Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
CSBCCorporation, Taiwan
C A T A L O G
CONTENTS
INTRODUCTION 01
02HISTORY
03SHIPYARDS
05GLOBAL MARKETS
07PRODUCT PROFILE
07Newbuilding of Container Ships
09Newbuilding of Tankers
10Newbuilding of Bulk Carriers
11Newbuilding of Special Purpose Vessels
12Newbuilding of Naval Vessels
13Commercial / Naval Ships Retrofit / Repair
15Offshore Wind Industry, Ocean Energy
Industry and Industrial Business
23TOTAL QUALITY MANAGEMENT
25CORPORATE SOCIAL
RESPONSIBILITY
17SHIPYARD FACILITIES
19DESIGN & RESEARCH
. Operating with Integrity
. Learning with Innovation
. Growing with Sustainability
OURPHILOSOPHY
I N T RO D U C T I O N
BE A PILOT IN OCEAN
1 CSBC CORPORATION, TAIWAN
Founded in 1973, CSBC Corporation, Taiwan is a shipbuilding enterprise based in Kaohsiung, with two shipyards located separately in Keelung and Kaohsiung. Our services extend over commercial and naval shipbuilding, ship repair, machinery manufacturing, offshore engineering and diversified operations.
CSBC Corporation, Taiwan is the largest shipbuilding company in Taiwan. We can build approximately 18 ships or 1.4 million DWT yearly from two building docks separately located in our Kaohsiung and Keelung shipyards.
We value quality highly and continue developing new ship design and enhancing ship performance. From 1998 to 2017, 23 types (199 ships) of our ships were recognized as “SIGNIFICANT SHIP” by RINA (Royal Institute of Naval Architects).
We build more than a ship; we provide 3D lifetime services: Design, Delivery and Dry-docking. Additionally, to compete in the ever-changing global business environment, we have expanded our business to include offshore engineering. We are ambitious to become one of the world’s premier heavy industry companies!
H I S T O R Y
2
1937 06 Establishment of Taiwan Shipbuilding Company (TSC)
1973 07 Establishment of China Shipbuilding Corporation (CSBC)
1974 01 Groundbreaking of CSBC Kaohsiung Shipyard
1977 07 Reversion to Government-Owned Enterprise
12 Completion of Burmah Endeavor, the 1st 445 thousand dwt Ultra Large Crude Carrier (ULCC) in Taiwan
1978 01 Merger of Taiwan Shipbuilding Company
07 Completion of Burmah Enterprise, the 2nd 445 thousand dwt Ultra Large Crude Carrier (ULCC) in Taiwan
1993 10 Completion of Ship Repair Dock in Kaohsiung Shipyard
1995 01 Conferral of ISO 9001 Q.A. System Certificate in Shipbuilding Division in Kaohsiung Shipyard
12 Conferral of ISO 9001 Q.A. System Certificate in Shipbuilding Division in Keelung Shipyard
1996 10 Conferral of ISO 9002 Q.A. System Certificate in Machinery Division in Kaohsiung Shipyard
1997 10 Conferral of ISO 9002 Q.A. System Certificate in Ship Repair Division in Kaohsiung Shipyard
1999 09 Acquisition of N, NA, and NPT Certificates from ASME
2001 12 Reorganization utilizing “Rejuvenation Plan”
2007 01 Acquisition of ISO 9001 Integrated Certificate in All Divisions 03 Change of Company Name to CSBC Corporation, Taiwan
2008 12 1. Acquisition of OHSAS 18001: 2007 Taiwan Occupational Health &
Safety Advisory Services Certificate 2. Privatization of Enterprise and Company Stock Listing in Taiwan
2009 11 Conferral of National Industrial Innovation Award
12 Acquisition of TOSHMS: 2007 Taiwan Occupational Safety & Health Management System Certificate
2010 01 Conferral of Golden Torch Award (by National Federation of Industries)
09 Establishment of Subsidiary CSBC Coating Solutions Co., Ltd.
12 Acquisition of ISO 14001: 2004 International Environmental Management Certificate
2011 11 Conferral of Corporate Governance System Certificate (Provision CG6006)
2013 11 Conferral of 2013 Taiwan Corporate Sustainability Award
2014 07 Establishment of Subsidiary Blue Ocean Wind Power Engineering (H.K.) Ltd.
