1
2 Grating / Handrail / Plaza Steelwork Revised. 09.06.08 1 PARAPET POST PERPENDICULAR TO GIRDER 15.05.08 REV. DATE REVISION DESCRIPTION REV. MARK A A A C C C D D D - - Architectural Corporate Draughting Ltd SY11 4NA Shropshire Oswestry Whittington 9 Malthouse Close Mobile: 07711 093 578 Tel/Fax: 01691 654451 Web: [email protected] Welds:- 6mm F.W. Full profile U.S.O. Surface Finish / Prep:- See Spec Material to BS4360. Grade - See Spec HOLES BOLTS F/S IF IN DOUBT - ASK! A0 NO COPIES TO BE TAKEN WITHOUT THE PERMISSION OF 1. ALL DIMS IN MILLIMETRES UNO 2. RADIUS ALL NOTCHES 3. GENERAL TOLERANCE IS 4. REMOVE ALL BURRS AND SHARP EDGES MM UNO -2 0 DENOTES ERECTION MARK LOCATION - FOR ORIENTATION CSK N/S HOLES GENERAL NOTES R & R Engineering SITE ADDRESS PROJECT DESCRIPTION CLIENT EAGLES MEADOWS FOOT BRIDGE WREXHAM 2 A-C-D-001-001 ACD REF No: DRAWING No REVISION GA02 CHECKED BY Andy Curran Steve Wingett CONTACT NAME DRAWN BY SCALE DRAWING TITLE 1:10 1:100 1:20 1:30 1:85 SINGLE MAST CABLE STAY FOOTBRIDGE ELEVATION & ISOMETIC VIEWS CONTRACT No: 17926 DRAWING CREATION DATE 30.04.2008 ISOMETRIC VIEW SOUTH SIDE BR13 - LE NG TH FROM CENTRE HOLE OF FI N PLT TO UNDE RSI DE OF WASHER PLT 25081 mm BR11 - LENGTH F RO M CENTRE HOLE OF FIN PLT TO UNDERSIDE OF WASHER PLT 31676 mm B R12 - LE NGTH FROM CENTRE HOLE O F F IN PLT TO UNDERSIDE OF WAS HE R PLT 30863 m m P 2 5 P 1 7 B R14 - LENGTH F R OM C EN TRE HOLE OF FIN PLT T O U ND ER SIDE OF WASHER PLT 25540 m m BR15 - L ENGTH FROM CENTRE HOLE OF FIN PLT T O UNDER SIDE O F WASHER PLT 1 9848 m m B R16 - LENGTH FROM CENTRE HOLE OF FIN PLT TO UN DERS IDE OF WASHER PLT 20005 mm B40 B66 P13 BR18 - LENGTH FROM HOLES CENTRES 15480 mm BR10 - LENGT H F ROM HOLES CENTRES 20236 m m B R17 - LENGTH FROM HOLES CENTRES 20353 mm B51 P70 P12 P48 P2 0 P19 P1 5 P26 P16 P 5 2 B40 P21 P 1 8 P27 P5 3 B95 P 5 5 P29 P 2 8 P 30 P2 3 PLAZA STEELWORK REF TO PLAN FOR DETAILS P 1 4 B95 P 3 3 P2 2 P 51 P 3 2 B95 P 3 1 P 2 4 P 5 6 P4 7 P3 4 ELEVATION ON ARROW 'A' REF GA01 1:100 +71445 +72545 +72410 +73510 +78185 +77855 +78700 +78820 +78860 +78810 +78656 ISOMETRIC VIEW NORTH SIDE B51 ASSEMBLY WEIGHT OF STEEL STRUCTURE 7.43T B63 ASSEMBLY WEIGHT OF STEEL STRUCTURE 5.90T B66 