2012 CAPITAL UPDATESUPER STORM SANDY 

and2013 –2017 CAPITAL PLAN

12/6/2012 CITY OF OCEAN CITY

Page 2: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

The Capital Financing Process

• The City Council adopts Bond Ordinances to establish the capital appropriations according to the capital plan

• The City borrows BAN's (Bond Anticipation Notes) in order to pay for the improvements based on the schedules of completion

• The City makes interest only payments on BAN's, which are temporary debt and can be borrowed for no longer than terms of 1 year

CITY OF OCEAN CITY December 6, 2012

Page 3: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

The Capital Financing Process

• Based on the City's debt service model, several years of BAN's are rolled into bond sales and become "permanently funded“

• When Bonds are sold the City then commences on a schedule to pay back principal and interest over a number of years

• This cycle then repeats itself based upon the next several years of capital plans and projects to be completed

• This capital plan is being formulated with a focus on four bond sales scheduled to occur between 2012 and 2020

CITY OF OCEAN CITY December 6, 2012

Page 4: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

2012 Budget

DEBT SERVICEBond Principal $5,980,000Bond Interest 1,942,940Note Interest (BAN’s) 152,125Baker Note Interest 180,000Green Acres 65,155

TOTAL $8,320,220

CAPITAL IMPROVEMENT FUND5% down payment on $10 mil $500,000CIF Ordinance (pay as you go)                 320,000

TOTAL $820,000

CITY OF OCEAN CITY December 6, 2012

Page 5: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Total Debt Service AnnuallyYear Debt Service % Increase

• 2006 $6,429,092 3.6%• 2007 $6,840,244 6.4%• 2008 $7,125,000 4.2%• 2009 $7,561,315  6.1%• 2010 $7,812,967   3.3%• 2011 $7,975,087 2.1%• 2012 $8,313,065 4.2%

AVERAGE =  4.27%

• 2013   $9,350,000   12% Increase (Estimated)

CITY OF OCEAN CITY December 6, 2012

Page 6: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Temporary/Unfunded Debt as of Today

Debt as of 12/6/12 $31,005,825Less Reimbursements:FEMA: Dunes & Geotubes ‐1,150,000Library‐ Remaining Debt ‐1,950,000

Subtotal   = $27,905,8252013‐2019 Capital Plans7 years @ $10 mil per 70,000,000

Total         =   $97,905,825

CITY OF OCEAN CITY December 6, 2012

Page 7: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Future Financing of Debt 2012‐2020

Total from previous slide $97,905,825

2012 Bond Sale 9,900,0002016 Bond Sale 27,000,0002019 Bond Sale 45,000,0002020 Bond Sale 24,000,000

$105,900,000

CITY OF OCEAN CITY December 6, 2012

Page 8: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

0

2000000

4000000

6000000

8000000

10000000

12000000

2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026

AN

NU

AL

DEB

T SE

RVI

CE

REQ

UIR

EMEN

TSCITY OF OCEAN CITY

EXISTING & FUTURE DEBT SERVICE REQUIREMENTS

Principal Interest Baker & Other BANS 2012 Issue 2016 Issue 2019 Issue 2020 Issue

EXISTING BOND PRINCIPAL

EXISTING INTEREST2012 ISSUE

2016 ISSUE

2019 ISSUE

2020 ISSUE

Page 9: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

2012 CAPITAL UPDATE

12/6/2012 CITY OF OCEAN CITY

Page 10: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BEACHFILL

This would occur in the Federal Project Area.  (North End near Seaspray Road to 36th Street).

