PDO ENGINEERING STANDARDS AND PROCEDURES PROJECT MANAGEMENT    CFDH: UEP - (Julian Masters) Doc. ID Document Title Additional Notes Rev./DEM Date ProjectEngineering   CP-117 ProjectEngineering CodeofPractice  Rev. 5.0 Jan-12 CP-122 Health, Safetyand Environment Management SystemManual Ver. 5.0 Jul-11 CP-131 Riskand OpportunityManagement Codeof Practice Ver. 3.0 Dec-06  CP-206 Management ofChangeCode ofPractice  Rev. 1.0 Nov-11 PR-1150 Project CloseOut Procedure    EngineeringCAPEX &OPEX Projects Ver. 3.0 Apr-04 PR-1153 Field Trouble Report Procedure Ver. 2.0 Feb 06 PR-1247 ProjectManagementofChangeProcedure Ver. 4.1 May-12 PR-1358 ProcedureforConcept Selection and PreparingaBasis forDesign Ver. 2.0 Dec-04  PR-1979 ProcedureforProject DeliveryAssuranceBoards(PDAB’s)  Rev. 1 Mar-11 SP-1134 Specification forDetailed Design and EngineeringofOil &Gas Facilities Rev. 1.0 Aug-06  SP-2050 Spec ifica tion forCons truct ion Activ itieson Oil, Gasand Util ityFacil itiesPro ject s Ver. 1.0  Jul-06 SP-2100 Contract Cost EngineeringSpecification Ver. 1.0 Dec-09 GU-484 Project Engineering   Scheduling&ReportingGuideline Ver.2.0 Feb-11 GU-556 GuidelineforVendorProject Document Deliverables Rev.1.0 Feb-07  GU-569 Project Cost Engineering Rev.1.0 Jan-07 GU-663 Project ControlsPlan Guideline Rev. 0 Jun-11 DEP 00.00.07.10 Design ClassTables Complexand/orHigh Valueprojectsonly- Evaluate &justifyon caseby casebasis  Sept-11 DEP01.00.09.10 (Ι) Operational TaggingRequirements Feb-12 DEP30.10.01.10 RequisitionsIndex Feb-12 DEP70.10.90.11 (Ι) SparesParts Feb-12 DEP 82.00.10.12 LifeCycle Costing(Endorsement ofISO15663-1) Feb-11 Design / Drafting   SP-1131 Specification forHand Overand AsBuilt Documentation Ver. 3.0 May-06 SP-1132 Specification forPlant Design ReferenceManual Ver. 3.0 Apr-06 SP-2047 Specification forthe Preparation and Content ofEngineeringDrawings Ver. 2.0 Feb-10 PR-1666 Project DrawingProcedure Ver. 1.0 May-06 DEP 00.00.06.06 StandardDrawingsIndex Sep-12 DEP 00.00.07.30 (Ι) Applicationofa functional specification  Sep-12 (endorseme ntof ISO13879, ISO13880 an dISO/TR13881) DEP 02.00.00.10 Preparation &Microfilmingof Technical Drawings Amended byCirculars15/99, 64/01 &56/03  Oct-95 Standards Administrat ion   PR-1561 WinPCS Procedure Rev. 0 Mar-04 GU-453 GuidelinesforWinPCS Users Rev. 02 Jul-06 ORM OpportunityRealisation Manual Apr-10 DEP 00.00.00.30 (Ι) ProcedureforGlobal Technical StandardsPublications Sep-12 DEP00.00.05.05 Global Technical StandardsIndex Sep-12 DEP00.00.10.05 StandardFormsIndex Sep-12 DEP00.00.20.10 TheUseof SIQuantities    Endorsement ofISO-31, ISO-1000 &ISO 80000 Feb-11 MATERIALS SELECTION & CORROSION ENGINEERING    CFDH: UEOC - (Nasser Behlani) Doc. ID Document Title AdditionalNotes Rev./DEM Date General - CP-208 CorrosionManagemen tCode ofPractice NEWREQUIREMENT Ver. 1.0 Jul-12 SP-1128 Specification forCathodicProtection Design Ver. 2.0 Dec05 SP-1129 Specification forConstruction, Installation and CommissioningofCathodicProtection Systems  Ver. 2.0 Sep-05 SP-1130 Specification forCathodicProtection Materialsand Equipment Rev. 1.0 Sep-99 SP-1136 CathodicProtection Drawings Ver. 2.0 Dec05 SP-1189 Specification forDuplexStainlessSteel LinePipe - Amendments/S upplementsto API5LC REPLACESDEP31.40.20.34 Ver. 1.0 Dec-00 SP-1195 Specification forthe Wall ThicknessMeasurement ofPipelinesby Automated Ver. 1.0 Jan-01  Ultrasonic Techniques SP-1246 Specification forPaintingand CoatingofOil and GasProduction Facilities Ver. 2.0 Apr-10 (Parts1 to 5) SP-2034 Specification forInternal FBE CoatingofLine Pipe Ver. 1.0 Sep 05 (Amendment s/SupplementstoAPI REP5L7) SP-2041 Specification forCrackingResistant Materialsin H 2S ContainingEnvironment Ver. 2 Mar-11 SP-2092-1 GRP Specification   Part 1 (Qualification &Manufacturing) Ver. 0 Jan-10 SP-2094 Specification forPolyethyleneLinersin Carbon Steel Flowlines &Pipelines Ver. 0 Aug-10  SP-2095 Internal Liquid CoatingforCarbon