jammalamadugu- Chakrayapet SS D/C

    70 kM As agreed in 36th SCPSPSR

    220/132/33 kV Substation at Chakrayapet

    2x100 MVA As agreed in 36th

    SCPSPSR

    2x31.5 MVA As agreed in 36th

    SCPSPSR

    220kV Jammalamadugu- Porumamilla SS D/C

    75 kM As agreed in 36th

    SCPSPSR

    220/132 kV Substation at Porumamilla

    2x100 MVA As agreed in 36th

    SCPSPSR

    Renewables (KfW) Uravakonda – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    400/220kV Substation at Uravakonda

    4x315 MVA As agreed in 36th

    SCPSPSR

    80 MVAR BR As agreed in 36th

    SCPSPSR

    400kV Uravakonda - Mahaboobnagar D/C

    190 Km As agreed in 36th

    SCPSPSR

    220kV Uravakonda -Vajrakarur SS ( TM ) D/C

    13 kM As agreed in 36th

    SCPSPSR

    220/132 kV Substation at Vajrakarur

    1x100 MVA As agreed in 36th

    SCPSPSR 220kV Uravakonda- Borampalli( TM ) D/C

    68kM As agreed in 36th

    SCPSPSR 220/132 kV Substation at Borrampalli

    1x100 MVA As agreed in 36th

    SCPSPSR

  • Annexure - IV

    Renewables (KfW) 220 kV Interconnectivities – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    220kV Hindupur 400kV -Hindupur220kV D/C

    20kM As agreed in 36th

    SCPSPSR 220kV Uravakonda SS -KalyanDurgD/C

    50kM As agreed in 36th

    SCPSPSR LILO of both the circuits of 220kVUravakonda–KalyanDurgat 220kV Borampalli SS

    10 kM As agreed in 36th

    SCPSPSR

    220kV Jammalamadugu- TadipatriD/C

    40 kM As agreed in 36th

    SCPSPSR

    Renewables (KfW) 132 kV Interconnectivities – AP

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    Penukonda- 132/33 kV Penukonda SS

    10kM As agreed in 36th

    SCPSPSR Jammalamadugu - 132/33 kVJammalamadugu SS

    12kM As agreed in 36th

    SCPSPSR Porumamilla to 132/33 kV Porumamilla SS

    10 kM As agreed in 36th

    SCPSPSR 220kV Jammalamadugu- TadipatriD/C

    40 kM As agreed in 36th

    SCPSPSR

    Renewables (KfW) Intra-state – Karnataka

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch

    COD

    Ant COD/

    Act COD

    Constraints/ Remarks

    400/220 kV Dhoni S/S 2x500 MVA 36 SCPSPSR: Line survey is underprogress Earlier agreed in 3 SCPSP SR (16.04.2012)

    LILO of S/C400 KV line Davanagere- Guddadahally at Dhoni

    52kM As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012) LILO of 220KV D/C Gadag-Lingapur at Dhoni

    6 kM As agreed in 36th

    SCPSPSR 220/66 kV Shivanasamudram S/S

    2x100 MVA As agreed in 36th

    SCPSPSR

  • Annexure - IV

    LILO of 220KV D/C T.K.Hally and Madhuvinahallyat Shivanasamudram S/S

    4 kM 36 SCPSPSR: Line survey to betaken up

    Conversion of existing 220 kV Hootagally –Vajamangala – T.K. Halli S/Cline to D/C line with Drakeconductor

    130 kM As agreed in 36th

    SCPSPSR

    220/66 kV Hosadurga S/S 2x100 MVA As agreed in 36th

    SCPSPSR By extending 220 KV D/C line from the existing 400/220KV station at Hiriyur to Hosadurga

    84 kM 36 SCPSPSR: Line survey

    to betaken up

    220kV D/C Gadag-Bagalkote& LILO of one of the220kV D/C line Bidnal - Lingapur.

    191.4 kM 36 SCPSPSR: DPR ready

    Conversion of 220kV SC to DC Guttur-Chitradurga.

    170 kM 36 SCPSPSR: DPR ready

    Conversion of 220kV SC to DC Chitradurga-Hiriyurand 2nd 220 KV S/C line between 400/220 KV & 220/66 KVstations at Hiriyur.

    120 kM 36 SCPSPSR: DPR ready

    LILO of one of the circuit 220KV D/C Narendra - Haveri atBidnal.

    24 kM 36 SCPSPSR: Line survey to betaken up

    Conversion 66kV DC line‘Coyote ACSR’ to ‘Drake ACSR’ Sakalespura-Hassan.

    72 kM 36 SCPSPSR: DPR under progress

    Renewables (KfW) Phase I – Tamil Nadu

    Transmission Elements Line

    Length

    (ckm)/

    MVA

    Capacity

    Implementing

    Agency

    Sch

    COD

    Anticipat

    ed COD

    Constraints/ Remarks

    Thappugundu400/110 KV SS in Theni area

    5 x 200 MVA

    M/s BHEL,

    New Delhi

    04.12.14

    /

    30.09.15

    March

    2016

    Works under progress.

    63 MVAR Reactor

    As agreed in 36th SCPSPSR

    Anaikadavu400/230-110 KV SS in Udumalpet area

    400/230 kV 2 x 315 MVA

    M/s BHEL,

    New Delhi

    04.12.14

    /30.09.1

    5

    March

    2016

    Works under progress.

