53
2012 Business Plan September 2011

2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

2012 Business Plan

September 2011

Page 2: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

2

Mission

The mission of the Gwinnett County Department of Water Resources

is to enhance quality of life by providing excellent

water, wastewater, and stormwater services at the best possible value to our customers while preserving

natural water resources

Page 3: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

3

SWOT Analysis

• StrengthsTriple AAA ratingCredibility with regulatory agenciesBusiness-focused organizationIndustry leaderKnowledgeable staffCapacityDevelopment of advanced information systems

Page 4: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

4

SWOT Analysis

• Weaknesses Deteriorating stormwater infrastructureDebt service

Limited resources for training and skill development – bench strength

Page 5: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

5

SWOT Analysis

• Opportunities Permanent storage contract for net water withdrawalsContinue to optimize costs and improve performance and efficienciesOrganizational / staff realignmentEnvironmental initiatives: gas-to-energy, FOG, mitigation banking

Page 6: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

6

SWOT Analysis

• ThreatsWater warsStormwater fundingOverall economic environmentIncreasing cost of operations / maintenanceWeather extremes

Page 7: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

7

SWOT - Threat

Water Wars - What was the ruling ?

On June 28, 2011, a panel of the 11th

Circuit Court of Appeals ruled that LakeLanier was authorized for water supplyequal to other project purposes.

Page 8: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

8

SWOT - Threat

Water Wars - What was the ruling ?

The decision directed the Corps toquantify the amount of storage in thelake that can be used for water supplyunder the combined authority of threedifferent acts of Congress.

Page 9: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

9

SWOT - Threat

Water Wars – UpdatePhase 1 – Authorization

Alabama et al has appealed the panel’sdecision to the full 11th Circuit Court’sbench.

Phase 2 – Endangered SpeciesFlorida’s appeal of the District Courtdecision is awaiting further reports fromthe Fish and Wildlife Service

Page 10: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

10

2012 Budget Summary

Page 11: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

11

Operating Budget – Water & Sewer

Debt Service$95,935,371

34%

Transfer to R&E

$74,800,000 27%

Operating Expense

$107,942,434 39%

2012 Expense $278,677,805

Page 12: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

12

Operating Budget – Water & Sewer

Operating Expense

$107,942,434

Category $ %

General Operating Expenses

$47.9 M 17.2%

Personnel Services

$36.6 M 13.1%

Utilities $15.1 M 5.4%

Chemicals $8.3 M 3.0%

Page 13: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

13

Operating Budget – Stormwater

* In thousands

Debt Service$361,506

1%

Operating Expense

$10,156,849 34%

Transfer to R&E

$19,517,000, 65%

2012 Expense $30,035,355

Page 14: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

14

Operating Budget – Stormwater

Operating Expense

$10,156,849

Category $ %

General Operating Expenses

$5.3 M 17.8%

Personnel Services

$4.8 M 16.0%

Page 15: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

15

612

623

597587

576

550560570580590600610620630

2008 2009 2010 2011 2012

Operating Budget - Staffing

DWR Total

Authorized Positions

Page 16: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

16

Engage Gwinnett

The Departmentshould engage acollection agency toimprove its water andsewer fee collections

Penn Credit collection agencywas hired in 2009to collect past due

water and sewer receivables

$1.7M collected to date

Page 17: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

17

Engage Gwinnett

We fully support theDepartment’s plan ofavoiding future bondfunding by financing allfuture capital projects ona “pay as you go” basis

Gwinnett County completed a refunding 2003B Water & Sewer

Revenue Bonds in July 2011

Resulted in presentvalue debt savings

of $9.4M

Page 18: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

18

Engage Gwinnett

The Department needs todevelop a plan for funding thecost of repairing and replacingportions of the stormwaterinfrastructure that areexpected to fail within thenext 10 years.

A financial proformahas been developed

and funding levelshave been identified

to support required service levels forthe next 7 years

The Work Group recognizes this means incurring additional costs.