Steel Pipingand LinePipes Ver. 1.0 Sept-09  PR-1180 PerformanceTestingofCoatingSystems forPipelineRehabilitation Ver. 2.0 Nov-05 PR-1234 SafeWorkingProceduresfor CathodicProtection Systems Ver. 2.0 Mar-01 PR-1503 ProcedureforDeterminingPipeline’sAssessed Corrosion Rate (ACR)  Ver. 2.0 Dec-09 PR-2006 Replacement (Like/Like)ofCarbon Steel / OtherSpoolsConnected to GRP Lines Ver. 1.0 Nov-11 GU-368 GuidelinesForThe Protection OfBuried Sectionsof SurfaceLaid Pipelines/Flowlin es Rev. 0 May-00 GU-475 Corporate FlowlineMaterialsSelection Guideline Ver. 1.0 Sep-04 GU-486 Screening&MonitoringBacteriaGuidelines Ver. 1.0 Oct 05 GU-637 SourWellsCompletion, Material Selection Guidelines  Ver. 1.0 May-10 DEP30.10.02.11 MetallicMaterials-Selecte d Standards Feb-12 DEP30.10.02.13 (Ι)  Non-MetallicMaterials-Se lection &Application Feb-12 DEP 30.10.02.14 (Ι) Carbon Steel Corrosion EngineeringManual forUpstreamFacilities  DEM-1 Feb-11 DEP30.10.02.31 (Ι) MetallicMaterials-Prevent ion ofBrittle Fracturein NewAssets Amended byCircular59/11  DEM-1 Feb-11 DEP 30.46.00.31 ( Ι) Thermal Insulation Amendedby Circular70/12 Sep-12 Revisedby AmendmentA02   Sept-12 DEP30.48.00.31 ProtectiveCoatingsforOnshoreFacilities Amended &Supplemented bySP-1246 Jan-09  DEP 30.48.00.32 ( Ι) CoatingofFasteners Feb-12 DEP 30.48.30.31 ( Ι) CementLining ofPipes (BasedonEN 10298) Sep-12 DEP30.48.40.31 Thermal SprayCoatings of Aluminium Feb-12 DEP30.48.41.31 ElectrolessNickel Plating- Amendments/S upplementsto ASTM B 733 Jan-08 DEP30.48.60.10 Rubber-Lin edProcessEquipment Sep-12 DEP 31.10.00.10 ( Ι) Positive Material Identification (PMI) Program DEM-1 Sep-11  DEP31.24.40.31 (Ι) MaterialsforHigh TemperatureConversion ProcessFurnaceParts Feb-12  DEP 31.40.10.20 SpoolableFibre-Reinfo rcedPlasticPipes Sep-12 DEP 31.40.20.32 (I)  CRAClad orLined Steel Pipe- Amendments/ Supplementsto APISpec5LD Sep-11 DEP31.40.30.31 (Ι) External Polyethylene&PolypropyleneCoatingfor LinePipe Feb-11 -Amendments/SupplementstoISO/DIS21809-1:2009 DEP31.40.30.32 External Fusion-Bonded EpoxyPowderCoatingfor LinePipe Feb-11 -Amendments/Supp;eme ntsto ISO21809-2:2007 DEP31.40.30.34 ThermoplasticLined Pipelines Amended byCirculars05/02 &39/08  Dec-99 DEP31.40.30.35 Int ern al Coati ng ofLi nePip eforNon-Cor ris iveGa sTransmiss ionSe rvi ce Sep -12 - Amendments/Su pplementstoISO 15741 DEP31.40.30.37 External Field Joint and Rehabilitation CoatingSystemsfor LinePipe Jan-08  DEP 39.01.10.11 ( Ι) Selection OfMaterial ForLifeCycle Performance(UpstreamFacilities) Amended byCircular35/12 DEM-1 Feb-11 - MaterialsSelection Process  DEP 39.01.10.12 ( Ι) SelectionofMaterialsfor Life Cycle Performance(UpstreamFacilities) Amendedby A01 Sep-12 DEM-1 Feb-12    Equipment DEP39.01.10.32 (Ι) Specification ofnickel basealloy718 (UNS N07718)foroil and gasdrilling and Amended byCircular36/12 DEM-1 Feb-11  production equip ment (amendments/supplement sto API spec6A718)  DEP 70.10.70.11 ( Ι) Preservation ofNewand Old Equipment StandingIdle Feb-11  Welding - SP-1097 Specification forWeldingof DuplexStainlessSteel Pipelines Ver. 2.0 May-05 - Amendments/Supp lementsto API Std 1104 SP-1167 Specification forWeldingon Pressurised Pipes Ver. 2.0 Oct-06 SP-1173 Specification forWeldingon On-Plot Pipe-Work REPLACESDEP31.38.01.31-GEN Ver. 1.3 May-08 -Amendments/Suppleme ntsto ASMEB31.3  &Amend/Supl’t DEP 30.10.60.18-GEN SP-1174 Spe cif ic ati on fo rWel di ngofCla ss2 &Cla ss3 Pip eli nes Ve r. 2. 0 De c- 04 - Amendments/Supp lementsto API Std 1104 SP-1177 Specification forWeldingofClass1 Pipelines Ver. 2.0 Oct-05 - Amendments/Supp lementsto API Std 1104 PR-1272 Sta nda rd Wel din gProc edu reQuali fic ati on Rec ord sforOn-Pl ot Pip ing Ver . 2.0 Jun -05 PR-1274 Sta nda rd Wel din gProc edu reQuali fic ati on Rec ord sForCl ass2 Pip eli nes Ver . 