EXISTING 300mmØ CSP DRIVEWAY
CULVERT TO BE REMOVED
EXISTING 450mmØ CSP
CULVERT TO BE REMOVED
HP HP
HP
HP
HYD
EX. VB
EX. VB
BPED
BPED
BPED
HP
HP
HP
HP
HP
EX. VB
BPED
15
16
17
MH17A
94.2m - 300mm SAN @ 0.25%
291
HW4
CURB AS PER OPSD
600.100
BLOCK 92
DCBMH51
ST
RE
ET
A
McNABB STREET
R
A
I
L
W
A
Y
S
T
R
E
E
T
MH16A
64.1m - 300mm SAN @ 0.25%
EX CBMH B-1
MH22
3
2
.
6
m
-
4
5
0
m
m
S
T
M
@
0
.
7
4
%
90.7m - 450mm STM @ 0.40%
R
=
9
.
0
0
m
R
=
9
.
0
0
m
1.5m
C
ON
CR
ET
E S
ID
EW
ALK
EX. 150mmØ WATERMAIN
(TO BE REMOVED)
DCB
330
TIE INTO EXISTING CURB AND
GUTTER, AND ASPHALT AS
SHOWN WITH PAVEMENT LAP JOINT
48.8m - 375mm STM @ 0.30%
9.5m - 600mm STM @ -1.05%
CTRLMH1
E
X
.
1
5
0
m
m
A
C
W
A
T
E
R
M
A
I
N
E
X
2
0
0
m
m
Ø
P
V
C
W
A
T
E
R
M
A
I
N
BLOCK 91
0.30m RESERVE
HP
BLOCK 93
SWM FACILITY
DCB
EX. VB
E
X
.
D
I
T
C
H
EX MH
EXISTING DICB c/w
150mmØ RIP RAP
TOP = 193.75
INV = 192.99
EXISTING 450mmØ
PE STM @ 0.50%
EXISTING WATERCOURSE
EX. VB
EXISTING
1800mm
Ø CSP
CULVER
T TO BE
REMOVE
D
VB
200m
mØ
P
VC
D
R18 W
AT
ER
MA
IN
19.5m - 3.0m x 1.80m PRECAST
CONCRETE BOX CULVERT @ 1.50%
N INV = 190.58
S INV = 190.87
TOP ELEVATION OF EXISTING
MANHOLE TO BE ADJUSTED
TO MATCH PROPOSED
GRADE OF FINISHED
SIDEWALK
EXISTING UTILITY PEDESTAL TO BE
RELOCATED IN CONSULTATION WITH
OWNING UTILITY
E
X
.
4
0
0
m
m
Ø
W
A
T
E
R
M
A
I
N
VBVB
VB
TIE INTO EXISTING 400mmØ WATERMAIN
WITH 400 x 200mm TAPPING SLEEVE AND
VALVE
200mmØ PVC DR18 WATERMAIN
1.5m CONCRETE SIDEWALK
4.7m - 600mm STM @ 2.11%
EXISTING RESIDENTIAL DRIVEWAYS
TO BE REINSTATED;
ASPHALT DRIVEWAYS TO BE 100mm
GRANULAR 'A' AND 50mm H.L.3.
GRAVEL DRIVEWAYS TO BE MIN.
100mm GRANULAR 'A' (TYP.)
BOULEVARD TO BE REINSTATED
WITH 100mm TOPSOIL &
NURSERY SOD OR 100mm
TOPSOIL, SEED & MULCH (TYP.)
2.3m - 450mm STM @ 0.30%
EXISTING RETAINING WALL TO BE REMOVED
HW3
8.5m - 300mm STM @ 0.50%
DCB51
NW INV=191.49
Reinforced Concrete
TOP=193.07
DEPTH TO SUMP=1.9
LOT 291
· SANITARY SERVICE TO BE150mmØ PVC SDR28
· WATER SERVICE TO BE50mmØ PE160
LOT 330
· SANITARY SERVICE TO BE150mmØ PVC SDR28
· WATER SERVICE TO BE50mmØ PE160
EXISTING TEE TO BE CAPPED
FOLLOWING REMOVAL OF EXISTING
WATERMAIN ON MCNABB ST.