11 Conferral of 2014 Taiwan Corporate Sustainability Award。
12 1. Conferral of Mergers & Acquisitions Award。
2. Acquisition of Taiwan Intellectual Property Management System (TIPS) Certificate
2015 10 Conferral of National Brand Yushan Award
12 Conferral of Taiwan Excellence Award (1,800 TEU container ship)
2016 12 Conferral of Taiwan Excellence Award (14,000 TEU container ship)
S H I P Y A R D S
Keelung Shipyard
Total Area of Premises (m2)Building Dock (m)No.1 Repair Dock (m)No.2 Repair Dock (m)Major Crane (t)Capacity of Ship BuildingCapacity of Ship Repair
355,886275 X 45 X 10210 X 26.4 X 12.4270 X 45 X 11.5300 t X 1 set and 150 t x 1 setapprox. 6 ships (0.3 M DWT) / year45~50 ships / year
Total Area of Premises (m2 )Building Dock (m)Repair Dock (m)Major Crane (t)Capacity of Ship BuildingCapacity of Naval Ship BuildingCapacity of Ship RepairCapacity of Machinery Manufacture
1,173,051950 X 92 X 14275 X 45 X 12350 t X 2 setsapprox. 12 ships (1.1 M DWT) / year6,000 t (displacement) / year70~80 ships / year16,000 t / year
Kaohsiung Shipyard
3 CSBC CORPORATION, TAIWAN 4
EUROPE
AFRICA
G L O B A LM A R K E T S
5 CSBC CORPORATION, TAIWAN
Over the past few decades, CSBC has expanded business throughout Asia, the Americas, Africa and Europe, and has built close relationships with prestigious ship owners all over the world. We go beyound borders and aim to introduce our cutting edge shipbulding technique to the world.
ASIA
SOUTHEASTASIA
NORTHAMERICA
SOUTHAMERICA
MAJOR CLIENT AREA
ASIA
EUROPE
AFRICA South Africa
Taiwan, China, Hong Kong, Malaysia, India, Israel, Japan, Korea, Kuwait, Singapore
THE AMERICAS Canada, Chile, U.S.A.
Denmark, France, Germany, Greece, Netherlands, Norway, U.K.
6
P R O D U C T P R O F I L E
Newbuilding of Container Ships
1
2
3
14,000 TEU Container Vessel
8,500 TEU Container Vessel
8,250 TEU Container Vessel
3
7 CSBC CORPORATION, TAIWAN
1
2
4
5
4,500 TEU Container Vessel
1,800 TEU Container Feeder
5
8
* The "Taiwan Excellence Award" was established by the Ministry of Economic Affairs in 1992. Products winning the award have excellent performance on "R&D," "Design," "Quality," and "Marketing".
4
Newbuilding of Tankers
P R O D U C T P R O F I L E
1 2
6
445,000 DWT Ultra Large Crude Oil Carrier (ULCC)
260,000 DWT Very Large Crude Oil Carrier (VLCC)
150,000 DWT Tanker
40,000 DWT Product Carrier
1 4
2
3
5 40,000 DWT Tanker
9 CSBC CORPORATION, TAIWAN
5
3
4
Newbuilding of Bulk Carriers
1
2 3 4
5
176,000 DWT Bulk Carrier
202,500 DWT Bulk Carrier 77,000 DWT Bulk Carrier (Panamax)
93,000 DWT Bulk Carrier (Post-Panamax)
2
1 4
3
35,000 DWT Bulk Carrier5
10
Newbuilding of Special Purpose Vessels
P R O D U C T P R O F I L E
1
2 3
4 5
57,000 DWT Semi-Submersible / Heavy Lift Deck Cargo Carrier
13,600 DWT Self-Unloading Cement Carrier
626,000 ft3 Reefer Ship
1
2
3
Floating Dock
5,200 HP Tugboat4
5
11 CSBC CORPORATION, TAIWAN
Newbuilding of Governmental Vessels
1 2
3
4 5 6
Fast Attack Craft, Guided Missile (FACG)
Frigate, Guided Missile (PFG-2)
Fast Combat Support Ship (AOE)
1
2
3
Patrol Craft, Guided Missile (PCG)
Coastal Patrol Vessel
Fast Attack Boat, Guided Missile (FABG)
4
5
6
12
Commercial / Governmental Vessels Retrofit / Repair
P R O D U C T P R O F I L E
1
2 3
4 5
6
CSBC CORPORATION, TAIWAN13
Two EVERGREEN “R” type vessels abreast in dry dock
Navy PFG-2 “1101” in dry dock
Navy AOE “530” and Wan Hai Lines container vessel abreast in dry dock
Two Panamax bulk carriers abreast in dry dock
Three German Laeisz sister ships in yard
260,000 DWT bulk carrier at berth and two container ships abreast in dry dock
1
2
3
4
5
6
1 2
3
4
5
14
BEFORE AFTER6
Vortex generator installation
Silicon base paint application
Wake Equalizing Duct (WED) and propeller cap fins installation
8,000 TEU container vessel rudder bulb installation
8,000 TEU container vessel energy saving bulbous bow retrofit
1
2
3
4
5
4,500 TEU container vessel energy saving bulbous bow retrofit6
P R O D U C T P R O F I L E
CSBC CORPORATION, TAIWAN15
Offshore Wind Industry, Ocean Energy Industry and Industrial Business
1
3 42
Engineering Procurement Construction Installation O&M
16
An Offshore Wind Energy and Ocean Energy Turnkey Provider.