ASSEMBLY WEIGHT OF STEEL STRUCTURE 3.67T B54 P36 P38 PLAZA STEELWORK REF TO PLAN FOR DETAILS B64 ASSEMBLY WEIGHT OF STEEL STRUCTURE 4.31T P9 P1 P46 P3 P4 B95 P8 P35 P36 B54 B65 ASSEMBLY WEIGHT OF STEEL STRUCTURE 3.88T P 39 P50 P 36 P 49 P39 P5 P6 P7 P 4 3 B40 ASSEMBLY WEIGHT OF STEEL STRUCTURE 6.51T P2 P4 4 P4 0 P136 P 42 P 4 1 P 42 P 3 7 P 1 0 P 5 4 P69 P 1 1 P 4 5 - PLAZA STEELWORK +78650 1:20 7 5 6 3 3 7 0 6 F126 F126 E X 122 U C 30 5*305 * 9 7 D D A A 1897 8 3 0 329 2600 2600 500 B64 UB610*305*149 B78 UB254*146*31 B83 RSA80*80* 8 E X 1 1 7 UB 457 *1 52 *5 2 B89 UB305*165*40 B84 RSA80*80*8 B 8 7 UB 356 *1 71 *4 5 985 F147 F147 C C B B 1420 325 18 3 6 1962 1373 1332 E X 122 U C 30 5*305 * 9 7 B75 PFC-200*90*30 B77 UC203*203*46 B64 UB610*305*149 B82 R SA80*80*8 F132 F131 F129 F128 B88 UB305*165*40 B85 RSA80*80*8 B64 UB203*133*30 B8 1 RSA80*8 0*8 E X 1 1 9 UB 457 *1 91 *7 4 EX120 UB686*254*1 40 B86 RSA80*80*8 F130 Column 63mm of gridline F125 F125 4 0 0 F152 F149 F152 1 3 1 7 B 7 6 U B 2 5 4 * 1 4 6 * 3 1 F142 6 3 5 6 8 7 EX118 UB457*191*74 F127 EX121 UB610*229*101 70 1 5 0 3 7 0 6 M350 BS F152 PLT10*170 F152 PLT10*170 F149 PLT5*170 A-A 1:30 102 62 B64 UB610*305*149 B64 UB610*305*149 EX119 UB457*191*74 EX120 UB686*254*140 B88 UB305*165*40 B87 UB356*171*45 EX118 UB457*191*74 B89 UB305*165*40 20 +78180 +78650 100 B64 UB203*133*30 B-B 1:30 TOP OF BEARING PLT TO UNDERSIDE OF BEAM 87mm CLEARANCE. +78650 87 205 270 290 B64 UB203*133*30 400 GRIDLINE XB14 102 PLT15*460 FLT6*25 460 300 400 102 +78650 C-C 1:30 205 270 B64 UB203*133*30 GRIDLINE XB14 100 PLT15*460 FLT6*25 F140 FLT10*120 F140 FLT10*120 EX120 UB686*254*140 B88 UB305*165*40 F147 BS PLT10*160 FB173 FLT10*150 FB173 FLT10*150 +78974 117 B64 UB203*133*30 +78650 T.O.S 100 EX117 UB457*152*52 B87 UB356*171*45 EX122 UC305*305*97 D-D 1:30 +78180 T.O.S 3707 150 3706 7563 F152 PLT10*170 F152 PLT10*170 F149 PLT5*170 EX122 UC305*305*97 F145 FLT10*150 F145 FLT10*150 CHS139.7*3.6 S.O.P. 4No M8 DRILL & TAP INTO SLEEVE. SWAGED STUD SOCKET (SW-S 35) 336 274 5 170 CHS88.9*6.3 WASHER DIA EXT 130*INT 70*15THK HOLE DIA 70 M64*6 THREAD SWAGED SOCKET WITH DOUBLE LOCK NUT CHS193.7*12.5 POIN T OF C ABLE LENGTH TYPICAL CABLE SUPPORT CONNECTION 1:10

