2007 California Bridge Construction Forum. Opening Remarks Dolores Valls, Chief, Statewide Operations Offices of Structure Construction. Overview. Introductions Special Thanks Purpose of Forum Summary of Past Forums 2007 Expectations. Special Thanks : CT/ Industry Joint Committee. - PowerPoint PPT Presentation
Citation preview
Slide 1
2007 California Bridge Construction Forum
Opening RemarksDolores Valls, Chief, Statewide Operations
Offices of Structure Construction
Slide 2
Overview
• Introductions• Special Thanks• Purpose of Forum• Summary of Past Forums• 2007 Expectations
Slide 3
Special Thanks:CT/ Industry Joint Committee
Jeff Abercrombie, ACM – Districts 5,6,10
Ken Bocchicchio, ACM – Districts 7 s/e,12
Bill Corn, Balfour Beatty Construction
Andre Catellier, MCM Construction Inc.
Rich Hebert, CC Myers
Brian Maple, FCI Constructor, Inc.
Mike Halverson, Facilitator
Slide 4
Purpose of Forum
• Share information & concerns• Collect ideas and suggestions• Improve practices and relationships• We’re here to communicate!
Slide 5
Overview of Past Forums
• 2001, 2002, 2005 Forums • 2006 Forums Action Items• Joint committee of Industry/ OSC Managers• Surveys mailed (for topics)• Workshops (from popular response areas)• Management Panel (2006)
Slide 6
2001 Topic Workshops
• Falsework practices• Flyash/ bridge deck cracking• Training OSC staff• Support/ Authority of OSC staff
Slide 7
2002 Workshops
• Innovations for Acceleration• Quality Control & Quality Assurance• Welding• Bridge Surveying practices
Slide 8
2005 Forum Topic: Falsework Construction Safety
• Falsework Erection and Removal• Falsework Grading and Jacking• Column Cage Construction & Guying Plans
Slide 9
2006 Workshops
• Cost Reduction Incentive Proposals• Work Window Restrictions• Bridge Construction Acceleration• The Human Factor
Slide 10
2006 Forums Action Items:
• New signed CRIP “Decision Document”– DES process for proposed changes– CRIP concept review team– CRIP process facilitator– Conceptual assessment within 10 days– Facilitator coordinates formal review– DES Deputies panel review– Lessons learned shared
Slide 11
2006 Forums Action Items:
• Work Window Restrictions:– Update design & construction checklists– “Environmental Commitment Summary” with bid
documents– Project tours for Environmental and Traffic
Operations staff
Slide 12
2006 Forums Action Items:
• Bridge Construction Acceleration:– Standard waste slab designs/ metal deck forms– Precast structural bridge elements– Option to eliminate haunch at top of retaining walls– New BCM on sharing concrete trial batch
compressive strength test results
Slide 13
2006 Forums Action Items
• Human Factor:– Pilot “End of Job Satisfaction” surveys– Partnering Presentations– ACM brown bag lunches (all-staff)– Bid Item for “Contractor-furnished RE Office Trailer”
Slide 14
2007 Forum Expectations
• New Ideas and Action Items for Improvements• Management Panel for open discussion• Feedback on value of Forums