2.0 Jun -05 PR-1276 Standard ProcedureQualification RecordsforWelding on to Pressurised Pipes Ver. 2.0 Jun-05 PR-1659 PipelineEmergencyRepairPQR’SWelding/ PipelineProcedures  Ver. 1.0 Oct 05 DEP30.10.60.18 WeldingofMetals Amendedand Supplemented bySP-1173 Feb-12 - Amendments/ Supplement sto APIRP 582 DEP-30.10.60.30 (Ι) Weldingon Pressurised Pipes Amended and Supplemented bySP-1167 DEM 1 Feb-11  - Amendments/S upplementsto ANSI/ API RP 1107 Amended byCircular 60/11  DEP-30.10.60.31 Oxidation ofStainlessSteel Weldments Dec-98  DEP61.40.20.30 (Ι) WeldingofPipelinesand Related Facilities Amended byCircular07/12 DEM 1 Feb-11 (Amendment s/Supplementsto ISO13847:2000) Inspection- PR-1013 Static Equipment Inspection and MaintenanceProcedure Ver. 3.0 May-05 GU-256 Static Equipment Inspection Guideline Ver. 2.0 May-05 GU-363 Guidelineforthe Useof Scaffolding Ver. 1.0 Aug-00 GU-432B GuidelineforAutomated Ultrasonic TestingScope Ver. 1.0 May-03 Definition forClass1 Piggable Pipelines GU-450 GuidelineforInspection and IntegrityAssessment of Ver. 1.0 Nov-03 CarbonSteelNon-PiggablePipelines DEP30.55.03.30 Validation ofNDE forFabrication Inspection  Feb-12 DEP61.10.08.11 Field Inspection priorto CommissioningofMechanical Equipment Feb-11 PROCESS ENGINEERING    CFDH: OSE/1 - (Said Alawi) Doc. ID Document Title Additional Notes Rev./DEM Date CP-200 WaterManagement CodeofPractice  Ver. 1.0 Nov-11 SP-1125 IsolationofProcessEquipmentSpecification Rev. 4.0 Jun-12 SP-1126 DrainSystemsSpecification Ver. 3.0 Jun-12 SP-1166 Specification forIdentification ofOn-Plot Pipework Ver. 2.0 Sep-04 SP-1190 Des ign forSo urSer vic eSpec ifi cat ion Owner : Saf etyEn gin eer ing Ver . 3.0 Sep -11 PR-1696 HAZOP Procedure  ContactOSE/1 &MSE4 BeforeUse Rev. 3 Jun-12 GU-665 Water Treatment Strategy Ver. 0 Oct-11 DEP01.00.01.30 (Ι) Definition &Determination ofTemperature, Pressureand ToxicityLevels DEM-1 Feb-12 DEP 01.00.02 11 (Ι) Preparation ofProcessFlow Schemes&Process EngineeringFlowSchemes DEM-1 Feb-11 DEP01.00.02.12 (Ι) Preparation ofSafeguardingMemoranda&ProcessSafeguardingFlowSchemes DEM-1  Feb-11 DEP20.04.10.10 Glycol TypeGasDehydration System Amended byCirculars50/06, 74/08 &05/10  Jan-05 DEP20.05.50.10 (Ι) Heat TransferFluid (HTF)Systems Amended byCircular42/11  DEM-1 Feb-11 DEP 20.05.60.10 ( Ι) FuelSystems Amended byCircular27/11 DEM-1 Feb-11 DEP20.21.00.31 FoulingResistanceForHeat TransferEquipment Feb-11 DEP 30.05.10.30 ( Ι)  Nitrogen / Oxy gen Supply&Distribution System  DEM-1 Feb-12 DEP30.10.05.11 Plant Model Construction&Review Feb-12 DEP 30.75.10.10 ( Ι) Steam, Condensate and BoilerFeed WaterSystems  DEM-1 Feb-12 DEP31.22.05.11 Gas/Liquid Separators - TypeSelection and Design Rules Feb-12 DEP31.22.05.12 Liquid/Liquid and Gas/Liquid/L iquid Separators- TypeSelection and Design Rules Feb-12 DEP 37.05.10.11 ( Ι) Diesel Oil Systems DEM-1 Feb-12 DEP 80.10.10.31 (Ι) Breathing Air&Supply Syst ems NEWREQUIREMENT   TBC Sep-12 DEP 80.45.10.10 ( Ι) DesignofPressure Relief, FlareandVent Systems AmendedA01  Sep-12 DEM-1 Feb-12 DEP 80.45.10.11 ( Ι) Overpressureand Under-pressure    Prevention and Protection DEM-1 Feb-12 DEP 80.45.10.12 ( Ι) Emergency Depressuring and Sectionalizing Amendedby Circular 77/12 DEM-1 Feb-11 AmendedA03  Sep-12 DEP80.45.11.12 (Ι) FlareDetails(Amendments/Supplementsto ISO 25457)  Amended byCircular 01/12 DEM-1 Feb-11 (No DocNo) De-oilingManual Ver 2.0 Dec-10 EP95-0312HAZID Hazard Identification Technique Rev. 0 Sep-95 EP95-0313HAZOP Hazard &OperabilityTechnique Rev. 0 Oct-95 EP 98-5632 Best PracticesGuide- GasSweeteningTechnology Dec-98 EP 99-5266 Removal ofHeavyMetals fromWasteWater    DeskStudy Feb-99 EP 99-5508 KeyMultiphaseand Hydrate LearningPointsfromtheMain GasCondensate Sep-99 Systemsin theShell Group EP 99-5806 Best Practicein Produced WaterTreatment Dec-99 EP2003-5184 Shell Expro TopsidesSolidsManagement Guide Sep-03 EP2007-5644 EP Guidelineon ProcessSafeguarding Nov-07 EPTL-GL-PRO-0001 Global Pro cessEngineeringGuideline    FacilityLineSizing Dec-08 GS 06.53139 GuideforFluid Characterizatio