2010 Resource Entitlement Statement for Schools The School Resource Entitlement Statement indicates the resources schools received for: Industrial Entitlements (Authority of Certified Agreement) - the resources that are mandated as part of the Arbitrated Enterprise Bargaining Award. Commonwealth and State Government Initiatives (Authority of State & Commonwealth Ministers) - the resources required to support students with special needs and resources specific projects from both State and Commonwealth Governments. Discretionary Allocations (Authority delegated to the Chief Executive of DECS) and Additional Approved Funding - discretionary allocations made to schools as part of the staffing process or in recognition of special circumstances such as power charges for those schools not on the electricity grid or those schools hosting other DECS offices. Please refer to the 2010 School RES Notes for more information. These are the final versions of the 2010 Resource Entitlement Statements that have been issued to schools. In a small number of cases there may be some aspects of the statements still under discussion with schools. Any further adjustments will be reflected in the 2011 statements. Not all school funding appears on the Resource Entitlement Statements. Funding for some corporately managed, Regional Office or Commonwealth programs is provided outside of the Resource Entitlement Statement process. Produced by: Site Finance and Resource Services

2010 Resource Entitlement Statement for Schools · CPC Administration Grant $1,225.85 CPC Operating Grant $1,257.86 TOTAL Grants $2,483.71 Grants CPC School Services Officer 11.250

Embed Size (px)

Citation preview

2010 Resource Entitlement Statement for Schools

The School Resource Entitlement Statement indicates the resources schools received for:

Industrial Entitlements (Authority of Certified Agreement) - the resources that are mandated as part of the Arbitrated Enterprise Bargaining Award.

Commonwealth and State Government Initiatives (Authority of State & Commonwealth Ministers) - the resources required to support students with special needs and resources specific projects from both State and Commonwealth Governments.

Discretionary Allocations (Authority delegated to the Chief Executive of DECS) and Additional Approved Funding - discretionary allocations made to schools as part of the staffing process or in recognition of special circumstances such as power charges for those schools not on the electricity grid or those schools hosting other DECS offices.

Please refer to the 2010 School RES Notes for more information. These are the final versions of the 2010 Resource Entitlement Statements that have been issued to schools. In a small number of cases there may be some aspects of the statements still under discussion with schools. Any further adjustments will be reflected in the 2011 statements. Not all school funding appears on the Resource Entitlement Statements. Funding for some corporately managed, Regional Office or Commonwealth programs is provided outside of the Resource Entitlement Statement process. Produced by: Site Finance and Resource Services

Report Run:22/06/2011

Primary M/S Strategy Teacher Professional Learning $19,824.00

Special Education - Students with Learning Difficulties $9,926.55

Early Assistance Grant $4,978.00

Early Years Literacy and Numeracy $9,446.00

TOTAL Whole School Literacy & Numeracy Grants $44,174.55

Whole School Literacy & Numeracy Grants

Training and Development $617.86

School Support Grant $18,021.66

Furniture Replacement $1,747.40

TOTAL Grants $20,386.92

Grants

TOTAL Part 4: Grants $64,561.47

Part 4: Grants

ACEO1 0.700 $25.50 $928.20

TOTAL Additional Allocations $928.20

Additional Allocations

SSO1 69.000 $25.02 $89,771.76

SSO2 32.000 $29.85 $49,670.40

TOTAL Industrial Entitlement $139,442.16

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $140,370.36

Part 2: Ancillary Staffing

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $8,300.00

Flexible Initiatives Resourcing 0.560 $85,893.00 $48,100.08

Additional Admin Leadership Time 0.320 $85,893.00 $27,485.76

Mainstream D $18,708.00

ESL Teacher/s 0.060 $85,893.00 $5,153.58

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $202,229.72

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 3.000 $91,830.00 $275,490.00

Teachers 8.350 $85,893.00 $717,206.55

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 61.000 $352.00 $21,472.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,279,273.70

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,481,503.42

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Crafers Primary School ( 0107 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $64,561.47

Part 6: Supplementations $43,300.86

Part 5: Utilities & Maintenance $89,247.97

TOTAL Others $197,110.30

Others

Teacher (DAYS) Supplementation 66.500 $23,408.00

Teacher (DAYS) 61.000 $21,472.00

Ancillary (HRS) 101.700 $140,370.36

Teacher (FTE) 15.940 $1,460,031.42

TOTAL Staffing $1,645,281.78

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,842,392.08

SUMMARY

Breakdown Maintenance - Prior Years $29,029.00

SSO Special Education $2,417.00

TRT Over-entitlement 66.500 $352.00 $23,408.00

Flu Vaccinations $207.00

Leadership Reconfiguration $7,479.74

Prior Year Reconciliation $4,168.12

TOTAL Supplementations $66,708.86

Supplementations

TOTAL Part 6: Supplementations $66,708.86

Part 6: Supplementations

Waste $3,186.03

Breakdown Maintenance $22,583.15

Water $3,269.55

Telephone $3,143.87

Cleaning $37,072.36

Energy $19,993.01

TOTAL Utilities & Maintenance $89,247.97

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $89,247.97

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Energy $10,025.81

Cleaning $30,099.50

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $8,260.00

Special Education - Students with Learning Difficulties $5,991.44

Early Assistance Grant $2,755.00

Early Years Literacy and Numeracy $4,834.00

TOTAL Whole School Literacy & Numeracy Grants $21,840.44

Whole School Literacy & Numeracy Grants

Training and Development $303.29

School Support Grant $8,758.15

Furniture Replacement $781.69

TOTAL Grants $9,843.13

Grants

TOTAL Part 4: Grants $31,683.57

Part 4: Grants

ACEO1 3.500 $25.50 $4,641.00

TOTAL Additional Allocations $4,641.00

Additional Allocations

SSO1 20.500 $25.02 $26,671.32

SSO2 37.500 $29.85 $58,207.50

TOTAL Industrial Entitlement $84,878.82

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $89,519.82

Part 2: Ancillary Staffing

Mainstream A $5,395.00

Mainstream D $4,677.00

Flexible Initiatives Resourcing 0.200 $85,893.00 $17,178.60

Additional Admin Leadership Time 0.110 $85,893.00 $9,448.23

ESL Teacher/s 0.030 $85,893.00 $2,576.79

Extra Administration Time 0.100 $85,893.00 $8,589.30

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $47,864.92

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.220 $85,893.00 $276,575.46

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 26.000 $352.00 $9,152.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $486,487.46

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $534,352.38

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Echunga Primary School ( 0123 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $56,220.05

Part 6: Supplementations $7,754.42

Part 4: Grants $31,683.57

TOTAL Others $95,658.04

Others

Teacher (FTE) 5.660 $525,200.38

Ancillary (HRS) 61.500 $89,519.82

Teacher (DAYS) 26.000 $9,152.00

TOTAL Staffing $623,872.20

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $719,530.24

SUMMARY

Prior Year Reconciliation $6,082.92

Flu Vaccinations $184.00

SSO Special Education $1,487.50

TOTAL Supplementations $7,754.42

Supplementations

TOTAL Part 6: Supplementations $7,754.42

Part 6: Supplementations

Water $924.44

Breakdown Maintenance $11,746.61

Telephone $1,923.62

Waste $1,500.07

TOTAL Utilities & Maintenance $56,220.05

TOTAL Part 5: Utilities & Maintenance $56,220.05

Report Run:22/06/2011

Part 4: Grants $428.00

Part 3: Child Parent Centre Entitlement $66,173.25

TOTAL Others $66,601.25

Others

Ancillary (HRS) 0.500 $650.52

TOTAL Staffing $650.52

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $67,251.77

SUMMARY

Adjustments 0.500 $25.02 $650.52

TOTAL Resource Allocation Adjustment Panel $650.52

Resource Allocation Adjustment Panel

TOTAL Part 6: Supplementations $650.52

Part 6: Supplementations

CPC Early Assistance Grant $428.00

TOTAL Whole School Literacy & Numeracy Grants $428.00

Whole School Literacy & Numeracy Grants

TOTAL Part 4: Grants $428.00

Part 4: Grants

CPC Administration Grant $1,225.85

CPC Operating Grant $1,257.86

TOTAL Grants $2,483.71

Grants

CPC School Services Officer 11.250 $29.85 $17,462.25

TOTAL Industrial Entitlement $17,462.25

Industrial Entitlement

Additional Administration Leadership CPC $1,717.86

Flexible Initiatives Resourcing(CPC) 0.010 $85,893.00 $858.93

Child Parent Centre (CPC) Teacher 0.500 $85,893.00 $42,946.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $45,523.29

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (CPC) 2.000 $352.00 $704.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $704.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 3: Child Parent Centre Entitlement $66,173.25

Part 3: Child Parent Centre Entitlement

Resource Entitlement Statement (Reconciled RES 2010)

Echunga Child Parent Centre ( 1570 0123)Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Telephone $2,052.17

Waste $4,303.78

Cleaning $12,822.05

Energy $4,284.36

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $6,254.00

Special Education - Students with Learning Difficulties $3,597.09

Early Assistance Grant $2,638.00

Early Years Literacy and Numeracy $4,382.00

TOTAL Whole School Literacy & Numeracy Grants $16,871.09

Whole School Literacy & Numeracy Grants

School Support Grant $8,118.56

Training and Development $218.56

Furniture Replacement $634.14

TOTAL Grants $8,971.26

Grants

TOTAL Part 4: Grants $25,842.35

Part 4: Grants

ACEO1 0.700 $25.50 $928.20

TOTAL Additional Allocations $928.20

Additional Allocations

SSO1 58.500 $25.02 $76,110.84

TOTAL Industrial Entitlement $76,110.84

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $77,039.04

Part 2: Ancillary Staffing

Mainstream A $4,980.00

Mainstream D $9,354.00

Flexible Initiatives Resourcing 0.180 $85,893.00 $15,460.74

Additional Admin Leadership Time 0.100 $85,893.00 $8,589.30

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $55,562.64

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.020 $85,893.00 $259,396.86

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 23.500 $352.00 $8,272.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $468,428.86

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $523,991.50

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Lenswood Primary School ( 0136 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 6: Supplementations $5,943.28

Part 4: Grants $25,842.35

Part 5: Utilities & Maintenance $35,344.89

TOTAL Others $67,130.52

Others

Ancillary (HRS) 69.200 $86,023.24

Teacher (FTE) 5.500 $515,719.50

Teacher (DAYS) Supplementation 18.500 $6,512.00

Teacher (DAYS) 23.500 $8,272.00

TOTAL Staffing $616,526.74

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $683,657.26

SUMMARY

Adjustments 10.000 $30.98 $8,984.20

TOTAL Resource Allocation Adjustment Panel $8,984.20

Resource Allocation Adjustment Panel

Flu Vaccinations $69.00

Surplus Teacher -$622.51

TRT Over-entitlement 18.500 $352.00 $6,512.00

SSO Special Education $5,545.00

Prior Year Reconciliation $951.79

TOTAL Supplementations $12,455.28

Supplementations

TOTAL Part 6: Supplementations $21,439.48

Part 6: Supplementations

Breakdown Maintenance $10,807.10

Water $1,075.43

TOTAL Utilities & Maintenance $35,344.89

TOTAL Part 5: Utilities & Maintenance $35,344.89

Report Run:22/06/2011

Telephone $2,440.79

Cleaning $30,125.42

Energy $15,570.80

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $7,552.00

Early Years Literacy and Numeracy $5,531.00

Early Assistance Grant $2,443.00

Special Education - Students with Learning Difficulties $5,965.73

TOTAL Whole School Literacy & Numeracy Grants $21,491.73

Whole School Literacy & Numeracy Grants

Training and Development $246.80

School Support Grant $7,729.15

Furniture Replacement $686.36

TOTAL Grants $8,662.31

Grants

TOTAL Part 4: Grants $30,154.04

Part 4: Grants

Gov. Services Employee 1-7 15.000 $23.69 $18,478.20

SSO2 44.000 $29.85 $68,296.80

TOTAL Industrial Entitlement $86,775.00

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $86,775.00

Part 2: Ancillary Staffing

Mainstream A $1,660.00

Mainstream D $14,031.00

Early Years Scheme 1.100 $85,893.00 $94,482.30

Flexible Initiatives Resourcing 0.160 $85,893.00 $13,742.88

Additional Admin Leadership Time 0.090 $85,893.00 $7,730.37

Extra Administration Time 0.200 $85,893.00 $17,178.60

ESL Teacher/s 0.020 $85,893.00 $1,717.86

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $150,543.01

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Term 4 Intake 0.280 $85,893.00 $24,050.04

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 33.000 $352.00 $11,616.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $400,481.67

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $551,024.68

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Gumeracha Primary School ( 0162 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $30,154.04

