4
 PPTA-Integrated Citarum WRM Investment Programme, Indonesia Project director Meijden, Geerte van der (Gme) Assignment  The T A will (i) prepar e a bulk water supply master plan; (ii) prepare an option study for the bulk water supply; (iii) feasibility study (F), whi!h in!ludes investi"ative surveys, preliminary desi"ns, !ost estimates, te!hni!al, #nan!ial, and e!onomi! analysis, environment analysis, so!ial impa!t assessment, a baseline survey for proje!t indi!ators, and a proje!t administration manual; (iv) preparation of T$% and tender do!uments for detailed desi"n of the sele!ted options and initiate the tender pro!ess with !onsultants; (v) "roundwater mana"ement plan for &andun" &asin, (vi) upper !at!h mana"ement and development pro"ram, and (vii) s!ope for 'F% as well as a preparation fa!ility for 'F% Client Government of *ndonesia Financing Agency Asian +evelopment &ank Partners 't aturbina Gunatama; 't *-+. *nternusa; 't Mott Ma!+onald Composition of Team Euroconsult Mott MacDonald:  T eam leader; Groundwater spe!ialist; enior water resour!es en"ineer; enior water supply en"ineer; Geote!hni!al en"ineer; 'roje!t e!onomist/ Finan!ial mana"ement spe!ialist; o!ial development/ %esettlement spe!ialist; enior environment/ 0atershed mana"ement spe!ialist Partner(s):  0ater resour!es planner/ +eputy tam leader and 12 short term e3perts Period of Assignment From 4anuary 561 to 4une 5612 ta7 months8 .uro!onsult Mott Ma!+onald8 59; 'artner(s)8 : Contract value .uro!onsult Mott Ma!+onald8 < :,566 'artner(s) 8 < 6,966 ac!ground  The Government of *ndones ia re=uested for A+&>s assistan!e to prepare the 'eriodi! Finan! in" %e=uest 5 ('F% 5) of the *nte"rated itarum 0ater %esour!es Mana"ement *nvestment 'ro"ram, for addressin" the shorta"e of water supply in &andun" and its surroundin" "uroconsult Mott Mac#onald

2014_WM461CIT

Embed Size (px)

DESCRIPTION

f

Citation preview

7/18/2019 2014_WM461CIT

http://slidepdf.com/reader/full/2014wm461cit 1/4

PPTA-Integrated Citarum WRMInvestment Programme, Indonesia

Project director Meijden, Geerte van der (Gme)

Assignment  The TA will (i) prepare a bulk water supply master plan; (ii)prepare an option study for the bulk water supply; (iii)feasibility study (F), whi!h in!ludes investi"ative surveys,preliminary desi"ns, !ost estimates, te!hni!al, #nan!ial,and e!onomi! analysis, environment analysis, so!ialimpa!t assessment, a baseline survey for proje!tindi!ators, and a proje!t administration manual; (iv)preparation of T$% and tender do!uments for detaileddesi"n of the sele!ted options and initiate the tender

pro!ess with !onsultants; (v) "roundwater mana"ementplan for &andun" &asin, (vi) upper !at!h mana"ement anddevelopment pro"ram, and (vii) s!ope for 'F% as well asa preparation fa!ility for 'F%

Client Government of *ndonesia

FinancingAgency

Asian +evelopment &ank

Partners 't aturbina Gunatama; 't *-+. *nternusa; 't MottMa!+onald

Composition of Team

Euroconsult Mott MacDonald: Team leader; Groundwaterspe!ialist; enior water resour!es en"ineer; enior watersupply en"ineer; Geote!hni!al en"ineer; 'roje!te!onomist/ Finan!ial mana"ement spe!ialist; o!ialdevelopment/ %esettlement spe!ialist; enior environment/0atershed mana"ement spe!ialist

Partner(s): 0ater resour!es planner/ +eputy tam leaderand 12 short term e3perts

Period of Assignment

From 4anuary 561 to 4une 5612

ta7 months8 .uro!onsult Mott Ma!+onald8 59; 'artner(s)8:

Contract value .uro!onsult Mott Ma!+onald8 < :,566'artner(s)8 < 6,966

ac!ground  The Government of *ndonesia re=uested for A+&>sassistan!e to prepare the 'eriodi! Finan!in" %e=uest 5('F% 5) of the *nte"rated itarum 0ater %esour!esMana"ement *nvestment 'ro"ram, for addressin" theshorta"e of water supply in &andun" and its surroundin"

"uroconsult Mott Mac#onald

7/18/2019 2014_WM461CIT

http://slidepdf.com/reader/full/2014wm461cit 2/4

PPTA-Integrated Citarum WRM Investment Programme,Indonesia

5

areas and !onservin" the upper watershed

 The itarum river basin lo!ated in the provin!e of 0est

 4ava is so!ially and e!onomi!ally the most important riverbasin in *ndonesia The basin provides around ?6@ of thesurfa!e water supply to the !apital !ity of 4akarta andsurroundin" areas supportin" a population of about 6million and !ontributin" 56@ of the !ountry>s industrialoutputs *n addition, the river fed irri"ation s!hemesprodu!e @ of the !ountry>s ri!e produ!tion ustainablemana"ement of the surfa!e and "round water in the riverbasin is, therefore, !riti!al to the !ountry>s e!onomi!development and food se!urity Furthermore, water =ualityde"radation is !ompromisin" publi! health and livelihoods,

parti!ularly of the rural and urban poor, and in!ursadditional e!onomi! and #nan!ial !osts related to thedelivery of !lean and reliable water supplies

