ASWG DHMG SWHN MOSG SHME WRSN DHID FILA WMZD SHPS & S2PS QDFA SASN BECH QURM ADST REEM SDYT TWPS ICAD To Salwa 400kV grid Station (KSA) GCSL Abu Dhabi Islands’ (AD) Northern Emirates (NE) A l-Ain region (AA ) Western region (WR) TANE SASN Eastern Region (ER) BHYG MHWG BHYG SMKG WSTG S3PS RWSG BABG BNPP MRPS 2020 FJCT HMEM F3 FAYA OMAN 400kV grid station. 400kV double circuit-standard rating. 400kV XLPE cable single circuit. 400kV generation entry points. 400kV double circuit-higher rating-2000MVA/circuit. 2013 Seven Year Electricity Planning Statement (2014-2020) Attachments Power Network Development Department Asset Management Directorate June 2013

2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

  • Upload
    dangthu

  • View
    214

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

2010 Best View (30GW)

ASWG

DHMG

SWHN

MOSG

SHME

WRSN

DHID

FILA

WMZD

SHPS & S2PS

QDFA

SASNBECH

QURM

ADST

REEM

SDYT

TWPS

ICAD

To Salwa 400kV grid Station (KSA)

GCSL

Abu Dhabi Islands’(AD)

Northern Emirates(NE)

Al-

Ain

reg

ion

(AA

)

Western region (WR)

TANE

SASN

Eastern Region

(ER)

BHYG

MHWG

BHYG

SMKG

WSTG

S3PS

RWSG BABG

BNPP

MRPS

2020

FJCT

HMEM

F3

FAYA

OMAN

400kV grid station.

400kV double circuit-standard rating.

400kV XLPE cable single circuit.

400kV generation entry points.

400kV double circuit-higher rating-2000MVA/circuit.

2013 Seven Year Electricity Planning Statement (2014-2020)

Attachments

Power Network Development Department Asset Management Directorate

June 2013

Page 2: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020) June 2013 TRANSCO/AMD/PNDD Attachments

Table of Contents

Attachment-A

Electricity generation capacity expansion plan (existing and committed plan).

Electricity demand forecast at the demand supply exit points.

Attachment-B

Electricity transmission network topology (400kV, 220kV, 132kV system).

Attachment-C

Forecast power flows and loading on the transmission system for Year 2013-2020.

Attachment-D

Fault levels at the transmission nodes for Year 2013-2020.

Attachment-E

Transmission system dataset.

Attachment-F

Constraints and constraint volumes.

Attachment-G

Major existing generation plants and planned committed generation projects.

Page 3: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-A

Electricity Generation Capacity Expansion Plan Electricity Demand Forecast

Page 4: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Power Stations/IWPPs/IPPs 2013 2014 2015 2016 2017 2018 2019 2020

1 UAN Plant ‐ APC 778 778 778 778 778

2 SASN Plant ‐ APC 1,652 1,652 1,652 1,652 1,652 1,652 1,652 1,652

3 TAW B1 + TAW B2 (TAPCO) ‐ Total 1,183 1,183 1,183 1,183 1,183 1,183 1,183 1,183

4 TANE (TAPCO)  1,037 1,037 1,037 1,037 1,037 1,037 1,037 1,037

5 TAW A1 + TAW A10 (GTTPC) ‐ Total 1,670 1,670 1,670 1,670 1,670 1,670 1,670 1,670

6 TAW A2 (ECPC) 760 760 760 760 760 760 760 760

7,080 7,080 7,080 7,080 7,080 6,302 6,302 6,302

1 Al Ain Power Station (AAPS) ‐ AMPC 256 256 256 256 256 256 256 256

256 256 256 256 256 256 256 256

1 Existing Al Mirfa Power Station ‐ AMPC 186 186

2 Madinat Zayed Power Station ‐ AMPC 109 109 109 109 109 109 109 109

3 Shuweihat S1 (SCIPCO)  1,615 1,615 1,615 1,615 1,615 1,615 1,615 1,615

4 Shuweihat S2 (RPC) 1,621 1,619 1,618 1,616 1,616 1,616 1,616 1,616

Table‐A1  Electricity Generation Capacity Expansion Plan (Existing and Committed Projects; and Retirement)

Eastern Region

Subtotal 1‐ Eastern Region (MW)

Al‐Ain Region

Subtotal 2‐ Al‐Ain Region (MW)

Western (Gharbia) Region

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A1  Sheet 1 of  2

Page 5: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Power Stations/IWPPs/IPPs 2013 2014 2015 2016 2017 2018 2019 2020

Table‐A1  Electricity Generation Capacity Expansion Plan (Existing and Committed Projects; and Retirement)

5 Shuweihat S3 (SAPCO) 493 1647 1647 1647 1647 1647 1647 1647

6 New IWPP at Mirfa 850 1600 1600 1600 1600 1600

7Nuclear Power Station at Barakah                                              (each unit 1390MWe)

1390 2780 4170 5560

4,024 5,176 5,839 6,587 7,977 9,367 10,757 12,147

1 Fujairah F1 + F1 Extension ‐ ESWPC 861 861 861 861 861 861 861 861

2 Fujairah F2 (FAPCO) 2,114 2,114 2,114 2,114 2,114 2,114 2,114 2,114

2,975 2,975 2,975 2,975 2,975 2,975 2,975 2,975

1 Shams CSP (peak capacity 50%) ‐ Masdar Shams and Others          50 50 50 150 150 150 150 250

2 Taqa Waste to Energy ‐ in ICAD area 100 100 200 200

50 50 50 150 250 250 350 450

14,385 15,537 16,200 17,048 18,538 19,150 20,640 22,130

Subtotal 4‐ Northern Emirates (MW)

Others

Subtotal 5 ‐ Renewables (MW)

Grand Total Generation Capacity (Gross MW)

Subtotal 3‐ Western Region (MW)

Northern Emirates

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A1  Sheet 2 of  2

Page 6: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

2013 2014 2015 2016 2017 2018 2019 2020

2,023 2,108 2,236 2,359 2,491 2,661 2,803 2,949

2,576 2,755 3,077 3,524 4,108 4,527 4,894 5,159

1,300 2,115 2,683 2,905 3,212 3,290 3,370 3,446

2,014 2,152 2,496 2,594 2,715 2,808 2,861 2,919

784 815 815 848 978 1,068 1,178 1,268

8,698 9,945 11,307 12,230 13,503 14,354 15,106 15,741

2,474 2,928 3,103 3,230 3,400 3,533 3,715 3,855

254 254 254 339 339 339 339 339

2,728 3,182 3,357 3,569 3,739 3,872 4,054 4,194

130 195 200 210 240 315 390 450

11,556 13,322 14,864 16,009 17,482 18,541 19,550 20,385

Total ‐ Northern Emirates (MW)

5) Aux & Desal Loads in Abu Dhabi Emirate 

Description/Region

1) Abu Dhabi Islands'

3) Western (Gharbia) Region

4) Al‐Ain Region

Total ‐Abu Dhabi Emirate (MW)

Table‐A2  Sum of Region‐Wise Peak Demand Forecast (MW)

C) Estimated Transmission Losses (MW)

Grand Total (MW)

A) Abu Dhabi Emirate

B) Northern Emirates

1) Northern Emirates (MW)

2) Water pumping & Aux Loads in N.E (MW)

2) Eastern Region

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A2  Sheet   1 of  1

Page 7: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

1 ADST  132/33 2 x 120 120 0.92 0.91 56 56 36 36 36 36 36 36 51 33

2 Market 1‐MKT1 (W1)  132/11 4 x 40 120 0.93 0.93 57 58 61 62 64 67 69 70 51 63

3 Capital Gardens‐CPGR (E08)  132/11 4 x 40 120 0.84 0.83 82 85 80 65 68 72 75 79 81 79

4 Firdous‐FRDS (E09)  132/11 4 x 40 120 0.95 0.95 73 73 63 63 63 66 69 73 64 64

5 Zayed 2nd St‐ZYD2 (E11)  132/11 4 x 40 120 0.84 0.84 78 78 79 70 69 70 72 75 77 75

6 Tourist Club‐TCLB (E15)  132/11 4 x 40 120 0.89 0.89 70 73 68 63 62 65 68 72 66 67

7 Port (E14)  132/11 4 x 40 120 0.96 0.97 51 52 55 57 60 63 66 70 44 60

9 New Market ‐MRKT (W02) 132/11 4 x 40 120 0.83 0.84 45 47 50 52 55 57 60 63 45 63

10 Souq (E01)  132/11 4 x 40 120 0.92 0.95 29 35 55 70 74 77 77 77 26 68

12 Corniche Hosp/Saraya ‐CRHO (E12) 132/11 4 x 40 120 0.91 0.91 20 42 44 46 49 51 47

13 E04/02  132/11 4 x 40 120 0.91 0.91 21 31 43 45 48 44

541 557 567 601 626 663 687 714

1 QURM (E19)  132/11 4 x 40 120 0.90 0.90 72 69 69 65 68 72 75 79 67 73

2 Madinat Zayed‐MDZD (E04)  132/11 4 x 40 120 0.92 0.91 99 99 99 95 90 Transferred to REEM Zone in 2017.

3 Khalidiya‐KLDY (W09) 132/11 4 x 40 120 0.91 0.91 88 88 88 88 88 88 88 88 81 81

4 Al Jazeira Hosp‐JZRH (W13) 132/11 4 x 40 120 0.96 0.97 83 87 87 79 83

Current intact capacity is 3x40MVA +24MVA. Intact capacity will be 4x40MVA by Q4 2015. Transferred to REEM Zone in 2017.

5 Bateen‐BATN (W39)  132/11 4 x 40 120 0.95 0.95 99 85 78 80 84 88 93 97 87 85

6 Bateen Bus Station‐BSTN (W17) 132/11 4 x 40 120 0.91 0.91 91 83 86 86 90 90 90 90 83 82

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

A) ADST Zone 

B) QURM Zone 

ADST Zone Total (MW)

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  1 of  10

Page 8: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

7 Conference Palace (CONH)  132/11 4 x 40 120 0.95 0.96 54 55 55 59 62 65 65 65 47 56

8 Marina Mall (MRML)  132/11 4 x 40 120 0.96 0.96 24 25 30 30 30 30 30 30 21 26

9 CLNS (E16/01)  132/11 4 x 40 120 0.97 0.97 65 65 66 68 71 75 79 83 56 71

10 Green Head‐GRHD (W41) 132/11 4 x 40 120 0.92 0.96 25 30 36 43 52 62 75 90 23 78

11 Presidential Palace (PRSP) 132/10 3 x 40 80 0.91 0.91 20 30 40 51 51 51 51 70

12 W13/02 132/11 4 x 40 120 0.91 0.91 25 Transferred to REEM Zone in 2017.

700 706 724 758 597 621 645 672

1 Beach‐BECH (E48)  132/11 4 x 40 120 0.95 0.96 74 75 75 77 79 79 79 79 65 69

2 Al Salam‐ALSM (E18)  132/11 3 x 40 80 0.95 0.95 59 60 58 52 45 47 50 52 78 69

3 Falah‐FLAH (E18/02)  132/11 4 x 40 120 0.95 0.96 91 95 97 100 101 103 105 108 80 94

4 New Mushrif‐ MSHF (W24) 132/11 4 x 40 120 0.97 0.98 108 108 108 100 102 105 108 110 93 94

5 Embassy‐EMBS (W59)  132/11 4 x 40 120 0.96 0.96 100 79 64 65 68 72 75 79 87 69

6 Higher Tech. College‐HTCO (E25)  132/11 4 x 40 120 0.95 0.95 101 101 104 87 90 95 99 100 89 88

7 GLFA (W47)  132/11 4 x 40 120 0.95 0.95 105 101 101 97 98 100 102 102 92 89

8 Khalifa Park‐KHPK  132/11 4 x 40 120 0.92 0.94 52 57 62 66 69 73 76 80 47 71

9 DANET‐DANT (E40)  132/11 4 x 40 120 0.91 0.94 16 38 48 63 65 68 72 75 15 67

10 CCAD near ADNEC (W59/02) 132/11 4 x 40 120 0.91 0.91 0 20 40 56 59 62 65 68 62

11 EROD (E25/02)  132/11 4 x 40 120 0.91 0.91 0 22 30 55 58 61 64 58

12 Rawdah ‐RWDH 132/11 3 x 40 120 0.91 0.91 44 57 70 64Indicative ‐ ADDC requirements to be confirmed. 

706 734 779 793 831 905 949 987

QURM  Zone Total (MW)

BECH Zone Total (MW)

C) BECH Zone 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  2 of  10

Page 9: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

1 REEM  132/22 4 x 80 240 0.90 0.92 22 25 40 45 49 55 66 75 10 34

2 RMDV  132/22 4 x 80 240 0.93 0.94 5 8 12 14 16 26 30 40 2 18

3 SRUH  132/22 4 x 80 240 0.93 0.94 5 8 15 21 27 29 32 35 2 16

4 TMUH 132/22 4 x 80 240 0.93 0.93 2 5 10 20 25 25 30 30 1 13

5 SOWA  132/22 4 x 80 240 0.91 0.93 22 28 33 39 45 50 57 63 10 28

6 Madinat Zayed‐MDZD (E04)  132/11 4 x 40 120 0.91 85 73 77 80 74Transferred from QURM to REEM Zone in 2017.

7 Al Jazeira Hosp‐JZRH (W13) 132/11 4 x 40 120 0.97 83 87 91 96 82Transferred from QURM to REEM Zone in 2017.

8 W13/02 132/11 4 x 40 120 0.91 30 38 43 53 49Transferred from QURM to REEM Zone in 2017.

56 74 110 139 360 383 426 473

1 SDYT  132/22 4 x 80 240 0.90 0.90 2 2 2 2 2 2 2 2 1 1

2 SDBB  132/22 4 x 80 240 0.91 0.93 13 30 42 45 50 58 63 65 6 29

3 SDCC  132/22 4 x 80 240 0.91 0.91 0 0 0 3 5 7 9 10 0 5

4 SDDD  132/22 4 x 80 240 0.91 0.91 5 5 12 18 20 22 22 25 2 11

20 37 56 68 77 89 96 102

2,023 2,108 2,236 2,359 2,491 2,661 2,803 2,949

SDYT Zone Total (MW)

D) REEM Zone 

REEM Zone Total (MW)

Abu Dhabi Islands' Grand Total (MW)

E) SDYT Zone 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  3 of  10

Page 10: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

1 Salt & Chlorine (SLTC)  132/11 3 x 40 80 0.90 0.91 38 40 42 48 50 53 55 58 88 80

Current intact capacity is 2x24MVA +40MVA. Intact capacity will be 3x40MVA by Q2 2014.

2 S18 (JSRN)  132/11 4 x 40 120 0.96 0.96 88 90 94 91 96 100 100 100 76 87

3 Old Airport (AIRP)  132/11 4 x 40 120 0.92 0.93 50 55 60 80 80 80 80 80 45 72

4 Khalifa A (MKAA)  132/11 4 x 40 120 0.95 0.94 105 105 105 97 97 97 97 97 92 86

5 Khalifa B (MKBB)  132/11 4 x 40 120 0.95 0.95 70 70 72 81 85 89 94 98 61 86

6 Khalifa Aka Watani (MKAW) 132/11 4 x 40 120 0.92 0.96 0 30 42 55 96 96 96 96 0 83

7 Capital District (STDM)  132/22 4 x 80 240 0.91 0.91 15 25 30 61 91 100 105 48

351 405 440 482 565 606 622 634

1 Watbha (WATH) ‐ existing  220/33 2 x 100 + 2x140 2x100+140 0.96 265 160 81 Dismantle in 2015/2016.

2 Watbha (WATH) ‐ new 132/33 3 x 120 240 0.96 0.96 110 195 200 205 220 220 220 95

3 Mahawi (MHWG) ‐ existing 220/33 3 x 140 280 0.94 270 185 103 Dismantle in 2015/2016.

4 Mahawi (MHWG) ‐ new 132/33 4 x 120 360 0.94 0.94 90 291 295 300 310 320 320 95

5 Mussafah (MOS1)   132/11 4 x 40 120 0.93 0.93 90 80 78 78 78 78 78 78 81 70

6 Mussafah M12 single circuit station (MICT) 132/11 2 x 40 N/A 35 25

7 Mussafah M12 (MICT) 132/11 4 x 40 120 0.93 0.93 23 42 46 51 56 61 68 61

8 Mohd Bin Zayed (MCAA)‐Z6/01 132/11 4 x 40 120 0.91 0.91 12 15 20 27 31 42 61 56

9 Mafraq single circuit station (LCMO)  220/33 140 N/A 60 60 60 Dismantle after Q2 2016.

SASN Zone Total (MW)

G) MAHAWI Zone 

F) SASN Zone 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  4 of  10

Page 11: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

10 Al Nahda (NAHD) 132/33 3 x 120 240 0.91 0.91 45 55 89 95 120 131 60

11 Mafraq (MAFQ) 132/22 4 x 80 240 0.91 0.91 45 55 75 85 100 120 55

12 MCBB (Z16) 132/11 4 x 40 120 0.91 0.91 0 22 45 50 55 69 63

13 Khalifa B (KBAA) 132/11 4 x 40 120 0.91 0.91 30 50 55 60 55

720 745 771 771 900 975 1,051 1,127

1 Raha‐B (RBBB)  132/22 4 x 80 240 0.92 0.94 25 28 43 50 60 71 80 100 11 44

2 BAHYA (BHYA) 132/33 2 x 140 140 0.96 0.96 100 103 109 110 119 120 122 126 74 94

3 Raha‐A (RBAA)  132/22 4 x 80 240 0.9 0.91 5 10 11 20 27 32 39 47 2 21

4 Yas Island (YAS1) 132/22 4 x 80 240 0.97 0.98 35 40 44 48 58 70 84 100 15 43

5 Al Falah (FLCT) 132/22 4 x 80 240 0.91 0.95 27 30 33 40 60 74 126 150 12 66

6 New Airport (ADIP) 132/22 4 x 80 240 0.91 0.91 0 10 35 44 55 70 90 100 46

7 Khalifa D (MKDD)   132/11 4 x 40 120 0.91 0.91 30 35 45 55 70 64

192 221 275 342 414 482 596 693

1 Shamkha single circuit station (1SMK) 220/33 80 N/A 68 70

2 Shamkha single circuit station (2SMK) 220/33 75 N/A 63 65

3 Shamkha (SMKH) 132/33 3 x 120 240 0.91 0.91 150 160 168 196 200 215 98

4 South Shamkha (SMKB) 132/22 4 x 60 180 0.91 0.91 30 35 75 80 121 125 76

5 Al Faya single circuit station (3SMK) 220/33 80 N/A 10 35 40 Dismantle in Q2/Q3 2017.

6 Al Faya ‐ 132/33kV (FAYA)  132/33 3 x 100 200 0.91 0.91 63 75 90 105 58

BAHIA Zone Total (MW)

H) BAHIA Zone 

MAHAWI Zone Total (MW)

I) SHAMKHA Zone 

Dismantle after Q2 2015.

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  5 of  10

Page 12: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

131 145 215 235 306 351 411 445

1 Mussafah (MOSG)  220/33 3 x 140 280 0.95 0.95 241 241 241 241 241 241 241 241 91 91

2 MGIC  220/33 4 x 140 420 0.95 0.95 314 315 329 332 338 344 350 357 79 89

3 ICAD  220/33 2 x (3 x 100) 400 0.92 0.95 50 70 105 110 250 297 330 340 14 89

4 ICAD Steel ‐GHC & Emirates (MOSF)  220/33 & 220/11

220/11kV (40+ 2x60 + 2x90); 220/33kV (2x180 + 2x60 + 

63)

TBC 0.94 0.94 305 305 305 305 305 305 305 305 Assumed reduced demand during peak.

910 931 980 988 1,134 1,187 1,226 1,243

1 Taweela A (TWPS‐A) 132/33 2 x 140 140 0.89 0.91 55 65 80 83 85 90 115 120 44 94  

2 Taweela A (TWPS‐A)‐ initial KIZAD loads 132/33 3 x 100  200 0.89 0.91 13 65 74 90 110 125 130 71  

3 ICAD/Emirates Steel Extension ‐ Phase3 TBC TBC TBC 0.91 255 255 255 255 255customer requirements/scheme to be confirmed. 

4 Other KIZAD loads  TBC TBC TBC 0.91 35 90 180 185 185Indicative ‐customer requirements to be confirmed.

55 78 145 447 520 635 680 690

1 Shahama East (SHME)  220/33 3 x 140 280 0.97 0.97 168 170 175 179 182 200 214 229 62 84

2 Samha (SMHG)  220/33 2 x 140 140 0.97 0.97 49 50 59 63 70 74 77 81 36 60

3 Ghantoot (GNTT) 220/33 2 x 140 140 0.91 0.91 0 10 17 17 17 17 17 17 13

217 230 251 259 269 291 308 327

2,576 2,755 3,077 3,524 4,108 4,527 4,894 5,159

Others (MW)

TAWEELA/KPIZ  Zone Total (MW)

K) TAWEELA/KPIZ Zone 

L) Other 220/33kV Grid Stations in Eastern Region

Eastern Region Grand Total  ‐MW

J) MUSSAFAH & ICAD Zone 

SHAMKHA Zone Total (MW)

MUSSAFAH & ICAD Zone Total (MW)

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  6 of  10

Page 13: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

1 Liwa (LIWA)  220/33 3 x 100 200 0.91 0.91 115 117 119 122 123 125 127 128 63 70

2 Madinat Zayed (WMZD)  220/33 2x100+140 200 0.90 0.90 115 118 124 130 137 150 153 155 64 86

3 Sila (SILA)  220/33 2 x 80  80 0.93 0.94 32 34 39 41 42 46 48 50 43 66

4 Mirfa (MRFA)  220/33 3 x 100 200 0.89 0.89 90 92 101 110 112 113 115 118 51 66

Existing intact capacity is 2x100MVA. Local generation at 33kV available upto end 2014. Planned to increase intact capacity to 3x100MVA in Q2 2015.

5 Ruwais (RUWS)   220/33 2 x 140 + 140 280 0.98 0.95 112 114 123 132 137 144 151 159 41 60

Existing intact capacity is 2x140MVA. Planned to increase intact capacity  to 3x140MVA by Q2 2015. 

6 Central (CNTG) 220/33 2 x 140 140 0.96 0.96 27 29 32 34 35 37 39 41 20 30

7 Liwa West single circuit station (LWST) 220/33 80 N/A 13 15 16 18 19 20 21 22

8 Ghayathi (GTHY)  220/33 2 x 140 140 0.88 0.89 33 34 41 45 48 50 52 53 27 43

9 Delma Island (DLMA) 132/11 2 x 40 40 0.91 0.92 14 15 18 19 20 21 22 24 38 65

10 Hameem single circuit station (HMMO) 220/33 100 N/A 17 18 23 25 26 28 29 30

11 Qusahwira single circuit station (QSWM) 220/33 100 N/A 4 4 7 11 11 11 11 11

12 Sir Baniyas Island (SRBY)  132/11 3 x 40 80 0.92 0.93 5 6 7 9 11 13 15 17 7 23

13 Baab (BAAB) for ADDC 220/33 2 x 100 100 0.91 0.91 0 10 17 23 28 32 37 41

14 New industrial loads ‐ ChemaWyeet 0.91 55 60 85 120 145 150Indicative ‐ Customer requirements to be confirmed.

577 596 715 773 829 905 960 994

M) 220/33kV Grid Stations and 132/11kV Substations in Western Region

Sub‐Total‐1 (MW)

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  7 of  10

Page 14: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

1 DABBIYA 220/33kV (DBYA) 220/33 2 x 110 110 0.93 0.91 45 45 45 45 45 45 45 45 44 45

2 RUMAITHA  220/33kV  (RMTH) 220/33 2 x 50 50 0.97 0.91 15 15 15 15 15 15 15 15 31 33

3 New Rumaitha ‐ 220kV 220/33 2 x 140 140 0.91 0.91 70 70 70 70 70 55

4 New Dabiyya ‐ 220kV 220/33 2 x 150 150 0.91 0.91 75 75 75 75 55

5 BUHASA ‐ 220/33kV (BHSA) 220/33 (2 x 140) + (2 x 140) 140 + 140 0.91 0.91 85 97 127 128 213 215 217 218 33 86

6 BAAB ‐ 220/132kV & 220/33kV220/132         & 220/33

(2 x 320) + (2 x 150)  320 + 150  0.91 0.90 68 115 209 209 211 211 211 212 16

7 Habshan Fields ‐5 (HBSN) 220 TBC TBC 0.91 0.91 0 53 53 53 53 53 53

8Habshan‐3 (OGD III) ONGS ‐ Source from BAAB

220/33 2 x 140 140 0.91 0.91 50 67 67 67 67 67 67 67 39 53

9 ENRU (in Habshan‐3 area) ‐ HBAA 220/33 2 x 140 140 0.91 0.91 43 43 43 43 43 43 34

10 ASAB ‐ 220/132kV  220/132 2 x 200  200 0.99 0.91 60 85 108 152 206 206 206 246 30

11 AGD‐II (ASGS) ‐ Source from ASAB 220/33 2 x 140 140 0.91 0.91 40 40 40 40 40 40 40 40 31 31

12 New supply for ADCO (Near ASAB)‐ADAS 220/33 TBC TBC 0.91 0.91 80 80 80 80 80 80

13 Qusahwira (ADCO 1.8MMBD Proj)‐WAHA 220/33 2 x 110 110 0.91 0.91 25 25 25 50 50 50 73 73 25 73

14 SHAH ADGDC (Near SHAH) TBC TBC TBC 0.91 0.91 25 280 280 280 280 280 280 280

15 ELIXIER‐II at Mirfa (ELXR)   220/33 (2 x 140) + (2x140) 140 + 140 0.98 0.98 100 100 100 100 100 100 100 100 36 36Assuming 1 train will run during the peak. 1 Train is 100MW. 2 trains is 160MW.

16 RUWAIS (RWSG)  400/220 3 x 500 1000 0.92 0.91 210 650 776 800 835 835 835 835 23 92

723 1,519 1,968 2,132 2,383 2,385 2,410 2,452

1,300 2,115 2,683 2,905 3,212 3,290 3,370 3,446Western Region Total (MW)

Sub‐Total‐2 (MW)

Customer requirements/scheme under study. 

N) 220kV Grid Stations in Western Region for ADNOC Group

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  8 of  10

Page 15: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

1 Sweihan (SWHG)  220/33 2x80 + 140 160 0.91 0.91 88 90 106 106 107 109 110 112 60 77

2 Al‐Hayer (AHYG)  220/33 3 x 80 160 0.94 0.94 69 72 74 77 79 82 84 85 46 57

3 Ramah (RMAG)  220/33 3 x 140 280 0.85 0.85 100 103 105 108 110 113 115 117 42 49

4 Al Khazna (KHZG)  220/33 2 x 140 140 0.93 0.93 62 64 64 66 66 66 68 70 48 54

5 Al Salamat (SLMG)  220/33 3 x 140 280 0.94 0.95 180 200 235 240 250 255 260 268 68 101

6 Al Foah (AOHG) 220/33 3 x 140 280 0.92 0.94 115 125 138 141 147 150 155 160 45 61

Currently intact capacity  is 2x140MVA. Planned to increase Intact capacity to 3x140MVA by Q2 2015. 

7 Dahma (DHMG)   220/33 3 x 80 160 0.93 0.91 135 145 99 90 93 96 99 100 91 69

8 Towayya (TWYA) 220/33 3 x 120 240 0.91 0.91 93 100 117 126 132 135 0 62

9 AAPS‐33kV Calor Emag  220/33 2 x 80 80 0.93 0.93 64 68 52 62 62 62 62 62 86 83

10 AAPS‐33kV Toshiba  220/33 100 + 80 80 0.93 0.93 65 70 70 70 70 70 70 70 87 94

11 AAPS‐33kV Siemens  220/33 2 x 80 80 0.93 0.93 62 78 58 58 60 60 60 60 83 81

12New Grid Station in Al‐Ain Power House (AAPH)

220/33 3 x 120 240 0.91 0.91 123 132 135 138 141 145 66

13 City Centre (CTCG) 220/33 3 x 140 280 0.90 0.90 186 190 191 192 195 199 200 205 74 81

14 Zakher (ZAKG)    220/33 3x120 + 2x140 380 0.93 0.94 210 228 262 267 267 272 275 280 98 78

Currently intact capacity  is (2x140MVA) + (2x90MVA). Planned to increase Intact capacity to (3x120MVA) + (2x140MVA) by Q2 2015. 

15 Mazyad (MZDG) 220/33 2 x 140 + 140 280 0.94 0.95 120 130 141 147 153 159 160 162 46 61

Currently intact capacity is 2x140MVA. Planned to increase Intact capacity to 3x140MVA by Q2 2014.

16 Sanaiya (SNYG) 220/33 3 x 140 280 0.93 0.93 210 221 160 167 175 185 190 200 81 77

17 Al‐Ain South West (ASWG) 220/33 3 x 140 280 0.96 0.98 100 110 147 171 186 204 210 212 37 77

18 Al‐Arad (ARDG) 220/33 2 x 140 140 0.86 0.87 78 84 86 88 92 94 95 98 65 80

19 Al‐Wagon (AWGG) 220/33 3 x 80    160 0.85 0.86 72 72 72 75 78 79 80 81 53 59Conversion of outdoor S/S to indoor S/S assumed to complete by Q2 2016.

O)  Al Ain Region

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  9 of  10

Page 16: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Substation Name/Code Voltage (kV) Intact Capacity (MVA)N‐1 Capacity 

(MVA)

Power factor on LV side (2013‐2016)

Power factor on LV side (2017‐2020)

2013 2014 2015 2016 2017 2018 2019 2020

Utilization w.r.t N‐1 Capacity in 2013 

(%)

Utilization w.r.t N‐1 Capacity in 2020 

(%)

Remarks

 Table‐A3  Peak Demand Forecast (MW) at Demand Supply Points in Abu Dhabi Emirate 

20 Umn Al Oush (OUSH) 220/33 2 x 140 140 0.92 0.92 28 32 34 36 36 40 40 40 22 31

21 Al‐Ain Industrial City (AIAA) 220/33 3 x 140 280 0.92 0.94 70 70 111 111 114 114 115 115 27 44

22 Ain Al Fydha (AAFD) 220/33 3 x 120 240 0.91 0.91 75 90 123 135 140 142 65

2,014 2,152 2,496 2,594 2,715 2,808 2,861 2,919Al‐Ain Region Grand Total (MW)  

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table A3   Sheet  10 of  10

Page 17: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐A

S.N Grid Station  Voltage (kV)

Intact Capacity (MVA)

N‐1 Capacity (MVA)

Power factor on LV side  (2013‐2016) 

Power factor on LV side (2017‐2020) 

ENG Utility 2013 2014 2015 2016 2017 2018 2019 2020

FEWA 250 250 335 350 350 350 350 350

SEWA 700 400 400 400 400 400 400 400

FEWA 400 400 400 400 450 455 455 455

SEWA 100 100 100 100 100 100 100

3 Ras Al Khaimah (FILA) 400/132 3 x 500 1000 0.98 0.95 FEWA 740 745 750 795 800 800 800 800

FEWA 366 400 450 500 550 650 750

SEWA 200 200 200 200 200 200 200

5 Fujairah City (FJCT) 400/132 3 x 500 1000 0.98 0.95 FEWA 384 467 518 535 600 678 760 800

2,474 2,928 3,103 3,230 3,400 3,533 3,715 3,855

2013 2014 2015 2016 2017 2018 2019 2020

700 700 700 700 700 700 700 700

1,774 2,228 2,403 2,530 2,700 2,833 3,015 3,155

0.95

3 x 500Dhaid (DHID) 1

4 x 500Ajman (WSTG) 

2 x 500  500 0.92

400/220

 Table‐A4  Exports to Northern Emirates (MW)

0.991000

2 Fujairah‐Qidfa (QDFA) 400/132

0.95

0.92

1500

Total SEWA exports (MW)

Total  FEWA exports (MW)

Year

Grand Total ‐ Northern Emirates (MW)

4 0.95400/132

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS(2014‐2020) Table A4   Sheet   1 of   1

Page 18: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-B

Electricity Transmission Network Topology (400kV, 220kV and 132kV System)

Page 19: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Sheet 1 of 25 AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

S.NGrid station/Substation 

NameCode

Voltage (kV)

S.N Grid station/Substation Name CodeVoltage 

(kV)

1 Abu Dhabi  ADST 132/33 26 Marina Mall MRML 132/11

2 Abu Dhabi  ADST 400/132 27 Market 1 MKT1 (W1) 132/11

3 Al Jazeira Hospital JZRH (W13) 132/11 28 New Market MRKT (W02) 132/11

4 Al Salam ALSM (E18) 132/11 29 New Mushrif  MSHF (W24) 132/11

5 Arabian Gulf  GLFA (W47) 132/11 30 Old Mushrif  MSXX  132

6 Bateen BATN (W39) 132/11 31 Port PORT (E14) 132/11

7 Bateen Bus Station BSTN (W17) 132/11 32 Presidential Palace (Ras Al Akdar) PRSP 132/11

8 Beach BECH 400/132 33 Qurm QURM 400/132

9 Beach BECH (E48) 132/11 34 QURM  QURM (E19) 132/11

10 Capital Centre ADNEC CCAD (W59/02) 132/11 35 Rawdah RWDH 132/11

11 Capital Gardens CPGR (E08) 132/11 36 Reem REEM 400/132

12 Clinic  Salam CLNS (E16/01) 132/11 37 REEM  REEM 132/22

13 Conference Palace  CONH 132/11 38 Reem development RMDV 132/22

14 Corniche Hospital/Saraya   CRHO 132/11 39 Sadiyat SDYT 132/22

15 DANET DANT (E40) 132/11 40 Sadiyat SDYT 400/132

16 E04/02  E04/02 132/11 41 Sadiyat B SDBB  132/22

17 Eastern Road  EROD (E25/02) 132/11 42 Sadiyat C SDCC  132/22

18 Embassy EMBS (W59) 132/11 43 Sadiyat D SDDD  132/22

19 Falah FLAH (E18/02) 132/11 44 Sorouh SRUH 132/22

20 Firdous FRDS (E09) 132/11 45 Souq  SOUQ (E01) 132/11

21 Green Head GRHD (W41) 132/11 46 Suwa SOWA 132/22

22 Higher Tech. College  HTCO (E25) 132/11 47 Tourist Club TCLB (E15) 132/11

23 Khalidiya KLDY (W09) 132/11 48 Tumuoh TMUH 132/22

24 Khalifa Park KHPK 132/11 49 W13/02 W13/02 132/11

25 Madinat Zayed MDZD (E04) 132/11 50 Zayed 2nd Street ZYD2 (E11) 132/11

Abu Dhabi Islands' Abu Dhabi Islands'

Page 20: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 2 of 25

S.N Grid station/Substation Name CodeVoltage 

(kV)S.N Grid station/Substation Name Code

Voltage (kV)

1 Al Falah City FLCT 132/22 25 Mussafah   MOS1 132/11

2 Al Faya  FAYA 132/33 26 Mussafah GIC MGIC 220/33

3 Al Faya temporary 3SMK 220/33 27 Mussafah Iron & Steel Factory   MOSF 220

4 Al Nahda  NAHD 132/33 28 Mussafah M12 temporary MICT 132/11

5 Bahia BHYG 400/132 29 New Airport  ADIP 132/22

6 BAHYA BHYA 132/33 30 Old Airport  AIRP 132/11

7 Bin Al Jeserean JSRN (S18) 132/11 31 Raha‐A  RBAA 132/22

8 Capital District  STDM 132/22 32 Raha‐B  RBBB 132/22

9 Ghantoot  GNTT 220/33 33 Salt & Chlorine  SLTC 132/11

10 ICAD Steel Extension ‐ Phase3 220 34 Samha  SMHG 220/33

11 Industrial City of Abu Dhabi ICAD 220/33 35 Sas Al Nakheel SASN 400/132

12 Industrial Mussafah City M12  MICT 132/11 36 Shahama SHME 400/220

13 Khalifa B KBAA 132/11 37 Shahama East  SHME 220/33

14 Madinat Khalifa A MKAA 132/11 38 Shamkha SMKG 400/132

15 Madinat Khalifa B  MKBB 132/11 39 Shamkha SMKH 132/33

16 Madinat Khalifa D   MKDD 132/11 40 Shamkha‐1 single circuit station  1SMK 220/33

17 Madinat Khalifa Aka Watani MKAW 132/11 41 Shamkha‐2 single circuit station  2SMK 220/33

18 Mafraq  MAFQ 132/22 42 South Shamkha SMKB 132/22

19 Mafraq temporary LCMO 220/33 43 Taweela  TWPS 400/132

20 Mahawi‐ new MHWG 132/33 44 Taweela A  TWPS‐A 132/33

21 Mahawi‐existing MHWG 220/33 45 Taweela Asia New Extension TANE 400

22 Mohammed Bin Zayed City ‐ Z6/01 MCAA 132/11 46 Umn Al Nar UNPS 220/132

23 Mohammed Bin Zayed City ‐ Z16 MCBB 132/11 47 Watbha‐ existing  WATH 220/33

24 Mussafah  MOSG 220/33 48 Watbha‐ new WATH 132/33

49 Yas Island  YASI 132/22

Eastern region Eastern region

Page 21: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 3 of 25

S.N Grid station/Substation Name CodeVoltage 

(kV)

1 Ain Al Fydha AAFD 220/33

2 Al Foah  AOHG 220/33

3 Al Khazna KHZG 220/33

4 Al Salamat  SLMG 220/33

5 Al‐Ain Industrial City  AIAA 220/33

6 Al‐Ain Power Station Calor Emag  CA 33

7 Al‐Ain Power Station Siemens  SE 33

8 Al‐Ain Power Station Toshiba  TH 33

9 Al‐Ain South West  ASWG 220/33

10 Al‐Arad  ARDG 220/33

11 Al‐Hayer AHYG 220/33

12 Al‐Wagon  AWGG 220/33

13 City Centre CTCG 220/33

14 Dahma   DHMG 220/33

15 Existing Al‐Ain Power Station Grid AAPS 220

16 Mazyad  MZDG 220/33

17 New Al‐Ain Power House Grid Station AAPH 220/33

18 Ramah  RMAG 220/33

19 Sanaiya  SNYG 220/33

20 Sweihan   SWHG 220/33

21 Towayya TWYA 220/33

22 Umn Al Oush  OUSH 220/33

23 Zakher    ZAKG 220/33

Al‐Ain region

S.N Grid station/Substation Name CodeVoltage 

(kV)S.N Grid station/Substation Name Code

Voltage (kV)

1 Asab ASAB 220 24 New Mirfa Power Station MRPS 400

2 Asab Switching Station ASBS 220 25 On shore Gas Station ‐ OGD III (Habshan‐2) ONGS 220/33

3 Asab Gas Station ‐ AGD II ASGS 220/33 26 Qusahwira single circuit station  QSWM 220/33

4 ADCO 1.8MMBD Project WAHA 220/33 27 Rumaithy RMTH 220/33

5 ADCO Asab ADAS 220/33 28 Ruwais  RWSG 400/220

6 New Baab BABG 400/220 29 Ruwais    RUWS 220/33

7 Existing Baab BAAB 220 30 Shah SHAH 220

8 Braka Nuclear Power Station BNPP 400 31 Shuweihat S1 Power Station SHPS 400

9 Buhasa BHSA 220/33 32 Shuweihat S2 Power Station S2PS 400

10 Central  CNTG 220/33 33 Shuweihat S3 Power Station S3PS 400

11 Dabiyya DBYA 220/33 34 Sila  SILA 220/33

12 Delma island  DLMA 132/11 35 Sir Baniyas Island  SRBY 132/11

13 ELIXIER  ELXR 220

14 GCC Grid Sila GCSL 400

15 Ghayathi   GTHY 220/33

16 Hameem single circuit station  HMMO 220/33

17 Habshan‐5 HBSN 220/132

18 ENRU‐Habshan‐2  HBAA 220/33

19 Liwa   LIWA 220/33

20 Liwa West single circuit station LWST 220/33

21 Madinat Zayed  WMZD 220/33

22 Madinat Zayed Western region  WMZD 400/220

23 Mirfa   MRFA 220/33

Western regionWestern region

Page 22: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 4 of 25

S.N Grid station/Substation Name CodeVoltage 

(kV)S.N Grid station/Substation Name Code

Voltage (kV)

1 Ajman  WSTG 400/132 21 Qusaidat Main ‐ FEWA QSMN 132/33

2 Al Awir Dubai WRSN 400 22 Quirat ‐ FEWA QUMN 132/33

3 Al Hayl Industrial Fujairah ‐ TRANSCO HAYL 132/33 23 Ras Al Khaimah  FILA 400/132

4 Al Wasit (Oman) WAST 400 24 Ras Al Khaimah Main ‐ FEWA RAKM 132/33

5 Dadnah ‐ FEWA DAMN 132/33 25 Sajja SAJA 220

6 Dhaid DHID 400/220 26 Shaggy ‐ FEWA SGMN 132/33

7 Dibba ‐ FEWA DBMN 132/33 27 Sharjah SRJH 400/132

8 Fujairah City  FJCT 400/132 28 Sheraih Main ‐ FEWA SHMN 132/11

9 Fujairah F1 Power Station F1PS 132 29 Sudha Port Fujairah ‐ TRANSCO SUDA 132/33

10 Fujairah Main ‐ FEWA FUMN 132/33 30 TRANSCO F1 Pumping station PPST 132/11

11 Fujairah‐Qidfa  QDFA 400/132 31 Tawyeen ‐ TRANSCO TAWY 132/33

12 Ghurfa Main ‐ FEWA GHMN 132/33 32 Water Tower ‐ FEWA WTMN 132/33

13 Kalba Fujairah ‐ TRANSCO KLBA 132/33 33 Wasit ‐ SEWA WSTS 132/33

14 Khor Khwair ‐ TRANSCO KHRK 132/33

15 Khorfakkan ‐ TRANSCO KPKN 132/33

16 Masafi Main ‐ FEWA MSMN 132/33

17 Munay Main ‐ FEWA MUMN 132/33

18 Namiyah ‐ FEWA NAMN 132/11

19 Nakheel Old Town Main ‐ FEWA NOTM 132/33

20 Qidfa Main ‐ FEWA QDMN 132/33

Northern Emirates & OthersNorthern Emirates & Others

Page 23: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

132/33kV transformer

220/33kV transformer

400kV XLPE cable

220kV XLPE cable

400kV OHL (standard rating 1400MVA per circuit)

220kV OHL

132kV Substation

New Assets by Peak Summer of the respective Year (400kV & 220kV)

400kV OHL (Higher rating 2000MVA per circuit)

132kV OHL

132kV XLPE Cable

400kV Gridstation

220kV Gridstation

Power Plant

400/132kV transformer

400/220kV transformer

220/132kV transformer

132/11kV transformer

New 132kV Assets by Peak Summer of the respective Year

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 5 of 25

132/22kV transformer

Page 24: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

SILA

WMZD

BHSA

LIWA

2x320MVA

4x140MVA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

2x100MVA

2x100MVA + 140MVA

MOSG

CNTG

2x140MVA

2x500MVA2x36 MVAr

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA

3x140MVA

3x80MVA

2x140MVA

3x80MVA

3x140MVA

TANE

SWHN

FILA

QDFA

MGIC

4x140MVA

2x140MVA

2x140MVA

RMTH

ICAD 2x50MVA

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr

DBYA

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36MVAr

2x20MVAr

3x500MVA

3x300MVA

AIAA

3x140MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

BAAB

2x(3x100MVA)

OGD III(ONGS)

2x140MVA

SHPS & S2PS

Masdar Shams(SHMS)

2x140MVA+2x90MVA

ASAB

220/132kV2x200MVA

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

2x320MVA

100MVA

2x80MVA

2x80MVA

SVC

+ 2x90 MVAr- 2x45 MVAr

AAPS

GTHY

2x70MVAr

2x140MVA

GNTT

2x150MVA

ToMahadha (MHDA)OMAN

3x500MVA

ADCO 1.8MMBD Project

Toshiba

Siemens

Calor Emag

MRFA

2x500MVA2x50MVAr

FJCT

3x500MVA

2x100MVA

WATH

MHWG

3x140MVA

RWSG

RUWS

N7015 

SHAH 2x140MVA

SMHG

AGD-II (ASGS)

N7137(Only 400kV cable) 

N2107‐01: S/S N7148: OHL

220/33kV75MVA Mobile-2

(2SMK-Shamkha Area)

220/33kV80MVA Mobile-1

(1SMK-Shamkha Area)

2x140MVA

220/33kV140MVA Mobile (LCMO-Mafraq)

220/33kV100MVA Mobile

(HMMO-Hameem) 220/33kV 100MVA Mobile

(QSWM-Qusahwira)

N11304       (Only OHL) 

220/33kV2x110MVA

N6318: OHL 

N5424‐V01 

S3PS

N7681: OHL N7680: S/S N7681: OHL

N11446: OHL 

User

220/33kV80MVA Mobile

(LWST-Liwa West area)

User

15/220kV165MVA

ELXR

GCSL

New assets expected by Summer 2013 Attachment-BFig. B1 400kV & 220kV Electrical Power System Topology- Year 2013

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 6 of 25

SASN

QURM

BECH

3x500MVA

3x500MVA

3x500MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

2x500MVA

4x500MVA4x50 MVAr

4x500MVA4x50MVAr

2x70MVAr

SDYT

2x250MVA

N5419 

N5398A/B 

UNPS

WAHA

DLMA

132/11kV2x40MVA

N7133: S/SN7097: 132kV Cables 

SRBY

132/11kV3x40MVA

TWPS

2x500 MVA3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NONO

NC NC

NC NC

2x140MVA

Transformer not available (failed)

Page 25: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

2x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

2x500MVA2x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAGKHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA +140MVA

3x140MVA

3x80MVA

2x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

2x140MVA

2x140MVARMTH

BHYG

ICAD

2x50MVA

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr

DBYA

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

2x100MVAr

2x70MVAr

2x100 MVAr

3x500MVA3x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVA

SVC+ 2x90 MVAr- 2x45 MVAr

Calor Emag

AAPS

SDYT

GTHY

2x100MVAr

2x70MVAr

2x140MVA

GNTT

3x500MVA

2x500MVA2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BABG

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

ADCO 1.8MMBD Project

100 MVAr

ASBS

MRFA

4x500MVA4x50MVAr

2x100MVA

2x100MVA

2x140MVA

WATH

MHWG

3x140MVA

open

2x500MVA

2x250MVA

SMKG

3x500 MVA

220/33kV75MVA Mobile-2

(2SMK-Shamkha Area)

220/33kV80MVA Mobile-1

(1SMK-Shamkha Area)

N7110: S/S N7150: OHL

220/33kV80MVA Mobile(3SMK- AlFaya)

220/33kV140MVA Mobile (LCMO-Mafraq)

N4611‐1A/1B, N4611‐1A V01 & N10920:S/S 

N7055:Cables N4906‐V04:OHL 

N7906:S/S 

N6524:Cables

N6462.A:S/S

N6462.C:S/S

UNPS

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA220/33kV

100MVA Mobile(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

OGD III(ONGS)

N11443 & N11446:OHL

N11447:S/S N11443 & N11446:OHL

2x140MVA+2x90MVA

2x140MVA

AGD-II (ASGS)

Sheet 7 of 25 AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

Attachment-BFig. B2 400kV & 220kV Electrical Power System Topology- Year 2014

MHWG

N6449:S/S N6445:OHL

N11762 

ToMahadha (MHDA)OMAN

New assets expected by Summer 2014

N7203 

N11448: S/SN11446: OHL 

WAHA

220/132kVHabshan-5

HBSN

BAAB

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

TWPS

2x500 MVA

3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NONO

NC NC

NC NC

3x100MVA 2x140MVA

Transformer not available (failed) 

N7149 

DB 2014Assumed dismantle of mobiles will start after Q2 2015. Assumed ADDC completes load transfer to new 132/33kV Shamkha substation by Q4 2014.    

