    DRAFT INTERNAL AUDIT REPORTSTRICTLY CONFIDENTIAL

    BACKGROUND INFORMATION

    Report title Review of PS04 Fazilpur Station Activities

    Auditors Umair Asghar, Muhammad Yousuf NasimStart of Audit October 27, 2011

    Close out Meeting November 02, 2011

    Draft Report December 22, 2011

    Final Report

    Follow-up

    No part of this document may be reproduced or transmitted in any form or by any means including photocopying,

    recording and electronic transmission to a party external to PARCO, without permission in writing from the

    Managing Director. Internally it may only be copied with discretion and on a "need to know" basis.

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    2/32

    Internal Audit Department

    2 of 32

    TABLE OF CONTENTS Page No.

    1. EXECUTIVE SUMMARY 3

    1.1 Summary of Observations 3

    2. DETAILED OBSERVATIONS, RISKS AND RECOMMENDATIONS 4

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    3/32

    Internal Audit Department

    1. EXECUTIVE SUMMARY

    Summary of Observations Priority

    1 In-Effective Control on Imprest Fund.High

    2 Security Controls are in a Perilous Position.High

    3 Plant Maintenance Module of SAP should be fully implemented.High

    4Maintenance Department should Considerably Improve record keeping and

    monitoring of material and manpower consumption on equipment.

    High

    5 HSE - Smoke Detectors and Multi-Gas-Monitor not present at the station.High

    6

    Inventory Items lying in open area behind NMPT residence have apparently been

    abandoned by the Warehouse.

    High

    7 Scrap Declaration Practice lacks firm controls.High

    8 Inventory Management needs Substantial Improvement at the Warehouse.High

    9 Fixed Asset Register does not match with assets present at the station.High

    For ease of reference, the risks have been rated as:

    High - These issues involve a substantial and direct exposure to loss of assets, loss of revenue

    and / or substantially negative impact to operating efficiency and / or effectiveness;

    Medium - These issues involve moderate exposure to loss of assets or revenue and / or negative

    impact on operating efficiency and / or effectiveness; and

    Low - These issues do not appear to have a substantially negative impact on operations or the

    control environment, but have been brought to Management's attention for informational

    purposes and consideration.

    3 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    4/32

    Internal Audit Department

    4 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    5/32

    Internal Audit Department

    2. DETAILED OBSERVATIONS, RISKS AND RECOMMENDATIONS

    2.1 In-Effective Control on Imprest Fund.

    FindingStation maintains an Imprest Fund of PKR. 1,200,000 to meet its daily financialrequirements. Internal Audit made the following observations on physical cash count at

    the station as of October 27, 2011.

    Cash in Hand: Physically counted cash in hand was PKR. 195,205 which

    matches with SAP balance.

    Payments and Advances: Total payments as per station record were PKR.

    771,601 however SAP balance was PKR. 765,718. Difference of PKR. 5,883could not be substantiated with approved vouchers.

    Cash at Bank: Station record shows bank balance of PKR. 383,174 while MCB

    bank statement shows the balance of PKR. 381,974. Difference of PKR. 1,200 iswithholding tax appearing on the bank statement.

    Monies Recovered from Oil Theft Case: As per station record amount of PKR.

    150,000 has been recovered by Station Security from oil culprits, this amount wassitting with Station Accountant since August 07, 2009 in the form of cash,

    however it was deposited into PARCO bank account Rajanpur dated February 18,

    2010. This amount appears to be part of the station Imprest fund.

    Cash advances extended to station staff without settling outstanding balances:

    Cash advances to staff should be settled within 7 days of being extended; however there

    appears to be no control in place to ensure this rule is being enforced properly.

    Following is a list of cases where cash advances have been extended to staff without prior

    settlement of outstanding balances falling outside the 7 days period.