Funding alternativesare being explored

Page 19: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

19

Revenue Enhancements

Current water and sewer rate resolution:Water, effective January 1, 2012 $ 5.1MSewer, effective January 1, 2012 $10.6MTotal rate driven increase $15.7M

Other fees and charges ($0.8M)

2012 Total Water and Sewer $14.9Mrevenue increase

Page 20: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

20

Revenue Enhancements

$20,000 $40,000 $60,000 $80,000 $100,000 $120,000

2008

2009

2010

2011

2012

Transfer to R & EDebt ServiceOper Expenses

Page 21: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

21

Cost Savings

Initiatives– Closure of Jackson

Creek WRF

– Gas-to-Energy capture methane gas, generate electricity, Hill Plant

– FOG and High Strength Waste receiving station, Hill Plant

$ Results– Annual cost savings

~$500k

– Estimated annual electricity savings ~$400k

– Additional gas generation tipping fees ~$450k/yr

Page 22: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

22

Cost Savings

$3,700$3,900$4,100$4,300$4,500$4,700$4,900$5,100$5,300

Jan-

11

Feb-

11

Mar

-11

Apr

-11

May

-11

Jun-

11

Jul-1

1

GeneratorOn Line

Power from GridPer Million Gallon Wastewater Treated at FWHWRC

$ K

WH

r / M

G

Page 23: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

23

Cost Savings

Initiatives– Water Production,

Derceto management system

– Pump Station phase out program

– Plant Maintenance, effectiveness program, implementation 2012

$ Results– Estimated annual

electricity savings ~$325k

– Estimated annual cost savings ~$250k by 2015

– Annual savings ~$500k in 2012

Page 24: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

24

Cost Savings

800

850

900

950

1,000

1,050

1,100

1,150

2009 2010 2011

KW

Hr /

MG

Power Use Per Million Gallon Water Produced

DercetoStart Up

Page 25: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

25

Cost Savings

Initiatives– Large meter testing,

repair and replacement

– Small meter replacement schedule, from 10 to 15 years

– Sewer manhole, flood plain inspection and repair, reduction of inflow

$ Results– Annual increased revenue

~$1M

– Annual cost savings ~$400k

– Reduced treatment costs ~$300k per rain event

Page 26: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

26

Cost Savings

Initiatives– Non-revenue water

reduction initiatives

– Central warehouse surplus sales, eBay

– Customer service process automation, eBill notification and online forms

$ Results– Estimated cost savings

~$50k, increased revenue TBD

– Estimated cost savings ~$150k

– Annual cost savings ~$100k

Page 27: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

27

Cost Savings

Initiatives– Nutrient recovery

Hill plant, 2013 / 2014

– South Gwinnett wastewater exit DeKalb, 2013 / 2014

$ Results– Annual cost savings

~$350k– Annual revenue

~$250k

– Annual cost savings ~$750k

– Avoid capital costs of $50M+

Page 28: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

28

Cost Savings

$1,218

$1,600

$0$200$400$600$800

$1,000$1,200$1,400$1,600$1,800

Gwinnett CountyWRF's

DeKalb CountyPole Bridge

Gwinnett CountyWRF's DeKalb CountyPole Bridge

O&M Cost Wastewater Treated in 2010$ / MG

Page 29: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

29

2012 Capital Budget

Page 30: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

30

Capital Budget – Water & Sewer

2012 2013 2014 2015 2016 2017Budget Budget Budget Budget Budget Budget

Sources of Funds2008 Bonds2009 BondsGEFA/StimulusInternal Funding 108,297,881 91,645,065 107,283,761 125,144,000 127,804,000 126,889,000Total Source 108,297,881 91,645,065 107,283,761 125,144,000 127,804,000 126,889,000