Followin" the ena!tment of the 0ater aw in 5662, theGovernment adopted an inte"rated approa!h to improvin"land and water mana"ement in the itarum river basinand developed a strate"i! inte"rated water resour!esmana"ement (*0%M) roadmap for the basin mana"ement*n 566?, A+& approved a Multitran!he Finan!in" Fa!ility(MFF) not e3!eedin" B66 million e=uivalent for the*nte"rated itarum 0ater %esour!es *nvestment 'ro"ram

(*nvestment 'ro"ram) The A+& also approved in 566? the'roje!t Finan!in" %e=uest 1 ('F% 1) under the MFF

#escription of project

0hile 'F% 1 implementation is pro"ressin" to stren"thenbasin wide water "overnan!e and mana"ement !apa!ity,demand and !ompetition for itarum water resour!es hasin!reased si"ni#!antly over the past 56 years 0atershedde"radation, rapid urbaniCation and industrialiCation in thearea and slow development of surfa!e water sour!es have!reated an overdependen!e on "roundwater as a primarysour!e of water onse=uently, the rate of water e3tra!tionfrom lo!al a=uifers si"ni#!antly e3!eeds re!har"e rates,

with water tables de!linin" at more than 1 meter a year insome pla!es This has led to a!ute water stress anddepletion of a=uifers in major urban areas su!h as&andun" Moreover, the hydrolo"i! Dow re"ime in theitarum river basin on whi!h &andun" water supplydepends has been also adversely a7e!ted by landde"radation, notably the loss of forest !over andunsustainable farmin" pra!ti!es on steep slopes in theupper !at!hments

 To e7e!tively address the problems of de"radin"

"uroconsult Mott Mac#onald

7/18/2019 2014_WM461CIT

http://slidepdf.com/reader/full/2014wm461cit 3/4

PPTA-Integrated Citarum WRM Investment Programme,Indonesia

watershed and a!ute water stress and depletion ofa=uifers in &andun" and its surroundin" areas, theGovernment re=uested A+& in 5616 to support the

preparation of 'F% 5 for #nan!in" under the *nvestment'ro"ram 'F% 5 will improve &andun" water supply bydevelopin" ade=uate surfa!e water resour!es andprovidin" raw water to the provin!ial water supply!ompanies ('+AMs), thereby redu!in" the dependen!e andovere3ploitation of "roundwater *t will also address theupper watershed de"radation

$ervicesprovided

 The TA will (i) prepare a bulk water supply master plan; (ii)prepare an option study for the bulk water supply; (iii)feasibility study (F), whi!h in!ludes investi"ative surveys,preliminary desi"ns, !ost estimates, te!hni!al, #nan!ial,

and e!onomi! analysis, environment analysis, so!ialimpa!t assessment, a baseline survey for proje!tindi!ators, and a proje!t administration manual; (iv)preparation of T$% and tender do!uments for detaileddesi"n of the sele!ted options and initiate the tenderpro!ess with !onsultants; (v) "roundwater mana"ementplan for &andun" &asin, (vi) upper !at!h mana"ement anddevelopment pro"ram, and (vii) s!ope for 'F% as well asa preparation fa!ility for 'F%

 The TA will also (i) identify priority reforms in provin!ial

water supply system ; (ii) prepare a situation and "apsanalysis of the raw water supply in the tar"eted areasbased on need and poverty alleviation; and (iii) prepare afeasibility study, whi!h in!lude investi"ative surveys,preliminary desi"ns, preliminary en"ineerin" desi"n ofsome subproje!ts, !ost estimates, te!hni!al, #nan!ial,e!onomi! and so!ioe!onomi! analysis, environmentanalysis, so!ial impa!t assessment, a study for initialben!hmark indi!ators, and a proje!t administrationmanual The se=uen!in" of the TA to prepare 'F% 5in!ludes the bulk water supply master plan for themetropolitan &andun" areas, feasibility studies for

sele!ted water supply options, tender do!uments fordetailed desi"n, and preparation of "roundwatermana"ement and upper watershed mana"ement Thea!tivities to be in!luded into 'F% 5 should be also reDe!tedinto the 'ola and %en!ana for itarum, whi!h is underpreparation with the support of TA E1?9 'a!ka"e &!onsultin" servi!es

Results

$enior sta% andfunctions

%ik Frenkel Team leader; harles 4ones Groundwaterspe!ialist; +avid Mei"h enior 0ater %esour!es .n"ineer;

"uroconsult Mott Mac#onald

7/18/2019 2014_WM461CIT

http://slidepdf.com/reader/full/2014wm461cit 4/4

PPTA-Integrated Citarum WRM Investment Programme,Indonesia

2

-i"el $smaston enior 0ater upply .n"ineer; Tim&lower Geote!hni!al .n"ineer; 'eter Mawson 'roje!t.!onomist/ Finan!ial Mana"ement pe!ialist; i!ky 'ineda

o!ial +evelopment/ %esettlement pe!ialist; 0im Giesen enior .nvironment/ 0atershed Mana"ement pe!ialist

"uroconsult Mott Mac#onald