VALVE TO REMAIN CLOSED
TO SEPARATE OPERATING
PRESSURE ZONES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
G
G
G
+
-
0
-
0
2
0
+
0
0
0
0
+
0
0
2
0
+0
040
+0
060
+0
080
+0
100
+0
120
+0
140
+0
160
+
0
5
2
0
+
0
5
4
0
+
0
5
6
0
+
0
5
8
0
+
0
6
0
0
6
0
7
+
0
6
4
0
+0
660
+0 680
+0 700
+0 706
MA
TC
H L
IN
E
AT
S
TA
TIO
N - 0+
159.48
NE
XT
S
HE
ET
N
UM
BE
R: C
411
MH16A
(1200Ø)
TOP=193.79
OPSD 701.010
ST
RE
ET
A
ORIGINAL GROUND
EX
150m
mØ
PV
C W
M
MH17A
(1200Ø)
TOP=193.35
OPSD 701.010
0.50m
PROPOSED GROUND
TIE INTO EXISTING ASPHALT
WITH PAVEMENT LAP JOINT
EXISTING 1800mmØ CSP
CULVERT TO BE REMOVED
200mm TEE
200m
mØ
PV
C W
M
EXISTING 150mmØ
WATERMAIN
TO BE REMOVED ALONG
WITH ALL
APPURTENANCES
UNLESS OTHERWISE
SPECIFIED
HY
D
ST
A. 0+
023.755
VB
ST
A. 0+
050.582
VB
ST
A. 0+
075.879
EXISTING 150mmØ WATERMAIN
TIE INTO EXISTING 400mmØ
WATERMAIN WITH 400 x 200mm
TAPPING SLEEVE AND VALVE
RA
ILW
AY
S
TR
EE
T
DCBMH51
(1800Ø)
TOP=193.07
OPSD 701.012
19.5m - 3.0m x 1.80m PRECAST
CONCRETE BOX CULVERT @ 1.50%
N INV = 190.58
S INV = 190.87
0.50m
VB
ST
A. -0+
002.948
45° B
EN
D
45° B
EN
D
45° B
EN
D
45° B
EN
D
45° B
EN
D
45° B
EN
D
45° B
EN
D
45° B
EN
D
2.3m - 450mm PVC STM @
0.30% TO TIE INTO
PRECAST CONCRETE
BOX CULVERT
INV = 191.29
EXISTING TEE TO BE
CAPPED FOLLLOWING
REMOVAL OF EXISTING
WATERMAIN
EX. MCNABB STREET
190
191
192
193
194
195
196
190
191
192
193
194
195
196
PROPOSED
STORM
PROPOSED
STORM
PROPOSED
SANITARY
PROPOSED
SANITARY
EXIST\PROP
CENTERLINE
ELEVATION
EXIST\PROP
CENTERLINE
ELEVATION
CHAINAGE CHAINAGE
76.4m - 375mm PERF. PVC
STM @ 1.30%
2.3m - 450mm PERF. PVC
STM @ 0.30%
94.2m - 300mm PVC
SAN @ 0.25%
79.9m - 300mm PVC
SAN @ 0.25%
194.20
194.196
194.44
194.445
194.20
194.201
194.00
193.995
193.77
193.773
193.60
193.598
193.53
193.531
193.32
193.322
193.19
193.189
193.41
193.410
-0+
020
0+
000
0+
020
0+
040
0+
060
0+
080
0+
100
0+
120
0+
140
0+
160
NE
190.32
SE
190.32
SW
190.08
NE
190.08
-0.8
0%
-0.7
0%
PV
I S
TA
=
0+
008.26
PV
I E
LE
V =
194.169
PV
I S
TA
=
0+
059.83
PV
I E
LE
V =
193.755
PVI STA= 0+159.51
PVI ELEV= 193.058
K= 8.00
LVC= 32.41m
A= 4.05%
BV
CS
= 0+
143.31
BV
CE
= 193.171
LOW PT. STA= 0+148.90
LOW PT ELEV= 193.152
-0.8
0%
-0.7
0%
PV
I S
TA
=
0+
008.26
PV
I E
LE
V =
194.169
PV
I S
TA
=
0+
059.83
PV
I E
LE
V =
193.755
PVI STA= 0+159.51
PVI ELEV= 193.058
K= 8.00
LVC= 32.41m
A= 4.05%
BV
CS
= 0+
143.31
BV
CE
= 193.171
LOW PT. STA= 0+148.90
LOW PT ELEV= 193.152
NE
191.29
NE
191.44
SW
191.30
SE
191.45
0 10.0 20.0 30.0m5.0
H 1:500 V 1:50
KEY PLAN
File: C:\U
sers\kevin\D
esktop\Capes Engineering\Projects\2018-045 Southam
pton Landing\D
esign D
raw
ings\02_ProductionD
wg\033534_P&
P - M
cN
ABB Street.dw
g D
ate Plotted: February 15, 2019 - 9:37 AM
Client
1. This drawing is the exclusive property of CAPES Engineering Ltd. The reproduction of
any part without express written consent of this Corporation is strictly prohibited.