N5812.2A 

Page 26: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

2x100MVA+100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

2x500MVA2x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

2x140MVA+ 140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

2x140MVA+140MVA

2x140MVA RMTH

BHYG

ICAD

2x50MVA

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr

DBYA

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

2x70MVAr

2x100 MVAr

3x500MVA3x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+ 80MVA

2x80MVA

2x80MVA

SVC+ 2x90 MVAr- 2x45 MVAr

Calor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

2x500MVA2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BABG

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

2x100 MVAr

4x500MVA4x50MVAr

2x100MVA

NO

3x500MVA

2x250MVASMKG

3x500 MVA

2x140MVA+3x120MVA

UNPS

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG)

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

AGD-II (ASGS)

BNPP

100MVAr

2x70MVAr

TWYA

2x500MVA2x36 MVAr

220/33kV80MVA Mobile(3SMK-AlFaya)

N6462.A: S/S

N6524:Cables

N6462.C: S/S

N7906:S/S 

N7055 Cables 

N6524:Cables

N6462.B: S/S

N‐P‐13‐0011 

N‐P‐13‐0010 

2x100MVA

2x140MVA

WATH

3x140MVA

220/33kV140MVA Mobile (LCMO-Mafraq)

MHWG

MRPS

MHWG

N12305‐A (LOT‐1A)  (400kV OHL betn Mirfa‐Ruwais).

N‐P‐13‐0023‐Lot2 

N‐P‐13‐0014 

N12304 (400/220/33kV Grid Station at Mirfa).

N12305‐C (LOT‐1B) (220kV OHL diversion works).

N12305‐B (LOT‐2A)  [400kV & 220kV OHL circuits (Quad Circuits) OHL betn Mirfa‐Central Junction J/P]. 

Central Junction

N12305‐C (LOT‐2B)  (220kV OHL works from J/P Central‐to Central G.S).

Al Faya Junction

N12305‐B (LOT‐2C)  (400kV OHL works from J/P Central‐Al Faya Junction) –Likely to be delayed to 2016.

N12305‐B (LOT‐2D)  (400kV OHL works from Al Faya Junction‐Shamkha) ‐Likely to be delayed to 2016.

Attachment-BFig. B3 400kV & 220kV Electrical Power System Topology- Year 2015

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 8 of 25

N6977 lot 2.1: S/S N6977 Lot 2.2: Cables

N7277: S/S & cables 

N7733: S/S N7734: Cables

MRFAN6977 Lot A.01: S/S N6977 Lot A.02: Cables

N12628‐Lot1 & Lot2

New assets expected by Summer 2015

ToMahadha (MHDA)OMAN

OGD III (ONGS) – Existing Habshan 3 Plant

2x140MVA(ENRU-Habshan 2)

By User

WAHA

ASBS

ADAS

BAAB

HBSN

220/132kVHabshan-5

HBAA

N12037OHL

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

100 MVAr +

TWPS

2x500 MVA

3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NONO

NC NC

NC NC

3x100MVA 2x140MVA

DB 2014 Start of dismantle 400kV OHL tower across ADST‐SDYT‐BHYG corridor likely to be after Q3 2016. Depends on completion of N7055/N7906 works and final stage of N‐P‐13‐0014 works. 

N‐12472(Only 220kV OHL works) 

DB 2014Assumed dismantle of mobile will start after Q2 2016. Assumed ADDC completes load transfer to new 132/33kV Nahda substation by Q4 2015.    

Transformer not available (failed) 

Page 27: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

3x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

3x500MVA3x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

3x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

3x140MVA

2x140MVA RMTH

BHYG

ICAD

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr+ 2 x 50MVAr

DBYA

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

2x70MVAr

3x100 MVAr

3x500MVA3x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVACalor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

Masdar Noor

2x500MVA2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BABG

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

3x100 MVAr

4x500MVA4x50MVAr

2x100MVA

NO

2x500MVA

SMKG

3x500 MVA

2x140MVA+3x120MVA

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

OGD III (ONGS) – Existing Habshan 3 Plant

AGD-II (ASGS)

BNPP

2x100MVAr

TWYA

2x500MVA2x36 MVAr

220/33kV120MVA

220/33kV80MVA Mobile(3SMK- AlFaya)

N6462.A: S/S

N6524:Cables

N6462.C: S/S

N‐P‐13‐0012 

MRPS

MHWG

Central Junction

Al Faya Junction

Attachment-BFig. B4 400kV & 220kV Electrical Power System Topology- Year 2016

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 9 of 25

MRFA

New assets expected by Summer 2016

N12311 

N‐P‐13‐0018 

Mahadha (MHDA)OMAN

User 

UNPS

F3

WAHA

ASBS

ADAS

BAAB

HBSN

220/132kVHabshan‐5

HBAA

2x140MVA(ENRU‐Habshan 2)

2x250MVA

2x100MVA

2x140MVA

WATH

3x140MVA

MHWG

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

DB 2014 Assumed in 2016. Time line and location to be confirmed by ADWEA Privatization Directorate/ADWEC.   

2x50MVA

New Rumaithy

DB 2014(Only 220kV OHL works)

TWPS

2x500 MVA

3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NO NO

NC NC

NC NC

+ 2x90 MVAr- 2x45 MVAr

2x140MVA3x100MVA

DB 2014 Start of dismantle 400kV OHL tower across ADST‐SDYT‐BHYG corridor likely to be after Q3 2016. Depends on completion of  final stage of N‐P‐13‐0014 works. 

DB 2014 Ref‐configure 220kV OHL circuits betn Shahama‐Al Ain and Mahawi area. 

N6384Includes Watbha 220/33kV substation equipment decommision, dismantle and transport to stores (220kV GIS; 2x100MVA transformer &  1x140MVA transformer).  

DB 2014Scope to include dismantle Mahawi 220/33kV substation equipment, 220kV OHL towers in Mahawi and Watbha area. Start dismantle likely after Q3 2016. 

DB 2015 Start of dismantle 400kV OHL towers across SASN‐MHWG‐MOSG corridor likely to be after Q2/Q3 2017. 

N‐P‐13‐0023‐Lot2 

N6524:Cables

DB 2014Replaced failed transformer

220/33kV140MVA Mobile (LCMO-Mafraq)

DB 2014Assumed dismantle of mobile will start after Q3 2016. Assumed ADDC completes load transfer to new 132/33kV Nahda substation by Q4 2015.    

2x500MVA2x36MVAr

MahadhaOMAN

N10941: S/SN11072: OHL

2x140MVA

SVC

Page 28: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

3x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

3x500MVA3x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

3x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

3x140MVA

2x140MVARMTH

BHYG

ICAD

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr+ 2 x 50MVAr

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

2x70MVAr

3 x100 MVAr

3x500MVA3x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVACalor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

Masdar Noor

2x500MVA2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BABG

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

3x100 MVAr

4x500MVA4x50MVAr

2x100MVA

NO

3x500MVA

SMKG

3x500 MVA

2x140MVA+3x120MVA

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG)

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

AGD-II (ASGS)

BNPP

2x100MVAr

TWYA

2x500MVA2x36 MVAr

MRPS

MHWG

Central Junction

Al Faya Junction

Attachment-BFig. B5 400kV & 220kV Electrical Power System Topology- Year 2017

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 10 of 25

MRFA

New assets expected by Summer 2017

Mahadha (MHDA)OMAN

NPP-1

220/33kV120MVA

OGD III (ONGS) – Existing Habshan 3 Plant

N‐P‐13‐0014 (final stage assumed in 2017 ‐ Need to accelerate for completion by Q2 2016).  

UNPS

F3

IPP

WAHA

ASBS

ADAS

BAAB

HBSN

220/132kVHabshan‐5

HBAA

2x140MVA(ENRU‐Habshan 2)

DB 2014 

N12732 Time line dependent on UAN Plant retirement. Assumed delayed upto 2017 per ADWEC Capacity Statement dtd Dec 2012. 

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

TWPS

2x500 MVA

3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NO NO

NC NC

NC NC

DB 2014Assumed in 2017. Time line and location to be confirmed by ADWEA Privatization Directorate/ADWEC.   

Time line dependent on UAN Plant retirement. Assumed delayed upto 2017 per ADWEC Capacity Statement dtd Dec 2012. 

2x250MVA

DB 2015 Start of dismantle 220kV OHL tower between UAN‐MOSG/MGIC likely to be after Q3 2017.Time line dependent on UAN Plant retirement delayed upto 2017 per ADWEC Capacity Statement dtd Dec 2012. 

DB 2014

DB 2014

DB 2014

2x50MVA

New Rumaithy

SVC

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

Subject to the outcome of reactive power compensation study (N12699‐Lot 1).

DB 2014

100MVAr

DB 2014 Subject to the outcome of reactive power compensation study (N12699‐Lot 1).

DBYA

New Dabiya

DB 2014(Only 220kV OHL works)

2x140MVA3x100MVA

DB 2015 Reconfigure 220kV OHL circuit betn MOSG‐MGIC (refer diagram B6 ‐ 2018 network configuration)

DB 2015 Reinstate SASN‐ICAD 400kV OHL circuit to its original ICAD‐MOSG circuit configuration.  

Taqa

DB 2014

220/33kV80MVA Mobile(3SMK- AlFaya)

DB 2015Assumed dismantle of mobile will start after Q3 2017. Assumed ADDC completes load transfer to new 132/33kV Faya substation by Q1 2017.    

2x500MVA2x36MVAr

Mahadha OMAN

2x150MVA

2x140MVA

SVC+ 2x90 MVAr- 2x45 MVAr

Page 29: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

3x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

3x500MVA3x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

3x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

3x140MVA

2x140MVA

RMTH

BHYG

ICAD

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr+ 2 x 50MVAr

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

2x70MVAr

3 x100 MVAr

4x500MVA4x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVACalor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

Masdar Noor

2x500MVA

2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BAAB

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

3x100 MVAr

4x500MVA4x50MVAr

2x100MVA

NO

3x500MVA

SMKG

3x500MVA

2x140MVA+3x120MVA

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG)

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

AGD-II (ASGS)

BNPP

2x100MVAr

TWYA

2x500MVA2x36 MVAr

MRPS

MHWG

Central Junction

Al Faya Junction

Attachment-BFig. B6 400kV & 220kV Electrical Power System Topology- Year 2018

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 11 of 25

MRFA

New assets expected by Summer 2018

Mahadha (MHDA)OMAN

NPP-1

NPP-2

220/33kV120MVA

OGD III (ONGS) – Existing Habshan 3 Plant

DB 2015

UNPS

SVC(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

F3

WAHA

ADAS

ASBS

2x140MVA(ENRU‐Habshan 2)

HBAA

BABG

HBSN220/132kVHabshan‐5

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

100MVArDB 2015

100MVAr

DB 2015

SVC(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

DB 2015

TWPS

2x500 MVA

3x275MVA 2x36MVAr

TWPS‐A TWPS‐B

NO NO

NC NC

NC NC

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

Subject to the outcome of reactive power compensation study (N12699‐Lot 1).

HMEM

DB 2015

DB 2015

DB 2015

100MVAr

DBYA

New Dabiya

2x50MVA

New Rumaithy

2x140MVA3x100MVA

These 220kV OHL circuits would be retained for possible use to feed future demand in MOSG/MGIC area.

Taqa

2x500MVA2x36MVAr

Mahadha OMAN

2x150MVA

2x140MVA

+ 2x90 MVAr- 2x45 MVAr

SVC

Page 30: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

3x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

3x500MVA3x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

3x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

3x140MVA

2x140MVA RMTH

BHYG

ICAD

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr+ 2 x 50MVAr

2x110MVA

DHMG

EMAL

3x140MVA

2x500MVA2x36 MVAr

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

2x70MVAr

3 x100 MVAr

4x500MVA4x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVACalor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

Masdar Noor

2x500MVA

2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BAAB

2x140MVA

3x500MVA

SHAH

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

3x100 MVAr

4x500MVA4x50MVAr

2x100MVA

NO

3x500MVA

SMKG

3x500 MVA

2x140MVA+3x120MVA

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

AGD-II (ASGS)

BNPP

2x100MVAr

TWYA

2x500MVA2x36 MVAr

MRPS

MHWG

Central Junction

Al Faya Junction

Attachment-BFig. B7 400kV & 220kV Electrical Power System Topology- Year 2019

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 12 of 25

MRFA

New assets expected by Summer 2019

Mahadha (MHDA)OMAN

NPP-1

NPP-2

NPP-3HMEM

220/33kV120MVA

OGD III (ONGS) – Existing Habshan 3 Plant

UNPS

SVC

SVC

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

DB 2016

DB 2016

F3

WAHA

ADAS

ASBS

BABG

HBSN220/132kVHabshan-5

HBAA

2x140MVA(ENRU‐Habshan 2)

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

100MVAr

100MVAr

TWPS

2x500 MVA

2x140 MVA

3x275MVA

3x100 MVA

2x36MVAr

TWPS‐A TWPS‐B

NO NO

NC NC

NC NC

SVC(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

SVC

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

2x50MVA

New Rumaithy

100MVAr

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

DB 2016

DBYA

New Dabiya

New Dabiya

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

DB 2016

Taqa

2x500MVA2x36MVAr

Mahadha OMAN

2x150MVA

2x140MVA

Scheme subject to further study and optimization.

Page 31: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

RUWS

SILA

WMZD

LIWA

2x80MVA

2x500MVA2x36MVAr

3x500MVA3x36MVAr

3x100MVA

3x100MVA

2x100MVA+140MVA

SASN

QURM

BECH

MOSG

CNTG

2x140MVA

3x500MVA3x36 MVAr

SMHG

2x140MVA

3x140MVA ASWG

SLMG

RMAG

KHZG

3x140MVA

2x140MVA

3x140MVA

3x500 MVA3x36MVAr

3x500MVA3x36MVAr

WRSN (DEWA)

DHID

SHME

ZAKG

ARDG

AWGG

MZDG

SNYG

AHYG

AOHG

3x80MVA

2x140MVA

2x140MVA + 140MVA

3x140MVA

3x80MVA

3x140MVA

3x80MVA

3x140MVA

TANE

SWHN

3x500MVA

3x500MVA

3x500MVA

FILA

QDFA

MGIC

4x140MVA

3x140MVA

2x140MVA RMTH

BHYG

ICAD

3x500MVA

MOSF

SVC

SVC

OUSH

SAJA

2x140MVA

2x200MVA

REEM

ADST

ABU DHABI ISLANDS’ REGION

WESTERN REGION

NORTHERN EMIRATES

Al-AIN REGION

4x500MVA4x50MVAr

4x500MVA4x50MVAr

3x500MVA

2x100MVAr

± 2x100MVAr

± 2x100 MVAr+ 2 x 50MVAr

DBYA

2x110MVA

DHMG

TWPS

2x500 MVA

2x140 MVA

EMAL

3x140MVA

2x500MVA2x36 MVAr

3x275MVA

WSTG

2x20MVAr

4x500MVA

3x500MVA

3x300MVA

AIAA

3x140MVA

3x120MVA

2x80MVA+140MVA

3x500MVA3x36MVAr

2x(3x100MVA)

3x100MVAr

3x100 MVA

2x70MVAr

3x100 MVAr

4x500MVA4x50MVAr

To SalwaGCC Interconnection

KSA

CTCG

3x140MVA

3x120MVA

2x320MVA

Toshiba

Siemens

100MVA+80MVA

2x80MVA

2x80MVACalor Emag

AAPS

SDYT

GTHY

2x100MVAr

AAPH

2x70MVAr

2x140MVA

GNTT

3x500MVA

AAFD

3x120MVA

Masdar Noor

2x36MVAr

2x500MVA2x50MVAr

FJCT

3x500MVA

BHSA

2x320MVA

4x140MVA

2x150MVA

BAAB

2x140MVA

3x500MVA

SHAH-SGD

ASAB

220/132kV2x200MVA

2x140MVA

ADCO 1.8MMBD Project

3x100 MVAr

TWPS‐A TWPS‐B

4x500MVA4x50MVAr

2x100MVA

NO

3x500MVA

SMKG

3x500 MVA

2x140MVA+3x120MVA

SHPS & S2PS

S3PS

GCSL

ELXR

RWSG)

220/33kV80MVA Mobile

(LWST-Liwa West area)

Masdar Shams(SHMS)

15/220kV165MVA

220/33kV2x110MVA

220/33kV 100MVA Mobile

(QSWM-Qusahwira)

220/33kV100MVA Mobile

(HMMO-Hameem)

AGD-II (ASGS)

BNPP

2x100MVAr

TWYA

2x500MVA2x36 MVAr

MRPS

MHWG

Central Junction

Attachment-BFig.B8 400kV & 220kV Electrical Power System Topology- Year 2020

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 13 of 25

MRFA

Mahadha (MHDA)OMAN

NPP-1

NPP-2

NPP-3 HMEM

NPP-4

FAYA

220/33kV120MVA

OGD III (ONGS) – Existing Habshan 3 Plant

DB 2017

UNPS SVC

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

SVC(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

F3

ASBS

ADAS

WAHA

HBAA

2x140MVA(ENRU‐Habshan 2)

BABG

HBSN

220/132kVHabshan-5

New assets expected by Summer 2020

132/11kV2x40MVA

SRBY

132/11kV3x40MVA

DLMA

NO NO

NC NC

NC NC

SVC(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

100MVAr

100MVAr

2x50MVA

New Rumaithy

2x50MVA

New Dabiya

SVC

(+500MVAr/-200MVAr) or 2x(+250MVAr/-100MVAr)

100MVAr

Taqa

2x500MVA2x36MVAr

Mahadha OMAN

2x150MVA

2x140MVA

Page 32: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB)

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MV

A

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MV

A

3x500MVA

QU

RM

BE

CH

2x120MVA

DANT

4x40MVA

GRHD

4 x 40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4x40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA 4x80MVA

4 x 80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

2x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MSXX

N6166.1 LotB :S/S

MICT (Mobile)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-ASDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

N4352 V01             (Bruggs Cables) 

2x40MVA

SDAA

N4887‐A    &               (Silec Cable) 

N6755(Nexans Cables) 

4x80MVA

FLCT

ADIP

4x80MVA

N6755(Nexans Cables) 

N7204.1 LotE :S/S

N6526                    (Sued Kabel) 

MKAW

4x40MVA

N6166.1 LotC :S/SN6755: Nexans Cables

N7144‐B (ETA Cables) 

CCAD

4x40MVA

N6166.1 LotD :S/SN6755: Nexans Cables

Attachment-BFig. B9 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2013AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 14 of 25

N11022/N7144‐A:S/SN6755:Nexans Cables 

New Assets by Summer Year 2013

Delayed commissioning of these Circuits‐ likely to be after Q2 2013.

132kV OHL

Delayed commissioning of these circuits ‐likely to be after Q2 2013.

Delayed commissioning of these circuits ‐likely to be after Q2 2013.

Page 33: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

2x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT (M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

3x500MVA3x50MVAr

4x120MVA

WATH

3x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

SMKG

3x120MVA

3x500MVA

SMKH

Attachment-BFig. B10 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2014AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 15 of 25

N6384‐1A:S/SN6485.1:Silec Cables

N6362:S/S

N7110:S/S

N7204‐A:S/S

N6384‐1B:S/SN6485‐1:Silec Cables

N6755:Nexans Cables

N7022:Silec Cables

N6755:Nexans Cables N6755:Nexans CablesN7144‐B (ETA Cables)

N6166.1 Lot E:S/S

MICT (Mobile)

2x40MVA

MSXX

N7204‐LotC:S/SN7144‐A (ETA Cables)

N7203

N4887‐A (Silec Cable) & N6526 (Sued Kabel) 

N6755:Nexans Cables

N4352 VO1                 (Bruggs Cables) 

N6755:Nexans Cables

New Assets by Summer Year 2014

N7204 LotD:S/SN7144‐A: ETA Cables 

132kV OHL

Page 34: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2015

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

2x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT (M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

3x500MVA3x50MVAr

4x120MVA WATH

3x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

3x120MVA

NAHD

MAFQ

4 x 80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

SMKH

Attachment-BFig. B11 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2015AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 16 of 25

MCBB (Z16)

4x40MVA

N12258‐2:S/SN12291‐2:Cables

N‐P‐13‐0017

N6976B‐1A1:S/S

N12258‐1:S/SN7144‐A:Cables

N7022

N12291‐1

N7204‐B:S/SN6485‐1:Silec Cables

N6485‐1:Silec CablesN6755:Nexans Cables

N6166‐A:S/SN6755:Nexans Cables

N6485‐1:Silec Cables

DB 2013/2014Dismantle portion of these 132kV OHL tower ‐likely to start after Q2 2015  

Page 35: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2016

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

2x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT(M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

3x500MVA3x50MVAr

4x120MVA WATH

3x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

E04/02

4x40MVA

3x120MVA

NAHD

MAFQ

4 x 80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

4 x 40MVA

MKDD

SMKH

Attachment-BFig. B12 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2016AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 17 of 25

MCBB (Z16)

4x40MVA

W13/02

4x40MVA

ESI-Phase3

132kV OHL

DB 2014

DB 2014 132kV scheme subject to confirmation of ESI Phase‐3 location.

N‐P‐13‐0003: S/SN7144: ETA Cables

DB 2014

N‐P‐13‐0002

Page 36: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2017

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

2x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT(M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

3x500MVA3x50MVAr

4x120MVA WATH

3x120MVA+ 120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

E04/02

4x40MVA

3x120MVA

NAHD

MAFQ

4x80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

4 x 40MVA

MKDD

SMKH

Attachment-BFig. B13 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2017AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 18 of 25

MCBB (Z16)

4x40MVA

W13/02

4x40MVA

ESI-Phase3

FAYA

3x100MVA

KBAA

4x40MVA

132kV OHL

DB 2014

DB 2014

DB 2014

DB 2013 (N‐P‐13‐0015)

Page 37: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2018

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4x40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

3x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT(M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4x80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

4x500MVA4x50MVAr

4x120MVA WATH

4x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

E04/02

4x40MVA

3x120MVA

NAHD

MAFQ

4x80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

4x40MVA

MKDD

SMKH

Attachment-BFig. B14 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2018AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 19 of 25

MCBB (Z16)

4x40MVA

W13/02

4x40MVA

ESI-Phase3

FAYA

3x100MVA

4x40MVA

RWDH

KBAA

4x40MVA

132kV OHL

DB 2015

Scheme indicative. ADDC requirements to be confirmed. Subject to further assessment. 

100MVAr

DB 2015

Subject to the outcome of reactive power compensation study (N12699‐Lot 1)

Page 38: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2019

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

3x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT(M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

4x500MVA4x50MVAr

4x120MVA WATH

4x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

E04/02

4x40MVA

3x120MVA

NAHD

MAFQ

4x80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

4 x 40MVA

MKDD

SMKH

Attachment-BFig. B15 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2019AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 20 of 25

MCBB (Z16)

4x40MVA

W13/02

4x40MVA

ESI-Phase3

FAYA

3x100MVA

4x40MVA

RWDH

KBAA

4x40MVA

132kV OHL

100MVAr

Page 39: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Abu Dhabi IslandPORT

TCLB

FRDS

ZYD2

CPGR

MKT1

MRKT

4x40MVA

MDZD

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

4x40MVA

CLNS

4x40MVA

3x500MVA

AD

ST

JZRHKLDY

4x40MVA

4x40MVA

MRML

BATN

15MVAr

4x40MVA

4x40MVA

4x40MVA

CONH

4x40MVA

HTCO

4x40MVABSTN

4x40MVA

ALSM

3x40MVA

FLAH4x40MV

A

MSHF

4x40MVA

GLFA

4x40MVA

EMBS

4x40MVA

2x20MVAr

3x500MVA

4x40MVA3x500MVA

QU

RM

BE

CH

New Assets by Summer Year 2020

2x120MVA

DANT

4x40MVA

GRHD

4x40MVA

4x40MVA

SOUQ

Sowa Island Reem Island

Sadiyat Island

Yas Island

4x80MVA

SLTC

JSRN

3x40MVA

4x40MVA

MOS1

4x40MVA

Abu Dhabi Mainland

RBBB

AIRP

4 x 40MVA

BHYA

2x140MVA

4x500MVA

4x50MVAr

4x80MVA

YASI

SDBB

SDCC

4x80MVA

SDDD

4x80MVA

4x40MVA

KHPK

4x500MVA4x50MVAr

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

4x80MVA

SASN

3x500MVA

4x40MVA

MKAA

4x40MVA

MKBB

15MVAr

MICT(M12)

RBAA

Taweela P.S (TWPS)

2x500MVA

2x140MVA

TWPS-A

SDYT

RMDV

SRUH

SOWA

TMUH

REEM

UNPS

4x40MVA

SDAA

3x100MVA

4 x 80MVA

FLCT

ADIP

4x80MVA

MKAW

4x40MVA

PRSP

3x40MVA

CCAD

4x40MVA

STDM

4x80MVA

MHWG

4x500MVA4x50MVAr

4x120MVA WATH

4x120MVA

MCAA (Z6/01)

4x40MVA

BHYG

4x500MVA4x50MVAr

EROD4x40MVA

E04/02

4x40MVA

3x120MVA

NAHD

MAFQ

4x80MVA

SMKG

3x120MVA

3x500MVA

SMKB

4x60MVA

CRHO

4x40MVA

4 x 40MVA

MKDD

SMKH

Attachment-BFig. B16 132kV Electrical Power System Topology

(Abu Dhabi Islands’ and Eastern Region in Abu Dhabi Emirate)- Year 2020AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013 Sheet 21 of 25

MCBB (Z16)

4x40MVA

W13/02

4x40MVA

ESI-Phase3

FAYA

3x100MVA

4x40MVA

RWDH

KBAA

4x40MVA

132kV OHL

100MVAr

Page 40: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

FILA

400/132kV 3x500MVA

132/33kV3x140MVA

KHRK

QSMN

RAKM

FUMN

F1PS

QDMN

TRANSCO F2 Pumping Station132/11/11kV

2x(90/45/45MVA)

FJCT

3x500MVA

132/33kV2x100MVA

HAYL

GHMN

SUDA132/33kV

3x100MVA

KLBA132/33kV

2x100MVA

132/33kV90MVA

NOTM

MSMN

SAJA

220/132kV3x300MVA

400/220kV3x500MVA

DHID

QDFA

400/132kV 2x500MVA

To FEWA 132kV Network

To SEWA Network

SHMN

N5629.1E: S/S

N8033: S/S

N5629.1 Lot B: S/S

N7169: S/S

Attachment-BFig. B17 132kV Electrical Power System Topology: Yr 2013

(Northern Emirates)

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

Sheet 22 of 25

To SEWA Network

WRSN (DEWA)

Taweela Power Station (TWPS)

400kV

400kV

400kV

220kV

220kV

N5771132kV OHL

TRANSCO + FEWA Asset

TRANSCO + FEWA Asset

SEWA Asset

To FEWA Network

N5771132kV OHL

N11830:132kV OHL

2x20MVAr2x20MVAr

N5771132kV OHL

To Sweihan 400/220kV Grid Station

(SWHN)

TRANSCO F1 Pumping Station132/11kV (2x56MVA)

400kV

132kV

N5771‐02 132kV OHL

SGMN

DBMN

DAMN

KPKN(FEWA)

To FEWA 132kV Network

132kV

400kV

400kV

132kV

To FEWA 132kV Network

KPKN(TRANSCO)

N6734132kV OHL

132/33kV2x120MVA

Sembcorp Assets

PPSTNotes: 1) All others assets unless otherwise indicated are

TRANSCO Assets.

2) TRANSCO assets under construction/expected to be energized by summer 2013 are indicated as NXXX.

SEWA

FEWA

TRANSCO 132kV Assets

LEGEND

Sembcorp

DEWA

NORTHERN EMIRATES

QUMN

To FEWA 132kV Network

To FEWA 132kV Network

Page 41: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

FILA

400/132kV 3x500MVA

132/33kV3x140MVA

KHRK

QSMN

RAKM

FUMN

F1PS

QDMN

TRANSCO F2 Pumping Station132/11/11kV

2x(90/45/45MVA)

FJCT

3x500MVA

132/33kV2x100MVA

HAYL

GHMN

SUDA132/33kV

3x100MVA

KLBA132/33kV

2x100MVA

NOTM

MSMN

SAJA

220/132kV3x300MVA

400/220kV3x500MVA

DHID

QDFA

400/132kV 2x500MVA

To FEWA 132kV Network

To SEWA Network

SHMN

N7169:S/S

Attachment-BFig. B18 132kV Electrical Power System Topology: Yr 2014

(Northern Emirates)

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

Sheet 23 of 25

To SEWA Network

WRSN (DEWA)

Taweela Power Station (TWPS)

400kV

400kV

400kV

220kV

220kV

TRANSCO + FEWA Asset

TRANSCO + FEWA Asset

SEWA Asset

To FEWA Network

2x20MVAr2x20MVAr

To Sweihan 400/220kV Grid Station

(SWHN)

TRANSCO F1 Pumping Station132/11kV (2x56MVA)

400kV

132kV

SGMN

DBMN

DAMN

KPKN(FEWA)

132kV

400kV

400kV

132kV

To FEWA 132kV Network

KPKN(TRANSCO)

N6734132kV OHL

132/33kV2x120MVA

Sembcorp Assets

PPST

400/132kV 4x500MVA

WSTG400kV

132kV

WSTS

NAMN WTMN

To FEWA 132kV Network

To SEWA 132kV Network

MUMN

To FEWA Network

Notes: 1) All others assets unless otherwise indicated are

TRANSCO Assets.

2) TRANSCO assets under construction/expected to be energized by summer 2014 are indicated as

NXXX.

SEWA

FEWA

TRANSCO 132kV Assets

LEGEND

Sembcorp

DEWA

NORTHERN EMIRATES

QUMN

To FEWA 132kV Network

To FEWA 132kV Network

Page 42: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

FILA

400/132kV 3x500MVA

132/33kV3x140MVA

KHRK

QSMN

RAKM

FUMN

F1PSTRANSCO F2 Pumping Station

132/11/11kV2x(90/45/45MVA)

FJCT

3x500MVA

132/33kV2x100MVA

HAYL

GHMN

SUDA

132/33kV3x100MVA

KLBA132/33kV

2x100MVA

NOTM

MSMN

SAJA

220/132kV3x300MVA

400/220kV3x500MVA

DHID

QDFA

400/132kV 2x500MVA

To FEWA 132kV Network

To SEWA Network

SHMN

N7169:S/S

Attachment-BFig. B19 132kV Electrical Power System Topology: Yr 2015

(Northern Emirates)

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

Sheet 24 of 25

To SEWA Network

WRSN (DEWA)

Taweela Power Station (TWPS)

400kV

400kV

400kV

220kV

220kV

TRANSCO + FEWA Asset

TRANSCO + FEWA Asset

SEWA Asset

To FEWA Network

2x20MVAr2x20MVAr

To Sweihan 400/220kV Grid Station

(SWHN)

TRANSCO F1 Pumping Station132/11kV (2x56MVA)

400kV

132kV

SGMN

DBMN

DAMN

132kV

400kV

400kV

132kV

To FEWA 132kV Network

KPKN(TRANSCO)

N6734132kV OHL

132/33kV2x120MVA + 120MVA

PPST

400/132kV 4x500MVA

WSTG400kV

132kV

WSTS

NAMN WTMN

To FEWA 132kV Network

To SEWA 132kV Network

TAWY

132/33kV2x120MVA

N6725.1: S/S

MUMN

To FEWA Network

Notes: 1) All others assets unless otherwise indicated are

TRANSCO Assets.

2) TRANSCO assets under construction/expected to be energized by summer 2015 are indicated as NXXX.

SEWA

FEWA

TRANSCO 132kV Assets

LEGEND

Sembcorp

DEWA

NORTHERN EMIRATES

QUMN

To FEWA 132kV Network

To FEWA 132kV Network

N‐P‐13‐0001

Page 43: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

FILA

400/132kV 3x500MVA

132/33kV3x140MVA

KHRK

QSMN

RAKM

FUMN

F1PSTRANSCO F2 Pumping Station

132/11/11kV2x(90/45/45MVA)

FJCT

3x500MVA

132/33kV2x100MVA

HAYL

GHMN

SUDA132/33kV

3x100MVA

KLBA132/33kV

2x100MVA

NOTM

MSMN

SAJA

220/132kV3x300MVA

400/220kV3x500MVA

DHID

QDFA

400/132kV 2x500MVA

To FEWA 132kV Network

To SEWA Network

SHMN

NORTHERN EMIRATES

Attachment-BFig. B20 132kV Electrical Power System Topology: Yr 2016-2020

(Northern Emirates)

AMD/PNDD, TRANSCOTRANSCO 2013 7YPS (2014-2020) June 2013

Sheet 25 of 25

To SEWA 33kV network

WRSN (DEWA)

Taweela Power Station (TWPS)

400kV

400kV 400kV

220kV

220kV

TRANSCO + FEWA Asset

SEWA Asset

To FEWA 33kV network

2x20MVAr2x20MVAr

To Sweihan 400/220kV Grid Station

(SWHN)

TRANSCO F1 Pumping Station132/11kV (2x56MVA)

400kV

132kV

SGMN

DBMN

DAMN

132kV

400kV

400kV

132kV

To FEWA 132kV Network

KPKN(TRANSCO)

132/33kV3x120MVA

PPST

400/132kV 4x500MVA

WSTG 400kV

132kV

WSTS

NAMN WTMN

To FEWA 132kV Network

To SEWA 132kV Network

TAWY

132/33kV2x120MVA

MUMN

To FEWA Network

To FEWA & SEWA 33kV Network

Note: All others assets unless otherwise indicated are TRANSCO Assets

SEWA

FEWA

TRANSCO 132kV Assets

LEGEND

Sembcorp

DEWA

QUMN

To FEWA 132kV Network

To FEWA 132kV Network

Page 44: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-C

Forecast Power Flows on the Transmission System (2013-2020)

Page 45: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0

104

1

00

1

0

1

21

1

0

105

95

105

94

95

105

71

0

1

0

52

1

0

52

67

238 239

51

0 9

0

0

0

48

1

LEGEND:

67

239

219

21

222

680

105

51

71

272

197

272

197

446

82446

82

339

199

28

51

48

94

1

0 71

1

0 71

129

26

129 13

13

0

27

130 16

405

26

238

104

MVAR

MW

438

37

438

355

10

26 41

26

5

26 41

26

5

214

45

213

10

218

69

218

69

1

0 37

1

0 37

258

79

260 33

258

79

402

ADST-400

402

403

402

402

402

408

SHPS-400

S3

RWS

408

400

412

403402

394

402

407

FJCT-400

406

QDFA-400

FILA-400

384

400

WRSN

406

406

260 33

403

51

39553

53

13

53

1

53

53

1

53

1

53

13

242 55

16 2

42 55

242

16

242 55

242

16

242 55

242

1632

302

35

83

680

222 21

193

673

193

219

13

13

53

1

43

673

21

400

37

9

333

197

81

REEM-400

562

51

564

43

23

21332

17

0

91

91

GCSL-400

271

271

76

153

92

61

43

79

580

0

0

0

0

153

43

506 53

35509

30

314

258 79

118

258

257

118

257

79

408

5

117

302

5 27 38

98

130

608

128

409 130

130

608

128

489

30

482

20

489 4

82

20 30

219 99

219

145

22

0

100

220

147

406

242

332

640

446

171

442

189

446

171

442

189

QURM-400

TWPS-BC

606

132

1.0100

1.0100

296

39

317

53

358

606

TANE

TWPS-2A

TWPS-1A

SDYT-400

DHID-400

BECH-400

SASN-132

SASN-400

EML2

EMAL

ASWG-400

DHMG-400

SWHG-400

MOSG-400

SHME-400

WMZD-400

ICAD-400

Total SHPT (S1,S2,S3) = 2822 MW

Total SASN & UAN = 2072 MW

Total TAW = 3793 MW

Total Fuj (F1,F2) = 2772 MW

FIG. C1LF FOR YEAR 2013

400kV NETWORK-PEAK LOAD

Page 46: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

50 14

49

14

79 25 23

78

79 23

78

24

117 34

116 34

89 25

26

206

40.1

8

206

40.1

8

206

2

69

56.7

8

2

69

56.7

8

24

6

25 6

6

25 6

25

25

142

27.8

2

142

27.8

2

142

27.8

2

34.76

175

34.76

19

6

19 8

29

13

12

61 18

61

19

61 18

61

19

124

124

17

124

17

3

23

323

54

17

54

11 4

11

4 17

5

17

5

41 14

41

15 31

10

31

8

131 35

131

35 13

11

13

4

108

40

108

43

85 24

85

22

8 2

8

8 2

8

53

52

19

94 21

93

94 21

93

21

82

5

21 6

21 5

21 6

22

65

2366 22

65

23

28

70271

21

44

11

44

11 1

0 3

16

64

16

7

35

9

35

2

2

175

310

78

190

57

189

58

17

323

65.48

323

65.48

323

65.48

SV

0

100H

0

77

0

0

53

1

16

1

0 20

16

12

46

18

8

8

8

0

41 10

41 10

41 10

3

08

61.3

2

3

08

61.3

2

158

39

39

158

156

71 18

71

18

71

39

0 0 0

0 2

0 0

2

17

17

131

35

1

25

49

25

39

27

16

16 17

16 17

29

42.7

3

2

16

2

16

42.7

3

42.7

3

216

65.4

5

8

65.4

5

66

242

58

0

17

6

51

65 16

64

18

6

30

9

51

51

220

28

11

44

1

131

62 16

62

22

62

80

21

22

17 13

2

13

2

13

2

13

2

16

13

4413

4

13

13

4

210

29

29

210

29

209 29

2

18

156

40.1

8

88

SV

62

80

29

49

219

1716

17

9

2 2

79

4

21

LEGEND:

241

70 35

MVAR

SV

0

90H

0

81

SV

0

90H

0

81

100H

SV

0

100H

0 53

SV

0

100H

0 77

208

70

408

MW

24

1041

31

241 66

58

34 82

242

33

349

8

45

219

124

22

62

22

63

70

16

70

16

70

16

8

46

12

66

209

220

220

133

133

225

408

228

223

SILA-220

132

221

220

BAAB

BHSA

219

223

224

ASAB

WMZD-400

403

225

225

14

222225

225

225

ICAD-400

400

226

225

225

225

225

MOSG-220

MOSG-400

400 225

AIAA

394

224

223

OUSH

224

MOSF

225

221

219223

219

226

226

403

226

DHID-220

221395

DHID-400

SWHG-400

402

226

225

225

402

SLMG

224

AAPS

226

ZAKG

226

226

NOUR-1

MZDG

224

224

SNYG

226

CTCG

224

68

21

74

23

74

2169 22

71

71

25

30

0

3

0

0

0

DHMG-400

WAST

226

225

0

0

3

146

53

41

12

54

22

68

23

73 17

72

17

13

58

58

27

6

147

54

14 71

68

203

ASGS

225

0

0

0

0

0

0

0

132

119 29

0

185H

20 16

7 26

17

.

0

0

FAYA-MOB

AOHG

.