Contract has been awardedScheduled to start after the 1st of the year

CITY OF OCEAN CITY12/6/2012

Beachfront Outfall Upgrades as part of Beachfill =  $671,880City Funding =  $167,970, State Funding =  $503,910

Page 11: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Phase 2:Simpson Road: North 

Street to Battersea 1st to St. Charles Alley and4th To Park Place Alley

Atlantic Ave. to the Beach 

5th To Brighton Alley11th and Pleasure Ave. Alley

Phase 3:Bayland Drive (South terminus to 28th Street) Valmar Court & Summer CourtWesley Avenue (29th Street to 27th Street)29th Street (Central Avenue to Wesley Avenue)Stormwater management facilities at the street ends 

29th, 28th , and 27thStreets

PAVING Contracts for Phase 2, 3 and 4 are complete:

12/6/2012 CITY OF OCEAN CITY

Page 12: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PAVING Contract for Phase 4 is complete

• Phase 4:• Asbury Avenue:  

– 45th to 42nd 

• 43rd Street:  – (the) Bay to Central Asbury Avenue:  

– 45th to 42nd 

• 43rd Street:  – (the) Bay to Central

12/6/2012 CITY OF OCEAN CITY

44th Street:  (the) Bay to Central 

45th Street – NorthSide:  West to Central

Asbury/Central alley:  47th to 46th Streets

Bulkhead Replacements 

15th Street4th Street6th Street

Page 13: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Bid Authorization scheduled for December 13th meetingPennlyn Place from Ocean Avenue to the Beach7th Street from West Avenue  to the Beach(except intersections)8th Street from West Avenue to Atlantic Avenue(except intersections)West Avenue 9th Street 8th Street 

UPCOMING PAVING 

CITY OF OCEAN CITY12/6/2012

Page 14: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

MP HVAC Replacement underway

City Hall A/C replacements and 6th FH boiler replacements, bid authorization scheduled for December 13th

PW Underground Storage Tank Remediation andPW Fueling Renovations Bid due December 18th

CITY OF OCEAN CITY12/6/2012

Completed Projects:MP Restroom Renovations Demolished the BellevueDemolished the AnnexFinished Tenn. Ave. Boat attendant building and closed out the grantEnergy Grants6th St. FH, City Hall, and 29th Street:  Water aerators, light sensors, and A/C condessor replacements for energy cost savingsSewer Lateral Replacements46th, 35th, and 18th Sts.

PUBLIC BUILDINGS

Page 15: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

RECREATION FACILITIES

Portable Rest Room completed at 11th St.

Fence at @ 6th & Baycompleted

Concept and Design of Carey Field and adjacent areas completed

CITY OF OCEAN CITY12/6/2012

Downtown Park completed at 9th and Asbury

Safety Netting completed

New sprinkler systems completed at variousgarden plots

5th and Bay Sports Lighting replaced

Page 16: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PARKING AND INTERMODAL TRANSPORTATION

Bike Racks PurchasedDowntown Holiday Decorations PurchasedNew Traffic Signal Installed at 5th and West

DEPARTMENTAL EQUIPMENT

Aerator/Seeder and a Turf Tractor was purchasedMP Chair Replacements were purchased911 Enhancement completed

CITY OF OCEAN CITY12/6/2012

Page 17: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

LARGE EQUIPMENT AND TRUCKS

Wheel Loaderwas purchased

Storm Truck Replacement is out to bid

CITY OF OCEAN CITY12/6/2012

Rehabilitation completed on the:

Load n PackBeach Tractor

Page 18: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

POST SANDY

DAMAGE AND REPAIRS

12/6/2012 CITY OF OCEAN CITY

Page 19: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

WAVERLY BEACH

Sand Loss due to Sandy 850,000 cubic yards = $10 million*

12/6/2012 CITY OF OCEAN CITY

*  STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES

Page 20: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

SAND LOSS *

LOCATION CYDS COST

Inlet-Terminal Groin to Bridge 5,000 $ 60,000

Terminal Groin to 14th Street 271,111 $3,253,333

14th Street to 34th Street 248,889 $2,986,667

34th Street South 323,556 $3,882,667

12/6/2012 CITY OF OCEAN CITY

*  STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES

Page 21: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Additional Outfall Repairs required at 7 Locations = $190,000

