2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

  • Upload
    cgraurr

  • View
    20

  • Download
    0

Embed Size (px)

Citation preview

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    1/12iC group of companies [email protected] www.ic-group.orgiC group of companies [email protected] www.ic-group.org

    TEN-T CNC Rhine

    DanubeCorridor study

    Second Corridor Forum

    Corridor Characteristics

    Inland Waterways

    Andreas Bck, viadonau18 June 2014

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    2/12iC group of companies [email protected] www.ic-group.org

    2

    Structure of the presentation

    (1) Overview on Inland Waterways of the Rhine

    Danube CNC

    (2) Infrastructurerequirements, characteristics and projects

    (3) Fairway maintenance needs

    (4) Deployment of River Information Services

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    3/12iC group of companies [email protected] www.ic-group.org

    Frankfurt/M

    Regensburg

    Enns Bratislava

    Budapest

    Bucureti

    Constana

    Wien

    3

    Vukovar

    Cernavod

    Galai

    Turnu-Severin

    Corridor origin/terminus

    Core Ports

    Sulina

    Beograd

    Border crossings

    Sisak

    Main sections IWW

    A Main Main-Danube-Canal Danube (KehlheimBudapest) X

    C

    DanubeDanube-Black Sea Canal (Budapest

    Constana/Midia/Sulina)

    + Sava (Sisak - Slavonski Brod Beograd)

    + BucuretiDunre Canal

    X

    Komrno

    Komarom

    CalafatVidin

    Ruse

    MidiaGiurgiu

    E80

    E80

    E80

    E80

    E80

    E80

    E80-14

    E80-12

    Nrnberg

    Danube

    Sava

    DanubeDanube-

    Black

    Sea

    Canal

    Slavonski Brod

    TEN-T CNC Rhine-Danube - Overview on IWW infrastructure

    Main +Main-Danube Canal

    Strasbourg

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    4/12iC group of companies [email protected] www.ic-group.org

    Compliance with ECMT waterway class IV:

    Length of vessels and barges: from 80-85m

    Maximum beam: from 9.50m

    Minimum draught: from 2.50m

    Tonnage: from 1000 1500t

    Minimum height under bridges: from 5.25 / 7.00 m (2 layer

    resp. 3 layer container transport)

    Preservation of good navigational status

    Equipment with River Information Services

    Availability of alternative clean fuels (for core ports only)

    Transport infrastructure requirements for IWW

    (TEN-T Guidelines, Article 15 and 39)

    4

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    5/12

    iC group of companies [email protected] www.ic-group.org

    5

    Inland waterways

    Free-flowing sections

    Low ECMT class (< IV)

    Low bridge clearance (< 5,25 m)

    Straubing - Vilshofen

    Inland waterways with critical infrastructure conditions

    Melk-Krems

    Wien - Devin

    Sap - Szob

    Sap Mohacs port / Batina

    Batina - Beograd

    Portil de fier II - SulinaSava

    especially in free-flowingsections a draught of 2.5 m

    throughout the year is hardly

    met, even the provision of

    2.5 m fairway depths on 240

    days on average per year is

    challenging for some sections

    River Sava is partly Class III

    low bridge clearance at the rail and road bridge in Auheim, the road bridge Alte Mainbrcke

    Wrzburg (arch bridge), the rail bridge Bogen and the Margit-hd in Budapest (arch bridge).

    Missing Link: Danube-Bucharest Canal

    5

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    6/12

    iC group of companies [email protected] www.ic-group.org

    Austria

    East of Vienna

    rkm 1,921 1,873

    Germany

    Straubing - Vilshofen

    rkm 2,319 2,250

    Hungary

    Szap - Mohcs

    rkm 1,708 1,433

    Bulgaria / Romania

    Iron Gate II Clrai

    rkm 850 375

    Romania

    ClraiBrila

    rkm 375 170

    Romania / Ukraine

    Tchatal Ismail

    Black Sea

    rkm 172 0

    6

    IWWidentification of main projects

    work on-going plans approved under study

    Slovakia

    Upstream of Bratislava

    rkm 1,880 1,862

    Slovakia / Hungary

    Downstream of Bratislava

    rkm 1,8111,708

    Croatia / Serbia /

    Bosnia Herzegovina

    Sava River

    Croatia / Serbia

    Upstream of Apatin

    rkm 1,433 1,382

    Serbia

    Danube in Serbia

    rkm 1,296 - 1,150

    GermanyMain

  • 5/24/2018 2014-06-16 AB TEN-T Rhine-Danube Corridor-characteristics IWW Short

    7/12

    iC group of companies [email protected] www.ic-group.org

    7

    Inland waterways with critical infrastructure conditions: locks