13

6

1

RWS

SWHG-220

MHWG

ASWG-400

SHPS-132

MRFA

SHPS-220

GTHY

LIWA

LWST

SHAMS1

ASAB-SW

SHAH-SGD

RMTH

WMZD-220

DBYA

CNTG

RUWS

RUWS-220

DLMA

UNPS-B

UNPS-132

UNPS-220

224

MGIC

WATH

WATH-B

KHZG

RMAG

ASWG-220

AWGG

ICAD-220

HMMO

ARDG

AHYG

DHMG-220

GHANTOOT

SMHG

SHME-220

SHME-400

SHPS-400

ELXR

192

38.4

0

192

38.4

0

192

38.4

0

LCMO

2SMK

1SMK

ADCO-2

ADCO-1

QSWM-1

FIG. C2LF FOR YEAR 2013

220kV NETWORK-PEAK LOAD

Page 47: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

9059

90

5 25

23249.24

23249.24

23249.24

52.7

2

5

52.7

2

52.7

2

18641.46

18641.46

18641.46

13 2.6

4

13 2.6

4

13 2.6

4

2.6

4

4 24 3

24 3

4

2033 20

46

85

8556

14 8 14 9

16 9 11

974

73

35 21

35 21 85 54

8552

88 61

8860

11

11 7

572847

33

119

9

1 1 1

50

32

44 41

40

10

66 45

7 4 37 27

37

5236

18

37

62

566561

43 31

43 32 56

5636

23648.93

23648.93

23648.93

73 3973 38

73 3938

73 56

7356

47

7545

68

60

6037

59 3933 202

1

35 23

35

46

5030

50 30

30

50 30

66

44

5 25 5

11 6

16

1

375236

52

25

7

48 79 49

39

17

56 34

5634

1779

11

1 01 1

13 2

3 123

35

3 1 3 1 2 1

5

2 1

2 2 6 2

3

6

6 3

3

6

5

9

20

37

1 1

1

0

13

14 14

0

14 30

0 0

1

22 13

68

50

19 13

13

19 13

22

1

62

0 4

21

45

1614

13

4

13

2

1 5

2.72

1

2

32

32

13

19

73

72

13

59

1426

43

26

1

28

2

62

20

73

75

MVAR

MW

57

2

LEGEND:

20

15 26

2614

31

43

43

39

15

33 43

26 21

1726

66

17 1716

1

0 1

4

38

6445

11 9

86 65

86 65

39

4

1913

191319

13

13

20 33

16

30 18

66

296

59.63

19

43

19

50

52

PORT

133

ADST-132

ADST-400

402

133

133

133133

133

133

133132

132

133

133

402133

BECH-132

133

133MRML

133

BECH-400

402

133

133

133EMBS

133

133

133GLFABSTN

133

133BATN

133

133GRHD

132

FLCT

132135

132

132

132

221

UNPS-132132

SASN-132

SLTC

132

135

131BHYA

ADIP135

135

403

SASN-400402

132

RMDV133

REEM-400402

REEM-132133

133SRUHTMUH

133

SOWA

132SDDD

132

132

132SDYT-132

SDBB

133

133

24 24 16

18 14

18

18 17

61 53

61 54 37 3237 32

61

1821

133

35 23 35

22

3321

33 3321

QURM-400

45 30 30304429

18

12

16 16 2616

2616

133

19

3618

20

33

53

66

66

45

53

7

45

36

21 33

23

26 26

13223

13 8

13 8

68 43

6842

5538

5535

50 45

51 44

50 45

51 44

41 13

13

41 13

41 13

9 12

9 4

4 24 6

8

41 133TAWA

8 11

135

16

38

53 15.66

1

2 1

2

133

JZRH

0

UNPS-B

132

11929

4412

133HTCO

QURM-132

SOUQ

0 1

132

SDYT-400

KLDY

MRKT

18

ZYD2

JSRN

11

CCAD

KHPK

17

UNPS-220

406TWPS-BC

406

53 15.66

TWPS-1A

9 5 9 5

CONH

0 100 10

132

39 19

39 18

39 2039 19STDM

18 30MKBB

MKAA

AIRP

RBAA

RBBB

YASI

MDZD

DANT

CPGRFRDS

MKT1

MKAW

MICT

MOS1

SDCC

ALSM-B

FLAHALSM-A

CLNSTCLB

MSHF

MSHF OLD

FIG. C3LF FOR YEAR 2013

132kV NETWORK-PEAK LOAD

Page 48: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0105

1

0

0

1

0

1

20

1

0

36726

367 28

26

367

1

0

1

010

9

68

0

1

051

1

051

64 238 238

53

0 53

0

0 53

0 51

550

45

552

550

45

1

64238

1961

367

53

68

335

334

364

369

325

368

6785267852

459

305

155

2

178

51

756116

744 92

28

118 166

118

109

82

11

40

40

1

0 7520

7 23

2

207

187

131

82

557

552

94

207

232

18

7

1

0 75 680

238

105

552

207

81

92

66180

66180

132 10

132

2

503

140

504

132

502

140

504

13

30 40 30 2

30 40 30 2

9 499 36

9 49 36

19 120

1

0 38

1

0 38 40

216

406 44

40

216

286 611

132

406 44

405

211

167

166 81

16767

166

16767

16767

166 81

288 41

82 28

8 4128

8 82

288 41

288

82

288

288

82

220

131

163

216 20

6

19

81 81 166

67

288

11 118

118 166

131

16

3 13

1

82

216

61

9

216 37

216

147

303

147

305

146

352

147

355

756116

744 92

548

72 19 120

118

163

163

107

404

402

404 64

95 293

292

293

40 29

2 77

64 40

2

40 77

6

252

94

1616 216

448

19

301143

3177

316 56 436

152

431

190

95

679

76 671

216

16

36615

364 62

36615

364 62

260

276

4110

9

108

0 66

26

0 66

199

73

209

161

209

141

457

11

10 65458

535

0

63520

636 20

73

26

0

683

64 535

656

LEGEND:

MW

MVAR

MAL2

EMAL-400

TWPS-AIII

409409

TWPS-AIITWPS-AI

409

419 TWPS-BITWPS-BII

409TWPS-BIII

409

AJMAN

401

FILA-400

400

QDFA-400409

WRSN

80SHME-400

406

SHAMKHA

MAHAWI-400

410

DHID-400

404

FUJ-CITY

416

ADST-400

416REEM-400

QURM-400

415

418

SDYT-400

419

BHYG-400

TANE419

BECH-400

414

SASN-400

414

ICAD-400

410

MOSG-400

405

403

397

SWHG-400

396

BAB

DHMG-400

393

ASWG-400

389

WMZD-400

410

394

412

GCSL-400

411

S3PS

SHPS-400

411

RWS

410

Total TAW = 4177 MW

Total SHPT (S3) = 1477 MW

Total SHPT (S1,S2) = 2893 MW

Total SASN = 1478 MW

Total Fuj (F1,F2) = 2435 MW

FIG. C4LF FOR YEAR 2014

400kV NETWORK-PEAK LOAD

Page 49: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

182

68

182

68

182

68

66 4

66 7

32 39 33

60

61 33

60 40

115 34

114 37

107 12

16

237

54

237

54

237

22

9 84

22

9 84

430 2

430 2

30 30

112

75

112

75

112

75

111

97111

35 835 15

64

16

67 17

67 19

67 17

67 19

71

71 106

71

106

246

246

26

44

14 7

14 5

18 10

18 2

42 20 42 25 30 24

3016

83 39

83 6649 39

493

4161

41 76

100 4

100 41

6

6 44

100 12

99

100 12

99 19

165

30 70 35

70 30 70 35

46

46 7

46 8 12 3

28 66

37 12

37

3

8

97 1112

16798

167 112

106

217 26

217

26

217

26

SV

0 20

R

00

21

0

00 73

69

1

18

1 0

20 18

1146

34

3

8

7

0

45 13

45 9

45 13

20

4 13

20

4 13

20

4

13

172

26

2317

2

169

119 32

119

119

119

26

5 5 2

5 4 5 2

4

106

35

83 66

7

0

23

52

64

49

29

2

292 33

33

294

189

7

189

52

246

64

17 9

51

67 28 15

7 15

7

66

33

13 6

13

6

18 9

31 3

83

0

0 16

03

0 16

144

3

144 25

144

91

41

156 41

3612

36 15

12 36 15

12 36 15

92

129 10

128 0

10

128 0

2

15 7

25

28

1

70 32

7025

70 32

7025

70 32

7025

70 32

70

122

51

124

36

36 4

55

25

3

336 8

336

33

10

15 7

33

155

15

28

128 28

128 28

129

12

223 11

14

223 11

222 14

128

1

3

33 169

54

107

SV

144

90 48

6

61

3

8

19

LEGEND:

244

39

18

MVAR

SV

082R

0 74

082

SV

082R

0 74

082

73R

SV

073

R

0 690 73

SV

0 20

R

0 210 20 20

20

3

MW

40

945

89 77

64

227

72

74 9

2

71

28

6228

62

86

8

70

222

28

222

222

86

86

46 11

19

2

8

227

00

0 0

1

15

70

16

17

153

28

132

50

289 61

21

4729

255 67

61

222

MHWG

701044 257

23 22 10

23 7 22 10

7

23 32

2 3 8

8

222

99 22

99

86 27

86

44 26

22

15

126 10

131 17

131 8

126

32

91

12 34 15

3412

34

34

15

3 29

3 1

3

3 1

29

13

142

92 1 22

0

32

152

70 28

17

44 16

DHID-220DHID-400

404

SWHG-400

224

397

SWHG-220

224

AHYG

222

AOHG

221

DHMG-400

393

DHMG-220

222

OMAN-220

222220

SLMGRMAG

220

217

LCMO

217

WATH222

FAYA-MOB

222

2SMK

220

222

1SMK

223

SHME-220

SHME-400

405

222

SMHG

GHANTOOT

222

UNPS-220

224

AAPS

222

ZAKG

222

CTCG

222

MZDG

219

220

SNYG

220

ARDG

218

AWGG

OUSH

219

220

AIAA

ASWG-400 389

AASW-220

222

MOSG-400

410

MOSG-220

223

ICAD-220

ICAD-400

410

224

ADQW-1

ADQW-2

218

219

QSWM-1

HMMO

KHZG

219

MRFA

219

ELXR

132

DLMA

133

S-B ISLAND

SHPS-132

133

SHPS-220

222411

SHPS-400

RWS

RWS-220

229

410

RUWS

220

SILA-220

221

GTHY

220

BHSA

219

BAB

396

220

BAAB

219

219

HBSN

BAB-220OGDIII

219

MOSF

222

223

MGIC

CNTG

DBYA

223

223

RMTH223

ASAB

WMZD-400

394

WMZD-220

222

SHAMS1

218

LIWA

215

SHAH-SGD

219

ASBS

219

7

15

FIG. C5LF FOR YEAR 2014

220kV NETWORK-PEAK LOAD

Page 50: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

4 04

236 90

236 90

236 90

4 13

4

4 13

4 13

186 94

186 94

186 94

15 1

15 1

15 1

1

4 14 3

14 3

4

825 6

36

75

7525

30 6 30 12

82 34

29

35 13

35 8 75 32

7626

78 33

7828

9

9 1

321036

25

82

14 5 14

29

25

48

34

12 65 38

36

8 3 38 24

38

52

32

34

245 77

245 77

245 77

76 2176 12

76 2112

70 26

7022

31

7521

72

63

6318

61 2533 5 4

2

38 12

38

30

5220

52 21

20

52 21

74

15

4 04 10

11 11

1 11

1

345330

53

18

2

21 73 26

46

12

65 26

6523

1673

17

1 3

1 01 3

14 3

4 1 34

6

4

3 2

0

11

2 1

2 4 7 2 7

7 1

4

7

4

03

3 0

26

26 10

8

6

20

4 13 7

18 19 5

17 19

9

17

0 2

0

0

5

7 9

13 413 7 7

1313

52 20

52

52

13 4

52

70 3

3 8

4

20 17

15

8

0 15

3

23 7

61 6119

6119

61 24

3

72

27

29

67

52

12 35

34

12 35

37 37 13

37 2

1818 9

18 4 9

78 5

78 5

78 5

18

23

2

13

17

24

12

8

10

2

15

2

1 10

13

1

2

52 16

52 16

52 16

19

6

237

19

9

4

12

85

85

34

61

1029

45

29

3

15

11

8

76

75

MVAR

MW

0

LEGEND:

12

15

24

03

29

2910

12

45

45

46

15

17 45

29 19

229

65

17 1311

1

55

55

1515 22

18

28

24

48

12 9

67

70 25

70 24

21

1234

12 35 12

34

35

9 33

4

25 7

74

95 54

12

3

12

00

00

00

3

3 25

50

52

SDYT-132

2 3

2 2

9 26 9

726

7

17 11

17 8 45 26 46 26

45254625

33 11 33 11 338

338

2 1 3

10222

102

31

45 11

19 30 12 30 17

18

95 54

52 16

124

6

0 0 0 0 0 0 0 0

0 0 0 0

0 0 0 0

26 3

26 9

0

23 23 10

45

6

3 16

3 11

1

315

151

31 2229

76 31

95 40

9537

100

42

10039

40 9 13

76

40

68 33

6829

50

3531 20

13

37 2

37

6

124

6536

3717

65 38

37 25

0

0

0

49

30 15 15

64

0

30

0

17

19

2

2138 12

38

65 20

65 30

SDBB

132SDDD

132

132

SDCC

132

418

SDYT-400

TAWA

135

409419409

TWPS-AI TWPS-BI TWPS-BII

BHYA

133

BHYG-132

133

BHYG-400

419

YASI

133

RBAA

133

133

RBBB

133

ADIP

133

SOWA

133

TMUH SRUH

133

133

REEM-132

416

REEM-400

133

RMDV

SASN-400

414

SASN-132

133

UNPS-132

SLTC

133

FLCT

133AIRP

132

132

132

JSRN

132

133

MKAA132

MOS1

132

132M12XX

135

M12

132

STDM

SHAMKH-132

SHAMKHA

406134

135

MCAA

135

N-MAHAWI132

WATHBA

135

410

MAHAWI-400

CCAD

132

132

EMBS

132

GLFA

132

MSHF-A

49134MSXX

132

DANT

HTCO132

414

BECH-400

BECH-132

133

KHPK132

132

EROD

415132

BSTN

132

132

BATN

CONH

132

132

PRE-PALACE

132

GRHD

KLDY

132

132

MRML

132

JZRH

QURM-400

QURM-132

CLNS

132

TCLB137

132137

ALSM-B

ALSM-A

FLAH

MDZD

132

132

137

416

ADST-400

PORT

137

137

CPGR137

FRDS

ZYD2

137137

SOUQ

137

MKT1

137

MRKT

ADST-132

26 26

MKBB

MKAW

FIG. C6LF FOR YEAR 2014

132kV NETWORK-PEAK LOAD

Page 51: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0106

1

0

0

1

0

1

20

1

0

1

0

1

010

5

70

0

1

051

1

051

69 250 250

58

0 52

0

0 52

0 50

542

110

544

542

110

1

LEGEND:

69250

7864

58

180 84

180

17

180 84

180

70

380

379

405

419

361

418

6149561495

357

326

55

32

221

50

62848

620 59

271 182

271

1

0 28

2

105

148

33

11

103

103

105

1

0 7220

9 20

3

209

159

283

86

576

490 59

209

203

15

9

1

0 72 31

250

106

544

209

14

MVAR

109

MW

0 16

35

16

0 35

0 74

035

0 74

035

60011

60011

78 578 7

492

110

493

102

491

110

492

24

50 29 50 8

50 29 50 8

12 48 12 37

12 48 37

78 120

1

0 37

1

0 37 36

723

370 56

36

723

283

86

580

102

370 56

259

356

355 84

35674

355

35674

35674

355 84

300 16

56 30

0 1630

0 56

300 16

300

56

300

300

56

55123

552 23

126

283

148

290 20

0

78

84

17

84 355

74

300

11 271

271 182

288

172

23

282

14

8 28

2

86

289

64

12

290 38

289

546

21 546

2154

813 54

813

154

286

155

288

154

333

155

336

62848

620 59

114 10 114 10

114

67 114

67

567

95 78 120

127

246

247

125

369

367

369 88

121

289

288

289

48 28

8 85

88 36

7

48 85

0

0

266

78

31

1717 290

350

85

32342

0

191 20

192 38 355 47

358 47

355 47

358 47

85

527

154

521

174

121

661 97

95

180

180

44

653

290

17

39021

388 64

39021

388 64

135

153

16

7

1727

128

105

128

FIG. C7LF FOR YEAR 2015

400kV NETWORK-PEAK LOAD

MAL2

EMAL-400

407407TANE

413

BHYG-400

407 407

AJMAN

399

FILA-400

399

QDFA-400409

WRSN

404SHME-400

DHID-400

403

FUJ-CITY

402

405

SHAMKHA

404

MAHAWI-400

MOSG-400

404

407

QURM-400

SDYT-400

410

411

407REEM-400

ADST-400

407

404

395

SWHG-400

ASWG-400

387

DHMG-400

390

411

271407 668 TWPS-BIIITWPS-BIITWPS-BI

TWPS-AI TWPS-AII TWPS-AIII

MRF-400

408

SHPS-400

412

BAB

407

RWS

S3PS

BNPP-1

406

406

BECH-400

SASN-400

ICAD-400

404

403

410

408

GCSL-400

410

399

WMZD-400

Total TAW = 4350 MW

Total SASN = 1580 MW

Total SHPT (S1,S2) = 3200 MW

Total SHPT (S3) = 1500 MW

Total Fuj (F1,F2) = 2775 MW

Total New MIRFA = 845 MW

Page 52: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

187

67

187

67

187

67

104 1

103

9

45 22 30

46

46 30

46

37

157 40

156 4

0

146 18

20

271

57

271

57

271

2

00 49

2

00 49

7

38 2

7

38 2

38

38

134

73

134

73

134

73

112

58

112

71

6

71 12

164

3

70 6

69

9

70 6

69

9

157

157

95

157

95

177

177

177

142

77

37

77

15 5

15

6 19

10

19

3

42 23

42

27

30

22

30

14

107 39

107

6555

35

55

0

16

56

16

71

121 8

121

43

43

42

68

142

12

141

142

12

141

8

16

33

72

38

72 33

72

38

60

45

7

45

8 4 7

28

67

37

12

37

2

10

58

15

4

182

92

182

106

95

245

30

245

30

245

30

SV

0

0

0

0

79

1

17

1 0

20 17

13

46

60

4

9

9

0

46

13

46 10

46

13

1

73 33

1

73 33

1

73

33

138

36

29

138

136

86 38

86

86 38

86

36

9 9 4

9 2

9 4

2

95

36

107

65

6

40

29

35

163

6

5

2

89

289 5

0

50

291

142

9

142

14

173

28

20

8

52

68 29

16

8

16

7

68

39

13

6

13

6

23

12

9

36

1

107

0

0

25

0

12

0

25

143

4

142

32

142

160

160

19

94

9

94

15

102

16

7

56

2

108

108

107

35

64

22

64

16

29

56

11

102

96

21

247

12

72

29

72

32

29

72

32

29

72

32

85

85 143

62

142

54

62

142

54

16

46

21

19

160

32

38

8

7

70

32

70

24

70

32

70

24

70

32

70

24

70

32

70

147

61

149

72

724

62

24

8

160

4

59

282659

28

59

1

7 3

59

244

46

15

170

15

170

15

143

11

35

107

200

21

22

200

21

198 22

170

1

2

39

136

57

145

SV

143

95

61

6

46

12

26

8

LEGEND:

171

39

7

23

MVAR

SV

0

90H

0

81

SV

0

90H

0

81

85R

29

SV

0

85R

0

79

SV

0

100

L

0

117

20

4

MW

37

1046

55

73

58

150

78

80 1

4

31

14

31

31

1

4

31 15

31

31 15

31

16

15

31

16

16

14

31

34

157

64

1965

19

105

9

72

198

222

MRFA

222

ELXR

133

DLMA

SHPS-220

133

222

SHPS-400

412

RWS

218 RUWS

222

SILA-220

BAB-220

BAB

403

220

218

BAAB

HBSN

218

BHSA

219

GTHY

221

222

ASAB

WMZD-400

399

WMZD-220

LIWA 28

221 220

SHAH-SGD

224

ASBS

224

HMMO

223

223

QSWM-1ICAD-400

404

ICAD-220

223

223

223

CNTG

MGIC

223

224

MOSG-220

MOSG-400

404

218

AIAA

ASWG-400 387

AASW-220

217

ARDG

AWGG

216

OUSH

217

MOSF

223

KHZG220

219

RMAG

225

224

SMHG

SHME-220

SHME-400

404

224

GHANTOOT

DHID-220

223403

DHID-400

SWHG-400

395

SWHG-220

223

AHYG

220

AOHG

219

220

OMAN-220

221

DHMG-220

390

DHMG-400

TWYA-LA

SLMG

218

AAPS

220

AAPH

220

ZAKG

219

220

AAFD

218

217

218

SNYG

219

CTCG

45

259

259

105

RWS-220

407

105

46 13

ADQW-1

3

2

8

225

HBAA

219

55 55

25

55

22

55

25

OGDIII

219

3434

15

34

15

34

15

15

22

150

0 0

0

18

0 0

0

18

0H 1.00

00

1.00

00

40 0

402

1

40

SHAMS1

15

MZDG

224

RMTH

173 7

173

7 70 20

171

21

43 10

43 8

65 10

65 8

179 92

78

20

70 14

24

1775

173 7

91

79

223

223224

MHWG

WATH

FAYA-MOB

7 291 174 224

UNPS-220

23 23 10

23 7 23 10

7

DBYA

6 109

2 3 8

8

2

259

ADQW-2

221

LCMO

22021

244

21

223

223

244

FIG. C8LF FOR YEAR 2015

220kV NETWORK-PEAK LOAD

4

4 14 29

4 1SHPS-132

29

133

S-B ISLAND

Page 53: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

15 515

242 94

242 94

242 94

12 9

12

12 9

12 9

189 97

189 97

189 97

25 4

25 4

25 4

4

7 27 2

27 2

7

1234 10

35

77

7726

34 8 34 14

85 36

31

40 16

40 11 79 34

7928

82 35

8230

12

12 0

33935

34

85

15 6 15

32

27

45

32

10 73 42

40

7 4 41 26

41

55

34

20

36

260 87

260 87

260 87

50 1550 6

50 156

71 26

7123

31

7621

77

66

6620

62 2532 5 6

5

37 12

37

33

3912

39 13

12

39 13

74

15

15 515 5

55 10

5 10

1

355632

56

21

3

21 71 25

49

15

70 29

7026

1872

16

2 2

2 02 2

26 2

6 2 26

10

12

10 2

2

9

4 0

4 5 13 5 13

13 3

6

13

12

2 0

0 2

30

30 12

10

0

21

4 15 7

13 38 6

30 11

4

16

1 2

1

0

8

13 12

15 415 7 7

1515

55 2155

55

15 4

55

1331

1 10

3

15 30

26

1

6 26

8

42 1

69 6923

6923

69 28

0

77

25

28

64

39

11 3

4

11 3

80 80 27

80 13

4848 2

48 11 2

238 61

238 61

238 61

19

42

2

27

19

27

11

7

10

3

25

5

5 5

9

1

7

69 10

69 10

69 10

38

4

1380

22

11

12

11

84

84

4

62

1231

48

31

8

15

11

9

50

76

MVAR

MW

5

LEGEND:

14

16

28

2 0

31

3112

14

48

48

49

16

19 48

32 21

332

73

20 1412

2

53

53

2828 1819

29

23

18

45

10 4

64

56 18

56 17

22

11 4

11311

4

3

8 32

235

23 1223 23

50 32

29

40

40 25 57 33 57

54

5428

31

15 715 0

15 7

15 0 15 7

10 6

10 10

10 6

10

10 6

10 10

11 1011 3

11 1011

19

55 14

3

11

37

10

30 4

74

115

18

11

2

11

37

10

60 19

60 19

60 19

26

50 30

3

5 30

5

54

55

4 4

4 2

28 10 28 10

287

287

20 12

20 10 43 25 44 25

44244424

33 11 33 11 338

338

7 4 10

10422

104

31

54 16

24 29 12 29 17

39 1639 3

19 2 19 2

19 7 19 7 48

11

5 18

10

101

8

28 2

28 10

2

3

26 1 26 9

55

15

12

54

4

5 16

5 13

3

721

215

31 2231

81 34

97 41

9738

102

43

10240

44 11 16

81

44

69 33

6929

54

3331 20

0 27

80 13

80

8

FIG. C9LF FOR YEAR 2015

132kV NETWORK-PEAK LOAD

0 00 0

0 00 0

0 0 0

0 0 0 0

101

0

407

134

TAWA

SDYT-132

SDBBSDDD

133133

133

SDCC

133

SDYT-400

410

YASI

136BHYG-400

BHYG-132

411

136

RBBB

136

136

RBAA

BHYA

136

ADIP

136

136

SOWA

TMUH

136

SRUH

136

RMDV

136

136

REEM-400

407

REEM-132

SASN-132

133

SASN-400

406

UNPS-132

133

SLTC

133

131

N-MAHAWI132

MAHAWI-400

404NAHD

135

135

WATHBA

136

MAFRAQ136

MCAA

136

136MCBB

M12

136

136

MOS1133

STDM

MKAA132

MKBB

133

MKAW

133

JSRN

133

SHAMKHA

136AIRP

132

SMKB

SHAMKH-132

405132

132

FLCT

69

407411TWPS-AI

TWPS-BIITWPS-BI

ADST-132PORT

134

ADST-400

407

134TCLB134

134130

ALSM-B

ALSM-A

FLAH

MDZD

130

MRKT

134

MKT1

134

SOUQ

134

134

CPGR

CRHO

134

134

FRDS

ZYD2

134

131

130

MRML

JZRH

KLDY

131

131

GRHD

130

131

QURM-132131

CLNS

QURM-400

407

130

CONH

BATN

130

131

BSTN

MSHF-A

130

HTCO130PRE-PALACE

130

EROD

130

DANT

131

EMBS

130

131

CCAD

KHPK

131

406

BECH-400

130

GLFA

BECH-132

Page 54: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0106

1

0

0

1

0

1

20

1

0

1

0

1

010

3

69

0

1

051

1

051

78 275 276

67

0 64

0

0 64

0 35

567

109

569

567

109

1

LEGEND:

78276

28470

67

302 96

303

40

302 96

303

69

357

357

299

384

258

384

618108618108

334

388

57

32

119

35

53564

528 93

11 28

11

276 221

276

1

0 26

5

103

144

52

276

276 52

105

105

103

1

0 7127

6 71

27

6 28 266

85

533

293 14

276

71

28

1

0 71 75

275

106

569

236

27

6

9

221

MVAR

95

MW

0 11

41

11

0 41

60 48

6010

60 48

6010

60 69

6031

60 69

6031

6042

6042

460

8246

1 72 46

0 82

461

12

60 23 60 13

60 23 60 13

53 48 53 36

53 48 36

282

104

1

0 37

1

0 37 18

424

185 79

18

424

266

85

GCSL-400

410

73

185 79

155

338

338 71

33861

338

33861

33861

338 71

337 52

12 33

7 5233

712

337 52

337

12

337 52

337

12

483160

484 161

266

144

469 20

5

284

71

40

71 338

61

337

52 276

276 221

236

11

28 11

265

14

4 26

5

85

462

70

11

53

450 73 450 73

45438

45438

342 342

469 31

466

532

28 532

2853

419 53

419

104

161

104

162

104

208

104

210

53564

528 93

2 6 2 6

2 52 2 52

525

104

282

104

122

363

364

1 1 13

1

127

185

185

185 99

142

274

273

274

61 27

3 98

99 18

5

61 98

8

0

278

56

27

8 31

464 8

8

168 168

464

331

30

328

91

334 37

38456

384

68 38468

388 126

0

39828

401 67 431 50

436 25

431 50

436 25

190 69

190

29

544

148

536

164

142

75

407

28

458

205

133

152205

FIG. C10LF FOR YEAR 2016

400kV NETWORK-PEAK LOAD

96 517

521 76

238

MAL2

EMAL-400

TWPS-AIIITWPS-AII

TWPS-BI404 404

404404

AJMAN

399

FILA-400

399

F3

QDFA-400

405

WRSN

409SHME-400

402

DHID-400

FUJ-CITY

403SHAMKHA

402

MAHAWI-400

403

MOSG-400

ICAD-400

402

402

SASN-400

404

404

BECH-400

QURM-400

404

ADST-400

404

404REEM-400

SDYT-400

406

407

BHYG-400

TANE409

MRF-400

408

SHPS-400

411

407

RWS

S3PS

408

BNPP-1

409

401

BAB

DHMG-400

388

394

SWHG-400

ASWG-400

385

WMZD-400

397

410

405

403

Total TAW = 4277 MW

Total Fuj (F1,F2) = 2688 MW

Total SASN = 1440 MW

Total SHPT (S3) = 1550 MW

Total SHPT (S1,S2) = 2945 MW

Total New MIRFA = 1466 MW

TWPS-BIII404

TWPS-BII

TWPS-AI

Total Fuj (F3) = 1115 MW

Page 55: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

238

46

238

46

238

46

104 7

103

1

32 16 19

101

102 19

101 25

185 22

20

149 11

12

296

52

296

52

296

19

9 37

19

9 37

840 2

840 2

40 40

137

73

137

73

137

73

111

39111

70 1570 22

94

9

71 13

71 16

71 13

71 16

197

197

25

197

25

146

146

146

128

9139

90

17 4

17 7

19 10

19 3

46 25 45 29 30 23

3014

125 15

125 4248 19

48 16

1645

16 60

128 3

128 39

7

8

34

34 54

159 8

157

159 8

1576

62

35 75 40

76 35 75 40

66

41 5

41 104 8

30 70

35 11

35

6

10

39 16 4

15867

158 83

25

250 30

250

30

250

30

SV

0 10

0L

00

117

0

0 0 13

8 12

4

1

17

1 0

20 17

1445

45

4

10

0

82 30

82 27

82 30

17

3 92

17

3 92

17

3

92

91 33

2191

91

41 30

41

41 30

41

33

9 9 4

9 2 9 4

2

25

37

125 42

7

30

21

30

94

54

28

8

288 54

54

288

128

10

128

70

151

55

70

361

52

71 30 18

9 18

8

70

31

25 11

25 11

25 1411

507

125

0

0 18

05

0 18

112

24

112 53

112

170

170

19

9912

99 18

108

19

7 302

96

96

96 38

57 23

5717

32

30

14

108

105

49

295 32

7229

72 32

29 72 32

29 72 32

95

94 164 41

16336

41

16336

16

46 21

19 169

29

53

40

9

8

70 32

7024

70 32

7024

70 32

7024

70 32

70

183

61

187

72

72 11

56

24

9

169

24

38 454238

45 38

1

7 3

38

290

46

44

174 44

174 44

164

10

38 96

164 17

17

164 17

163 17

174

1

6

31 91

52

147

SV

112

105 68

7

102

5

42

6

LEGEND:

150

15

7

25

MVAR

SV

090H

0 81

090

SV

090H

0 81

090

138R

32

SV

013

8R

0 12

4 0 13

8

SV

0 10

0L

011

70 10

0

100

20

4

MW

25

2782

86 131

116

93

100

102 8

2

37 1 7

37

37

17

37 19 37

37 19 37 20

19 37 20 20

1 7

37

197

55

1955

19

108

10

76

163

BAAB

28

224

33

267

267

108

267

108

45 14

12

43 17

17

16

35 16

43

55 55 25

5522

55 25

3434

34 15

3415

15

22

92

0 0

0 18

0 0

0 18

3

0H

300

301

1

3015

700H

70 0

70

1

5

15

35

99 6

699 8

85 6

285

23 23 10

23 7 23 10

7

3

223

223

114 4

114

6

99

183

0 13

30914

0

990

10 139

FIG. C11LF FOR YEAR 2016

220kV NETWORK-PEAK LOAD

5 28

5 2

5 28

5 2

10

DHID-220DHID-400

403223

AHYG

221

SWHG-400

394

SWHG-220

223

AOHG

221

DHMG-400

388

DHMG-220

222

OMAN-220

33TWYA-LA

224

GHANTOOT

SMHG

224

SHME-220

SHME-400

402

FAYA-MOB

223

KHZG

222

RMAG

220

SLMG

220 222

AAPS

AAPH

221

221CTCG

221

NOUR

SNYG

220MZDG

AAFD

220

218

AWGG

ARDG

219

220

AIAA

ASWG-400

AASW-220

385

222

ZAKG

221

219

OUSH

219

MOSG-400

MOSG-220

402

224

226

ICAD-220

ICAD-400

402ADQW-1

QSWM-1

223

225

UNPS-220

HBAA

15

OGDIII

220

MOSF

224

MGIC

222

MRFA

222

ELXR

133

S-B ISLAND

SHPS-132

133

SHPS-220

SHPS-400

411222

132

DLMA

RWS

407

RWS-220

222

221

RUWS

221

SILA-220

221

GTHY

BHSA

219

401

BAB

BAB-220

HBSN 220

219

219

221 DBYA

224

CNTG

224

RMTH-M224

RMTH224

WMZD-220

224

WMZD-400

397

SHAMS1

LIWA

220 219

SHAH-SGD

ASBS

223222

ASAB

HMMO

220

220

ADQW-2

Page 56: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

16 616

253 96

253 96

253 96

14 8

14

14 8

14 8

201 100

201 100

201 100

30 6

30 6

30 6

6

10 310 1

310 1

10

1335 11

35

80

8028

21 0 21 6

109

50

46

45 19

45 14 82 35

8230

85 37

8531

23

23 7

34935

35

109

15 5 15

54 31

27

23 19

18

8 67 37

35

8 3 41

41

50 29

18

32

265 89

265 89

265 89

50 1550 6

50 156

74 29

7425

30

7319

72

63

6318

58 2327 2 7

6

40 13

40

30

4214

42 15

14

42 15

81

18

16 616 4

66 9

6 9

2

284525

45

20

9

18 67 22

17

77

7731

2167

19

2 2

2 02 2

28 1

8 2 18

10

13

10 2

3

8

5 0

5 5 15 6 15

15 5

8

15

13

2 0

0 2

39

39 18

16

5

18

5 16 6

9 45 5

40 5

23

59

5931

2

19

2 3

2

0

7

25 11

16 516 6 616

68 1868

68

16 5

68

252 9

9 9

3

9 40

37

6

9 37

10

45 3

67 6722

6722

67 27

0

72

20

22

55

21 4 3

24

41

41

42

8 3

4

8 3

85 85 30

85 16

5252 1

52 141

268 70

26

8 70

268 70

15

45

1

30

22

23

34

15

8

13

2

30

6

6 4

8

2

8

86 6

86 6

86 6

45

18

1685

24

14

14

8

87

87

4

58

1333

52

10

16

11

8

50

73

MVAR

MW

5

LEGEND:

17

18

27

2 0

33

3313

17

52

52

54

18

22 52

36 24

736

67

18 1211

2

50

50

3535 1315

27

22

16

23

9 2

55

49 13

49 12

19

8 4

838

4

3

6 27

288

1428 28

48 29

26

22

22 14 57 33 57

55

5528

30

2 18 9

18 2 18 9

18 2 9

12 7

12 9

12 7

12

12 7

12 9

11 911 2

11 911

20

57 15

2

5

715 5

14

15

37

10

37 1

81

109

18

8

6

8

37

9

65 22

65 22

65 22

48 30

7

8 37

8

54

50

132

404

5 1

29 10 29 10

298

298

18 11

18 8 40 23

41 23

40214122

34 11 34 34

9349

3420

1 4 1

1 2 2

34 22

1

31

7123

26 8

26 1

8 4 10

15 8

15 8

01515 0

10222

102

31

39 9

17 39 17 39 22

40 1640 3

31 4 31 4

31 1 31 1 52

10

9 18

45 48

59 25 68 34 59 25 68 34

59 25 68 34 59 25 68 34

7

44 19

2

71

3

28 10

57

18

14

18

5 13

5

15 715

45 48

34

612656

82

3182

21

30 61

56 25

28

14

26

34 54

33

16

18

4

228

30 85

1685

155

5 5

FIG. C12LF FOR YEAR 2016

132kV NETWORK-PEAK LOAD

39

6 86

44

404

TWPS-BII

404

TWPS-AITWPS-BI

407

TAWA

131

131ESI-PHASE-3

SDYT-132

SDBB

131SDDD

131

131

SDCC

131

406

SDYT-400

BHYG-400133

YASI

BHYG-132

133

407

133

BHYA

RBAA

133

133

RBBB

MKDD

133

133

ADIP

FLCT

MKBB132

132

SASN-400

SASN-132

UNPS-132

SLTC

132

RMDV

134

REEM-400

404

REEM-132

134

134

SRUHTMUH

134

SOWA

134

SHAMKHA

402131

131

SMKB

SHAMKH-132

AIRP

131

133

MKAA132

MKAW

132

132

JSRN

MOS1

134

STDM-B

STDM132

135

M12

134

134

MCAA

MAFRAQ134

135MCBB

N-MAHAWI132135

403

MAHAWI-400NAHD

134

134

WATHBA

CCAD

133

133

KHPK

404

BECH-400

BECH-132

133132

EMBS

132

CONH

BATN

132

132

BSTN

PRE-PALACE

132

132

GRHD

MRML

132

132

133

HTCO132

132

GLFA

132

DANT

133

132

EROD

404133

QURM-400

QURM-132133

TCLB133

133

132

ALSM-B

ALSM-A

FLAHMRKT

132

132

MKT1

SOUQ

133

133

CPGR

133

E04-02

133

FRDS

ZYD2

133

133

CRHO

404

133

ADST-132

133

ADST-400

132

11

KLDY

133

JZRH

W13-02

PORT

MDZD

132

MSHF-A

CLNS

Page 57: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0107

1

0

0

1

0

1

21

1

0

1

0

1

010

6

72

0

1

052

1

052

23327 323

23

77 7

25

77 7

252

699

49

702

699

49

1

LEGEND:

23323

1027

23

58129

584

28

58129

584

72

492

545 53

506

53543

7124971249

413

548

39

29

49

2

44030

44331

88 9

356

42342

339

1

051

7

106

50

32

33

423

339 33

49

49

106

1

0 7413

416

95 9

529

51

379

117

8

134

16

9

1

0 74 461

327

107

702

35

95

32

42

MVAR

26

MW

352 1

217

1

24917

24817

24917

24817

401 28

40028

401 28

40028

68648

68648

225

1621

8 1522

516

218

25

169 16

177

17

169 16

177

17

78 671 5

78 65

115

8

1

0 38

1

0 3819

113

183 13

19

113

529

51

412 30434 354

15

183 13

48

477

477 33

47733

477

47733

47733

477 33

237 23

2323

7 2323

523

237 23

235

23

237 23

235

23

39628

39828

3962828

529

50

491 21

35

102

33

28

33477

33

235

33339

42342

35356

988

398

517

5051

7

51

482

7

35

71

479 35 479 35

47534

47534

442442

48935

488

415

29 415

2941

629 41

629

297 36 299 36

326

40 329

40

44030

44331

308 21 308 21

323

22 323

22

41 115

82957

8

251

246 17

17

42

228

255

228 16

18 300

310

300

2231

0 23

1625

5

2223

35

17

217

15

462

48534

34

31 31

485

411

30

54238

35

31722

317 22665 46

676 47

665 46

676 47

479 33

489

36

18

666

46

668

46

545 53

492

48

232

FIG. C13

LF FOR YEAR 2017400kV NETWORK-PEAK LOAD

578

16221

14206

145

171

145

10

1

10

17

398

MAL2

EMAL-400

TWPS-AIII

412

TWPS-AIITWPS-AI

412

412 412TWPS-BIIITWPS-BII

414TWPS-BI

TANE414

BHYG-400

413

413

SDYT-400

REEM-400 411

411

ADST-400

411

QURM-400

BECH-400

410

410

SASN-400

ICAD-400

406

MOSG-400

407

408

MAHAWI-400

SHAMKHA

410

SHME-400

410

WRSN

410

397

FILA-400

397

AJMAN

QDFA-400

F3

407

402

DHID-400

407

FUJ-CITY

404

406

SWHG-400

396

DHMG-400

ASWG-400

391

WMZD-400

405

414

414

GCSL-400

BNPP-2

413

BNPP-1

411

S3PS

RWS

410

414

406

BAB

SHPS-400

413

MRF-400

232

Total TAW = 3930 MW

Total Fuj (F3) = 1060 MW

Total Fuj (F1,F2) = 2538 MW

Total SASN = 1510 MW

Total SHPT (S1,S2) = 2893 MW

Total SHPT (S3) = 1480 MW

Total ENEC = 1390 MW

Total New MIRFA = 1420 MW

Total Sweihan = 920 MW

Page 58: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

254

46

254

46

254

46

120 6

119

0

0 8 21

85

86 21

85 28

199 25

196 22

166 11

12

300

90

300

90

300

2

14 25

2

14 25

9

44 3

9

44 3

44

44

145

54

145

54

145

54

112

28

112

85

16

85 22

151

12

74 9

74

12

74 9

74

12

193

194

119

193

119

210

210

210

153

9641

96

16 5

16 7

20 10

20 2

45 25 45 29 33 24

3316

134 5

134 324517

45 52

19 14

19 1

131 25

131 61

8

8

50

50 38

168 21

166

168 21

16620

48

36 77 40

77 36 77 40

64

40

6

39 109 8

30 71

34

12

34

8

10

28

17 9

17785

176 100

119

250

82

250

82

82

SV

0 56

R

00

60

0

00 83

78

1

17

1 0

20 17

16

45

29

4

10

10

0

83 30

83 27

83 30

20

8 51

20

8 51

20

8

51

72 45

31

72

71

21 40

21

21 40

21

45

9 9 4

9 2

9 4

2

119

37

134 32

7

30

31

23

150

79

28

0

280 64

64

281

153

10

153

30

132

45

70

361

52

72 30 19

10 19

9

41

25 11

25 11

26 1512

518

134

0

0

21

0

8

0

21

111

4

111 33

111

173

173

72

101 38

10132

110

36

2 25 7

103

103

103 37

57 19

5713

32

25

41

110

98

85

310

66

7329

73 32

29 73 32

29 73 32

164

163 183 17

18113

17

18113

16

46 21

72 173

29

33

42

45

77

70 32

7024

70 32

7024

70 32

7024

70 32

70

201

44

205

73

73 77

38

24

45

173

4

20 716920

71 19

0

7 3

19

304

46

96

208 96

208 96

183

11

37

103

149

19

19

19

149 19

208

1

8

41

71

90

164

SV

111

98 65

7

86

8

69

20

LEGEND:

131

5

7

26

MVAR

SV

SV

83R

32

SV

083

R

0 780 83

SV

0 56

R

0 600 56 56

4

MW

28

2783

100 41

25

125

97

99 6

1

39 1 8

39

39

18

39 20

39

39 20

39

22

20

39

22

22

1 8

39

194

69

2670

26

113

10

77

149

BAB-220

BAB

28

222

0

278

278

113

410

278

113

45 16

43 17

17

16

35 16

43

55 55

25

55

22 55

25 3434

15

34

15

34

15

15

22

125

0 0

0

19

0 0

0

19

3

0H

300

301

1

3015

700H

700

70

1

5

35

0 5

1 0

23 23 10

23 7 23 10

7

3

227 227

1

0 5

0

92

7

67 7

12 90

66 7

8

FIG. C14LF FOR YEAR 2017

220kV NETWORK-PEAK LOAD

6 28

6 2

6

6 271

250

DHID-220DHID-400

402219

SWHG-400

406

SWHG-220

223

AHYG

221

AOHG

220

221

DHMG-400

396

DHMG-220

OMAN-220

222

TWYA-LA 33

219

SLMGRMAG

220KHZG

221

223

410

SHME-400

SHME-220

SMHG

GHANTOOT

222

222

OGDIIIHBAA

225

MOSF

223

224

AAPS

AAPH

220

220CTCG

220

SNYG

219

NOUR

MZDG15

218

219

AAFD

216

218

ARDG

AWGG

OUSH

218

219

AIAA

ASWG-400 391

AASW-220

221

ZAKG

221

MOSG-400

MOSG-220

407

224

ICAD-220

224

406

ICAD-400ADQW-1

ADQW-2

222

222

CNTG

DBYA

222

MGIC

224

UNPS-220

225

MRFA

225

ELXR

DLMA

133

S-B ISLAND

SHPS-132

134

SHPS-220

SHPS-400

414224

RWS

RWS-220

RUWS

223

221

SILA-220

223

222

GTHY

BHSABAAB

HBSN

224

225

221

226

224

406

222RMTH-M

222RMTH

ASAB

224

HMMO

QSWM-1

ASBS

225

SHAH-SGD

222

LIWA

221

SHAMS1

WMZD-220

225

WMZD-400

405

149

134

28

20

Page 59: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

19 719

199 76

199 76

199 76

17 8

17

17 8

17 8

209 103

209 103

209 103

84 25

84 25

84 25

25

12 412 0

412 0

12

1341 11

39

87

8730

26 2 26 8

114

52

48

51 20

51 16 88 38

8833

92 40

9234

23

23 8

371039

41

19 8 19

57 32

28

27 21

20

7 69 38

37

7 3 43 26

43

5130

18

32

278 90

278 90

278 90

59 1859 8

59 188

77 30

7727

30

7420

77

63

6318

58 2228 2 11

9

37 11

37

32

4314

43 15

14

43 15

88

21

19 719 4

99 8

9 8

3

294826

48

21

10

20 68 24

55

15

79 31

7928

1968

19

3 2

3 03 2

39 1

9 3 19

9

12

13 3

4

7

5 0

5 5 17 7 17

17 5

9

17

12

4 4

4 4

44

44 22

20

8

20

5 19 6

6 56 5

51 1

20

64

6433

0

19

3 3

3

0

8

27 11

19 519 6 6

1919

77 2077

77

19 5

77

272 13

13 9

4

6 51

46

10

12 46

18

58 7

76 7627

7627

76 31

4

77

17

19

50

18 7 3

17

41

41

43

70 14

15

70 14

95 95 36

95 22

5858 4

58 174

311 89

311 89

311 89

18

57

1

36

23

26

36

15

7

14

2

84

7

9 4

8

3

11

104

1

104

1

104

1

56

22

2295

31

21

18

70

107

107

15

58

1235

54

35

18

14

11

11

59

74

MVAR

MW

4

LEGEND:

18

17

31

4 4

35

3512

18

54

54

55

17

23 54

36 22

536

69

18 1311

3

46

46

5050 1018

28

19

13

27

80

50

50 14

50 13

18

70 15

701470

15

14

6 28

7720

77 2677 77

52 29

26

21

21 15 60 34 60

57

5729

31

9 30 16

30 9 30 16

30 9 30 16

25 7

25 9

25 7

25

25 7

25 9

10 910 2

10 910

21

59 16

2

3

1631 3

17

31

36

11

34 2

87

168

32

70

9

70

36

9

81 24

81 24

81 24

15

52 31

10

8 34

20

57

51

135

MCAA

5 5

5 1

30 10 30 10

308

308

18 11

18 8 40 22

40 23

40214021

36 11

1136

936

92517

24 2

4 0 0

25 19

4

33

7725

34 5

34 4

11 5 13

18 9

17 9

11718 1

10724

107

33

35 7

15 35 15 35 20

030

0 11

0 11

41 1741 2

43 11 43 11

43 6 43 6 58

168

32

68 46

59 25 68 34 59 25 68 34

59 25 68 34 59 25 68 34

44 6

44 17

4

77

4

30 30

59

2626 2

11

105

37

29

30

105 26

22

10 14

10 13

5

31 1631

26 11 26 18

68 46

4 114

60 29

61 23

62 29

62 22

76 31

76 26

FIG. C15LF FOR YEAR 2017

132kV NETWORK-PEAK LOAD

35

4 11

1 104

3

412TWPS-BIITWPS-BI

414TWPS-AI412

134TAWA

ESI-PHASE-3134

SDYT-132

SDBB

134SDDD

134

134

134

413

SDYT-400

RMDV

133

REEM-400

411

133

REEM-132

133

SOWA

133

SRUH

133

SASN-400

410

SASN-132

132

UNPS-132

SLTC

132

BHYG-400

413

BHYG-132

134

YASI

134

RBBB

133

133

RBAA

BHYA

133

ADIP

133

MKDD

FLCT

133

SHAMKHA

SHAMKH-132

SMKBFAYA

134

133134

410

AIRP

131

133132

132

132

JSRN

MKAW

132MKAA

STDM

STDM-B

132

135KBAA

135

MAFRAQ135

135

134

WATHBA

134

NAHD408

MAHAWI-400

N-MAHAWI132

MCBB135

134

M12

134

MOS1

132

410

SDCC

TMUH

MKBB

KHPK

133

CCAD

133

133

EMBS

133

DANT

133

133

MSHF-A

GLFA

133

133

EROD

BECH-132

BECH-400

QURM-400

411132

BSTN

131

131

BATN

CONH

131

131

PRE-PALACE

131

GRHD

131

131

MRML

132

132

PORT

132

411

CLNS

132

TCLB132

132

ALSM-A

ALSM-B132133

132

133

MRKT

132

132

MKT1

132

SOUQ132

E04-02

CPGR

132132

FRDS

ZYD2

132

CRHO

HTCO133

KLDY

36QURM-132

FLAH

JZRH

ADST-132

ADST-400

132

W13-02

MDZD

32 168

Page 60: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0105

1

0

0

1

0

1

20

1

0

1

0

1

010

4

70

0

1

051

1

051

159 353 354

151

0 77

0

0 77

0 23

571

573

571

8

1

LEGEND:

159354

7313

151

1128124

1143

17

1128124

1143

70

543

542

312

573

250

571

676122676122

361

179

38

38

112

23

53330

527 60

51 171

51

391 300

391

1

0 58

1

104

144

542

543

169

12

135

391

391

135

2

2

252 28

104

1

0 721 16

2

111

8 581

79

252

404

4

95

1 162

11

8

1

0 72 502

353

105

573

431

1

3

300

MVAR

101

26

312

MW

59 131

596

59 131

596

0 12 40 0 12

0 40

60 135

6033

60 135

6033

553 16

5562

553 16

5562

735 25

74133

735 25

74133

65916

65916

57537

577 40

57537

577 40

177 20 787 88

787 88

100

149

100

131

100

149

100

106

184 29

184

65

184 29

184

65

60 67 60 15

60 67 15

73 72

1

0 37

1

0 37 23

4 5

235 47

23

4 5

581

79

DHID-400

407 45693 474

131

235 47

169

615

614 58

61556

614

61556

61556

614 58

227 0

40 22

7 022

7 40

227 0

227

40

227 0

227

40

328201

328 203

328201 203

755

170

164

581

144

462 20

16

73

58

17

58 614

56

227

135

391

391 300

431

51

171 51

328

581

14

4 58

1

79

454

13

11

60

461

108

461

108

46476

46476

430 430

462 9

459

485

5 485

548

7 16 48

7 16

310

212

312

214

310

258

312

261

808 31 808 31

585 60585 60

57740

57740

53330

527 60

330 88 330 88

332

130

332

130

399

184

73 72 15

8

511

514

577

576

206

208

195

236

235

236

158

197

316

315

316

56 31

5 90

158

235

197

56 90

14

0

282

254

281

230

503

758

45613

13

135 135

456

5178

357 51

354

90

400538

145

532

159

538 145

539

140

FIG. C16LF FOR YEAR 2018

400kV NETWORK-PEAK LOAD

78 313

315 31

8

Total TAW = 4051 MW

Total Fuj (F3) = 1041 MW

Total Sweihan = 859 MW

Total SASN = 1425 MW

Total New MIRFA = 1369 MW

Total SHPT (S1,S2) = 2787 MW

Total SHPT (S3) = 1430 MW

Total ENEC = 2780 MW

MAL2

EMAL-400

TWPS-AIIITWPS-AIITWPS-AI

407 407

407TWPS-BIII

407TWPS-BII

410TWPS-BI

TANE410

BHYG-400

409

QURM-400

SDYT-400

407

405REEM-400

405

ADST-400

405

404

BECH-400

SASN-400

404

ICAD-400

MOSG-400

401

MAHAWI-400

400

399

SHAMKHA

403

405

SHME-400WRSN

409

AJMAN

396

FILA-400

394

QDFA-400

F3

403

400

FUJ-CITY

399

403

400

SWHG-400

DHMG-400

391

ASWG-400

387

HAMIM SWSTN

400

WMZD-400

400

410

GCSL-400

BNPP-2

409

407

BNPP-1

405

S3PS

RWS

403

402

SHPS-400

410

407

MRF-400

Total Fuj (F1,F2) = 2557 MW

BAB

Page 61: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

261

71

261

71

261

71

125 12

124

17

4 25 29

87

87 29

87 35

205 29

203 25

173 30

30

303

83

303

83

303

23

0 11

23

0 11

945 4

945 4

45 45

240

70

240

70

240

70

92

8692

89 189 5

157

22

76 10

75 12

76 10

75 12

195

195

80

195

80

211

211

211

124

10142

101

17 6

17 6

23 13

230

45 22 45 27 34 27

3419

133 6

133 324718

47 53

19 13

19 2

133 26

132 62

8

8

80

79 67

186 4

184

186 4

184 1

46

24 24

35 78 39

79 35 78 39

49

23 1

23 1427 6

31 72

26 9

26

20

9

86 14 27

18394

182 108

80

250 82

250

82

250

82

SV

0 46

R

00

49

0

00 81

76

1

16

1 0

20 16

1743

61

5

11

11

0

121 48

121

46

121 48

22

0 10

6

22

0 10

6

22

0

106

57 19

5 57

57

107 15

107

107 15

107

19

9 9 4

9 2 9 4

2

80

38

133 32

7

30

5

39

156

51

29

5

295 51

51

295

124

11

124

11

145

4

80

362

53

73 31 20

10 20

9

73

15

25 11

25 11

28 1613

539

133

0

0 22

09

0 22

119

10

119 39

119

175

175

74

101 38

10133

110

36

1 24 6

109

109

109 42

58 20

5814

37

24

41

110

100

7330

73 32

30 73 32

30 73 32

137

136 166 30

16525

30

16525

16

46 21

74 175

27

39

43

46

49

70 32

7025

70 32

7025

70 32

7025

70 32

70

0

73

73 50

9

25

46

175

10

36 514936

51 36

0

7 3

36

46

51

291 51

291 51

166

11

42

109

394

7

394

39 7

291

1

20

1557

83

171

SV

119

99 51

10

3

87

9

49

1

LEGEND:

144

6

7

28

MVAR

SV

SV

81R

37

SV

081

R

0 760 81

SV

0 46

R

0 490 46 46

20

5

MW

35

46121

20 80

65

115

26

2915

20

42 1 9

42

42

19

42 22 42

42 22 42 23

22 42 23 23

1 9

42

195

71

3372

32

113

11

79

39

28

29

15 97

98 23

7010

4

71

60

278

278

113

278

113

43 17

140 25

140

31

22

10 23

38 17

38 17

23

43 18

18

16

35 16

43

55 55 25

55 55

34 15

341522

115

60

0 0

0 18

0 0

0 18

3

0H

300

301

1

3015

800H

800

80

1

6

15

1

1600H

140 14031 11

15

35

10

FIG. C17LF FOR YEAR 2018

220kV NETWORK-PEAK LOAD

8 00

22 25 15 15 3434

7 7 3

7 27

3

27

DHID-400DHID-220

220400

SWHG-400

400

225

SWHG-220

GHANTOOT

220

SMHG

220

SHME-220

SHME-400

221

405AHYG

222

AOHG

220

OMAN-220

221

AAPS

221

DHMG-400

391

DHMG-220

TWYA-LA 33

SLMG

221RMAG

221KHZG

221

220

AAPH

CTCG 220

220

NOUR

SNYG

219MZDG

218

AAFD

219

217

218

ARDG

AWGG

OUSH

218

219

AIAA

ASWG-400 387

AASW-220

221

ZAKG

220

MOSG-220

MOSG-400

222

400

ICAD-220

ICAD-400

399

223TAQA

ADQW-1217

ADQW-2

217

QSWM-1

HMMO

219

ASAB

RMTH-M RMTH220220

220

CNTG

DBYADAYA-M

219 219

MGIC

222

222

MOSF

OGDIII

218

HBAA

218

218

HBSN

BAAB

218

WMZD-400

400

WMZD-220

223

SHAMS1

LIWA

219 217

SHAH-SGD

220

ASBS

216

BHSA

402

219

BAB-220

BAB

GTHY

218

SILA-220

219

220

222

403

RWS-220

RUWS

222

ELXR

MRFA

222

S-B ISLAND

131

131

DLMA

SHPS-132

131

SHPS-220

SHPS-400

410220

RWS

0

7

Page 62: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

23 923

208 78

208 78

208 78

21 5

21

21 5

21 5

221 111

221 111

221 111

92 28

92 28

92 28

28

14 514 1

514 1

14

1545 13

43

90

9132

29 3 29 9

117

48

53 22

53 17 92 39

9234

95 41

9535

21

21 7

381143

45

19 8 19

61 34

30

31 24

23

6 74 41

39

7 3 46 28

46

5331

19

34

302 75

302 75

302 75

61 1961 10

61 1910

79 31

7928

31

7620

80

66

6620

60 2329 2 11

9

37 11

37

34

4515

45 16

15

45 16

89

22

23 923 2

1212 6

12 6

4

325229

52

22

9

20 70 25

57

16

81 33

8129

2070

18

7 0

7 27 0

413 1

13 4113

10

12

16 5

6

5

4 0

4 5 20 8 20

20 6

13

20

12

4 4

4 4

43

43 21

19

14

23

6 23 5

1 68 2

62 6

19

71

7137

2

18

1 2

1

2

11

33 15

23 623 5 5

2323

82 2383

82

23 6

83

331 16

16 8

6

0 62

56

17

17 56

18

58 7

79 7928

7928

79 33

4

80

18

20

52

18 11 1

111

39

39

45

72 15

16

72 15

104

104

10

104

3

6161 6

61 196

267 78

267 78

267 78

21

2

10

23

27

41

15

7

14

3

92

8

12 2

5

4

14

121

7

121

7

121

7

68

27

3104

32

22

18

72

109

109

16

60

1341

55

41

18

14

13

11

61

76

MVAR

MW

4

LEGEND:

18

18

33

4 4

41

4113

18

55

55

57

18

23 55

35 22

535

74

19 1311

7

47

47

6262 521

29

19

14

31

72

52

53 16

53 15

19

72 16

721572

16

15

6 29

9614

96 2097 97

56 31

28

22

22 15 64 36 64

61

6131

34

24 32 17

32 24 32 17

32 24 32 17

52 23

527

52 23

52

52 23

52

7

9 89 1

9 89

22

60 17

1

13

2546 13

19

46

37

12

35 1

89

172

34

72

10

72

37

7

117 48

117

48

117

48

16

56 33

15

8 35

14

267 78

61

53

133

133

AIRP

130

6 5

6 1

31 11 31 11

318

318

19 11

19 9 42 24

42 24

42224223

38 12 38 12

389

389

1511

15 1

5 0 0

15 13

10 1

3811

10 6 19

4

4 4

45 1

45 9

14 7 16

23 12

22 12

42223 4

10825

108

34

34 7

34 15 34 20

38 20 38 20

38123812

43 1843 0

46 13 46 13

46 8 46 8 61

17

2

172

34

12

1 7

78 50

59 25 68 34 59 25 68 34

59 25 68 34 59 25 68 34

45 6

45

4

1 38

5

31 5 31

60

4949 5

18

107

3

10

MAFRAQ

32

107 20

27

12 14

12 14

6

46 2546

1 91 2

78 50

5 117

58 27

58 21

63 29

63 22

77 31

77 27

57

FIG. C18LF FOR YEAR 2018

132kV NETWORK-PEAK LOAD

34 15

12

34

5

53

81 35

8126

17

407TWPS-BIITWPS-BITWPS-AI

407 410

SDBB

132SDDD

132

132

SDCC

132

407

SDYT-400

SDYT-132

TAWA132

132ESI-PHASE-3

BHYG-132

409

BHYG-400134

YASI

134

RBBB

134

134

RBAA

BHYA

134

MKDD

134

ADIP

SASN-400

404

SASN-132

132

UNPS-132

RMDV

133

405

SOWA

133

133

TMUH SRUH

133

133

REEM-132

131

SLTC

131

131

MKAW

131MKBB 134

134

FLCT

SHAMKHA

403133

132

SMKB

SHAMKH-132

FAYA

132

WATHBA

133

NAHD

133

401

133

MAHAWI-400

N-MAHAWI132

MCBB133

M12133

133

MOS1

MCAA

133

133 KBAA

133

STDM

STDM-B

131

MKAA131

JSRN

131

RWDH

133CCAD

133

KHPK

133

404

BECH-400

133133

EMBS

133

GLFA

133

MSHF-A

HTCO133

133

DANT

BECH-132

EROD

133

134

405

QURM-400

BSTN

134CONH

133

BATN

133

133

PRE-PALACE

GRHD

KLDY133

MRML

133

133

JZRH 133

QURM-132134CLNS

TCLB132

133132

ALSM-B

ALSM-AFLAH

MDZD

133

133

MRKT

132

132

MKT1

SOUQ

132

132

E04-02

132

CPGR132

FRDS

ZYD2

132

132

CRHO

PORT ADST-132

132

ADST-400

405

133

W13-02

REEM-400

Page 63: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0106

1

0

0

1

0

1

21

1

0

1

0

1

010

3

71

0

1

051

1

051

428 426

89

12

89

12

407

409

407

1

LEGEND:

426

43

1050

1061

1050

1061

71

633

689

648

68

8

827 827

372

372

412

417

210

467

502

424

1

066

7

103

68

963

3

502

424

541

535

362

103

1

0 7112

2

82

647

362

487

231

122

1

0 71 554

428

106

409

82

MVAR

MW

344

334

344

334

30 30

22

330

316

330

316

553

555

553

555

737

743

737

743

785

785

514

517

514

517

364

886

886

525

527

30

1

292

301

292

213

223

213

223

75 65

75

83

1

0 38

1

0 3836

0

363

36

0

647

481

703

363

623

622

623

622

623

623

622

220

22

0 21

8

220

218

220

218

473

474

473

912

647

396 21

43

62

2

218

42

4

502

467

21

0

474

667

667

390

65

473

473

468

468

417417

393

395

547

547

54

7 54

7

424

427

449

453

904

904

922 922

904

904

400

405

412

417

430

430

442

442

490

83 55

6

555

527

525

383

394

383

378

383

378

38

3

39

4

22

537

530

364

405

400

554

916

390

390

FIG. C19LF FOR YEAR 2019

400kV NETWORK-PEAK LOAD

Total Fuj (F3) = 990 MW

Total TAW = 3842 MW

Total SASN = 1450 MW

Total SHPT (S1,S2) = 2822 MW

Total SHPT (S3) = 1450 MW

Total ENEC = 4170 MW

Total Sweihan = 900 MW

Total Fuj (F1,F2) = 2297 MW

Total New MIRFA = 1385 MW

MAL2

EMAL-400

411TANE

TWPS-AITWPS-AII TWPS-AIII

410410410

TWPS-BIII410

TWPS-BII411

TWPS-BI410

AJMAN

396

FILA-400

396

QDFA-400

F3

405

409

WRSNSHME-400

408

DHID-400

401

FUJ-CITY

402

407

SHAMKHA

MAHAWI-400

400

MOSG-400

398

397

ICAD-400

SASN-400

403

403

403

QURM-400

BECH-400

SDYT-400

406

408

BHYG-400

404

ADST-400

REEM-400 404410

MRF-400

SHPS-400

412

BAB

403

407

RWS

S3PS

409

BNPP-1

411

405

404

SWHG-400

ASWG-400

387

HAMIM SWSTN

WMZD-400

397

403

413

BNPP-2

GCSL-400

413

DHMG-400

395

Page 64: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

267

44

267

44

267

44

135 8

133

3

26 19 20

87

87 20

87 27

224 10

221 5

183 11

10

332

63

332

63

332

26

9 24

26

9 24

1047 4

1047 4

47 47

246

70

246

70

246

70

100

76100

97 2098 25

189

38

78 17

78 20

78 17

78 20

210

211

130

210

130

221

221

221 79

10545

104

17 5

17 6

23 12

23 0

44 24 44 28 36 27

3618

167 14

167 4028 13

28 23

3136

31 51

142 8

142 44

8

8

89

88 58

198 5

195

198 5

195 0

70

24 24

37 78 41

79 37 78 41

56

25 1

24 1428 7

32 74

28 9

27

21

10

76 15 28

209104

209 118

130

250 82

250

82

250

82

SV

074

R

00

69

0

0 0 10

4 96

1

16

1 0

20 16

1943

52

5

11

11

0

122 48

122

47

122 48

23

4 82

23

4 82

23

4

82

57 23

8 57

57

107 18

107

107 18

107

23

9 9 4

9 2 9 4

2

130

39

167 40

5

50

8

33

188

38

26

2

262 38

38

262

79

11

79

35

119

50

70

488

53

75 32 21

11 21

10

74

18

37 17

36 17

29 1714

6616

167

0

0 16

03

0 16

90 9

89 21

89

182

182

15

107 62

10756

116

61

8 16 12

107

107

106 40

56 18

5612

34

16

67

116

93

0

0 8

7330

73 32

30 73 32

30 73 32

130

130 167 21

16616

21

16616

16

46 21

15 182

29

21

46

13

59

70 32

7025

70 32

7025

70 32

7025

70 32

70

0

73

73 60

9

25

13

182

9

35 595735

59 35

0

7 3

35

0

46

61

291 61

291 61

167

11

40

106

432

6

432

43 6

291

1

21

1857

63

182

SV

90

93 58

10

3

87

3

57

0

LEGEND:

118

14

7

29

MVAR

104R

34

SV

010

4R

0 96 0 10

4

SV

074

R

0 690 74 74

20

5

MW

27

47122

115 31

15

117

57

607

11

44 2 0

44

44

20

44 23 44

44 23 44 25

23 44 25 25

2 0

44

211

82

6682

66

113

11

79

43

29

QSWM-1

397

220

224

398

223

395

222

19

11 131

133 14

943

26

95

60

278

278

113

278

113

43 19

110 29

110

35

36

10 23

38 17

38 17

23

43 18

18

16

35 16

43

55 55 25

5522

55 25

343415

34 15

3415

15

22

117

60

0 0

0 18

0 0

0 18

3

0H

50 0

502

1

5015

700H

70 0

70

1

5

1

1500H

110 11035

224

2315

35

10

220

224

FIG. C20LF FOR YEAR 2019

220kV NETWORK-PEAK LOAD

8 27

88 27

8 3

DHID-220DHID-400

221401

SWHG-400

404

SWHG-220

225

AHYG

222

AOHG

221

OMAN-220

222

DHMG-400

DHMG-220

222

34TWYA-LA

SLMG

221

221

RMAG

KHZG

222

408

SHME-400

SHME-220

GHANTOOT

SMHG

223

224

OGDIIIHBAA

218 218HBSN

218

BAAB

218

DAYA-M DBYA

MOSF

223

MGIC

224

221

RMTH-M 221221 RMTH

MOSG-220

MOSG-400

ICAD-220

ICAD-400

TAQA

ADQW-1

215

ADQW-2

215

HMMO

ASAB

218

ZAKG

AAPS

AAPH

222

222CTCG

222

222

AASW-220

ASWG-400 387

AIAA

220

ARDG

219

AWGG

218

OUSH

AAFD

SNYG

NOUR

MZDG220220

219219

15

CNTG

224

MRFA

224

ELXR

S-B ISLAND

SHPS-132

3132

DLMA

132

SHPS-220

SHPS-400132

222412

RWS

222

221

RWS-220

RUWS

407

SILA-220

220

GTHY

220

BAB

BAB-220

403

219

BHSA

216

WMZD-400

403

WMZD-220

222

SHAMS1

ASBS

219

SHAH-SGD

216

LIWA

218

Page 65: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

25 1025

216 110

216 110

216 110

24 4

24

24 4

24 4

229 116

229 116

229 116

10

4 34

10

4 34

10

4 34

34

16 516 2

516 2

16

1749 15

47

94

9534

32 5 32 11

120

55

50

56 23

56 18 95 42

9536

99 43

9938

18

18 6

411448

49

20 8 20

63 35

31

33 25

24

6 76 43

41

7 4 47 29

47

5532

20

35

317 78

317 78

317 78

61 1961 10

61 1910

83 34

8330

33

7922

83

68

6821

60 2329 3 11

10

38 11

38

36

4616

46 17

16

46 17

91

23

25 1025 0

1313 5

13 5

5

335430

54

23

8

22 72 26

59

17

85 35

8532

2172

20

122

12 412 2

515 2

15 5215

10

12

18 6

7

4

3 0

3 4 23 10 23

23 8

15

23

12

4 5

5 4

41

41 21

18

23

28

7 28 3

7 861

79 16

19

74

7439

3

20

1 2

1

4

12

33 15

28 728 3 3

2828

91 2891

91

28 7

91

33 2 22

22 5

9

10 79

70

27

25 70

19

58 8

82 8230

8230

82 35

5

83

19

22

54

18 11 1

111

40

40

46

73 16

17

73 16

113

113

17

113

4

6868 11

68 2311

289 86

289 86

289 86

25

58

2

17

26

30

43

17

7

15

3

104

10

13 0

4

5

17

149

23

149

23

149

23

86

33

4113

33

23

18

73

110

110

17

60

1545

59

45

19

14

16

11

61

79

MVAR

MW

4

LEGEND:

21

20

35

5 5

45

4515

21

59

59

59

20

26 59

35 22

535

76

20 1312

12

49

49

9797 1525

30

20

15

33

63

54

52 15

52 14

19

73 17

731673

17

16

6 29

107

22

107 27

107

107

57 32

29

23

23 16 66 38 66

63

6332

35

18 40 11

40 1811

40 18 40 11

74 33

7417

74 33

74

74 33

7417

9 89 1

9 89

23

61 18

1

16

2750 16

23

50

37

12

37 0

91

175

35

73

11

73

37

17

141 58

141 58

141 58

17

57 34

33

9 37

22

289 86

63

55

7 6

7 0

33 11 33 11

339

339

20 12

20 9 44 25

44 25

44244424

39 13 39 13 3910

101511

15 1

5 0

15 13

5

37

8529

13 3

4214

13 8 22

22 0

59 9

59 18

17 8 18

28 15

27 15

72728 8

10925

108

34

34 7

14 14 34 20

132

39 20 39 20 23

3912391223

3

47 2047 2

51 16 51 16

51 11 51 11 68

17

5 35 17

5 35

14

9

100

41

59 24 68 34 59 24 68 34

59 24 68 34 59 24 68 34

46 7

46 18

5

85

3 42

5

32 6 32

61

5555 9

21

114

3

4

40

114 27

34

33

29 5

29 22

8

50 2750

0 80 1

100

41

5 120

62 29

62 23

67 31

67 24

82 33

83 29

0

FIG. C21LF FOR YEAR 2019

132kV NETWORK-PEAK LOAD

34

13

39

40

SDBB

132SDDD

132

132

SRUHTMUH

132

SOWA

132

REEM-132

132

RMDV

132

REEM-400

404

SASN-400

403

SASN-132

131

UNPS-132

SLTC

131

131

132

SDCC

SDYT-132

TAWA133

410TWPS-BIITWPS-BITWPS-AI

410 411

133ESI-PHASE-3

SDYT-400

406

132

YASI

133BHYG-400

408

BHYG-132

133

RBAA

132

132

RBBB

MKDD

132

132

ADIP

BHYA

133

FLCT

132AIRP

130

SHAMKHA

SHAMKH-132

SMKBFAYA

16

132133

407

132

STDM

STDM-B

130

132

MKAA130

131

JSRN

131

MOS1

132

MCAA

132

M12132

MCBB132

132MAFRAQ

WATHBA

132

132

NAHD400

MAHAWI-400

N-MAHAWI132132

132

RWDH

KHPK

133

CCAD

132

403

133

MKBB130

MKAW

KBAA

23

ADST-400

404

ADST-132PORT

132

132

CLNS132

TCLB132132132

ALSM-B

ALSM-AFLAH

MRKT

132

132

MKT1

SOUQ

132

132

E04-02

132

ZYD2

FRDS

132CPGR

132

CRHO

132

132

MDZD

132

W13-02

132131

MRML

131 KLDY

JZRH 132

QURM-132

QURM-400

403132

BECH-132

BECH-400

EROD

132

HTCO132

GRHD

131

PRE-PALACE

131

BATN

131

BSTN

MSHF-A

132

133

DANT

EMBS

132

CONH

131

132GLFA

132

Page 66: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

1

0105

1

0

0

1

0

1

20

1

0

1

0

1

010

2

69

0

1

051

1

051

442 441

97

2

97

2

267

265

267

1

LEGEND:

441

52

891

903

891

903

69

631

684

647

68

3

884 884

517

517

257

285

293

526

618

546

1

066

8

102

68

463

1

618

546

607

599

364

102

1

0 7089

47

652

364

496

284

89

1

0 70 579

442

105

265

47

MVAR

MW

599

610

599

610

22 22

30

676

689

676

689

557

560

557

560

733

739

733

739

836

836

679

681

679

681

727

728

727

728

727

728

639

641

41

0

402

409

402

245

257

245

257

78 72

78

98

1

0 37

1

0 3738

4

389

38

4

652

403

393

408

408 529 760

389

599

598

599

598

599

599

598

256

25

6 25

4

256

254

256

254

505

506

505

957

652

417 20

52

59

8

254

54

6

618

526

29

3

506

668

668

409

72

509

509

506

506

512512

415

416

570

570

57

1 57

1

363

366

385

389

511

511

946

946

966

966

1108 1108

1086

1086

417

417

257

285

530

530

539

539

498

98 52

7

526

641

639

417

427

417

427

432

427

43

2

42

7

30

647

643

728

727

417

417

580

963

410

410

FIG. C22LF FOR YEAR 2020

400kV NETWORK-PEAK LOAD

Total Fuj (F1,F2) = 2439 MW

Total Fuj (F3) = 974 MW

Total TAW = 3748 MW

Total Sweihan = 813 MW

Total SASN = 1339 MW

Total SHPT (S3) = 1340 MW

Total ENEC = 5560 MW

Total SHPT (S1,S2) = 2621 MW

Total New MIRFA = 1298 MW

MAL2

EMAL-400

408TANE

TWPS-AI TWPS-AII TWPS-AIII

408

408TWPS-BIII

408

TWPS-BII

408TWPS-BI

BHYG-400

405

BECH-400

401

401

QURM-400

SDYT-400

403

401

401REEM-400

ADST-400

409

MRF-400

SHPS-400

410

BAB

406

RWS

S3PS

408

399

ICAD-400

SASN-400

401

MOSG-400

394

395AL FAYAH

397

MAHAWI-400

SHAMKHA

403

404

SHME-400WRSN

408

AJMAN

393

393

FILA-400

F3

QDFA-400

404

FUJ-CITY

400

399

DHID-400

404

401

SWHG-400

392

DHMG-400

ASWG-400

386

HAMIM SWSTN

WMZD-400

398

411

BNPP-2

410

GCSL-400

411

BNPP-1

Page 67: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

267

73

267

73

267

73

137 16

135

20

30 16 28

86

86 28

86 35

224 35

222 29

186 36

34

325

64

325

64

325

28

5 35

28

5 35

1049 5

1049 5

49 49

232

70

232

70

232

70

103

62103

99 399 2

192

14

81 11

80 13

81 11

80 13

224

224

139

224

139

230

230

230 70

10643

106

16 6

16 5

24 13

241

45 23 45 27 36 29

3720

154 9

154 35384

38 39

2713

27 28

140 18

140 53

8

8

102

101 43

218 1

215

218 1

2156

91

24 24

37 80 41

80 37 80 41

50

26 1

26 1427 7

32 75

29 8

29

21

10

62 15 27

192106

191 120

139

250 82

250

82

250

82

SV

010

0H

0 0

90

0

0 0 15

0 13

3

1

16

1 0

20 16

2142

37

5

12

12

0

123 48

123

47

123 48

24

8 77

24

8 77

24

8

77

52 25

10 52

52

102 20

102

102 20

102

25

9 9 4

9 2 9 4

2

139

39

154 35

15

150

10

30

191

15

27

4

274 15

15

274

70

12

70

39

106

54

100

487

53

76 33 22

11 22

10

75

20

37 17

37 17

30 1815

6717

154

0

0 24

011

0 24

101

8

101 37

101

182

182

44

105 51

10545

114

50

0 15 5

107

107

107 46

56 21

5615

40

15

55

114

95

0

0 8

7330

73 32

30 73 32

30 73 32

118

117 168 10

1675

10

1675

16

46 21

44 182

23

37

44

17

75

70 32

7024

70 32

7024

70 32

7024

70 32

70

0

73

73 76

9

24

17

182

8

34 747234

74 34

0

7 3

34

0

46

74

289 74

289 74

168

10

46

107

523

6

523

52 6

289

1

21

2052

64

184

SV

101

94 51

11

3

86

11

72

6

LEGEND:

106

9

7

30

MVAR

SV

00

0 0

SV

00

0 0

150H

40

SV

015

0H

0 13

3 0 15

0

SV

010

0H

0 90 0 10

0

100

20

5

MW

35

47123

129 21

5

109

24

2617

21

45 2 1

45

45

21

45 24 45

45 24 45 25

24 45 25 25

2 1

45

224

81

6381

63

113

12

80

52

28

219

395

9

2 138

141 10

100 1

30

101

60

278

278

113

278

113

42 21

60 2060 27

12

10 23

38 17

38 17

23

43 18

18

16

35 16

43

222

55 55 25

5522

55 25

3434

34 15

3415

15

22

109

60

0 0

0 18 0 18

3

0H

150 0

15022

1

15015

1000H

100 0

100

1

10

1

1000H

60 6027 23

15

35

10

219

223

224

224

00

FIG. C23LF FOR YEAR 2020

220kV NETWORK-PEAK LOAD

9 26

9 49 26

9 4

DHID-220DHID-400

399225

AHYG

222

AOHG

220

220

DHMG-400

392

DHMG-220

TWYA-LA 34

220

SLMGRMAG

221KHZG

223

OMAN-220

221

SWHG-400

225

401

SWHG-220

225

SHME-220

SMHG

225

224

GHANTOOT

SHME-400

404

MRFA

223

223

ELXR

RUWS

406

RWS

224

RWS-220

132

SHPS-132

S-B ISLAND

132

DLMA

131

SHPS-220

220

GTHY

219

BHSA

219

BAB

BAB-220HBAA OGDIII

22215

222

HBSN

BAAB

222

223

399

DAYA-M DBYA

MOSF

222

222

MGIC

AAPS

AAPH

220

220CTCG

220

ZAKG

220

221

AASW-220

ASWG-400 386

AIAA

219

ARDG

218

216

AWGG

AAFD

SNYG

NOUR

MZDG

217

15218218

OUSH

217

MOSG-400

MOSG-220

223

ICAD-220

ICAD-400

394

TAQA222

ADQW-1218

ADQW-2

218

QSWM-1

HMMO

221222

SHAH-SGD

219

LIWA

220

ASBS

ASAB

RMTH-M RMTH

CNTG

220

218 218

SHAMS1

WMZD-400

224

398

WMZD-220

SHPS-400

410221

220

SILA-220

Page 68: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

27 1027

225 91

225 91

225 91

26 3

26

26 3

26 3

239 122

239 122

239 122

11

8 42

11

8 42

11

8 42

42

18 618 3

618 3

18

1954 18

53

99

9937

35 6 35 12

123

56

52

58 24

58 20 99 44

9938

102

45

10340

15

15 4

431753

54

123

20 8 20

64 36

32

34 26

25

6 80 45

43

6 4 49 30

49

5834

20

37

330 59

330 59

330 59

61 1961 10

61 1910

88 36

8833

34

8123

85

70

7122

59 2330 3 11

10

40 12

40

37

4717

47 18

17

47 18

93

23

27 1027 0

1515 5

15 5

5

355632

56

24

6

22 73 26

61

19

87 36

8733

2273

21

164

16 616 4

720 4

20 7420

9

12

19 6

8

4

2 1

2 4 26 11 26

26 10

20

26

12

5 6

6 5

39

39 19

17

33

33

9 34 1

17 101

7

95 26

19

76

7641

3

21

1 2

1

6

18

43 21

34 934 1 1

3434

99 3399

99

34 9

99

43 7 29

29 1

15

20 95

84

36

33 84

18

59 8

84 8532

8532

84 37

6

85

19

22

55

18 11 1

011

39

39

47

74 16

17

74 16

118

118

20

119

8

7878 17

78 2917

309 69

309 69

309 69

30

59

2

20

28

31

44

17

6

16

4

118

11

15 0

3

5

18

174

37

174

37

174

37

101

43

8119

33

23

18

74

111

111

17

59

1848

63

48

18

16

18

11

61

80

MVAR

MW

4

LEGEND:

23

23

37

5 6

48

4818

23

63

63

61

23

28 63

34 22

534

80

20 1412

16

50

50

116

116 2730

31

21

16

34

73

55

51 14

51 13

19

74 17

741674

17

16

7 30

118

29

118 35

118

118

58 33

30

25

25 17 69 39 69

65

6534

37

15 44 9

44 15 44 9

44 15 44 9

77 39

7724

77 39

77

77 39

7724

8 88 1

8 88

23

62 18

18

2953 18

29

53

37

11

40 1

93

177

36

74

11

74

37

24

149 70

149 70

149 70

18

58 36

44

10 40

29

309 69

64

58

132

73 2867 26 90 34

8 6

8

35 12 35 12

35103510

20 12

20 10 46 26

47 27

46254725

41 14 41114111

1411 73 353 23 2

3 1 1 90 38

14 13 67 32

3

40

9032

16 5

4717

16 10 25

77 4

72 17

72 25

18 8 19

36 21

34 20

123436 13

10925

109

34

34 7

14 34 14 34 19

53 29 53 29

53225322

515

60 23 60 23

60 18 60 18 78

17

7 36 17

7 36

17

4 37

107

40

59 24 68 34 59 24 68 34

59 24 68 34 59 24 68 34

46 7

46 18

5

90

7 47

4

33 6

62

6060 13

25

115

3

4

44

115 35

34

43

35 2

35 25

10

53 2953

0 80 1

107

40

FIG. C24LF FOR YEAR 2020

132kV NETWORK-PEAK LOAD

13 33

51

1

14 41

1 23

408TWPS-BIITWPS-BI

408TWPS-AI

408

133TAWA

ESI-PHASE-3 132

SDYT-132

SDBB

132SDDD

132

132

SDCC

132

404

SDYT-400

132

SRUH

132

SOWA

132

REEM-132

132

REEM-400

401

132

RMDV

SASN-400

401

SASN-132

132

YASI

132BHYG-400

405

BHYG-132

132

132

BHYA

RBAA

132

132

RBBB

MKDD

132

ADIP

UNPS-132

SLTC

132

FLCT

131

SHAMKHA

SHAMKH-132

SMKBFAYA

AIRP

131

131MKBB131

MKAA131

MKAW

131

JSRN

131

403132

132

131

MAFRAQ

132

132

KBAA

STDM-B

STDM131

132MOS1

131

M12131

N-MAHAWI132

MCBB132

MCAA

132

WATHBA132

132

132

NAHD397

MAHAWI-400RWDH

132

KHPK

132

CCAD

132

401

BECH-400

BECH-132

401

QURM-400

TMUH

132

EMBS

DANT

133

132

MSHF-A

GLFA

132

HTCO132

132

EROD

133

132

BSTN

132

131

BATN

CONH

131

131

PRE-PALACE

GRHD

131

KLDY131

131

MRML

131

JZRH 131

QURM-132

CLNS132

132132 TCLB

132ALSM-B

ALSM-A

131

132

132

MRKT

MKT1

132

SOUQ

132

132

E04-02

CPGR

132

CRHO

132

PORT ADST-132

132

ADST-400

402

FRDS

132

132

ZYD2

132

W13-02

MDZD

FLAH

Page 69: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-D

Fault Levels on the Transmission System (2013-2020)