2. The contractor shall verify all dimensions, levels, and datums on site and report any
discrepancies or omissions to CAPES Engineering Ltd. prior to construction.
3. This drawing is to be read and understood in conjunction with all other plans and
documents applicable to this project.
Notes
Scale
Drawing No.Designed Checked Date
Rev No.Project No.
355310 BLUE MOUNTAINS - EUPHRASIA TOWNLINE
CLARKSBURG, ON N0H 1J0
TEL: 705-994-4818
SEATON SOUTHAMPTON LIMITED
245 EGLINTON AVENUE EAST, SUITE 400
TORONTO, ON
M4P 3B7
SOUTHAMPTON LANDING
PLAN AND PROFILE
K. GRIFFIN C. CAPES
2018-045
JAN 2019
1
C410
No Issue / Revision Date Auth
1 ISSUED FOR APPROVALS 2019/02/15
STREET A
STREET B
MCNABB ST.
R
A
I
L
W
A
Y
S
T
.
STORM MANHOLE
LEGEND
SANITARY MANHOLE
SANITARY SERVICE CONNECTION
STORM SERVICE CONNECTION
WATER SERVICE CONNECTION AND CURB STOP
VALVE & BOX
WATERMAIN TEE
HYDRANT
LIGHT STANDARD
TRANSFORMER
MAILBOX PAD
CURB DEPRESSION
EX. GAS MAIN
EX. BELL
EX. LIGHT STANDARD
EX. LS
G
B
EX. CHAIN LINK FENCE
x x
CB
SINGLE CATCHBASIN
DUCT BANK CROSSING
VALVE IN CHAMBER
DRAIN CHAMBER
BELL PEDESTAL
WATER SAMPLING STATION
PAVEMENT STRUCTURE FILL PLACED IN MAX.
200mm LIFTS, COMPACTED TO 98% SPMDD
(SEE PROFILE VIEW)
1.50m CHAIN LINK FENCE
x x
1.80m CHAIN LINK FENCE
ELEVATION 195.62m
BM1
NAIL IN HYDRO POLE AT NORTHEAST CORNER OF INTERSECTION OF
PEEL STREET AND GRENVILLE STREET.
TOP NUT OF HYDRANT 10m SOUTHEAST OF THE INTERSECTION OF PEEL
STREET AND McNABB STREET.
BM2
ELEVATION 195.83m
TOP OF SIB AT EASTERLY CORNER OF THE INTERSECTION OF McNABB
STREET AND HIGHWAY 21.
BM3
ELEVATION 194.06m
BOLT IN HYDRO POLE ON THE EAST SIDE OF HIGHWAY 21-68m SOUTH
OF THE INTERSECTION OF STREET A AND HIGHWAY 21.
BM4
ELEVATION 196.11m
BENCHMARKS
TREE PRESERVATION ZONE
EXISTING WATERCOURSE
CONSTRUCTION NOTES:
1. FULL DEPTH REMOVAL OF EXISTING ASPHALT ON McNABB ST.
(ESTIMATED DEPTH 80mm).
2. FULL DEPTH REMOVAL OF EXISTING SHOULDER GRANULARS
(ESTIMATED DEPTH 150mm).
3. ALL ORGANICS TO BE STRIPPED FROM UNDER ROADBED AND
REPLACE WITH SELECT SUBGRADE MATERIAL.
