8
APPENDIX E - REFERENCES CITED Applied Science Associates, Inc., (ASA) 1986 . Circulation and Pollution Transport Model in New Bedford Harbor. Narragansett, Rhode Island. Applied Science Associates, Inc., (ASA) 1987. Selected Studies of PCB Transport in New Bedford Harbor; technical report prepared for Ropes and Gray . Boston, Massachusetts. Narragansett, Rhode Island. Averett, D.E ., 1989. Characterization and Elutriate Testing of Acushnet River Estuary Sediment, Report 3 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. March 1989. Averett, D. E. , Otis, M.l , Palermo, M.R. and P.B. Rubinoff, 1989. Evaluation of Conceptual Dredging and Disposal Alternatives, Repon 11 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers Waterways Experiment Station, Vicksburg, Mississippi and New England Division, Waltham, Massachusetts. July 1989. AVX, 1989. Transcript of the August 22 , 1989 public meeting regarding a proposal by AVX Corporation for the hot spot area of the New Bedford Harbor Superfund Site. Balsam Environmental Consultants, Inc . (Balsam), 1989. Assessment of PCB in Acushnet River Upper Estuary Saltmarsh Wetlands Sediments New Bedford Harbor - Draft; prepared for AVX Corporation; October 10, 1989. Barnthouse, LW. , G.W. Suter U, S.M. Bartell, J.J . Beauchamp, R.H . Gardner, E. Linder, R.V. O'Neill, and AE. Rosen, 1986. User's Manual for Ecological Risk Assessment; Environmental Sciences Division, Publication No. 2679, Oak Ridge National Laboratory, Martin Marietta Energy Systems, Inc . Bartell, S.N ., R.H. Gardner, and R.V. O'Neill, 1992. Ecological Risk Estimation; Lewis Publishers, Chelsea, MI. Battelle, 1987. Ratios of Edible Tissue to Whole Body PCB Concentrations in Plounder and Lobster from New Bedford Harbor; Report prepared by Battelle Oeean Sciences for U.S. EPA Office of Marine and Estuarine Protection; Contract No. 68-03-3319. July 1987. Battelle, 1990. Final Report for Modeling of the Transport, Distribution, and Fate of PCBs and Heavy Metals ill the Acushnet RiverlNew Bedford HarborlBuzzards Bay System (Volumes I, II and 111) . Battelle Memorial Institute, Duxbury, MA. September 21 , 1990. Battelle, 1991. Overview of the New Bedford Harbor PhysicaVChemical Modeling Program. Battelle Ocean Sciences, Duxbury, MA. April 1, 1991 .

1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

APPENDIX E - REFERENCES CITED

Applied Science Associates, Inc., (ASA) 1986. Circulation and Pollution Transport Model in New Bedford Harbor. Narragansett, Rhode Island.

Applied Science Associates, Inc., (ASA) 1987. Selected Studies ofPCB Transport in New Bedford Harbor; technical report prepared for Ropes and Gray. Boston, Massachusetts. Narragansett, Rhode Island.

Averett, D.E ., 1989. Characterization and Elutriate Testing of Acushnet River Estuary Sediment, Report 3 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. March 1989.

Averett, D.E. , Otis, M.l , Palermo, M.R. and P.B. Rubinoff, 1989. Evaluation of Conceptual Dredging and Disposal Alternatives, Repon 11 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives . U.S. Army Corps ofEngineers Waterways Experiment Station, Vicksburg, Mississippi and New England Division, Waltham, Massachusetts . July 1989.

AVX, 1989. Transcript of the August 22, 1989 public meeting regarding a proposal by AVX Corporation for the hot spot area of the New Bedford Harbor Superfund Site.

Balsam Environmental Consultants, Inc . (Balsam), 1989. Assessment of PCB in Acushnet River Upper Estuary Saltmarsh Wetlands Sediments New Bedford Harbor - Draft; prepared for A VX Corporation; October 10, 1989.

Barnthouse, LW., G.W. Suter U, S.M. Bartell, J.J . Beauchamp, R.H. Gardner, E. Linder, R.V. O'Neill, and AE. Rosen, 1986. User's Manual for Ecological Risk Assessment; Environmental Sciences Division, Publication No. 2679, Oak Ridge National Laboratory, Martin Marietta Energy Systems, Inc.

Bartell, S.N ., R.H. Gardner, and R.V. O'Neill, 1992. Ecological Risk Estimation; Lewis Publishers, Chelsea, MI.