n usingC7PLUSMethod in HYSYS Dec-06 GS 08.53105 Hydrate Guidelines Aug-08 GS 09.50282 FlowAssuranceGuideline Jan-09 GS 09.51858 Guidelinesforthe HydraulicDesign and Op eration ofMultiphaseFlowPipelineSystems PreviouslyGS.06.50701 May-09 GS 09.53369 Plant and PipelineDepressuringGuideline Dec-09 GS 10.50828 Heat ExchangerSelection Guideline PreviouslyEP 2005-5186 Apr-10 SR 11.11103 GuideforFluid Characterizatio n usingC7PLUSMethod in UNISIM Apr-11 ELECTRICAL ENGINEERING    CFDH: UIE (UEE2) - (Mohammed Aghbari) Doc. ID Document Title Additional Notes Rev./DEM Date Electrical Equipment   SP-1099 ElectricalInfrastructure- Specification forElectrical Installation Practice Ver. 5.0 Dec-06  SP-1100 Specification forTesting& CommissioningofElectrical Equipment Ver. 3.0 Jun 04 SP-1101 Electrical InfrastructureSpecification forinstallation ofOverhead Transmission Ver. 2.0 May-08 Lines SP-1102A Electrical InfrastructureSpecification forDesign of33kV Overhead Power Ver. 6.0 Aug-08 Lines on WoodenPoles SP-1102B Electrical Infrastructure Specification forDesign of33kV Overhead Power Ver. 7.1 Dec-10 Lines on Concrete Poles SP-1103 Electrical Engineering Guidelines Amend’t/Suppl’t toDEP 33.64.10.10-Gen(Feb-11) Ver. 5.0 Oct-11  SP-1105 ElectricalInfrastructure- Electrical Standard DrawingsList Ver. 4.0 Ma y-06 SP-1106 ElectricalInfrastructure- Specification forCodingand Identification of Ver. 2.0 May-08 Overhead LineSystems SP-1107 ElectricalInfrastructure-Specificationfor  El ec tr ic al Pr otec ti on Syst em Ve r. 3. 0 Jul- 08 SP-1109 Specification for Earthinga nd Bonding Ver. 4.0 Mar-04  SP-1110 Electrical Infrastructure- Specification forElectrical SuppliesforMobile Camps Ver. 5.0 May-06 SP-1111 Electrical Infrastructure- Specification forTemporaryElectrical Supplies Ver 4.0 Apr-06 forConstruction &MaintenanceWork SP-1112 Electrical Infrastructure- Electrical Specification forDrillingRigs Ver. 4.0 Apr-06 SP-1113 Electrical Infrastructure- Specification for132kV Substation Ver. 4.0 Apr-0 8 SP-1114A Electrical Infrastruct ure- Specification forDesign of132kV Overhead Power Lineson Wooden Poles Ver. 4.0 May-08 SP-1114B Electrical InfrastructureSpecification forDesign of132/220 kV Overhead Ver 2.0 May-08 PowerLineson Steel Towers SP-1114C Electrical Infrastructure   Specification forDesign ofTWINELM 132kV Ver. 2 Dec-10 Overhead PowerLineson Concrete Poles  SP-1115 Spe cif ica tio n forDi git al PowerLin eCarr ierCommuni cat ion Sys tem Ver 2.0 Jun -04 SP-1116 Ele ctr ica l Inf ras tru ctu re- Spe cif ica tio n forSC ADAofEle ctr ica l Sys tem Ver . 3.0 Jan -07 SP-1117 Specification forPowerTransformers Amend’t /Suppl’t to DEP-33.65.40.31-Ge n (Oct-01) Ver. 4.0 Nov-03 SP-1118 Specification forPowerStation Ver. 2.0 Oct-04 SP-1119 SpecificationsforElectrical MachinesCageInduction Types Amend’t /Suppl’t to DEP 33.66.05.31-Gen (Jan-99) Ver. 4.0 Jun-06 SP-1120 SpecificationsforHigh VoltageSwitchgearand Control Assemblies Amend’t /Suppl’t to DEP 33.67.51.31-Gen (Jul-98) Ver. 3.0 Jun-04 SP-1121 SpecificationsforLowVoltage Switchgearand Control Assembl ies Amend’t /Suppl’t to DEP 33.67.01.31-Gen (Jan-98) Ver 4.0 Jun-05 SP-1144 InfrastructurePowerSystemsDepartment    Oil and Ga sDire cto rat e Ser vic e Ver . F Ma y-0 5 Level Agreement SP-1242 HSESpecificationfor  Activitiesin theVicinityof Overhead PowerLines Ver 4.0 Oct-04 SP-1267 SpecificationforSynchronousACMachines Amend’t /Suppl’t to DEP-33.65.11.31-Ge n (Jan 99) Ver.2.0 Jun-06 PR-1168 PowerSystems   EmergencyResponseProcedure Ver 7.0 Mar-09 VolumeVII: PowerSystemsOperstionsInterior  PR-1259 InfrastructureManageme nt Procedure Ver. 2.0 Sep-99 PR-1265 ProceduresforMaintainingPowerSystemNetworkModels Ver. 2.0 Nov-06  PR-1353 Electrical SystemFaults& AnalysisProcedure Ver. 4.0 Jun-05 PR-1421 InfrastructurePowerSystemsDepartment MHEWInterconnectorOperation Ver 3.0 Dec-04 MaintenanceProcedure PR-1613 ProcedureforAssessment ofProtection