4. ALL TRENCHES TO BE BACKFILLED WITH GRANULAR MATERIAL (NATIVE
SAND WHERE AVAILABLE)
5. PLACEMENT OF McNABB ST. ROAD BASE AND ASPHALT AS PER TOWN
OF SAUGEEN SHORES TYPICAL URBAN CROSS SECTION.
6. RESTORE GRASS AREAS WITH 100mm TOPSOIL & NURSERY SOD OR
100mm TOPSOIL, SEED & MULCH.
7. EXISTING RESIDENTIAL DRIVEWAYS TO BE REINSTATED; ASPHALT
DRIVEWAYS TO BE 100mm GRANULAR 'A' AND 50mm H.L.3. GRAVEL
DRIVEWAYS TO BE MIN. 100mm GRANULAR 'A'.
Not Fo
r Cons
truction
EXISTING 300mmØ CSP DRIVEWAY
CULVERT TO BE REMOVED
271
HP
EX. HYD
HP
HP
HP
HP
HP
EX. 85.9m - 375mmØ STRM @ 0.20%
EX. VB
82
83
84
85
86
87
LOT 12
LOT 11
LOT 10
79.9m - 300mm SAN @ 0.25%
MH17A
BLOCK 92
DCBMH51
76.4m - 375mm STM @ 1.30%
McNABB STREET
PE
EL S
RE
ET
MH18A
EX MH2A
EX MH1A
80.1m - 300mm SAN @ 0.25%
76
.3
m - 2
00
mm
S
AN
@
1.4
4%
55.2m
- 300m
m S
AN
@
0.23%
EX CBMH3
EX CBMH2
EX CB7
EX CB5
EX CB6
13.7m - 250mm STM @ 0.50%
72
.7
m - 25
0m
m S
TM
@
0
.3
2%
10.7m - 300mm STM @ 0.47%
7.6m - 250mm STM @ 1.32%
39.6m
- 300m
m S
TM
@
0.23%
261
321
320
330
334
340
20mmØ REHAU MUNICIPEX OR
IPEX SDR9 WATER SERVICE
CONNECTION (TYP.)
125mmØ PVC DR28 SANITARY
SERVICE CONNECTION (TYP.)
TIE INTO EXISTING
SANITARY STUB
CURB AS PER OPSD
600.100
TIE INTO EXISTING CURB AND
GUTTER, AND ASPHALT AS
SHOWN WITH PAVEMENT LAP JOINT
EX. VB
EX. VB
EX. DITCH
EX. DITCH
EX. DITCH
EX. DITCH
EX. CB
TOP = 194.14
EXISTING 300mmØ CSP DRIVEWAY
CULVERT TO BE REMOVED
EXISTING 300mmØ CSP DRIVEWAY
CULVERT TO BE REMOVED
EXISTING STORM SEWER OUTLET
TO ROADSIDE DITCH
INV = 193.38
TO BE CONNECTED TO
PROPOSED MH50
EX. VB
200mmØ PVC DR18 WATERMAIN
EXISTING RESIDENTIAL DRIVEWAYS
TO BE REINSTATED;
ASPHALT DRIVEWAYS TO BE 100mm
GRANULAR 'A' AND 50mm H.L.3.
GRAVEL DRIVEWAYS TO BE MIN.
100mm GRANULAR 'A' (TYP.)
BOULEVARD TO BE REINSTATED
WITH 100mm TOPSOIL &
NURSERY SOD OR 100mm
TOPSOIL, SEED & MULCH (TYP.)
TIE INTO EXISTING WATERMAIN,
INSTALLING 150 x 150mmØ TEE
C/W 200 x 150mm REDUCER
CBMH50
EXISTING 150mmØ WATERMAIN
(TO BE REMOVED)
DCB51
NW INV=191.49
Reinforced Concrete
TOP=193.07
DEPTH TO SUMP=1.9
8.7m - 250mm STM @ 0.50%
CB50
W INV=192.52
Reinforced Concrete
TOP=194.29
DEPTH TO SUMP=2.1
MH50
NE INV=193.39
SE INV=192.70
(1200Ø)
OPSD 701.010
TOP=194.58
DEPTH TO SUMP=2.2
CBMH50
4.3m - 375mm STM @ 5.00%
LOT 261
· SANITARY SERVICE TO BE150mmØ PVC SDR28
· WATER SERVICE TO BE50mmØ PE160
EXISTING TEE TO BE CAPPED
FOLLOWING REMOVAL OF
EXISTING WATERMAIN ON
MCNABB ST.