Part 5: Utilities & Maintenance $66,761.52

Part 6: Supplementations $4,534.63

TOTAL Others $101,450.19

Others

Ancillary (HRS) 59.000 $86,775.00

Teacher (DAYS) 33.000 $11,616.00

Teacher (FTE) 5.760 $539,408.68

Teacher (DAYS) Supplementation 14.500 $5,104.00

TOTAL Staffing $642,903.68

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $744,353.87

SUMMARY

Prior Year Reconciliation $74.62

Surplus Teacher -$2,046.99

SSO Special Education $6,507.00

TRT Over-entitlement 14.500 $352.00 $5,104.00

TOTAL Supplementations $9,638.63

Supplementations

TOTAL Part 6: Supplementations $9,638.63

Part 6: Supplementations

Breakdown Maintenance $10,356.65

Water $5,488.54

Waste $2,779.32

TOTAL Utilities & Maintenance $66,761.52

TOTAL Part 5: Utilities & Maintenance $66,761.52

Report Run:22/06/2011

Early Years Literacy and Numeracy $13,268.00

Primary M/S Strategy Teacher Professional Learning $14,868.00

Special Education - Students with Learning Difficulties $11,774.60

Early Assistance Grant $4,900.00

TOTAL Whole School Literacy & Numeracy Grants $44,810.60

Whole School Literacy & Numeracy Grants

Training and Development $635.53

School Support Grant $14,516.01

Furniture Replacement $1,482.14

TOTAL Grants $16,633.68

Grants

TOTAL Part 4: Grants $61,444.28

Part 4: Grants

ACEO1 2.100 $25.50 $2,784.60

TOTAL Additional Allocations $2,784.60

Additional Allocations

SSO1 62.000 $25.02 $80,664.48

SSO2 25.000 $29.85 $38,805.00

TOTAL Industrial Entitlement $119,469.48

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $122,254.08

Part 2: Ancillary Staffing

Mainstream D $31,569.75

Mainstream A $3,735.00

Flexible Initiatives Resourcing 0.420 $85,893.00 $36,075.06

Additional Admin Leadership Time 0.240 $85,893.00 $20,614.32

Additional Year 3 Teacher 1.100 $85,893.00 $94,482.30

ESL Teacher/s 0.010 $85,893.00 $858.93

Mainstream I $10,410.00

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $197,745.36

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Teachers 6.640 $85,893.00 $570,329.52

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 4 Intake 0.280 $85,893.00 $24,050.04

Temporary Relieving Teachers (TRT) 51.000 $352.00 $17,952.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,013,855.56

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,211,600.92

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Hahndorf Primary School ( 0163 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $61,444.28

Part 5: Utilities & Maintenance $91,877.89

Part 6: Supplementations $34,508.39

TOTAL Others $187,830.56

Others

Teacher (DAYS) Supplementation 41.000 $14,432.00

Teacher (FTE) 12.690 $1,193,648.92

Teacher (DAYS) 51.000 $17,952.00

Ancillary (HRS) 89.100 $122,254.08

TOTAL Staffing $1,348,287.00

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,536,117.56

SUMMARY

Flu Vaccinations $460.00

TRT Over-entitlement 41.000 $352.00 $14,432.00

SSO Special Education $4,570.00

Breakdown Maintenance - Prior Years $7,962.55

Prior Year Reconciliation $21,515.84

TOTAL Supplementations $48,940.39

Supplementations

TOTAL Part 6: Supplementations $48,940.39

Part 6: Supplementations

Waste $2,243.96

Breakdown Maintenance $19,339.91

Water $9,682.92

Telephone $4,285.43

Cleaning $34,735.11

Energy $21,590.56

TOTAL Utilities & Maintenance $91,877.89

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $91,877.89

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Part 3: Child Parent Centre Entitlement $189,358.88

Part 4: Grants $553.00

TOTAL Others $189,911.88

Others

Ancillary (HRS) 2.000 $2,602.08

TOTAL Staffing $2,602.08

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $192,513.96

SUMMARY

Adjustments 2.000 $25.02 $2,602.08

TOTAL Resource Allocation Adjustment Panel $2,602.08

Resource Allocation Adjustment Panel

TOTAL Part 6: Supplementations $2,602.08

Part 6: Supplementations

CPC Early Assistance Grant $553.00

TOTAL Whole School Literacy & Numeracy Grants $553.00

Whole School Literacy & Numeracy Grants

TOTAL Part 4: Grants $553.00

Part 4: Grants

CPC Administration Grant $4,273.45

CPC Operating Grant $2,606.11

TOTAL Grants $6,879.56

Grants

CPC School Services Officer 33.750 $29.85 $52,386.75

TOTAL Industrial Entitlement $52,386.75

Industrial Entitlement

Additional Administration Leadership CPC $4,294.65

Flexible Initiatives Resourcing(CPC) 0.040 $85,893.00 $3,435.72

Child Parent Centre (CPC) Teacher 1.400 $85,893.00 $120,250.20

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $127,980.57

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (CPC) 6.000 $352.00 $2,112.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $2,112.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 3: Child Parent Centre Entitlement $189,358.88

Part 3: Child Parent Centre Entitlement

Resource Entitlement Statement (Reconciled RES 2010)

Hahndorf Child Parent Centre ( 1683 0163)Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Telephone $1,948.38

Waste $1,753.46

Cleaning $18,554.56

Energy $5,227.09

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $9,714.00

Special Education - Students with Learning Difficulties $3,855.43

Early Assistance Grant $1,975.00

Early Years Literacy and Numeracy $2,952.00

TOTAL Whole School Literacy & Numeracy Grants $18,496.43

Whole School Literacy & Numeracy Grants

Training and Development $205.79

Furniture Replacement $627.50

School Support Grant $7,396.80

TOTAL Grants $8,230.09

Grants

TOTAL Part 4: Grants $26,726.52

Part 4: Grants

SSO2 35.000 $29.85 $54,327.00

SSO1 15.000 $25.02 $19,515.60

Gov. Services Employee 1-7 9.000 $23.69 $11,086.92

TOTAL Industrial Entitlement $84,929.52

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $84,929.52

Part 2: Ancillary Staffing

Mainstream D $4,677.00

Mainstream A $2,075.00

Additional Admin Leadership Time 0.100 $85,893.00 $8,589.30

Extra Administration Time 0.200 $85,893.00 $17,178.60

Flexible Initiatives Resourcing 0.170 $85,893.00 $14,601.81

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $47,121.71

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Term 4 Intake 0.280 $85,893.00 $24,050.04

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 27.500 $352.00 $9,680.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $398,545.67

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $445,667.38

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Heathfield Primary School ( 0176 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $41,720.59

Part 6: Supplementations $11,688.03

Part 4: Grants $26,726.52

TOTAL Others $80,135.14

Others

Teacher (FTE) 4.660 $435,987.38

Teacher (DAYS) Supplementation 27.500 $9,680.00

Teacher (DAYS) 27.500 $9,680.00

Ancillary (HRS) 59.000 $84,929.52

TOTAL Staffing $540,276.90

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $620,412.04

SUMMARY

Breakdown Maintenance - Prior Years $7,634.00

Prior Year Reconciliation $5,270.00

TRT Over-entitlement 27.500 $352.00 $9,680.00

Surplus Teacher -$1,215.97

TOTAL Supplementations $21,368.03

Supplementations

TOTAL Part 6: Supplementations $21,368.03

Part 6: Supplementations

Breakdown Maintenance $10,485.35

Water $3,751.75

TOTAL Utilities & Maintenance $41,720.59

TOTAL Part 5: Utilities & Maintenance $41,720.59

Report Run:22/06/2011

Telephone $2,618.51

Waste $1,711.78

Cleaning $13,952.97

Energy $6,528.17

Water $1,084.90

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $4,564.00

Special Education - Students with Learning Difficulties $3,019.67

Early Assistance Grant $1,741.00

Early Years Literacy and Numeracy $1,616.00

TOTAL Whole School Literacy & Numeracy Grants $10,940.67

Whole School Literacy & Numeracy Grants

School Support Grant $5,837.73

Training and Development $153.74

Furniture Replacement $392.92

TOTAL Grants $6,384.39

Grants

TOTAL Part 4: Grants $17,325.06

Part 4: Grants

SSO1 12.000 $25.02 $15,612.48

SSO2 37.500 $29.85 $58,207.50

TOTAL Industrial Entitlement $73,819.98

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $73,819.98

Part 2: Ancillary Staffing

Mainstream A $1,660.00

Mainstream D $4,677.00

Flexible Initiatives Resourcing 0.090 $85,893.00 $7,730.37

Additional Admin Leadership Time 0.050 $85,893.00 $4,294.65

Extra Administration Time 0.100 $85,893.00 $8,589.30

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $26,951.32

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.810 $85,893.00 $155,466.33

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 20.500 $352.00 $7,216.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $356,777.33

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $383,728.65

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Houghton Primary School ( 0187 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $34,554.14

Part 4: Grants $17,325.06

Part 6: Supplementations $849.30

TOTAL Others $52,728.50

Others

Ancillary (HRS) 49.500 $73,819.98

Teacher (DAYS) 20.500 $7,216.00

Teacher (FTE) 4.050 $376,512.65

TOTAL Staffing $457,548.63

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $510,277.13

SUMMARY

Prior Year Reconciliation $780.30

Flu Vaccinations $69.00

TOTAL Supplementations $849.30

Supplementations

TOTAL Part 6: Supplementations $849.30

Part 6: Supplementations

Breakdown Maintenance $8,657.81

TOTAL Utilities & Maintenance $34,554.14

TOTAL Part 5: Utilities & Maintenance $34,554.14

Report Run:22/06/2011

Part 4: Grants $369.00

Part 3: Child Parent Centre Entitlement $40,352.26

TOTAL Others $40,721.26

Others

Ancillary (HRS) 0.500 $650.52

TOTAL Staffing $650.52

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $41,371.78

SUMMARY

Adjustments 0.500 $25.02 $650.52

TOTAL Resource Allocation Adjustment Panel $650.52

Resource Allocation Adjustment Panel

TOTAL Part 6: Supplementations $650.52

Part 6: Supplementations

CPC Early Assistance Grant $369.00

TOTAL Whole School Literacy & Numeracy Grants $369.00

Whole School Literacy & Numeracy Grants

TOTAL Part 4: Grants $369.00

Part 4: Grants

CPC Administration Grant $1,140.72

CPC Operating Grant $1,107.89

TOTAL Grants $2,248.61

Grants

CPC School Services Officer 0.300 $29.85 $465.66

TOTAL Industrial Entitlement $465.66

Industrial Entitlement

Additional Administration Leadership CPC $1,717.86

Flexible Initiatives Resourcing(CPC) 0.010 $85,893.00 $858.93

Child Parent Centre (CPC) Teacher 0.400 $85,893.00 $34,357.20

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $36,933.99

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (CPC) 2.000 $352.00 $704.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $704.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 3: Child Parent Centre Entitlement $40,352.26

Part 3: Child Parent Centre Entitlement

Resource Entitlement Statement (Reconciled RES 2010)

Houghton Child Parent Centre ( 1830 0187)Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Telephone $2,092.74

Waste $1,019.86

Cleaning $14,245.89

Energy $5,885.11

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $7,670.00

Special Education - Students with Learning Difficulties $4,137.24

Early Assistance Grant $2,404.00

Early Years Literacy and Numeracy $3,635.00

TOTAL Whole School Literacy & Numeracy Grants $17,846.24

Whole School Literacy & Numeracy Grants

Training and Development $242.15

Furniture Replacement $648.23

School Support Grant $8,563.60

TOTAL Grants $9,453.98

Grants

TOTAL Part 4: Grants $27,300.22

Part 4: Grants

SSO2 37.500 $29.85 $58,207.50

SSO1 15.500 $25.02 $20,166.12

Gov. Services Employee 1-7 8.000 $23.69 $9,855.04

TOTAL Industrial Entitlement $88,228.66

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $88,228.66

Part 2: Ancillary Staffing

Mainstream A $6,225.00

Mainstream D $9,354.00

Flexible Initiatives Resourcing 0.190 $85,893.00 $16,319.67

Additional Admin Leadership Time 0.110 $85,893.00 $9,448.23

Mainstream I $10,410.00

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $68,935.50

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.120 $85,893.00 $267,986.16

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 27.500 $352.00 $9,680.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $478,426.16

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $547,361.66

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Kersbrook Primary School ( 0204 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $39,797.41