2 - GA02 … · ga02 checked by andy curran steve wingett drawn by contact name scale drawing title 1:10 1:100 1:20 1:30 1:85 single mast cable stay footbridge elevation & isometic

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 2 - GA02 … · ga02 checked by andy curran steve wingett drawn by contact name scale drawing title 1:10 1:100 1:20 1:30 1:85 single mast cable stay footbridge elevation & isometic

2 Grating / Handrail / Plaza Steelwork Revised. 09.06.08

1 PARAPET POST PERPENDICULAR TO GIRDER 15.05.08

REV. DATEREVISION DESCRIPTIONREV. MARK

AAAA CCCC DDDD- -Architectural Corporate Draughting Ltd SY11 4NA

Shropshire

Oswestry

Whittington

9 Malthouse Close

Mobile: 07711 093 578

Tel/Fax: 01691 654451

Web: [email protected]

Welds:- 6mm F.W. Full profile U.S.O.

Surface Finish / Prep:- See Spec

Material to BS4360. Grade - See Spec

HOLES BOLTS

F/S

IF IN DOUBT - ASK! A0NO COPIES TO BE TAKEN WITHOUT THE PERMISSION OF

1. ALL DIMS IN MILLIMETRES UNO2. RADIUS ALL NOTCHES3. GENERAL TOLERANCE IS4. REMOVE ALL BURRS AND SHARP EDGES

MM UNO-20

DENOTES ERECTION MARK LOCATION - FOR ORIENTATION

CSK N/SHOLES

GENERAL NOTES

R & R Engineering

SITE ADDRESS

PROJECT DESCRIPTION

CLIENT

EAGLES MEADOWS FOOT BRIDGE

WREXHAM

2A-C-D-001-001

ACD REF No:

DRAWING No

REVISION

GA02

CHECKED BY

Andy Curran Steve Wingett

CONTACT NAMEDRAWN BY

SCALE

DRAWING TITLE

1:10 1:100 1:20 1:30 1:85

SINGLE MAST

CABLE STAY FOOTBRIDGE

ELEVATION & ISOMETIC VIEWS

CONTRACT No:

17926

DRAWING CREATION DATE

30.04.2008

ISOMETRIC VIEWSOUTH SIDE

BR13

- LENG

TH FR

OM

CENTR

E H

OLE

OF FIN

PLT TO

UNDERSID

E O

F WASHER P

LT25081m

m

BR11

- LENGTH

FROM

CEN

TRE H

OLE

OF FIN

PLT TO U

NDERSID

E O

F WASH

ER PLT31676

mm

BR12

- LENG

TH FR

OM

CEN

TRE H

OLE O

F FIN PLT TO

UNDER

SIDE O

F WASH

ER PLT30863

mm

P25

P17

BR

14- LE

NG

TH

FR

OM

CEN

TR

E H

OLE

OF F

IN P

LT T

O U

ND

ER

SID

E O

F W

ASH

ER

PLT

25540m

m

BR

15- LE

NG

TH

FR

OM

CEN

TR

E H

OLE

OF F

IN P

LT T

O U

ND

ER

SID

E O

F W

ASH

ER

PLT

19848m

m

BR

16

-LE

NG

TH

FR

OM

CE

NTR

E H

OLE

OF F

IN P

LT T

O U

ND

ER

SID

E O

F W

AS

HE

R P

LT20005

mm

B4

0

B66

P13

BR

18

-LE

NG

TH

FR

OM

HO

LE

S C

EN

TR

ES

15480

mm

BR

10

-LE

NG

TH

FR

OM

HO

LE

S C

EN

TR

ES

20236

mm

BR

17

-LE

NG

TH

FR

OM

HO

LE

S C

EN

TR

ES

2035

3m

m

B51

P70

P12

P48

P20

P19

P15

P26

P16

P52

B40

P21

P18

P27

P53

B95

P55

P29P28

P30

P23

PLAZA STEELWORKREF TO PLAN FOR DETAILS

P14

B95

P33

P22

P51

P32

B95

P31

P24

P56P47

P34

ELEVATION ON ARROW 'A'REF GA011:100

+71445

+72545

+72410

+73510

+78185

+77855

+78700+78820

+78860 +78810

+78656

ISOMETRIC VIEWNORTH SIDE

B51ASSEMBLY WEIGHT OF STEEL STRUCTURE7.43T

B63ASSEMBLY WEIGHT OF STEEL STRUCTURE5.90T

B66ASSEMBLY WEIGHT OF STEEL STRUCTURE3.67T

B54

P36

P38

PLAZA STEELWORKREF TO PLAN FOR DETAILS

B64ASSEMBLY WEIGHT OF STEEL STRUCTURE4.31T

P9

P1

P46

P3

P4

B95

P8

P35

P36

B54

B65ASSEMBLY WEIGHT OF STEEL STRUCTURE3.88T

P39

P50

P36

P49

P39

P5

P6

P7

P43

B40ASSEMBLY WEIGHT OF STEEL STRUCTURE6.51T

P2

P44

P40

P136

P42P41

P42P37 P10P54

P69

P11 P45

-

PLAZA STEELWORK +786501:20

7563

3706

F126

F126

EX12

2U

C30

5*30

5*97

D

D

A

A

1897

830

329

2600

2600

500B64 UB610*305*149

B78 UB254*146*31 B83

RS

A80*8

0*8

EX117 UB457*152*52

B89

UB

305*1

65* 4

0

B84

RS

A80*8

0*8

B87 UB356*171*45

98

5

F147

F147

C C

B B

14

20

32

5

1836

1962

1373

1332

EX12

2U

C30

5*30

5*97

B75 PFC-200*90*30

B77 UC203*203*46

B64 UB610*305*149

B82 RSA80*80*8

F132

F131

F129

F128

B88

UB

305*1

65* 4

0

B85

RS

A80*8

0*8

B64

UB

203*1

33* 3

0

B81

RSA80

*80*

8

EX119 UB457*191*74

EX

120

UB

686*2

54*1

40

B86 RSA80*80*8 F130

Column 63mm of gridline

F125F125

400

F152

F149

F152

1317

B76 UB254*146*31

F142

635

687

EX118 UB457*191*74

F127

EX121 UB610*229*101

70

150

3706

M350 BS

F152 PLT10*170

F152 PLT10*170

F149 PLT5*170

A - A

1:30

10

2

62

B64 UB610*305*149 B64 UB610*305*149

EX119 UB457*191*74

EX120 UB686*254*140

B88 UB305*165*40

B87 UB356*171*45

EX118 UB457*191*74

B89 UB305*165*40

20

+78180

+78650

10

0

B64 UB203*133*30

B - B1:30

TOP OF BEARING PLT TOUNDERSIDE OF BEAM87mm CLEARANCE.

+78650

87

205 270 290

B64 UB203*133*30

400 GRIDLINE XB14

10

2

PLT15*460

FLT6*25

460

300

400

10

2 +78650

C - C

1:30

205 270

B64 UB203*133*30

GRIDLINE XB14

10

0

PLT15*460

FLT6*25

F140 FLT10*120

F140 FLT10*120

EX120 UB686*254*140

B88 UB305*165*40

F147 BS PLT10*160

FB173 FLT10*150

FB173 FLT10*150

+78974

11

7

B64 UB203*133*30

+78650 T.O.S

10

0

EX117 UB457*152*52

B87 UB356*171*45

EX122 UC305*305*97

D - D1:30

+78180 T.O.S

3707 150 3706

7563

F152 PLT10*170

F152 PLT10*170

F149 PLT5*170

EX122 UC305*305*97

F145 FLT10*150

F145 FLT10*150

CHS139.7*3.6

S.O.P.

4No M8 DRILL & TAPINTO SLEEVE.

SWAGED STUD SOCKET(SW-S 35)

336

274

5

170

CHS88.9*6.3

WASHERDIA EXT 130*INT 70*15THK

HOLE DIA 70M64*6 THREADSWAGED SOCKETWITH DOUBLE LOCK NUT

CHS193.7*12.5

PO

INT

OF

CABLE

LENG

TH

TYPICAL CABLE SUPPORT CONNECTION1:10