RelayTestingEngineers Ver. 2.0 Jun-10  GU-290 InfrastructurePowerSystemsDepartment    PowerSystemsAsset Management  Ver. 2.0 Apr-06 GU-323 InfrastructurePowerSystemsDepartment - KeyBusinessControl Ver. 3.0 May-06 Documentation Guidelines DEP 33.64.10.10 ( Ι) Electrical EngineeringDesign Amended &Supplemented bySP-1103 DEM 1 Feb-11  DEP 33.64.10.12 (I)  Electrical Supplyand Generation-De sign and Operation Sep-11 DEP 33.64.10.32 (I)  Electrical NetworkMonitoringand Control SystemforIndustrial Sep-11  Networks- Specification DEP33.64.10.33 Electromag netic Compatibility (EMC) Sep-12 DEP 33.65.11.31 (I)  SynchronousACMachines    Ame ndme nts/S upple ment sto IEC 60034 -1 & Ame nded and Supp leme nted bySP-126 7 Feb- 12 IEC60034-14 DEP33.65.11.32 Packaged Unit AC GeneratorSets Apr-03 DEP33.65.40.31 (I) PowerTransformers   Amend me nts /Su ppl eme ntsto IEC 600 76- 01 & Amend ed and Sup ple me nte d bySP- 111 7 Sep -11 IEC60076-11 DEP33.65.50.31 (Ι) Static DC Uninterruptible PowerSupply(DC UPS)Units DEM-1 Feb-11 DEP33.65.50.32 (Ι) Static AC Uninterruptible PowerSupplyUnit (Static A.C.UPS unit) DEM-1 Feb-11 DEP 33.65.60.30 (I)  SolarPowerSystems  Feb-12 DEP33.66.05.31 (I) ElectricalMachines-Cage-InductionTypes    Amendments/S upplements Amended and Supplemented bySP-1119 Feb-12  to IEC 60034-1 &IEC 60034-14 DEP 33.66.05.33 (I)  AC Electrical Variable Speed DriveSystems Feb-12 DEP33.67.01.31 (Ι) LowVoltageSwitchgear& Control GearAssemblies Amended and Supplemented bySP-1121 Feb-11    Amendments/Suppleme ntsto IEC60439-1 DEP 33.67.51.31 (I)  High-VoltageSwitch Gearand Control GearAssembliesfor Rated Voltages Amended and Supplemented bySP-1120 Feb-12  between 1kV &52kV   Amendments/Suppleme ntsto IEC62271-200 DEP33.68.30.32 Electrical Trace Heating Sep-10 DEP33.68.30.33 ElectricalProcessHeaters   Nov-06 DEP 63.10.08.11 (I)  Field Commissionin g& MaintenanceofElectrical Installations&Equipment Sep-11 Electrical Safety Operational Procedures (ESOP’s)–  SP-1145 Guideto SafetyOperability(SAFOP)Studieson Electrical Systems Ver. 3.0 Oct-03 PR-1947 Electrical SafetyRules Ver. 8.0 Aug-10 PR-1948 Electrical SafetyOperatingProcedures Ver. 9.0 May-10 CIVIL ENGINEERING    CFDH: UEP1C (UEB) - (Hilal Aghbari) Doc. ID Document Title Additional Notes Rev./DEM Date Civil / Structures  - SP-1143 Specification sfor Earthmovi ng &ConstructionEquipment NEWREQUIREMENT Rev. 2 May-12 SP-1274 Spec if icat ion forCi vi l &Buil di ngsCons tr ucti on- Ma teri al sTest ing Ve r. 2. 0 De c- 09  SP-1275 Specification &Criteria forDesign ofCivil &BuildingWorks Ver. 2.0 Dec-09  SP-1277 Specification forTransportable Accommodat ion Units Ver. 2.0 Dec-09  SP-1279 Specification forCivil &BuildingConstruction Ver. 2.0 Dec-09 SP-1281 EngineeringSpecification forSafeRoad Works  Ver. 2.0 Dec-09 SP-1282 Specification forReinforced Concrete - Production &Construction Ver. 2.0 Dec-09 SP-1284 Specification forSign &Signboards- Standard SignsCatalogue Ver. 2.0 Dec-09 GU-628 Guideto Civil &Buildings Standard Drawings Ver2.0 Dec-09 GU-629 GuidelineforApplication &Selection ofStandard PipeSupports Ver 1.0 Dec-09 GU-630 Guidelineto Design &Construction ofSwimmingPools Ver2.0 Dec-09 GU-631 GuidelineforSunshade    Specification, Design Requirements&Standard Drawings  Ver 1.0 Dec-09 DEP34.00.01.30 (I) Structural Design &Engineeringof OnshoreStructures Sep-11 DEP 34.11.00.10 (I)  Onshore&NearshoreSite Investigations Sep-11 DEP34.11.00.11 (I) SitePreparations&Earthworks IncludingTankFoundationsand TankFarms Sep-11 DEP34.11.00.12 (Ι) Geotechnica l &FoundationEngineering   Onshore Amendedby Circula r99/11 & 68/12  Feb-11 &AmendmentA03-Sep-12 DEP 34.13.20.31 (I)  Road Paving, Surfacing, SlopeProtection &Fencing Sep-11 DEP34.14.20.31 (Ι) Drainagesystemsand primarytreatment facilities Amended byCircular55/11 DEM-1 Feb-11 DEP34.17.00.32 (Ι) Design&Engineering ofBuildings Amended/S upplementedby SP-1275 Sep-12 DEP34.17.10.30 (Ι) Design