    Name

    Advances to Staff in PKRSettleme

    nt (indays)Date PKR

    Outstanding

    BalanceKhanMohammad

    21.07.2011 35,000 Nil 16

    KhanMohammad

    25.07.2011 40,000 35,000 12

    KhanMohammad

    11.08.2011 20,000 12,437 9

    KhanMohammad

    12.08.2011 9,000 17,840 8

    KhanMohammad

    05.09.2011 30,000 18,437 22

    KhanMohammad

    09.10.2011 50,000 14,937 16

    Ghulam Jilani10.10.20

    11 3,000 997 51

    5 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    6/32

    Internal Audit Department

    Suffian Qureshi18.10.20

    11 50,000 10,585 26Syed AzharHussain

    24.10.2011 10,000 13,570 2

    Observations on implementation of SAP FI Cash Module at the station:SAP enables recording of movement of Imprest cash using Cash Journal of FI module.Internal Audit made the following observations regarding the implementation and usage

    of SAP by Station Accountant:

    There appears to be limited training of SAP for Station Accountant to do morethan posting a simple transaction entry. E.g. Accountant cannot run Management

    Information Report in SAP to monitor and control the status of Outstanding

    Advances extended to staff falling outside the 7 days period.

    Payments and Advances made through Cash Journal of SAP are also recorded in

    a manual register.

    Receipts from CHQ are updated in the Cash Journal however a manual register is

    also maintained for the same. Expense summary is prepared manually to claimreimbursements from CHQ.

    Risk / Impact In-effective use of company ERP system - SAP.

    Duplication of Work in absence of full implementation of SAP.

    Imprest Fund exposed to abuse in absence of proper monitoring and controls on

    finances at the station.

    Recommendation SAP should be fully implemented with training given to Station Accountant.

    Cash advances to staff should be monitored by Station Accountant using

    Outstanding Balance Report generated by SAP, advances falling outside the 7days range should be chased for timely recovery and flagged up to Station In-Charge if there is an issue.

    Monies worth PKR. 150,000 recovered from oil theft case should be deposited

    with relevant authorities in PARCO.

    Manual booking keeping should be discontinued by fully implementing SAP.

    Priority High

    Management

    Comments

    Manager

    Responsible

    Manager Finance

    Implementation

    Date

    6 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    7/32

    Internal Audit Department

    2.2 Security Controls are in a Perilous Position.

    Finding Internal Audit made observations on Security Practices at the station which are not incompliance with Standard Operating Procedures and Key Point Intelligence

    Division directives. These are listed below:

    Non-Compliant Practices:

    No

    Non-Compliant Practices

    Non-compliance

    ofSOP/KPID**

    1

    Contractual labour hired for less the 3 monthstime period is not given a Visitor Card to bedisplayed on the chest, instead a paper slip fordays between 10-20 days is issued with whichstaff can move in and out of the station premiseseasily.

    SEC-SOP-010

    2

    Main Gate Security Guards do not search staffworking on the station for prohibited devices likemobile phones, cameras and firearms assumingthat this checking will be conducted on the PlantArea Gate by Safety Team however it wasobserved that this gate remained wide openduring daytime working hours without anyhindrance and checking of people entering andleaving the Plant Area.

    SEC-SOP-004& SEC-SI-001

    3 Watch Towers are not manned by armedguards at the station at any given time.

    KPID

    4 There is no CCTV camera installed at the station.

    KPID & SEC-SI-

    001

    5There is no Automated Barrier Gate at thestation. KPID

    6Patrolling does not take place along theboundary wall of the station both from inside andoutside.

    SEC-SOP-004

    7There is no record of a Weapons Register at thestation. SEC-SOP-002

    8 Arms License is not in the custody of StationSecurity In-Charge. SEC-SOP-002

    7 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    8/32

    Internal Audit Department

    9

    It has been observed that certain PARCO andcontractual staff do not wear and display theirEmployee Cards while on duty, including SecurityGuards.

    SEC-SOP-004

    10

    Patrolling of station premises during night is

    "not" taking place 4 times per night, which is therequired frequency.

    SEC-SOP-004

    **Key Point Intelligence Division

    SOP Description Doc NoRevNo Rev Date

    Security Measures for Stations &Terminals

    SEC-SOP-004

    210.03.2011

    Security Instructions for Stations &Terminals

    SEC-SI-001

    101.10.2010

    Weapons Inspection for Station &Terminals

    SEC-SOP-002

    108.03.2010

    Contractor Movement Control forSecurity for Stations and Terminals

    SEC-SOP-010

    1 21.09.2010

    Observations:

    10 gate passes randomly tested, out of which 1 had entry missing from the In-

    Out Register for material, however record of Gate Pass and Dispatch Advice

    was found on the main security gate.

    On night shift duty one security guard goes on patrol while the other stays atthe main entrance gate, whereas there should at least be 2 guards present at the

    main gate at all times. 2 out of 10 Amano Watch Patrolling Devices are dysfunctional on the

    following locations:

    Grid Station.