Additional Outfall Repairs Cost Confirmed by ACOE

12/6/2012 CITY OF OCEAN CITY

Page 22: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

Dune and Sand Fence Repairs = $10M*

12/6/2012 CITY OF OCEAN CITY

*  STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES

Page 23: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

DUNE REPAIRS

LOCATION COST

Inlet-Terminal Groin to Bridge $ 110,000

Terminal Groin to 14th Street $ 1,450,000

14th Street to 34th Street $ 3,100,000

34th Street South $ 3,300,000

12/6/2012 CITY OF OCEAN CITY

*  STILL WAITING FOR ACOE CONFIRMATION OF THESE FIGURES

Page 24: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BAY FRONT REPAIRS

Bayside

2nd and Bay Avenue

12/6/2012 CITY OF OCEAN CITY

Page 25: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BAYFRONT REPAIRS

• $    1,000

• $  11,400• $120,000

• $478,000

• $  60,000

12/6/2012 CITY OF OCEAN CITY

Cardiff Road Bulkhead Cap Repair

3rd Street Bulkhead Repair (temporary repair completed)Permanent Repair Required

2nd and Bay MarinaDock Damage Electric and Water Service

Bayside Dock Damage Concrete Damage Floating Docks

Page 26: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BOARDWALK‐‐BOARDWALK RAMPS‐‐STEPS

REPAIRS ESTIMATED AT $ 202,000

12/6/2012 CITY OF OCEAN CITY

Page 27: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BOARDWALK & ACCESSORY STRUCTURES

LOCATION COSTSTEPS:  5th , 7th, 8th, 10th,  54th Sts.:        

in‐house $    28,000RAMPS:  St. James, 2nd,  3rd, 6th, 

55th Sts.: in‐house $  110,000CROSS OVERS with RAMP:  

E. Atlantic And 58th St. $    17,000Boardwalk deck and 18 cribbing

locations: in‐house $    25,000Railing:  various locations $    22,000

12/6/2012 CITY OF OCEAN CITY

Page 28: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

RECREATIONAL FACILITIES

12/6/2012 CITY OF OCEAN CITY

52nd Street Golf Course

Page 29: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

RECREATIONAL FACILITIES

LOCATION COST34th Street Playground Surface,  Tennis Surface, and Restroom Deck $    40,000

Golf Course Netting and Fencing (Post & Rail) $    10,000

8TH St. Playground Surface    $    25,000

52nd St. Hockey Rink Assembly$    10,000

12/6/2012 CITY OF OCEAN CITY

Page 30: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• Bayside – Water Damage toPool House

– Garage 

• Estimated Building Damage Estimated at $15,000 or less

• Estimated BuildingContent Loss = $ 1,200

12/6/2012 CITY OF OCEAN CITY

Page 31: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

AIRPORT—GOLF COURSE PRO SHOP

• Runway/Taxiway Lighting & Signage 

• AWOS (weather station)• Store novelties • Security Cameras • Security Gate Control Equip. 

TOTAL = $ 170,000

• Pro Shop Repairs:– Still awaiting quote– Estimated at $10,000or less

• Building Contents– $3,000

12/6/2012 CITY OF OCEAN CITY

Page 32: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• MUSIC PIER DAMAGE

Window , Floor Repair Still awaiting cost estimateEquipment  Replacement =

$32,00012/6/2012 CITY OF OCEAN CITY

Page 33: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• CITY HALL DAMAGEBuilding Still awaiting cost estimateContents = $   250,000Document Salvage  =  $     67,000

12/6/2012 CITY OF OCEAN CITY

Page 34: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• TRANSPORTATION CENTER DAMAGE– Historic Structure Cost 

being developed for• Floor replacement• Wainscot Rehabilitation

• Restroom  Rehabilitation

• Office Rehabilitation

– Building Contents =• $16,000

Flood Level

12/6/2012 CITY OF OCEAN CITY

Page 35: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• VEHICLE MAINTENANCE DAMAGE:– Repair of Displaced Concrete Floor  =  $ 200,000– Building Contents  =    $   45,000