Part 6: Supplementations $3,459.05

Part 4: Grants $27,300.22

TOTAL Others $70,556.68

Others

Teacher (FTE) 5.620 $537,681.66

Teacher (DAYS) 27.500 $9,680.00

Ancillary (HRS) 61.000 $88,228.66

TOTAL Staffing $635,590.32

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $706,147.00

SUMMARY

Prior Year Reconciliation $35.05

Prior Year Reconciliation -$200.00

SSO Special Education $3,624.00

TOTAL Supplementations $3,459.05

Supplementations

TOTAL Part 6: Supplementations $3,459.05

Part 6: Supplementations

Breakdown Maintenance $11,321.90

Water $5,231.91

TOTAL Utilities & Maintenance $39,797.41

TOTAL Part 5: Utilities & Maintenance $39,797.41

Report Run:22/06/2011

Energy $18,109.12

Cleaning $27,160.67

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $8,170.00

Special Education - Students with Learning Difficulties $6,798.97

Early Assistance Grant $3,184.00

Early Years Literacy and Numeracy $5,625.00

TOTAL Whole School Literacy & Numeracy Grants $23,777.97

Whole School Literacy & Numeracy Grants

Training and Development $310.21

School Support Grant $9,371.56

Furniture Replacement $789.98

TOTAL Grants $10,471.75

Grants

TOTAL Part 4: Grants $34,249.72

Part 4: Grants

ACEO1 2.100 $25.50 $2,784.60

TOTAL Additional Allocations $2,784.60

Additional Allocations

SSO1 39.000 $25.02 $50,740.56

SSO2 37.500 $29.85 $58,207.50

TOTAL Industrial Entitlement $108,948.06

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $111,732.66

Part 2: Ancillary Staffing

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $6,225.00

Flexible Initiatives Resourcing 0.250 $85,893.00 $21,473.25

Additional Admin Leadership Time 0.140 $85,893.00 $12,025.02

Mainstream D $36,246.75

Mainstream I $10,410.00

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $180,862.32

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.520 $85,893.00 $302,343.36

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Temporary Relieving Teachers (TRT) 34.500 $352.00 $12,144.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $607,077.36

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $787,939.68

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Aldgate Primary School ( 0210 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 6: Supplementations $20,822.78

Part 4: Grants $34,249.72

Part 5: Utilities & Maintenance $68,049.87

TOTAL Others $123,122.37

Others

Teacher (DAYS) Supplementation 32.000 $11,264.00

Teacher (FTE) 8.010 $775,795.68

Ancillary (HRS) 78.600 $111,732.66

Teacher (DAYS) 34.500 $12,144.00

TOTAL Staffing $910,936.34

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,034,058.71

SUMMARY

Breakdown Maintenance - Prior Years $9,064.00

Prior Year Reconciliation $7,040.00

Surplus Teacher -$1,137.22

TRT Over-entitlement 32.000 $352.00 $11,264.00

SSO Special Education $5,856.00

TOTAL Supplementations $32,086.78

Supplementations

TOTAL Part 6: Supplementations $32,086.78

Part 6: Supplementations

Water $3,144.87

Breakdown Maintenance $12,673.25

Telephone $5,073.85

Waste $1,888.11

TOTAL Utilities & Maintenance $68,049.87

TOTAL Part 5: Utilities & Maintenance $68,049.87

Report Run:22/06/2011

Cleaning $50,048.75

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $22,800.00

Special Education - Students with Learning Difficulties $9,346.25

Early Assistance Grant $5,797.00

Early Years Literacy and Numeracy $16,335.00

TOTAL Whole School Literacy & Numeracy Grants $54,278.25

Whole School Literacy & Numeracy Grants

Training and Development $768.07

School Support Grant $20,468.42

Furniture Replacement $2,040.01

TOTAL Grants $23,276.50

Grants

TOTAL Part 4: Grants $77,554.75

Part 4: Grants

ACEO1 2.800 $25.50 $3,712.80

TOTAL Additional Allocations $3,712.80

Additional Allocations

Gov. Services Employee 1-7 14.500 $23.69 $17,862.26

SSO1 47.500 $25.02 $61,799.40

SSO2 46.000 $29.85 $71,401.20

TOTAL Industrial Entitlement $151,062.86

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $154,775.66

Part 2: Ancillary Staffing

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $3,320.00

Flexible Initiatives Resourcing 0.640 $85,893.00 $54,971.52

Additional Admin Leadership Time 0.360 $85,893.00 $30,921.48

Mainstream D $24,554.25

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $208,249.55

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 4.000 $91,830.00 $367,320.00

Teachers 9.560 $85,893.00 $821,137.08

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Temporary Relieving Teachers (TRT) 66.500 $352.00 $23,408.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,429,729.08

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,637,978.63

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Littlehampton Primary School ( 0225 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $104,384.63

Part 6: Supplementations $53,003.26

Part 4: Grants $77,554.75

TOTAL Others $234,942.64

Others

Teacher (DAYS) 66.500 $23,408.00

Ancillary (HRS) 110.800 $154,775.66

Teacher (DAYS) Supplementation 91.000 $32,032.00

Teacher (FTE) 17.660 $1,614,570.63

TOTAL Staffing $1,824,786.29

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $2,059,728.93

SUMMARY

Flu Vaccinations $253.00

Prior Year Reconciliation $35,149.74

SSO Special Education $976.00

TRT Over-entitlement 91.000 $352.00 $32,032.00

Double Debiting - Teacher $9,144.78

Leadership Reconfiguration $7,479.74

TOTAL Supplementations $85,035.26

Supplementations

TOTAL Part 6: Supplementations $85,035.26

Part 6: Supplementations

Breakdown Maintenance $26,096.66

Water $9,896.42

Waste $1,916.96

Energy $13,800.63

Telephone $2,625.21

TOTAL Utilities & Maintenance $104,384.63

TOTAL Part 5: Utilities & Maintenance $104,384.63

Report Run:22/06/2011

Part 4: Grants $455.00

Part 3: Child Parent Centre Entitlement Supplementation $11,446.65

Part 3: Child Parent Centre Entitlement $133,510.01

TOTAL Others $145,411.66

Others

Ancillary (HRS) 1.500 $1,951.56

TOTAL Staffing $1,951.56

Staffing

SUMMARY

Adjustments 1.500 $25.02 $1,951.56

TOTAL Resource Allocation Adjustment Panel $1,951.56

Resource Allocation Adjustment Panel

TOTAL Part 6: Supplementations $1,951.56

Part 6: Supplementations

CPC Early Assistance Grant $455.00

TOTAL Whole School Literacy & Numeracy Grants $455.00

Whole School Literacy & Numeracy Grants

TOTAL Part 4: Grants $455.00

Part 4: Grants

CPC Term Adjustment 15.000 $25.02 $4,503.60

CPC Term Adjustment 7.500 $25.02 $2,439.45

CPC Term Adjustment 3.750 $25.02 $1,125.90

CPC Term Adjustment 11.250 $25.02 $3,377.70

TOTAL Supplementations $11,446.65

Supplementations

CPC Operating Grant $1,808.14

CPC Administration Grant $2,604.93

TOTAL Grants $4,413.07

Grants

CPC School Services Officer 22.500 $29.85 $34,924.50

TOTAL Industrial Entitlement $34,924.50

Industrial Entitlement

Flexible Initiatives Resourcing(CPC) 0.030 $85,893.00 $2,576.79

Child Parent Centre (CPC) Teacher 1.000 $85,893.00 $85,893.00

Additional Administration Leadership CPC $4,294.65

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $92,764.44

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (CPC) 4.000 $352.00 $1,408.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,408.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 3: Child Parent Centre Entitlement $144,956.66

Part 3: Child Parent Centre Entitlement

Resource Entitlement Statement (Reconciled RES 2010)

Position FTE/HPW/DAYS Unit Cost Total

Littlehampton Child Parent Centre ( 1829 0225)

Report Run:22/06/2011

TOTAL RESOURCE ENTITLEMENT STATEMENT $147,363.22

Report Run:22/06/2011

Early Years Literacy and Numeracy $2,083.00

Primary M/S Strategy Teacher Professional Learning $9,204.00

Special Education - Students with Learning Difficulties $5,309.94

Early Assistance Grant $2,716.00

TOTAL Whole School Literacy & Numeracy Grants $19,312.94

Whole School Literacy & Numeracy Grants

Training and Development $275.35

School Support Grant $9,898.72

Furniture Replacement $766.77

TOTAL Grants $10,940.84

Grants

TOTAL Part 4: Grants $30,253.78

Part 4: Grants

ACEO1 0.700 $25.50 $928.20

TOTAL Additional Allocations $928.20

Additional Allocations

SSO2 28.000 $29.85 $43,461.60

Gov. Services Employee 1-7 3.000 $23.69 $3,695.64

SSO1 32.000 $25.02 $41,633.28

TOTAL Industrial Entitlement $88,790.52

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $89,718.72

Part 2: Ancillary Staffing

Mainstream D $4,677.00

Mainstream A $3,320.00

Flexible Initiatives Resourcing 0.260 $85,893.00 $22,332.18

Additional Admin Leadership Time 0.150 $85,893.00 $12,883.95

Primary School Counsellor 0.220 $95,723.00 $21,059.06

First Language Maintenance & Development 0.100 $85,893.00 $8,589.30

ESL Teacher/s 0.330 $85,893.00 $28,344.69

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $101,206.18

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.520 $85,893.00 $302,343.36

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Temporary Relieving Teachers (TRT) 33.000 $352.00 $11,616.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $606,549.36

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $707,755.54

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Lobethal Primary School ( 0227 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $30,253.78

Part 6: Supplementations $20,406.01

Part 5: Utilities & Maintenance $50,073.51

TOTAL Others $100,733.30

Others

Teacher (FTE) 7.580 $696,139.54

Teacher (DAYS) Supplementation 30.500 $10,736.00

Teacher (DAYS) 33.000 $11,616.00

Ancillary (HRS) 63.700 $89,718.72

TOTAL Staffing $808,210.26

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $908,943.56

SUMMARY

SSO Special Education $1,703.90

Prior Year Reconciliation $16,002.68

SSO Reclassification $2,699.43

TRT Over-entitlement 30.500 $352.00 $10,736.00

TOTAL Supplementations $31,142.01

Supplementations

TOTAL Part 6: Supplementations $31,142.01

Part 6: Supplementations

Water $2,818.84

Breakdown Maintenance $12,866.30

Energy $11,261.88

Telephone $2,612.79

Cleaning $20,513.70

TOTAL Utilities & Maintenance $50,073.51

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $50,073.51

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Cleaning $21,988.04

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $6,962.00

Special Education - Students with Learning Difficulties $6,368.61

Early Assistance Grant $2,443.00

Early Years Literacy and Numeracy $2,672.00

TOTAL Whole School Literacy & Numeracy Grants $18,445.61

Whole School Literacy & Numeracy Grants

Training and Development $242.15

School Support Grant $8,354.63

Furniture Replacement $649.06

TOTAL Grants $9,245.84

Grants

TOTAL Part 4: Grants $27,691.45

Part 4: Grants

ACEO1 2.800 $25.50 $3,712.80

TOTAL Additional Allocations $3,712.80

Additional Allocations

Gov. Services Employee 1-7 9.000 $23.69 $11,086.92

SSO1 35.000 $25.02 $45,536.40

SSO2 15.000 $29.85 $23,283.00

TOTAL Industrial Entitlement $79,906.32

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $83,619.12

Part 2: Ancillary Staffing

Primary School Counsellor 0.210 $95,723.00 $20,101.83

Mainstream A $1,660.00

Flexible Initiatives Resourcing 0.180 $85,893.00 $15,460.74

Additional Admin Leadership Time 0.100 $85,893.00 $8,589.30

Mainstream D $21,046.50

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $84,036.97

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.020 $85,893.00 $259,396.86

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 27.000 $352.00 $9,504.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $469,660.86

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $553,697.83

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Macclesfield Primary School ( 0239 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $43,622.96

Part 6: Supplementations $19,129.96

Part 4: Grants $27,691.45

TOTAL Others $90,444.37

Others

Teacher (DAYS) 27.000 $9,504.00

Teacher (FTE) 5.710 $544,193.83

Teacher (DAYS) Supplementation 11.500 $4,048.00

Ancillary (HRS) 61.800 $83,619.12

TOTAL Staffing $641,364.95

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $731,809.32

SUMMARY

Breakdown Maintenance - Prior Years $3,719.00

Flu Vaccinations $161.00

Teacher Salary Adjustment $2,128.96

TRT Over-entitlement 11.500 $352.00 $4,048.00

SSO Special Education $6,041.00

Prior Year Reconciliation $7,080.00

TOTAL Supplementations $23,177.96

Supplementations

TOTAL Part 6: Supplementations $23,177.96

Part 6: Supplementations

Breakdown Maintenance $10,935.80

Water $1,034.65

Waste $1,514.77

Energy $6,015.53

Telephone $2,134.17

TOTAL Utilities & Maintenance $43,622.96

TOTAL Part 5: Utilities & Maintenance $43,622.96

Report Run:22/06/2011

Telephone $2,432.74

Cleaning $26,019.40

Energy $11,187.43

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $13,990.00

Special Education - Students with Learning Difficulties $10,041.45

Early Assistance Grant $3,223.00

Early Years Literacy and Numeracy $8,203.00

TOTAL Whole School Literacy & Numeracy Grants $35,457.45

Whole School Literacy & Numeracy Grants

Training and Development $418.12

School Support Grant $12,052.67

Furniture Replacement $1,166.31

TOTAL Grants $13,637.10

Grants

TOTAL Part 4: Grants $49,094.55

Part 4: Grants

ACEO1 2.800 $25.50 $3,712.80

TOTAL Additional Allocations $3,712.80

Additional Allocations

Gov. Services Employee 1-7 4.500 $23.69 $5,543.46

SSO2 62.000 $29.85 $96,236.40

TOTAL Industrial Entitlement $101,779.86

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $105,492.66

Part 2: Ancillary Staffing

Mainstream A $5,810.00

Mainstream D $25,723.50

Flexible Initiatives Resourcing 0.320 $85,893.00 $27,485.76

Additional Admin Leadership Time 0.180 $85,893.00 $15,460.74

ESL Teacher/s 0.050 $85,893.00 $4,294.65

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $78,774.65

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 4.930 $85,893.00 $423,452.49