Battelle, 1987. Ratios of Edible Tissue to Whole Body PCB Concentrations in Plounder and Lobster from New Bedford Harbor; Report prepared by Battelle Oeean Sciences for U.S. EPA Office of Marine and Estuarine Protection; Contract No. 68-03-3319. July 1987.

Battelle, 1990. Final Report for Modeling of the Transport, Distribution, and Fate of PCBs and Heavy Metals ill the Acushnet RiverlNew Bedford HarborlBuzzards Bay System (Volumes I, II and 111). Battelle Memorial Institute, Duxbury, MA. September 21 , 1990.

Battelle, 1991. Overview of the New Bedford Harbor PhysicaVChemical Modeling Program. Battelle Ocean Sciences, Duxbury, MA. April 1, 1991 .

Page 2: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-2

Bellmer, RJ" 1986. A Wetland Analyses in a Highly Polluted Harbor, New Bedford, Massachusetts, USA New England Division Corps of Engineers, Waltham, MA.

Bergen, B.1 ., Nelson, W.G. , and RJ. PruelI, 1993 . Bioaccumulation of PCB Congeners by Blue Mussels (Mytilus Edulis) Deployed in New Bedford Harbor, Massachusetts. Environmental Toxicologyand Chemislry, Vol. 12, No.9, pp. 1671-1681.

Bergen, B.1., Nelson, W.G., Rahn, K and G. Morrison, 1997. Remediation at a Marine Superfund Site: Surficial Sediment PCB Concentrations, Composition and Redistribution. Poster presentation at the 1997 Society of Environmental Toxicologists and Chemists conference.

Blumberg, A.F.• L.l Dodge and W.M. Leo, 1989. CSO Induced Circulation in Marine Tributaries. Proceedings ofthe American Society ofCivil Engineers Waterway Port, Coastal and Ocean Division Conference, Newport, Rhode Island, November 15-17, 1989 pp 142-153 .

Brown, John F. , and Robert E. Wagner, 1986 . Polychlorinated Biphenyl (PCB) Movement and Transformation in Acushnet Estuary Sediments; technical report prepared by General Electric Research and Development Center; Schenectady, New York.

Brownawell, B.1., and J.W. Farrington, 1986. Biogeochemistry of PCBs in [nterstitial Waters ofa Coastal Marine Sediment. Geochemica el Cosmochimica Acta; Vol. 50; pp. 157-169.

Camp Dresser & McKee, Inc. (COM), 1987. Grit Study, City of New Bedford, Massachusetts. August 31 , 1987.

Camp Dresser & McKee, Inc. (CDM), 1989. Combined Sewer Overflow Facilities Plan - Phase 3, City of New Bedford, Massachusetts. September 1989.

Commonwealth Electric Company (COMIE/eetric), 1998 . New Bedford Supply Cables Relocation, Estimates & Schedules. Informational handout for the March 18, 1998 meeting between COMIElectric and USEPA Region I.

Connally, J. 1991 . Application ofa Food Chain Model to Polychlorinated Biphenyl Contamination ofLohster and Winter Flounder Food Chains in New Bedford Harbor. Environ. Sci. Technol ., Vol 25, #4, pp 760-777 .

Cornell Dubilier Electronics, Inc. (CDE), 1985 . Post Remedial Action Report, Selected Areas of New Bedford Municipal Sewer System. Cornell Dubilier Electronics, Inc. , New Bedford, MA. January 1985.

Ebasco Services Incorporated, 1989. Draft Final Baseline Public Health Risk Assessment; New Bedford Harbor Feasibility Study. August 1989.

Page 3: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-3

Ebasco Services Incorporated, 1990a. Draft. Final Baseline Ecological Risk Assessment; New Bedford Harbor Site Feasibility Study. April 1990.

Ebasco Services Incorporated, 1990b. Final Air Monitoring Report, New Bedford Harbor Pilot Dredging and Disposal Study, New Bedford Harbor FS. July 1990.

Ebasco Services Incorporated, 1990c. Draft Final Feasibility Study of Remedial Alternatives for the Estuary and Lower HarborlBay, New Bedford, Massachusetts. Volumes I, II and III. AU,gust 1990.

Ebasco Services Incorporated, 1992. Draft Final Supplemental Feasibility Study Evaluation for Upper Buzzards Bay. New Bedford Harbor RlfFS, New Bedford, Massachusetts. May 1992.

ERM, 199 1. Final Design Analysis New BedfordIHot Spot Operable Unit Superfund Site. Prepared by ERM-New England, Inc., Boston, MA for US Army Corps of Engineers, Omaha District. November 1991 .