Engineering, Manufacturing, Transportation and Installation of 20 kW Wave Generator.
Fabrication & Assembly of 70 t Level Luffing Crane.
Fabrication and Installation of Continuous Ship Unloader.
Fabrication and Installation of Continuous Ship Unloader.
1
2
3
4
5
55
S H I P YA R D FA C I L I T I E S
1 2 3 4
CONTRACTSIGNING
DESIGN
LOFTING
STEELCUTTING
CSBC CORPORATION, TAIWAN17
350 t Goliath Cranes1
High Pressure Dust Cleaning Machine and Steel Plate Conveyor2
Regenerative Thermal Oxidizers for Volatile Organic Compounds (VOCs) Abatement3
NC Plasma Cutting Machine4
"It is necessary to have effective tools to do good work."
The major facilities of CSBC are as follows:
5 6 7 8
PLATEBENDING
PRIMARYASSEMBLY
BLOCKASSEMBLY
KEEL LAYING LAUNCHING
PAINTING& OUTFITTING
DELIVERY
AFTER SALESSERVICE
18
Parallel Cutting Machine5
1,000 t Hydraulic Bending Machine6
Blasting and Painting Shop7
Super Carrier8
CSBC CORPORATION, TAIWAN19
DESIGN & RESEARCH
With successful launching of these three stages, the
ES-10, ES-20 and ES-30 have become a well-known
CSBC brand and example of green technology.
ES not only means the achievement of energy-saving but
also indicates the effort of CSBC for environmental
sustainability. The fact that ES technologies have been
applied extensively in new building design also means
that the products of CSBC are effective and reliable.
Three stages of energy-saving ( ES )
Environmental Sustainability
ES : Innovative Energy Saving technique& sustainable environment consideration
Seaway Optimum Design & OperationStrategy, service and registered mark of CSBC
In this context, CSBC implemented a three-stage energy-saving R&D project which intended to reduce energy use by 10%, 20%, 30% progressively.
To achieve 10% energy savings in the first stage, we applied various energy-saving devices which have benefits of reducing hull resistance or improving propulsion efficiency. The second stage reached 20% energy savings by establishing a new procedure of propeller design, the Sea Sword Bow application, and other innovative designs to increase propulsion, reduce resistance, and improve seaworthiness. Standing on the foundation of the previous achievements, the third stage, involving the research of a sea water cooling system, lighting equipment and the development of Cooperative Maritime Performance Analyzing Support System (COMPASS), successfully carried out the goal of 30% energy savings.
With the ultimate aim of customer satisfaction and awareness of environmental protection, CSBC continues to pursue technological improvement and design innovation through R&D resources, ceaselessly studying and meeting customer needs to create economical, reliable products.
ES Sea Sword Bow
Vortex Generator
ES Pre-Rotational Flow Fin
ES Rudder Bulb ( ES RB )ES Rudder Fin ( ES RF ) Variable Frequency Control System
for Main Cooling Sea Water Pump in Ships
Full Scale Measurement on Large Container Vessel
20
Prediction of COMPASS during Severe Sea Conditions
Strain Gauge
Accelerometer
DAQ
PC
Navigation Data
Ship’s position,speed, wind speed,direction, etc.
Amp.