    WOPP Main Gate.

    Security Guards do not wear proper uniform, in one case guard on duty wasfound wearing Shalwar Kameez.

    2 Nos Walkie Talkie used for communicating between security guards is not

    functional; instead communication while on patrol is relied upon personalmobile phones.

    1 out of 3 search lights used for patrolling is dysfunctional. Barbed wire on the station boundary wall broken between:

    South West and South East Watch Tower.

    North East Watch Tower and Main Gate.

    Dummy human figures erected on South East and South West watch towers

    during summer of 2011, however their debris still lying inside the tower withno apparent use at present.

    Risk / Impact Safety and security of station staff at risk.

    Risk of a Security Breach resulting in damage/loss to PARCO property and

    operations. 8 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    9/32

    Internal Audit Department

    Recommendation Recommendations are based on observations made to ensure compliance with Security

    SOPs and Key Point Intelligence Division directives.

    Contractual labour hired for less than 3 months should be issued a proper

    Visitor Card for work inside the station premises.

    Security Guards at the Main Gate should thoroughly search all people

    coming inside and leaving the station premises for prohibited items.

    Watch Towers should be manned with armed guards at all times.

    There should be a CCTV camera installed at Main Gate to monitor the

    movement of material, vehicles and personnel coming in and leaving stationpremises.

    An Automated Barrier Gate to be installed at the Main Gate.

    Daily patrolling along the boundary wall of station should be enforced, both

    inside and outside. The following equipment should be fixed on priority basis:

    Equipment NameQty

    Amano Watch PatrollingDevices 2

    Walkie Talkies 2

    Patrolling Search Lights 1

    A minimum of 4 patrols per night shift should be enforced with at least 2

    Security Guards present on the Main Gate at all times. All staff (PARCO and

    contractual) present at the station premises should display their EmployeeCards on chest during duty hours.

    Weapons Register and Arms License should be maintained at the station.

    Damaged barbed wires on boundary wall of the station should be repaired.

    Proper and complete uniforms to be worn by security personals while on duty

    with Employee Card clearly displayed on the chest.

    Key Point Intelligence Division Instructions should be fully implemented at the

    station for compliance with Ministry of Interior requirements.

    Priority High

    Management

    Comments

    Manager

    Responsible

    Manager Security

    9 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    10/32

    Internal Audit Department

    Implementation

    Date

    2.3 Plant Maintenance Module of SAP should be fully implemented.

    Finding As it stands, the Plant Maintenance Process is following, step-wise:

    Plant Maintenance ProcessMetho

    dLocatio

    n

    Notification issued by Planning Engineer at CHQ. SAP PS01

    Work Order raised by Planning Engineer at CHQ. SAP PS01

    Planning Engineer from PS01 Korangi emails WorkOrder list to Maintenance Staff.

    Manual PS01

    Work Order List printed by Station MaintenanceStaff.

    Manual PS04

    Work Permit form is updated manually on paper. Manual PS04Tools, consumable material and spare parts usage isrecorded on manually paper.

    Manual PS04

    Equipment Maintenance History Card updatedmanually on paper

    Manual PS04

    Work Order completed and closed in SAP SAP PS04

    Monthly Work Order Completion Summary signedby Station In-charge sent to Manager S&TMaintenance PS1.

    Manual PS04

    10 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    11/32

    Internal Audit Department

    Moreover, Internal Audit made the following observations on implementation of SAP:

    Maintenance Staff do not generate or use any reports via SAP.

    There appears to be a lack of Proper Training and Practice on SAP usage.

    Risk / Impact Inefficient usage of SAP.

    Not getting Value for Money.

    Information from SAP cannot be relied upon for Decision Making.

    Recommendation Plant Maintenance Module of SAP should be fully implemented.

    Complete SAP training should be given to the Maintenance Staff with particular

    focus on how to generate and use Management Information Reports.

    Priority Medium

    Management

    Comments

    Letter has been sent to Department Heads for arranging Training Sessions

    at Station for Staff on Optimal Use of SAP, especially report generation.

    Plant Maintenance Module of SAP should be fully implemented.

    Maintenance Supervisors execute work orders report at stations &

    terminals. However other reports are executed by Planning Engineer for

    management review.

