Water Supply, Wastewater Collection, Disposal and Treatment Systems for the towns of Hadibo and Qalansiyah in Soqotra Island, Yemen ro!ect director Wal, Jan van de (JWK) "ssi#nment Preparation of Detailed Engineering Design and Tender Documents for Water Supply, Wastewater ollection, Disposal and Treatment Systems for t!e towns of "adi#o and $alansiya! in So%otra &sland' Client overnment of emen $inancin# "#ency *ational government artners E, ++ man Composition of Team Euroconsult Mott MacDonald: Team -eader . ontract Specialist, /ield o0ordinator . Water Supply Engineer, "ydrogeologist, Sr /inancial Specialist, Topograp!ic Surveyor . Wastewater Engineer, Sr' Environment . Ecology Specialist, 1uto1D . +apping Specialist Partner(s): Sr' Water Supply 0 Wastewater . Treatment Process Design Eng', Electro0+ec!anical Design Engineer, Structural Engineer eriod of "ssi#nment /rom 1pril 2334 to June 2356 Sta7 mont!s8 Euroconsult +ott +acDonald8 59: Partner(s)8 64 Contract %alue Euroconsult +ott +acDonald8 ; <65,=33 Partner(s)8 ; >9,3>3 &ac'#round T!e So%otra arc!ipelago is located in t!e nort!0western part of t!e &ndian cean in t!e ulf of 1den a#out <33 ?m sout! of t!e emeni oastline' T!ere are four islands in t!e group, namely So%otra (52> @ <2 ?m) and t!e smaller islands of 1#d 1l Kuri, Sam!a and Darsa' Darsa is unin!a#ited and Sam!a and 1#d 1l Kuri are sparsely populated' T!e population of t!e arc!ipelago !as #een estimated to #e a#out <<,333' &t is one of t!e poorest and most disadvantaged group of islands anyw!ere' T!e water production for #ot! "adi#o and $alansiya! does not cover t!e water demand for t!e in!a#itants and ot!er activities' (uroconsult )ott )acDonald

2013_SE408SOQ

Embed Size (px)

DESCRIPTION

f

Citation preview

Yemen, Water Supply, Wastewater Collection, Disposal and Treatment Systems for Hadibo and Qalansiyah in Soqotra Island

Water Supply, Wastewater Collection, Disposal and Treatment Systems for the towns of Hadibo and Qalansiyah in Soqotra Island, Yemen2

ADVANCE \d 46

Water Supply, Wastewater Collection, Disposal and Treatment Systems for the towns of Hadibo and Qalansiyah in Soqotra Island, Yemen

Project directorWal, Jan van de (JWK)

AssignmentPreparation of Detailed Engineering Design and Tender Documents for Water Supply, Wastewater Collection, Disposal and Treatment Systems for the towns of Hadibo and Qalansiyah in Soqotra Island.

ClientGovernment of Yemen

Financing AgencyNational government

PartnersEC, MM Oman

Composition of TeamEuroconsult Mott MacDonald: Team Leader / Contract Specialist, Field Co-ordinator / Water Supply Engineer, Hydrogeologist, Sr Financial Specialist, Topographic Surveyor / Wastewater Engineer, Sr. Environment / Ecology Specialist, AutoCAD / Mapping Specialist

Partner(s): Sr. Water Supply - Wastewater / Treatment Process Design Eng., Electro-Mechanical Design Engineer, Structural Engineer

Period of AssignmentFrom April 2009 to June 2013

Staff months: Euroconsult Mott MacDonald: 16; Partner(s): 39

Contract valueEuroconsult Mott MacDonald: 431,800Partner(s): 56,050

BackgroundThe Soqotra archipelago is located in the north-western part of the Indian Ocean in the Gulf of Aden about 400 km south of the Yemeni Coastline. There are four islands in the group, namely Soqotra (125 x 42 km) and the smaller islands of Abd Al Kuri, Samha and Darsa. Darsa is uninhabited and Samha and Abd Al Kuri are sparsely populated. The population of the archipelago has been estimated to be about 44,000. It is one of the poorest and most disadvantaged group of islands anywhere. The water production for both Hadibo and Qalansiyah does not cover the water demand for the inhabitants and other activities. The existing water supply distribution system in Hadibo was not properly designed and 70% of it needs replacement while 30% has recently been installed in 2005. The continuity of water supply is daily but only for 12 hours per day.

Description of projectThe project aimed to improve the quality of life of the population in the towns of Hadibo and Qalansiyah by reducing health risks related to the use of insufficient drinking water (in terms of quantity and quality and lack of wastewater collection and treatment. This goal was to be achieved through the provision of basic volume of safe water through new and /or rehabilitated production and distribution systems and sanitary schemes improvement of the operational efficiency of the rehabilitated and/or upgraded water supply and scheme, and an improvement of the hygiene awareness and health attitudes of the population.

Services providedThe objectives of the Consultancy were:

i) To achieve an overall understanding of present water supply conditions and of future requirements.

ii) To determine satisfactory service levels and standards commensurate with affordability and environmental concerns.

iii) To ensure that facilities to be provided are least cost solutions financially, and environmentally sustainable, and appropriate to the circumstances.

iv) To arrive at the most feasible alternatives for the development of sufficient and sustainable water resources for the demand through the project horizon.

v) To carry out hydraulic networks analysis and rehabilitation study of the existing water systems.

vi) To recommend and design improvements and extensions to the water facilities to serve the population of the project area to the year 2034.

vii) To prepare the feasibility study and detailed design and tender document of the first stage for sewage collection and treatment facilities.

The scope of the services included the following major tasks:

Task (A) : Preparation of water supply system design report (feasibility report).

Task (B) : Preparation of detailed engineering design and tender documents for water supply project of Hadibo and Qalansiyah.

Task (C) : Preparation of wastewater design report ( feasibility report).

Task (D) : Preparation of detailed engineering design and tender document for wastewater collection and treatment systems.

Euroconsult Mott MacDonald