1P. Vande Vyvre - CERN/PH

ALICE DAQProgress Report

Comprehensive Review IV

P. Vande Vyvre – CERN/PH

ALICE DAQProgress Report

Comprehensive Review IV

P. Vande Vyvre – CERN/PH

5P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

6P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

7P. Vande Vyvre - CERN/PH

Institutes & ResponsibilitiesInstitutes & Responsibilities

• Birmingham– TRG/DAQ simulation– RORC receiver cards

• KFKI-Budapest :– DDL: optical links and RORC receiver cards– Radiation tolerance tests (with Technical University/Budapest and

Institute of Nuclear Research (ATOMKI/Debrecen)

• CERN:– DATE: DAQ software framework– DAQ fabric

• Zagreb:– TRG/DAQ simulation– AFFAIR: performance monitoring package

• Split:– TRG/DAQ simulation– Storage

• Collaborating institutes: Istanbul (Data quality monitoring)

8P. Vande Vyvre - CERN/PH

Milestones and outcome of CR3Milestones and outcome of CR3LHCC Milestones Detector readout with January 2003

TDR preparation status March 2003

Common TDR submission to LHCC December 2003

DDL pre-production for detector 1Q 2004test and commissioning

• D-RORC pre-production for detector 1Q 2004 test and commissioning

• DAQ reference system in DAQ lab: 4Q 2004

• DAQ systems for surface tests and commissioning:– SXL2: mounting hall on the surface of point 2 1Q 2005

– Si. lab: ITS surface test 2005

• Milestones Final DAQ– Jan 2006 Final DAQ system ready with all functionalities

20 % of final performance

– Nov 2006 30 % for pp and first HI run

– Oct 2008 100 % for second HI run (needs and budget)

9P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

10P. Vande Vyvre - CERN/PH

25 GB/s

2.50 GB/s

1.25 GB/s

Pb-Pb beam Rate Max. ev. size

- Central 20 Hz 86.0 MB - MB 20 Hz 20.0 MB- Dimuon 1600 Hz 0.5 MB- Dielectron 200 Hz 9.0 MB

pp beamMB 100 Hz 2.5 MB

Running modes

A: DAQB: DAQ+HLT AnalysisC: DAQ+HLT Trigger

Physics requirementsPhysics requirements

TriggerLevel 0,1

TriggerLevel 2

High-LevelTrigger

Detector

Front-end Buffer

Readout Buffer

Event-Building Network

Storage network

Local DataConcentrators (LDC)

Global Data Collectors(GDC)

Permanent DataStorage (PDS)

Detector Data Link(DDL)

11P. Vande Vyvre - CERN/PH

GDC GDCGDCGDC

DAQ architectureDAQ architecture

CTP

LTU

TTC

FERO FERO

LTU

TTC

FERO FERO

LDCLDC

BUSY BUSY

Rare/All

Event Fragment

Sub-event

Event

File

Storage Network

TDS

PDS

L0, L1a, L2

L0, L1a, L2

262 DDLs

EDM

LDCLoad Bal. LDC LDC

HLT Farm

FEPFEP

DDL

H-RORC

10 DDLs

10 D-RORC

10 HLT LDC

123 DDLs

TDS

DSS DSS

Event Building Network

329 D-RORC

175 Detector LDC

50 GDC25 TDS

5 DSS

14P. Vande Vyvre - CERN/PH

Key building blocks and conceptsKey building blocks and concepts

• Protocol-less push-down strategy

• System throttling by X-on/X-Off signals

• Detector interface via a standard link (DDL)

– Readout

– Control and download

• Software framework (DATE)

– Dataflow (data driven according to TRG generated event tags)

– Control (FSM and messages)

– Monitoring

• Distributed DAQ Fabric

– LDC

– GDC

– DSS

15P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

16P. Vande Vyvre - CERN/PH

D-RORC Hardware ArchitectureD-RORC Hardware Architecture

APEXFPGA

64-bit/66 MHz, PCI/PCI-X

MediaI/F 1

MediaI/F 2

BusyI/F

Conf.Flash

JTAGJTAG

P11

P12

P13

P14

CMC I/F

Opt

ical

I/F

LV

DS

I/F

Configuring

250 MB/s

250 MB/s

528 MB/s

17P. Vande Vyvre - CERN/PH

D-RORC HardwareD-RORC Hardware

D-RORC with integrated DIU ports• 2 DDL channels• Integration with the HLT system