    Maintenance Supervisors have been assigned rights as per their jobresponsibility and they exercise rights when required. Details of rights are

    as under

    Create / Change / Print Notification

    Create / Change / Close / Print Work Order

    Execute Work Orders Report & History

    Create / Change / Print Material Reservation

    Create / Change / Print Purchase Requisition

    Material Stock Overview

    Complete SAP training should be given to the Maintenance Staff with particular

    focus on how to generate and use Management Information Reports.

    Agreed.

    IT department should conduct trainings on regular basis for further

    improvement.

    Manager Manager S&T / Manager IT

    11 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    12/32

    Internal Audit Department

    Responsible

    Implementation

    DateJune 2012

    12 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    13/32

    Internal Audit Department

    2.4 Maintenance Department should Considerably Improve record keeping and

    monitoring of material and manpower consumption on equipment.

    Finding Internal Audit made the following observations on Manual Plant Maintenance Practicesat the station:

    Combined Issues of Plant Maintenance:

    Different formats of Maintenance History Cards are being used E.g. Standard

    card appears to be (HSEQ-F-45, Rev Date: 01.12.2008) however for followingequipment a different format of card is in use:

    Mainline Pump GM-002 (Mechanical)

    Station Case Pressure Transmitter (Instrumentation)

    Wire Position XMTR - Rotary Motion Type (Instrumentation)

    Smoke Detectors (Instrumentation)

    In some cases Spare Part Consumption on Maintenance History Card is not been

    updated properly.

    E.g. in following cases spare part consumption is not being updated on card:

    Station Case Pressure Transmitter (Instrumentation)

    Wire Position XMTR - Rotary Motion Type (Instrumentation)

    Smoke Detectors (Instrumentation)

    There appears to be little oversight of Maintenance Supervisor on the rest of

    Maintenance Teams working and record keeping.

    Instrument Maintenance:

    Entire equipment is replaced with a new one due to unavailability of spares at

    the warehouse increasing the cost of maintenance.

    E.g. Internal Audit noted that there is zero consumption of material and spare

    parts for maintaining equipment. Following are 3 sample:

    Station Case Pressure Transmitter (Instrumentation)

    Wire Position XMTR - Rotary Motion Type (Instrumentation)

    Smoke Detectors (Instrumentation)

    Subsequently on further probing the Instrument Technician confirmed that the

    reason for zero consumption of parts and materials is that The whole

    equipment is replaced instead on equipment breakdown.

    Inventory items are being shared between Maintenance Departments of PS04 andPS01 effectively by-passing their respective warehouses E.g. Smoke Tester

    Spray has been consumed for testing Smoke Detectors; however Maintenance

    13 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    14/32

    Internal Audit Department

    History Card for this equipment shows NIL consumption.

    5 samples of Work Orders randomly tested from September and October 2010 out

    of which record of 2 work orders was found missing at the station, however thesehave now been received by Internal Audit via email.

    2 samples of Work Orders randomly tested from October 2011, both of whichwere missing from file, however Work Permits for same were available at the

    time of checking, Instrument Technician confirmed that these were not printed.

    Electrical Maintenance:

    5 samples of Work Orders randomly tested from September and October 2011 out

    of which all 5 have information and signatures of Maintenance Technician

    Missing. For example:

    Actual Work Hours have not been updated on the form.

    Type of Work used is not tick marked on the form.

    Comments related to the Maintenance Job have not been updated at the

    bottom of form.

    Mechanical Maintenance:

    Mechanical Maintenance does not return partially consumed items issued by

    Warehouse for example pipes, similarly Warehouse is not bothered either toidentify or recover these items from User Department.

    Risk / Impact Maintenance record keeping is not consistent.

    Risk of high cost of maintenance if Management Information is not readilyavailable for Decision Making via SAP.

    Recommendation Important information on the consumption of Material and Man-hours should

    be uploaded in SAP.

    Cost of Maintenance should be monitored to assess which factor of the

    following is pushing it up:

    Material consumption

    Man hours consumption

    Maintenance Tool cost

    Workmanship cost

    Materials shared between different stations should be routed through their

    respective Warehouses.

    Record keeping needs consistency and completion amongst all four sections ofElectrical, Instrument, Mechanical and Power Generation.

    Maintenance Supervisor should randomly check the record keeping and work14 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    15/32

    Internal Audit Department

    completed by technicians on site for quality assurance.