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Temporary Relieving Teachers (TRT) 36.000 $352.00 $12,672.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $735,383.49

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $814,158.14

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Meadows Primary School ( 0252 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $49,094.55

Part 5: Utilities & Maintenance $58,755.52

Part 6: Supplementations $17,353.20

TOTAL Others $125,203.27

Others

Teacher (FTE) 8.480 $801,486.14

Ancillary (HRS) 69.300 $105,492.66

Teacher (DAYS) 36.000 $12,672.00

Teacher (DAYS) Supplementation 74.000 $26,048.00

TOTAL Staffing $945,698.80

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,070,902.07

SUMMARY

Swimming Pool Operating Allowance $4,102.87

Prior Year Reconciliation $3,950.00

Flu Vaccinations $115.00

TRT Over-entitlement 74.000 $352.00 $26,048.00

SSO Special Education $8,457.00

Teacher Salary Adjustment $728.33

TOTAL Supplementations $43,401.20

Supplementations

TOTAL Part 6: Supplementations $43,401.20

Part 6: Supplementations

Breakdown Maintenance $15,182.90

Water $2,449.69

Waste $1,483.36

TOTAL Utilities & Maintenance $58,755.52

TOTAL Part 5: Utilities & Maintenance $58,755.52

Report Run:22/06/2011

Telephone $1,296.33

Waste $1,438.87

Cleaning $13,473.70

Energy $2,230.96

Water $1,433.90

Breakdown Maintenance $6,109.55

TOTAL Utilities & Maintenance $25,983.31

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $25,983.31

Part 5: Utilities & Maintenance

Special Education - Students with Learning Difficulties $1,075.45

Early Assistance Grant $1,195.00

Primary M/S Strategy Teacher Professional Learning $4,774.00

Early Years Literacy and Numeracy $1,243.00

TOTAL Whole School Literacy & Numeracy Grants $8,287.45

Whole School Literacy & Numeracy Grants

School Support Grant $4,057.57

Furniture Replacement $174.91

Training and Development $44.44

TOTAL Grants $4,276.92

Grants

TOTAL Part 4: Grants $12,564.37

Part 4: Grants

SSO1 22.500 $25.02 $29,273.40

SSO2 21.000 $29.85 $32,596.20

TOTAL Industrial Entitlement $61,869.60

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $61,869.60

Part 2: Ancillary Staffing

Extra Administration Time 0.050 $85,893.00 $4,294.65

Additional Admin Leadership Time 0.020 $85,893.00 $1,717.86

Flexible Initiatives Resourcing 0.030 $85,893.00 $2,576.79

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $8,589.30

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (TRT) 14.500 $352.00 $5,104.00

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Teachers 0.600 $85,893.00 $51,535.80

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $158,904.80

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $167,494.10

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Millbrook Primary School ( 0264 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $25,983.31

Part 6: Supplementations -$2,924.23

Part 4: Grants $12,564.37

TOTAL Others $35,623.45

Others

Teacher (FTE) 1.700 $162,390.10

Teacher (DAYS) 14.500 $5,104.00

Ancillary (HRS) 43.500 $61,869.60

TOTAL Staffing $229,363.70

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $264,987.15

SUMMARY

Prior Year Reconciliation -$300.00

Flu Vaccinations $46.00

Surplus Teacher -$910.23

Open Access TRT Recovery -$1,760.00

TOTAL Supplementations -$2,924.23

Supplementations

TOTAL Part 6: Supplementations -$2,924.23

Part 6: Supplementations

Report Run:22/06/2011

ESL Geographic Isolation Allowance $4,294.65

ESL Geographic Isolation Allowance $4,294.65

Early Assistance Grant $5,758.00

Special Education - Students with Learning Difficulties $16,029.64

Primary M/S Strategy Teacher Professional Learning $20,296.00

Whole School Literacy & Numeracy Grants

Training and Development $726.22

Furniture Replacement $1,960.43

School Support Grant $18,688.26

TOTAL Grants $21,374.91

Grants

Part 4: Grants

ACEO1 9.800 $25.50 $12,994.80

TOTAL Additional Allocations $12,994.80

Additional Allocations

Gov. Services Employee 1-7 12.000 $23.69 $14,782.56

SSO1 30.000 $25.02 $39,031.20

SSO2 67.500 $29.85 $104,773.50

TOTAL Industrial Entitlement $158,587.26

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $171,582.06

Part 2: Ancillary Staffing

Primary School Counsellor 0.440 $95,723.00 $42,118.12

Aboriginal Education Teacher 0.200 $85,893.00 $17,178.60

Mainstream A $27,390.00

Flexible Initiatives Resourcing 0.570 $85,893.00 $48,959.01

Additional Admin Leadership Time 0.320 $85,893.00 $27,485.76

Additional Year 3 Teacher 1.100 $85,893.00 $94,482.30

ESL Teacher/s 0.070 $85,893.00 $6,012.51

Mainstream I $7,807.50

Mainstream D $30,400.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $301,834.30

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 3.000 $91,830.00 $275,490.00

Teachers 8.350 $85,893.00 $717,206.55

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 64.500 $352.00 $22,704.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,280,505.70

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,582,340.00

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Mount Barker Primary School ( 0285 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $93,396.77

Part 4: Grants $82,614.85

Part 6: Supplementations $35,529.07

TOTAL Others $211,540.69

Others

Teacher (DAYS) Supplementation 105.500 $37,136.00

Ancillary (HRS) 129.300 $183,974.06

Teacher (DAYS) 64.500 $22,704.00

Teacher (FTE) 16.600 $1,559,636.00

TOTAL Staffing $1,803,450.06

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $2,014,990.75

SUMMARY

Adjustments 10.000 $30.98 $12,392.00

TOTAL Resource Allocation Adjustment Panel $12,392.00

Resource Allocation Adjustment Panel

SSO Special Education $9,078.20

Breakdown Maintenance - Prior Years $2,486.30

TRT Over-entitlement 105.500 $352.00 $37,136.00

Double Debiting - Teacher $5,007.42

Prior Year Reconciliation $198.41

Leadership Reconfiguration $7,479.74

Breakdown Maintenance - Prior Years $11,279.00

TOTAL Supplementations $72,665.07

Supplementations

TOTAL Part 6: Supplementations $85,057.07

Part 6: Supplementations

Waste $3,628.86

Water $4,949.26

Energy $17,513.91

Telephone $3,177.05

Cleaning $41,094.09

Breakdown Maintenance $23,033.60

TOTAL Utilities & Maintenance $93,396.77

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $93,396.77

Part 5: Utilities & Maintenance

Early Years Literacy and Numeracy $10,567.00

TOTAL Whole School Literacy & Numeracy Grants $61,239.94

TOTAL Part 4: Grants $82,614.85

Report Run:22/06/2011

Telephone $1,718.27

Waste $2,099.57

Cleaning $12,930.15

Energy $4,814.10

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $9,254.80

Special Education - Students with Learning Difficulties $2,513.41

Early Assistance Grant $1,975.00

Early Years Literacy and Numeracy $3,915.00

TOTAL Whole School Literacy & Numeracy Grants $17,658.21

Whole School Literacy & Numeracy Grants

Training and Development $186.14

Furniture Replacement $523.89

School Support Grant $7,706.90

TOTAL Grants $8,416.93

Grants

TOTAL Part 4: Grants $26,075.14

Part 4: Grants

SSO2 32.000 $29.85 $49,670.40

SSO1 15.500 $25.02 $20,166.12

Gov. Services Employee 1-7 3.000 $23.69 $3,695.64

TOTAL Industrial Entitlement $73,532.16

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $73,532.16

Part 2: Ancillary Staffing

Mainstream A $5,395.00

Mainstream D $1,169.25

Flexible Initiatives Resourcing 0.160 $85,893.00 $13,742.88

Additional Admin Leadership Time 0.090 $85,893.00 $7,730.37

Mainstream I $6,246.00

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $51,462.10

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 26.000 $352.00 $9,152.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $373,967.63

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $425,429.73

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Mount Torrens Primary School ( 0296 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $26,075.14

Part 5: Utilities & Maintenance $35,988.93

Part 6: Supplementations $4,076.82

TOTAL Others $66,140.89

Others

Teacher (DAYS) 26.000 $9,152.00

Teacher (FTE) 4.360 $416,277.73

Ancillary (HRS) 50.500 $73,532.16

TOTAL Staffing $498,961.89

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $565,102.78

SUMMARY

SSO Special Education $4,245.00

Prior Year Reconciliation -$168.18

TOTAL Supplementations $4,076.82

Supplementations

TOTAL Part 6: Supplementations $4,076.82

Part 6: Supplementations

Breakdown Maintenance $10,330.91

Water $4,095.93

TOTAL Utilities & Maintenance $35,988.93

TOTAL Part 5: Utilities & Maintenance $35,988.93

Report Run:22/06/2011

Telephone $2,283.19

Waste $996.62

Cleaning $13,089.96

Energy $5,356.34

Water $171.46

Breakdown Maintenance $7,396.55

TOTAL Utilities & Maintenance $29,294.12

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $29,294.12

Part 5: Utilities & Maintenance

Special Education - Students with Learning Difficulties $2,257.44

Early Assistance Grant $1,663.00

Primary M/S Strategy Teacher Professional Learning $5,366.00

Early Years Literacy and Numeracy $3,541.00

TOTAL Whole School Literacy & Numeracy Grants $12,827.44

Whole School Literacy & Numeracy Grants

School Support Grant $5,170.17

Furniture Replacement $253.65

Training and Development $81.91

TOTAL Grants $5,505.73

Grants

TOTAL Part 4: Grants $18,333.17

Part 4: Grants

SSO1 44.000 $25.02 $57,245.76

TOTAL Industrial Entitlement $57,245.76

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $57,245.76

Part 2: Ancillary Staffing

Flexible Initiatives Resourcing 0.070 $85,893.00 $6,012.51

Additional Admin Leadership Time 0.040 $85,893.00 $3,435.72

Extra Administration Time 0.100 $85,893.00 $8,589.30

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $18,037.53

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 0.710 $85,893.00 $60,984.03

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 20.000 $352.00 $7,040.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $262,119.03

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $280,156.56

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Mylor Primary School ( 0301 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $18,333.17

Part 6: Supplementations $8,710.00

Part 5: Utilities & Maintenance $29,294.12

TOTAL Others $56,337.29

Others

Ancillary (HRS) 44.000 $57,245.76

Teacher (DAYS) 20.000 $7,040.00

Teacher (DAYS) Supplementation 28.500 $10,032.00

Teacher (FTE) 2.920 $273,116.56

TOTAL Staffing $347,434.32

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $403,771.61

SUMMARY

Prior Year Reconciliation $8,710.00

TRT Over-entitlement 28.500 $352.00 $10,032.00

TOTAL Supplementations $18,742.00

Supplementations

TOTAL Part 6: Supplementations $18,742.00

Part 6: Supplementations

Report Run:22/06/2011

Primary M/S Strategy Teacher Professional Learning $35,636.00

Special Education - Students with Learning Difficulties $29,880.44

Early Years Literacy Program $4,224.00

Early Years Literacy and Numeracy $16,837.00

Early Assistance Grant $8,916.00

TOTAL Whole School Literacy & Numeracy Grants $95,493.44

Whole School Literacy & Numeracy Grants

Training and Development $1,326.40

School Support Grant $29,536.11

Furniture Replacement $3,210.47

TOTAL Grants $34,072.98

Grants

TOTAL Part 4: Grants $129,566.42

Part 4: Grants

ACEO1 1.400 $25.50 $1,856.40

TOTAL Additional Allocations $1,856.40

Additional Allocations

SSO1 101.000 $25.02 $131,405.04

SSO3 33.000 $34.31 $58,875.96

Gov. Services Employee 1-7 14.000 $23.69 $17,246.32

TOTAL Industrial Entitlement $207,527.32

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $209,383.72

Part 2: Ancillary Staffing

Mainstream D $57,293.25

Mainstream A $29,465.00

Flexible Initiatives Resourcing 1.000 $85,893.00 $85,893.00

Additional Admin Leadership Time 0.560 $85,893.00 $48,100.08

Primary School Counsellor 0.690 $95,723.00 $66,048.87

ESL Teacher/s 0.060 $85,893.00 $5,153.58

Mainstream I $23,422.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $315,376.28