    400/110 kV 2 x 200 MVA

  • Annexure - IV

    Rasipalayam400/230-110 kV SS in Udumalpet area

    400/230 kV 2 x 315 MVA

    M/s Alstom T

    & D India

    Limited,

    Chennai

    15.11.15

    March

    2016

    Works under progress.

    400/110 kV 2 x 200 MVA

    63 MVAR Reactor

    As agreed in 36th SCPSPSR

    Kanarpatty400/230-110 KV SS in Tirunelveliarea

    400/230 kV 2 x 315 MVA

    March

    2016

    As agreed in 36th SCPSPSR

    400/110 kV 2 x 200 MVA

    March

    2016

    As agreed in 36th SCPSPSR

    LILO of one circuit of Thappagundu -Anikadavu 400KV D /C Line at Udumalpet(PGCIL)

    25 kM As agreed in 36th SCPSPSR

    Tendering activities underway.

    Agreement signed for bay

    provision with PGCIL . Thappagundu- Anaikadavu 400 KV Twin DC

    358 ckm M/s. KEC

    International

    Ltd, Gurgaon

    31.05.15 March

    2016

    Works are under progress.

    Anaikadavu- Rasipalayam 400 KV Twin DC

    86 ckm M/s. KEC

    International

    Ltd, Gurgaon

    13.08.14

    /31.05.1

    5

    March

    2016

    Works are under progress.

    Rasipalayam - Palvadi (SS) 400 KV Quad DC

    386 ckm M/s Larsen

    and Toubro

    Ltd, Chennai

    31.05.15 March

    2016

    Work under progress

    Kanarpatti – Tirunelveli(PGCIL) 400 KV Quad S/C

    15 kM March 2016

    Work under progress

    As agreed in 36th SCPSPSR Kanarpatty – Kayathar 400 KV D/C Twin line

    12 kM March 2016

    Work under progress

    As agreed in 36th SCPSPSR

    Renewables (KfW) Phase II – Tamil Nadu

    Transmission Elements Line Length

    (ckm)/ MVA

    Capacity

    Implemen

    ting

    Agency

    Sch COD Ant COD/

    Act COD

    Constraints/ Remarks

    Thenampatty400/230 KV SS inTirunelveli area

    400/230 kV 4 x 315 MVA

    18

    months

    from

    date of

    award

    Price bid opened on

    20.08.2015

    As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012)

  • Annexure - IV

    Vagarai400/230-110 KV SS in Udumalpetarea

    400/230 kV 4 x 315 MVA

    Not

    consider

    ed at

    present

    As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012) 400/110 kV 2 x 200 MVA

    As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012) Thenampatty-Kayathar 400 KV Quad D/C

    112 ckm Techno

    Commer

    cial

    tender

    analysis

    under

    progress

    As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012) Thenampatty-Koilpatty 400 KV Quad D/C

    110 ckm As agreed in 36th

    SCPSPSR

    Vagarai - Rasipalayam 400 KV Twin D/C

    100 kM Not

    consider

    ed at

    present

    As agreed in 36th

    SCPSPSR

    Vagarai – Udumalpet (PGCIL) 400 KV Twin D/C

    40 kM Not

    consider

    ed at

    present

    As agreed in 36th

    SCPSPSR

    Salem – Palvadi (Singarapet) 400 KV D/C Quad Line

    90 kM Subject to availability of bays at Salem PS PGCIL

    As agreed in 36th

    SCPSPSR

    Rasipalayam- Palvadi (Singarapet) 400 KV D/C Quad line

    390 ckm Board note for placing order submitted

    As agreed in 36th

    SCPSPSR

    Earlier agreed in 3 SCPSP

    SR (16.04.2012)

    Kayathar – Tuticorin Auto 230 KV D/C Line

    110 ckm Work awarded on 30.06.15 Fifteen months from date of award

    Sep 2016 As agreed in 36th

    SCPSPSR Veeranam-Tirunelveli 230 KVDC Line

    30 km As agreed in 36th

    SCPSPSR Veeranam- Kodikurichi 230 KV D/C Line

    25 km As agreed in 36th

    SCPSPSR Ingur-Thiruppur 230 KV D/C Line

    60 km As agreed in 36th

    SCPSPSR

    Arasur- Thiruppur 230 KV D/C line

    As agreed in 36th

    SCPSPSR Arasur- Gobi (MC patty) 230 KV DCline

    95 km As agreed in 36th

    SCPSPSR Cuddalore- Neyveli 230 KV DC line

    360 ckm As agreed in 36th

    SCPSPSR

  • Annexure - IV

    Neyveli- SP Koil 230 KV DCline

    As agreed in 36th

    SCPSPSR OK Mandapam- Thudiyalur 230 KV DC Line

    28 kM As agreed in 36th

    SCPSPSR Sembatti-Madurai 230 KV DCline

    40 kM As agreed in 36th

    SCPSPSR Villupuram - Neyveli 230 KVDC line

    40 kM As agreed in 36th

    SCPSPSR Sembatty SS 2X100 MVA Contract

    awarded on 25.08.2015 Eighteen months from date of award

    Feb 2017 As agreed in 36th

    SCPSPSR Anupankulam SS 2X100 MVA As agreed in 36th

    SCPSPSR Cuddalore SS 2X100 MVA As agreed in 36th

    SCPSPSR Pudhukottai SS 2X150 MVA As agreed in 36th

    SCPSPSR Tiruvanamalai SS 2X150MVA As agreed in 36th

    SCPSPSR Villupuram SS 2X100MVA As agreed in 36th

    SCPSPSR