    Partially Consumed Material issued from Warehouse should be timely returned

    by User Department if it is of no further use.

    Priority High

    Management

    Comments

    Planned and actual Man-hours are uploaded against each work order.

    However for materials, separate MRs are generated. Maintenance

    staff needs training for issuance of material against work order. IT

    personnel should visit all stations & terminals to provide required

    training.

    Material consumption cost and some special tools e.g. cranes etc.

    will be monitored after issuance of material and hiring of tools

    against work order. In this regard, training is required. Man-hours

    and workmanship cost is not possible as the SAP PM module is notintegrated with HR module.

    The material is transferred warehouse to warehouse as a standard

    practice however in case of emergency when transport is delayed /

    unavailable, the material is shifted through Courier / goods transport

    Company. The information should be communicated to Materials

    dept.for their record updating.

    All Maintenance staff is maintaining Equipment maintenance record

    on history cards as well as SAP. Further more they have been

    advised for consistency in record keeping.

    Maintenance Representatives have been advised to update their

    Records on the current HSEQ Formats, accordingly.

    Maintenance supervisors are already in practice to check record

    keeping of technical staff. However, at some stations, maintenance

    supervisor and performer are same.

    The concerned staff at station shall be advised to return the partially

    consumed items to Warehouse against Zero Value items.

    Spare parts of these Instruments are not available. Replacement of

    the whole equipment is advisable and economical. However, it has

    been advised to Maint. Representatives to record consumption of

    spare parts, wherever applicable

    15 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    16/32

    Internal Audit Department

    Manager

    Responsible

    Manager S&T

    Implementation

    DateSEP,2012

    2.5 HSE - Smoke Detectors and Multi-Gas-Monitor not present at the station.

    Finding Internal Audit made the following observations related to HSE at the station:

    Smoke detectors are not installed on the following locations:

    Station House

    MPT residence

    NMPT residence

    PS-04 Fazilpur Stations Multi-Gas-Monitor is sitting with PS-1 Warehouse

    (Korangi) on Dispatch Advice (DA) since November 11, 2010 for calibration.

    No Multi-Gas-Monitor replacement was physically verified by Audit Team at the

    station.

    As per Dispatch Advice record, a Multi-Gas-Monitor was loaned from WOTS-3

    between 05.10.2011 28.10.2011.

    Multi-Gas-Monitor Usage/Purpose:

    The monitor is used for detection of any gas and fume leakage. Monitor takes asample of the air and gives reading of the details as below:

    Plant Area: For detection of permissible fumes levels for Lower Explosive Limit

    (LEL).

    Welding Area: For detection of fumes levels of Pipeline, HSD tank cleaning and

    maintenance.

    Confined Space: For detection of oxygen level in below ground or excavation toensure safe working condition of staff.

    Moreover, Audit Team observed that contractual labour working on Safety

    Warehouse Building inside Plant Area premises were not wearing thefollowing Personal Protective Equipment:

    Safety Shoes

    16 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    17/32

    Internal Audit Department

    Protective Gloves

    Internal Audit noted Instrument Technician wearing Shalwar Kameez inside

    Maintenance Workshop Area during daytime working hours.

    There was no safety briefing given to Internal Audit Team at the station duringthe course of audit, however a safety brochure each was handed over 2 days

    before departure.

    Risk / Impact Risk of injury to contractual staff for not wearing PPEs.

    Fumes and gas leakage intensity might not be detected in the absence of the Multi-

    Gas-Monitor at the station and may result in loss of life and property.

    Recommendation Smoke detectors should be installed at the Station House, MPT and NMPT residence.

    HSE standards should be enforced for all contractual staff at all times.

    Multi-Gas-Monitor sent for calibration to PS01 Korangi should be clawed back onurgent basis.

    Priority High

    Management

    Comments

    Manager

    Responsible

    Manager HSE

    ImplementationDate

    17 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    18/32

    Internal Audit Department

    18 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    19/32

    Internal Audit Department

    2.6 Inventory Items lying in open area behind NMPT residence have apparently been

    abandoned by the Warehouse.

    19 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    20/32

    Internal Audit Department

    Finding Internal Audit observed that there are a number of items lying in open area behind NMPT

    residence.

