2013 COST SAVINGS AND
PROJECT UPDATE COST SAVING ITEM AMOUNT BUDGET YEAR IN BUDGET
Lighting Change through SMUD Rebate Program
$ 888 Annually
Ongoing
No
Workmen’s Compensation Insurance
$ 65,225 Annually
2013 – 2014
Yes
Liability Insurance $ 13,800 2013 – 2014 Yes Switch to VOIP Service for RMA Office
$ 3,900 Annually
Ongoing
Yes
Rental Income from RMA-Owned Homes
$ 17,941 Annually
2013
No
Identified CSD Over Charging on Water Bill
$ 8,600 One Time
2013
No
New Adjusted CSD Billing Reduced Sewer Charge for RMA Office
$ 1,476 Annually
Ongoing
Yes
Renegotiated Trash Carrier Contract
$ 2,446
Ongoing
No
Change Designation of Escuela Site to Common Area
$ 2,200
Ongoing
Yes
Renegotiated Bandwidth Contract Increasing Bandwidth by 275%
$ 28,080
2014 – 2017
Yes
ANNUAL SAVINGS $144,556
2
2013 PROJECT LIST AND
ACCOMPLISHMENTS
PERA PATH
The Pera Path was upgraded from a decomposed granite path to a paved path way.
ESCUELA PATH
3
The Escuela Park Site was improved with a 12-foot wide asphalt biking/walking/golf cart path running the perimeter of the Park.
RIVERVIEW PLAYGROUND
New swings and small play structure with sunshade and large play structure retro-fitted with shade sail.
HEADEND BUILDING
New siding was installed and painted. In August a fifth air conditioning unit was installed.
4
STONEHOUSE PARK STORAGE BUILDING
A new roof was installed and stucco was placed on the sides of the building. Injection pumps and barrels were installed to facilitate the maintenance of the park site turf.
5
STONEHOUSE PLAZA
6
The Stonehouse Plaza construction is moving forward with the ribbon cutting scheduled for Spring 2014.
TREE MITIGATION
Approximately 100 trees were planted in RMA Common Area which was funded by Sacramento County Tree Mitigation funds.
7
MAINTENACE BUILDING ROOF
The RMA Maintenance Building was re-roofed.
LAKE CLEMENTIA BOAT DOCK
The Lake Clementia boat dock was replaced and expanded.
8
CHESBORO LAKE BOAT DOCK
A concrete abutment was poured and the old Lake Clementia boat and swim dock was rehabilitated and placed at Chesboro Lake.
LAKE CLEMENTIA SWIM DOCK
9
A new swim dock was installed at Lake Clementia.
RIVERVIEW BICYCLE PUMP TRACK
RMA with a group of very dedicated volunteers constructed the Riverview Bicycle Pump Track. Pump track rules were developed and adopted.
RIVERVIEW SPRAY PARK
The Board is scheduled to take action at the November Board of Directors meeting on the Riverview Spray Park. Construction is scheduled for early 2014.
10
RMA COMMUNITY COOKBOOK
The RMA Community Cookbook was compiled with recipes from the residents and is now on sale. To date more than half the cookbooks have been sold.
COMMUNITY GARDENS
Additional gardening plots were added and a vole fence was installed. A booster pump was also installed to accommodate the growing demand for the gardening plots.
BACKUP CMTS
11
The CMTS is the brain that runs the Cable TV headend. If the CMTS fails, it would be catastrophic and could take weeks to replace and program. A new unit costs $55,000. RMA, through a donation and efforts on Paul’s behalf, has acquired and configured a backup CMTS which is now mounted and ready for action.
260-AMP SERVICE
Through a donation from Summerfest, RMA was able to install a new 260-amp service at Stonehouse Park – an upgrade that was sorely needed.
12
4TH OF JULY CELEBRATION
RMA Staff pulled off another stunning 4th of July celebration.
LAKE CLEMENTIA SWIM COVE
RMA Maintenance dredged the Lake Clementia Swim Cove removing debris which impedes swimmers.
13
RIVER ACCESS
RMA worked with the PTF, CSD and neighboring ranchers to reopen the river access.
SMUD LIGHT POLES
RMA Staff worked with SMUD in an attempt to acquire the street light poles in the community in order to provide better maintenance and lighting. Attempts to acquire the poles were unsuccessful. However, the end result was positive with SMUD reviewing their maintenance procedures and testing all 158 wooden poles. SMUD replaced 61 of those poles in 2013 with the balance to be replaced in 2014.
TENNIS COURTS
14
Staff had planned to replace the Riverview Tennis Courts in 2013. However as due diligence was conducted on the site via soil tests, the scope of the repair has changed from complete replacement to an overlay.
ESCUELA PARK PRACTICE FIELD
The grading permit delayed work on the site. The permit is being reviewed by Sacramento County.
ACCOUNTING UPDATED
15
Staff transitioned new accounting and payroll software.
ADOPTED NEW FINE POLICY RMA’s Board and Staff successfully adopted a fine policy.
COMMUNITY DIRECTORY The 2013 – 2014 Community Directory was compiled and delivered to the residents.
VOICE OVER INTERNET (VOIP)
The cable TV staff in conjunction with Z-corum has reconfigured the RMA Cable system to provide voice over the internet.
BUS TRIPS RMA Staff provided bus trips to San Francisco for shopping, the Giants’ baseball games and Stockton Thunder hockey games. The SF bus trip has already reserved four buses this year, which is twice as many as in the past.
REZONING OF ESCUELA SITE Staff accomplished the rezoning of Escuela Site from school to Stonehouse Park Master Plan.
INCREASED BROADBAND SUBSCRIBERS Staff increased Broadband subscribers from 882 to 1,030 (16.7%) over 12-month period.