9
Chelsea Mei Lee

2011 Worksamples

Embed Size (px)

DESCRIPTION

Selected projects architecture and design.

Citation preview

Page 1: 2011 Worksamples

Chelsea Mei Lee

Page 2: 2011 Worksamples

Chelsea Mei [email protected]

www.chelseamlee.weebly.com

Barclay and Crousse_Lima, Perúhttp://www.barclaycrousse.com/

09.2011-present_architecture intern

Habitat for Humanity_Bridgeport, Connecticut, USAhttp://www.habitatcfc.org/

09.2010-07.2011_construction and volunteer manager

Hope for Ariang_Ariang, South Sudanhttp://hopeforariang.org/

12.2011_freelance 3D vizualization

Carlton Architecture_New York, New York, USAhttp://www.carltonpc.com/

11.2010-05.2011_junior designer

Operation Helping Hands_New Orleans, Louisiana, USAhttp://www.ccano.org/programs/operation-helping-hands/

05.2009-08.2009_construction and volunteer manager

KSI Architecture and Planning_Seattle, Washington, USAhttp://www.ksiarchitects.com/

07.2008-08.2008, 06.2007-07.2007_architecture intern

EXPERIENCE

EDUCATION

MARCH_Tulane University, New Orleans, Louisiana, USA09.2005-05.2010

LEED Acredited_USA, 2009

Tulane Architecture Rome Program_Rome, Italy09.2008-12.2008

Tulane Architecture Japan Program_Southern Japan travel_New Orleans studio05.2008-07.2008

Universidad Internacional del Menendez Playo_Santander, Spain07.2004-08.2004

Proficiency: Auto-CAD, Archicad, Revit, Rhino, Flamingo Renderer, Maxwell, Artlantis, Adobe: Photoshop, Acrobat, Illustrator, and InDesign.

Working knowledge: Maya, XSI, Vray, Sketch-UP. Languages: English_native, Spanish_advanced

Page 3: 2011 Worksamples

Schematic Design

single family home_Ica, Perú

This project is currently in the beginning design phases and will soon be presented to the client. I have been responsible for the architectural drawings, virtual model, and renderings.

practiceBarclay & Crousse_PUCP Science and Architecture Library 2012.

Page 4: 2011 Worksamples

Visual Presentation for Contest Entry

Universidad de Ingeniería y Tecnología_Lima, Perú

Participated in visioning design and produced several presentation drawings and images for final contest submission.

practiceBarclay & Crousse_UTEC Campus Building 2011.

Page 5: 2011 Worksamples

Visual Presentation for Contest Entry

Pontificia Universidad Católica del Perú_Lima, Perú

For this project I became envolved at the stage of presentation, readying images and drawings for the entry boards.

practiceBarclay & Crousse_PUCP Science and Architecture Library 2011.

Page 6: 2011 Worksamples

Made of recycled paper pulp, this blossom’s petals were individually formed on wine bottles and hand dyed. With a hard coat satin finish, the blossom emits a soft glow.

glowblossom of light 2011.

Page 7: 2011 Worksamples

Constructed from construction refuse, these dresses were produced for the Hearts and Hammers Gala, the primary fundraising event of Habitat for Humanity in Coastal Fairfield County, Connecticut.

constructfashion for funds 2011.

Page 8: 2011 Worksamples

terra BONDThesis Project _ Social cohesion through shared experience 2010.

Thompson Hayward Chemical Plant closed 1982

AIR CONTAMINATION

GROUND CONTAMINATION

Lafarge Cement Yard

Program Occupation by Time

Elevating Eye-Level | Raising Ground

T I M E

O

C

C

U

P

A

T

I

O

N

Plan View 8 am 10 am 12 pm 2 pm 4 pm 6 pm 8 pm 10 pmkindergarten elderly teen adult

To strengthen a community suffering from pollution and disrepair by establishing connections through shared experience. Here landscape serves dual purposes: remediating pollution and catalyzing intergernerational interface to achieve a community of investment and ownership.

Kindergarten + Community CenterThesis Project . Spring 2010

Gert Town, New Orleans

night rendering (above) dining hall (below)

Landscape Interaction

germination pots - planted by kindergarten, placed by teens

hanging tomatoes at kindergarten enterance mock-up of vegetated screen and hanging tomatoes community garden and vegetated screen for dining hall

10’

30’

50’

70’

90’

110’

50

AIR CONTAMINATION

GROUND CONTAMINATIONEARTH BERM:Creates areas of depositionProtection from polluted soil

WINDBREAK:Slows and filters air of particulatesCreates solidified mass protecting from contaminated soils

WIND SCREEN:Filters air of particulatesRe-establish a healthy soil base

Page 9: 2011 Worksamples

reOCCUPY Bayou Bienvenueyear 5 . Fall Semester 2009

Working with the Make It Right organization, 6 studentsworked for 6 weeks on a proposal for rehabilitatingthe bayou and renewing interest in the area. A fund-rais-ing installation of ‘pink houses’ using the samematerials as the original Make It Right installation isused to raise money for replanting the bayou wetland.As funds become avialabe, pavilions are to be placed inthe water as un-programed access points.

What happens ‘meanwhile’?

CAFF

IN A

VE.

vinessteel framewood slats

pink fabric expanded metal

reOCCUPY

buildurbanBUILD _ Make It Right 2009.

CAFF

IN A

VE..