D-RORC with plug-in DIU• Read out single DDL channel• Detector integration

18P. Vande Vyvre - CERN/PH

D-RORC and DIUD-RORC and DIU

PC + single-channel D-RORC

CPU: 2 x Xeon 2400 MHzKernel: 2.4.20-30.7

Testing the integration of the D-RORC and the DIU using the new library (v4.2)

• rorc_receive –g 3 ... (internal loopback)• rorc_receive –g 1 ... (DIU loopback)

19P. Vande Vyvre - CERN/PH

D-RORC and DATED-RORC and DATE

• 2 D-RORC cards• Same PCI bus• Data generation:

• Front-end emulator cards• Internal data generator

20P. Vande Vyvre - CERN/PH

D-RORC and DATED-RORC and DATE

1 week220 106 events98 MBytes/s

21P. Vande Vyvre - CERN/PH

Data splitter for DAQ/HLT interfaceData splitter for DAQ/HLT interface

PC + twin-channel D-RORC

PC + single-channel D-RORC

FEE Emulator

CPU: Intel P3 800 MHzKernel: 2.4.20-24.7rorc_receive

CPU: 2 x Xeon 2400 MHzKernel: 2.4.20-30.7rorc_receive

DAQ

HLT

Detector

22P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

23P. Vande Vyvre - CERN/PH

• Monitoring Of Online Data

• Detector Debugger (raw data visualizer)

• Written in C/C++

• Based on ROOT

• Based on DATE

• Data quality monitoring framework for all ALICE detectors

MOODMOOD

24P. Vande Vyvre - CERN/PH

MOOD: Current Detector SchemeMOOD: Current Detector Scheme

Detectors currently implemented :•ITS – SDD

•TPC Sector

•HMPID Photocathode

Detectors to be implemented :•All detectors individually

• Test setups

•ALICE as a whole

25P. Vande Vyvre - CERN/PH

TPC Sector TestTPC Sector Test

PadPlane

ChargePlane

Event SizeDistribution

3DView

ChargePlane 3D

ToolBar

26P. Vande Vyvre - CERN/PH

HMPID Photocathode (1)HMPID Photocathode (1)

Tabs•Photocathode•3D View•Size Distribution•Event Dump•Logs…

27P. Vande Vyvre - CERN/PH

HMPID Photocathode (2)HMPID Photocathode (2)

Tabs•Photocathode•3D View•Size Distribution•Event Dump•Logs…

28P. Vande Vyvre - CERN/PH

ITS - SDD (1)ITS - SDD (1)

Tabs•SDD Display•3D View•Size Distribution•Event Dump•Logs…

29P. Vande Vyvre - CERN/PH

ITS - SDD (2)ITS - SDD (2)

Tabs•SDD Display•3D View•Size Distribution•Event Dump•Logs…

30P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

31P. Vande Vyvre - CERN/PH

DAQ Reference System DAQ Reference System

1 FC switch

1 GE switch

4 LDCs (Local Data Concentrator):

- rackmount PCs- U1, U2, U4 height- equipped with 6 D-RORCs

6 DDLs

2 GDCs (Gobal Data Collector):

- rackmount PCs- U1 height - equipped with FC cards

2 TDS (Transient Data Storage):

- rackmount disk array- U2 height- IDE and FC disks

1 DSS (DAQ Services):

- rackmount PC- U4 height- hot-swap SCSI disks

1 KVM switch

standard LAN

32P. Vande Vyvre - CERN/PH

Reference Setup – FrontReference Setup – Front

KVM switch:

Raritan Paragon UMT2161

2x LDCs:

- 4U height- dual Xeon- 2x D-RORC cards DDL

2x GDCs:

- 1U height- dual Xeon- Qlogic QLA2310F cards

2x disk arrays:

- Infortrend IFT-6330

- DotHill SANnet II

DSS:

- 4U height- quad Xeon- 3x 36GB SCSI disks

L3 rack

2x GB Ethernet switch:

3COM SuperStack 3

Fibre Channel switch:

Broacade SilkWorm 3800

• DAQ lab• Detect and address integration issues• System for development and support

33P. Vande Vyvre - CERN/PH

Reference Setup - RearReference Setup - Rear

Power distributor

Cat5 cables:

- Ethernet- KVM- RJ45 connectors

Optical cables:

- DDL- FiberChannel- 2 Gbit/s multimode - LC-LC connectors

L3 rack

Mounting rails (!)

34P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

35P. Vande Vyvre - CERN/PH

ADC V Hw ArchitectureADC V Hw Architecture

4 x GE4 x GE

4 x GE4 x GE 10GE10GE

10GE10GE

10GE10GE

10 Tape Server10 Tape Server

4 x GE4 x GE

3COM 49003COM 4900

~ 80 CPU servers 2 x 2.4 GHz Xeon, 1 GB RAM, Intel 8254EM Gigabit in PCI-X 133 (Intel PRO/1000), CERN Linux 7.3.3~ 80 CPU servers 2 x 2.4 GHz Xeon, 1 GB RAM, Intel 8254EM Gigabit in PCI-X 133 (Intel PRO/1000), CERN Linux 7.3.3

4 x 7 Disk servers4 x 7 Disk servers2 x 2.0 GHz Xeon2 x 2.0 GHz Xeon1 GB RAM1 GB RAMIntel 82544GCIntel 82544GC

32 x GE32 x GE

32 IA64 HP-rx2600 Servers32 IA64 HP-rx2600 Servers2 x 1 GHz Itanium-22 x 1 GHz Itanium-22 GB RAM2 GB RAMBroadcom NetXtrem BCM5701 (tg3)Broadcom NetXtrem BCM5701 (tg3)RedHat Advanced Workstation 2.1RedHat Advanced Workstation 2.16.4 GB/s to memory, 4.0 GB/s to I/O6.4 GB/s to memory, 4.0 GB/s to I/O

3COM 49003COM 490016 x Gbit16 x Gbit

Enterasys E1 OASEnterasys E1 OAS12 Gbit, 1 x 10 Gbit12 Gbit, 1 x 10 Gbit

Enterasys ER16Enterasys ER1616 slots16 slots4/8 x Gbit or 1 x 10 Gbit/slot4/8 x Gbit or 1 x 10 Gbit/slot

3COM 49003COM 4900

36P. Vande Vyvre - CERN/PH

Achievements (1)Achievements (1)

System size (lack of resources in LCG testbed) System scalability Performance test with ALICE data traffic

– ALICE-like traffic– ALICE-like events simulated data used:Realistic (sub-)event size on tape (ALICE year 1)

DATE load-balancing demonstrated and used

Sustained bw to tape not achieved– Peak 350 MB/s. Sustained 280 MB/s over 1 day – Reached production-quality level only last week of test

IA-64 from Openlab successfully integrated in the ADC V Simulated raw data used for performance test Data read back from CASTOR and verified

37P. Vande Vyvre - CERN/PH

ALICE DC: ScalabilityALICE DC: Scalability

38P. Vande Vyvre - CERN/PH

ALICE DC – MSS BwALICE DC – MSS Bw

39P. Vande Vyvre - CERN/PH

Achievements (2)Achievements (2)

• Network LDCs and GDCs: stable and scaleable including trunking

Between GDCs and disk servers: Unreliable

Truncking not scaling as expected

Module broken and replaced twice in Enterasys

10 Gbit Eth. Backbone New generation of NIC cards (Intel Pro 1000)

– NIC from Broadcom unreliable. Replaced by Intel Pro 1000.