Water Level

12/6/2012 CITY OF OCEAN CITY

Page 36: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS—BEACH PATROL

12/6/2012 CITY OF OCEAN CITY

Total Beach Patrol Damages = $26,500

Page 37: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS—BEACH PATROL

12/6/2012 CITY OF OCEAN CITY

1st Street BeachPatrol

  Stanley Metal Security Doors‐Front & Side Entrance‐‐two $1,500Storage Sheds ( 10' Wide X 14' Deep X 10' High) Double doors ( 3' 1/4" each)  two $5,800

12th Street Beach Patrol

Storage Sheds ( 12' Wide X 12' Deep X 12' High) Double doors ( 3' doors) two $6,000Storage Sheds ( 11' Wide X 14' Deep X 8' High) Double doors ( 3' doors)‐‐ shared with OCPD $2,850

Siding Damage $1,000

Page 38: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS—BEACH PATROL

12/6/2012 CITY OF OCEAN CITY

34th Street Beach Patrol

Stanley Metal Security Door‐Front Entrance $   750Storage Shed ( 6' Wide X 14' Deep X 6' High) Single door ( 3' door) $2,500

58th Street Beach Patrol

Stanley Metal Security Doors‐Front & Side Entrance—two $1,500Storage Sheds ( 10' Wide X 12' Deep X 10' High) Double doors ( 3' doors)‐ two $5,600Roof Damage‐ Leaking in the Headquarters $1,500

Page 39: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS Community Center Damage

12/6/2012 CITY OF OCEAN CITY

Pool Pump Room Repairs = $7,500

(2) Lobby Areas Remediated = $3,000

Foundation Fill Replacement still under review

Page 40: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS29th Firehouse Damage

12/6/2012 CITY OF OCEAN CITY

Currently investigating cost benefit of repair vs. replacementBuilding Contents = $ 61,000

Page 41: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

• 46th Fire House, Post Office, and Beach Fee Office Damage

12/6/2012 CITY OF OCEAN CITY

Building Repairs = $25,000 estimated

Building Contents = $ 8,700

Page 42: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

• Traffic Signal Repairs by CMC: – 6th St. =  $ 47,000 (5)– 8th St. =  $ 43,000 (3)– 10th St. = $ 36,000 (4)– 14th St. = $ 25,782 (3)

Total = $151,782

12/6/2012 CITY OF OCEAN CITY

• Communication Repairs– WWAN = $   5,000– Alarms =  $52,900

INTERMODAL AND COMMUNICATIONS

Page 43: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

DAMAGES TO DATE

12/6/2012 CITY OF OCEAN CITY

$18,150,000 

$673,000 

$202,000 $85,000 

$170,000  $275,500  $200,000 

$151,782 

$57,900 

Beach

Bay Front

Boardwalk

Playgrounds/Golf Course

Airport

Buildings (Incomplete)

Parking

Traffic Signals

Communications

Page 44: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

2013—2016 Capital Plan

CATEGORY PROJECTS THAT INTERFACE WITH STORM RELATED REPAIRS AND/OR REPLACEMENTS ARE NOTED 

WITH AN ASTERISK

12/6/2012 CITY OF OCEAN CITY

Page 45: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BEACH AND BAY

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

ADA Beach Paths* $  15,000 $   15,000 $   15,000 $   15,000 $   15,000

Dune Fence* $   15,000 $   15,000 $   15,000 $   15,000

Beach Fill $750,000 $ 1,750,000 

Contingency $100,000  $150,000 $ 100,000 

Dredging $250,000 $ 500,000

TOTALS = $1.015M $ 130K $ 1.78M $180K $630K

Page 46: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PAVING DRAINAGE AND BULKHEADS