Page 70: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

4001 ADST‐400 400 31.8 39.4 33.0 41.3 34.9 44.1 34.1 43.3 44.0 54.3 45.0 55.4 47.0 57.5 47.2 57.7

4002 BECH‐400 400 34.7 42.5 36.4 44.9 38.5 48.1 37.5 47.1 44.2 54.6 44.8 55.3 47.2 57.8 47.4 58.0

4003 QURM‐400 400 32.5 40.3 33.9 42.3 35.8 45.2 35.0 44.4 43.9 54.3 44.8 55.3 47.0 57.6 47.2 57.8

4004 SASN‐400 400 35.2 43.0 37.0 45.5 39.1 48.7 38.1 47.7 44.3 54.6 44.8 55.3 47.3 57.9 47.5 58.1

4005 BHYG‐400 400 27.5 33.8 29.8 37.0 29.3 36.6 48.5 56.7 50.0 58.1 51.2 59.3 51.4 59.4

4006 REEM‐400 400 30.6 38.0 31.8 39.8 33.5 42.4 32.8 41.7 41.8 51.8 42.7 52.7 44.5 54.6 44.7 54.8

4007 SDYT‐400 400 28.7 35.1 30.4 37.7 32.0 40.0 31.4 39.4 44.6 54.1 45.8 55.3 47.5 57.1 47.7 57.2

4011 MOSG‐400 400 33.0 30.7 35.0 33.8 38.2 44.8 36.8 44.8 38.3 46.6 37.2 45.5 40.4 48.8 40.6 49.0

4012 SHME‐400 400 33.4 29.8 37.0 33.6 40.9 36.0 39.2 34.7 46.8 39.8 46.8 39.5 48.9 41.1 49.1 41.2

4014 MAHAWI‐400 400 29.2 29.6 34.9 42.3 36.2 44.7 39.4 48.3 38.9 47.8 41.8 50.9 42.0 51.1

4015 ICAD‐400 400 31.7 29.1 33.6 31.1 34.9 34.1 33.6 33.5 34.7 36.3 33.8 35.6 36.3 37.5 36.5 37.7

4016 SHAMKHA 400 33.4 28.6 39.7 33.3 39.6 33.2 44.0 36.1 42.5 34.2 49.1 40.1 49.4 40.2

4017 HAMIM SWSTN 400 29.9 26.1 34.0 29.7 34.3 29.8

4018 AL FAYAH 400 24.3 16.1 26.0 17.0 44.2 33.0

4501 SHPS‐400 400 36.0 43.8 45.5 51.9 34.7 38.6 35.0 38.9 35.1 39.0 36.3 40.0 37.1 40.7 37.4 40.9

4502 WMZD‐400 400 18.3 15.7 18.8 17.1 24.5 20.9 25.0 21.1 25.4 21.3 29.5 25.0 32.7 26.9 34.6 27.8

4503 GCSL‐400 400 18.5 15.9 19.0 9.3 18.7 9.4 20.0 10.4 21.4 11.8 16.7 10.0 18.9 11.4 20.5 11.8

4504 BABG 400 20.0 18.0 28.9 24.7 29.7 25.2 30.3 25.6 38.2 32.7 42.1 35.1 44.2 36.1

4505 S3 400 35.6 43.1 44.4 49.6 32.5 32.6 33.9 33.7 38.1 39.2 39.4 41.3 40.0 41.7 40.2 41.9

4507 RWS 400 30.6 32.0 37.2 36.5 33.2 31.7 35.4 33.4 39.6 38.5 41.2 40.7 41.9 41.2 42.3 41.4

4509 ENEC 400 24.9 18.2 29.0 22.8 34.3 32.5 34.9 37.2 35.3 37.5 35.5 37.7

2019 2020

A) 400kV System

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 1 of  10

Page 71: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

4510 ENEC‐2 400 19.8 19.5 25.5 27.4 30.9 31.4

4511 MRF‐400 400 28.1 26.7 33.1 33.5 34.3 34.4 34.0 34.1 34.5 34.4 35.0 34.9

4601 ASWG‐400 400 13.8 13.0 14.3 13.3 14.9 13.8 14.7 13.7 15.3 14.0 15.3 14.0 15.8 14.5 15.8 14.5

4602 SWHG‐400 400 22.5 19.4 22.6 19.4 23.7 20.1 21.9 18.8 28.8 29.2 28.8 29.2 30.5 30.4 30.5 30.5

4603 DHMG‐400 400 17.6 16.4 17.4 16.3 18.1 16.9 17.5 16.5 19.7 18.2 19.7 18.2 20.5 18.7 20.5 18.7

4701 TWPS‐AI 400 44.4 48.0 45.2 48.5 48.5 50.7 47.7 50.0 59.0 60.2 59.9 60.8 61.2 61.8 61.4 61.9

4702 TANE 400 24.7 26.9 25.1 27.4 25.3 27.8 25.0 27.6 44.2 46.0 44.6 45.8 45.7 46.6 45.8 46.6

4705 TWPS‐AII 400 44.4 48.0 45.2 48.5 48.5 50.7 47.7 50.0 59.0 60.2 59.9 60.8 61.2 61.8 61.4 61.9

4706 TWPS‐AIII 400 45.2 48.5 48.5 50.7 47.7 50.0 59.0 60.2 59.9 60.8 61.2 61.8 61.4 61.9

4802 DHID‐400 400 32.5 29.6 31.4 26.4 31.6 26.5 34.3 28.0 34.8 28.3 34.8 28.3 34.9 28.4 34.9 28.4

4803 QDFA‐400 400 36.2 39.8 35.9 40.1 36.2 40.3 44.8 51.3 46.1 52.5 46.2 52.5 46.4 52.7 46.4 52.8

4804 FILA‐400 400 15.5 15.1 17.7 17.6 17.8 17.6 19.2 18.6 19.4 18.8 19.4 18.8 19.4 18.8 19.4 18.8

4805 AJMAN 400 19.1 17.0 19.2 17.0 20.3 17.7 20.5 17.8 20.5 17.8 20.6 17.8 20.6 17.8

4806 FUJ‐CITY 400 25.1 23.0 24.3 21.1 24.5 21.2 28.1 23.6 28.6 23.8 28.6 23.8 28.7 23.8 28.7 23.8

4807 HAMRIA 400 44.3 50.3 45.5 51.4 45.5 51.4 45.8 51.6 45.8 51.6

94701 TWPS‐BI 400 23.8 24.5 24.7 25.9 21.7 19.9 21.4 19.8 44.2 46.0 41.0 39.5 41.9 40.0 42.0 40.1

94705 TWPS‐BII 400 44.4 48.0 45.2 48.5 48.5 50.7 47.7 50.0 59.0 60.2 59.9 60.8 61.2 61.8 61.4 61.9

94706 TWPS‐BIII 400 44.4 48.0 45.2 48.5 48.5 50.7 47.7 50.0 59.0 60.2 59.9 60.8 61.2 61.8 61.4 61.9

2001 UNPS‐220 220 22.5 24.4 21.7 23.0 21.2 21.4 18.9 19.7 14.6 12.4

2002 MOSF 220 26.6 29.5 28.8 31.6 32.0 35.3 28.2 32.1 26.3 30.1 26.0 29.9 26.7 30.5 26.8 30.6

2003 MGIC 220 28.4 31.4 30.0 33.0 34.5 38.0 29.4 33.6 26.8 30.9 26.5 30.6 27.3 31.4 27.3 31.4

B) 220kV System

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 2 of  10

Page 72: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

2005 MHWG 220 19.8 19.0 19.6 18.9 22.2 21.2

2006 WATH 220 22.1 20.1 22.2 20.4 28.9 27.5

2007 1SMK 220 17.2 11.5 17.2 11.5 17.4 11.7 10.7 8.1

2008 2SMK 220 14.8 10.9 14.9 10.8 17.8 12.1 9.7 7.1

2009 LCMO 220 9.3 8.0 9.3 7.8 13.9 11.1 7.5 5.9

2010 CNTG 220 14.6 12.0 15.6 12.6 16.2 12.9 15.4 12.5 15.1 12.4 15.0 12.3 15.2 12.5 15.2 12.5

2011 DBYA 220 10.6 7.1 11.1 7.3 11.4 7.4 11.1 7.3 10.9 7.2 10.8 7.2 11.0 7.2 11.0 7.2

2012 RMTH 220 12.2 8.8 12.9 9.1 13.3 9.2 12.8 9.1 12.5 9.0 12.5 9.0 12.6 9.0 12.7 9.0

2013 SMHG 220 11.9 11.9 12.0 11.9 12.3 12.1 9.7 10.3 10.7 11.1 10.7 11.1 10.8 11.2 10.8 11.2

2017 FAYA‐MOB 220 17.5 11.5 17.5 11.6 18.5 12.1 9.3 6.6

2020 DAYA‐M 220 10.7 7.0 10.8 7.1 10.8 7.1

2021 RMTH‐M 220 12.6 8.9 12.3 8.8 12.3 8.8 12.4 8.8 12.5 8.8

2411 MOSG‐220 220 29.8 34.0 31.2 35.4 36.8 42.8 30.6 36.8 27.4 33.0 27.1 32.7 27.9 33.6 28.0 33.6

2412 SHME‐220 220 21.3 23.8 21.5 24.2 22.5 25.0 15.1 18.0 17.8 20.8 17.8 20.8 18.1 21.0 18.1 21.0

2415 ICAD‐220 220 25.6 28.8 28.8 32.7 30.9 35.0 28.3 32.8 27.0 31.8 26.7 31.5 27.5 32.3 27.6 32.3

2416 TAQA 24.9 29.4 24.7 29.2 25.4 29.9 25.4 29.9

2451 SHPS‐220 220 19.9 24.3 24.4 28.7 25.6 29.7 25.8 29.9 25.9 30.0 25.8 29.9 25.9 30.0 25.9 30.0

2452 WMZD‐220 220 18.6 21.4 19.2 22.2 23.5 26.1 23.9 26.4 24.1 26.6 21.4 24.3 22.2 25.1 22.6 25.4

2454 BAB‐220 220 19.8 21.7 24.4 26.5 24.9 26.9 25.1 27.0 20.8 23.4 21.4 24.0 21.8 24.3

2457 RWS‐220 220 19.1 21.4 20.0 22.2 19.5 21.5 19.8 21.8 20.3 22.4 20.4 22.7 20.5 22.7 20.5 22.7

2461 ASWG‐220 220 28.1 33.3 27.4 32.7 29.0 34.5 27.5 33.1 29.7 35.2 29.6 35.2 31.2 36.7 31.2 36.8

2462 SWHG‐220 220 25.6 28.2 25.3 27.9 27.7 29.9 24.8 27.4 28.1 31.5 28.1 31.5 29.2 32.5 29.2 32.5

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 3 of  10

Page 73: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

2463 DHMG‐220 220 30.9 37.4 29.2 35.8 30.7 38.2 29.2 36.7 31.6 39.2 31.6 39.2 33.8 41.6 33.8 41.7

2482 DHID‐220 220 21.5 24.3 18.4 21.2 18.4 21.3 18.9 21.7 19.0 21.8 19.0 21.8 19.0 21.8 10.8 12.0

2487 HAMRIA‐220 220 19.0 21.8

2491 WASIT‐220 220 16.6 14.5

2501 RUWS 220 15.9 16.4 19.2 18.6 21.4 20.7 21.7 20.9 21.8 20.9 21.2 20.6 21.3 20.6 21.3 20.6

2502 MRFA 220 11.9 11.0 16.9 15.2 30.5 33.8 32.9 36.1 33.1 36.3 25.6 29.2 25.7 29.3 25.7 29.3

2503 GTHY 220 8.0 7.7 8.8 8.1 9.1 8.3 9.1 8.3 9.1 8.3 9.1 8.3 9.1 8.3 9.1 8.3

2504 SILA‐220 220 5.3 5.0 5.6 5.1 5.7 5.2 5.8 5.2 5.8 5.2 5.7 5.2 5.7 5.2 5.7 5.2

2506 ASGS 220 6.9 5.4 11.3 8.9 12.6 9.5 12.7 9.6 12.8 9.6 12.0 9.3 12.2 9.4 12.3 9.4

2507 SHAMS1 220 18.6 21.4 17.5 20.2 21.1 23.6 21.5 23.9 21.6 24.0 19.4 22.2 20.1 22.8 20.4 23.0

2508 BAAB 220 9.0 6.7 15.8 14.9 18.6 16.9 18.9 17.1 19.1 17.2 16.5 15.7 16.9 15.9 17.1 16.0

2509 BHSA 220 8.2 8.7 11.7 11.9 13.1 12.9 13.3 13.0 13.3 13.0 12.4 12.4 12.6 12.6 12.7 12.7

2510 LIWA 220 8.3 8.4 8.5 8.5 9.2 9.0 9.3 9.0 9.3 9.0 8.9 8.8 9.0 8.8 9.1 8.9

2511 ASAB 220 7.9 6.5 12.0 9.9 13.5 10.6 13.7 10.7 13.7 10.7 12.9 10.4 13.1 10.5 13.3 10.6

2512 LWST 220 8.3 8.3 8.5 8.4 9.2 8.9 9.3 8.9 9.3 8.9 8.9 8.6 9.0 8.7 9.1 8.8

2513 HMMO 220 4.1 3.6 5.1 4.2 5.3 4.3 5.3 4.4 5.4 4.4 5.2 4.3 5.3 4.3 5.3 4.3

2514 ELXR 220 11.9 10.7 16.6 14.3 28.4 27.5 30.4 28.9 30.6 29.0 24.4 24.6 24.5 24.6 24.5 24.6

2515 ADQW‐1 220 3.0 2.8 3.4 3.1 3.5 3.2 3.5 3.2 3.5 3.2 3.5 3.2 3.5 3.2 3.5 3.2

2516 ADQW‐2 220 3.0 2.6 3.4 2.9 3.5 3.0 3.5 3.0 3.5 3.0 3.5 2.9 3.5 2.9 3.5 3.0

2517 SHAH‐SGD 220 4.8 3.5 8.8 6.4 9.5 6.7 9.6 6.8 9.7 6.8 9.2 6.6 9.3 6.7 9.4 6.7

2518 QSWM‐1 220 3.3 3.1 3.8 3.5 4.0 3.6 4.0 3.6 4.0 3.6 3.9 3.6 4.0 3.6 4.0 3.6

2519 QSWM‐2 220 3.3 2.9 3.8 3.2 4.0 3.3 4.0 3.3 4.0 3.3 3.9 3.2 4.0 3.3 4.0 3.3

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 4 of  10

Page 74: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

2520 ASAB‐SW 220 7.0 5.5 11.9 9.6 13.4 10.3 13.6 10.3 13.6 10.4 12.8 10.0 13.0 10.1 13.1 10.2

2521 OGDIII 220 7.6 5.4 13.2 11.3 16.0 14.6 16.2 14.7 16.3 14.7 14.4 13.6 14.7 13.8 14.8 13.9

2522 HABSHAN 220 12.8 10.8 14.5 11.8 14.7 11.9 14.8 11.9 13.2 11.2 13.5 11.3 13.6 11.4

2523 HBAA 220 16.3 15.0 16.5 15.1 16.6 15.1 14.6 14.0 14.9 14.2 15.1 14.3

2601 KHZG 220 8.4 7.9 8.4 7.8 10.7 9.4 7.5 6.9 7.7 7.0 7.7 7.0 7.8 7.1 7.8 7.1

2602 RMAG 220 17.4 16.8 17.3 16.7 19.4 18.1 15.2 14.8 18.2 17.1 18.2 17.1 18.7 17.4 18.7 17.4

2603 SLMG 220 21.4 20.9 21.1 20.7 22.6 21.7 20.4 20.2 22.5 21.7 22.5 21.7 23.3 22.2 23.4 22.2

2604 ZAKG 220 29.4 35.9 27.9 34.5 29.4 36.8 28.0 35.3 30.2 37.7 30.2 37.7 32.1 39.8 32.1 39.8

2605 AAPS 220 26.3 32.0 25.8 31.8 26.6 33.3 25.6 32.2 27.2 33.9 27.2 33.9 29.2 36.1 29.2 36.2

2606 AHYG 220 13.9 12.1 13.7 12.0 14.2 12.3 13.6 12.0 14.3 12.4 14.3 12.4 14.7 12.6 14.7 12.6

2607 AOHG 220 21.9 20.3 21.3 20.6 21.9 21.1 21.3 20.8 22.3 21.4 22.3 21.4 23.1 21.9 23.1 21.9

2608 WAST 220 16.1 13.7

2609 SNYG 220 21.3 23.1 20.7 22.6 21.4 23.8 20.8 23.3 22.0 24.3 22.0 24.3 22.9 25.1 22.9 25.1

2610 MZDG 220 16.7 16.1 16.3 15.9 16.9 16.8 16.5 16.5 17.2 17.0 17.2 17.0 17.8 17.4 17.8 17.4

2611 ARDG 220 14.6 13.8 14.4 13.7 14.8 14.0 14.4 13.7 15.0 14.1 15.0 14.1 15.4 14.3 15.4 14.3

2612 AWGG 220 9.8 8.9 9.7 8.9 9.9 9.0 9.7 8.9 10.0 9.0 10.0 9.0 10.2 9.1 10.2 9.1

2613 CTCG 220 26.6 32.4 25.4 31.4 26.5 33.1 25.4 31.9 27.1 33.7 27.0 33.7 28.9 35.7 28.9 35.7

2614 OUSH 220 7.0 6.2 7.0 6.0 7.1 6.0 6.9 6.0 7.1 6.0 7.1 6.0 7.2 6.1 7.2 6.1

2615 AIAA 220 16.2 14.3 16.0 14.2 16.6 14.5 15.9 14.2 16.7 14.6 16.7 14.6 17.2 14.8 17.2 14.8

2617 NEW‐AAPS 220 26.9 33.7 25.8 32.5 27.5 34.4 27.5 34.4 29.6 36.7 29.6 36.7

2618 AL FAYDA 220 20.3 21.2 19.7 20.8 20.7 21.6 20.7 21.6 21.6 22.2 21.6 22.2

2701 GHANTOOT 220 8.1 7.7 8.1 7.7 8.3 7.8 7.0 7.0 7.6 7.4 7.6 7.4 7.6 7.4 7.6 7.4

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 5 of  10

Page 75: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

62616 TOWAYYA 220 29.9 37.3 28.6 35.9 30.8 38.3 30.8 38.2 32.9 39.9 32.9 39.9

1001 MKT1 132 27.1 29.2 27.4 29.5 27.9 30.4 27.8 30.8 29.5 32.2 29.7 32.3 30.0 32.6 30.0 32.6

1002 MRKT 132 27.6 29.7 27.9 29.9 28.4 31.0 28.3 31.4 30.1 32.9 30.3 33.0 30.6 33.2 30.6 33.3

1003 SOUQ 132 27.9 29.9 28.2 30.1 28.9 31.4 28.8 32.0 30.7 33.5 30.9 33.6 31.2 33.9 31.2 33.9

1004 CPGR 132 28.5 30.5 28.8 30.8 29.3 31.7 29.2 32.3 31.2 33.9 31.3 34.0 31.6 34.2 31.7 34.3

1005 FRDS 132 29.1 31.2 29.4 31.4 29.9 32.5 29.8 32.9 31.8 34.5 32.0 34.7 32.3 34.9 32.4 34.9

1006 ZYD2 132 28.6 30.6 28.9 30.9 29.4 31.8 29.2 32.2 31.2 33.8 31.3 33.9 31.6 34.1 31.7 34.2

1007 TCLB 132 29.1 31.1 29.4 31.3 29.9 32.3 29.7 32.7 31.7 34.3 31.9 34.4 32.2 34.7 32.3 34.7

1008 PORT 132 28.4 30.3 28.7 30.5 29.1 31.4 29.0 31.8 30.9 33.3 31.1 33.4 31.4 33.7 31.4 33.7

1009 EMBS 132 27.2 29.7 27.6 30.4 27.9 30.7 27.8 30.6 30.9 33.6 31.3 34.5 31.6 34.7 31.6 34.8

1010 DANT 132 27.4 29.7 27.7 30.5 28.1 30.8 27.9 30.7 31.1 33.7 31.2 34.3 31.5 34.5 31.5 34.6

1011 GLFA 132 25.7 28.2 26.1 28.9 26.4 29.1 26.2 29.0 29.0 31.7 29.1 32.3 29.4 32.5 29.4 32.5

1012 MSHF‐A 132 23.9 26.3 24.1 26.9 24.4 27.2 24.3 27.1 26.6 29.4 26.7 29.8 26.9 30.0 27.0 30.0

1013 HTCO 132 25.5 27.9 25.8 28.7 26.2 29.0 26.0 28.8 28.7 31.5 28.8 31.9 29.1 32.2 29.1 32.2

1014 FLAH 132 24.7 27.1 25.0 27.8 25.3 28.1 25.1 27.9 27.7 30.4 27.8 30.8 28.0 31.0 28.0 31.0

1015 ALSM‐A 132 23.9 26.2 24.2 26.9 24.4 27.1 24.3 27.0 26.7 29.3 26.7 29.7 27.0 29.8 27.0 29.9

61015 ALSM‐B 132 27.8 29.6 27.8 29.6 28.2 30.5 28.1 30.8 29.9 32.3 30.0 32.4 30.3 32.6 30.3 32.6

1016 KHPK 132 25.9 28.1 26.2 28.8 26.6 29.0 26.4 28.9 29.2 31.6 30.4 33.5 30.7 33.7 30.7 33.7

1017 CLNS 132 27.5 30.0 27.8 30.5 28.2 30.9 28.1 31.2 29.7 30.4 29.8 30.5 32.1 32.8 32.1 32.8

1018 JZRH 132 28.2 30.9 28.8 31.8 29.3 32.2 28.2 31.6 27.0 30.0 27.1 30.1 27.4 30.2 27.4 30.3

1019 MDZD 132 26.7 29.2 27.1 29.9 27.5 30.2 27.1 30.2 26.1 28.9 26.2 29.0 26.4 29.2 26.4 29.2

C) 132kV System

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 6 of  10

Page 76: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

1020 KLDY 132 25.3 28.2 27.5 30.6 27.9 31.0 25.0 28.1 26.2 27.6 26.3 27.6 28.1 29.5 28.1 29.5

1021 MRML 132 24.7 27.5 25.7 28.7 26.0 28.9 25.7 29.0 27.0 28.5 27.1 28.6 29.0 30.6 29.1 30.6

1022 GRHD 132 25.7 28.7 26.6 29.8 26.9 30.1 26.6 30.1 28.0 29.6 28.2 29.7 30.2 31.8 30.2 31.8

1023 CONH 132 25.1 28.1 25.7 28.8 26.0 29.1 25.8 29.2 27.1 28.8 27.2 28.9 29.1 30.8 29.1 30.8

1024 BATN 132 26.2 29.2 26.8 30.0 27.2 30.3 27.0 30.4 28.4 29.9 28.5 30.0 30.7 32.1 30.7 32.1

1025 BSTN 132 26.6 29.5 27.1 30.3 27.5 30.6 27.3 30.8 28.8 30.2 29.0 30.3 31.1 32.5 31.2 32.5

1026 UNPS‐132 132 28.5 34.9 37.8 43.8 26.7 29.8 26.6 28.8 40.5 42.2 30.4 27.9 30.8 28.1 30.8 28.1

1027 RBAA 132 12.0 14.8 22.3 25.5 22.8 25.9 23.2 26.7 25.9 29.0 26.0 29.1 26.1 29.2 26.2 29.2

1028 MKAA 132 21.6 26.4 26.4 31.2 20.5 23.7 18.1 20.2 33.6 37.7 19.9 20.0 20.0 20.1 20.0 20.1

1029 AIRP 132 17.5 20.8 20.5 23.6 16.8 19.2 16.2 18.1 23.7 25.9 17.5 18.0 17.6 18.1 17.7 18.1

1030 SLTC 132 27.5 33.6 36.1 41.8 25.9 28.9 25.7 28.0 38.7 40.4 29.4 27.1 29.7 27.3 29.7 27.3

1031 MOS1 132 21.9 25.8 26.0 29.0 18.4 21.3 18.5 21.8 25.9 29.4 23.5 26.9 23.8 27.1 23.8 27.2

1032 MKBB 132 21.9 26.5 26.7 31.2 20.7 23.7 20.6 23.0 30.4 32.9 22.9 22.6 23.1 22.8 23.2 22.8

1033 JSRN 132 25.2 30.7 31.9 37.0 24.1 27.2 24.0 26.3 35.8 37.8 27.3 25.7 27.5 25.8 27.6 25.8

1034 BHYA 132 9.0 9.0 25.7 28.4 26.3 28.9 26.3 29.4 29.8 32.2 30.0 32.4 30.1 32.5 30.1 32.5

1035 YASI 132 12.6 15.5 23.7 26.5 24.2 26.9 24.1 27.2 27.0 29.6 27.1 29.7 27.2 29.8 27.2 29.8

1036 RBBB 132 12.6 15.5 21.9 25.1 22.4 25.4 22.8 26.3 25.4 28.5 25.5 28.6 25.6 28.7 25.6 28.7

1037 TMUH 132 27.0 28.6 27.5 28.9 27.9 29.2 27.7 29.1 29.5 32.5 29.7 32.6 29.9 32.9 30.0 32.9

1038 SRUH 132 26.5 28.1 27.0 28.4 27.4 28.7 27.2 28.6 28.9 31.9 29.1 32.0 29.3 32.2 29.3 32.3

1039 RMDV 132 26.6 28.1 27.0 28.5 27.4 28.7 27.3 28.6 29.0 31.9 29.1 32.1 29.4 32.3 29.4 32.3

1040 YASM1 132 9.1 8.5

1041 YASM2 132 9.1 8.5

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 7 of  10

Page 77: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

1044 SDBB 132 23.4 24.9 23.8 25.1 24.1 25.3 24.0 25.3 25.9 26.7 26.0 26.8 26.2 26.9 26.2 26.9

1045 SDCC 132 23.6 25.0 23.9 25.2 24.3 25.4 24.1 25.4 26.1 26.8 26.2 26.9 26.4 27.0 26.4 27.0

1046 SDDD 132 23.5 25.0 23.9 25.2 24.2 25.5 24.1 25.4 26.1 26.8 26.2 26.9 26.4 27.0 26.4 27.0

1048 ADIP 132 10.5 13.0 22.0 25.2 22.5 25.6 23.7 27.2 26.6 29.6 26.7 29.7 26.8 29.8 26.8 29.8

1049 CCAD 132 27.4 29.9 27.7 30.5 28.0 30.8 27.9 30.7 31.0 33.7 31.6 34.9 32.0 35.1 32.0 35.2

1051 CRHO 132 29.9 32.5 29.8 32.9 31.8 34.5 32.0 34.7 32.3 34.9 32.4 35.0

1053 SOWA 132 27.4 28.8 27.8 29.2 28.2 29.5 28.1 29.4 29.9 32.9 30.0 33.0 30.3 33.2 30.4 33.2

1054 RWDH 132 30.5 33.8 30.8 34.1 30.9 34.1

1056 WATHBA 132 19.3 20.4 20.0 23.4 20.1 24.1 31.2 36.4 26.6 31.1 26.9 31.4 27.0 31.5

1057 MCAA 132 18.3 19.3 19.7 22.9 19.8 23.4 28.6 32.6 25.6 29.5 26.0 29.8 26.0 29.8

1058 KBAA 132 28.3 32.0 25.4 29.0 25.7 29.3 25.7 29.3

1059 STDM 132 21.5 26.3 26.1 31.0 20.3 23.6 19.4 22.6 19.7 22.4 24.9 28.3 25.2 28.5 25.2 28.6

1061 E03 132 29.0 32.1 30.9 33.7 31.1 33.8 31.4 34.1 31.4 34.1

1063 PRE‐PALACE 132 25.6 28.8 26.0 29.1 25.7 29.2 27.1 28.7 27.2 28.8 29.1 30.8 29.1 30.8

1064 AL FALAH 132 9.7 12.1 17.8 20.4 18.0 20.7 18.0 20.9 19.6 22.2 19.7 22.3 19.8 22.3 19.8 22.4

1065 SMKB 132 20.0 18.6 20.0 18.6 20.4 18.8 20.3 20.4 20.7 20.7 20.7 20.7

1066 MAFRAQ 132 21.0 24.3 21.1 25.0 32.9 38.1 29.0 33.6 29.4 33.9 29.5 34.0

1067 NAHD 132 18.6 21.8 18.8 22.4 28.1 32.5 24.3 28.3 24.6 28.5 24.6 28.6

1068 MKCC 132 24.3 29.9 30.1 35.6 22.7 26.1 22.2 24.6 36.0 39.5 24.9 24.1 25.1 24.3 25.1 24.3

1069 MKDD 132 19.9 22.8 21.9 24.5 22.0 24.6 22.1 24.7 22.1 24.7

1070 E25/02 132 26.7 29.6 27.1 29.9 26.9 29.7 29.9 32.6 29.9 33.1 30.2 33.3 30.3 33.3

1072 M12 132 15.0 16.0 18.7 21.6 18.8 22.1 26.4 30.0 23.9 27.3 24.2 27.6 24.2 27.6

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 8 of  10

Page 78: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

1073 M12XX 132 21.9 25.8 26.0 29.0

1074 W13‐02 132 28.3 31.6 27.1 30.1 27.3 30.2 27.5 30.4 27.5 30.4

1075 MCBB 132 21.6 24.9 21.8 25.6 32.8 37.5 29.0 33.2 29.4 33.5 29.5 33.6

1076 FAYA 132 17.5 16.5 17.9 18.4 18.8 19.1 18.3 18.7

1401 ADST‐132 132 30.1 32.1 30.5 32.4 31.0 33.4 30.8 33.8 33.0 35.6 33.2 35.7 33.5 36.0 33.6 36.0

1402 BECH‐132 132 29.5 31.8 29.9 32.7 30.3 33.0 30.1 32.9 33.8 36.4 34.0 37.0 34.3 37.3 34.4 37.4

1403 QURM‐132 132 30.0 32.6 30.4 33.3 30.9 33.6 30.7 34.0 32.6 33.1 32.8 33.2 35.6 36.0 35.6 36.0

1404 SASN‐132 132 28.4 34.7 37.8 43.8 26.9 30.0 26.8 29.0 41.1 42.6 31.0 28.2 31.3 28.4 31.4 28.4

1405 BHYG‐132 132 27.2 30.0 27.9 30.5 27.8 30.9 31.7 34.0 31.9 34.2 32.1 34.3 32.1 34.3

1406 REEM‐132 132 28.2 29.5 28.6 29.9 29.1 30.2 28.9 30.1 30.8 33.8 31.0 33.9 31.3 34.2 31.3 34.2

1407 SDYT‐132 132 26.8 27.7 27.3 28.0 27.7 28.3 27.6 28.2 30.2 30.0 30.3 30.1 30.6 30.2 30.6 30.2

1414 N‐MAHAWI132 132 22.6 23.1 23.6 27.0 23.8 27.9 37.4 43.0 32.5 37.2 33.1 37.7 33.1 37.7

1416 SHAMKH‐132 132 23.3 18.1 24.2 21.3 24.2 21.3 24.7 21.5 24.5 23.3 25.2 23.7 25.2 23.7

1483 QDFA‐132 132 29.6 32.4 29.6 32.0 29.6 32.0 30.1 32.3 30.1 32.4 30.1 32.4 30.1 32.4 30.1 32.4

1484 FILA‐132 132 24.3 32.7 22.7 30.9 22.7 30.9 23.4 31.8 23.5 31.9 23.5 31.9 23.6 31.9 23.6 31.9

1485 AJMAN‐132 132 23.8 15.7 23.8 15.7 24.4 15.8 24.5 15.9 24.5 15.9 24.5 15.9 24.5 15.9

1486 FUJCITY‐132 132 26.3 14.1 21.5 12.8 21.5 12.8 22.3 13.0 22.4 13.0 22.4 13.0 22.5 13.0 22.5 13.0

1501 ADNC 132 20.7 23.0 20.9 23.2 20.8 23.1 20.9 23.1 20.9 23.2 21.0 23.2 21.0 23.2 21.0 23.3

1502 SHPS‐132 132 8.8 10.7 9.3 11.2 9.4 11.3 9.4 11.3 9.4 11.3 9.4 11.3 9.4 11.3 9.4 11.3

1506 DLMA 132 6.4 7.3 6.7 7.5 6.7 7.6 6.7 7.6 6.7 7.6 6.7 7.6 6.7 7.6 6.7 7.6

1508 S‐B ISLAND 132 8.3 10.0 8.7 10.4 8.8 10.5 8.8 10.5 8.8 10.5 8.8 10.5 8.8 10.5 8.8 10.5

1701 TAWB 132 29.8 38.9 35.7 45.4 35.9 45.7 35.9 45.6 36.5 46.4 36.5 46.4 36.6 46.5 36.6 46.5

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 9 of  10

Page 79: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH 3‐PH 1‐PH

2019 2020

Table D1  3‐Phase and 1‐Phase Short Circuit Levels (kA) for Peak Load Condition

PSS/E Bus No.

Grid/Substation Name

Voltage    ( kV)

2013 2014 2015 2016 2017 2018

1702 TAWA 132 31.5 40.8 31.5 40.5 31.8 40.8 31.7 40.7 32.5 41.6 32.6 41.6 32.6 41.7 32.6 41.7

1703 ESI‐PHASE‐3 132 30.2 36.6 30.2 36.5 30.9 37.2 30.9 37.3 31.0 37.3 31.0 37.3

1801 F1PS 132 29.6 32.4 29.6 32.0 29.6 32.0 30.1 32.3 30.1 32.4 30.1 32.4 30.1 32.4 30.1 32.4

1821 DHMN‐132 132 23.0 24.4 13.8 16.5 13.8 16.5 13.9 16.6 14.0 16.7 14.0 16.7 14.0 16.7 14.0 16.7

1)

2)

3)

4)

5) ALSM 132kV switchgear is run split.

Notes:     

All existing 400kV switchgears are rated 63kA; 220kV & 132kV switchgear rated 40kA; with the following exceptions:

132kV switchgear rated 31.5kA at substations in W02 (MRKT), ADPS, and W24 (MSHF).

TAWA‐132kV Switchgear Rated 50kA.

400kV, 220kV and 132kV  Fault Levels are calculated in accordance with IEC60909 with a C Factor of 10%.

Taweela P.S 400kV switchgear is run split.

Wathba 220kV switchgear is split for Year 2013.

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table D1 Sheet 10 of  10

Page 80: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

S.N Substation No of TXF Pri/Sec/Ter (kV) Pri (kV) Sec (kV)Pri/Sec/Ter 

(MVA) % Zps % Zst* % Zpt* Rating (MVA)

Fault Current Per Transformer (kA) (HV fault level equal 

switchgear rating) 

Fault Current Per Transformer (kA) (HV fault level in 2013)

Fault Current Per Transformer (kA) (HV fault level in 2020)

1 Al Wathba (WATH) 2 220/33/11 220 33 100/60/40 23.5 N/A 17.1 100 8.0 7.9

2 Al Wathba (WATH) 2 220/33/11 220 33 140/140/40 18.5 5.0 17.1 140 13.9 13.6

3 Mahawi (MHWG) 3 220/34.5/11 220 33 140/140/20 19.5 2.3 10.5 140 13.2 12.8

4 Shahama (SHME) 3 220/34.5/11 220 33 140/140/20 20.4 7.0 31.5 140 12.7 12.2 12.0

5 Mussafah (MOSG) 3 220/34.5/11 220 33 140/140/20 19.5 7.0 31.5 140 13.2 13.0 13.0

6 Samha (SMHG) 2 220/34.5/11 220 33 140/140/20 19.5 2.3 10.5 140 13.2 12.0 11.7

7 MGIC  3 220/34.5/11 220 33 140/140/20 20.3 2.3 10.5 140 12.7 12.6 12.5

8 MGIC  1 220/34.5/11 220 33 140/140/20 25.0 2.3 10.5 140 10.4 10.3 10.3

9 Central (CNTG) 2 220/34.5/11 220 33 140/140/20 20.4 2.3 10.5 140 12.7 11.9 11.9

10 Mirfa (MRWR) 2 220/34.5/11.5 220 33 100/100/30 18.1 9.0 17.4 100 10.3 9.6 10.2

11 Madinat Zayed‐WR (WMZD) 2 220/34.5/11.5 220 33 100/100/30 17.4 9.0 17.4 100 10.7 10.1 10.5

12 Madinat Zayed‐WR (WMZD) 1 220/34.5/11.5 220 33 140/140/30 17.7 9.0 17.4 140 14.5 13.5 14.1

13 Sila (SLWR) 2 220/34.5/9.8 220 33 80/80/26.7 15.0 1.6 7.3 80 9.9 8.3 8.3

14 Ruwais (RWWR) 2 220/34.5/11 220 33 140/140/20 19.5 7.0 31.5 140 13.2 12.7 12.7

15 Liwa (LWWR) 3 220/34.5/11.5 220 33 100/100/30 17.4 9.0 17.4 100 10.7 9.3 9.6

16 Sweihan (SWHN) 2 225/34.5/11 220 33 80/80/20 18.2 10.0 14.3 80 8.2 8.1 8.1

17 Sweihan (SWHN) 1 220/34.5/11 220 33 140/140/20 19.5 10.0 14.3 140 13.2 12.9 12.9

18 Salamat (SLMG) 3 220/34.5/11 220 33 140/140/47 20.3 7.0 31.5 140 12.7 12.3 12.3

19 Al‐Hayer (AHYG) 2 225/34.5/11 220 33 80/80/20 18.0 10.0 14.3 80 8.3 7.9 7.9

20 Al‐Hayer (AHYG) 1 225/34.5/10 220 33 80/80/20 18.1 10.0 14.3 80 8.3 7.9 7.9

21 Ramah (RMAG) 3 220/34.5/11 220 33 140/140/47 19.5 7.0 31.5 140 13.2 12.6 12.5

22 Khazna (KHZG) 2 220/34.5/10 220 33 140/140/20 20.5 7.0 31.5 140 12.6 11.3 10.6

23 ARAD (ARDG) 2 220/34.5/11 220 33 140/140/47 20.1 7.0 31.5 140 12.8 11.9 11.9

24 Maziyad (MZDG) 2 220/34.5/11 220 33 140/140/47 20.2 7.0 31.5 140 12.8 12.0 12.0

Table D2  3‐ph Fault Contribution from 220/33kV Transformer at 33kV Based on Computed HV Fault Level 

TRANSCO/AMD/PNDD

June 2013 Transco 2013 7YPS(2014‐2020) Table D2 Sheet 1 of 2

Page 81: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

S.N Substation No of TXF Pri/Sec/Ter (kV) Pri (kV) Sec (kV)Pri/Sec/Ter 

(MVA) % Zps % Zst* % Zpt* Rating (MVA)

Fault Current Per Transformer (kA) (HV fault level equal 

switchgear rating) 

Fault Current Per Transformer (kA) (HV fault level in 2013)

Fault Current Per Transformer (kA) (HV fault level in 2020)

Table D2  3‐ph Fault Contribution from 220/33kV Transformer at 33kV Based on Computed HV Fault Level 

25 Al‐Ain Industrial City (AAIC) 3 220/34.5/9.87 220 33 140/140/20 24.6 N/A N/A 140 10.6 10.0 10.0

26 Al Wagon (AWGG) 3 225/34.5/11 220 33 80/60/20 18.2 10.6 17.5 80 8.2 7.6 7.6

27 Sanaiya (SNYG) 3 225/34.5/11 220 33 140/80/20 19.8 10.0 14.3 140 13.0 12.5 12.5

28 Zakher (ZAKG) 2 220/33/11 220 33 90/75/15 12.1 10.0 13.5 90 13.7 13.4 13.4

29 Zakher (ZAKG) 2 220/34.5/11 220 33 140/140/20 19.5 13.3 18.0 140 13.2 12.9 12.9

30 Al‐Ain City Centre (CTCG) 3 220/34.5/11 220 33 140/140/20 19.7 7.0 31.5 140 13.1 12.8 12.7

31 Al Foah (AOHG) 3 220/34.5/11 220 33 140/140/20 20.0 7.0 31.5 140 12.9 12.4 12.2

32 Dahma (DHMG) 3 225/34.5/11 220 33 80/80/20 17.9 10.0 14.3 80 8.4 8.3 8.3

33 Al‐Ain South West (ASWG) 3 220/34.5/11 220 33 140/140/20 19.7 7.0 31.5 140 13.1 12.8 12.8

34 AAPS (Toshiba) 1 220/33/11 220 33 100/100/20 13.7 7.1 13.7 100 13.4 13.1 13.0

35 AAPS (Siemens) 2 220/33/11 220 33 80/80/20 18.6 7.1 18.6 80 8.1 7.9 7.9

36 AAPS (Calor Emag) 2 220/33/11 220 33 80/80/20 18.6 7.1 18.6 80 8.1 7.9 7.9

37 UM Oush(OUSH) 2 220/34.5/10 220 33 140/140/20 20.5 7.0 31.5 140 12.6 11.3 10.6

38 ICAD 3 220/34.5 220 33 100/100/30 25.9 7.1 18.6 100 7.3 7.2 7.2

39 All future 220/33kV S/S      3 220/34.5 220 33 100/100/30 25.0 7.1 18.6 100 7.5 7.5 7.5

Notes:

3‐ A voltage factor of 1.1 as per IEC60909 is used in calculating the fault currents

2‐ Zps = positive sequence impedance of primary‐secondary winding of the transformer.

1‐ LV 1‐phase fault currents controlled by the NERs, details depend on running arrangement and are available on request. 

TRANSCO/AMD/PNDD

June 2013 Transco 2013 7YPS(2014‐2020) Table D2 Sheet 2 of 2

Page 82: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

S.N SubstationNo of 

TransformersPri/Sec/Ter (kV) Pri (kV) Sec (kV) Pri/Sec/Ter (MVA)  % Zps

Fault Current Per Transformer (kA) (HV fault level equal 

switchgear rating) 

Fault Current Per Transformer (kA) (HV fault level  in 2013)

Fault Current Per Transformer (kA) (HV fault 

level in 2020)

1 ADST         2 132/34.5/33 132 33 120/120/40 18.1 11.9 11.7 11.8

2 Bahia Old (BHYA)        2 132/34.5/8.8 132 33 140/140/46.7 19.8 12.6 11.6 12.3

3 Taweelah‐A 2 132/34.5/8.8 132 33 140/140/46.7 20.0 12.3 12.1 12.2

4 Market 1‐W1 (MKT1)           4 132/11.5/10 132 11 40/40/13 17.2 13.1 13.0 13.0

5 Market‐W02 (MRKT)           3 132/11.5/10 132 11 40/40/13 17.2 13.1 13.0 13.0

6 Capital Gardens‐E8 (CPGR)           4 132/11.5/10 132 11 40/40/13 19.1 11.8 11.7 11.8

7 Firdous‐E09 (FRDS)         4 132/11.5/10 132 11 40/40/13 17.9 12.6 12.5 12.5

8 Zayed 2nd St‐E11 (ZYD2)         4 132/11.5/10 132 11 40/40/13 17.9 12.6 12.5 12.5

9 Tourist Club‐E15 (TCLB)         4 132/11.5/10 132 11 40/40/13 17.1 13.2 13.1 13.0

10 E14 (PORT)        4 132/11.5/10.5 132 11 40/40/13 18.0 12.5 12.4 12.4

11 Embassy‐W59 (EMBS)         4 132/11.5/10 132 11 40/40/13 17.5 12.9 12.8 12.8

12 W47 (GLFA)          4 132/11.5/10.5 132 11 40/40/13 18.0 12.5 12.4 12.4

13 Mushrif‐W24 (MSHF)         4 132/11.5/10 132 11 40/40/13 18.4 12.3 12.1 12.1

14 Higher Tech College‐E25 (HTCO)          4 132/11.5/10 132 11 40/40/13 17.1 13.2 13.0 13.0

15 Falah‐E18/02 (FLAH)       4 132/11.5/8.0 132 11 40/40/13 18.4 12.3 12.1 12.1

16 Al‐Salam ‐ E18 (ALSM)         3 132/11.5/10 132 11 40/40/13 17.0 13.3 13.1 13.1

17 E16 (CLNS)       4 132/11.5/4.8 132 11 40/40/13 18.4 12.3 12.2 12.2

18 Jazira Hospital‐W13 (JZRH)         4 132/11.5/10 132 11 40/40/13 17.0 13.2 13.1 13.2

19 Madinat Zayed‐E04 (MDZD)         4 132/11.5/10 132 11 40/40/13 17.3 13.0 12.9 12.9

20 Khalidya‐W09 (KLDY)         4 132/11.5/10 132 11 40/40/13 17.9 12.6 12.5 12.5

21 Marina Mall (MRML)       4 132/11.5/10 132 11 40/40/13 17.9 12.6 12.5 12.5

22 Conference Palace (CONH)         4 132/11.5/10 132 11 40/40/13 17.8 12.7 12.5 12.5

23 Bateen ‐W16 (BATN)         4 132/11.5/10 132 11 40/40/13 18.6 12.1 12.0 12.0

24 Bateen Bus Station‐W17 (BSTN)          4 132/11.5/10.5 132 11 40/40/13 17.4 13.0 12.8 12.8

25 Khalifa A (MDKH)         4 132/11.5/10 132 11 40/40/13 18.6 12.1 11.9 11.9

Table D3  3‐ph Fault Contribution from 132/33kV, 132/22kV & 132/11kV Transformer at LV Based on Computed HV Fault Level 

TRANSCO/AMD/PNDD

June 2013 Transco 2013 7YPS(2014‐2020) Table D3 Sheet 1 of 2

Page 83: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐D

S.N SubstationNo of 

TransformersPri/Sec/Ter (kV) Pri (kV) Sec (kV) Pri/Sec/Ter (MVA)  % Zps

Fault Current Per Transformer (kA) (HV fault level equal 

switchgear rating) 

Fault Current Per Transformer (kA) (HV fault level  in 2013)

Fault Current Per Transformer (kA) (HV fault 

level in 2020)

Table D3  3‐ph Fault Contribution from 132/33kV, 132/22kV & 132/11kV Transformer at LV Based on Computed HV Fault Level 

26 Old Airport (NADIA)         4 132/11.5/10 132 11 40/40/13 17.4 13.0 12.6 12.5

27 Salt & Chlorine (SLTC)         3 132/11.5/10 132 11 40/40/13 17.3 12.9 12.9 12.8

28 Mussafah (MOS1)         4 132/11.5/10 132 11 40/40/13 17.2 13.1 12.9 12.9

29 S18 (JSRN)         4 132/11.5/4.8 132 11 40/40/13 18.4 12.3 12.1 12.1

30 Beach‐E48         4 132/11.5/10 132 11 40/40/13 17.0 13.3 13.2 13.2

31 Al‐Qurm‐E19      4 132/11.5/5.2 132 11 40/40/13 18.3 12.3 12.3 12.3

32 E01 (SOUQ)          4 132/11.5/10 132 11 40/40/13 24.3 9.4 9.3 9.3

33 Khalifa B (KHBB)  4 132/11.5/10 132 11 40/40/13 24.2 9.4 9.3 9.2

34 Khalifa Park (KHPK)       4 132/11.5/10 132 11 40/40/13 24.3 9.4 9.3 9.3

35 Reem T1 4 132/23/10 132 22 80/80/26.7 24.7 9.0 8.9 8.9

36 Saadiat SS6 (SDDD) 4 132/23/10 132 22 80/80/26.7 24.7 9.0 8.9 8.9

37 Yas Island (YASI) 4 132/23/10 132 22 80/80/26.7 25.0 8.9 8.3 8.8

38 All future 132/11/11kV S/S      4 132/11.5/10 132 11 40/40/13 25.0 9.1 9.1 9.1

39 All future 132/22/11kV S/S      4 132/23/10 132 22 80/80/26.7 25.0 8.9 8.9 8.9

Notes:

3‐ A voltage factor of 1.1 as per IEC60909 is used in calculating the fault currents

1‐ LV 1‐phase fault currents controlled by the NERs, details depend on running arrangement and are available on request. 

2‐ Zps = positive sequence impedance of primary‐secondary winding of the transformer.

TRANSCO/AMD/PNDD

June 2013 Transco 2013 7YPS(2014‐2020) Table D3 Sheet 2 of 2

Page 84: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-E

Transmission System Dataset

Page 85: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N POWER STATION Plant Type  Units  GENERATOR DATA GENERATOR STEP‐UP TRANSFORMER DATA

GT‐14, GT‐15 (Calor Emag) 11kV, 38.7MVA, Xd"=20.9% 33.7/11kV, 45MVA, Z1=17.9%,YNd11

GT‐7, GT‐8 (Siemens) 11.5kV, 48.3MVA, Xd"=18% 34.7/11.5kV, 47MVA, Z1=11.8%, YNd11

GT‐13 (Siemens) 11kV, 38.7MVA, Xd"=20.9% 33.7/11kV, 45MVA, Z1=17.9%,YNd11

GT‐9, GT‐10 (Toshiba) 11.5kV, 48.3MVA, Xd"=18% 34.7/11.5kV, 47MVA, Z1=11.8% , YNd11

GT‐11, GT‐12 (Toshiba)11kV, 44MVA (for GT‐11), 48.3MVA (for‐GT‐12), Xd"=20.5%

34.6/11.5kV, 40MVA, Z1=11.8%, YNd11

GT‐16 (Toshiba) 11kV, 38.7MVA, Xd"=20.9% 33.7/11kV, 45MVA, Z1=17.9%,YNd11

GT‐01, GT‐04  11.5kV, 75MVA, Xd"=15.7% 231/11.5kV, 75MVA, YNd1, Z1=16.1%,  Z0=18.4% on 86MVA & 231kV base, X/R=52         

GT‐02, GT‐03 11.5kV, 75MVA, Xd"=15.7%34.5/11.5kV, 75MVA, YNd1, Z1=15.9%(for GT‐2) & Z1=16.4%(for GT‐03),  Z0=18.4% on 86MVA & 34.5kV base, X/R=44

GT‐01, GT‐02  11kV, 47MVA, Xd"=15.5% 33/11kV, 47MVA, YNd11, Z1=15% 

GT‐03  10.5kV, 29MVA, Xd"=15.9% 33/10.5kV, 32MVA, YNd11, Z1=7.7% 

GT‐04, GT‐05  11kV, 24MVA, Xd"=10.9% 33/11kV, 30MVA, YNd11, Z1=7.7%

4 Al Zawra Relocation Gas Turbine Power Plant  GT‐05, GT‐06, GT‐07, GT‐08 15kV, 154MVA,0.8pf Xd"(Sat)=12%, X0=8.5%231/15/15kV,300/150/150MVA, YNd1d1, Zps =28%(Based on 300MVA), Zpt =28%(Based on 300MVA), Zst=18%(Based on 150MVA)

ST‐01, ST‐02, ST‐03, ST‐04, ST‐05, ST‐06 

11kV, 81MVA, Xd"=16.6% 138/11kV, 75MVA, YNd1, Z1=12%, X/R=35

ST‐07, ST‐08  15kV, 218MVA, Xd"=15.9% 240/15kV, 218MVA, YNd1, Z1=11.67%

6Umn Al Nar Power Station East‐Arabian Power Company (APC) 

Gas Turbine Power and Water Desalination Plant 

GT‐01, GT‐02  10.5kV, 110MVA, Xd"=15% 138/10.5kV, 81MVA, YNd1, Z1=12.4%, X/R=41

GT‐21, GT‐22, GT‐23, GT‐24, GT‐25 

15.75kV, 321MVA, 0.8pf, Xd"=17.5% 420/15.75kV, 321MVA, YNd1, Z1=Z0=15.23%, X/R=72

ST‐11, ST‐12  15.75kV, 386MVA, 0.8pf, Xd"=19.3% 420/15.75kV, 386MVA, YNd1, Z1=Z0=15.15%, X/R=77

ST‐11, ST‐21   132/15kV, 175MVA, YNd1, Z1=14.5%, Z0=12.8%

ST‐31, ST‐41, ST‐51, ST‐61 380/15kV, 175MVA, YNd1, Z1=14.7%, Z0=13%

ST‐71  15.75kV, 169.5MVA, 0.85pf, Xd"(Sat)=15%

GT‐81, GT‐91  15.75kV, 134MVA, 0.8pf, Xd"(Sat)=11.9%

ST‐98 16.5kV, 415MVA, 0.8pf, Xd"(Sat)=28.9%, X0=15.7% 420/16.5kV, 415MVA, YNd11, Z1=15%

GT‐95, GT‐96, GT‐97 20kV, 300MVA, 0.8pf, Xd"(Sat)=15.9%, X0=8.9% 420/20kV, 300MVA, YNd11, Z1=14.96%

Table‐E1  Generators & generator step‐up transformers dataset summary

1Al‐Ain Power Station ‐Al Mirfa Power Company (AMPC)  

Gas Turbine Power Plant

2 Mirfa Power Station ‐Al Mirfa Power Company (AMPC) Gas Turbine Power and   Water Desalination Plant 

3Madinat Zayed Power Station ‐Al Mirfa Power Company (AMPC) 

Gas Turbine Power Plant 

5Umn Al Nar Power Station West ‐Arabian Power Company (APC) 

Steam Turbine Power and Water Desalination Plant 

10Taweelah BExt (TANE) Plant ‐ Taweelah Asia Power Company (TAPCO)

Combined Cycle Power and Water Desalination Plant 

7Sas Al Nakeel Plant                   Arabian Power Company (APC)

Combined Cycle Power and   Water  Desalination Plant 

8Taweelah Power Station B      Taweelah Asia Power Company (TAPCO) 

Steam Turbine Power and Water Desalination Plant 

15kV, 175MVA, 0.85pf, Xd"=14.1%

9Taweelah Power Station Bext‐Taweelah Asia Power Company (TAPCO) 

Combined Cycle Power and Water Desalination Plant 

138/15.75kV, 208MVA, YNd1, Z1=12.17%, Z0=10.49%

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E1 Sheet 1 of 2

Page 86: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N POWER STATION Plant Type  Units  GENERATOR DATA GENERATOR STEP‐UP TRANSFORMER DATA

Table‐E1  Generators & generator step‐up transformers dataset summary

GT‐01, GT‐02, GT‐03  11kV, 106MVA, 0.85pf, Xd"=13.25% 138/11kV, 119MVA,YNd1,Z1=11.0%, Z0=11.06%

GT‐18 132/15kV, 150MVA, Z1=15%

 GT‐14, GT‐15, GT‐16, GT‐17  400/15/15kV, 300/150/150MVA,  YNd11d11, Zps=10.467%, Zpt=10.533%,Zst=22.167%(Based on 100MVA)

ST‐21, ST‐22, ST‐23  19kV, 256MVA, 0.8pf, Xd"(Sat)=10.3%, X0=8.1% 380/19kV, 255MVA, Z1=16%

12Taweelah A10 (TANE)‐Gulf Total Tractebel Power Company (GTTPC)

Gas Turbine Power Plant  GT19, GT20 15kV, 141MVA, 0.8pf, Xd"(Sat)=13.23%, X0=8.0%420/15/15kV, 264/132/132MVA, YNd11d11, Zps=14% (Based on 132MVA), Zpt=14%(Based on 132MVA) and Zst=29.6%(Based on 132MVA)

GT‐11, GT‐12, GT‐13  15.75kV, 221MVA, Xd"(Sat)=14.5% 420/15.75kV, 221MVA, YNd11, Z1=15.63%, Z0=15.4%.

ST‐14, ST‐15  10.5kV, 134MVA, Xd"(Sat)=17.9% 420/10.5kV, 268MVA, YNd11d11, Z1=15.28%, Z0=15.16%.

GT‐01, GT‐02, GT‐03, GT‐04 15kV, 165MVA, 0.8pf, Xd”(Sat)=16.8%, X0=9.9%138/15kV, 133MVA, YNd5, Z1=13.081%,Z1=13.029%,Z1=13.086%,Z1=13.127% resply,  Z0=12.51%,Z0=12.47%, Z0=12.52%,Z0=12.56% resply

ST‐1, ST‐2  15kV, 152MVA, 0.8pf, Xd”(Sat)=14.7%, X0=10.4% 138/15kV, 145MVA, YNd5, Z1=11.9%,  Z1=11.882% resply,Z0=11.39%,  Z0=11.37% resply

15Fujairah F1 Extension‐Emirates Semcorp Water and Power Company (ESWPC)

Gas Turbine Power Plant  GT44 15kV, 337MVA, 0.8pf 420/15kV, 351MVA, Ynd5, Z1=15.354%, Z0=15.247%

GT‐11, GT‐12  225/16.5kV, 262MVA, 0.85pf, YNd11, Z1=14.80%, Z0=14.65% and Z1=14.86%, Z0=14.71% respectively.

GT‐21, GT‐22, GT‐23410/16.5kV, 262MVA,0.85pf, YNd11, Z1=15.06%,Z0=15.06%,Z1=15.05%,Z0=15.05% and Z1=15.12%,Z0=15.12% respectively.

ST‐10, ST‐20  16.5kV, 299MVA, 0.85pf, Xd”(Sat)=14.5%, X0=11% 410/16.5kV, 298MVA,0.85pf, YNd11,  Z1=14.85%, Z0=14.85% and Z1=14.88%, Z0=14.88% respectively

GT‐11, GT‐12, GT‐21, GT‐31, GT‐32

21kV, 325MVA, 0.85pf, Xd"(Sat)=11.4%, X0=6.9% 420/21kV, 325MVA,YNd1, Z1=15.8%

ST‐18, ST‐38 21kV, 450MVA, 0.85pf, Xd"(Sat)=19.4%,X0=10.2% 420/21kV, 450MVA,YNd1, Z1=16%

ST‐28 15kV, 225MVA, 0.85pf, Xd"(Sat)=13.7% ,X0=8% 420/15kV, 210MVA,YNd1, Z1=13%

ST‐40, ST‐50 16.5kV, 392MVA, 0.85pf, Xd"=27.2% 420/16.5kV, 422MVA, YNd11, Z1=16.2%, 

GT‐41, GT‐42, GT‐51, GT‐52  20kV, 293MVA, 0.85pf, Xd"=13.42% 420/20kV, 296MVA, YNd11,  Z1=16.4%

11Taweelah Power Station A1 ‐Gulf Total Tractebel Power Company (GTTPC)

Combined Cycle Power and Water Desalination Plant 

15kV, 150MVA, 0.8pf, Xd"(Sat)=15.3%, X0=9%

13Taweelah Power Station A2 ‐ Emirates CMS Power Company (ECPC) 

Combined Cycle Power and Water Desalination Plant 

14Fujairah F1 Plant ‐ Emirates Semcorp Water and Power Company (ESWPC)

Combined Cycle Power and Water Desalination Plant 

16Shuweihat S1 Plant ‐Shuweihat Power Company (SCIPCO)  

Combined Cycle Power and Water Desalination Plant 

16.5kV, 262MVA, 0.85pf, Xd”(Sat)=12.7%, X0=9.6%.

17 Fujairah Asia Power Company (FAPCO) F2Combined Cycle Power and Water Desalination Plant 

18Shuweihat S2 Plant ‐ Ruwais Suez Tractebel Power Company (RSTPC) 

Combined Cycle Power and Water Desalination Plant 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E1 Sheet 2 of 2

Page 87: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N GRID STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  Vector Group % Zps % Zst* % Zpt*Z0ps (Short) 

(Ω/ph)

Z0sp  (Short)  (Ω/ph)

Z0ps (Open)      (Ω/ph)

1 ADST 3 380/138/10 500/500/125 YNyn0d11 18.6 3.2 7.9 53.0 2.4 97.1

2 Al‐Qurm (E19) 3 400/138/34.5 500/500/125 YNyn0d11 16.7 1.9 6.9 53.4 1.7 86.3

3 Beach (E48) 3 400/138/34.5 500/500/125 YNyn0d11 17.6 2.0 7.2 55.9 1.7 89.2

4 Sas Al Nakheel (SASN) 2 400/132/11.2 500/500/125 YNyn0d11 18.0 10.4 16.5

5 Mussafah (MOSG) 3 380/230/34.5 500/500/125 YNa0d11 17.7 10.2 16.1 49.4 11.7 181.3

6 Madinat Zayed (WMZD) 3 400/230/34.5 500/500/125 YNa0d11 18.1 10.4 15.8 56.8 12.5 199.4

7 Shuweihat (SHPS) 2 420/245/52 500/500/125 YNa0d11 15.8 10.6 15.3 49.9 11.4 189.9

8 Taweelah (TWPSA) 2 400/138/12.3 500/500/125 YNyn0d1  17.8 8.3 13.6 56.1 3.2 91.5

9 Taweelah (TWPSB) 3 380/138/15 275/275/90 YNa0d1 17.3 20.0 16.7 77.7 8.4 242.0

10 Shahama (SHME) 2 400/230/34 500/500/125 YNa0d11 17.7 8.3 13.6 56.2 11.4 172.5

11 Sweihan (SWHN) 3 400/230/34.5 500/500/125 YNa0d11 18.1 10.3 15.8 56.7 12.4 198.6

12 Dahma (DHMG) 3 400/230/34 500/500/125 YNa0d11 17.7 8.4 13.6 55.9 11.4 172.5

13 Al‐Ain South West (AASW) 3 400/230/34.5 500/500/125 YNa0d11 18.1 10.3 15.7 57.2 12.5 199.0

14 Fujairah (Qidfa) 2 400/132/9.89 500/500/125 YNyn0d11 28.2 2.3 10.4 88.6 2.6 142.3

15 Dhaid (DHID) 2 380/230/33 500/500/75 YNa0d11 17.8 6.3 9.8 50.59 11.93 186.56

16 Ras Al khaimah (FILA) 3 400/138/34.5 500/500/125 YNyn0d11 18.4 11.3 16.6 57.66 1.909 91.8

17 Reem (REEM) 4 400/138/23 500/500/125 YNyn0d11 23.8 11.8 18.7 75.7 5.7 238.7

18 Saadiyat (SDYT) 4 400/138/23 500/500/125 YNyn0d11 24.8 11.4 18.8 79.1 2.5 130.2

19 ICAD 3 400/230/34.5 500/500/125 YNyn0d11 16.0 10.3 14.9 50.4 12.2 188.0

Table‐E2   400kV grid transformers generic dataset summary

Not Available

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E2 Sheet 1 of 2

Page 88: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N GRID STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  Vector Group % Zps % Zst* % Zpt*Z0ps (Short) 

(Ω/ph)

Z0sp  (Short)  (Ω/ph)

Z0ps (Open)      (Ω/ph)

Table‐E2   400kV grid transformers generic dataset summary

Notes

1)

2)

3)

4)

5)

6)

7)

Future 400/132kV grid stations at MAHAWI , BAHIA  and SHAMKA shall be 4x500MVA, 3x500MVA and 3x500MVA resply, assume Zps= 24%.  

Future 400/138/34.5kV, 500/500/125MVA grid stations at  AJMAN, NEW FUJAIRAH , NEW SHARJAH shall be 3x500MVA (YNyn0d11), assume Zps=24%

Future 400/230/34.5kV, 500/500/125MVA grid station at Ruwais, Bab and Oman shall be 3x500MVA, 3x500MVA and 2x500MVA resply. assume Zps=20%

*   %Z based on tertiary winding rating.