Storage–Hardware problem on the disk servers–Several last minute workarounds needed (scripts for monitoring and reconfiguring)

40P. Vande Vyvre - CERN/PH

Performance Goals (1)Performance Goals (1)

0

500

1000

1500

2000

2500

3000

MB/s

1998 1999 2000 2001 2002 2003 2004 2005 2006

DAQ bw

DAQ bw ALICE traffic

DAQ bw uniform traffic

650 MB/s650 MB/s650 MB/s650 MB/s

41P. Vande Vyvre - CERN/PH

Performance Goals (2)Performance Goals (2)

MB/s to Mass Storage

0

200

400

600

800

1000

1200

1400

1998 1999 2000 2001 2002 2003 2004 2005 2006

MSS bw initial goalsMSS bw achievedMSS bw revised goalsTape Bw LCG

300 MB/s300 MB/s300 MB/s300 MB/s

42P. Vande Vyvre - CERN/PH

Open issues and future goalsOpen issues and future goals

• CASTOR: – Recovery from malfunctioning disk server– New stager– Special daemon between CPU and disk server instead of

standard RFIO daemon. Needed to achieve adequate performance. Should be put back in main development.

• DAQ– Increase performances

• Network– First prototypes of 10 Gbit Eth. equipment from Enterasys

unreliable– Enterasys support not effective on this case

• Meeting scheduled with LCG PEB to present results and address the open issues

43P. Vande Vyvre - CERN/PH

ALICE DAQALICE DAQ

• Institutes, Responsibilities, Milestones

• DAQ Architecture

• DDL and D-RORC

• MOOD (Data quality monitoring)

• DAQ Fabric

• Data Challenge V

• Installation, test and commissioning

44P. Vande Vyvre - CERN/PH

DAQ Commissioning (1) DAQ Commissioning (1)

• What: – DAQ itself – How the DAQ will help the commissioning of other systems

• Where:– ACR: ALICE Control Room.– PX24-CR1: ALICE DAQ Counting Room located in the access shaft.– SXL2: mounting hall on the surface of point 2.– UX25: experimental underground area

• When:– 1 Q 2005: all DAQ functionalities. Hw at the final location.

20 DDLs for readout of 2 TPC sectors in SXL2 + other detectors

– Jan 2006 Final DAQ system ready with all functionalities 20 % of performance

– Nov 2006 30 % of performance– Oct 2008 100 % of performance (needs and budget)

45P. Vande Vyvre - CERN/PH

DAQ Commissioning (2)DAQ Commissioning (2)

• Tests at the construction site of hardware elements– Verification of the DDLs and D-RORCs– Test of the cards with a test station made of a PC and DDL test software

• Tests at the development sites of software elements: – AFFAIR, DATE, DDL sw, CASTOR – Combined tests well before installation: test beams, Data Challenges

• Standalone tests in experimental area– DAQ: possibility of injecting data at every stage of the data flow. – Each segment of the dataflow first tested in isolation and then in combination with

other elements• DAQ integration at Point 2:

– Integration with ECS– Tests with TRG, HLT, DCS– Detector test and commissioning

• Test with cosmic and pulser trigger– From June 2005: a TTC-based trigger to trigger autonomous DDL data sources

for global tests of the DAQ involving DDLs.– From January 2006: a cosmic or pulser trigger for the commissioning of detectors

involving Trigger and DAQ

46P. Vande Vyvre - CERN/PH

DAQ Tools for Detector CommissioningDAQ Tools for Detector Commissioning

• Lab test– DDL Simulator: standalone daughter-card– Detector readout with DDL and DATE

• Beam test– Detector readout by DDL and DATE– VME for trigger and older electronics (Silicon

telescope e.g.)• Point 2

– DAQ system at Point 2 in 2004– Detector test and commissioning – System will evolve in size and performances

according to the needs.– Concurrent tests of several detectors (~3

in 2004, all in 2006)– Complete capabilities since the start– Control from ACR or any computer

• Other tests– ITS integrated test

DDL Simulator

Detector Readout card

under test

47P. Vande Vyvre - CERN/PH

DAQ Tools for Detector CommissioningDAQ Tools for Detector Commissioning

• Lab test– DDL Simulator: standalone daughter-card– Detector readout with DDL and DATE

• Beam test– Detector readout by DDL and DATE– VME for trigger and older electronics

(Silicon telescope e.g.)• Point 2

– DAQ system at Point 2 in 2004– Detector test and commissioning – System will evolve in size and

performances according to the needs.– Concurrent tests of several detectors

(~3 in 2004, all in 2006)– Complete capabilities since the start– Control from ACR or any computer

• Other tests– ITS integrated test

SIU (DDL)Optical Fiber to LDC

Input Data from Pattern

Generator

48P. Vande Vyvre - CERN/PH

DAQ/TOF integrationDAQ/TOF integration4.5 days59 106 events86 MBytes/s.