Data Acquisition
PC
Function of SODO
SEA-KEEPING MANOEUVRING
ENVIRONMENTALPROTECTION
OPTIMALNAVIGATION
SAFETY
ENERGYEFFICIENCY
STRUCTURALDESIGN
ON BOARDMEASUREMENT
CSBC CORPORATION, TAIWAN21
Left Hand Side :Original Bow
Right Hand Side :ES Bow
Design, Delivery & Dry-docking
ES Bow
SODO
DESIGN & RESEARCH
CSBC developed another brand, Seaway Optimum Design & Operation (SODO), in cooperation with ship owners to optimize ship design and operation in different seaways; this creates added value through safety, effciency, reliability and economy. The purpose of SODO is to reduce carbon emissions, an important requirement of both EEDI (Energy Efficiency Design Index) and EEOI (Energy Efficiency Operation Indicator).
An innovative product vital to the spirit of SODO is ES Bow which is an enhanced design on the basis of frequent drafts and operating speeds during actual service conditions instead of design draft and speed. By considering realistic operating conditions, CSBC can customize the design of ES Bow and cut operating costs for ship owners.
The entire well-known range of CSBC brands: ES-10, ES-20, ES-30 and SODO confirms that CSBC not only builds vessels but also provides 3D lifetime services from Design to Delivery to Dry-docking.
Extensive Study on Bow Flare Impact & Design Alternative
Numerical Study on Seakeeping: Sloshing Coupling Effect of Container Ship for Sea Trial
An example of Resistance Reduction of ES-Bow
0.713 m
25.6 kts14.5 m19 kts
13 m19 kts
13 m17.5 kts
12.4 m17.5 kts
ES BowOrignal Bow
0.8
0.9
1.0
1.1 0.4% -3% -10% -12% -15%
22
7
6
5
4
3
2
1
00 0.2 0.4 0.6 0.8 1 1.2 1.4 1.6
Wave frequency (rad/s)
Roll RAO at COG
Roll with balasted C/H (90.0 deg)Roll without balasted C/H (90.0 deg)
Rol
l at r
efer
ence
poi
nt (d
eg/m
)
Induced resonant frequency
CSBC CORPORATION, TAIWAN23
TOTAL QUALITY MANAGEMENT
ProductionOrientedDesign
ProcessControlReliability
AfterSales
Service
Testingand
Inspection
QualityControl
QualityAssurance
&
CSBC has effectively implemented total quality management to continuously improve management performance and ensure total quality.
CSBC’s quality management system includes suppliers and sub-contractors; therefore, CSBC is able to facilitate the development of its partners’ quality management systems.
CSBC has fully implemented quality assurance and control in production to ensure optimal performance and continuously improve our products’ reliability.
CSBC maintains an excellent after-sales service system to provide customers with complete and immediate service; all customer feedback and opinions are collected and analyzed to upgrade the system.
24
CSBC holds the following certificates to ensure good quality performance:
ISO 9001: 2008 Quality Management System
ISO 14001: 2004 Environmental Management System
OHSAS 18001: 2007 Occupational Health and Safety Management
TOSHMS: 2007 Taiwan Occupational Safety and Health Management System
ASME N/NA/NPT/NS Certificates of Authorization for Nuclear Power ProjectsTIPS: Taiwan Intellectual Property Management System
CSBC CORPORATION, TAIWAN25
CORPORATE SOCIAL
RESPONSIB I L I T Y
CSBC's corporate social responsibility (CSR) activities
reflect its ongoing commitment to innovative shipbuilding
practices and customer satisfaction.
CSBC conducts business in a vast range of fields
including ship building and repair, land based machinery,
and offshore engineering etc., on which our operating
conditions and stakeholders' interests and expectations
depend.
Recognizing our obligations, we are carrying out our
corporate social responsibility (CSR) initiatives as a good
global corporate citizen, and have set a CSR agenda
26
comprised of seven key areas that span broadly across
CSBC's business fields: corporate governance,
compliance, human resources, responsible sourcing,
quality and services, environment, and community
engagement.
By operating businesses that are innovative and ethical, we intend to continuously enhance corporate value while helping to build a better world for everyone.
2017.02
CSBC CORPORATION, TAIWAN
KAOHSIUNG SHIPYARD
www.csbcnet.com.tw
No. 3, Jhonggang Road, Siaogang District, Kaohsiung 81234, Taiwan, R.O.C.
TEL : +886-(0)7-805 9888
FAX : +886-(0)7-803 8830
FAX : +886-(0)2-2462 6162
KEELUNG SHIPYARD
No. 224, Ho-1st Road, Zhongzheng District, Keelung 20203, Taiwan, R.O.C.
TEL : +886-(0)2-2463 1021