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 6.000 $91,830.00 $550,980.00

Teachers 14.590 $85,893.00 $1,253,178.87

Principal Lvl 4 (PC04) 1.000 $122,266.00 $122,266.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 4 Intake 0.280 $85,893.00 $24,050.04

Temporary Relieving Teachers (TRT) 92.000 $352.00 $32,384.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $2,085,123.91

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $2,400,500.19

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Nairne Primary School ( 0306 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $129,566.42

Part 5: Utilities & Maintenance $131,005.03

Part 6: Supplementations $56,959.44

TOTAL Others $317,530.89

Others

Ancillary (HRS) Supplementation 9.000 $278.82

Ancillary (HRS) 149.400 $209,383.72

Teacher (DAYS) 92.000 $32,384.00

Teacher (DAYS) Supplementation 204.500 $71,984.00

Teacher (FTE) Supplementation 1.000 $64,468.50

Teacher (FTE) 25.180 $2,368,116.19

TOTAL Staffing $2,746,615.23

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $3,064,146.12

SUMMARY

Leadership Reconfiguration $7,479.74

Double Debiting - Teacher $3,224.65

SSO Special Education $20,760.25

Double Debiting - Teacher $2,359.50

SSO/GSE Replacement 9.000 $30.98 $278.82

TRT Over-entitlement 204.500 $352.00 $71,984.00

Flu Vaccinations $529.00

Prior Year Reconciliation $16,312.30

Swimming Pool Operating Allowance $2,598.00

Teacher Salary Adjustment 1.000 $128,937.00 $64,468.50

Breakdown Maintenance - Prior Years $3,696.00

TOTAL Supplementations $193,690.76

Supplementations

TOTAL Part 6: Supplementations $193,690.76

Part 6: Supplementations

Telephone $5,088.60

Waste $3,008.85

Cleaning $55,963.46

Energy $21,203.99

Water $8,124.82

Breakdown Maintenance $37,615.31

TOTAL Utilities & Maintenance $131,005.03

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $131,005.03

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Part 4: Grants $762.25

Others

Ancillary (HRS) 2.500 $3,252.60

TOTAL Staffing $3,252.60

Staffing

SUMMARY

Adjustments 2.500 $25.02 $3,252.60

TOTAL Resource Allocation Adjustment Panel $3,252.60

Resource Allocation Adjustment Panel

TOTAL Part 6: Supplementations $3,252.60

Part 6: Supplementations

CPC Early Assistance Grant $762.25

TOTAL Whole School Literacy & Numeracy Grants $762.25

Whole School Literacy & Numeracy Grants

TOTAL Part 4: Grants $762.25

Part 4: Grants

CPC Term Adjustment -7.500 $25.02 -$2,251.80

CPC Term Adjustment 7.500 $25.02 $2,251.80

CPC Term Adjustment 0.500 $85,893.00 $10,736.63

CPC Term Adjustment 0.500 $85,893.00 $9,910.73

CPC Term Adjustment 0.500 $85,893.00 $9,910.73

CPC Term Adjustment -7.500 $25.02 -$2,439.45

CPC Term Adjustment -7.500 $25.02 -$2,251.80

TOTAL Supplementations $25,866.84

Supplementations

CPC Administration Grant $4,477.76

CPC Operating Grant $3,102.92

TOTAL Grants $7,580.68

Grants

CPC School Services Officer 45.000 $29.85 $69,849.00

TOTAL Industrial Entitlement $69,849.00

Industrial Entitlement

Additional Administration Leadership CPC $7,730.37

Flexible Initiatives Resourcing(CPC) 0.060 $85,893.00 $5,153.58

Child Parent Centre (CPC) Teacher 1.500 $85,893.00 $128,839.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $141,723.45

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Temporary Relieving Teachers (CPC) 6.000 $352.00 $2,112.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $2,112.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 3: Child Parent Centre Entitlement $247,131.97

Part 3: Child Parent Centre Entitlement

Resource Entitlement Statement (Reconciled RES 2010)

Position FTE/HPW/DAYS Unit Cost Total

Nairne Child Parent Centre ( 1604 0306)

Report Run:22/06/2011

Part 3: Child Parent Centre Entitlement $221,265.13

Part 3: Child Parent Centre Entitlement Supplementation $25,866.84

TOTAL Others $247,894.22

TOTAL RESOURCE ENTITLEMENT STATEMENT $251,146.82

Report Run:22/06/2011

Telephone $2,183.01

Waste $2,497.96

Cleaning $20,647.39

Energy $6,618.41

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $8,602.00

Special Education - Students with Learning Difficulties $3,897.77

Early Assistance Grant $2,443.00

Early Years Literacy and Numeracy $6,587.00

TOTAL Whole School Literacy & Numeracy Grants $21,529.77

Whole School Literacy & Numeracy Grants

Training and Development $205.13

School Support Grant $7,784.78

Furniture Replacement $571.14

TOTAL Grants $8,561.05

Grants

TOTAL Part 4: Grants $30,090.82

Part 4: Grants

SSO1 19.000 $25.02 $24,719.76

SSO2 35.000 $29.85 $54,327.00

TOTAL Industrial Entitlement $79,046.76

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $79,046.76

Part 2: Ancillary Staffing

Mainstream A $5,395.00

Mainstream D $7,015.50

Flexible Initiatives Resourcing 0.170 $85,893.00 $14,601.81

Additional Admin Leadership Time 0.100 $85,893.00 $8,589.30

Mainstream I $5,205.00

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $57,985.21

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.020 $85,893.00 $259,396.86

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 27.500 $352.00 $9,680.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $469,836.86

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $527,822.07

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Norton Summit Primary School ( 0316 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $42,367.77

Part 4: Grants $30,090.82

Part 6: Supplementations $32,700.68

TOTAL Others $105,159.27

Others

Ancillary (HRS) 54.000 $79,046.76

Teacher (DAYS) 27.500 $9,680.00

Teacher (FTE) 5.490 $518,142.07

Teacher (DAYS) Supplementation 16.000 $5,632.00

TOTAL Staffing $612,500.83

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $717,660.10

SUMMARY

Breakdown Maintenance - Prior Years $15,538.00

Prior Year Reconciliation $3,173.78

Double Debiting - Teacher $6,607.20

SSO Special Education $6,630.00

TRT Over-entitlement 16.000 $352.00 $5,632.00

Double Debiting - Teacher $751.70

TOTAL Supplementations $38,332.68

Supplementations

TOTAL Part 6: Supplementations $38,332.68

Part 6: Supplementations

Breakdown Maintenance $10,421.00

TOTAL Utilities & Maintenance $42,367.77

TOTAL Part 5: Utilities & Maintenance $42,367.77

Report Run:22/06/2011

Telephone $1,043.37

Waste $1,687.76

Cleaning $12,712.99

Energy $4,445.94

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $4,248.00

Special Education - Students with Learning Difficulties $2,320.10

Early Assistance Grant $1,780.00

Early Years Literacy and Numeracy $1,803.00

TOTAL Whole School Literacy & Numeracy Grants $10,151.10

Whole School Literacy & Numeracy Grants

School Support Grant $6,338.40

Training and Development $135.37

Furniture Replacement $382.14

TOTAL Grants $6,855.91

Grants

TOTAL Part 4: Grants $17,007.01

Part 4: Grants

ACEO1 1.400 $25.50 $1,856.40

TOTAL Additional Allocations $1,856.40

Additional Allocations

SSO1 27.500 $25.02 $35,778.60

SSO2 20.000 $29.85 $31,044.00

TOTAL Industrial Entitlement $66,822.60

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $68,679.00

Part 2: Ancillary Staffing

Extra Administration Time 0.200 $85,893.00 $17,178.60

Mainstream A $1,660.00

Additional Admin Leadership Time 0.060 $85,893.00 $5,153.58

Flexible Initiatives Resourcing 0.120 $85,893.00 $10,307.16

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $34,299.34

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Temporary Relieving Teachers (TRT) 22.500 $352.00 $7,920.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $366,070.63

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $400,369.97

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Paracombe Primary School ( 0327 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $17,007.01

Part 5: Utilities & Maintenance $30,938.41

Part 6: Supplementations -$307.23

TOTAL Others $47,638.19

Others

Ancillary (HRS) 48.900 $68,679.00

Teacher (DAYS) 22.500 $7,920.00

Teacher (FTE) 4.290 $392,449.97

TOTAL Staffing $469,048.97

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $516,687.16

SUMMARY

Prior Year Reconciliation -$376.23

Flu Vaccinations $69.00

TOTAL Supplementations -$307.23

Supplementations

TOTAL Part 6: Supplementations -$307.23

Part 6: Supplementations

Breakdown Maintenance $8,747.90

Water $2,300.45

TOTAL Utilities & Maintenance $30,938.41

TOTAL Part 5: Utilities & Maintenance $30,938.41

Report Run:22/06/2011

Breakdown Maintenance $9,391.40

Waste $920.98

Telephone $2,072.86

Cleaning $12,626.62

Energy $7,722.04

TOTAL Utilities & Maintenance $32,733.90

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $7,886.00

Special Education - Students with Learning Difficulties $2,384.21

Early Assistance Grant $2,014.00

Early Years Literacy and Numeracy $3,448.00

TOTAL Whole School Literacy & Numeracy Grants $15,732.21

Whole School Literacy & Numeracy Grants

Training and Development $162.09

School Support Grant $6,894.70

Furniture Replacement $475.81

TOTAL Grants $7,532.60

Grants

TOTAL Part 4: Grants $23,264.81

Part 4: Grants

Gov. Services Employee 1-7 4.000 $23.69 $4,927.52

SSO2 18.500 $29.85 $28,715.70

SSO1 27.000 $25.02 $35,128.08

TOTAL Industrial Entitlement $68,771.30

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $68,771.30

Part 2: Ancillary Staffing

Mainstream A $1,660.00

Additional Admin Leadership Time 0.080 $85,893.00 $6,871.44

Flexible Initiatives Resourcing 0.130 $85,893.00 $11,166.09

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $36,876.13

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 26.000 $352.00 $9,152.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $373,967.63

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $410,843.76

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Scott Creek Primary School ( 0396 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $23,264.81

Part 5: Utilities & Maintenance $32,733.90

Part 6: Supplementations $10,845.00

TOTAL Others $66,843.71

Others

Teacher (FTE) 4.320 $401,691.76

Teacher (DAYS) 26.000 $9,152.00

Ancillary (HRS) 49.500 $68,771.30

TOTAL Staffing $479,615.06

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $546,458.77

SUMMARY

Breakdown Maintenance - Prior Years $6,938.00

Prior Year Reconciliation -$650.00

Breakdown Maintenance - Prior Years $4,557.00

TOTAL Supplementations $10,845.00

Supplementations

TOTAL Part 6: Supplementations $10,845.00

Part 6: Supplementations

TOTAL Part 5: Utilities & Maintenance $32,733.90

Report Run:22/06/2011

Early Years Literacy and Numeracy $16,069.00

Primary M/S Strategy Teacher Professional Learning $33,630.00

Special Education - Students with Learning Difficulties $15,263.31

Early Assistance Grant $8,760.00

TOTAL Whole School Literacy & Numeracy Grants $73,722.31

Whole School Literacy & Numeracy Grants

Training and Development $1,096.00

School Support Grant $28,925.14

Furniture Replacement $3,017.33

TOTAL Grants $33,038.47

Grants

TOTAL Part 4: Grants $106,760.78

Part 4: Grants

ACEO1 1.400 $25.50 $1,856.40

TOTAL Additional Allocations $1,856.40

Additional Allocations

SSO1 49.000 $25.02 $63,750.96

SSO2 75.000 $29.85 $116,415.00

Gov. Services Employee 1-7 20.000 $23.69 $24,637.60

TOTAL Industrial Entitlement $204,803.56

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $206,659.96

Part 2: Ancillary Staffing

Additional Year 3 Teacher 1.100 $85,893.00 $94,482.30

Flexible Initiatives Resourcing 0.970 $85,893.00 $83,316.21

Additional Admin Leadership Time 0.550 $85,893.00 $47,241.15

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $14,110.00

Mainstream D $7,015.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $340,647.46

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 6.000 $91,830.00 $550,980.00

Teachers 13.480 $85,893.00 $1,157,837.64

Principal Lvl 4 (PC04) 1.000 $122,266.00 $122,266.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 89.000 $352.00 $31,328.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $2,011,917.79

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $2,352,565.25

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Stirling East Primary School ( 0413 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $117,732.80