Foster Wheeler, 1997. Draft Final New Bedford Harbor Hot Spot Feasibility Study Addendum, New Bedford, Massachusetts. Foster Wheeler Environmental Corporation. December 1997.

Ford, T ., 1995 . Statement of Dr. Timothy Ford, Harvard School of Public Health, during the November 14, 1995 Sea Change, Inc. panel on confined disposal facilities . Panel meeting synopsis, Sea Change, fnc., Marion, Massachusetts.

Foster Wheeler, 1997. Draft Final New Bedford Harbor Hot Spot Feasibility Study Addendum, New Bedford, Massachusetts. Foster Wheeler Environmental Corporation. December 1997.

GC" 1984. New Bedford Environmental Investigation - Ambient Monitoring Program Final Report. GCA Corporation, Bedford, Massachusetts. April 1984.

GNBHES, 1987. Final Report of Greater New Bedford PCB Heallb Effects Study, 1984-1987. Massachusetts Department of Public Health. June, 1987.

Grant, W.D., A.J. Williams III and S.M. Glenn, 1984. Bottom Stress Estimates and Their Prediction on the Northern California Continental Shelf during CODE-I: Importance of Wave-Current Interactions. Journal ofPhy.\·ical Oceanography, Vol . 14, No.3 pp 506-527.

Gray, J.S. , 1989. Effects ofEnvironmental Stress on Species Rich Assemblages. Bioi. J. Linn. Soc. (G.B.):37: 19.

Gushue, 1.1. and RS. Cummings, undated. On-Site Containment of PCB-Contaminated Soils at Aerovox, Inc., New Bedford, Massachusetts.

aZA, 1986. NUS/Goldberg-Zoino Associates. Harbor Grid Sampling Program.

Page 4: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-4

Hansen, D., 1986. Preliminary Data Report, New Bedford Harbor Project. EPA Narragansett Laboratory, Rl; unpubli shed report .

Ho, KT. McKinney, R.A., Kuhn, A. , Pelletier, M .e., and R.M. Burgess, 1996. Identification of Acute Toxicants in New Bedford Harbor Sediments. Environmental Toxic%gyandChemislry, Vol. 16, No. 3, pp. 551-558, 1997.

IEP, 1988 . Wetland Study Report for the New Bedford Superfund Site, Final Report. Prepared by IEP, Inc., Northborough, MA for U. S. Army Corps ofEngineers, New England Division. June 1988.

Kissel, 1., Richter, K.Y. and R.A. Fenske, 1996. Field Measurements of Dermal Soil Loading Attributed to Various Activities: Implications for exposure assessment. Risk Analysis, 16: I 5-125.

Landrum, P.K. and JA. Robbins, 1990. Bioavailability of Sediment-Associated Contaminants to Benthic Invertebrates. Sediments: Chemistry and Toxicity of In-Place Pollutants, R. Baudo, J. Giesy, H. Muntau, Eds. Lewis Publishers Inc., Ann Arbor, MI.

Long, E.R. and L.G. Morgan, 1990. The Potential for Biological Effects of Sediment-sorbed Contaminants Tested in the National Status and Trends Program. NOAA Tech. Memo. NOS 52, National Oceanic and Atmospheric Administration, Seattle, W A.

long, ER. , 1992. Ranges in Chemical Concentrations in Sediments Associated with Adverse Biological Effects; Mar. Poll. Bull. 24(1): 38-45.

Long, E .R. , MacDonald, D.O., Smith, S.L. and F.D. Calder, 1993. Incidence ofAdverse Biological Effects within Ranges of Chemical Concentrations in Marine and Estuarine Sediments. Submitted to Environmental Management October 15, 1993 .

MA DMF, 1996. Letter from W. Leigh Bridges to Suzanne Condon regarding analysis of PCBs in American Lobster from Area 3 of New Bedford Harbor, 1980 through 1995. Commonwealth of Massachusetts, Division of Marine Fisheries. April 17, 1996.

Maguire Group, 1997. Presentation at the September 22, 1997 New Bedford Harbor Dredging Subcommittee meeting.

McAnally, W.H. , J.Y. Letter, and B.P. Donnell, 1989, "Two-Dimensional Numerical Modeling for Long term Sedimentation," in: Proceedings of the American Society of Civil Engineers Hydraulics Engineering Division Conference.

Myers, T.E. and 1M. Brannon, 1989. Evaluation ofLeachate Quality. Report 5 of 12, New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. April 1989.