ofBlast Resistant OnshoreBuildings, Control Rooms, &Field AuxiliaryRooms DEM-1  Feb-12 DEP 34.17.10.31 Laboratories Sep-12 DEP 34.17.10.33 ( Ι) Portable Blast-Resistant Modules  Amended byCircular71/11 &42/12 DEM-1 Feb-11 DEP 34.17.10.35 ( Ι) SitingofOnshore Occupied Portable Buildings DEM-1 Feb-11 DEP34.19.20.11 (Ι) FireproofingofSteel St ructures Amended byCircular03/12 DEM-1 Feb-11 DEP 34.19.20.31 (I)  Reinforced Concrete Structures Sep-11 DEP34.24.26.31 Chimneysselection, designandengineering (basedonEN 1992-1-1, Sep-12 EN1993-3-2, EN1443, EN13084 Parts1, 2, 4, 5, 6, 7 and 8) DEP 34.28.00.31 (I)  OnshoreSteel Structures Sep-11 DEP 34.28.00.33 (I)  OnshoreAncillarySteel S tructures Amended byCircular52/12 Sep-11 BuildingServices  - SP-1285 Specification forCivil &BuildingServices Ver. 2.0  Dec-09 DEP31.76.10.10 Heating, Ventilation and AirConditioningforPlant Building Amended byCircular43/08 Jul-98 DEP31.76.10.11 Installation, Testingand Balancing, and CommissioningofHVAC Systems Apr-06 DEP34.14.20.31 (Ι) Drainagesystemsand primarytreatment facilities Amended byCircular55/11 DEM-1 Feb-11 PIPELINE & FLOWLINE ENGINEERING    CFDH: UIPT(UEL) - (Said Asmi) Doc. ID Document Title Additional Notes Rev./DEM Date SP-1032 SpecificationfortheDesign, Operation, Maintenance&Inspection Ver. 3.0 Sep-11 ofPipelineBlock ValveStations SP-1199 Procurement Specification forPipelineSplit Tees Ver. 2.0 May-11 SP-1208 PipelineConstruction Specification Ver. 3.0 Mar-11 SP-1210 PipelineOperationsand Maintenance Ver. 2.0 Dec-03 SP-1211 OnshorePipelineEngineering Ver. 3.0 Jan-11 SP-1212 DEP 31.40.40.38-PDOHydrostaticPressureTestingofNew Pipelines Based on DEP 31.40.40.38-Gen (Jan-10) Rev. 2.0 Mar-11  SP-1235 DEP 31.40.60.12-PDOPipelineRepairs(Supplement to ASME B31.4 &B31.8) Based on DEP 31.40.60.12-Gen (Jan-10) Rev. 2.0 Mar-11 SP-1236 DEP 31.40.21.31-PDOPipelineIsolatingJoints- Amendments /Supplementsto MSS SP-75 Based on DEP 31.40.21.31-Gen (1999) Ver. 1.0 Dec02 PR-1067 Inf ras tru ctu re- Emerg enc yRes pon seDoc ume nt Par t IIICo nti nge ncyPlan s Ver . 8.0 Jul -09 - Vol. 4: Main Oil Line PR-1146 EngineeringandOperations  - FlowlineCold CuttingProcedure Ver. 3.0 Dec-06 PR-1235 Main Oil LineSystem - Management Procedure Rev. 02 Jun-08 PR-1236 South Oman GasLineSystem - Management Procedure Rev. 02 Jun-08 PR-1416 Proceduresf ortheUseofPipe-RBAMethodology Rev. 1 Mar-03 PR-1504 FacilitiesChangeProposal ProcedureforMain Oil Line, South Oman GasLine Rev. 0 Feb-02 and MAF Terminal PR-1506 PipelineHot Tap Management Procedure Rev. 01  Oct-02 PR-1522 ProcedureforAnalysisof PipelineRoadCrossing Rev. 1.0 May-12 PR-1629 Installation ofEpoxyGrouted Sleeve&ClockSpringRepairs Ver. 2.0 Dec-09  PR-1642 Procedurefor“COSASCO”RetrievingEquipmentOperation,CorrosionMonitoring  Ver. 2.0 Dec-09 and Weight LossCoupon Analysis PR-1799 ProcedureforEmergencyPipelineRepair Material Management Ver. 1.0 Sep-08  GU-379 Pi pe li neEme rg en cy Re pa ir Ma nu al (Class1 Pi pe li ne s) Re v. 5. 0 Ma y- 12 GU-501 ExcavationandWorking AroundLivePipelines Rev. 2.0 Sept-11 DEP 31.38.60.10 (Ι) Hot Tappingon Pipelines , Pipingand Equipment - Owner    Mechanical Static Amended byCircular76/11 DEM-1 Feb-11 DEP 31.40.10.12 ( Ι) Design OfMultiple-pipeSlugCatchers Amended byCircular19/12  DEM-1 Feb-11 DEP31.40.10.13 (Ι) Design ofPipelinePigTrap Systems Amended byCircular84/11 DEM-1 Feb-11 DEP31.40.10.16 Upheaval BucklingofPipelines Apr-06 DEP31.40.20.33 (Ι) LinePipeInduction Bends- Amendments/ Supplementsto ISO15590-1 Amended byCircular102/11 &56/12 DEM-1 Feb-11 DEP31.40.20.37 (Ι) LinePipefor Critical Servi ce- Amendments/ Supplementsto ISO3183:2007 Amended byCircular100/11 DEM-1 Feb-11 DEP31.40.21.30 PipelineFittings- Amendments/ Supplementsto ISO-15590-2 Jun-07 DEP31.40.21.31 PipelineIsolation Joints- Amendments/ Supplementsto ISO15590-2 Sep-11 DEP31.40.21.33 PigSignallers: IntrusiveType Sep-11 DEP31.40.21.34 Carbon And