X X X XX X X
X X X XX X X
XX
+0
160
+0
180
+0
200
+0
220
+0
240
+0
260
+0
280
+0
300
+0
318
+0 380
+0 400
+0 420
+0 440
+0 448
MA
TC
H L
IN
E
AT
S
TA
TIO
N - 0+
159.48
PR
EV
IO
US
S
HE
ET
N
UM
BE
R - C
410
ORIGINAL GROUND
EX 150mmØ PVC WM
MH18A
(1200Ø)
TOP=194.45
OPSD 701.010
PROPOSED GRADE
EX MH2A
(1200Ø)
TOP=195.00
OPSD 701.010
TIE INTO EXISTING SANITARY STUB
INV = 189.68
EX CBMH3
(1200Ø)
TOP=194.78
OPSD 701.010
TIE INTO EXISTING ASPHALT
WITH PAVEMENT LAP JOINT
VB
ST
A. 0+
307.960
HY
D
ST
A. 0+
175.597
2
0
0
m
m
Ø
P
V
C
W
M
EXISTING 150mmØ
WATERMAIN
TO BE REMOVED ALONG
WITH ALL
APPURTENANCES
UNLESS OTHERWISE
SPECIFIED
CBMH50
(1200Ø)
TOP=194.53
OPSD 701.010
TIE INTO EXISTING WATERMAIN,
INSTALLING 150 x 150mmØ TEE C/W
200 x 150mm REDUCER
TIE INTO EXISTING EXCBMH3
WITH PROPOSED 375mmØ PVC
STORM
SW INV = 193.56
CONNECT EXISTING
375mmØ STORM SEWER
TO PROPOSED MH50
EX. MCNABB STREET
190
191
192
193
194
195
196
190
191
192
193
194
195
196
PROPOSED
STORM
PROPOSED
STORM
PROPOSED
SANITARY
PROPOSED
SANITARY
EXIST\PROP
CENTERLINE
ELEVATION
EXIST\PROP
CENTERLINE
ELEVATION
CHAINAGE CHAINAGE
83.9m - 375mm PVC
STM @ 0.20%
10.7m - 300mm HDPE
STM @ 0.47%
76.4m - 375mm PERF. PVC
STM @ 1.30%
79.9m - 300mm PVC
SAN @ 0.25%
80.1m - 300mm PVC
SAN @ 0.25%
193.41
193.410
194.00
193.995
194.23
194.230
194.32
194.318
194.48
194.481
194.57
194.573
194.62
194.623
194.71
194.712
0+
160
0+
180
0+
200
0+
220
0+
240
0+
260
0+
280
0+
300
0+
320
SW
189.88
NE
189.88
PV
I S
TA
=
0+
245.66
PV
I E
LE
V =
194.524
PV
I S
TA
=
0+
313.69
PV
I E
LE
V =
194.861
3
.
3
5
%
0.7
0%
0.50
%
PVI STA= 0+159.51
PVI ELEV= 193.058
K= 8.00
LVC= 32.41m
A= 4.05%
EV
CS
= 0+
175.72
EV
CE
=193.601
PVI STA= 0+192.11
PVI ELEV= 194.150
K= 12.00
LVC= 31.84m
A= -2.65%
BV
CS
= 0+
176.18
BV
CE
= 193.617
EV
CS
= 0+
208.03
EV
CE
=194.261
PV
I S
TA
=
0+
245.66
PV
I E
LE
V =
194.524
PV
I S
TA
=
0+
313.69
PV
I E
LE
V =
194.861
SE
190.11
NW
189.68
SW
189.68
SE
193.70
NE
193.60
SW
193.56
EXISTING
EXISTING
SW
192.44
NW
192.48
E 192.48
0.50
0 10.0 20.0 30.0m5.0
H 1:500 V 1:50
KEY PLAN
File: C:\U
sers\kevin\D
esktop\Capes Engineering\Projects\2018-045 Southam
pton Landing\D
esign D
raw
ings\02_ProductionD
wg\033534_P&
P - M
cN
ABB Street.dw
g D
ate Plotted: February 15, 2019 - 9:38 AM
Client
1. This drawing is the exclusive property of CAPES Engineering Ltd. The reproduction of
any part without express written consent of this Corporation is strictly prohibited.