Page 5: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E - 5

Myers, 1995 . Presentation by Dr. Tommy Myers, USACE Waterways Experiment Station, Vicksburg, Mississippi, at the July 25, 1995 New Bedford Harbor Superfund Site Community Forum, New Bedford, MA ..

Nelson, W.G. and D.l Hansen, 1991. "Development and Use of Site Specific Chemical and Biological Criteria for Assessing New Bedford Harbor Pilot Dredging Project"; Env. Mgt. 15(1) : 105-112.

Nelson, W.G., B.J. Bergen, S.l Benyi, G. Morrison, RA.Voyer, C.J . Strobe, S. Rego, G. Thursby and C.E. Pesch, 1996. New Bedford Harbor Long-Term Monitoring Assessment Report : Baseline Sampling. U.S. Environmental Protection Agency, National Health and Environmental Effects Research Laboratory, Atlantic Ecology Division, Narragansett, RI. EPN600/R-96/097 . October 1996.

Nelson, W.G, Bergen, B.1., Benyi, S. , Comeleo, R. and G. Morrison, 1997. Habitat, and Ecological Indicators. Poster presentation at the 1997 Society of Environmental Toxicologists and Chemists conference.

New Bedford Harbor Trustee Council (NBHTC), 1998. Final Restoration Plan/Environmental Impact Statement fOf the New Bedford Harbor Environment. May 1998.

NUS Corporation (NUS), 1984. Draft Feasibility Study ofRemedial Action Alternatives, Acushnet River Estuary Above Coggeshall Street Bridge, New Bedford Site, Bristol Couny, Massachusetts. August 1984 .

NUS Corporation (NUS), 1986. Ambient Air Monitoring Program, Acushnet River Estuary, New Bedford, Massachusetts, Volume I, Draft Report. NUS Corporation. February 1986.

National Institute for Occupational Safety and Health (NlOSH), 1994. NlOSH Pocket Guide to Chemical Hazards; U.S. Department of Health and Human ServicesfPublic Health Service/Centers for Disease Control and PreventionlNlOSH. June 1994.

Otis, M., Andon S. and R. Bellmer et aI., 1990. New Bedford Harbor Superfund Pilot Study, Evaluation of Dredging and Dredged Material Disposal. US Anny Corps of Engineers, New England Division. May 1990.

Palermo, M.R. and 1. Miller, 1995. Assessment of Technologies for Manistique River and Harbor Areas of Concern, Report of US Army Corps of Engineers to the Interagency Review Team. Appendix E of the March 31 , 1995 Final Report of the Manistique Technical Review Team. March 30, 1995.

PrueH, RJ., 198&. Letter Report to Douglas C. Allen, E.C. Jordan Co., Portland, ME, in response to a request for a summary of information available on the in-situ biodegradation of PCBs in New Bedford; from EPA Environmental Research Laboratory, Narragansett, RI. October 25. 1988.

Page 6: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-6

Pruell, R.l. , Norwood, c.a., Bowen, R.D., Boothman, W.S., Rogerson, PF., Hackett, M. and B .C. Butterworth, 1990. Geochemical Study of Sediment Contamination in New Bedford Harbor, Massachusetts. Marine Environmental Research, Vol. 29, pp.77-IOl.

Rhoads, D.C. , 1987. Sedimentological Coefficients for the New Bedford Numerical Model: Bioturbation, Biodepositions and Critical Erosion Velocities. Science Applications International Corp.) Woods Hole, Massachusetts.

Rusek, T .F., 1989. Polychlorinated Biphenyls (PCB' s) in Striped Bass, Morone Saxatilis(Walbaum) of Buzzards Bay and the Acushnet River. Thesis presented to the faculty of the biology department of Southeastern Massachusetts University (Master of Science). April 1989.

Sturgis, T.C. and Gunnison, D., 1988 . Laboratory Testing for Subaqueous Capping, Report 6 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. October 1988.

Teeter, A.M., 1988. "Sediment and Contaminant Hydraulic Transport Investigations," Report 2 of 12, New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. U.S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. December 1988.

TERRA, Inc., 1997. PCB Guidelines for New Bedford Harbor Sediments: Re-Evaluation of the 50 ppm Target Cleanup Level Using New PCB Cancer Slope Factors. January 1997.

USACE, 1991. Construction Plans for the New Bedford Harbor Superfund Hazardous Waste Cleanup, Hot Spot Operable Unit, New Bedford, Massachusetts. US Army Corps of Engineers Omaha District. December 1991.

USACE, 1997. Memorandum for the Record with seven attachments from Mark Otis regarding New Bedford Harbor Superfund Site, estimates of contaminant loss (through leachate) from confined disposal facilities. October J7, J997.