LowAlloySteel PipelineFlangesFor Usein Oil &Gas Operations Jun-07 - Amendments/Supplementsto ISO 15590-3 DEP31.40.50.30 (I) Pre-commissio ningof Pipelines Sep-11 DEP31.40.60.11 PipelineLeakDetection Amended byCircular41/08  Sep-02 CONTROL & AUTOMATION ENGINEERING    CFDH: UEOA2 (UES) - (Salim Hinai) Doc. ID Document Title Additional Notes Rev./DEM Date Instrument Equipment  SP-1089 Instrume nt Impuls eLi ne s WITHDRAWN   Replacedby DEP 32.37.10.11 Ver 1.0 Jan 01 SP-1090 Instrument Signal Lines Based on DEP 32.37.20.10(May2004) Ver. 2.0 Dec05 SP-1206 C &A Standard Drawings Ver. 2.0 Dec-10 SP-1243 Corporate PhilosophyforControl and Automation Ver. 2.0 Jun-11 SP-1245 Fieldbus Control SystemSpecification Ver. 3.0 Dec-10 SP-2098 SmartPlant Instrumentat ionSpecification NEWREQUIREMENT Ver. 2.0 May-12 SP-2121 DACAPCDSystemsAccess &Control Management Ver. 1.0 Dec-11 PR-1094 In st ru ment ed Pr ot ect iveFu nc tio nsTes t Pro ced ur e Re v. 1. 0 Aug -0 4 PR-1293 Main Oil Line(MOL)MeteringSystems Verification Procedure Rev. 1 May-09 PR-1304 Product FlowMeasurement Rev. 3.0 Jul-11 PR-1315 Measurement Equipment Calibration/Rec ertification Procedure Rev. 2.0 Aug-11 PR-1619 MinaAl Fahal Terminal Oil Material Balance Rev. 1.0 Mar-11 PR-1620 MinaAl Fahal Terminal Dip Procedure Rev. 2.0 Sep-10 PR-1809 ProductionMeasurement Management SystemProcedure Ver 1.0 Nov-08 PR-1995 DACAPCDP &PCDSystemsAccessRequest Procedures Ver. 1.0 Dec-11  PR-1996 Venturi Based Wet GasMeter(WGM) Sizing, Commissioning , Update &Review Rev. 1.0 Nov-11  GU-437 SILAssessment &Implementation Guidelines Ver. 2.0 May-09 GU-513 GuidelinesforAlarmManagement and Rationalisation Ver. 2.0 Dec-09 GU-656 Guidelineforthe useof Level MeasuringInstruments Rev. 1.0 Sep-11 DEP 30.00.60.15 ( Ι) HumanFactorsEngineering    Control RoomDesign Feb-12 DEP30.00.60.16 Human FactorsEng.    Human/MachineInterfaceDesign for Situation Awareness REPLACES SP-1192 Aug-09 DEP31.40.70.30 (Ι) QuarterTurn Actu atorsfor On/OffValves  Amended byCircular50/11 DEM-1 Feb-11 DEP32.01.20.12 ProcessControl Domain - Feb-12 - Enterpriseindustrial automation information technologyand security  DEP32.01.23.17 (Ι) ProcessControlDomain    SecurityRequirementsforSuppliers  DEM-1 Feb-11 DEP32.01.40.31 (Ι) RequirementsforReal-TimeProduction Operationsand Production-Critical Feb-12 Real-TimeData DEP32.10.03.10 (Ι) Instrument Symbolsand Identificationon ProcessEngineeringFlowSchemes DEM-1 Feb-11 DEP32.24.20.44 (Ι) Instrumentatio n Control & Protection forFired Equipment  DEM-1 Feb-12 DEP32.29.20.10 (I) Safeguarding&Instrumented ProtectiveFunctionsforRotatingEquipment  Amended byCircular 74/11  DEM-1 Feb-11 DEP32.30.20.11 (I) Fire, Gasand Smoke Detection Systems Amended byCircular 72/12 DEM-1 Sep-11 DEP 32.30.20.14 (I)  Instrument Asset Management Feb-12 DEP 32.30.20.15 (I)  DCSBasicApplication Standards  Sep-11 DEP32.30.20.16 BaselayerControl Applications Sep-11 DEP32.30.20.17 Integration OfMotorControls Into BPCS Feb-12  DEP32.30.20.18 RealTimeOptimisationProjectStandards NEWREQUIREMENT   TBC  Sep-12 DEP32.31.00.32 (Ι) InstrumentsforMeasurement and Control Amended byCircular73/11 &46/12 Feb-11 DEP 32.31.00.34 (I)  Instrumentatio n Documentsand Drawings Sep-11  DEP 32.31.09.31 (I)  Instrumentatio n forEquipment Packag es Amended byCircular47/12 Sep-11 DEP32.31.50.10 On-lineProcessAnalysers Sep-12 DEP32.31.50.13 AnalyserHousing Sep-12 DEP32.32.00.11 TurbineFiscal Metering SystemsforLiquid Hydrocarbo ns Sep-12 DEP32.32.00.12 Fiscal FlowMeasurement ofNatural Gas Amended byCircular11/10  Jun-07 DEP32.36.01.17 (Ι) Control Valves   Selection, Sizing & Specifications Amendedby Circular06/12 &(A03   Sep-12)  DEM-1 Feb-11 DEP32.37.10.11 (Ι) InstallationofOn-LineInstruments NEWREQUIREMENT   ReplacesSP-1089 Sep-12 DEP32.45.10.10 (Ι) Instrumentatio n ofDepressuringSystems Amended byCircular49/11 DEM-1 Feb-11 DEP32.80.10.10 (Ι) Instrumented ProtectiveFunctions(IPF) Amended