Positive & Zero sequence impedance of above 400kV, 500MVA grid transformers are based on actual FAT report.

10 ohm NERs are installed at  ADST, E19 and Beach 400/132kV transformers.

10 ohm NERs are assumed at future 400/132kV grid station transformers.

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E2 Sheet 2 of 2

Page 89: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N SUB STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  % ZpsZ0ps (Short) 

(Ω/ph)

Z0sp  (Short)   (Ω/ph)

Z0ps (Open)    (Ω/ph)

1 Umn Al Nar (UAN) 2 220/132/11 250MW 13.8 22.6 12.5 45.4

2 Al Wathba (WATH) 2 220/33/11 100/60/40 23.5 112.9 0.6 160.2

3 Al Wathba (WATH) 1 220/33/11 140/140/40 18.5 60.0 0.4 92.1

4 Mahawi (MHWG) 3 220/34.5/11 140/140/20 19.5 60.8 0.4 92.1

5 Shahama (SHME) 3 220/34.5/11 140/140/20 20.4 68.7 0.4 108.0

6 Mussafah (MOSG) 3 220/34.5/11 140/140/20 19.5 39.8 1.7 116.3

7 Samha (SMHG) 2 220/34.5/11 140/140/20 19.5 60.8 0.4 92.1

8 GIC  3 220/34.5/11.0 140/140/20 20.3 60.8 0.4 92.1

9 Central (CNTG) 2 220/34.5/8.1 140/140/20 20.4 60.8 0.4 92.1

10 Mirfa (MRWR) 2 220/34.5/11.5 100/100/30 18.1 73.6 0.5 110.6

11 Madinat Zayed‐WR (WMZD) 2 220/34.5/11.5 100/100/30 17.4 76.6 0.4 108.0

12 Madinat Zayed‐WR (WMZD) 1 220/34.5/11.5 140/140/30 17.7 59.6 0.4 95.5

13 Sila (SLWR) 2 220/34.5/9.8 80/80/26.7 15.0 77.0 0.6 142.9

14 Ruwais (RWWR) 2 220/34.5/11 140/140/20 19.5 60.8 0.4 92.1

15 Liwa (LWWR) 3 220/34.5/11.5 100/100/30 17.4 76.6 0.4 108.0

16 Sweihan (SWHN) 2 225/34.5/11 80/80/20 18.2 102.6 0.6 142.9

17 Sweihan (SWHN) 1 220/34.5/11 140/140/20 19.5 61.1 0.4 88.3

18 Salamat (SLMG) 2 220/34.5/11 140/140/47 19.9 60.8 0.4 133.0

19 Salamat (SLMG) 1 220/34.5/11 140/140/47 20.3 60.8 0.4 129.4

20 Al‐Hayer (AHYG) 2 225/34.5/11 80/80/20 18.0 105.8 0.54 146.4

21 Al‐Hayer (AHYG) 1 225/34.5/10 80/80/20 18.1 107.6 0.5 148.6

22 Ramah (RMAG) 3 220/34.5/9.7 140/140/47 19.5 61.1 0.37 88.3

23 Khazna (KHZG) 2 220/34.5/10 140/140/20 20.5 56.2 0.35 95.1

Table‐E3   220kV transformers generic dataset summary

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E3 Sheet 1 of  2

Page 90: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N SUB STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  % ZpsZ0ps (Short) 

(Ω/ph)

Z0sp  (Short)   (Ω/ph)

Z0ps (Open)    (Ω/ph)

Table‐E3   220kV transformers generic dataset summary

24 Arad (ARDG) 2 220/34.5/11 140/140/47 20.1 60.8 0.4 132.7

25 Maziyad (MZDG) 2 220/34.5/11 140/140/47 20.2 60.8 0.4 133.0

26 Al‐Ain Industrial City (AAIC) 2 220/34.5/9.87 140/140/20 24.6 41.1 0.41 109.3

27 Al Wagon (AWGG) 3 225/34.5/11 80/80/20 18.2 145.4 2.2 332.6

29 Sanaiya (SNYG) 3 245/36/12 140/140/47 19.8 61.5 0.4 95.2

30 Zakher (ZAKG) 2 220/33/11 90/75/15 12.1 74.0 0.4 111.0

31 Zakher (ZAKG) 2 220/34.5/11 140/140/47 19.5 60.8 0.4 92.1

32 Al‐Ain City Centre (CTCG) 3 220/34.5/11 140/140/20 19.7 60.8 0.4 92.1

33 Al Foah (AOHG) 3 220/34.5/11 140/140/20 20.0 60.8 0.4 92.1

34 Dahma (DHMG) 3 225/34.5/11 80/80/20 17.9 101.5 0.6 142.2

35 Al‐Ain South West (AASW) 3 220/34.5/8 140/140/47 19.7 62.0 0.3 91.1

36 AAPS (Toshiba) 2 220/33/11 100/100/20 13.7 63.0 0.4 99.0

37 AAPS (Siemens) 2 220/33/11 80/80/20 18.6 107.2 0.6 148.0

38 AAPS (Calor Emag) 2 220/33/11 80/80/20 18.6 107.2 0.6 148.0

39 ICAD 3 220/34.5 100/100 25.9 112.9 0.6 160.2

Notes

1)

2)

3)

4)

Vector group of all 220kV transformers are YNyn0d11.

Positive & Zero sequence impedance of 220/33kV transformers are best estimate if not available from the FAT reports.

 Future 220/33kV substations may be 3x100MVA, 2x140MVA and 2x120MVA, assume Zps= 25% and NER=1 ohm. 

1 ohm Neutral Earthing Reactor assumed at 220/33kV transformers of existing grid stations in GIC, Central, Sweihan, Al‐Hayer, Ramah, Khazna, AASW.AAIC and Neutral Earthing Resistors 10.56 ohm at AAPS (Toshiba), 13.6 ohm at AAPS (Siemens) and AAPS(Calor Emag). 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E3 Sheet 2 of  2

Page 91: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N SUB STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  % Zps

1 ADST         2 132/34.5/33 120/120 18.1

2 Bahia Old (BHYA)        2 132/34.5/8.8 140/140/46.7 19.8

3 Taweelah‐A 2 132/34.5/8.8 140/140/46.7 20.0

4 Market 1‐W1 (MKT1)           4 132/11.5/10 40/40/13 17.2

5 Market‐W02 (MRKT)           3 132/11.5/10 40/40/13 17.2

6 Capital Gardens‐E8 (CPGR)           4 132/11.5/10 40/40/13 19.1

7 Firdous‐E09 (FRDS)         4 132/11.5/10 40/40/13 17.9

8 Zayed 2nd St‐E11 (ZYD2)         4 132/11.5/10 40/40/13 17.9

9 Tourist Club‐E15 (TCLB)         4 132/11.5/10 40/40/13 17.1

10 E14 (PORT)        4 132/11.5/10.5 40/40/13 18.0

11 Embassy‐W59 (EMBS)         4 132/11.5/10 40/40/13 17.5

12 W47 (GLFA)          4 132/11.5/10.5 40/40/13 18.0

13 Mushrif‐W24 (MSHF)         4 132/11.5/10 40/40/13 18.4

14 Higher Tech College‐E25 (HTCO)          4 132/11.5/10 40/40/13 17.1

15 Falah‐E18/02 (FLAH)       4 132/11.5/8.0 40/40/13 18.4

16 Al‐Salam ‐ E18 (ALSM)         3 132/11.5/10 40/40/13 17.0

17 E16 (CLNS)       4 132/11.5/4.8 40/40/13 18.4

18 Jazira Hospital‐W13 (JZRH)         4 132/11.5/10 40/40/13 17.0

19 Madinat Zayed‐E04 (MDZD)         4 132/11.5/10 40/40/13 17.3

20 Khalidya‐W09 (KLDY)         4 132/11.5/10 40/40/13 17.9

21 Marina Mall (MRML)       4 132/11.5/10 40/40/13 17.9

22 Conference Palace (CONH)         4 132/11.5/10 40/40/13 17.8

23 Bateen ‐W16 (BATN)         4 132/11.5/10 40/40/13 18.6

Table‐E4   132kV transformers generic dataset summary

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E4 Sheet 1 of 2

Page 92: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N SUB STATION No of TXF Pri/Sec/Ter (kV) Pri/Sec/Ter (MVA)  % Zps

Table‐E4   132kV transformers generic dataset summary

24 Bateen Bus Station‐W17 (BSTN)          4 132/11.5/10.5 40/40/13 17.4

25 Khalifa A (MDKH)         4 132/11.5/10 40/40/13 18.6

26 Old Airport (NADIA)         4 132/11.5/10 40/40/13 17.4

27 Salt & Chlorine (SLTC)         3 132/11.5/10 40/40/13 17.3

28 Mussafah (MOS1)         4 132/11.5/10 40/40/13 17.2

29 S18 (JSRN)         4 132/11.5/4.8 40/40/13 18.4

30 Beach‐E48         4 132/11.5/10 40/40/13 17.0

31 Al‐Qurm‐E19      4 132/11.5/5.2 40/40/13 18.3

34 E01 (SOUQ)          4 132/11.5/10 40/40/13 24.3

35 Khalifa B (KHBB)  4 132/11.5/10 40/40/13 24.2

36 Khalifa Park (KHPK)       4 132/11.5/10 40/40/13 24.3

37 W2(Replacement) 4 132/11.5/10 40/40/13 24.2

38 Reem T1 4 132/23/10 80/80/26.7 24.7

39 Saadiat SS6 (SDDD) 4 132/23/10 80/80/26.7 24.7

40 Yas Island (YASI) 4 132/23/10 80/80/26.7 25.0

Notes

1)

2)

3)

4)

5)

6)

7)

8)

NER for 40MVA and 80MVA transformers at new substations shall be designed 0.35 ohms and 0.7 ohms respectively. 

 NER (0.175 ohms) is installed at 40MVA transformers in Khalifa‐A (MDKH) 132/11kV S/S.

 NER of typical 0.35 ohm assumed to be installed at 40MVA transformers of other existing 132/11kV S/S.

Vector group of all 132kV transformers are YNyn0d11.

Rating of typical 40MVA transformer is 132/11.5/11.5kV, 40/40/13MVA.

 Zero sequence impedance of typical 40MVA transformer is Zops(short)=68 ohms;Zosp(short)=0.12 ohms;Zops(open)=99.1ohms.

 Zero sequence impedance of typical 80MVA transformer is Zops(short)=49.2 ohms;Zosp(short)=0.32 ohms;Zops(open)=71ohms.

New 132/11kV (4x40MVA) , 132/22kV (4x80MVA) and 132/33kV(3x100MVA) substations planned to commission shall be designed for Zps= 25%. 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E4 Sheet 2 of 2

Page 93: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N Line Description Thermal Rating (A)[MVA] Line Type R1 (Ω/km) X1 (Ω/km) Y1  (µS/km) R0 (Ω/km) X0 (Ω/km)

1 2500 sq.mm XLPE Cable (existing) 1150A[800MVA] Type A1 0.0094 0.222 81.086 0.090 0.061

2 2500 sq.mm XLPE Cable (new) 1440A[1000MVA] Type A2 0.0094 0.222 81.086 0.090 0.061

3 ACSR Dove (4x328 sq.mm) OHL  2100A[1400MVA] Type A3 0.0310 0.264 4.39 0.181 0.900

4 ACSR/ACS Dove (4x328 sq.mm) OHL  2000A[1380MVA] Type A4 0.0240 0.256 4.35 0.150 0.777

5 GTACSR Dove (4x328 sq.mm) OHL  2886A[2000MVA] Type A5 0.0310 0.264 4.39 0.181 0.900

6 630 sq.mm XLPE Cable (existing) 817A[565MVA] Type A6 0.0388 0.261 43.4 0.123 0.094

1 1200 sq.mm XLPE Cable 980A[370MVA] Type B1 0.0200 0.223 65.60 0.226 0.071

2 ACSR Dove (4x328 sq.mm) OHL  2100A[800MVA] Type B2 0.0310 0.264 4.39 0.181 0.900

5 ACSR Dove (2x328 sq.mm) OHL 1100A[419MVA] Type B3 0.0673 0.296 3.45 0.192 0.905

4 ACSR Dove (2x328 sq.mm) OHL 1050A[400MVA] Type B4 0.0572 0.337 3.45 0.320 1.610

6 ACSR Dove (2x285 sq.mm) OHL 1050A[400MVA] Type B5 0.0680 0.308 3.72 0.320 1.608

7 AAAC/Aldrey (2x240 sq.mm) OHL 900A[340MVA] Type B6 0.0682 0.307 3.45 0.181 0.838

8 ACSR (2x210 sq.mm) OHL 840A[320MVA] Type B7 0.0800 0.312 3.42 0.200 0.860

9 HD Copper (2x185 sq.mm) OHL 827A[315MVA] Type B8 0.0510 0.318 3.46 0.222 1.004

1 1200 sq.mm XLPE Cable 1150A[260MVA] Type C1 0.023 0.180 77.00 0.240 0.120

2 1000 sq.mm XLPE Cable 960A[220MVA] Type C2 0.023 0.174 75.00 0.150 0.070

Table‐E5  Generic line data types

A)  400kV SYSTEM

B)  220kV SYSTEM

C)  132kV SYSTEM

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E5 Sheet 1 of 2

Page 94: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

S.N Line Description Thermal Rating (A)[MVA] Line Type R1 (Ω/km) X1 (Ω/km) Y1  (µS/km) R0 (Ω/km) X0 (Ω/km)

Table‐E5  Generic line data types

3 800 sq.mm XLPE Cable 766A[170MVA] Type C3 0.0281 0.1892 59.000 0.2119 0.1276

4 500 sq.mm XLPE Cable 668A[152MVA] Type C4 0.0281 0.1892 50.000 0.2119 0.1276

5 500 sq.mm Oil Filled Cable 570A[130MVA] Type C5 0.0517 0.1983 135.340 0.3707 0.1724

6 300 sq.mm XLPE Cable 460[105MVA] Type C6 0.0820 0.1730 51.182 0.2420 0.0910

7 300 sq.mm Submarine Cable 415[94MVA] Type C7 0.1100 0.1400 50.240 0.2200 0.1100

8 ACSR Dove (4x328 sq.mm) OHL  2100A[480MVA] Type C8 0.0310 0.264 4.39 0.181 0.900

9 HD Copper (1x185 sq.mm) OHL 415A[ 114 MVA] Type C9 0.1500 0.470 8.60 0.335 1.024

10 ACSR Dove (4x328 sq.mm) OHL  2000A[450MVA] Type C10 0.0244 0.256 4.35 0.150 0.777

11 ACSR Dove (2x328 sq.mm) OHL  1000A[225MVA] Type C11 0.0487 0.301 3.73 0.196 0.966

12 AAAC (2x328 sq.mm) OHL 1240A[280MVA] Type C12 0.0347 0.296 3.18 0.1805 0.969

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E5 Sheet 2 of 2

Page 95: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E6  400kV OHL/Cable and 400kV switchgear dataset variance: 2013‐2020

TRANSMISSION LINES SUBSTATION400KV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)Charging 

B (pu)

R‐Zero (pu)

X‐Zero (pu)

Rate Line TypeLength 

KM

4001 ADST 4006 REEM 1 0.000017 0.000378 0.35029 0.000152 0.000103 970 A2 2.7

4001 ADST 4006 REEM 2 0.000017 0.000378 0.35029 0.000152 0.000103 970 A2 2.7

4001 ADST 4007 SDYT 1 0.000177 0.001592 1.460592 0.0009 0.000998 1000 A2 13.041

4001 ADST 4701 TWPS 1 0.00116 0.00979 0.42133 0.006788 0.03375 1400 A3 60

4002 BECH 4004 SASN 1 0.000052 0.000483 0.392437 0.000367 0.000803 1000 A2 3.7

4002 BECH 4004 SASN 2 0.000052 0.000483 0.392437 0.000367 0.000803 1000 A2 3.7

4002 BECH 4004 SASN 3 0.000052 0.000483 0.392437 0.000367 0.000803 1000 A2 3.7

4002 BECH 4004 SASN 4 0.000052 0.000483 0.392437 0.000367 0.000803 1000 A2 3.7

4002 BECH 4003 QURM 1 0.000053 0.001179 1.09239 0.000474 0.000321 693 A2 8.42

4002 BECH 4003 QURM 2 0.000049 0.001168 1.12965 0.000474 0.000321 803 A2 8.42

4003 QURM 4001 ADST 1N 0.000022 0.00049 0.45408 0.000197 0.000133 900 A2 3.5

4003 QURM 4001 ADST 2P 0.000021 0.000486 0.46957 0.000197 0.000133 900 A2 3.5

4004 SASN 4011 MOSG 1 0.00049 0.00418 0.17977 0.0029 0.0144 1400 A3 25.6

4004 SASN 4011 MOSG 2 0.00049 0.00418 0.17977 0.0029 0.0144 1400 A3 25.6

4007 SDYT 4702 TANE 1 0.000733 0.008457 0.343031 0.007755 0.03111 1400 A3 48.848

4011 MOSG 4015 ICAD 1 0.000142 0.001326 0.045743 0.000867 0.005794 1400 A3 7.79

4015 ICAD 4011 MOSG 2 0.000142 0.001326 0.045743 0.000867 0.005794 1400 A3 7.79

4011 MOSG 4701 TWPS 1 0.00247 0.02088 0.89887 0.01456 0.072 1400 A3 128

4012 MOSG 4502 WMDZ 1 0.003061 0.02607 1.10954 0.017874 0.088876 1400 A3 158

4012 SHME 4601 ASWG 1 0.00251 0.021401 0.91151 0.01393 0.06919 1400 A3 129.8

4012 SHME 4602 SWHG 1 0.00164 0.01387 0.5969 0.00962 0.04781 1400 A3 85

4012 SHME 4705 TWPS 1 0.0005 0.00429 0.18258 0.00283 0.01406 1400 A3 25

4012 SHME 4705 TWPS 2 0.0005 0.00429 0.18258 0.00283 0.01406 1400 A3 25

4502 WMDZ 4601 ASWG 1 0.005096 0.043395 1.84689 0.029752 0.147938 1400 A3 263

4015 ICAD 64501 SHW 1 0.003967 0.037009 1.276455 0.024184 0.161676 1400 A3 217.38

4015 ICAD 74501 SHW 1 0.003967 0.037009 1.276455 0.024184 0.161676 1400 A3 217.38

4501 SHPS 4502 WMZD 1 0.002818 0.024008 1.02176 0.01646 0.081844 1400 A3 145.5

4501 SHPS 4502 WMZD 2 0.002818 0.024008 1.02176 0.01646 0.081844 1400 A3 145.5

4602 SWHG 4603 DHMG 1 0.00106 0.00897 0.38623 0.00622 0.03094 1400 A3 55

4602 SWHG 4803 QDFA 1 0.003034 0.029127 1.106627 0.028264 0.113888 1380 A4 166.26

4602 SWHG 4803 QDFA 2 0.003034 0.029127 1.106627 0.028264 0.113888 1380 A4 166.26

4603 DHMG 4705 TWPS 1 0.00274 0.023363 0.99507 0.01572 0.07818 1400 A3 142.3

4702 TANE 4703 EMAL 1 0.000194 0.001305 0.55552 0.000615 0.00047 656 A6 8

4702 TANE 94701 TWPS 1 0.00008 0.00066 0.02809 0.00045 0.00225 1400 A3 4

4801 WRSN 4802 DHID 1 0.001157 0.010762 0.469904 0.005626 0.032127 1386 A4 68.3

4801 WRSN 4802 DHID 2 0.001157 0.010762 0.469904 0.005626 0.032127 1386 A4 68.3

4801 WRSN 4701 TAW 1 0.002426 0.023319 0.981638 0.011664 0.05997 1400 A3 142.68

4801 WRSN 4701 TAW 2 0.002426 0.023319 0.981638 0.011664 0.05997 1400 A3 142.68

4802 DHID 4804 FILA 1 0.001352 0.011541 0.49157 0.007 0.035 1386 A4 70 SWITCH GEAR‐REMOVE

4802 DHID 4804 FILA 2 0.001352 0.011541 0.49157 0.007 0.035 1386 A4 70

4802 DHID 64803 QDFA 1 0.001318 0.01122 0.46784 0.007692 0.032938 1386 A4 68 NO. RATING VOLTAGE NO. RATING VOLTAGE

4802 DHID 74803 QDFA 2 0.001318 0.01122 0.46784 0.007692 0.032938 1386 A4 68 MOSG 0 0 0 0 0 0 1 1X500MVA 400/220KV 0 0 0

Removed Lines from Database4501 SHPS 4503 GCSL 1 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.202

4501 SHPS 4503 GCSL 2 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.202

Note: above circuitS will be LI/LO into S3 GS to form four circuits

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20134505 S3 4507 RWS 1 0.000388 0.0033 0.140448 0.002263 0.01125 1400 A3 0 20

4505 S3 4507 RWS 2 0.000388 0.0033 0.140448 0.002263 0.01125 1400 A3 0 20

4505 S3 4507 RWS 3 0.000388 0.0033 0.140448 0.002263 0.01125 1400 A3 0 20 SWITCH GEAR

4505 S3 4507 RWS 4 0.000388 0.0033 0.140448 0.002263 0.01125 1400 A3 0 20

4803 QDFA 4806 FJCT 1 0.0004 0.0041 0.1775 0.0024 0.0124 1386 A4 0 25.5 NO. RATING VOLTAGE NO. RATING VOLTAGE

4803 QDFA 4806 FJCT 2 0.0004 0.0041 0.1775 0.0024 0.0124 1386 A4 0 25.5 S3 10 6 0 2 2 0 X X 0 0 0

POWER TRANSFORMER REA/CAP RATING

REA/CAP RATING

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMERLINE BAY GEN BAY TR BAY BS BAY BC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E6 Sheet 1 of 4

Page 96: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E4501 SHPS 4505 S3 1 0.00002 0.00017 0.00702 0.00011 0.00056 1400 A3 0.5 0.5 FUJ CITY 4 0 3 2 2 3 3X500 MVA 400/132KV 0 0 0

4501 SHPS 4505 S3 2 0.00002 0.00017 0.00702 0.00011 0.00056 1400 A3 0.5 0.5 RWSG 10 0 3 2 2 3 3X500 MVA 400/220KV 0 0 0

4503 GCSL 4505 S3 1 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.202 0.5

4503 GCSL 4505 S3 2 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.202 0.5

4803 QDFA 4804 FILA 1 0.0015 0.0154 0.6682 0.009 0.0466 1380 A4 96

4803 QDFA 4804 FILA 2 0.0015 0.0154 0.6682 0.009 0.0466 1380 A4 96

OHL‐CKT 325

4702 TANE 4707 EML2 1 0.000194 0.001305 0.55552 0.000615 0.00047 656 A6 0 8

4001 ADST 4007 SDYT 2 0.000177 0.001592 1.460592 0.0009 0.000998 1000 A2 0 13.041

CABLE‐CKT 21.041

400KV Network--2014

Removed Lines from Database4501 SHPS 4502 WMZD 1 0.002818 0.024008 1.02176 0.01646 0.081844 1400 A3 145.5

4501 SHPS 4502 WMZD 2 0.002818 0.024008 1.02176 0.01646 0.081844 1400 A3 145.5

4001 ADST 4701 TWPS 1 0.00116 0.00979 0.42133 0.006788 0.03375 1400 A3 60

4004 SASN 4011 MOSG 2 0.00049 0.00418 0.17977 0.0029 0.0144 1400 A3 25.6

4015 ICAD 4011 MOSG 2 0.000142 0.001326 0.045743 0.000867 0.005794 1400 A3 7.79

4011 MOSG 4701 TWPS 1 0.00247 0.02088 0.89887 0.01456 0.072 1400 A3 128

4012 SHME 4601 ASWG 1 0.00251 0.021401 0.91151 0.01393 0.06919 1400 A3 129.8

4802 DHID 4804 FILA 1 0.001352 0.011541 0.49157 0.007 0.035 1386 A4 70

4802 DHID 4804 FILA 2 0.001352 0.011541 0.49157 0.007 0.035 1386 A4 70

Note: above circuitS will be LI/LO into BAB, SMKA, BAHIA AND AJMN GSs to form the following circuits

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐2014

4004 SASN 4015 ICAD 1 0.000632 0.005506 0.225513 0.003767 0.020194 1400 A3 33.39 0

4501 SHPS 4504 BAB 1 0.00217 0.01848 0.786509 0.01267 0.063 1400 A3 112 0.5

4501 SHPS 4504 BAB 2 0.00217 0.01848 0.786509 0.01267 0.063 1400 A3 112 0.5 SWITCH GEAR

4502 WMZD 4504 BAB 1 0.000634 0.005396 0.22963 0.003699 0.018394 1400 A3 32.7 0.5

4502 WMZD 4504 BAB 2 0.000634 0.005396 0.22963 0.003699 0.018394 1400 A3 32.7 0.5 NO. RATING VOLTAGE NO. RATING VOLTAGE

4001 ADST 4005 BHYG 1 0.000581 0.00495 0.210672 0.003394 0.016875 1400 A3 30 0.5 0 0 0

4005 BHYG 4701 TWPS 2 0.00052 0.00446 0.1896 0.00305 0.01519 1400 A3 27 0.5 0 0 0

4011 MOSG 4016 SMKA 1 0.00169 0.01436 0.61095 0.00984 0.04894 1400 A3 87 0.5 3 2X150MVAR 401

4012 SHME 4016 SMKA 1 0.00033 0.00281 0.11938 0.00192 0.00956 1400 A3 17 0.5 3 3X50MVAR 33

4016 SMKA 4601 ASWG 1 0.002209 0.01881 0.800554 0.012896 0.064125 1400 A3 114 0.5 0 0 0

4016 SMKA 4701 TWPS 1 0.000829 0.007095 0.301961 0.004753 0.023623 1400 A3 42 0.5 3 3X50MVAR 33

4802 DHID 4805 AJMA 1 0.001 0.0104 0.4524 0.0061 0.0316 1380 A4 5 60 2 2X100MVAR 400

4802 DHID 4805 AJMA 2 0.001 0.0104 0.4524 0.0061 0.0316 1380 A4 5 60 4 4X50MVAR 33

4804 FILA 4805 AJMA 1 0.0019 0.0195 0.8491 0.0114 0.0592 1380 A4 59 63 0 0 0

4804 FILA 4805 AJMA 2 0.0019 0.0195 0.8491 0.0114 0.0592 1380 A4 59 63 4 4X50MVAR 33

OHL‐CKT 251 SDYT 0 0 0 0 0 0 0 0 2 2X100MVAR 400

4005 BHYG 4007 SDYT 1 0.000147 0.003469 3.24344 0.001408 0.000953 1000 A2 0 25

4005 BHYG 4007 SDYT 2 0.000147 0.003469 3.24344 0.001408 0.000953 1000 A2 0 25

4011 MOSG 4014 MHWG 1 0.000076 0.001804 1.686589 0.000732 0.000496 1000 A2 0 13

4011 MOSG 4014 MHWG 2 0.000076 0.001804 1.686589 0.000732 0.000496 1000 A2 0 13

CABLE‐CKT 76

400KV Network--2015

Removed Lines from Database4503 GCSL 4505 S3 1 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.702

4503 GCSL 4505 S3 2 0.002319 0.019574 0.873638 0.012312 0.063753 1400 A3 122.702

Note: above circuitS will be LI/LO into BNPP-1 to form the four circuits

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20154005 BHYG 4702 TANE 3 0.00058 0.00495 0.21067 0.00339 0.01688 1400 A3 30

4005 BHYG 4702 TANE 4 0.00058 0.00495 0.21067 0.00339 0.01688 1400 A3 30

4016 SMKG 4511 MRFA 1 0.002528 0.029273 1.254746 0.020136 0.100125 1400 A3 0 178 SWITCH GEAR

AJMN 4 0 4 2

BHYG 4  + 3 0 4 2

2 4 4X500 MVA

400/132KV

400/132KV

3 2 4 4X500 MVA 400/132KV

SMKG 8 + 3 0 3 2 2 3 3X500 MVA

2 3 3X500 MVA 400/220KV

MHWG 6 0 4 2 2 2 3 3X500 MVA 400/132KV

BABG 10 OR 8 0 3 2

REA/CAP RATINGOHL BAY GEN BAY TR BAY BS BAY BC BAY

POWER TRANSFORMERREACTOR BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E6 Sheet 2 of 4

Page 97: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E4016 SMKG 4511 MRFA 2 0.002528 0.029273 1.254746 0.020136 0.100125 1400 A3 0 178

4504 BABG 4507 RWSG 1 0.001141 0.016525 0.7064 0.010394 0.070425 2000 A5 0 100 NO. RATING VOLTAGE NO. RATING VOLTAGE

4504 BABG 4507 RWSG 2 0.001141 0.016525 0.7064 0.010394 0.070425 2000 A5 0 100 MIRFA 6 6 2 2 2 2 2X500MVA 400/220KV 2 2X36MVAR 33

4507 RWSG 4511 MRFA 1 0.00155 0.0132 0.561792 0.00905 0.045 1400 A3 0 80 BNPP‐1 6 6 0 3 2 0 X X 0 0 0

4507 RWSG 4511 MRFA 2 0.00155 0.0132 0.561792 0.00905 0.045 1400 A3 0 80 SDYT 0 0 0 0 0 0 0 0 1 1X100MVAR 400

4503 GCSL 4509 BNPP1 1 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 70 1 SASN 0 0 0 0 0 0 0 0 1 1X100MVAR 400

4503 GCSL 4509 BNPP1 2 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 70 1 BHYG 0 0 0 0 0 0 0 0 1 1X100MVAR 400

4505 S3PS 4509 BNPP1 1 0.000581 0.00495 0.210672 0.003394 0.016875 1400 A3 52 1

4505 S3PS 4509 BNPP1 2 0.000581 0.00495 0.210672 0.003394 0.016875 1400 A3 52 1

NOTE: 1ST ONE AND HALF BREAKER IN THE SYSTEM

OHL‐CKT 720

4005 BHYG 4007 SDYT 3 0.000147 0.003469 3.24344 0.001408 0.000953 1000 A2 0 25

4004 SASN 4014 MHWG 1 0.000118 0.002775 2.594752 0.001126 0.000762 1000 A2 0 20

CABLE‐CKT 45

400KV Network--2016

Removed Lines from Database

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐2016

4507 RWSG 4509 BNPP‐1 1 0.001027 0.008745 0.372187 0.005996 0.029813 1400 A3 0 53

4507 RWSG 4509 BNPP‐1 2 0.001027 0.008745 0.372187 0.005996 0.029813 1400 A3 0 53

4602 SWHG 4901 WASIT 1 0.002906 0.02475 1.05336 0.016969 0.084375 1400 A3 0 90 SWITCH GEAR

4602 SWHG 4901 WASIT 2 0.002906 0.02475 1.05336 0.016969 0.084375 1400 A3 0 90

OHL‐CKT 286 NO. RATING VOLTAGE NO. RATING VOLTAGE

F3 6 6 0 2 2 0 X X 0 0 0

4004 SASN 4014 MHWG 2 0.000118 0.002775 2.594752 0.001126 0.000762 1000 A2 0 20 OMAN 4 0 2 0 1 2 2X500MVA  400/220KV 2 2X50MVAR 33

4011 MOSG 4014 MHWG 3 0.000076 0.001804 1.686589 0.000732 0.000496 1000 A2 0 13 MOSG 0 0 0 0 0 1 1X500MVA  400/220KV 0 0 0

CABLE‐CKT 33 SASN 0 0 0 0 0 0 0 0 1 1X100MVAR 400

400KV Network--2017

Removed Lines from Database4016 SMKA 4701 TWPS 1 0.000829 0.007095 0.301961 0.004753 0.023623 1400 A3 42.5

4001 ADST 4701 TWPS 1 0.00116 0.00979 0.42133 0.006788 0.03375 1400 A3 60

4503 GCSL 4509 BNPP1 1 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 71

4503 GCSL 4509 BNPP1 2 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 71

4004 SASN 4015 MOSG 1 0.000632 0.005506 0.225513 0.003767 0.020194 1400 A3 25.6 DISM

4005 MOSG 4016 ICAD 1 0.000632 0.005506 0.225513 0.003767 0.020194 1400 A4 7.79

Note: above circuitS will be LI/LO into BAB, SMKA, BAHIA AND AJMN GSs to form the following circuits

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20174502 WMZD 4510 BNPP‐2 1 0.003424 0.029156 1.240858 0.019989 0.099394 1400 A3 0 176.7

4502 WMZD 4510 BNPP‐2 2 0.003424 0.029156 1.240858 0.019989 0.099394 1400 A3 0 176.7

4702 TAN 4016 SMKA 1 0.000829 0.007095 0.301961 0.004753 0.023623 1401 A3 42 SWITCH GEAR

4005 BHYG 4701 TWPS 1 0.00052 0.00446 0.1896 0.00305 0.01519 1400 A3 27

4702 TANE 94701 TWPS 2 7.7E‐05 0.000661 0.028089 0.000452 0.00225 1400 A3 4 NO. RATING VOLTAGE NO. RATING VOLTAGE

4503 GCSL 4509 BNPP2 1 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 71 BNPP‐2 9 6 0 3 0 0 0 0 0

4503 GCSL 4509 BNPP2 2 0.001356 0.01155 0.491568 0.007919 0.039375 1400 A3 71 SASN 0 0 1 0 0 1 1X500MVA  400/132KV 0 0 0

4015 ICAD 4011 MOSG 2 0.000142 0.001326 0.045743 0.000867 0.005794 1400 A3 7.79 SWHN 0 4 0 0 0 0 0 0 0 0 0

OHL‐CKT 353.4

4001 ADST 4007 SDYT 3 0.000144 0.001644 1.438837 0.000889 0.00099 1000 A2 0 13

CABLE‐CKT 13

400KV Network--2018

Removed Lines from Database4011 MOSG 4016 SMKA 1 0.00169 0.01436 0.61095 0.00984 0.04894 1400 A3 87

REA/CAP RATING

REA/CAP RATING

REA/CAP RATINGOHL BAY GEN BAY TR BAY BS BAY BC BAY

POWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAY BC BAYPOWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAY BC BAYPOWER TRANSFORMER

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E6 Sheet 3 of 4

Page 98: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E4011 MOSG 4502 WMDZ 1 0.003061 0.02607 1.10954 0.017874 0.088876 1400 A3 158

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20184504 BABG 4510 BNPP2 1 0.00279 0.02376 1.01123 0.01629 0.081 1400 A3 0 144

4504 BABG 4510 BNPP2 2 0.00279 0.02376 1.01123 0.01629 0.081 1400 A3 0 144

4017 HAMG 4504 BABG 1 0.0026 0.0223 0.948 0.0153 0.0759 2000 A4 0 135 SWITCH GEAR

4017 HAMG 4504 BABG 2 0.0026 0.0223 0.948 0.0153 0.0759 2000 A4 0 135

4011 MOSG 4017 HAMG 1 0.000484 0.004125 0.17556 0.002828 0.014063 1400 A3 25 0 NO. RATING VOLTAGE NO. RATING VOLTAGE

4011 MOSG 4017 HAMG 2 0.000484 0.004125 0.17556 0.002828 0.014063 1400 A3 25 0 MHWG 0 0 0 0 0 1 1X500MVA  400/132KV 0 0 0

4016 SMKG 4502  WMDZ 2 0.0038 0.0323 1.3764 0.0222 0.1102 1400 A3 196 0 HMEM 8 0 0 2 2 0 X X 0 0 0

OHL‐CKT 558

CABLE‐CKT 0

400KV Network--2019

Removed Lines from Database4502 WMDZ 4601 ASWG 1 0.005096 0.043395 1.84689 0.029752 0.147938 1400 A3 263

4016 SMKA 4601 ASWG 1 0.002209 0.01881 0.800554 0.012896 0.064125 1400 A3 114.5

4012 SHME 4602 SWHG 1 0.00164 0.01387 0.5969 0.00962 0.04781 1400 A3 85

Note: above circuitS will be LI/LO into BAB, SMKA, BAHIA AND AJMN GSs to form the following circuits

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20194017 HAMG 4601 ASWG 1 0.002519 0.02145 0.912912 0.014706 0.073125 1400 A3 90 40

4017 HAMG 4601 ASWG 2 0.002519 0.02145 0.912912 0.014706 0.073125 1400 A3 90 40

4016 SMKG 4502  WMDZ 1 0.0038 0.0323 1.3764 0.0222 0.1102 1400 A3 196 0 SWITCH GEAR

4012 SHMG 4016 SMKG 2 0.00033 0.00281 0.11938 0.00192 0.00956 1400 A3 0 17

4016 SMKG 4602 SWHG 2 0.001938 0.0165 0.70224 0.011313 0.05625 1400 A3 83 17 NO. RATING VOLTAGE NO. RATING VOLTAGE

OHL‐CKT 114 0 0 0

0 0 0

CABLE‐CKT 0

400KV Network--2020

Removed Lines from Database4016 SMKG 4502  WMDZ 1 0.0038 0.0323 1.3764 0.0222 0.1102 1400 A3 196

4016 SMKG 4502  WMDZ 2 0.0038 0.0323 1.3764 0.0222 0.1102 1400 A3 196

4016 SMKG 4511 MRFA 1 0.002528 0.029273 1.254746 0.020136 0.100125 1400 A3 178

4016 SMKG 4511 MRFA 2 0.002528 0.029273 1.254746 0.020136 0.100125 1400 A3 178

Add Lines TO Data baseExisting 

(km) New (km) 400KV ‐20204016 SMKG 4018 FAYG 1 0.0004 0.0038 0.1615 0.0026 0.0129 1400 A3 23

4016 SMKG 4018 FAYG 2 0.0004 0.0038 0.1615 0.0026 0.0129 1400 A3 23

4016 SMKG 4018 FAYG 3 0.0004 0.0038 0.1615 0.0026 0.0129 1400 A3 23 SWITCH GEAR

4016 SMKG 4018 FAYG 4 0.0004 0.0038 0.1615 0.0026 0.0129 1400 A3 23

4018 FAYG 4511 MRFG 1 0.003 0.0256 1.0885 0.0175 0.0872 2000 A3 155 NO. RATING VOLTAGE NO. RATING VOLTAGE

4018 FAYG 4511 MRFG 2 0.003 0.0256 1.0885 0.0175 0.0872 2000 A3 155 FAYH 8 0 3 2 2 2 2X500MVA  400/132KV 0 0 0

4018 FAYG 64502 MRFG 1 0.0034 0.0285 1.2149 0.0196 0.0973 1400 A3 173 0 0 0

4018 FAYG 74502 MRFG 2 0.0034 0.0285 1.2149 0.0196 0.0973 1400 A3 173

OHL‐CKT 0

CABLE‐CKT 0

REA/CAP RATING

REA/CAP RATING

REA/CAP RATINGOHL BAY GEN BAY TR BAY BS BAY BC BAY

POWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAY BC BAYPOWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAY BC BAYPOWER TRANSFORMER

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E6 Sheet 4 of 4

Page 99: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E7  220kV OHL/Cable and 220kV switchgear dataset variance: 2013‐2020

TRANSMISSION LINES SUBSTATION

220KV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)

Charging B (pu)

R‐Zero (pu)

X‐Zero (pu)

Rate Line TypeLength 

(km)

ABU DABHI MAIN LAND REGON

2001 UNPS 2005 MHWG 1 0.002168 0.009552 0.02605 0.006183 0.029184 315 B8 15.6

2001 UNPS 2411 MOSG 1 0.004702 0.02123 0.05589 0.012517 0.057951 315 B8 33.47

2002 MOSF 2003 MGIC 1 0.000199 0.00221 0.15286 0.00224 0.000711 370 B1 5.2

2002 MOSF 62415 MOSFj1 2 0.000418 0.000235 0.165642 0.001269 0.000965 370 B1 5.217

2002 MOSF 82002 MOSFj2 1 0.000418 0.000235 0.165642 0.001269 0.000965 370 B1 5.217

62415j1 MOSF 2415 ICAD 2 0.000748 0.004423 0.010608 0.0042 0.021133 415 B3 6.353

82002j2 MOSF 2415 ICAD 1 0.000748 0.004423 0.010608 0.0042 0.021133 415 B3 6.353

2003 MGIC 2411 MOSG 1 0.00028 0.00238 0.00941 0.00165 0.00824 745 B2 4.43

2003 MGIC 2411 MOSG 2 0.00028 0.00238 0.00941 0.00165 0.00824 745 B2 4.43

2006 WATH 2411 MOSG 1 0.002178 0.012825 0.03077 0.006861 0.031771 315 B8 18.53

2007 1SMK 2412 SHME 1 0.002178 0.011942 0.030608 0.011767 0.057076 400 B5 17

2008 2SMK 2412 SHME 2 0.002077 0.010473 0.027907 0.010239 0.051499 400 B5 15.5

2009 LCMO 2601 KHZG 1 0.003394 0.015337 0.04383 0.00903 0.041813 340 B6 24

2010 CNTG 2011 DBYA 1 0.00248 0.01461 0.03507 0.01388 0.06986 400 B5 21

2010 CNTG 2011 DBYA 2 0.00248 0.01461 0.03507 0.01388 0.06986 400 B5 21

2010 CNTG 2012 RMTH 1 0.0013 0.00765 0.01837 0.00727 0.03659 400 B5 11

2010 CNTG 2012 RMTH 2 0.0013 0.00765 0.01837 0.00727 0.03659 400 B5 11

2010 CNTG 2415 ICAD 1 0.002838 0.016782 0.040245 0.015935 0.080174 400 B5 24.102

2010 CNTG 2415 ICAD 2 0.002838 0.016782 0.040245 0.015935 0.080174 400 B5 24.102

2013 SMHG 2412 SHME 1 0.00477 0.021 0.05727 0.012825 0.059386 400 B5 34.3

2013 SMHG 2412 SHME 2 0.00477 0.021 0.05727 0.012825 0.059386 400 B5 34.3

AL AIN REGON

2461 ASWG 2603 SLMG 1 0.00243 0.010458 0.02872 0.00643 0.02978 320 B7 17.2

2461 ASWG 2609 SNYG 1 0.00521 0.02296 0.06262 0.01486 0.07015 340 B6 37.5

2461 ASWG 2610 MZDG 1 0.00659 0.02962 0.07798 0.01746 0.08085 340 B6 46.7

2461 ASWG 2611 ARDG 1 0.00612 0.02385 0.06125 0.01529 0.06575 315 B8 37

2461 ASWG 2611 ARDG 2 0.00612 0.02385 0.06125 0.01529 0.06575 315 B8 37

2461 ASWG 2615 AIAA 1 0.002252 0.014659 0.035901 0.014792 0.072718 315 B8 21.5

2461 ASWG 72604 ZAKj 1 0.000969 0.004281 0.011689 0.002618 0.013089 400 B5 7

2461 ASWG 82604 ZAKj 1 0.000969 0.004281 0.011689 0.002618 0.013089 400 B5 7

72604 ZAKj 2604 ZAKG 1 0.000412 0.004598 0.28556 0.00466 0.001474 370 B1 10

82604 ZAKj 2604 ZAKG 1 0.000412 0.004598 0.28556 0.00466 0.001474 370 B1 10

2462 SWHG 2463 DHMG 1 0.009398 0.050555 0.130411 0.043552 0.207352 340 B6 78.1

2462 SWHG 2601 KHZG 1 0.01213 0.05455 0.1436 0.03215 0.14889 340 B6 86

2462 SWHG 2602 RMAG 1 0.00745 0.03366 0.0885 0.01982 0.09176 340 B6 53

2462 SWHG 2602 RMAG 2 0.00745 0.03366 0.0885 0.01982 0.09176 340 B6 53

2462 SWHG 2603 SLMG 1 0.00592 0.02673 0.07021 0.0157 0.07271 340 B6 42

2462 SWHG 2606 AHYG 1 0.005 0.02204 0.06011 0.01427 0.06735 340 B6 36

2463 DHMG 2604 ZAKG 1 0.000383 0.004586 0.268126 0.004302 0.00136 370 B1 9.233

2463 DHMG 2605 AAPS 1 0.000364 0.00435 0.254332 0.004081 0.00129 370 B1 8.758

2463 DHMG 2606 AHYG 2 0.004909 0.027814 0.075712 0.015008 0.085119 340 B6 45.342

2463 DHMG 2607 AOHG 1 0.002796 0.012354 0.03373 0.008013 0.037771 340 B6 20.2

2463 DHMG 2607 AOHG 2 0.002796 0.012354 0.03373 0.008013 0.037771 340 B6 20.2

2463 DHMG 2613 CTCG 2 0.000446 0.006379 0.367039 0.004777 0.002958 370 B1 12.908

2602 RMAG 2603 SLMG 1 0.00353 0.01586 0.04174 0.00935 0.04328 340 B6 25

2602 RMAG 2006 WATH 1 0.010281 0.046301 0.1325 0.028931 0.136567 340 B6 73

2603 SLMG 2615 AIAA 1 0.004426 0.025519 0.064287 0.021279 0.104599 315 B8 38.5

2604 ZAKG 2613 CTCG 1 0.00046 0.0051 0.35275 0.00517 0.00164 340 B6 12

2609 SNYG 62604 ZAKGj 1 0.00021 0.0023 0.15875 0.00233 0.00074 340 B6 5

62604 ZAKGj 2604 ZAKG 1 0.00083 0.00367 0.01002 0.00238 0.01122 370 B1 6

2605 AAPS 2613 CTCG 1 0.00019 0.00213 0.14732 0.00216 0.00068 340 B6 4.64

2607 AOHG 2608 WAST 1 0.0029 0.029972 0.085661 0.021916 0.127674 340 B6 51.3

2607 AOHG 2608 WAST 2 0.0029 0.029972 0.085661 0.021916 0.127674 340 B6 51.3

2609 SNYG 2610 MZDG 1 0.00139 0.00612 0.0167 0.00396 0.01871 340 B6 10

2609 SNYG 2619 NOUR 1 0.000697 0.00469 0.342672 0.005253 0.003162 170 12

2611 ARDG 2612 AWGG 1 0.004016 0.02065 0.050983 0.011244 0.05782 315 B8 30.8

2611 ARDG 2614 OUSH 1 0.007983 0.048881 0.119677 0.044577 0.220456 315 B8 72.3

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E7 Sheet 1 of 4

Page 100: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E2612 AWGG 2615 AIAA 1 0.006217 0.037808 0.092199 0.033498 0.165906 400 B5 55.7