Part 6: Supplementations $35,118.77

Part 4: Grants $106,760.78

TOTAL Others $259,612.35

Others

Teacher (DAYS) Supplementation 83.500 $29,392.00

Teacher (DAYS) 89.000 $31,328.00

Teacher (FTE) 25.750 $2,321,237.25

Ancillary (HRS) 145.400 $206,659.96

TOTAL Staffing $2,588,617.21

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $2,848,229.56

SUMMARY

Flu Vaccinations $345.00

Prior Year Reconciliation $32,419.77

TRT Over-entitlement 83.500 $352.00 $29,392.00

SSO Special Education $2,354.00

TOTAL Supplementations $64,510.77

Supplementations

TOTAL Part 6: Supplementations $64,510.77

Part 6: Supplementations

Waste $2,618.08

Breakdown Maintenance $35,195.75

Water $7,189.55

Cleaning $48,496.68

Energy $20,386.23

Telephone $3,846.51

TOTAL Utilities & Maintenance $117,732.80

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $117,732.80

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Cleaning $12,876.04

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $5,294.00

Special Education - Students with Learning Difficulties $1,437.72

Early Assistance Grant $1,741.00

Early Years Literacy and Numeracy $3,541.00

TOTAL Whole School Literacy & Numeracy Grants $12,013.72

Whole School Literacy & Numeracy Grants

Training and Development $96.84

School Support Grant $5,448.32

Furniture Replacement $277.69

TOTAL Grants $5,822.85

Grants

TOTAL Part 4: Grants $17,836.57

Part 4: Grants

ACEO1 0.700 $25.50 $928.20

TOTAL Additional Allocations $928.20

Additional Allocations

Gov. Services Employee 1-7 8.000 $23.69 $9,855.04

SSO1 3.000 $25.02 $3,903.12

SSO2 37.500 $29.85 $58,207.50

TOTAL Industrial Entitlement $71,965.66

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $72,893.86

Part 2: Ancillary Staffing

Mainstream A $2,905.00

Mainstream D $15,200.25

Flexible Initiatives Resourcing 0.080 $85,893.00 $6,871.44

Additional Admin Leadership Time 0.040 $85,893.00 $3,435.72

Mainstream I $10,410.00

Extra Administration Time 0.100 $85,893.00 $8,589.30

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $47,411.71

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 0.710 $85,893.00 $60,984.03

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 16.500 $352.00 $5,808.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $260,887.03

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $308,298.74

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Upper Sturt Primary School ( 0448 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $17,836.57

Part 6: Supplementations $9,639.00

Part 5: Utilities & Maintenance $27,686.27

TOTAL Others $55,161.84

Others

Teacher (FTE) 2.930 $302,490.74

Ancillary (HRS) 61.200 $87,764.26

Teacher (DAYS) 16.500 $5,808.00

TOTAL Staffing $396,063.00

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $451,224.84

SUMMARY

Adjustments 12.000 $30.98 $14,870.40

TOTAL Resource Allocation Adjustment Panel $14,870.40

Resource Allocation Adjustment Panel

Prior Year Reconciliation $3,420.00

Flu Vaccinations $23.00

SSO Special Education $6,196.00

TOTAL Supplementations $9,639.00

Supplementations

TOTAL Part 6: Supplementations $24,509.40

Part 6: Supplementations

Waste $907.65

Water $597.92

Energy $4,158.25

Telephone $1,428.11

Breakdown Maintenance $7,718.30

TOTAL Utilities & Maintenance $27,686.27

TOTAL Part 5: Utilities & Maintenance $27,686.27

Report Run:22/06/2011

Energy $8,500.15

Cleaning $17,840.15

Utilities & Maintenance

Part 5: Utilities & Maintenance

ESL Occasional Hours BSSO $147.84

ESL Occasional Hours BSSO $332.64

ESL Occasional Hours BSSO $813.12

Early Assistance Grant $2,326.00

Special Education - Students with Learning Difficulties $3,126.24

ESL Occasional Hours BSSO $369.60

Early Years Literacy and Numeracy $5,344.00

Primary M/S Strategy Teacher Professional Learning $7,818.00

TOTAL Whole School Literacy & Numeracy Grants $20,277.44

Whole School Literacy & Numeracy Grants

School Support Grant $8,174.19

Furniture Replacement $594.35

Training and Development $200.16

TOTAL Grants $8,968.70

Grants

TOTAL Part 4: Grants $29,246.14

Part 4: Grants

SSO2 44.000 $29.85 $68,296.80

SSO1 13.500 $25.02 $17,564.04

TOTAL Industrial Entitlement $85,860.84

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $85,860.84

Part 2: Ancillary Staffing

Mainstream A $1,660.00

Mainstream D $9,354.00

Flexible Initiatives Resourcing 0.190 $85,893.00 $16,319.67

Additional Admin Leadership Time 0.100 $85,893.00 $8,589.30

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $53,101.57

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 3.120 $85,893.00 $267,986.16

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 26.000 $352.00 $9,152.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $477,898.16

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $530,999.73

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Uraidla Primary School ( 0449 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 6: Supplementations $31,756.85

Part 5: Utilities & Maintenance $41,204.94

Part 4: Grants $29,246.14

TOTAL Others $102,207.93

Others

Teacher (FTE) 5.610 $521,847.73

Teacher (DAYS) Supplementation 12.500 $4,400.00

Teacher (DAYS) 26.000 $9,152.00

Ancillary (HRS) 57.500 $85,860.84

TOTAL Staffing $621,260.57

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $723,468.50

SUMMARY

Breakdown Maintenance - Prior Years $20,725.00

Prior Year Reconciliation $35.45

Teacher Salary Adjustment $4,955.40

TRT Over-entitlement 12.500 $352.00 $4,400.00

SSO Special Education $6,041.00

TOTAL Supplementations $36,156.85

Supplementations

TOTAL Part 6: Supplementations $36,156.85

Part 6: Supplementations

Water $146.77

Breakdown Maintenance $10,871.45

Telephone $2,149.82

Waste $1,696.60

TOTAL Utilities & Maintenance $41,204.94

TOTAL Part 5: Utilities & Maintenance $41,204.94

Report Run:22/06/2011

Early Years Literacy and Numeracy $8,577.00

Primary M/S Strategy Teacher Professional Learning $15,340.00

Special Education - Students with Learning Difficulties $11,956.57

Early Assistance Grant $4,120.00

TOTAL Whole School Literacy & Numeracy Grants $39,993.57

Whole School Literacy & Numeracy Grants

Training and Development $1,292.39

Furniture Replacement $1,354.48

School Support Grant $14,516.01

Rural and Isolated Index $8,005.00

TOTAL Grants $25,167.88

Grants

TOTAL Part 4: Grants $65,161.45

Part 4: Grants

ACEO1 2.100 $25.50 $2,784.60

TOTAL Additional Allocations $2,784.60

Additional Allocations

SSO1 56.500 $25.02 $73,508.76

SSO2 30.000 $29.85 $46,566.00

TOTAL Industrial Entitlement $120,074.76

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $122,859.36

Part 2: Ancillary Staffing

Primary School Counsellor 0.320 $95,723.00 $30,631.36

Flexible Initiatives Resourcing 0.420 $85,893.00 $36,075.06

Additional Admin Leadership Time 0.240 $85,893.00 $20,614.32

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $4,980.00

Mainstream D $4,677.00

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $191,460.04

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Teachers 6.640 $85,893.00 $570,329.52

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 51.000 $352.00 $17,952.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $1,037,046.67

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,228,506.71

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Woodside Primary School ( 0495 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $65,161.45

Part 5: Utilities & Maintenance $77,712.03

Part 6: Supplementations $29,373.39

TOTAL Others $172,246.87

Others

Teacher (DAYS) Supplementation 41.500 $14,608.00

Teacher (FTE) 13.270 $1,210,554.71

Ancillary (HRS) 88.600 $122,859.36

Teacher (DAYS) 51.000 $17,952.00

TOTAL Staffing $1,365,974.07

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,538,220.94

SUMMARY

National Partnerships: Student Mentoring -$133,258.00

SSO Special Education $3,206.30

TRT Over-entitlement 36.500 $352.00 $12,848.00

TRT Over-entitlement 5.000 $352.00 $1,760.00

Double Debiting - Teacher $4,414.14

Flu Vaccinations $138.00

Prior Year Reconciliation $21,614.95

National Partnerships: Student Mentoring $133,258.00

TOTAL Supplementations $43,981.39

Supplementations

TOTAL Part 6: Supplementations $43,981.39

Part 6: Supplementations

Breakdown Maintenance $18,207.35

Water $6,026.80

Telephone $2,939.13

Cleaning $40,787.43

Energy $9,751.32

TOTAL Utilities & Maintenance $77,712.03

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $77,712.03

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Telephone $1,369.78

Waste $434.73

Cleaning $15,015.48

Energy $4,252.79

Breakdown Maintenance $8,490.50

TOTAL Utilities & Maintenance $29,563.28

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $29,563.28

Part 5: Utilities & Maintenance

Special Education - Students with Learning Difficulties $1,745.56

Early Assistance Grant $1,819.00

Primary M/S Strategy Teacher Professional Learning $4,130.00

Early Years Literacy and Numeracy $2,579.00

TOTAL Whole School Literacy & Numeracy Grants $10,273.56

Whole School Literacy & Numeracy Grants

School Support Grant $6,115.88

Furniture Replacement $386.28

Training and Development $126.10

TOTAL Grants $6,628.26

Grants

TOTAL Part 4: Grants $16,901.82

Part 4: Grants

SSO1 15.000 $25.02 $19,515.60

SSO2 32.000 $29.85 $49,670.40

TOTAL Industrial Entitlement $69,186.00

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $69,186.00

Part 2: Ancillary Staffing

Extra Administration Time 0.200 $85,893.00 $17,178.60

Additional Admin Leadership Time 0.060 $85,893.00 $5,153.58

Flexible Initiatives Resourcing 0.100 $85,893.00 $8,589.30

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $30,921.48

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.810 $85,893.00 $155,466.33

Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 21.500 $352.00 $7,568.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $357,129.33

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $388,050.81

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Basket Range Primary School ( 0511 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $16,901.82

Part 5: Utilities & Maintenance $29,563.28

Part 6: Supplementations $9,548.00

TOTAL Others $56,013.10

Others

Teacher (DAYS) 21.500 $7,568.00

Ancillary (HRS) 47.000 $69,186.00

Teacher (FTE) 4.170 $380,482.81

TOTAL Staffing $457,236.81

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $513,249.91

SUMMARY

Breakdown Maintenance - Prior Years $9,548.00

TOTAL Supplementations $9,548.00

Supplementations

TOTAL Part 6: Supplementations $9,548.00

Part 6: Supplementations

Report Run:22/06/2011

Cleaning $21,542.69

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $14,986.00

Special Education - Students with Learning Difficulties $8,694.00

Early Assistance Grant $3,613.00

Early Years Literacy and Numeracy $8,017.00

TOTAL Whole School Literacy & Numeracy Grants $35,310.00

Whole School Literacy & Numeracy Grants

Training and Development $451.73

School Support Grant $13,737.19

Furniture Replacement $1,283.19

TOTAL Grants $15,472.11

Grants

TOTAL Part 4: Grants $50,782.11

Part 4: Grants

ACEO1 4.200 $25.50 $5,569.20

TOTAL Additional Allocations $5,569.20

Additional Allocations

SSO2 37.500 $29.85 $58,207.50

SSO1 38.000 $25.02 $49,439.52

TOTAL Industrial Entitlement $107,647.02

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $113,216.22

Part 2: Ancillary Staffing

Mainstream A $12,035.00

Primary School Counsellor 0.320 $95,723.00 $30,631.36

Additional Admin Leadership Time 0.220 $85,893.00 $18,896.46

Mainstream D $14,031.00

Flexible Initiatives Resourcing 0.380 $85,893.00 $32,639.34

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $108,233.16

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Teachers 5.230 $85,893.00 $449,220.39

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 42.500 $352.00 $14,960.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $912,945.54

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,021,178.70

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Birdwood Primary School ( 0547 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $50,782.11

Part 6: Supplementations $44,646.75

Part 5: Utilities & Maintenance $51,714.55

TOTAL Others $147,143.41

Others

Teacher (DAYS) Supplementation 61.500 $21,648.00

Teacher (DAYS) 42.500 $14,960.00

Teacher (FTE) 10.700 $1,006,218.70

Ancillary (HRS) 79.700 $113,216.22

TOTAL Staffing $1,156,042.92

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,303,186.33

SUMMARY

SSO Special Education $2,479.00

Breakdown Maintenance - Prior Years $8,542.00

TRT Over-entitlement 61.500 $352.00 $21,648.00

Double Debiting - Teacher $4,325.75

Prior Year Reconciliation $29,300.00

TOTAL Supplementations $66,294.75

Supplementations

TOTAL Part 6: Supplementations $66,294.75

Part 6: Supplementations

Breakdown Maintenance $17,306.45

Water $1,794.36

Waste $4,429.24

Energy $4,009.01

Telephone $2,632.80

TOTAL Utilities & Maintenance $51,714.55

TOTAL Part 5: Utilities & Maintenance $51,714.55

Report Run:22/06/2011

Telephone $2,894.25

Cleaning $22,317.93

Energy $11,284.29

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $14,016.00

Special Education - Students with Learning Difficulties $7,926.40

Early Assistance Grant $3,223.00

Early Years Literacy and Numeracy $7,550.00

TOTAL Whole School Literacy & Numeracy Grants $32,715.40

Whole School Literacy & Numeracy Grants

Training and Development $410.50

School Support Grant $11,235.27

Furniture Replacement $1,148.91

TOTAL Grants $12,794.68

Grants

TOTAL Part 4: Grants $45,510.08

Part 4: Grants

ACEO1 2.800 $25.50 $3,712.80

TOTAL Additional Allocations $3,712.80

Additional Allocations

SSO2 79.500 $29.85 $123,399.90

SSO1 2.000 $25.02 $2,602.08

TOTAL Industrial Entitlement $126,001.98

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $129,714.78

Part 2: Ancillary Staffing

Early Years Scheme 1.100 $85,893.00 $94,482.30

Mainstream A $7,055.00

Flexible Initiatives Resourcing 0.300 $85,893.00 $25,767.90

Additional Admin Leadership Time 0.180 $85,893.00 $15,460.74

Mainstream D $22,215.75

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $164,981.69

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 4.830 $85,893.00 $414,863.19