US Census Bureau, 1997. Phone caJl with David Dickerson, USEPA, December 23, 1997

USEPA, 1988. Interim Sediment Criteria Values for Non-polar Hydrophobic Organic Contaminants. SCD 17, United States Environmental Protection Agency, Washington, DC.

USEPA, 1988b. Guidance for Conducting Remedial Investigations and Feasibility Studies Under CERCLA, Interim Final. OSWER Directive 9355.3-01. October 1988.

USEPA, 1990. Record of Decision Summary, New Bedford Harbor Hot Spot Operable Unit, New Bedford, Massachusetts. U.S. Environmental Protection Agency Region l. April 1990.

Page 7: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-7

USEPA, 1991. Technical Support Document for Water Quality-based Taxies Control . EPA/505/2-90-001 , United States Environmental Protection Agency, Washington, DC.

USEPA, 1992. Peer Review Workshop Report on a Framework for Ecological Risk Assessment. EPA/62S/3-9J /022, United States Environmental Protection Agency, Washington, DC.

USEPA, 1995 . New Bedford Harbor Superfund Site, Hot Spot Operable Unit, Explanation of Significant Differences for Continued Storage of Hot Spot Sediments. Prepared by EPA-New England. October 1995 .

USEPA, 1996a. Memorandum from Bruce Means to Linda M. Murphy regarding the National Remedy Review Board Recommendations on the New Bedford Harbor Superfund Site. September II , 1996.

USEPA, 1996b. Memorandum from David Dickerson and Cindy Catn to David Pincumbe, Ann Williams, Jane Downing, Larry BriJl, Frank Ciavattieri and Paul Ccaffey regarding the proposed TMDL for copper and other issues related to the proposed ROD 2 water treatment plants for the New Bedford Harbor Superfund Site. October II , 1996

USEPA, 1996c. Memorandum from David Dickerson to file regarding ROD 2 PCB limits for the New Bedford Harbor Superfund Site. October 23 , 1996.

USEP A, I 996d. Proposed Cleanup Plan, Upper and Lower New Bedford Harbor, New Bedford, MA. US EPA Superfund Program. November 1996.

USEPA, 1997a. Letter from Linda Murphy to Bruce Means regarding the New Bedford Harbor Superfund Site, New Bedford Massachusetts. May 22, 1997.

USEPA, I 997b. Memorandum from Ann·Marie Burke to Dave Dickerson regarding target levels for PCBs in fish for the New Bedford Harbor Superfund Site. September 22, 1997.

USEPA, I 997c. Report on the Effects of the Hot Spot Dredging Operations, New Bedford Harbor Superfund Site, New Bedford, Massachusetts. October 1997.

USEP A, 1998. Memorandum from Ann-Marie Burke to Dave Dickerson regarding area specific cleanup levels for New Bedford Harbor. June 3D, 1988.

Vermulakonda, S. Rao, and HL. Butler, 1989. Modeling Circulation in Los Angeles.Long Beach Harbor. Proceedings ofthe American Society ofCivil Engineers Waterway, Port, Coastal and Ocean Division Conference, Newport, Rhode Island, November IS-17, 1989, pp. 320·330.

VHB, 1996. New Bedford Harbor Historic Overview, Natural Resources Uses Status Report. Prepared by Vanasse Hangen Brustiin, Inc. For New Bedford Harbor Trustee Council. July 1996.

Page 8: 1998 RECORD OF DECISION (ROD) - ATTACHMENT E - … · 2020-07-02 · Science Applications International Corp.) Woods Hole, Massachusetts. Rusek, T.F., 1989. Polychlorinated Biphenyls

E-8

Wade, R., 1988. Settling and Chemical Clarification Tests, Report 7 (of 12), New Bedford Harbor Superfund Project: Acushnet River Estuary Engineering Feasibility Study ofDredging and Dredged Material Disposal Alternatives. U,S. Army Corps of Engineers, Waterways Experiment Station, Vicksburg, Mississippi. November 1988.

Wester, R.C. , Maibach, H.I. , Sedik, L., Meiendres, J. , and M.Wade, 1993 . Percutaneous absorption of PCBs from soil: in vivo Rhesus Monkey, in vitro human skin. and binding to powdered human stratum corneum. 1. TexicoL Environ. Health, 39:375-82.

Weston, 1983, New Bedford Remedial Action Master Plan, Final Report. Prepared by Roy F. Weston, Inc. for the USEPA. May 1, 1983 .