    No record was available for these items with the Warehouse. However on Internal

    Audit request, lists were prepared by respective departments of items in their

    custody. These include useable, project leftover, and scrap items. Project leftover and Useable

    items in User Department custody are excluded from Warehouse Inventory; similarlyscrap has not been handed over to Warehouse for timely disposal.

    Following are the list of items lying in open area department wise:

    Mechanical Maintenance

    Sr. Item DescriptionQuantityin Feet Status

    1 G.I. Pipe 03" 84ProjectLeftover

    2 G.I. Pipe 2.5" 20

    Useable

    3 G.I. Pipe 2" 6

    4 G.I. Pipe 1.5" 140

    5 G.I. Pipe 1.4" 80

    6 G.I. Pipe 1" 10

    7 G.I. Pipe 3/4" 150

    9 G.I. Pipe 1/2" 30

    8 G.I. Pipe 3/4" 50

    Scrap10 G.I. Pipe 1/2" 20

    11 G.I. Pipe 04" 20

    WarehouseSr. Item Description Quantity Status

    1Cable, Power, 4Core, 10MMSQ,0.6/1KV 270 Mtr

    Useable

    2Cable, 4 Core, 120 mm,600/1000V 65 Mtr

    3Cable, High Voltage, 6.35/11KVXLPE, S/95 115 Mtr

    4 Cable, Telephone, 0.6MM, 50 Pairs 68 Mtr

    5 Coaltar Enamel 105/8, BS4164 124.5 MT*

    6

    Corrosion Inhibitor DCI-6A> (this isissued once and consumed asrequired)

    10Drums**

    7Foam Compound Protein 3%(Local) 210 Kg

    8 Foam Compound AFFF CF 3% 88.88 Kg

    * 821 Tubes of 50 Kg each

    ** 190.5 Kg/Drum

    20 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    21/32

    Internal Audit Department

    Risk / Impact Practice of storing items/inventory for undefined periods by User Department

    without the knowledge and custodianship of Warehouse is fraught with risks of

    misappropriation.

    Items lying under open sky without protection, for example pipes and motor

    operated valves are at risk of corrosion.

    Recommendation Assets/Inventory items lying in open area behind NMPT residence should be

    returned by User departments to the Warehouse.

    Warehouse should take ownership and proactively identify items lying about

    at the station without proper accountability.

    SOP on Project Left Over items should be implemented.

    Items lying in open are that are exposed to risk of corrosion should be properly

    protected.

    Priority High

    Management

    Comments

    Lists of equipment lying in open yard have been prepared.

    Letters has been sent to Manager (Finance) & Manager (Materials)

    to incorporate the option of Consumption in SAP for partially

    consumed items.

    Moreover, all the concerned staff has been advised to return the

    partially consumed items to Warehouse. Manager (Material) to

    advise on return of partially consumed items, purchased from local

    market.

    Due to non availability of Finance Tags, the PG items have not been

    handed over to Warehouse. PG Representative has been advised to

    prepare list of such items so that Finance Tags may be obtained.

    Henceforth, these items may be handed over to Warehouse

    CP Representative has been advised to return the issued (Extra /

    bulk) items to Warehouse and issue these items, as and when

    required basis.

    Items (under heading of Administration) have been returned back

    to Warehouse as E-grade on Dispatch Advice.

    Manager

    Responsible

    Manager S&T

    Implementation June 2012

    21 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    22/32

    Internal Audit Department

    Date

    2.7 Scrap Declaration Practice lacks firm controls.

    Finding Internal Audit made the following observations regarding scrap declaration:

    There is no SOP at the station to determine on what basis User Department

    declares an item to be scrap.

    Warehouse does not take any initiative with the user department to identify items

    which may be scrap and are of no further use.

    Following is the list of items declared scrap by User Department without the knowledge /custody of Warehouse. These items are lying in open area behind NMPT residence.

    Administration

    Sr. Item Description

    Quanti

    ty Status

    1 Revolving Chair (Damaged / Broken) 3

    Scrap

    2 Table for Table Tennis (Broken) 1

    3 Carom Boards (Broken) 3

    4 Wooden Racks (Broken) 2

    5 Wooden Table (Broken) 1

    6 Steel Cot (Broken) 1

    7 Dining Chairs (Broken) 20

    9 Easy Chairs (Broken) 12

    8 Exhaust Fan (Corroded) 1

    10 Iron Chair (Broken) 1

    Mechanical Maintenance

    Sr. Item Description

    Quantity inFeet Status

    1 G.I. Pipe 3/4" 50

    Scrap2 G.I. Pipe 1/2" 20

    3 G.I. Pipe 04" 20

    Risk / Impact

    Scrap is not being identified timely by Warehouse for disposal.