Use of FundsWater Treatment 9,250,000 10,100,000 2,500,000 2,500,000 4,500,000 4,500,000Water Distribution 9,870,000 9,985,000 13,550,000 10,000,000 11,000,000 12,500,000Wastewater Treatment 48,918,615 16,850,000 28,900,000 39,700,000 26,700,000 24,700,000Wastewater Collection 16,000,000 20,950,000 22,300,000 16,025,000 16,800,000 14,850,000General Plant 19,542,155 32,760,065 39,033,761 55,919,000 67,804,000 69,339,000Utility Relocation 4,717,111 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000Total Use 108,297,881 91,645,065 107,283,761 125,144,000 127,804,000 126,889,000

Page 31: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

31

Trends – Capital Budget

$0$50

$100$150$200$250$300$350

2008

2009

2010

2011

2012

2013

2014

2015

2016

2017

Capital Budget

Debt Service

Page 32: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

32

$0

$20,000

$40,000

$60,000

$80,000

$100,000

$120,00020

08

2009

2010

2011

2012

2013

2014

2015

2016

2017

2018

2019

2020

2021

2022

2023

2024

2025

2026

2027

2028

2029

2030

* In thousands

Over $100M

Trends – Debt Service

Page 33: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

33

Capital Budget – Water & Sewer

Project Description• Consolidate multiple smaller

WRF’s with high unit costs and replace their capacity at Yellow River for economy of scale

• BNR/MBR treatment process is the latest technology in water reclamation

• On-line in 2011, final completion and warranty period in 2012

Yellow River WRF ImprovementsConstruction Manager at Risk

2012 Budget $22.5MTotal Project $277.3M

Page 34: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

34

Capital Budget – Water & Sewer

Project Description• Current work includes new

headworks and influent pump station, 2011

• Upcoming maintenance facility and operations center, 2012

• Future plant improvements, 2016 and beyond

Crooked Creek WRF Improvements

Pizzagalli Construction Company

2012 Budget $10.0MTotal Project $69.5M

Page 35: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

35

Capital Budget – Water & Sewer

Project Description• Centralize solids handling and

utilize anaerobic digestion as an energy recovery option

• Thickener improvements, 2012• Primary clarifier and scum

removal, 2012• Digestion capacity to be added

by 2016• Studying nutrient recovery, solar

drying, co-generation of biogases

Biosolids ProgramF. Wayne Hill WRC

2012 Budget $8.0MTotal Project $101.5M

Page 36: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

36

Capital Budget – Water & Sewer

Project Description• Replacement projects for over

3400 miles of water distribution pipe maintained

• Ensure reliability of water system• Reduce unscheduled water

outages• Currently, 40 sub-projects in

program• Range from 6” PVC to 48” PCCP• Prioritized based on break

history, pipe material and consequence of failure

Water Distribution Rehabilitation Program

2012 Budget $7.0MTotal Project $47.2M

Page 37: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

37

Capital Budget – Water & Sewer

Project Description• Maintain and rehabilitate 230

sewer pump stations• Prevent sanitary sewer overflows• Increase reliability• Ensure pump station capacity• Currently, 22 sub-projects in

program• Includes equipment replacement,

operational upgrades, odor control and assessments

Pump StationRehabilitation Program

2012 Budget $6.3MTotal Project $37.0M

Page 38: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

38

Capital Budget – Water & Sewer

Project Description• Replacement projects for over

2600 miles of gravity sewer and 288 miles for force mains maintained

• Currently, 14 sub-projects in program

• Prioritized based on condition, remaining useful life, cost, and capacity

Sanitary Sewer Collection Renewal / Replacement

2012 Budget $3.0MTotal Project $18.5M

Page 39: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

39

Capital Budget – Water & Sewer

Page 40: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

40

Capital Budget – Water & Sewer

Page 41: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

41

Capital Budget – Water & Sewer

Page 42: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

42

Capital Budget – Water & Sewer

Project Description• Mini business case evaluations

done on new candidates to determine payback period

• Currently, 13 of 234 pump stations earmarked for evaluation

• 1 project in construction• 6 projects in easement acquisition• Reduce operational costs