2. The contractor shall verify all dimensions, levels, and datums on site and report any
discrepancies or omissions to CAPES Engineering Ltd. prior to construction.
3. This drawing is to be read and understood in conjunction with all other plans and
documents applicable to this project.
Notes
Scale
Drawing No.Designed Checked Date
Rev No.Project No.
355310 BLUE MOUNTAINS - EUPHRASIA TOWNLINE
CLARKSBURG, ON N0H 1J0
TEL: 705-994-4818
SEATON SOUTHAMPTON LIMITED
245 EGLINTON AVENUE EAST, SUITE 400
TORONTO, ON
M4P 3B7
SOUTHAMPTON LANDING
PLAN AND PROFILE
K. GRIFFIN C. CAPES
2018-045
JAN 2019
1
C411
No Issue / Revision Date Auth
1 ISSUED FOR APPROVALS 2019/02/15
STREET A
STREET B
MCNABB ST.
R
A
I
L
W
A
Y
S
T
.
STORM MANHOLE
LEGEND
SANITARY MANHOLE
SANITARY SERVICE CONNECTION
STORM SERVICE CONNECTION
WATER SERVICE CONNECTION AND CURB STOP
VALVE & BOX
WATERMAIN TEE
HYDRANT
LIGHT STANDARD
TRANSFORMER
MAILBOX PAD
CURB DEPRESSION
EX. GAS MAIN
EX. BELL
EX. LIGHT STANDARD
EX. LS
G
B
EX. CHAIN LINK FENCE
x x
CB
SINGLE CATCHBASIN
DUCT BANK CROSSING
VALVE IN CHAMBER
DRAIN CHAMBER
BELL PEDESTAL
WATER SAMPLING STATION
PAVEMENT STRUCTURE FILL PLACED IN MAX.
200mm LIFTS, COMPACTED TO 98% SPMDD
(SEE PROFILE VIEW)
1.50m CHAIN LINK FENCE
x x
1.80m CHAIN LINK FENCE
ELEVATION 195.62m
BM1
NAIL IN HYDRO POLE AT NORTHEAST CORNER OF INTERSECTION OF
PEEL STREET AND GRENVILLE STREET.
TOP NUT OF HYDRANT 10m SOUTHEAST OF THE INTERSECTION OF PEEL
STREET AND McNABB STREET.
BM2
ELEVATION 195.83m
TOP OF SIB AT EASTERLY CORNER OF THE INTERSECTION OF McNABB
STREET AND HIGHWAY 21.
BM3
ELEVATION 194.06m
BOLT IN HYDRO POLE ON THE EAST SIDE OF HIGHWAY 21-68m SOUTH
OF THE INTERSECTION OF STREET A AND HIGHWAY 21.
BM4
ELEVATION 196.11m
BENCHMARKS
TREE PRESERVATION ZONE
CONSTRUCTION NOTES:
1. FULL DEPTH REMOVAL OF EXISTING ASPHALT ON McNABB ST.
(ESTIMATED DEPTH 80mm).
2. FULL DEPTH REMOVAL OF EXISTING SHOULDER GRANULARS
(ESTIMATED DEPTH 150mm).
3. ALL ORGANICS TO BE STRIPPED FROM UNDER ROADBED AND
REPLACE WITH SELECT SUBGRADE MATERIAL.
4. ALL TRENCHES TO BE BACKFILLED WITH GRANULAR MATERIAL (NATIVE
SAND WHERE AVAILABLE)
5. PLACEMENT OF McNABB ST. ROAD BASE AND ASPHALT AS PER TOWN
OF SAUGEEN SHORES TYPICAL URBAN CROSS SECTION.
6. RESTORE GRASS AREAS WITH 100mm TOPSOIL & NURSERY SOD OR
100mm TOPSOIL, SEED & MULCH.
7. EXISTING RESIDENTIAL DRIVEWAYS TO BE REINSTATED; ASPHALT
DRIVEWAYS TO BE 100mm GRANULAR 'A' AND 50mm H.L.3. GRAVEL
DRIVEWAYS TO BE MIN. 100mm GRANULAR 'A'.
Not Fo
r Cons
truction