2614 OUSH 2615 AIAA 1 0.008303 0.053713 0.131197 0.054532 0.268076 340 B6 79.26

WESTER REGON

2451 SHPS 2501 RUWS 1 0.00313 0.01378 0.03757 0.00892 0.04209 700 B2 22.5

2451 SHPS 2501 RUWS 2 0.00313 0.01378 0.03757 0.00892 0.04209 700 B2 22.5

2451 SHPS 2503 GTHY 1 0.0132 0.05817 0.15863 0.03765 0.17772 400 B4 95.8

2451 SHPS 2504 SILA 1 0.015579 0.078612 0.193697 0.04314 0.203719 400 B4 116

2452 WMZD 2507 SHAM 1 0 0.0001 0 0 0 370 B1 0

2452 WMZD 2508 BAAB 1 0.00714 0.03147 0.08581 0.02037 0.09614 420 B3 51.39

2452 WMZD 2509 BHSA 1 0.00848 0.03735 0.10186 0.02418 0.11412 440 B3 61

2452 WMZD 2510 LIWA 2 0.00744 0.0375 0.09255 0.02072 0.10302 419 B3 55.4

2452 WMZD 2511 ASAB 1 0.007844 0.041833 0.116359 0.027754 0.181408 440 B3 64.894

2452 WMZD 2511 ASAB 2 0.007844 0.041833 0.116359 0.027754 0.181408 440 B3 64.894

2452 WMZD 2512 LWST 1 0.007217 0.036375 0.08977 0.020098 0.099929 419 B3 53.74

2501 RUWS 2503 GTHY 1 0.00685 0.0302 0.08235 0.01954 0.09226 400 B4 49.31

2501 RUWS 2504 SILA 1 0.01715 0.07556 0.20539 0.04891 0.23085 420 B3 123.4

2501 RUWS 2514 ELXR 1 0.009031 0.041864 0.155495 0.031954 0.18802 400 B4 74.714

2501 RUWS 2514 ELXR 2 0.009031 0.041864 0.155495 0.031954 0.18802 400 B4 74.714

2502 MRFA 2508 BAAB 1 0.0094 0.04142 0.11296 0.02681 0.12656 440 B3 67.52

2502 MRFA 2509 BHSA 1 0.01105 0.04867 0.13273 0.0315 0.14871 440 B3 79.5

2502 MRFA 2514 ELXR 1 0.00051 0.002366 0.008787 0.001806 0.010625 400 B4 4.222

2502 MRFA 2514 ELXR 2 0.00051 0.002366 0.008787 0.001806 0.010625 400 B4 4.222

2506 ASGS 2520 ASAB‐T 1 0.000278 0.001223 0.00334 0.000793 0.00374 315 B8 2

2506 ASGS 2520 ASAB‐T 2 0.000278 0.001223 0.00334 0.000793 0.00374 315 B8 2

2508 BAAB 2521 ONGS 1 0.002781 0.012231 0.0334 0.007934 0.037397 315 B8 20

2508 BAAB 2521 ONGS 2 0.002781 0.012231 0.0334 0.007934 0.037397 315 B8 20

2510 LIWA 2512 LWST 1 0.000223 0.001125 0.00278 0.000622 0.003091 419 B3 1.66

2511 ASAB 2518 QSWM 1 0.008042 0.050427 0.143138 0.031701 0.158228 315 B8 79.5

2511 ASAB 2520 ASAB‐T 1 0.001946 0.008573 0.023377 0.005548 0.026191 315 B8 14

2511 ASAB 2520 ASAB‐T 2 0.001946 0.008573 0.023377 0.005548 0.026191 315 B8 14

2511 ASAB 62513 HAM‐ 1 0.00351 0.02201 0.062477 0.013837 0.069063 315 B8 34.7

2513 HMMO 62513 HAM‐ 1 0.001664 0.010434 0.029618 0.00656 0.03274 315 B8 16.45

2515 ADCO 2518 QSWM 1 0.001519 0.009527 0.024829 0.005985 0.029854 315 B8 15

2516 ADCO 2519 QSWM 1 0.001519 0.009527 0.024829 0.005985 0.029854 315 B8 15

2519 QSWM 62513 HAM‐ 1 0.004536 0.028454 0.074157 0.017874 0.089165 315 B8 44.8

Removed Lines from Database

Note: above circuitS will be LI/LO into S3 GS to form four circuits

Add Lines TO Data baseExisting 

(km) New (km) 220KV ‐20132013 SMHG 2701 GHAN 1 0.004929 0.022199 0.058443 0.013086 0.060598 400 B5 0 35

2013 SMHG 2701 GHAN 2 0.004929 0.022199 0.058443 0.013086 0.060598 400 B5 0 35

2517 SHAH 2520 ASAB‐T 1 0.008204 0.036083 0.09852 0.023405 0.11032 800 B2 0 59 SWITCH GEAR‐ADD

2517 SHAH 2520 ASAB‐T 2 0.008204 0.036083 0.09852 0.023405 0.11032 800 B2 0 59

188 NO. RATING VOLTAGE NO. RATING VOLTAGE

GHAN 4 0 3 0 1 2 2X120 MVA 220/33KV

2463 DHMG 2604 ZAKG 2 0.000383 0.004586 0.268126 0.004302 0.00136 370 B1 0 9.233 SHAH ** 0 0 0 0 0 0 0 0

9.233 WAHA ** 0 0 0 0 0 0 0 0

RWSG 9 3 2 0 2 0 0 0

220KV Network--2014

Removed Lines from Database2452 WMZD 2508 BAAB 1 0.00714 0.03147 0.08581 0.02037 0.09614 420 B3 51.39

2502 MRFA 2508 BAAB 1 0.0094 0.04142 0.11296 0.02681 0.12656 440 B3 67.52

2502 MRFA 2509 BHSA 1 0.01105 0.04867 0.13273 0.0315 0.14871 440 B3 79.5

Add Lines TO Data baseExisting 

(km) New (km) 220KV ‐20142454 BABG 2520 ASBS 1 0.005508 0.046909 0.182688 0.032161 0.159917 315 B8 0 86

2454 BABG 2520 ASBS 2 0.005508 0.046909 0.182688 0.032161 0.159917 315 B8 0 86

2517 SHAH 2520 ASBS 3 0.007784 0.03429 0.093509 0.022194 0.104763 419 B3 0 56 SWITCH GEAR‐ADD

2517 SHAH 2520 ASBS 4 0.007784 0.03429 0.093509 0.022194 0.104763 419 B3 0 56

2454 BABG 2508 BAAB 1 0.002781 0.012231 0.0334 0.007934 0.037397 420 B3 0 20 NO. RATING VOLTAGE NO. RATING VOLTAGE

2454 BABG 2508 BAAB 2 0.002781 0.012231 0.0334 0.007934 0.037397 420 B3 0 20 BABG 10 0 5 2 2 2 2X100 MVA 220/33KV 0 0 0

REA/CAP RATING

REA/CAP RATINGPOWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E7 Sheet 2 of 4

Page 101: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E2454 BABG 2508 BAAB 3 0.002781 0.012231 0.0334 0.007934 0.037397 420 B3 0 20 ASBS 12 0 0 2 3 2 0 0 0 2 1X100MVAR 220KV

2454 BABG 2509 BHSA 1 0.00417 0.01837 0.05009 0.01189 0.056123 440 B3 30 MZDG 0 0 1 0 0 0 1 1X140MVA 220/33KV 0 0 0

2454 BABG 2521 OGDIII 1 0.003266 0.01439 0.03924 0.009313 0.043963 315 B8 23.5

2454 BABG 2521 OGDIII 2 0.003266 0.01439 0.03924 0.009313 0.043963 315 B8 23.5

2454 BABG 2522 HBSN 1 0.004728 0.020793 0.05677 0.013488 0.063574 315 B8 14 20

2508 BAAB 2522 HBSN 1 0.001947 0.008562 0.02338 0.005554 0.026178 315 B8 14

2454 BABG 2502 MRFA 1 0.006535 0.028744 0.07848 0.018645 0.087882 440 B3 47

2452 WMZD 2502 MRFA 0.01112 0.048986 0.13358 0.031706 0.149662 420 B3 80

364

0

220KV Network--2015

Removed Lines from Database2461 ASWG 2609 SNYG 1 0.00521 0.02296 0.06262 0.01486 0.07015 340 B6 37.5

2461 ASWG 2610 MZDG 1 0.00659 0.02962 0.07798 0.01746 0.08085 340 B6 46.7

2463 DHMG 2605 AAPS 1 0.000364 0.00435 0.25433 0.004081 0.00129 370 B1 8.76

2463 DHMG 2605 AAPS 2 0.000407 0.004177 0.25439 0.003318 0.001967 370 B1 8.76

Note: above circuitS will be LI/LO into BNPP-1 to form the four circuits

Add Lines TO Data baseExisting 

(km) New (km) 220KV ‐2015

2502 MRFA 2010 CNTG 1 0.014739 0.064826 0.176999 0.04205 0.198203 400 B3 0 106

2502 MRFA 2010 CNTG 2 0.014739 0.064826 0.176999 0.04205 0.198203 400 B3 0 106 SWITCH GEAR‐ADD

2461 AASW 2618 AAFD‐2 1 0.003908 0.017655 0.04642 0.010405 0.048116 315 B8 27.8

2461 AASW 2618 AAFD‐3 1 0.003908 0.017655 0.04642 0.010405 0.048116 315 B8 27.8 NO. RATING VOLTAGE NO. RATING VOLTAGE

2609 SNYG 2618 AAFD‐1 1 0.001476 0.006668 0.01753 0.00393 0.018173 315 B8 10.5 RUWS 0 0 1 0 0 1 1X140 MVA 220/33KV 0 0 0

2610 MZDG 2618 AAFD‐4 1 0.002882 0.013019 0.03423 0.007673 0.035481 315 B8 20.5 ASBS 0 0 0 0 0 0 0 0 0 2 100MVAR 220

2520 ASBS 2530 ADAS 1 0.001947 0.008562 0.02337723 0.005554 0.026178 400 B3 0 14 MIRFA 9 2 2 0 2 3 3X100MVA 220/33KV 2 2X36MVAR 33KV

2520 ASBS 2530 ADAS 2 0.001947 0.008562 0.02337723 0.005554 0.026178 400 B3 0 14 AAFD 5 0 3 0 0 1 3 3X120MVA 220/33KV 0 0 0

ZAKG 6 0 5 0 3 1 3 3X120MVA 220/33KV 2 2X70MVAR 220

240 TAWY 0 0 0 0 0 0 3 3X120MVA 220/33KV 0 0 0

DHMG 0 0 3 0 0 0 0 0 0 0 0 0

2463 DHMG 2616 TWYA‐1 1 0.000021 0.00023 0.01588 0.000233 0.000074 370 B1 0 0.5 AOHG 0 0 1 0 0 0 1 1X140MVA 220/33KV 0 0 0

2463 DHMG 2616 TWYA‐2 1 0.000021 0.00023 0.01588 0.000233 0.000074 370 B1 0 0.5 AAPH 4 0 3 0 0 1 3 3X120MVA 220/33KV 0 0 0

2463 DHMG 2616 TWYA‐3 1 0.000021 0.00023 0.01588 0.000233 0.000074 370 B1 0 0.5

2618 AAFD 2618 AAFD‐1 1 0.000046 0.000477 0.03175 0.000379 0.000225 370 B1 0 1

2618 AAFD 2618 AAFD‐2 1 0.000046 0.000477 0.03175 0.000379 0.000225 370 B1 0 1

2618 AAFD 2618 AAFD‐3 1 0.000046 0.000477 0.03175 0.000379 0.000225 370 B1 0 1

2618 AAFD 2618 AAFD‐4 1 0.000046 0.000477 0.03175 0.000379 0.000225 370 B1 0 1

2463 DHMG 2617 AAPH 1 0.000371 0.004138 0.28576 0.004194 0.001327 370 B1 8.75 0.25

2463 DHMG 2617 AAPH 2 0.000371 0.004138 0.28576 0.004194 0.001327 370 B1 8.75 0.25

2605 AAPS 2617 AAPH 1 0.000074 0.000826 0.05715 0.000699 0.000221 370 B1 0 1.08

2605 AAPS 2617 AAPH 2 0.000068 0.000757 0.05239 0.000767 0.000242 370 B1 0 1.65

8.73

220KV Network--2016

Removed Lines from Database 220KV ‐2016

2006 WATH 2411 MOSG 1 0.002178 0.012825 0.03077 0.006861 0.031771 315.1 B8 18.53

2001 UNPS 2005 MHWG 1 0.002168 0.009552 0.02605 0.006183 0.029184 340 B6 15.6 SWITCH GEAR‐REMOVE

2005 MHWG 2006 WATH 1 0.00109 0.0064 0.01536 0.003477 0.016102 340 B6 9.3

NO. RATING VOLTAGE NO. RATING VOLTAGE

62006 WATH 2008 2SMK 1 0.003618 0.018244 0.048613 0.017836 0.089708 400 B4 27 MHWG 2 0 3 0 0 1 3 3X140MVA 220/33KV 0 0 0

2008 2SMK 2412 SHME 2 0.002077 0.010473 0.027907 0.010239 0.051499 400 B4 15.5

72006 WATH 2017 FAYA‐M 1 0.001921 0.010537 0.027007 0.010382 0.050362 400 B4 15

2017 FAYA‐M 2007 1SMK 1 0.001409 0.007727 0.019805 0.007614 0.036932 400 B4 11

2007 1SMK 2412 SHME 1 0.002178 0.011942 0.030608 0.011767 0.057076 400 B4 17

22/33KV 0 0 0

REA/CAP RATING

WATH 6 0 3 0 0 1 42X100MVA+2

X140MVA

GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER

REA/CAP RATING

OHL BAY

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E7 Sheet 3 of 4

Page 102: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E2602 RMAG 62006 WATH 1 0.010281 0.046301 0.1325 0.028931 0.136567 340 B6 73

2602 RMAG 62006 WATH 1 0.010281 0.046301 0.1325 0.028931 0.136567 340 B6 73

Add Lines TO Data baseExisting 

(km) New (km) SWITCH GEAR‐ADD

2021 RMTH‐M 62012 RMTH 1 0.000118 0.000696 0.00167 0.000661 0.003326 400 B4 0 1 **

2021 RMTH‐M 72012 RMTH 1 0.000118 0.000696 0.00167 0.000661 0.003326 400 B4 0 1 ** NO. RATING VOLTAGE NO. RATING VOLTAGE

2001 UNPS 2411 MOSG 1 0.003512 0.015857 0.041745 0.009347 0.043285 315 B8 25 0 ASWG 0 0 0 0 0 0 0 0 0 2 50MVAR 24

2601 KHZG 2017 FAYA‐M 1 0.008709 0.041211 0.114667 0.028442 0.133988 419 B3 48 15 AWGG 4 0 3 0 0 1 0 0 0 0 0 0

2017 FAYA‐M 2412 SHME 1 0.003587 0.019669 0.050413 0.019381 0.094008 340 B6 28 0

2412 SHME 2602 RMAG 1 0.015976 0.075018 0.20902 0.057006 0.277774 340 B6 100 15.5

32.5

2609 SNYG 2619 NOUR‐1 1 0.000697 0.00469 0.34267 0.005253 0.003162 170 0 12

12

220KV Network--2017

Removed Lines from Database

220KV ‐2017

Add Lines TO Data baseExisting 

(km) New (km) SWITCH GEAR‐ADD

2020 DAYA‐M 62011 DBYA 1 0.000118 0.000696 0.00167 0.000661 0.003326 400 B4 0 1

2020 DAYA‐M 72011 DBYA 1 0.000118 0.000696 0.00167 0.000661 0.003326 400 B4 0 1 NO. RATING VOLTAGE NO. RATING VOLTAGE

ZAKG 0 0 0 0 0 0 0 0 0 1 100MVAR 220KV

2

0

220KV ‐2018220KV Network--2018-2020 SWITCH GEAR‐ADD

No Change NO. RATING VOLTAGE NO. RATING VOLTAGE

SLMG 0 0 0 0 0 0 0 0 0 1 100MVAR 220KV

220KV ‐2019SWITCH GEAR

NO. RATING VOLTAGE NO. RATING VOLTAGE

AAPH 0 0 2 0 0 0 2 2X250MVA 220/24KV 2 2(+250/‐100) 24KV

POWER TRANSFORMER REA/CAP RATINGOHL BAY GEN BAY TR BAY BS BAY

REA/CAP BAY

BC BAY

POWER TRANSFORMER REA/CAP RATING

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

OHL BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E7 Sheet 4 of 4

Page 103: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E8  132kV Cable dataset variance in ADST Zone: 2013‐2020

TRANSMISSION LINES

ADST Group 132kV Network--2013

From Bus Number

From Bus NameTo Bus Number

To Bus Name IdLine R (pu)

Line X (pu)

Charging B (pu)

R-Zero (pu)

X-Zero (pu)

Rate MVA

Line Type

Length km

1001 MKT1 1002 MRKT 1 0.000129 0.000869 0.008224 0.000973 0.00059 170 C3 0.8

1001 MKT1 1401 ADST 1 0.000686 0.004614 0.043691 0.005168 0.00311 170 C3 4.25

1002 MRKT 1003 SOUQ 1 0.000181 0.001216 0.011514 0.001362 0.00082 170 C3 1.12

1002 MRKT 1401 ADST 1 0.000661 0.004451 0.042149 0.004985 0.003 161 C3 4.1 5.5

1003 SOUQ 1401 ADST 1 0.000726 0.005492 0.07193 0.004735 0.00221 220 C2 3.65 5.5

1003 SOUQ 1004 CPGR 1 0.000273 0.001835 0.017373 0.002055 0.00124 170 C3 1.69

1004 CPGR 1005 FRDS 1 0.000165 0.001107 0.010486 0.00124 0.00075 170 C3 1.02

1004 CPGR 1401 ADST 2 0.000502 0.003376 0.031971 0.003782 0.00228 170 C3 3.11

1005 FRDS 1401 ADST 1 0.000284 0.001911 0.018093 0.00214 0.00129 170 C3 1.76

1005 FRDS 1401 ADST 2 0.000284 0.001911 0.018093 0.00214 0.00129 170 C3 1.76

1005 FRDS 1006 ZYD2 1 0.000152 0.001021 0.009663 0.001143 0.00069 152 C3 0.94

1006 ZYD2 1401 ADST 1 0.000384 0.002584 0.024467 0.002894 0.00174 170 C3 2.38

1006 ZYD2 61015 ALSM‐B 1 0.00048 0.0018 0.01576 0.00249 0.00156 130 C4 1.8

1007 TCLB 1401 ADST 1 0.000194 0.001303 0.012336 0.001459 0.00088 170 C3 1.2

1007 TCLB 1401 ADST 2 0.00019 0.001281 0.012131 0.001435 0.00086 170 C3 1.18

1007 TCLB 61015 ALSM‐B 1 0.000392 0.002638 0.024981 0.002955 0.00178 170 C3 2.43

1008 PORT 1401 ADST 1 0.000311 0.002095 0.019841 0.002347 0.00141 170 C3 1.93

1008 PORT 1401 ADST 2 0.000311 0.002095 0.019841 0.002347 0.00141 170 C3 1.93

ADST Group 132kV Network-2014

No Change

ADST Group 132kV Network-2015

Removed Line from Database

1003 SOUQ 1401 ADST 1 0.000726 0.005492 0.07193 0.004735 0.00221 220 C2 5.5

1005 FRDS 1401 ADST 1 0.000284 0.001911 0.018093 0.00214 0.00129 170 C3 1.76

Note: above circuits will be LI/LO into CRHO S/S to form the following four circuits

Add LineExisting 

(km) New (km)

1003 SOUQ 1051 CRHO 1 0.000273 0.001835 0.017373 0.002055 0.00124 220 C3 1.94 0.186

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E8  Sheet 1 of 2

Page 104: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E1005 FRDS 1051 CRHO 1 0.000284 0.001911 0.018093 0.00214 0.00129 170 C3 0.84 0.6

1051 CRHO 1401 ADST 1 0.000257 0.001947 0.02548 0.001679 0.00078 220 C2 1.71 0.223

1051 CRHO 1401 ADST 2 0.000306 0.002063 0.01953 0.002311 0.00139 170 C3 0.92 0.6

ADST Group 132kV Network-2016

Removed Line from Database

1003 SOUQ        132.00 1004 CPGR        132.00 1 0.000273 0.001835 0.017373 0.002055 0.00124 170 C3 1.69

Add LineExisting  New (km)

1003 SOUQ 1061 E04-02 1 0.00023 0.00152 0.01439 0.0017 0.00102 170 C3 0.49 1

1004 CPGR 1061 E04-02 1 0.00023 0.00152 0.01439 0.0017 0.00102 170 C3 1.2 1

1061 E04-02 1401 ADST 1 0.00036 0.0027 0.03528 0.00232 0.00108 220 C2 0 3.1

ADST Group 132kV Network-2017-2020

No Change

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E8  Sheet 2 of 2

Page 105: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E9  132kV Cable and 132kV switchgear dataset variance in QURM Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

QURM Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name IdLine R (pu)

Line X (pu)

Charging B (pu)

R‐Zero (pu)

X‐Zero (pu)

RateLine Type

Length (km)

1002 MRKT 61019 MDZD 1 0.000405 0.001249 0.015006 0.001828 0.000887 170 C3 1.325 *

1012 MSHF 61025 BSTN 1 0.00118 0.00793 0.07505 0.008874 0.005347 170 C3 7.3 *

1017 CLNS 1403 QURM 1 0.00044 0.00293 0.02776 0.00328 0.00198 155 C3 2.7

1017 CLNS 1403 QURM 2 0.00044 0.00293 0.02776 0.00328 0.00198 160 C3 2.7

1017 CLNS 61008 PORT 1 0.00044 0.00293 0.02352 0.00328 0.00198 160 C3 2.7 *

1018 JZRH 1019 MDZD 1 0.00035 0.00239 0.02262 0.00268 0.00161 160 C3 2.2

1018 JZRH 1403 QURM 1 0.00032 0.00245 0.03204 0.00211 0.00099 117 C4 2.45

1018 JZRH 1403 QURM 2 0.00031 0.00234 0.03066 0.00202 0.00094 112 C4 2.35

1019 MDZD 1403 QURM 1 0.00068 0.00455 0.04307 0.00509 0.00307 170 C3 4.19

1020 KLDY 1021 MRML 1 0.00097 0.00651 0.06168 0.0073 0.00439 170 C3 6

1020 KLDY 1022 GRHD 1 0.000818 0.004356 0.043632 0.002371 0.002073 183 C2 3.853

1020 KLDY 1403 QURM 1 0.0008 0.0054 0.05109 0.00604 0.00364 170 C3 4.97

1020 KLDY 61001 MKT1 1 0.00064 0.00358 0.06199 0.005554 0.002271 170 C3 2.7 *

1020 KLDY 1018 JZRH 1 0.0004 0.00271 0.0257 0.00304 0.00183 170 C3 2.5

1021 MRML 1022 GRHD 1 0.000449 0.002224 0.022902 0.00173 0.002977 160 C3 2.022

1021 MRML 1023 CONH 1 0.00044 0.00293 0.02776 0.00328 0.00198 144 C4 2.7

1022 GRHD 1023 CONH 1 0.000499 0.002979 0.03144 0.001925 0.001453 183 C2 2.776

1022 GRHD 1024 BATN 1 0.000287 0.001933 0.018299 0.002164 0.001303 160 C3 1.78

1023 CONH 1025 BSTN 1 0.00075 0.00504 0.0477 0.00564 0.0034 170 C3 4.64

1024 BATN 1025 BSTN 1 0.00027 0.00185 0.01748 0.00207 0.00124 170 C3 1.7

1024 BATN 1403 QURM 1 0.00113 0.0076 0.07196 0.00851 0.00512 160 C3 7

1025 BSTN 1403 QURM 1 0.00099 0.00664 0.06291 0.00744 0.00448 170 C3 6.12

1025 BSTN 1403 QURM 2 0.00095 0.00639 0.06055 0.00716 0.00431 154 C3 5.89

* 132KV TRANSFER LINKS BETWEEN QURM AND OTHER GROUPS, NORMALY OPEN

QURM Group 132kV Network-2014132KV ‐2014

Removed Line from Database

1022 GRHD 1023 CONH 1 0.000499 0.002979 0.03144 0.001925 0.001453 183 2.776 C2 SWITCH GEAR‐ADD

Note: above circuit will be LI/LO into PRSP S/S to form the following circuits

Add Line TO Data base NO. RATING VOLTAGE NO. RATING VOLTAGE

Existing (km) New (km)

PRSP 4 0 3 0 1 3 3X40MVA 132/11KV 0 0 0

1022 GRHD 1063 PRSP 1 0.000355 0.002388 0.02262 0.002675 0.001611 170 C3 2.6 0

1023 CONH 1063 PRSP 1 0.000032 0.000217 0.00206 0.000243 0.000146 170 C3 0.31 0

1023 CONH 1063 PRSP 2 0.000032 0.000217 0.00206 0.000243 0.000146 170 C3 0 0.31

0.31

QURM Group 132kV Network-2015132KV ‐2015

No Change

SWITCH GEAR‐ADD

QURM Group 132kV Network-2016NO. RATING VOLTAGE NO. RATING VOLTAGE

Removed Line from Database

1018 JZRH 1020 KLDY 1 0.0004 0.00271 0.0257 0.00304 0.00183 170 C3 2.5 *

1018 JZRH 1403 QURM 2 0.00031 0.00234 0.03066 0.00202 0.00094 182 C2 2.35 *

1020 KLDY 1022 GRHD 1 0.000818 0.004356 0.04363 0.002371 0.002073 183 C2 3.85 *

1018 JZRH 1019 MDZD 1 0.00035 0.00239 0.02262 0.00268 0.00161 170 C3 2.2 **

* these three circuit will be disconnected from JZRH and KLDY to form a direct circuit GRHD‐QURM

** Circuit will be LI/LO into PRSP S/S to form the following circuits

POWER TRANSFORMER REA/CAP RATINGCable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

BC BAY

POWER TRANSFORMER REA/CAP RATING

Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E9 Sheet 1 of 2

Page 106: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Add Line TO Data baseExisting 

(km) New (km) 132KV ‐2016

1074 W13‐02 1403 QURM 1 0.000462 0.003616 0.046958 0.004821 0.00241 230 C1 0 3.5

1019 MDZD 1074 W13‐02 1 0.000323 0.002171 0.02056 0.002432 0.001464 170 C3 1.4 0.6

1018 JZRH 1074 W13‐02 1 0.00021 0.001411 0.013364 0.001581 0.000952 170 C3 0 1.4 SWITCH GEAR‐ADD

1018 JZRH 1074 W13‐02 2 0.00021 0.001411 0.013364 0.001581 0.000952 170 C3 0.8 0.6

1022 GRHD 1403 QURM 1 0.001419 0.009554 0.090465 0.0107 0.006442 170 C3 8.8 0 NO. RATING VOLTAGE NO. RATING VOLTAGE

6.1 W13/02 5 0 4 0 0 1 4 4X40MVA 132/11KV 0 0 0

QURM Group 132kV Network-2017132KV ‐2017

Removed Line from Database

1019 MDZD 1403 QURM 1 0.00068 0.00455 0.04307 0.00509 0.00307 170 C3 4.19 * SWITCH GEAR‐ADD

1018 JZRH 1403 QURM 1 0.00031 0.00234 0.03066 0.00202 0.00094 182 C2 2.35 *

1074 W13‐02 1403 QURM 1 0.000462 0.003616 0.046958 0.004821 0.00241 230 C1 3.5 * NO. RATING VOLTAGE NO. RATING VOLTAGE

* These three circuit will be disconnected from QURM and extended up to AL REEM Grid to shift the sub‐group

    (W13/02, JZRH and MDZD) from Qurm to REEM group, please refer to REEM group

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name IdLine R (pu)

Line X (pu)

Charging B (pu)

R‐Zero (pu)

X‐Zero (pu)

RateLine Type

Length KM

1017 CLNS 1403 QURM 1 0.00044 0.00293 0.02776 0.00328 0.00198 170 C3 2.7 132KV ‐20181017 CLNS 1403 QURM 2 0.00044 0.00293 0.02776 0.00328 0.00198 170 C3 2.7

1020 KLDY 1021 MRML 1 0.00097 0.00651 0.06168 0.0073 0.00439 170 C3 6

1020 KLDY 1403 QURM 1 0.0008 0.0054 0.05109 0.00604 0.00364 170 C3 4.97 SWITCH GEAR‐ADD

1021 MRML 1022 GRHD 1 0.000449 0.002224 0.0229 0.00173 0.002977 160 C3 2.02

1021 MRML 1023 CONH 1 0.00044 0.00293 0.02776 0.00328 0.00198 170 C3 2.7 NO. RATING VOLTAGE NO. RATING VOLTAGE

1022 GRHD 1024 BATN 1 0.000287 0.001933 0.0183 0.002164 0.001303 170 C3 1.78

1022 GRHD 1063 PRSP 1 0.000355 0.002388 0.02262 0.002675 0.001611 170 C3 2.2

1022 GRHD 1403 QURM 1 0.001419 0.009554 0.090465 0.0107 0.006442 170 C3 8.8

1023 CONH 1025 BSTN 1 0.00075 0.00504 0.0477 0.00564 0.0034 170 C3 4.64

1023 CONH 1063 PRSP 1 0.000032 0.000217 0.00206 0.000243 0.000146 170 C3 0.2

1023 CONH 1063 PRSP 2 0.000032 0.000217 0.00206 0.000243 0.000146 170 C3 0.2 132KV ‐20191024 BATN 1025 BSTN 1 0.00027 0.00185 0.01748 0.00207 0.00124 114 C4 1.7

1024 BATN 1403 QURM 1 0.00113 0.0076 0.07196 0.00851 0.00512 170 C3 7

1025 BSTN 1403 QURM 1 0.00099 0.00664 0.06291 0.00744 0.00448 170 C3 6.12 SWITCH GEAR‐ADD

1025 BSTN 1403 QURM 2 0.00095 0.00639 0.06055 0.00716 0.00431 170 C3 5.89

1012 MSHF 1025 BSTN 1 0.00118 0.00793 0.07505 0.008874 0.005347 170 C3 7.3 NO. RATING VOLTAGE NO. RATING VOLTAGE

1001 KT1        132 1020 KLDY 1 0.00064 0.00358 0.06199 0.005554 0.002271 170 C3 2.7 BECH 2 2X250MVA 132/24KV 2 2X(+250/‐100)MVAR 24

QURM Group 132kV Network-2018-2020132KV ‐2020

No Change

SWITCH GEAR‐ADD

NO. RATING VOLTAGE NO. RATING VOLTAGE

POWER TRANSFORMER REA/CAP RATING

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E9 Sheet 2 of 2

Page 107: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E10  132kV Cable and 132kV switchgear dataset variance in BECH Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

BECH Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)Charging B 

(pu)

R‐Zero (pu)

X‐Zero (pu)

Rating (MVA)

Line Type

Length KM

1009 EMBS 1011 GLFA 1 0.0006 0.00402 0.03804 0.0045 0.00271 160 C3 3.75

1009 EMBS 1402 BECH 1 0.00053 0.00356 0.03374 0.00319 0.00192 136 C4 3.3

1010 DANT 1011 GLFA 1 0.000848 0.004565 0.045574 0.005209 0.002824 170 C3 4.143

1010 DANT 1402 BECH 1 0.000697 0.003615 0.036638 0.0041 0.004234 230 C1 3.284

1010 DANT 1402 BECH 2 0.00033 0.002497 0.03267 0.002152 0.001004 170 C3 2.5

1011 GLFA 1012 MSHF 1 0.00062 0.00418 0.03958 0.00468 0.00282 160 C3 3.85

1012 MSHF 1402 BECH 1 0.00111 0.00837 0.10959 0.00722 0.00337 170 C3 8.39

1013 HTCO 1014 FLAH 1 0.0005 0.00337 0.03189 0.00377 0.00227 160 C3 3.1

1013 HTCO 1402 BECH 1 0.00106 0.00714 0.06758 0.00799 0.00481 160 C3 6.5

1013 HTCO 1402 BECH 2 0.00106 0.00717 0.06785 0.00803 0.00483 170 C3 6.6

1014 FLAH 1015 ALSM‐A 1 0.00027 0.00185 0.01477 0.002067 0.001244 170 C3 1.7

1014 FLAH 1402 BECH 1 0.00165 0.01107 0.10486 0.0124 0.00747 160 C3 10.2

1015 ALSM‐A 1402 BECH 1 0.00149 0.01005 0.09519 0.01126 0.00678 170 C3 9.26 132KV ‐20131016 KHPK 1402 BECH 1 0.000667 0.004498 0.050312 0.004606 0.003078 200 C1 3.75

1016 KHPK 1402 BECH 2 0.000667 0.004498 0.050312 0.004606 0.003078 200 C1 3.75

SWITCH GEAR‐ADD

Removed Line from DatabaseNO. RATING VOLTAGE NO. RATING VOLTAGE

1009 EMBS 1402 BECH 1 0.00053 0.00356 0.03374 0.00319 0.00192 136 C3 3.3 CCAD 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

Note: above circuit will be LI/LO into CCAD S/S to form the following circuits

Add Line TO Data baseExisting 

(km) New (km)

1049 CCAD 1402 BECH 1 0.000528 0.003994 0.052272 0.003444 0.001607 220 C2 2.6 0.8 ***** RATING

1049 CCAD 1402 EMBS 1 0.000528 0.003994 0.052272 0.003444 0.001607 220 C2 0 0.8

1.6

BECH Group 132kV Network-2014

Removed Line from Database 132KV ‐2014

1014 FLAH 1402 BECH 1 0.00165 0.01107 0.10486 0.0124 0.00747 160 C3 10.2

1013 HTCO 1402 BECH 1 0.00106 0.00714 0.06758 0.00799 0.00481 160 C3 6.5 SWITCH GEAR‐ADD

Note: above circuit will be LI/LO into EROD S/S to form the following circuits

Add Line TO Data base NO. RATING VOLTAGE NO. RATING VOLTAGE

Existing (km) New (km) EROD 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

1013 HTCO 1070 EROD 1 0.000403 0.002714 0.0257 0.00304 0.00183 170 C3 1.73 0.65

1014 FLAH 1070 EROD 1 0.000843 0.005642 0.05346 0.00632 0.00381 170 C3 4.82 0.65

1070 EROD 1402 BECH 1 0.000807 0.005428 0.0514 0.00608 0.00366 170 C3 5.5 0.1

1070 EROD 1402 BECH 2 0.000807 0.005428 0.0514 0.00608 0.00366 170 C3 5.5 0.1

1049 CCAD 1402 BECH 1 0.000659 0.004219 0.051446 0.00373 0.00203 220 C2 0 3.1

4.6

BECH Group 132kV Network-2015-2017 132KV ‐2015‐2017

No Change SWITCH GEAR‐ADD

NO. RATING VOLTAGE NO. RATING VOLTAGE

BECH 2 2X250MVA 132/24KV 2 2X(+250/‐100)MVAR 24

REA/CAP RATINGPOWER TRANSFORMERCable BAY GEN BAY TR BAY BS BAY

REA/CAP BAY

BC BAY

POWER TRANSFORMER REA/CAP RATINGCable  BAY GEN BAY TR BAY BS BAY

REA/CAP BAY

BC BAY

BC BAY POWER TRANSFORMER REA/CAP RATINGCable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E10 Sheet 1 of 2

Page 108: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

BECH Group 132kV Network-2018

Add Line TO Data baseExisting 

(km) New (km) 132KV ‐2018

1054 RWDH 1016 KHPK 1 0.000528 0.003994 0.052272 0.003444 0.001607 220 C3 0 4

1054 RWDH 1049 CCAD 1 0.000264 0.001997 0.026136 0.001722 0.000803 220 C3 0 2

1054 RWDH 1402 BECH 1 0.000792 0.005992 0.078408 0.005165 0.00241 220 C3 0 6 SWITCH GEAR‐ADD

12

NO. RATING VOLTAGE NO. RATING VOLTAGE

RWDH 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

BECH Group 132kV Network-2019-2020 132KV ‐2020

No Change SWITCH GEAR‐ADD

Cable  BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

TRANSFORMER REA/CAP RATING

NO. RATING VOLTAGE NO. RATING VOLTAGE

POWER TRANSFORMER REA/CAP RATINGCable BAY GEN BAY TR BAY BS BAY

REA/CAP BAY

BC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E10 Sheet 2 of 2

Page 109: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E11  132kV Cable and 132kV switchgear dataset variance in SASN Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

SASN Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)Charging B 

(pu)

R‐Zero (pu)

X‐Zero (pu)

RateLine Type

Length KM

1026 UNPS 1028 MKAA 1 0.00164 0.01102 0.10436 0.011916 0.00743 153 C3 9.8

1026 UNPS 1030 SLTC 1 0.00019 0.00126 0.01195 0.00141 0.00085 170 C3 1.16

1026 UNPS 1030 SLTC 2 0.00019 0.00126 0.01195 0.00141 0.00085 170 C3 1.16

1026 UNPS 1032 MKBB 1 0.002071 0.012318 0.132249 0.015367 0.006399 152 C3 11.677

1026 UNPS 1404 SASN 1 0.00016 0.00109 0.01028 0.001291 0.000603 180 C3 1.5

1026 UNPS 1404 SASN 2 0.00016 0.00109 0.01028 0.001291 0.000603 180 C3 1.5

1026 UNPS 1404 SASN 3 0.00016 0.00109 0.01028 0.001291 0.000603 180 C3 1.5

1026 UNPS 1404 SASN 4 0.00016 0.00109 0.01028 0.001291 0.000603 180 C3 1.5

1026 UNPS 1012 MSHF OLD 1 0.00486 0.02095 0.15423 0.03651 0.0155 142 C4 17.6 *

1028 MKAA 1029 AIRP 1 0.002118 0.011808 0.116297 0.015145 0.00686 153 C3 11.182

1029 AIRP 1032 MKBB 1 0.003182 0.017741 0.174727 0.022755 0.010307 152 C3 16.8

1030 SLTC 1031 MOS1 1 0.001613 0.011857 0.1028 0.014051 0.008814 114 C4 10.15 132KV ‐20131031 MOS1 1033 JSRN 1 0.001731 0.008063 0.090183 0.012964 0.011088 114 C4 7.394

1031 MOS1 1073 MICT 1 0.000653 0.005114 0.06641 0.006818 0.003409 230 C1 4.95

1031 MOS1 1012 MSHF OLD 1 0.00556 0.02273 0.47506 0.04155 0.01699 114 C4 20.2 * SWITCH GEAR‐ADD

1033 JSRN 1404 SASN 1 0.00105 0.006874 0.093287 0.007821 0.004641 194 C2 6.953

1033 JSRN 1404 SASN 2 0.00105 0.006874 0.093287 0.007821 0.004641 194 C2 6.953 NO. RATING VOLTAGE NO. RATING VOLTAGE

1034 BHYA 1029 AIRP 1 0.003007 0.017759 0.170275 0.021893 0.013314 160 C3 16.372 * MKAW 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

1068 MKAW 1404 SASN 3 0.001122 0.008488 0.111078 0.007317 0.003415 230 C1 8.5

1032 MKBB 1036 RBBB 1 0.000396 0.002996 0.039204 0.002583 0.001205 230 C1 3 *

1032 MKBB 1036 RBBB 3 0.000792 0.006198 0.080499 0.008264 0.004132 230 C1 6 *

* 132KV TRANSFER LINKS BETWEEN SASN AND OTHER GROUPS, NORMALY OPEN

SASN Group 132kV Network-2013

Add Line TO Data baseExisting 

(km) New (km)

1032 MKBB 1068 MKAW 1 0.000924 0.007231 0.093915 0.009642 0.004821 170 C3 5.4 1.6

1033 JSRN 1068 MKAW 1 0.00066 0.004993 0.06534 0.004304 0.002009 170 C3 3.4 1.6

3.2

SASN Group 132kV Network-2014 132KV ‐2014

Add Line TO Data baseExisting 

(km) New (km) SWITCH GEAR‐ADD

1059 STDM 1028 MKAA 1 0.000528 0.003994 0.05227 0.003444 0.001607 230 C1 0 4 *

1059 STDM 1068 MKAW 1 0.000792 0.005992 0.07841 0.005165 0.00241 230 C1 0 6 * NO. RATING VOLTAGE NO. RATING VOLTAGE

* Could be used as 132KV TRANSFER LINKS BETWEEN SASN AND MHWG, NORMALY OPEN 16.4 STDM 5 0 4 0 1 4 4X80MVA 132/22KV 0 0 0

SASN Group 132kV Network-2015

POWER TRANSFORMER REA/CAP RATINGCable  BAY GEN BAY TR BAY BS BAY

REA/CAP BAY

BC BAY

BC BAYPOWER TRANSFORMER REA/CAP RATING

Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E11 Sheet 1 of 2

Page 110: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐ENo Change

SASN Group 132kV Network-2016

Relocated Line from SASN to BHIA1032 MKBB 1036 RBBB 1 0.000396 0.002996 0.039204 0.002583 0.001205 230 C1 3

1032 MKBB 1036 RBBB 3 0.000792 0.006198 0.080499 0.008264 0.004132 230 C1 6

Note: above circuits will be disconnected from MKBB and extending up to MKDD new 132/11kV-BAHIA GROUP

Add Line TO Data baseExisting 

(km) New (km)

1032 MKBB 1069 MKDD 1 0.000396 0.003099 0.040249 0.004132 0.002066 230 C1 0 3 *

* 132KV TRANSFER LINKS BETWEEN SASN AND OTHER GROUPS, NORMALY OPEN 3

SASN Group 132kV Network-2017-2020

No Change

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E11 Sheet 2 of 2

Page 111: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E12  132kV Cable dataset variance in Reem Zone: 2013‐2020

TRANSMISSION LINES

REEM Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)Charging B 

(pu)

R‐Zero (pu)

X‐Zero (pu)

Rate Line TypeLength 

KM

1044 SDBB 1046 SDDD 1 0.000535 0.004342 0.054478 0.005857 0.002406 230 C1 4.05

1044 SDBB 1407 SDYT 1 0.00107 0.00784 0.100468 0.01049 0.00427 200 C1 7.4

1044 SDBB 1407 SDYT 2 0.00107 0.00784 0.100468 0.01049 0.00427 200 C1 7.4

1045 SDCC 1046 SDDD 1 0.000211 0.001829 0.022571 0.002312 0.002581 230 C1 1.7

1045 SDCC 1407 SDYT 1 0.001096 0.008328 0.103842 0.010867 0.004561 200 C1 7.76

1045 SDCC 1407 SDYT 2 0.001096 0.008328 0.103842 0.010867 0.004561 200 C1 7.76

1046 SDDD 1407 SDYT 1 0.000984 0.008819 0.111769 0.012091 0.005518 230 C1 8.36

REEM Group 132kV Network-2014

Removed Line from Database

1037 TMUH 1406 REEM 3 0.000225 0.001698 0.020201 0.001739 0.00104 230 C1 1.506

Note: above circuit will be LI/LO into SOWA S/S to form the following two circuits

Add Line TO Data baseExisting 

(km) New (km)

1037 TMUH 1053 SOWA 1 0.000449 0.003395 0.044431 0.002927 0.001366 230 C1 0 1.3

1053 SOWA 1406 REEM 3 0.000554 0.004194 0.054886 0.003616 0.001687 230 C1 1.506 1.3

2.6

REEM Group 132kV Network-2015-2016

No Change

REEM Group 132kV Network-2017

Shifted Lines from QURM group to REEM group

1019 MDZD 1403 QURM 1 0.00068 0.00455 0.04307 0.00509 0.00307 170 C3 4.19 *

1018 JZRH 1403 QURM 1 0.00031 0.00234 0.03066 0.00202 0.00094 182 C2 2.35 *

1074 W13‐02 1403 QURM 1 0.000462 0.003616 0.046958 0.004821 0.00241 230 C1 3.5 *

* These three circuit will be disconnected from QURM and extended up to AL REEM Grid to shift the sub‐group (W13/02, JZRH     and MDZD) from Qurm to REEM group, please refer to REEM group

Add Line TO Data baseExisting 

(km) New (km)

1018 JZRH 1074 W13‐02 1 0.00021 0.001411 0.013364 0.001581 0.000952 170 C3 1.4 0

1018 JZRH 1074 W13‐02 2 0.00021 0.001411 0.013364 0.001581 0.000952 170 C3 1.4 0

1018 JZRH 1406 REEM 1 0.000702 0.004723 0.044719 0.005289 0.003184 170 C3 2.45 2

1019 MDZD 1074 W13‐02 1 0.000323 0.002171 0.02056 0.002432 0.001464 170 C3 2 0

1019 MDZD 1406 REEM 1 0.001 0.006731 0.063737 0.007539 0.004539 170 C3 4.19 2

1074 W13‐02 1406 REEM 1 0.000726 0.005682 0.073791 0.007576 0.003788 230 C1 3.5 2

6

REEM Group 132kV Network-2018-2020

No Change

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E12  Sheet 1 of 1

Page 112: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E13  132kV Cable dataset variance in Saadiyat Zone: 2013‐2020

TRANSMISSION LINES

Saadiyat Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

Id Line R (pu) Line X (pu)Charging B 

(pu)

R‐Zero (pu)

X‐Zero (pu)

Rating (MVA)

Line TypeLength 

KM

1044 SDBB 1046 SDDD 1 0.000535 0.004342 0.054478 0.005857 0.002406 230 C1 4.05

1044 SDBB 1407 SDYT 1 0.00107 0.00784 0.100468 0.01049 0.00427 200 C1 7.4

1044 SDBB 1407 SDYT 2 0.00107 0.00784 0.100468 0.01049 0.00427 200 C1 7.4

1045 SDCC 1046 SDDD 1 0.000211 0.001829 0.022571 0.002312 0.002581 230 C1 1.7

1045 SDCC 1407 SDYT 1 0.001096 0.008328 0.103842 0.010867 0.004561 200 C1 7.76

1045 SDCC 1407 SDYT 2 0.001096 0.008328 0.103842 0.010867 0.004561 200 C1 7.76

1046 SDDD 1407 SDYT 1 0.000984 0.008819 0.111769 0.012091 0.005518 230 C1 8.36

Saadiyat Group 132kV Network--2014-2020

No Change

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E13 Sheet 1 of 1

Page 113: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E14  132kV Cable and 132kV switchgear dataset variance in Taweela/Bahia Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

TAW/BAHIA Group 132kV Network--2013

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name IdLine R (pu)

Line X (pu)Charging B 

(pu)

R‐Zero (pu)

X‐Zero (pu)