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Temporary Relieving Teachers (TRT) 51.500 $352.00 $18,128.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $732,250.19

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $897,231.88

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Bridgewater Primary School ( 0636 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 6: Supplementations $17,883.50

Part 5: Utilities & Maintenance $58,107.68

Part 4: Grants $45,510.08

TOTAL Others $121,501.26

Others

Ancillary (HRS) 107.300 $158,216.38

Teacher (DAYS) 51.500 $18,128.00

Teacher (DAYS) Supplementation 23.500 $8,272.00

Teacher (FTE) 9.410 $879,103.88

TOTAL Staffing $1,063,720.26

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,185,221.52

SUMMARY

Adjustments 23.000 $30.98 $28,501.60

TOTAL Resource Allocation Adjustment Panel $28,501.60

Resource Allocation Adjustment Panel

Prior Year Reconciliation $10,200.00

TRT Over-entitlement 23.500 $352.00 $8,272.00

SSO Special Education $7,683.50

TOTAL Supplementations $26,155.50

Supplementations

TOTAL Part 6: Supplementations $54,657.10

Part 6: Supplementations

Breakdown Maintenance $14,925.50

Water $4,932.25

Waste $1,753.46

TOTAL Utilities & Maintenance $58,107.68

TOTAL Part 5: Utilities & Maintenance $58,107.68

Report Run:22/06/2011

Telephone $2,586.26

Waste $3,771.84

Cleaning $19,146.77

Energy $7,150.99

Water $4,186.23

Utilities & Maintenance

Part 5: Utilities & Maintenance

Primary M/S Strategy Teacher Professional Learning $5,782.00

Special Education - Students with Learning Difficulties $6,159.50

Early Assistance Grant $2,326.00

Early Years Literacy and Numeracy $3,822.00

TOTAL Whole School Literacy & Numeracy Grants $18,089.50

Whole School Literacy & Numeracy Grants

School Support Grant $7,100.28

Training and Development $190.93

Furniture Replacement $593.52

TOTAL Grants $7,884.73

Grants

TOTAL Part 4: Grants $25,974.23

Part 4: Grants

SSO1 1.500 $25.02 $1,951.56

SSO2 50.000 $29.85 $77,610.00

TOTAL Industrial Entitlement $79,561.56

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $79,561.56

Part 2: Ancillary Staffing

Mainstream A $14,110.00

Mainstream D $23,385.00

Flexible Initiatives Resourcing 0.140 $85,893.00 $12,025.02

Additional Admin Leadership Time 0.080 $85,893.00 $6,871.44

Extra Administration Time 0.200 $85,893.00 $17,178.60

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $73,570.06

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Teachers 1.910 $85,893.00 $164,055.63

Principal Lvl 2 (PC02) 1.000 $108,930.00 $108,930.00

Coordinator Level 1/ Key Teacher 1.000 $91,830.00 $91,830.00

Temporary Relieving Teachers (TRT) 24.500 $352.00 $8,624.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $373,439.63

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $447,009.69

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Callington Primary School ( 0705 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $46,362.19

Part 4: Grants $25,974.23

Part 6: Supplementations $10,224.13

TOTAL Others $82,560.55

Others

Ancillary (HRS) 51.500 $79,561.56

Teacher (DAYS) 24.500 $8,624.00

Teacher (FTE) 4.330 $438,385.69

TOTAL Staffing $526,571.25

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $609,131.80

SUMMARY

Prior Year Reconciliation $23.53

SSO Special Education $6,011.00

Double Debiting - Teacher $4,189.60

TOTAL Supplementations $10,224.13

Supplementations

TOTAL Part 6: Supplementations $10,224.13

Part 6: Supplementations

Breakdown Maintenance $9,520.10

TOTAL Utilities & Maintenance $46,362.19

TOTAL Part 5: Utilities & Maintenance $46,362.19

Report Run:22/06/2011

Primary M/S Strategy Teacher Professional Learning $14,042.00

Special Education - Students with Learning Difficulties $16,881.39

Early Assistance Grant $2,716.00

Early Years Literacy and Numeracy $6,120.00

TOTAL Whole School Literacy & Numeracy Grants $39,759.39

Whole School Literacy & Numeracy Grants

Training and Development $1,752.67

Student Mentoring $18,252.60

Furniture Replacement $3,256.89

School Support Grant $63,636.97

TOTAL Grants $86,899.13

Grants

TOTAL Part 4: Grants $126,658.52

Part 4: Grants

ACEO1 3.500 $25.50 $4,641.00

TOTAL Additional Allocations $4,641.00

Additional Allocations

SSO3 67.500 $34.31 $120,428.10

SSO4 37.500 $38.52 $75,114.00

Gov. Services Employee 1-7 25.000 $23.69 $30,797.00

SSO2 53.000 $29.85 $82,266.60

SSO1 34.500 $25.02 $44,885.88

TOTAL Industrial Entitlement $353,491.58

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $358,132.58

Part 2: Ancillary Staffing

Mainstream D $76,001.25

Additional Admin Leadership Time 0.170 $85,893.00 $14,601.81

Mainstream A $27,390.00

Flexible Initiatives Resourcing 0.990 $85,893.00 $85,034.07

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $203,027.13

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 2.000 $91,830.00 $183,660.00

Coordinator Level 3 / Secondary Coordinator 6.000 $100,009.00 $600,054.00

Assistant Principal Level 1 1.000 $101,138.00 $101,138.00

Principal Lvl 6 (PC06) 1.000 $135,604.00 $135,604.00

Deputy Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Temporary Relieving Teachers (TRT) 92.000 $352.00 $32,384.00

Teachers 19.310 $85,893.00 $1,658,593.83

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $2,827,032.83

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $3,030,059.96

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Oakbank Area School ( 0762 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $255,485.01

Part 4: Grants $126,658.52

Part 6: Supplementations $113,589.63

TOTAL Others $495,733.16

Others

Teacher (DAYS) Supplementation 151.000 $53,152.00

Teacher (FTE) 31.470 $2,997,675.96

Teacher (DAYS) 92.000 $32,384.00

Ancillary (HRS) 227.000 $365,523.86

TOTAL Staffing $3,448,735.82

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $3,944,468.98

SUMMARY

Adjustments 6.000 $23.69 $7,391.28

TOTAL Resource Allocation Adjustment Panel $7,391.28

Resource Allocation Adjustment Panel

Youth Compact – non SATAC 100% $5,107.50

Flu Vaccinations $368.00

Prior Year Reconciliation $13,837.23

Teacher Salary Adjustment $39,399.21

Surplus Teacher -$30,514.47

Breakdown Maintenance - Prior Years $3,157.00

TRT Over-entitlement 151.000 $352.00 $53,152.00

Open Access TRT Recovery -$8,500.00

SSO Special Education $4,615.00

Breakdown Maintenance - Prior Years $78,128.00

Youth Compact – SATAC 10% $170.25

Youth Compact – SATAC 10% $510.75

Youth Compact – SATAC 10% $510.75

Youth Compact – non SATAC 100% $3,405.00

Swimming Pool Operating Allowance $3,395.41

TOTAL Supplementations $166,741.63

Supplementations

TOTAL Part 6: Supplementations $174,132.91

Part 6: Supplementations

Breakdown Maintenance $49,321.94

Water $40,202.08

Waste $5,464.42

Telephone $9,870.01

Cleaning $102,425.28

Energy $48,201.28

TOTAL Utilities & Maintenance $255,485.01

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $255,485.01

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Supplementary ESL Allocation for NAP Exit Students $1,414.37

ESL Occasional Hours BSSO $739.20

ESL Occasional Hours BSSO $665.28

ESL Occasional Hours BSSO $1,478.40

Special Education - Students with Learning Difficulties $17,079.76

ESL Occasional Hours BSSO $1,626.24

TOTAL Whole School Literacy & Numeracy Grants $23,003.25

Whole School Literacy & Numeracy Grants

Training and Development $3,140.18

School Support Grant $106,532.96

Furniture Replacement $4,679.35

TOTAL Grants $114,352.49

Grants

Part 4: Grants

ACEO1 0.700 $25.50 $928.20

TOTAL Additional Allocations $928.20

Additional Allocations

SSO3 37.500 $34.31 $66,904.50

SSO4 37.500 $38.52 $75,114.00

Gov. Services Employee 1-7 38.000 $23.69 $46,811.44

SSO1 72.500 $25.02 $94,325.40

SSO2 117.500 $29.85 $182,383.50

TOTAL Industrial Entitlement $465,538.84

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $466,467.04

Part 2: Ancillary Staffing

Mainstream I $10,410.00

Mainstream D $78,339.75

Flexible Initiatives Resourcing 1.580 $85,893.00 $135,710.94

Mainstream A $27,805.00

ESL Teacher/s 0.210 $85,893.00 $18,037.53

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $270,303.22

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Assistant Principal Level 2 1.000 $107,059.00 $107,059.00

Coordinator Level 3 / Secondary Coordinator 10.000 $100,009.00 $1,000,090.00

Principal Lvl 6 (PC06) 1.000 $135,604.00 $135,604.00

Deputy Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Teachers 29.920 $85,893.00 $2,569,918.56

Temporary Relieving Teachers (TRT) 92.000 $352.00 $32,384.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $3,960,654.56

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $4,230,957.78

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Birdwood High School ( 0770 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Teacher (FTE) Supplementation 1.000 $85,893.00

Teacher (DAYS) 92.000 $32,384.00

Ancillary (HRS) 333.700 $503,496.64

Teacher (DAYS) Supplementation 323.500 $113,872.00

Teacher (FTE) 44.710 $4,198,573.78

TOTAL Staffing $4,934,219.42

Staffing

SUMMARY

Adjustments 10.000 $30.98 $12,392.00

Adjustments 20.000 $23.69 $24,637.60

TOTAL Resource Allocation Adjustment Panel $37,029.60

Resource Allocation Adjustment Panel

Youth Compact – non SATAC 100% $3,405.00

Youth Compact – non SATAC 100% $5,107.50

Youth Compact – SATAC 10% $340.50

Youth Compact – SATAC 10% $170.25

Youth Compact – SATAC 10% $340.50

Prior Year Reconciliation -$3,500.00

Other 1.000 $85,893.00 $85,893.00

Engineering Pathways $11,500.00

Youth Compact – non SATAC 100% $5,107.50

Engineering Pathways $3,500.00

Double Debiting - Teacher $2,613.39

Open Access TRT Recovery -$880.00

TRT Over-entitlement 323.500 $352.00 $113,872.00

Double Debiting - Teacher $3,846.50

SSO Special Education $11,634.00

Breakdown Maintenance - Prior Years $3,027.44

Breakdown Maintenance - Prior Years $29,427.00

Teacher Salary Adjustment $2,312.52

Surplus Teacher -$13,597.93

TOTAL Supplementations $264,119.17

Supplementations

TOTAL Part 6: Supplementations $301,148.77

Part 6: Supplementations

Water $34,478.51

Waste $11,838.26

Energy $71,689.10

Telephone $9,716.18

Cleaning $107,635.90

Breakdown Maintenance $74,244.86

TOTAL Utilities & Maintenance $309,602.81

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $309,602.81

Part 5: Utilities & Maintenance

TOTAL Part 4: Grants $137,355.74

Report Run:22/06/2011

Part 5: Utilities & Maintenance $309,602.81

Part 6: Supplementations $64,354.17

Part 4: Grants $137,355.74

TOTAL Others $511,312.72

Others

TOTAL RESOURCE ENTITLEMENT STATEMENT $5,445,532.14

Report Run:22/06/2011

Special Education - Students with Learning Difficulties $18,355.45

TOTAL Whole School Literacy & Numeracy Grants $18,355.45

Whole School Literacy & Numeracy Grants

Training and Development $3,005.72

School Support Grant $99,083.91

Furniture Replacement $4,142.20

TOTAL Grants $106,231.83

Grants

TOTAL Part 4: Grants $124,587.28

Part 4: Grants

Special Class SSO 10.000 $25.02 $13,010.40

ACEO1 4.200 $25.50 $5,569.20

TOTAL Additional Allocations $18,579.60

Additional Allocations

SSO2 92.000 $29.85 $142,802.40

SSO1 122.000 $25.02 $158,726.88

Gov. Services Employee 1-7 32.000 $23.69 $39,420.16

SSO4 37.500 $38.52 $75,114.00

TOTAL Industrial Entitlement $416,063.44

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $434,643.04

Part 2: Ancillary Staffing

Mainstream D $100,555.50

Flexible Initiatives Resourcing 1.380 $85,893.00 $118,532.34

Mainstream A $48,438.80

Special Class Teacher 1.200 $85,893.00 $103,071.60

ESL Teacher/s 0.060 $85,893.00 $5,153.58

Challenging Behaviours 2 $9,252.00

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $385,003.82

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Assistant Principal Level 2 1.000 $107,059.00 $107,059.00