2013‐2014 Planned Funding Level = $5M

12/6/2012 CITY OF OCEAN CITY

Page 47: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

12/6/2012 CITY OF OCEAN CITY

2013‐2014Simpson/Haven alley 7th Street 6th StreetSimpson/Haven alley 5th Street 4th StreetSimpson/Haven alley 4th Street 3rd StreetCentral/Wesley alley 3rd Street 2nd Street2nd Street West Avenue Asbury Avenue2nd Street Asbury Avenue Atlantic Avenue3rd Street West Avenue Central Avenue3rd Street Wesley Avenue Atlantic AvenueHaven Avenue 3rd Street 2nd StreetHaven Avenue 4th Street 3rd StreetSimpson/Haven alley 3rd Street 2nd StreetMoore Avenue 8th Street 7th StreetPleasure Avenue 7th Street 6th Street

Page 48: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

12/6/2012 CITY OF OCEAN CITY

2013‐2014Bayonne Place Bay Avenue Pleasure AvenueHaven Avenue 17th Street 16th Street16th Street Bay West AvenueSunset Place Pleasure Avenue Bay AvenuePleasure Avenue 16th Street 14th StreetBay/Simpson alley 17th Street 16th Street14th Street Bay Bay Avenue15th Street Bay Bay AvenueBayview/14th alley Bay Avenue Prospect AvenueProspect Avenue 15th Street 14th Street

Page 49: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

12/6/2012 CITY OF OCEAN CITY

2013‐2014Asbury Avenue 42nd Street 39th StreetDrainage Pipes 41st, 40th, and 39th

40th Street West Avenue Asbury Avenue42nd Street West Avenue Central Avenue

NJAW and SJG Associated ImprovementsPelham Place ‐ SJG Atlantic Avenue Wayne AvenueSimpson Avenue ‐ NJAW 12th Street 11th Street

Page 50: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

12/6/2012 CITY OF OCEAN CITY

2013‐2014 Bulkheads

7th Street ‐ Bulkhead

16th Street – Bulkhead

Battersea Road ‐ Bulkhead

Tonga Harbor ‐ Bulkhead

Page 51: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PAVING, DRAINAGE AND BULKHEADS

12/6/2012 CITY OF OCEAN CITY

2014 2015 2016 2017

Paving

Drainage

Bulkheads

YEARLY TOTALS $5,000,000  $ 4,000,000  $ 5,000,000  $ 5,000,000 

Page 52: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

BOARDWALK

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Isolated Replacements $ 75,000 $   75,000 $   75,000 $   75,000 $   75,000

Reconstruction  Averages $1,700,000 per year 2014 through 2017

No new funding in 2013; 

2012 planned funding has not been expended

Page 53: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

4th St. LLS (interior) $200,000  $200,000 

New PS & Court Bldg @6th St. Design

 $550,000 $ 550,000 

Construction $2,000,000 $2,000,000 $2,000,000 

$2M/Yr. for 2 additional Years 2018 and 2019

Page 54: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

MP Fire Suppression, Downspouts, 

& Painting 

$    300,000

City HallGround Floor* $    220,000

HVACImprovement $  75,000

Page 55: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC BUILDINGS

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

6th Street FH $  75,000

29th St. FH * $510,000

PUBLIC WORKS

Fleet Maint.* $200,000

Storage Facilities $100,000 $150,000 

General $100,000 $100,000 $100,000 $100,000 $100,000

TOTALS = $ 2M $1.25M $2.75M $2.1M $2.1M

Page 56: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PUBLIC FACILITIES

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Fenton CareyFld. Track &playing Fld.

   $ 750,000 

General Property 

Improvements: Irrigation, Fencing, 

Landscaping

$ 100,000 $ 100,000 $ 100,000 $ 100,000 $ 100,000

Page 57: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

RECREATION FACILITIES

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

15th Street Playground$   100,000 

52nd Street Playground*

Safety Surface and Play Equip.