49P. Vande Vyvre - CERN/PH

DAQ Tools for Detector CommissioningDAQ Tools for Detector Commissioning

• Lab test– DDL Simulator: standalone daughter-card– Detector readout with DDL and DATE

• Beam test– Detector readout by DDL and DATE– VME for trigger and older electronics

(Silicon telescope e.g.)• Point 2

– DAQ system at Point 2 in 2004– Detector test and commissioning – System will evolve in size and

performances according to the needs.– Concurrent tests of several detectors

(~3 in 2004, all in 2006)– Complete capabilities since the start– Control from ACR or any computer

• Other tests– ITS integrated test

DDL

LDC (PC/Linux)

RORC

DDL DIU

Detectorreadout

GDC

LDC (VME/Linux)

TriggerLogic

Event Building Network

Data Storage inComputing Center

DDL SIU

Silicon tel.readout

DATE V4

50P. Vande Vyvre - CERN/PH

DAQ/Detector integration statusDAQ/Detector integration statusDATE DDL

data generator

DDLreadout

MOOD

Data quality monitoring

SPD

SSD

SDD

TPC In progress

TRD

TOF

HMPID

Muon In progress

PHOS

ZDC

FMD

T0

V0

51P. Vande Vyvre - CERN/PH

DAQ Tools for Detector CommissioningDAQ Tools for Detector Commissioning

• Lab test– DDL Simulator: standalone daughter-card– Detector readout with DDL and DATE

• Beam test– Detector readout by DDL and DATE– VME for trigger and older electronics

(Silicon telescope e.g.)• Point 2

– DAQ system at Point 2 in 2004– Complete capabilities since the start– Detector test and commissioning – System will evolve in size and

performances according to the needs– Concurrent tests of several detectors

(~3 in 2004, all in 2006)– Control from ACR or any computer

• Other tests– ITS integrated test

52P. Vande Vyvre - CERN/PH

DAQ Tools for Detector CommissioningDAQ Tools for Detector Commissioning

• Lab test– DDL Simulator: standalone daughter-card– Detector readout with DDL and DATE

• Beam test– Detector readout by DDL and DATE– VME for trigger and older electronics

(Silicon telescope e.g.)• Point 2

– DAQ system at Point 2 in 2004– Complete capabilities since the start– Detector test and commissioning – System will evolve in size and

performances according to the needs– Concurrent tests of several detectors

(~3 in 2004, all in 2006)– Control from ACR or any computer

• Other tests– ITS integrated test

53P. Vande Vyvre - CERN/PH

DAQ for Test & Commissioning DAQ for Test & Commissioning

SXL HallSX Hall

UX25 (Experimental Area)

PX24/CR1 (DAQ)

PX24/CR2 (HLT)

SR Hall

Access Shaft

DDLLAN

DDL Patch Panel

(ALICE sub-detector assembly)(Networking)

PX24/CR3 (DCS)

PX24/CR4 (Misc.)

LAN

WR1

WR2

ACR

1 Q 2005 : DAQ System at Point 2

12 DDLs for TPC

8 DDLs for others

3 partitions

2005: similar system in Si. lab.

54P. Vande Vyvre - CERN/PH

Final DAQ System Final DAQ System

SXL HallSX Hall

UX25 (Experimental Area)

PX24/CR1 (DAQ)

PX24/CR2 (HLT)

SR Hall

Access Shaft

DDLLAN

DDL Patch Panel

(ALICE sub-detector assembly)(Networking)

PX24/CR3 (DCS)

PX24/CR4 (Misc.)

WR1

WR2

ACR

Installation staging:

(% of final DAQ performance)

2006: 20%

2007: 30%

2008: 100%