Coordinator Level 3 / Secondary Coordinator 10.000 $100,009.00 $1,000,090.00

Principal Lvl 6 (PC06) 1.000 $135,604.00 $135,604.00

Deputy Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Teachers 25.830 $85,893.00 $2,218,616.19

Temporary Relieving Teachers (TRT) 84.000 $352.00 $29,568.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $3,606,536.19

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $3,991,540.01

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Mount Barker High School ( 0783 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 4: Grants $124,587.28

Part 5: Utilities & Maintenance $291,686.65

Part 6: Supplementations $221,825.26

TOTAL Others $638,099.19

Others

Teacher (DAYS) Supplementation 308.500 $108,592.00

Teacher (FTE) 41.470 $3,961,972.01

Teacher (DAYS) 84.000 $29,568.00

Ancillary (HRS) 303.700 $442,034.32

TOTAL Staffing $4,542,166.33

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $5,180,265.52

SUMMARY

Adjustments 6.000 $23.69 $7,391.28

TOTAL Resource Allocation Adjustment Panel $7,391.28

Resource Allocation Adjustment Panel

Youth Compact – non SATAC 100% $8,512.50

Flu Vaccinations $460.00

Prior Year Reconciliation $81,600.00

SSO Special Education $13,135.00

Surplus Teacher -$3,054.24

Flexible Learning Options (FLO) $62,992.50

Open Access TRT Recovery -$440.00

TRT Over-entitlement 300.500 $352.00 $105,776.00

TRT Special Purpose 8.000 $352.00 $2,816.00

Open Access TRT Recovery -$6,375.00

Youth Compact – SATAC 10% $510.75

Youth Compact – non SATAC 100% $23,835.00

Youth Compact – non SATAC 100% $5,107.50

Youth Compact – SATAC 10% $510.75

Youth Compact – non SATAC 100% $1,702.50

Breakdown Maintenance - Prior Years $33,328.00

TOTAL Supplementations $330,417.26

Supplementations

TOTAL Part 6: Supplementations $337,808.54

Part 6: Supplementations

Breakdown Maintenance $67,496.69

Water $12,038.81

Energy $85,936.43

Telephone $11,084.59

Cleaning $109,937.67

Waste $5,192.46

TOTAL Utilities & Maintenance $291,686.65

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $291,686.65

Part 5: Utilities & Maintenance

Report Run:22/06/2011

Report Run:22/06/2011

Cleaning $107,257.47

Energy $65,744.72

Utilities & Maintenance

Part 5: Utilities & Maintenance

Special Education - Students with Learning Difficulties $12,757.44

TOTAL Whole School Literacy & Numeracy Grants $12,757.44

Whole School Literacy & Numeracy Grants

Training and Development $2,868.96

Furniture Replacement $4,232.55

School Support Grant $113,171.91

TOTAL Grants $120,273.42

Grants

TOTAL Part 4: Grants $133,030.86

Part 4: Grants

ACEO1 4.900 $25.50 $6,497.40

TOTAL Additional Allocations $6,497.40

Additional Allocations

Gov. Services Employee 1-7 38.000 $23.69 $46,811.44

SSO2 61.500 $29.85 $95,460.30

SSO1 103.000 $25.02 $134,007.12

SSO5 37.500 $45.42 $88,569.00

SSO3 75.000 $34.31 $133,809.00

TOTAL Industrial Entitlement $498,656.86

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $505,154.26

Part 2: Ancillary Staffing

Mainstream D $49,576.20

ESL Teacher/s 0.040 $85,893.00 $3,435.72

Mainstream A $13,280.00

Flexible Initiatives Resourcing 1.700 $85,893.00 $146,018.10

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $212,310.02

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Assistant Principal Level 2 1.000 $107,059.00 $107,059.00

Coordinator Level 3 / Secondary Coordinator 11.000 $100,009.00 $1,100,099.00

Principal Lvl 6 (PC06) 1.000 $135,604.00 $135,604.00

Deputy Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Teachers 32.630 $85,893.00 $2,802,688.59

Temporary Relieving Teachers (TRT) 103.500 $352.00 $36,432.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $4,297,481.59

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $4,509,791.61

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Heathfield High School ( 0926 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $301,606.84

Part 6: Supplementations $288,003.65

Part 4: Grants $133,030.86

TOTAL Others $722,641.35

Others

Teacher (FTE) 48.370 $4,473,359.61

Teacher (DAYS) 103.500 $36,432.00

Teacher (DAYS) Supplementation 281.000 $98,912.00

Ancillary (HRS) 319.900 $505,154.26

TOTAL Staffing $5,113,857.87

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $5,836,499.22

SUMMARY

E-Learning Flexible Delivery $50,550.00

Breakdown Maintenance - Prior Years $58,208.00

Youth Compact – SATAC 10% $340.50

Youth Compact – SATAC 10% $340.50

Open Access TRT Recovery -$440.00

TRT Over-entitlement 281.000 $352.00 $98,912.00

Surplus Teacher -$16,004.10

SSO Special Education $8,925.00

Flu Vaccinations $506.00

Prior Year Reconciliation $136,340.00

Other $26,764.75

Youth Compact – non SATAC 100% $5,107.50

Youth Compact – SATAC 10% $340.50

Youth Compact – non SATAC 100% $11,917.50

Youth Compact – non SATAC 100% $5,107.50

TOTAL Supplementations $386,915.65

Supplementations

TOTAL Part 6: Supplementations $386,915.65

Part 6: Supplementations

Water $26,560.81

Breakdown Maintenance $79,473.51

Telephone $15,899.42

Waste $6,670.91

TOTAL Utilities & Maintenance $301,606.84

TOTAL Part 5: Utilities & Maintenance $301,606.84

Report Run:22/06/2011

Adjustments 1.000 $85,893.00 $85,893.00

Adjustments 4.250 $29.85 $6,596.85

TOTAL Resource Allocation Adjustment Panel $92,489.85

Resource Allocation Adjustment Panel

TRT Over-entitlement 17.500 $352.00 $6,160.00

TOTAL Supplementations $6,160.00

Supplementations

TOTAL Part 6: Supplementations $98,649.85

Part 6: Supplementations

Telephone $3,611.88

Waste $973.33

Cleaning $24,128.92

Energy $21,397.38

Water $2,136.86

Breakdown Maintenance $33,973.90

TOTAL Utilities & Maintenance $86,222.27

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $86,222.27

Part 5: Utilities & Maintenance

School Support Grant $50,000.00

TOTAL Grants $50,000.00

Grants

TOTAL Part 4: Grants $50,000.00

Part 4: Grants

Gov. Services Employee 1-7 156.000 $23.69 $192,173.28

Operational Services Officer 38.000 $40.14 $79,316.64

SSO2 75.000 $29.85 $116,415.00

SSO3 30.000 $34.31 $53,523.60

TOTAL Industrial Entitlement $441,428.52

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $441,428.52

Part 2: Ancillary Staffing

Teachers 2.000 $85,893.00 $171,786.00

Coordinator Level 3 / Secondary Coordinator 1.000 $100,009.00 $100,009.00

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Temporary Relieving Teachers (TRT) 17.000 $352.00 $5,984.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $393,378.00

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $393,378.00

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Arbury Park Outdoor School ( 1426 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $86,222.27

Part 4: Grants $50,000.00

TOTAL Others $136,222.27

Others

Ancillary (HRS) 303.250 $448,025.37

Teacher (DAYS) Supplementation 17.500 $6,160.00

Teacher (FTE) 5.000 $473,287.00

Teacher (DAYS) 17.000 $5,984.00

TOTAL Staffing $933,456.37

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,069,678.64

SUMMARY

Report Run:22/06/2011

Early Years Component (SAISOP) $4,807.00

Special Education - Students with Learning Difficulties $17,782.08

Disadvantaged Schools Program (SAISOP) $15,857.00

Early Assistance Grant $3,457.00

Primary M/S Strategy Teacher Professional Learning $17,712.00

Whole School Literacy & Numeracy Grants

Training and Development $751.57

Furniture Replacement $1,474.68

School Support Grant $14,404.75

TOTAL Grants $16,631.00

Grants

Part 4: Grants

ACEO1 4.900 $25.50 $6,497.40

Special Class SSO 22.000 $25.02 $28,622.88

TOTAL Additional Allocations $35,120.28

Additional Allocations

SSO1 37.500 $25.02 $48,789.00

SSO2 22.000 $29.85 $34,148.40

SSO3 37.500 $34.31 $66,904.50

TOTAL Industrial Entitlement $149,841.90

Industrial Entitlement

TOTAL Part 2: Ancillary Staffing $184,962.18

Part 2: Ancillary Staffing

Mainstream A $16,600.00

Flexible Initiatives Resourcing 0.410 $85,893.00 $35,216.13

Additional Admin Leadership Time 0.240 $85,893.00 $20,614.32

Primary School Counsellor 0.470 $95,723.00 $44,989.81

ESL Teacher/s 0.060 $85,893.00 $5,153.58

Special Class Teacher 2.200 $85,893.00 $188,964.60

Mainstream D $44,431.50

TOTAL Commonwealth & State Government Initiatives (Tier 2 Staffing) $355,969.94

Commonwealth & State Government Initiatives (Tier 2 Staffing)

Coordinator Level 1/ Key Teacher 3.000 $91,830.00 $275,490.00

Teachers 4.530 $85,893.00 $389,095.29

Principal Lvl 3 (PC03) 1.000 $115,599.00 $115,599.00

Deputy Principal Lvl 1 (PC01) 1.000 $102,265.00 $102,265.00

Term 3 Intake 0.550 $85,893.00 $47,241.15

Temporary Relieving Teachers (TRT) 52.500 $352.00 $18,480.00

TOTAL Industrial Entitlement (Tier 1 Staffing Allocation) $948,170.44

Industrial Entitlement (Tier 1 Staffing Allocation)

TOTAL Part 1: Teaching Staff $1,304,140.38

Part 1: Teaching Staff

Resource Entitlement Statement (Reconciled RES 2010)

Mount Barker South Primary School ( 1539 )Position FTE/HPW/DAYS Unit Cost Total

Report Run:22/06/2011

Part 5: Utilities & Maintenance $85,363.27

Part 4: Grants $95,570.08

Part 6: Supplementations $39,673.02

TOTAL Others $220,606.37

Others

Teacher (FTE) 13.460 $1,285,660.38

Teacher (DAYS) Supplementation 91.000 $32,032.00

Teacher (FTE) Supplementation 0.200 $4,294.65

Ancillary (HRS) 138.900 $189,144.48

Teacher (DAYS) 52.500 $18,480.00

TOTAL Staffing $1,529,611.51

Staffing

TOTAL RESOURCE ENTITLEMENT STATEMENT $1,750,217.88

SUMMARY

Adjustments 15.000 $30.98 $4,182.30

TOTAL Resource Allocation Adjustment Panel $4,182.30

Resource Allocation Adjustment Panel

Teacher Salary Adjustment $3,567.89

Teacher Salary Adjustment $1,321.44

Prior Year Reconciliation $80.40

SSO Special Education $28,285.00

TRT Over-entitlement 91.000 $352.00 $32,032.00

Teacher Supplementation 0.200 $85,893.00 $4,294.65

Double Debiting - Teacher $3,303.60

Double Debiting - Teacher $3,114.69

TOTAL Supplementations $75,999.67

Supplementations

TOTAL Part 6: Supplementations $80,181.97

Part 6: Supplementations

Telephone $3,670.36

Waste $1,843.16

Cleaning $33,855.21

Energy $15,971.72

Water $11,944.17

Breakdown Maintenance $18,078.65

TOTAL Utilities & Maintenance $85,363.27

Utilities & Maintenance

TOTAL Part 5: Utilities & Maintenance $85,363.27

Part 5: Utilities & Maintenance

Early Years Literacy and Numeracy $19,324.00

TOTAL Whole School Literacy & Numeracy Grants $78,939.08

TOTAL Part 4: Grants $95,570.08