RateLine Type

Length KM

1027 RBAA 1035 YASI 1 0.00141 0.01069 0.13983 0.00921 0.0043 230 C1 10.7

1027 RBAA 1036 RBBB 1 0.000404 0.002783 0.036922 0.003889 0.00179 230 C1 2.752

1034 BHYA 1040 TAWBHYA1 1 0.00199 0.00739 0.00648 0.00569 0.02111 114 C4 3

1034 BHYA 1041 TAWBHYA2 2 0.00199 0.00739 0.00648 0.00569 0.02111 114 C4 3

1034 BHYA 61029 AIRPBHYA 1 0.003007 0.017759 0.170275 0.021893 0.01331 160 C3 16.372

1035 YASI 1036 RBBB 1 0.004133 0.026452 0.327207 0.03582 0.01447 160 C3 24.005

1035 YASI 1702 TAWA 1 0.005328 0.045481 0.02294 0.031215 0.15518 462 C10 24.28

1035 YASI 1702 TAWA 2 0.005328 0.045481 0.02294 0.031215 0.15518 462 C10 24.28

1035 YASI 61035 YASI 2 0.00106 0.00799 0.10454 0.00689 0.00321 230 C1 8

1040 TAWBHYA1 1702 TAWA 1 0.01787 0.06647 0.05832 0.05123 0.19001 114 C9 27.4

1041 TAWBHYA2 1702 TAWA 1 0.01787 0.06647 0.05832 0.05123 0.19001 114 C9 27.4

Removed Line from Database

1035 YASI 1036 RBBB 1 0.004133 0.026452 0.327207 0.03582 0.01447 160 C3 24.005

1027 RBAA 1035 YASI 1 0.00141 0.01069 0.13983 0.00921 0.0043 230 C1 10.7

Note: above circuit will be LI/LO into ADIP S/S to form the following circuits

Add Line TO Data base 132KV ‐2013Existing 

(km)

New (km)

1027 RBAA 1064 FLCT 2 0.00264 0.019972 0.26136 0.01721 0.00804 230 C1 6.4 14.4

1064 FLCT 1035 YASI 1 0.00198 0.014979 0.19602 0.01291 0.00603 230 C1 11 14.4 SWITCH GEAR‐ADD

1036 RBBB 1048 ADIP 1 0.000858 0.006491 0.08494 0.0056 0.00261 230 C1 6 0.75

1035 YASI 1048 ADIP 1 0.00198 0.014979 0.19602 0.01291 0.00603 230 C1 15.4 0.75 NO. RATING VOLTAGE NO. RATING VOLTAGE

1027 RBAA 1048 ADIP 1 0.000726 0.005492 0.071874 0.004735 0.00221 230 C1 0 4.1 FLCT 5 0 4 0 1 4 4X80MVA 132/22KV 0 0 0

34.4 ADIP 5 0 4 0 1 4 4X80MVA 132/22KV 0 0 0

TAW/BAHIA Group 132kV Network-2014

Removed Line from Database1035 YASI 1702 TAWA 1 0.005328 0.045481 0.02294 0.031215 0.15518 462 C10 24.28

1035 YASI 1702 TAWA 2 0.005328 0.045481 0.02294 0.031215 0.15518 462 C10 24.28

1040 BHYA‐old 1702 TAWA 1 0.01787 0.06647 0.05832 0.05123 0.19001 114 C9 27.4

1041 BHYA‐old 1702 TAWA 2 0.01787 0.06647 0.05832 0.05123 0.19001 114 C9 27.4

1064 FLCT 1035 YASI 1 0.00198 0.014979 0.19602 0.01291 0.00603 230 C1 25.4

1035 YASI 1048 ADIP 1 0.00198 0.014979 0.19602 0.01291 0.00603 230 C1 16.15

1027 RBAA 1035 YASI 1 0.00141 0.01069 0.13983 0.00921 0.0043 230 C1 10.7

Note: above circuit will be LI/LO into BAHIA GRID-132KV S/S to form the following circuits

Add Line TO Data baseExisting 

(km)

New (km) 132KV ‐2014

1027 RBAA 1405 BHYG 1 0.00141 0.01069 0.13983 0.00921 0.0043 230 C1 10.7

1034 BHYA 1405 BHYG 1 0.000253 0.002112 0.02614 0.002893 0.00132 230 C1 0 2

1034 BHYA 1405 BHYG 2 0.000253 0.002112 0.02614 0.002893 0.00132 230 C1 0 2 SWITCH GEAR‐ADD

1035 YASI 1405 BHYG 1 0.00106 0.00799 0.10454 0.00689 0.00321 230 C1 8

1035 YASI 1405 BHYG 2 0.00106 0.00799 0.10454 0.00689 0.00321 230 C1 8 NO. RATING VOLTAGE NO. RATING VOLTAGE

1035 YASI 1405 BHYG 3 0.00106 0.00799 0.10454 0.00689 0.00321 230 C1 8 BHYG 10 0 4 2 2 0 0 0 0 0 0

1036 RBBB 1405 BHYG 1 0.00178 0.01348 0.17642 0.01162 0.00542 230 C1 0 13.5 TAW‐A 0 0 3 3X100MVA 132/33KV

1048 ADIP 1405 BHYG 1 0.001122 0.008488 0.11108 0.007317 0.00342 230 C1 8.5

POWER TRANSFORMER REA/CAP RATINGCable BAY GEN BAY TR BAY BS BAY

REA/CA

P BAYBC BAY

REA/CAP RATINGCable BAY GEN BAY TR BAY BS BAY

REA/CA

P BAYBC BAY

POWER TRANSFORMER

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E14  Sheet 1 of 2

Page 114: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E1064 FLCT 1405 BHYG 1 0.00198 0.014979 0.19602 0.01291 0.00603 230 C1 15

17.5

TAW/BAHIA Group 132kV Network-2015

No Change

TAW/BAHIA Group 132kV Network-2016

Removed Line from Database

Refer to SASN Group

Add Line TO Data baseExisting 

(km)

New (km) 132KV ‐2016

1036 RBBB 1069 MKDD 1 0.000792 0.006198 0.080499 0.008264 0.00413 230 C1 3 3

1036 RBBB 1069 MKDD 2 0.000752 0.005888 0.076474 0.007851 0.00393 230 C1 2.7 3

6 CABLSWITCH GEAR‐ADD

1702 TAWA 1703 ESI‐3 1 0.000559 0.003455 0.0013 0.002247 0.01109 225 C9 3 0.5

1702 TAWA 1703 ESI‐3 2 0.000559 0.003455 0.0013 0.002247 0.01109 225 C9 30.5

NO. RATING VOLTAGE NO. RATING VOLTAGE

1702 TAWA 1703 ESI‐3 3 0.00028 0.002938 0.001516 0.001719 0.00892 450 C10 3 0.5 MKDD 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

1702 TAWA 1703 ESI‐3 4 0.00028 0.002938 0.001516 0.001719 0.00892 450 C10 3 0.5 ESI‐3 12 3 2 2 3 3X100MVA 132/33KV 0 0 0

2 OHL

TAW/BAHIA Group 132kV Network-2017-2020

No Change

Cable/ OHL BAY

GEN BAY TR BAY BS BAYREA/CA

P BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E14  Sheet 2 of 2

Page 115: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E15  132kV Cable and 132kV switchgear dataset variance in Mahawi Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

MHWG Group 132kV Network--2014

From Bus  Number

From Bus Name

To Bus  Number

To Bus  Name

IdLine R (pu)

Line X (pu)

Charging B (pu)

R‐Zero (pu)

X‐Zero (pu)

RateLine Type

Existing (km) New (km) 132KV ‐2014

1031 MOS1 1072 M12 2 0.000653 0.005114 0.06641 0.006818 0.003409 230 C1 0 4.95

1056 WATHBA 1414 MHWG 1 0.00145 0.01098 0.14375 0.00947 0.00442 230 C1 0 11

1056 WATHBA 1414 MHWG 2 0.00145 0.01098 0.14375 0.00947 0.00442 230 C1 0 11 SWITCH GEAR‐ADD

1056 WATHBA 1414 MHWG 3 0.00145 0.01098 0.14375 0.00947 0.00442 230 C1 0 11

1057 MCAA 1072 M12 1 0.000726 0.005682 0.073791 0.007576 0.003788 230 C1 0 5.5 NO. RATING VOLTAGE NO. RATING VOLTAGE

1057 MCAA 1414 MHWG 1 0.001199 0.010032 0.1258 0.01374 0.00627 230 C1 0 9.5 WATH 6 0 4 0 1 3 3X120MVA 132/33KV 0 0 0

1057 MCAA 1414 MHWG 2 0.001199 0.010032 0.1258 0.01374 0.00627 230 C1 0 9.5 MCAA 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

62.45 M12 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

MHWG 10 0 8 2 2 4 4X120MVA 132/33KV 0 0 0

MHWG Group 132kV Network-2015

Add Line TO Data baseExisting 

(km) New (km) 132KV ‐2015

1056 WATHBA 1067 NAHD 1 0.00066 0.005165 0.06708 0.006887 0.003444 230 C1 0 5

1056 WATHBA 1067 NAHD 2 0.00066 0.005165 0.06708 0.006887 0.003444 230 C1 0 5

1056 WATHBA 1067 NAHD 3 0.00066 0.005165 0.06708 0.006887 0.003444 230 C1 0 5 SWITCH GEAR‐ADD

1031 MOS1 1057 MCAA 1 0.000475 0.003719 0.0483 0.004959 0.002479 230 C1 0 3.6

1075 MCBB 1414 MHWG 1 0.000502 0.003926 0.050983 0.005234 0.002617 230 C1 0 3.8 NO. RATING VOLTAGE NO. RATING VOLTAGE

1075 MCBB 1414 MHWG 2 0.000502 0.003926 0.050983 0.005234 0.002617 230 C1 0 3.8 NAHD 6 0 4 0 1 3 3X120MVA 132/33KV 0 0 0

1066 MFRQ 1414 MHWG 1 0.00066 0.004993 0.06534 0.004304 0.002009 230 C1 0 5 MCBB 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

1066 MFRQ 1414 MHWG 2 0.00066 0.004993 0.06534 0.004304 0.002009 230 C1 0 5 MAFQ 5 0 4 0 1 4 4X80MVA 132/22KV 0 0 0

1072 M12 1075 MCBB 1 0.001822 0.014256 0.185147 0.019008 0.009504 230 C1 0 13.8

50

MHWG Group 132kV Network-2016

Add Line TO Data baseExisting 

(km) New (km)

1059 STDM 1414 MHWG 1 0.001162 0.009091 0.11806 0.012121 0.006061 230 C1 0 8.8 *

1059 STDM 1414 MHWG 2 0.001162 0.009091 0.11806 0.012121 0.006061 230 C1 0 8.8 *

* Could be used as 132KV TRANSFER LINKS BETWEEN SASN AND MHWG, NORMALY OPEN 17.6

MHWG Group 132kV Network-2017 132KV ‐2017

Removed Line from DatabaseSWITCH GEAR‐ADD

1056 WATHBA 1414 MHWG 3 0.00145 0.01098 0.14375 0.00947 0.00442 230 C1 11 Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

R TRANSFORMER REA/CAP RATING

Note: above circuit will be LI/LO into MFRQ S/S to form the following circuits NO. RATING VOLTAGE NO. RATING VOLTAGE

Add Line TO Data base KBAA 5 0 4 0 1 4 4X40MVA 132/11KV 0 0 0

Existing (km) New (km)

1058 KBAA 1414 MHWG 1 0.001254 0.009814 0.127457 0.013085 0.006543 260 C1 4.5 5

1056 WATHBA 1066 MFRQ 1 0.000792 0.006198 0.080499 0.008264 0.004132 260 C1 6 0

1058 KBAA 1066 MFRQ 1 0.00066 0.005165 0.067082 0.006887 0.003444 260 C1 0 5

10 132KV ‐2018

MHWG Group 132kV Network-2018SWITCH GEAR‐ADD

100 Mvar FCB

NO. RATING VOLTAGE NO. RATING VOLTAGE

NAHD 0 0 0 0 0 0 0 0 1 100MVAR 132KV

MHWG Group 132kV Network-2019-2020 MHWG 2 2X250MVA 132/24KV 2 2X(+250/‐100)MVAR 24

No Change

BC BAYPOWER TRANSFORMER REA/CAP RATING

Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAY

POWER TRANSFORMER REA/CAP RATING

Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable BAY GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table E15  Sheet 1 of 1

Page 116: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E16  132kV Cable and 132kV switchgear dataset variance in Shamkha Zone: 2013‐2020

TRANSMISSION LINES SUBSTATION

SMKG Group 132kV Network--2014 132KV ‐2014

SMKG will be commissioned

SWITCH GEAR‐ADD

SMKG Group 132kV Network-2015 NO. RATING VOLTAGE NO. RATING VOLTAGE

SMKH 10 0 6 2 2 3 3X120MVA 132/33KV 0 0 0

Add Line TO Data baseExisting 

(km) New (km) 132KV ‐2015

1065 SMKB 1416 SMKG 1 0.001584 0.012397 0.161 0.016529 0.008264 230 C1 0 12

1065 SMKB 1416 SMKG 2 0.001584 0.012397 0.161 0.016529 0.008264 230 C1 0 12

1065 SMKB 1416 SMKG 3 0.001584 0.012397 0.161 0.016529 0.008264 230 C1 0 12 SWITCH GEAR‐ADD

1064 FLCT 1416 SMKG 1 0.000924 0.007231 0.09392 0.009642 0.004821 230 C1 0 7 *

* 132KV TRANSFER LINKS BETWEEN SMKG AND BAHG, NORMALY OPEN 43 NO. RATING VOLTAGE NO. RATING VOLTAGE

SMKG Group 132kV Network-2016 SMKB 5 0 4 0 1 4 4X60MVA 132/22KV 0 0 0

No Change

SMKG Group 132kV Network-2017

Add Line TO Data base 132KV ‐2017Existing 

(km) New (km) SWITCH GEAR‐ADD

1065 SMKB 1076 FAYA 1 0.00132 0.010331 0.134165 0.013774 0.006887 260 C1 0 10

1065 SMKB 1076 FAYA 2 0.000792 0.006198 0.080499 0.008264 0.004132 260 C1 0 6 NO. RATING VOLTAGE NO. RATING VOLTAGE

16 FAYA 5 0 3 0 1 3 3X100MVA 132/33KV 0 0 0

SMKG Group 132kV Network-2018-2020

No Change

POWER TRANSFORMER REA/CAP RATINGCable BAY

GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable BAY

GEN BAY TR BAY BS BAYREA/CAP 

BAYBC BAY

POWER TRANSFORMER REA/CAP RATING

Cable BAY

GEN BAY TR BAY BS BAYREA/  CAP 

BAYBC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E16  Sheet 1 of 1

Page 117: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐E

Table‐E17  132kV Cable and 132kV switchgear dataset variance in Western region: 2013‐2020

TRANSMISSION LINES SUBSTATION

WESTERN REGON 132kV Network-2013

Add Line TO Data baseExisting 

(km) New (km) 132KV ‐2014

1502 SHPS 1508 SRBY 1 0.005366 0.00683 0.297 0.004293 0.005464 170 0 17

1502 SHPS 1508 SRBY 2 0.005366 0.00683 0.297 0.004293 0.005464 170 0 17

34 SWITCH GEAR‐ADD

NO. RATING VOLTAGE NO. RATING VOLTAGE

SRBY 4 0 3 0 1 3 3X40MVA 132/11KV 0 0 0

WESTERN REGON 132kV Network-2014-2020

NO CHANGE

POWER TRANSFORMER REA/CAP RATINGCable BAY

GEN BAY TR BAY BS BAYREA/  

CAP BAYBC BAY

TRANSCO/AMD/PNDD

June 2013 TRANSCO 20137YPS (2014‐2020) Table E17  Sheet 1 of 1

Page 118: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-F

Constraints and Constraint Volume

Page 119: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐F

S.N Interface Node Location UserVoltage 

(kV)

Gross Generation Connected (MW)

Constraint/risk

Constraint attributed to User Network 

(Yes/No)

Non‐Compliant 

Site

Non‐Compliance 

End

Constraint volume (MW)

Mitigation Measure

1 TANE 400kV grid station. Eastern region. TAPCO  400 1035

TANE 400kV grid station connected by two 400kV overhead line circuits. Constraint the generation for 400kV single‐circuit outage or during line maintenance. 

No 30 June 2017 475

Reinforce TANE 400kV grid station with additional 400kV overhead line circuits as part of 400kV overhead line reconfiguration works between Bahia‐TANE/TWPS (included in DB 2013) planned for completion by 30 June 2017.

2 TANE 400kV grid station. Eastern region. TAPCO  400 1035

TANE station auxiliaries are fed by two auxiliary feeder bays (connected to TANE 400kV bay 09 and 14). Constraint generation should one of these circuits be out of service. 

Yes × N/A 475 User constraint. User to rectify the plant design.

3 TWPS 400kV grid station. Eastern region. GTTPC (TAW A1) 400 1360

TAW A1 station auxiliaries are fed by two auxiliary feeder bays (connected to TWPS 400kV bay 21 and 33). Constraint generation should one of these circuits be out of service. 

Yes × N/A 800 User constraint. User to rectify the plant design.

4TWPS‐B 132kV substation (User equipment).

Eastern region. TAPCO  132 620High fault levels at TWPS‐B 132kV bus. TWPS‐B 132kV rated 40kA.

Yes × N/A 215

User constraint. Manage 132kV fault levels operationally by either operating one 400/132kV 275MVA transformer in isolation (open 132kV bus coupler) or constraint generation connected to TWPS‐B 132kV bus.

5 QDFA‐132kV substation. Northern Emirates. ESWPC 132 860

High fault levels at QDFA‐132kV bus and F1PS‐132kV bus. QDFA‐132kV bus and F1PS‐132kV bus rated 40kA.

Yes × N/A 240

User constraint. Manage 132kV fault levels operationally by either splitting QDFA and/or F1PS 132kV bus or constraint generation connected to F1PS and/or QDFA 132kV bus.

6Toshiba 33kV switchgear (user equipment).

Al‐Ain region. AMPC  33 125

High fault levels at Toshiba 33kV bus for intact system (with all machines connected to Toshiba, Siemens and CalorEmag; and 220/33kV transformers). 

Yes × N/A 70

User constraint. Manage 33kV fault levels operationally by despatching only two out of 5 machines connected to Toshiba 33kV switchgear.

 Table F1  Generation Constraints in Abu Dhabi Emirate ‐ Status as on 30 April 2013

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table F1   Sheet  1 of  1

Page 120: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐F

S.N Grid Station Name/Code Location Voltage (kV) Constraint/riskNon‐Compliant 

SiteOperational  Measures Permanent Mitigation Plans

1 TWPS 400kV grid station. Eastern region. 400High fault levels at TWPS 400kV bus. TWPS 400kV bus rated 63kA.  ×

Manage 400kV fault levels operationally by splitting TWPS 400kV busbar.

To be reviewed.

2BAAB, ASAB and BHSA 220kV grid stations.

Western region. 220220kV supplies are not secured for                                  N‐maintenance‐1 condition. 

ADCO/GASCO despatch generation at BAAB and ASAB sites during maintenance period or under N‐1.  

Constraint at BAAB and ASAB will be relieved after the establishment of 400/220kV grid station at Baab (BABG); 220kV switching station at Asab (ASBS) and related 220kV OHL works  planned to be completed by 30 June 2014. Economic case for reinforcing BHSA 220kV grid station with additional 220kV overhead line circuits currently appears weak.

3SILA, GTHY and LIWA 220/33kV grid stations.

Western region. 220220kV supplies are not secured for                                  N‐maintenance‐1 condition.  ADDC to transfer loads to other demand groups 

during maintenance period or under N‐1.  Economic case for reinforcing these 220/33kV grid stations with additional 220kV overhead line circuits currently appears weak.

4MHWG, SMHG and GNTT 220/33kV grid stations.

Eastern region. 220220kV supplies are not secured for                                  N‐maintenance‐1 condition.  ADDC to transfer loads to other demand groups 

during maintenance period or under N‐1.  

Constraint at MHWG 220/33kV grid station  will be relieved after the establishment of 400/132kV grid station and 132/33kV substation at Mahawi planned to be completed by 31 March 2014. Economic case for reinforcing SMHG and GNTT 220/33kV grid stations with additional 220kV overhead line circuits currently appears weak.

5

AHYG, KHZG, MZDG, AWGG and OUSH 220/33kV grid stations.

Al‐Ain region. 220

220kV supplies are not secured for                                  N‐maintenance‐1 condition. Currently, economic case for reinforcing these 220/33kV grid stations with additional 220kV overhead line circuits appears weak.

AADC to transfer loads to other demand groups during maintenance period or under N‐1.  

Economic case for reinforcing these 220/33kV grid stations with additional 220kV overhead line circuits currently appears weak.

6MHWG, WATH and MOSF 220kV grid stations.

Eastern region. 220Overload on 220kV OHL feeders (ICAD‐MOSF; UNPS‐MHWG; MOSG‐WATH) for N‐1.  × Split WATH and MOSF 220kV bus.

Constraint at MOSF grid station will be relieved after the replacement of the failed 400/220kV 500MVA transformer at MOSG planned by Q3/Q4 2015. Constraint at MHWG and WATH will be relieved after the establishment of Mahawi 400/132kV grid station and 132/33kV substations at Mahawi and Watbha planned for completion by 31 March 2014.

7SASN 400/132kV and UNPS 220/132kV grid stations.

Eastern region. 132

High fault levels at SASN, UNPS and SLTC 132kV bus when both SASN and UNPS generation in operation simultaneously. 

×

Manage 132kV fault levels by opening the low voltage side of 400/132kV 500MVA transformer at Sas Al Nakheel (SASN) among other measures such as splitting the downstream 132kV system, de‐coupling the 220kV network at Umn Al Nar to ensure the 132kV fault levels are within acceptable limits. 

Constraint will be removed after the retirement of UNPS generation planned in 2015/2017 and installation of NGRs at 132kV neutrals of 400/132kV 500MVA transformers at SASN. 

 Table F2  Main Interconnected Transmission System Constraints in Abu Dhabi Emirate ‐ Status as on 30 April 2013

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table F2   Sheet  1 of  1

Page 121: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐F

S.N Substation Name/Code Location User Voltage (kV)Intact Capacity 

(MVA)

Firm Capacity (MVA)

2013 forecast peak demand 

(MVA) 

Non‐Compliant Site

Non‐Compliance End

Max demand at risk (MVA)        

Refer Note‐1Non‐Compliance Mitigation Plan ‐ Refer Note 3

1 Shamkha (1SMK). Eastern region. ADDC 220/33 80 N/A 75 31 Dec 2014. 22

2 Shamkha (2SMK). Eastern region. ADDC 220/33 75 N/A 69 31 Dec 2014. NIL

3 Mafraq (LCMO).  Eastern region. ADDC 220/33 140 N/A 66 31 Dec 2015. 20

New Mahawi 400/132/33kV grid station works (N6462‐A) and related 400kV cable works (N6524); new 132/33kV substation at Watbha (N6384‐1A) and related 132kV cable works (N6485‐1) are currently in the execution stage. These works are expected to be completed by 31 March 2014. The Nahda 132/33kV substation (N12258‐2) and related 132kV cable works (N12291‐2) is currently under tender stage. The works are planned to be completed by 30 June 2015. The non‐compliance will be fully removed by 31 December 2015 assuming ADDC will be able to complete the 33kV load transfers to the new Nahda 132/33kV substation by then.

4 Hameem (HMMO). Western region. ADDC 220/33 100 N/A 19 N/A. 19Options are currently being reviewed by TRANSCO and ADDC for an economically justified solution in the medium to long‐term.

5 Qusahwira (QSWM). Western region. ADDC 220/33 100 N/A 4 N/A. NILADDC 33kV re‐supply arrangement from the ADCO's 220/33kV station (WAHA) is currently in the Tender stage. The work programme is 18 months from the LOA. The 33kV works are expected to be completed by 31 December 2014.  

6 Liwa West (LWST). Western region. ADDC 220/33 80 N/A 14 N/A. 9Options are currently being reviewed by TRANSCO and ADDC for an economically justified solution in the medium to long‐term.

7 Mussafah M12 (MICT). Eastern region. ADDC 132/11 2 x 40 40 38 30 June 2015. NIL

New 132/11kV substation works (N7204‐A) and related 132kV cable works (N6755, N6485.1) at Mussafah M12 are currently in the execution stage. The initial works (substation and atleast two 132kV cable circuits i.e. 1 circuit from MOS1 and 2nd circuit from MCAA) are planned to be completed by 30 June 2014. The non‐compliance will be fully removed by 30 June 2015.

8 Al Faya (3SMK). Eastern region. ADDC 220/33 80 N/A 11 31 March 2017. 11

New 400/132/33kV grid station works (N7110) and related 400kV overhead line works (N7150) at Shamkha are currently in execution stage. The works are planned to be completed by 30 June 2014. 

South Shamkha 132/22kV substation (N6976B‐1A1) and related 132kV cable works (N7022 & N12291‐1) is currently under final award stage. The works are planned to be completed by 31 March 2015. 

Faya 132/33kV substation (3x100MVA) and related 132kV cable works  is currently under planning stage and the same is included in development budget 2014. The works are planned to be completed by 31 December 2016. 

The non‐compliance will be fully removed by 31 March 2017 assuming ADDC will be able to complete the 33kV load transfers to the new 132/33kV substation by then.

 Table F3  Constraints at Demand Supply Exit Points in Abu Dhabi Emirate ‐ Status as on 30 April 2013

A)  Constraint category ‐ single circuit arrangement

33kV interconnection works between Shamkha1 (1SMK) and Shamkha2 (2SMK) 220/33kV grid stations is currently under execution as an interim measure to reduced the stranded demand at risk. TRANSCO is building a new 33kV switching station in Shamkha area (N‐12266) and these works are planned to be completed by August 2013.  As part of permanent mitigation plan, a new 400/132/33kV grid station works (N7110) and related 400kV OHL works (N7150) at Shamkha are currently in execution stage. As part of these grid station works include establishing new 132/33kV (3x120MVA) substation at Shamkha. The works are planned to be completed by 30 June 2014. The non‐compliance will be fully removed by 31 December 2014 assuming ADDC will be able to complete the 33kV load transfers to the new 132/33kV substation by then. 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table F3   Sheet  1 of  3

Page 122: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐F

S.N Substation Name/Code Location User Voltage (kV)Intact Capacity 

(MVA)

Firm Capacity (MVA)

2013 forecast peak demand 

(MVA) 

Non‐Compliant Site

Non‐Compliance End

Max demand at risk (MVA)        

Refer Note‐1Non‐Compliance Mitigation Plan ‐ Refer Note 3

 Table F3  Constraints at Demand Supply Exit Points in Abu Dhabi Emirate ‐ Status as on 30 April 2013

1 Market 1‐MKT1 (W1)  Abu Dhabi island. ADDC 132/11 4 x 40 120 61 NIL

2 Capital Gardens‐CPGR (E08)  Abu Dhabi island. ADDC 132/11 4 x 40 120 98 10

3 Firdous‐FRDS (E09)  Abu Dhabi island. ADDC 132/11 4 x 40 120 77 NIL

4 Zayed 2nd St‐ZYD2 (E11)  Abu Dhabi island. ADDC 132/11 4 x 40 120 93 10

5 Madinat Zayed‐MDZD (E04)  Abu Dhabi island. ADDC 132/11 4 x 40 120 108 10

6 Khalidiya‐KLDY (W09) Abu Dhabi island. ADDC 132/11 4 x 40 120 97 14

7Al Jazeira Hosp‐JZRH (W13) ‐             Refer Note 2

Abu Dhabi island. ADDC 132/11 3 x 40 + 24 104 86 NIL

8 Bateen‐BATN (W39)  Abu Dhabi island. ADDC 132/11 4 x 40 120 104 18

9 Bateen Bus Station‐BSTN (W17) Abu Dhabi island. ADDC 132/11 4 x 40 120 100 2

10 Beach‐BECH (E48)  Abu Dhabi island. ADDC 132/11 4 x 40 120 78 NIL

11 Al Salam‐ALSM (E18)  Abu Dhabi island. ADDC 132/11 3 x 40 80 62 NIL

12 Falah‐FLAH (E18/02)  Abu Dhabi island. ADDC 132/11 4 x 40 120 96 NIL

13 New Mushrif‐ MSHF (W24) Abu Dhabi island. ADDC 132/11 4 x 40 120 111 7

14 Embassy‐EMBS (W59)  Abu Dhabi island. ADDC 132/11 4 x 40 120 104 8

15 Higher Tech. College‐HTCO (E25)  Abu Dhabi island. ADDC 132/11 4 x 40 120 106 NIL

16 GLFA (W47)  Abu Dhabi island. ADDC 132/11 4 x 40 120 111 27

Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 March 2017. The non‐compliance will be fully removed by 30 June 2017. 

B)  Constraint category ‐ historical design wherein one more more transformers operated in independent mode

30 June  2017.

31 Dec  2018.

31 Dec  2017.

30 June  2018.

Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 October 2017. The non‐compliance will be fully removed by 31 December 2017. 

Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 March 2018. The non‐compliance will be fully removed by 30 June 2018. 

Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 October 2018. The non‐compliance will be fully removed by 31 December 2018. 

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table F3   Sheet  2 of  3

Page 123: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Attachment‐F

S.N Substation Name/Code Location User Voltage (kV)Intact Capacity 

(MVA)

Firm Capacity (MVA)

2013 forecast peak demand 

(MVA) 

Non‐Compliant Site

Non‐Compliance End

Max demand at risk (MVA)        

Refer Note‐1Non‐Compliance Mitigation Plan ‐ Refer Note 3

 Table F3  Constraints at Demand Supply Exit Points in Abu Dhabi Emirate ‐ Status as on 30 April 2013

17Salt & Chlorine (SLTC) ‐                        Refer Note 2

Eastern region. ADDC 132/11 40 + 2x24 48 42 NIL

18 S18 (JSRN)  Eastern region. ADDC 132/11 4 x 40 120 92 16

19 Khalifa A (MKAA)  Eastern region. ADDC 132/11 4 x 40 120 111 28

20 Watbha (WATH)   Eastern region. ADDC 220/33 2 x 100 + 2x140 2x100+140 276 31 Dec  2014. 42

21 Mahawi (MHWG)  Eastern region. ADDC 220/33 3 x 140 280 287 31 Dec  2014. NIL

22 Mussafah (MOS1)   Eastern region. ADDC 132/11 4 x 40 120 97 31 Dec 2018. 6Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 October 2018. The non‐compliance will be fully removed by 31 December 2018.

23 Mussafah (MOSG)  Eastern region. ADDC 220/33 3 x 140 280 254 30 June 2017. NIL

24 Shahama East (SHME)  Eastern region. ADDC 220/33 3 x 140 280 173 30 June 2017. NIL

25 Liwa (LIWA)  Western region. ADDC 220/33 3 x 100 200 126 30 June 2017. NIL

26 Sweihan (SWHG)  Al‐Ain region. AADC 220/33 2x80 + 140 160 97 30 June 2017. NIL

27 Al Salamat (SLMG)  Al‐Ain region. AADC 220/33 3 x 140 280 191 30 June 2017. NIL

28 Dahma (DHMG)   Al‐Ain region. AADC 220/33 3 x 80 160 145 30 June 2017. 6

29 City Centre (CTCG) Al‐Ain region. AADC 220/33 3 x 140 280 207 30 June 2017. NIL

30 Zakher (ZAKG)    Al‐Ain region. AADC 220/33 2x90 + 2x140 230 226 31 Dec  2015. 13

Currently intact capacity  of Zakher 220/33kV grid station is (2x140MVA) + (2x90MVA). Mitigation undertaken as part of new 220/33kV grid station at Zakher (N7733 & N7734) currently in the execution stage. The works are planned to be completed by 30 June 2015. The non‐compliance will be fully removed by 31 December 2015 assuming AADC will be able to complete the 33kV load transfers to the new 220/33kV grid station by then.

31 Sanaiya (SNYG) Al‐Ain region. AADC 220/33 3 x 140 280 226 30 June 2017. NILMitigation plan include installation of NERs and implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 March 2017. The non‐compliance will be fully removed by 30 June 2017. 

32 Al‐Wagon (AWGG) Al‐Ain region. AADC 220/33 3 x 80    160 85 31 Dec  2016. NIL

Mitigation undertaken as part of conversion of 220kV outdoor air insulated switchyard to indoor GIS works (N12311) planned to be completed by 30 June 2016.The non‐compliance will be fully removed by 31 December 2016 assuming AADC will be able to complete the 33kV load transfers to the new 220/33kV grid station by then.

New 132/33kV substation at Mahawi (N6462.A and N6524) and Watbha (N6384.A and N6485.1) are currently in the execution stage planned to be completed by 30 June 2014. The 132kV supply source for these new Mahawi and Watbha 132/33kV substations  will be from Mahawi 400/132kV grid station expected to be completed by 31 March 2014. The non‐compliance will be fully removed by 31 December 2014 assuming ADDC will be able to complete the 33kV load transfers to the new 132/33kV substations by then.

Note‐3: Mitigation proposals which are in the planning stage (i.e. Consultancy/Contracts not yet awarded) are subject to field survey and feasibility study report. The scope and schedule of such proposals are subject to change based on the outcome of the field survey and feasibility study report among other factors. Hence, non‐compliance end date for such sites is indicative only at this stage.

Mitigation plan include implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 October 2018. The non‐compliance will be fully removed by 31 December 2018.

31 Dec 2018.

Note‐2: Refers to the current intact capacity. Intact capacity at SLTC 132/11kV substation will be 3x40MVA after Q2 2014. Intact capacity at JZRH will be 4x40MVA after Q2 2015. 

Mitigation plan include installation of NERs and implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 March 2017. The non‐compliance will be fully removed by 30 June 2017. 

Mitigation plan include installation of NERs and implement aut‐close scheme.The works are  included in development budget 2014 planned for completion by 31 March 2017. The non‐compliance will be fully removed by 30 June 2017. 

Note‐1: Sites wherein 220/33kV or 132/11kV transformers operate in independent mode are NOT FULLY COMPLIANT to Transmission Security Standard. At these sites for N‐1, loss of supply > 5 minutes is expected for those Group demands connected from the transformers operating in independent mode.  However, supplies to the effected Group demands could be restored from a healthy transformer within/alternative demand supply points through distribution network re‐arrangement within half‐hour. The identified max. demand at risk is limited only to about half‐hour.  For those sites which belong to single circuit arrangement category, the identified max. demand at risk is that demand which will be subject to rota‐load shedding after re‐supplies are effected to the alternate demand supply points.  

TRANSCO/AMD/PNDD

June 2013 TRANSCO 2013 7YPS (2014‐2020) Table F3   Sheet  3 of  3

Page 124: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

Transco 2013 7YPS (2014-2020), Attachments

TRANSCO/AMD/PNDD June 2013

ATTACHMENT-G

Existing Major Generation Plants and Planned Major Committed Generation Projects

Page 125: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 1 of 8 Attachments

Attachment-G

A brief note on existing major generation plants and planned major committed generation projects

is described below. Other minor existing generation plants exist such as Madinat Zayed and Mirfa

in Western region, and Al-Ain Power Station in Al-Ain region which are operating as peaking

units.

Further information could be found on ADWEC website http://www.adwec.ae

A) Existing Generation Plants

Umm Al Nar/Sas Al Nakhl Plant

Arabian Power Company (APC) was established to purchase and rehabilitate the existing Umm

Al Nar Plant assets and build new electricity generating capacity and additional water

production capacity. Umm Al Nar Plant is located in the Emirate of Abu Dhabi at on Sas Al

Nakhl approximately 15 km to the east of Abu Dhabi City. Umm Al Nar Plant consists of

existing UAN East and UAN West Plants, and the newly build UAN B “Sas Al Nakhl“ Plant.

UAN East Plant consists of two BBC (now ABB) Gas Turbines (each 60MW) with HRSGs

(each 185 t/h), six Auxiliary Boilers (four boilers each 135 t/hr and two boilers each 160 t/h) and

three Italimpianti Multi-Stage Flash (MSF) distillers (each 7.5MIGD).

UAN West Plant consists of eight Babcock steam generators of (six boilers each 365 t/h and two

boilers each 660 t/h) in line with eight Skoda steam turbines (6x60MW and 2x150MW) as well

as eight multi stage flash desalination units, six IHI Units (each 4.6MIGD) and two SIDEM Unit

(6.4MIGD).

Page 126: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 2 of 8 Attachments

The New UAN B “Sas Al Nakhl“Plant has Five GE (PG 935IFA) Gas Turbines (each 215MW)

with HRSGs and two steam turbines (each 308MW). The New Desalination Plant consists of

two new Hitachi Zosen MSF units (each 12.68MIGD), five existing Hanjung (Doosan) MSF

units (each 12.56MIGD) and two existing SIDEM units of the Multi-effect Distillate (MED)

type (each 3.5MIGD).

The New UAN B “Sas Al Nakhl“ Plant has achieved Project Commercial Operation Date

(PCOD) on 21st July 2007 with total Net Power Generation Capacity of 1550MW and Net

Water Production Capacity of 94.4MIGD. The whole Umm Al Nar Plant has total Net Power

Generation Capacity of 2200 MW and Net Water Production Capacity of 143MIGD.

Taweelah A1 Plant

Gulf Total Tractebel Power Company (GTTPC) was established to purchase and rehabilitate the

existing Taweelah A1 Plant located in the Emirate of Abu Dhabi at the Taweelah Complex

approximately 80 km north-east of Abu Dhabi City, from the capacity of 221.25 MW/28.4 MGD

to its ultimate capacity of 1350 MW / 84 MGD on a build, own and operate basis. The Plant has

8 GE Frame 9 units (3 existing 9151E and 3 new 9171E) of about 100 MW each. Each GT has

its Heat Recovery Steam Generator (HRSG) fitted with supplementary firing. Steam from the

HRSGs is passed to three 3 Alstom backpressure steam turbines (each 200MW) with residual

low pressure steam being used in the desalination process.

The new desalination Plant consists of fourteen units, of the Multi-effect Distillate (MED) type,

each of 3.77 MIGD capacity giving together with the existing MSF units, each upgraded to 8

MGD, an overall capacity of 84 MIGD. The Plant has achieved Project Commercial Operation

Date (PCOD) on 30th April 2003.

Page 127: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 3 of 8 Attachments

Taweelah A2 Plant

Emirates CMS Power Company (ECPC) was established to build, own and operate the Al

Taweelah A2 combined cycle power and desalination plant located in the Emirate of Abu Dhabi

at the Taweelah Complex approximately 80 km north-east of Abu Dhabi City.

The power plant includes three (3) Siemens V94.3A.1 Gas Turbines, three (3) Heat Recovery

Steam Generators (HRSG's) and two (2) Steam Turbines. Water production is achieved from

four (4) Multi-stage Flash (MSF) distillers which are fed steam generated by waste heat from the

gas turbines. The A2 plant has the total Net Power Generation Capacity of 710MW and Net

Water Production Capacity of 50MIGD. The Plant has achieved Project Commercial Operation

Date (PCOD) on 9th October 2001.

Taweelah B Plant

Taweelah Asia Power Company (TAPCO) was established to purchase and rehabilitate the

existing Taweelah B Plant located in the Emirate of Abu Dhabi at the Taweelah Complex

approximately 80 km north-east of Abu Dhabi City. The B Plant consists of existing Initial B

Plant and B Extension Plant. The Initial B Plant consists of six Babcock steam generators of

Page 128: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 4 of 8 Attachments

(each 650t/h) inline with six steam turbines (ABB type DKE 2-1063 of each 146MW) as well as

six Fisia multi stage flash desalination units (each12.5MIGM capacity).

The Initial B Extension consists of two GE frame 9E gas turbines (each 97 MW) with Heat

Recovery Steam Generators (each 420t/h) connected to one back pressure steam turbine

(143MW) and three Multi-Stage Flash (MSF) distillers (each 7.7MIGD). The Taweelah B Plant

has total Net Power Generation Capacity of 1039MW and Net Water Production Capacity of

91.7MIGD.

Fujairah F1 IWPP

The Emirates SembCorp Water & Power Company (ESWPC) established the (F1) project plant

which is located at Qidfa near Fujairah on the Gulf of Oman coast. The power plant is

comprised of four gas turbines (GE frame 9E) with associated Heat Recovery Steam Generators

and two Steam Turbines. The water plant is comprised of five Multi Stage Flash distillers

(12.8MIGD) and one RO desalination plant (37.5MIGD). The Plant has total Net Power

Generation Capacity of 500MW and Net Water Production Capacity of 100MIGD.

Shuweihat S1 IWPP

The Shuweihat CMS International Power Company (SCIPCO) established the (S1) project plant

which is located at Jebel Dhana, near Shuweihat, 250 Km west of the city of Abu Dhabi. The

power plant is comprised of five Siemens V94.3A2 Gas Turbines with associated Heat Recovery

Steam Generators and two Siemens Steam Turbines providing total Net Power Generation

Capacity of 1500MW. The water island plant is comprised of six Multi Stage Flash distiller

units each with a design Net output of 16.67 MGD providing a total water output of 100 MGD.

The Plant has achieved Project Commercial Operation Date (PCOD) on 30th June 2005.

Page 129: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 5 of 8 Attachments

Taweelah A10 Plant

The Taweelah A10 Extension Project Plant shall be an extension of the Taweelah A1 Plant

located in the Emirate of Abu Dhabi at the Taweelah Complex approximately 80 km north-east

of Abu Dhabi City. The Project completed in May 2009 with additional Gross Power Generation

Capacity of 216.8MW (two GTs of GE9E) and Steam Production Capacity of 364.3 T/h (two

HRSGs) with 107.7bar and 539.2ºC. On completion of the project, along with the existing Initial

A1, Initial Extension and the Newly build A10 Plant the whole Taweelah A1 Plant shall have

the total Net Power Generation Capacity of 1592.6MW and Net Water Production Capacity of

84MIGD.

Taweelah New B Extension Plant

The Taweelah New B Extension Project plant shall be an extension of the existing Taweelah B

Plant (consisting of Initial B and New B) all together owned by the project company (TAPCO)

and is located in the Emirate of Abu Dhabi at the Taweelah Complex approximately 80km

north-east of Abu Dhabi City. The Project completed in July 2008 with total Net Power

Generation Capacity of 947MW (three Siemens V94.3A Gas Turbines with HRSGs and one

steam turbine) and Net Water Production Capacity of 68.4MIGD (four Multi stage flash

desalination units). On completion of the Project, along with the existing Initial B, New B and

the newly built New B Extension the whole Taweelah B Plant shall have the total Net Power

Generation Capacity of 2053MW and Net Water Production Capacity of 160MIGD.

Fujairah Plant Extension

The Fujairah Extension plant shall be an extension of the existing Fujairah IWPP Plant (F1)

located at Qidfa near Fujairah on the Gulf of Oman coast by installing one gas turbine including

HRSG and ancillary facilities. The Project completed in Feb 2009 with Net Power Generation

Capacity of 216.235MW and Net Water Production Capacity of 68.4MIGD. On completion of

the Project, along with the existing plant the whole Fujairah IWPP Plant shall have the total Net

Power Generation Capacity of 760MW and Net Water Production Capacity of 100MIGD.

Page 130: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 6 of 8 Attachments

Fujairah F2 IWPP

A new Greenfield power generation and water production plant (Adjacent to the existing

ADWEA Fujairah F1 plant) shall be implemented as an IWPP at Qidfa near Fujairah on the Gulf

of Oman coast. In July 2007, the PWPA was signed between ADWEC and Fujairah Asia Power

Company (FAPCO). The Project completed in July 2010 with total Net Power Generation

Capacity of 2000MW and Net Water Production Capacity of 130MIGD.

Shuweihat S2 IWPP

A new Greenfield power generation and water production plant (adjacent to existing S1 plant)

shall be implemented as an IWPP at Jebel Dhana, near Shuweihat, 250km west of the City of

Abu Dhabi. In July 2008, the PWPA was signed between ADWEC and Suez-Tractebel. The

Project achieved its commercial operation on 18 October 2011. Power station Shuweihat S2 has

a linced capacity of 1,627MW and produces 100MIGD.

Page 131: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 7 of 8 Attachments

Shams 1 Solar Power Plant

Shams 1 is developed, owned and operated by Shams Power Company PJSC, a special purpose

vehicle 60% owned by Masdar, 20% owned by Total and 20% owned by Abengoa. Shams 1 is a

100MW concentrated solar power (CSP) plant located south of the city of Madinat Zayed in the

Western region of the Abu Dhabi Emirate. Shams 1 is the largest concentrated solar power

project in the world. The plant was awarded in April 2009. The Plant was integrated to the

transmission system and achieved commercial operation in February 2013.

Shams 1, the first utility-scale commercial solar power project in the Middle East, will consist of

258,048 parabolic trough mirrors, 192 solar collector assembly loops with 8 solar collector

assemblies per loop, 768 solar collector assembly units, and 27,648 absorber pipes. It uses the

CSP technology and parabola shapes means that solar thermal electricity is generated by

focusing sunlight, concentrated by mirrors, reflects to heat a coolant which then generates high-

pressure steam to drive a steam turbine. This technology helps to create efficient, reliable and

clean electricity and will directly contribute to Abu Dhabi’s target of achieving 7 per cent

renewable energy power generation capacity by the year 2020.

Courtesy: Shams Power Company PJSC.

Page 132: 2013 Seven Year Electricity Planning Statement (2014 … · Attachments Table of Contents Attachment-A Electricity generation capacity expansion plan (existing and committed ... S.N

TRANSCO/AMD/PNDD TRANSCO 2013 7YPS (2014-2020) June 2013 Page 8 of 8 Attachments

B) Planned Committed Generation Projects

Shuweihat S3 IPP

In May 2011 a licence was issued to Shuweihat Asia Power Company (SAPCO) to generate

1,647MW at the Shuweihat 3 (S3) facility near Ruwais. This is the first IPP project in the

Emirate. The first phase of the project is scheduled to deliver 493MW in the summer 2013 and

scheduled to be fully operational by summer 2014.

Mirfa IWPP

The project will comprise several parts. The developer will own, develop, finance, construct,

operate and maintain a greenfield power plant which will have a capacity of 1,600MW of power

and 53MIGD of water. The first phase of the project is scheduled to deliver 850MW by summer

2015 and scheduled to be fully operational by summer 2016.

In addition to the greenfield work, the developer will be responsible for taking over certain

existing assets of Mirfa Power Company. It will also install four existing open-cycle gas

turbines, each with a capacity of about 100MW. The Federal Electricity & Water Authority

(FEWA) purchased the turbines from the US’ GE in February 2005 before they were transported

to Mirfa in 2009. The SPV will be responsible for integrating three 7.5 million g/d desalination

units, which were installed by Italy’s Fisia Italimpianti, into the new plant. The project will be

built at Mirfa, a site located around 120 kilometers from Abu Dhabi. It will be built within

ADWEA’s existing power and desalination complex. ADWEA is responsible for

decommissioning and demolishing its existing assets at the Mirfa site.

Barakah Nuclear Power Plant

On 27 December 2009, a consortium of firms led by the Korea Electric Power Corporation

(KEPCO) was selected as the Prime Contractor (PC) to design, construct and operate four power

generating units producing 1,390 MWe each. The first of the four units is scheduled to begin

providing electricity to Abu Dhabi and the UAE in 2017, with the three remaining units to be

completed by 2020. As the operating safety of the nuclear facilities is paramount to the

government, ENEC has decided to build KEPCO’s APR-1400 technology, a Generation III

reactor that meets the highest international standards for safety and performance. It is anticipated

that ENEC will deploy up to 5.56GW of nuclear capacity by 2020, completing a new unit every

12-18 months from 2017 onwards.