©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Takashi HAYASHITokyo Electric Power Company
Oct.24, 2005
TEPCO; Overview and ChallengesTEPCO; Overview and Challenges
2©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
ContentsContents
Overview and latest topics in TEPCO Current status and experiences of
Japan’s Liberalization
©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
1.1. Overview and Latest TopicsOverview and Latest Topics
4©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Company Highlight 2004FYCompany Highlight 2004FY
Customers 27,740,000(Based on electric service contracts cl
osed as of March 31,2005 )
Electricity Sales 286,741 GWh
Maximum Demand
64,300 MW(July 24,2001)
Power Generation Capacity
Total:62,825MW
Hydro: 8,521MW
Thermal: 36,995MW
Nuclear: 17,308MW
Wind: 1MW
Number of Employees
38,510(as of March 31,2005)
5©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Pacific OceanPacific Ocean
The Sea of JapanThe Sea of Japan
Center of TokyoCenter of Tokyo0 50 100km
Overall Transmission Network in TEPCOOverall Transmission Network in TEPCO
Large Power FlowLarge Power Flow
9GW
11GW
5GW
3GW
9GW
UHV - designed
6GW
6©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
UHV Transmission TechnologyUHV Transmission Technology
Same design technique as conventional 500kV facilities
10001000kV designed kV designed transmission linetransmission line
Existing 500kV transmission line
Same design technique as conventional 500kV facilities
10001000kV designed kV designed transmission linetransmission line
Existing 500kV transmission line
7©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
UHV Substation Equipment Test SiteUHV Substation Equipment Test Site
8©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Latest Latest TopicsTopics
• Construction of the Bulk Power System Operation Center in Tokyo suburb area, which has substitutive function for the Central Load Dispatching Center as a risk management for disaster
Central Tokyo
Central Load
Dispatching Center
Bulk power System Operation Center
Tachikawa City
Approx. 40km
©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
2.2. Current Status and Current Status and Experiences of Japan’s Experiences of Japan’s LiberalizationLiberalization
10©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Power SystemsPower Systems in Japanin Japan
AC interconnection(500kV)
AC interconnection(154kV ~ 275kV)
DC interconnection
Back-to-Back Frequency Converter
AC-DC Converter
Minami-Fukumitsu BTB
500kV Echizen-Reinan line
Sakuma F.C. 300MW
500kV Seiban-HigashiOkayama line
500kV Honshi tie line
Hokuriku
5GW
Shin-Shinano F.C. 600MW
Hokkaido 5 GW
187kV Donan line
275kV Hokubu Line
Tohoku
15GW
Hokkaido-HonshuHVDC 600MW
500kV Kanmon tie line
Shikoku 6GW
Kyushu
ChugokuTokyo
Kansai Chubu
25GW
64GW
16GW
3333
30GW11GW
60 Hz
-Distance between Kyushu- Hokkaido is about 2000 km-Utilities are located sequentially - Available capacity (ATC) is relatively scarce
50 Hz
500kV Soma-Futaba Line
Kii-suido HVDC 1400MW
11©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Characteristic of Load Curve in Characteristic of Load Curve in TEPCO TEPCO
0
20
40
60
80
100
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24
(時)
東京電力PJM
英国ドイツ
各国・各地域における負荷曲線の形状Load Curves in Countries and Regions
Germany
UK
TEPCOPJM
(Hour)
Load increases quite steeply
in the morning
12©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Present Electricity Market System Present Electricity Market System Partial liberalization of the electricity retail market
• Target:Eligible Customers
(Contract Demand 50kW Voltage 6,000V)≧ ≧• New Entrants use Wheeling Service provided by electric
utility companies.(TPA system)
Generation
Transmission&
Retail
Other Customers
New Entrants
Accounting Separation(to avoid internal subsidies)
ElectricUtility
Company
Other Electric Utilities
Wholesale Suppliers
Eligible Customers
Regulated Liberalized
Wheeling ServiceDistribution
13©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Functions of Functions of Electric Power System Council of Japan (ESCJ) Electric Power System Council of Japan (ESCJ)
TEPCOTohoku Electric
Power Co.
ESCJ
Inter-tie
Power Exchange
• OASIS
• Congestion Management of Inter-ties
• Enhancement Procedure Management
• Planning, Construction and Operation of regional grid for reliable and economic power system operation
• Grid Code (regional)
9 Vertically Integrated Utilities
• Grid Code (basic)
• Dispute resolution
Board of Directors
Utility, Wholesaler, Alternative Supplier, Independent member
14©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Start of Japan Electric Power Exchange (JEPX)Start of Japan Electric Power Exchange (JEPX)
Start with two types of products– Spot markets : Trade of day-ahead electricity– Forward markets
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
20.00
4/2
4/6
4/10
4/14
4/18
4/22
4/26
4/30 5/
4
5/8
5/12
5/16
5/20
5/24
5/28 6/
1
6/5
6/9
6/13
6/17
6/21
6/25
6/29 7/
3
7/7
7/11
7/15
7/19
7/23
7/27
7/31 8/
4
8/8
8/12
8/16
8/20
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
Total kWh Price (Daily Average) Price (Peak Time)
kWhYen/kWh
15©2005 The Tokyo Electric Power Company, INC. All Rights Reserved.
Comments on Regulatory Reform Steps Comments on Regulatory Reform Steps from Japan’s Experiencefrom Japan’s Experience
• We should take care of …– Consideration of the characteristics of the
power systems – ‘Well-ordered’ play for participants– Step-by-step liberalization – Opinions from grid operator’s/planner’s point
of view