    Project Leftover and Useable items may be declared scrap by mistake ordeliberately in absence of SOP.

    Recommendation Scrap Declaration SOP should be implemented at the station.

    Warehouse to take ownership and pro-actively identify items which are lyingabout at the station without accountability.

    Priority High

    22 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    23/32

    Internal Audit Department

    Management

    Comments

    Manager

    Responsible

    Manager Materials

    Implementation

    Date

    23 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    24/32

    Internal Audit Department

    2.8 Inventory Management needs Substantial Improvement at the Warehouse.

    Finding Internal Audit made the following observations on Warehouse activities:

    Audit Team physically verified 24 items (5 high value items) randomly at the

    Warehouse out of which 1 discrepancy was found in a high value item:

    Material Item Description SAPPhysicallyVerified

    Total Value(PKR)

    65-23-09-0071Circuit Breaker 2-Pole P/N

    41420-69-57

    03 02 419,094

    Warehouse does not monitor inventory re-order levels in SAP to ensure

    timely availability of spare parts and consumables at the station, in some

    instances User Department had to directly chase PS1 Warehouse for urgent

    delivery of items.

    SAP implementation and usage appears to be non-existent at the Warehouse

    except for when an entry is made while issuing an item out of stock.

    Warehouse does not generate and use any reports via SAP to maintain inventoryat optimum level.

    Changes in inventory volumes are recorded manually on paper history card in

    addition to the entry made on SAP.

    Inventory items are searched physically by warehouse staff using old codes,

    although SAP codes are written on the cabinets, but without proper sequencing.

    There appears to be a lack of Proper Training and Practice on SAP usage.

    Inventory items are being shared and used directly between User Departments of

    different stations effectively by-passing their respective Warehouses.

    There appears to be no monitoring and reporting of carrying costs of inventoryand how to manage dead stock lying in the Warehouse.

    Warehouse at PS04 Fazilpur is being used jointly by PS04 and TS02. On

    further probing it has been confirmed by Materials Department that TS02

    Warehouse is in-active due to a lack of SAP license.

    Risk / Impact Duplication of work.

    In-efficient use of company ERP system SAP.

    Increased cost of maintaining inventory in absence of proper reporting andmonitoring via SAP.

    Recommendation SAP should be fully implemented at the Warehouse.

    24 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    25/32

    Internal Audit Department

    SAP Training should be given to the Warehouse Staff with particular focus on

    how to generate and use Management Information Reports.

    Warehouse should manage inventory re-order level using SAP.

    SAP should be used to record changes in inventory volumes, while paper historycard to be made redundant.

    New SAP codes should be used for physical searching of inventory in the

    Warehouse instead of old ones.

    Warehouse should maintain inventory at optimum level by using SAP.

    SAP license should be given at TS02 Warehouse.

    Priority High

    Management

    Comments

    Manager

    Responsible

    Manager Materials

    Implementation

    Date

    25 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    26/32

    Internal Audit Department

    26 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    27/32

    Internal Audit Department

    2.9 Fixed Asset Register does not match with assets present at the station.

    27 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    28/32

    Internal Audit Department

    Finding Internal Audit observed a number of discrepancies between Fixed Asset Register

    (FAR) maintained in SAP and physically verified / available assets at station.

    Discrepancies noted are listed below asset class wise:

    Computers

    FAR record shows 11 computers, whereas 14 computers were found at the station.

    Following 3 computers were in excess.

    Sr.

    Asset Asset Description Location

    1 102-5131-152 HP Compaq with Monitor PL Maintenance Room

    2 102-5131-074 IBM Net vista with Monitor Control Building

    3 C-7520-1034711 IBM Net vista with Monitor HSE Engineer Room

    Following 5 computers did not have an asset tag affixed; however asset description did

    match with FAR record.

    Sr.

    Asset Asset Description Location

    1 No Tag affixedHP Intel, Core 2 Duo, with LCD

    Monitor

    Operation Engineer

    Room

    2 No Tag affixedHP Intel, Core i3, with LCD

    MonitorTelecom Room

    3 No Tag affixed HP Intel, P IV with Monitor Telecom Room

    4 No Tag affixed IBM PC 300 Telecom Room

    5 No Tag affixed HP Intel with Monitor PA to Station In-charge

    Printers

    FAR shows 5 printers whereas 7 printers were found at the station.