• Target 2015• $250k annual savings

• Reduce risk of failure, increase reliability

Pump Station Phase Out Program

2012 Budget $0.75MTotal Project $9.25M

Page 43: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

43

Capital Budget – Water & Sewer

Project Description• Old contract with DeKalb for

conveyance and treatment• 2 projects will bid in 2012 to

return flows back to Gwinnett• Avoid DeKalb capital costs

+$50M and monthly operating costs

• Take advantage of Gwinnett’s available capacity

South Gwinnett Project

2012 Budget $2.7MTotal Project $25.7M

Page 44: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

44

Capital Budget – Water & Sewer

Project Description• On-site permanent standby

generators• Lanier Filter Plant and Shoal

Creek Raw Water Intake• Address power and grid failure• Level of service commensurate

with neighboring utilities

Water Production Standby Generators

2012 Budget $6.0MTotal Project $15.8M

Page 45: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

45

Capital Budget – Water & Sewer

Project Description• Funding source for future assets• Results from master planning,

operational necessity, specific needs

• Major Activity Center Upgrades, in support of the Unified Plan, $11.6M

• Infrastructure pending water wars litigation outcome, $40.5M

Capital Needs Pending Business Case Evaluation

2012 Budget $2.5MTotal Project $104.1M

Page 46: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

46

2012 2013 2014 2015 2016 2017Budget Budget Budget Budget Budget Budget

Sources of FundsGEFAGrantsInternal Funding 30,126,467 19,246,737 20,036,535 20,427,060 20,845,000 21,975,000Total Source 30,126,467 19,246,737 20,036,535 20,427,060 20,845,000 21,975,000

Use of FundsStorm Drainage Improvements 16,568,787 15,341,334 18,594,465 18,824,108 19,077,762 20,977,762Watershed Improvements 100,000 150,000 150,000 150,000 150,000 150,000Dam Rehabilitation 250,000 250,000 250,000 250,000 250,000 250,000General Plant 13,207,680 3,505,403 1,042,070 1,202,952 1,367,238 597,238Total Use 30,126,467 19,246,737 20,036,535 20,427,060 20,845,000 21,975,000

Capital Budget – Stormwater

Page 47: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

47

Capital Budget – Stormwater

Project Description• 15 Major Category I Dams• 12 completed• 1 in permitting• 2 in design• Remote monitoring

installation

Dam Upgrade and Rehabilitation

2012 Budget $250kTotal Project $250k/yr

Lake Waterton Dam 2011

Page 48: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

48

Capital Budget – Stormwater

Project Description• Pipe replacement

• Pipe lining• Exploring new methods

and new products

Pipe Upgrade and Rehabilitation

2012 Budget $19MTotal Project $19M/yr

Cloister Place Lining

Lake RidgeTerrace

Replacement

Page 49: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

49

Capital Budget – Stormwater

Program Description• Meet Ga Water Quality

Standards • Maintain compliance with

wastewater permits• Restore damaged streams

to reduce bank erosion• Restore habitat, fish and

aquatic communities

Watershed Improvement Program

2012 Budget $6 MTotal Program $6 M/yrLake Claiborne

Stream Restoration and Stormwater BMP

Page 50: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

50

60.00

70.00

80.00

90.00

100.00

110.00

120.00

JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC

20072008200920102011

50

Trends – Water Production

MGD, through August 29, 2011

Page 51: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

51

Summary

• Reduced CIP from $1.124B to $641M– Focus on maintaining infrastructure

• Cost reduction initiatives – $3.6M in 2011– $2M for 2012 and beyond

Page 52: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

52

Summary

• 2012 Budget Targets – Supports debt service

– Support pay-as-you-go

– Supports operating expense levels

Page 53: 2012 Business Plan · Current water and sewer rate resolution: Water, effective January 1, 2012 $ 5.1M Sewer, effective January 1, 2012 $10.6M Total rate driven increase $15.7M Other

53

Department of Water ResourcesSeptember 2011