$150,000 

Fountains and Foot Baths

(Bdwk) $     25,000  $   25,000  $   25,000 

TOTALS =$ 225,000 $1,000,000 $ 125,000 $ 100,000 $ 125,000

Page 58: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PARKING & INTERMODAL

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Traffic Signal Installation: 

18th & Central$   150,000 

5th St. & the Beach ParkingLot Upgrade

 $ 220,000 

Moorlyn—8th

StreetConnector

 $ 300,000 

Page 59: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

PARKING & INTERMODAL

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Meter UpgradesAnd

Replacements *$  40,000 $  25,000 $  25,000 $  25,000

DowntownImprovements 

Multi‐year$  50,000 $  50,000

General $  50,000 $  50,000 $  50,000

TOTALS $560,000 $275,000 $125,000 $  75,000

Existing funds are available in 2013 for:Bike/Ped Improvements ($150k)

Downtown Improvements ($160K)

Page 60: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

DEPARTMENTAL EQUIPMENT

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Recreational $  20,000  $ 30,000 

Buildings & Grounds $  20,000  $ 10,000 

Music Pier$  50,000 

Public Works$  20,000  $  20,000  $  45,000  $  20,000 

CommunicationsAll Depts. RadioReplacements

 $  25,000  $  50,000  $ 125,000 $  75,000 

TOTALS =$  95,000 $ 70,000 $125,000 $160,000 $ 60,000

Page 61: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

LARGE EQUIPMENT, TRUCKS & REHAB

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Rehabilitation$    25,000  $   25,000  $  50,000 

PumperReplacement

 $  675,000 

33K DT w/SS Dump Body, Snow plow & Salt Sprdr

$ 160,000 $  175,000 

4 X 4 Mini Dumpw/SS DB, Snow

Plow & saltSpreader

   $  170,000 

Page 62: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

LARGE EQUIPMENT, TRUCKS & REHAB

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

66KHook LiftTruck with Snowplow & 

Salt Spreader $220,000

Mini Trash Packer $    80,000 

Hot Patcher $    60,000 Utility Body Pick 

Ups (2)$    50,000 

4WD Utility Body Pick Up with snow 

plow & Salt Spreader Insert

$    35,000  $  35,000 

Page 63: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

LARGE EQUIPMENT, TRUCKS & REHAB

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

4 X 4  Stake Body Crew Cab Beach 

truck$   35,000 

Load N Pack $ 185,000

Beach Tractor $   80,000 

4WD Extended Cab Pickup$   22,000 

4WD Pickup $  25,000 

Page 64: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

LARGE EQUIPMENT, TRUCKS & REHAB

12/6/2012 CITY OF OCEAN CITY

2013 2014 2015 2016 2017

Sweeper $ 185,000

Surf Rake $  75,000 

Mini 4x4 Ext Cab Pick Up $  25,000 

Mini Pickup $   22,000 

Mini Utility Vans (2)$       41,000 

TOTALS =$ 1,018,000 $497,000 $395,000 $460,000 $135,000

Page 65: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

12/6/2012 CITY OF OCEAN CITY

$3,735,000 

$24,000,000 

$7,175,000 

$10,205,000 

$1,575,000 

$1,035,000 $510,000 

$2,505,000 

5 YR. TOTALSBEACH & BAY

PAVING

BOARDWALK

BUILDINGS

RECREATION

INTERMODAL

DEPT. EQUIPMENT

LARGE EQUIPMENT

Page 66: 2012 CAPITAL UPDATE · 2012-12-11 · Demolished the Bellevue Demolished the Annex Finished Tenn. Ave. Boat attendantbuilding and closed out the grant Energy Grants 6th St. FH, City

5 YR. TOTALS

CATEGORY • BEACH & BAY   $                 3,735,000 • PAVING   $               24,000,000 • BOARDWALK   $                 7,175,000 • BUILDINGS   $               10,205,000 • RECREATION   $                 1,575,000 • INTERMODAL   $                 1,035,000 • DEPT. EQUIPMENT  $                    510,000 • LARGE EQUIPMENT   $                 2,505,000 

12/6/2012 CITY OF OCEAN CITY