    Following 2 printers were in excess.

    Sr

    . Asset Asset Description Location

    1 102-5144-065 HP Laser Jet 1200 Series PL Maintenance Room

    2 102-5144-038 HP Laser Jet 1000 Series Warehouse Office

    Following 2 printers did not have an asset tag affixed; however asset description did28 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    29/32

    Internal Audit Department

    Risk / ImpactRisk of misappropriation of assets.

    Fixed Assets Register in SAP does not represent the actual statuses of assets presentat the station.

    Recommendation Station In-charge in co-ordination with Manager Finance should take initiative to

    verify all assets present at the station so that Fixed Asset Register can be updated.

    Priority High

    Management

    Comments

    Activity has been started for updating the Fixed Asset Register as

    per physical assets available, jointly by S&T(OPS), Materials&

    Finance Departments at PS-4.

    List of air conditioners is being reviewed so that missing tag may

    be obtained from CHQ via Finance representative.

    Finance Representative has been advised to arrange missing

    Finance Tags from CHQ.

    Letters to concerned department Heads have been sent,

    accordingly.

    Manager

    Responsible

    Manager Finance / Manager S&T

    Implementation

    Date

    May 2012

    29 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    30/32

    Internal Audit Department

    ANNEXURE I

    PipelineSr. Item Description Qty

    1 ADJUSTABLE (18") 1

    2 ADJUSTABLE (15") 13 NOSE PLEIR 2

    4 MONKEY PLEIR 3

    5 WIRE BRUSH 1

    6 PLEIR 1

    7 PIPE WRENCH 1

    8 BLADE CUTTER 1

    9 HAMMER 1

    10 SCREW DRIVER 3

    11 L KEY 2

    12 BLADE CUTTER 3

    13 STAR SET 1

    14 SCISSOR 1

    15 CYLINDER KEY 2

    16 TEFLON TAPE 6

    17 EMERY PAPER 2

    18 CYLINDER FITTING 20

    19 CYLINDER FITTING 5

    20 DEPOXY 10

    21 OPEN SPANNER 14

    22 RING SPANNER 9

    23 CHIESEL 124 RUBBER PACKING 5

    25 COTTON GLOVES 2

    26 SURF 1

    27 PENCIL 1

    28 CHIESEL 8

    29 IROM BAR (BARI) 1

    30 STRAIGHT DRIVER 1

    31 MONKEY PLEIR 1

    30 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    31/32

    Internal Audit Department

    32 HAMMER 1

    33 HAMMER 3

    34 WOODEN PEG 10

    35 COTTON GLOVES 1

    36 EMERY PAPER 237 FITTING 10

    38 GREASE GUN 1

    39 WIRE BRUSH 3

    40 HAMMER 2

    41 PLASTIC GLOOVES 2

    42 SAFETY GLOOVES 2

    43 SAFETY CLAMPS 9

    44 SAFETY CLAMPS 3

    45 HOSE PIPE 1

    46 HOSE PIPE 2

    47 BRUSH 15

    48 BUCKET 3

    49 WATER COOLER 1

    50 CYLINDER 29

    51 BRUSH 78

    WOP PIG ITEMS:

    PipelineSr

    . Item Description

    UNUS

    ED USED1 GUIDE DISCS 41 12

    2 SEALING DISCS 2 24

    3 SPACERS 8 0

    4 BRUSHES 70 30

    5 BOLTS 220 0

    6 NUT 200 0

    KMK BRUSH PIG ITEMS:

    PipelineSr. Item Description

    UNUSED USED

    1 GUIDE DISCS 20 10

    2 SEALING DISCS 22 6

    3 SPACERS 0 13

    4 BRUSHES 6 7

    5 BOLTS 5 0

    6 NUT 5 0

    31 of 32

  • 8/2/2019 1.Draft Report - Fazilpur PS04

    32/32

    KMK MAGNETIC PIG ITEMS:

    PipelineSr. Item Description

    UNUSED USED

    1 GUIDE DISCS 13 16

    2 SEALING DISCS 14 20

    3 SPACERS 1 13

    5 BOLTS 5 0

    6 NUT 5 0