byCircular72/11 DEM-1 Feb-11 DEP32.80.10.14 (I) AlarmManagement Amended byCircular43/11 DEM-1 Feb-11 DEP61.38.10.10 Shop and Field Fabrication ofOrificeMeter Runs Feb-12 DEP62.10.08.11 (Ι) Inspection &Functional Te stingof Instruments Amended byCircular11/12 DEM-1 Feb-11 MECHANICAL STATIC EQUIPMENT ENGINEERING    CFDH: UEP1S - (Abdulnabi Balushi) Doc. ID Document Title AdditionalNotes Rev./DEM Date SP-1188 Chemical InjectionSkids Rev. 5 May-10 SP-1200 Procurement SpecificationsforPipelineCheckValves Ver. 2.0 Sep-11 SP-1201 Procurement Specification forPipelineBall Valves Ver. 2.0 Sep-11 SP-2020 Flange Connections- Bolt Tourquing&T ensioning Ver. 0 Jan-06 SP-2039 Mechanical Standard Drawings Ver. 1.0 Sep-05 SP-2044 Specification forS crewed Fittings Rev. 1.0 Nov-05 SP-2051 Specification forFlushing, PressureTesting, Picklingand SensitiveLeakTesting Ver. 2.0 May-10 of Mechanical Equipment and Piping SP-2069 Mechanical Engineering- Specification forPressureVessels Ver. 0 Sep-08 SP-2070 Mechanical Engineering- Specification forAir Cooled Heat Exchangers Ver. 1 Jun-10 DEP30.06.10.11 (Ι) Equipment in LPGInstallations DEM-1 Feb-11 DEP 30.06.10.12 ( Ι) Pressurised B ulkStorageInstallationsfor LPG Amended byCircular58/11 DEM-1 Feb-11 DEP30.06.10.13 (Ι) LPGBulkTransfer &Transportation Amended byCircular34/11 DEM-1 Feb-11 DEP30.06.10.18 (Ι) Pressurised BulkStorageInstallationsfor LPG    At CustomerPremises Feb-12 DEP30.48.60.13 Designandinstallationof chemical-resi stantbrick lining forProcess Sep-12 equipment(basedonEN 14879-Parts1, 4 and6) DEP 30.75.10.10 ( Ι) Steam, Condensate and BoilerFeed WaterSystems DEM-1 Feb-12 DEP 30.75.10.30 WaterTubeBoilers Amended byCircular48/12 Dec-08 DEP 31.06.11.11 ( Ι) LoadingFacilitiesforBulk Road Ve hicles Amended byCircular83/11 DEM-1 Feb-11 DEP31.10.03.10 Symbols&Identification System   Mechanical Feb-12 DEP31.20.20.31 InternalsforColumns Amendedby CircularSep-12  Feb-12 DEP 31.21.01.11 ( Ι) PrintedCircuitHeatExchangers    Selection &Application DEM-1 Feb-12 DEP 31.21.01.12 ( Ι) Shell &TubeHeat Exchangers    Selection &Application DEM-1 Feb-12 DEP 31.21.01.13 ( Ι) WeldedPlate-BlocHeatExchangers    Application, Design &Fabrication Feb-12 DEP 31.21.01.30 ( Ι) Shell &TubeHeat Exchangers- Amendments/Supplementsto ISO16812 Amended byCircular13/12 DEM-1 Feb-11 DEP 31.21.01.32 ( Ι) Plate&FrameHeat Exch ange rs- Ame ndme nts/S upple ment sto ISO1 5547- 1:2005 DEM-1  Feb-12 DEP31.21.01.33 (Ι) Printed Circuit Heat Exchangers   Design &Fabrication Amended byCircular44/11 DEM-1 Feb-11 DEP31.21.01.36 (Ι) Heat ExchangersforPackaged Equipment    Design &Fabrication Feb-12 DEP31.21.70.10 (Ι) Air-CooledHeatExchangers;SelectionandApplication Amended byCircular98/11 DEM-1 Feb-11 DEP 31.21.70.31 (Ι) Air-cooled Heat Exch angers- Amendments/Supplementsto ISO13706 Amended byCircular08/12 DEM-1 Feb-11 DEP31.22.10.35 Manufactur ing ReportforPressureVessels Sep-12 DEP 31.22.20.31 (Ι) PressureVessels - BasedonASME Sectio nVIII Amendedby CircularSep-12 DEM-1 Feb-12 DEP31.22.30.14 Glass-FibreReinforcedPlasticVessels Sep-12 DEP 31.24.00.30 ( Ι) Fired Heater s- Amendments/Supplementsto ISO13705 Amended byCircular97/11  DEM-1 Feb-11 DEP31.24.00.31 Calculation ofHeater-TubeThickness- Endorsement ofISO 13704 Dec-07 DEP 31.24.40.12 Fabric ExpansionJoints- Endorsemen tof RAL-GZ719 Sep-12 DEP31.27.21.10 (Ι) Fil te rsfo rRemovi ngPa rt ic le sfromHydr opr oce ss or Fe ed s Fe b-1 2 - TypeSelection and Design Rules DEP31.36.10.30 (Ι) HydraulicSystemsforthe Operation ofOn/OffValves in ProtectiveFunctions Amended byCircular65/11 DEM-1 Feb-11 DEP31.37.00.11 (Ι) Instrument Air Supply DEM-1 Feb-12 DEP31.38.01.10 (Ι) PipingClasses   Basisof Design DEM-1 Feb-12 DEP 31.38.01.11 (Ι) Piping - General Requir ements AmendedA01  Sep-12 DEM-1 Feb-12 DEP 31.38.01.12 (Ι) PipingClasses- RefiningAnd Chemicals DEM-1 Feb-12  DEP 31.38.01.13 Compilation ofBill ofMaterial forPipingIsometrics Feb-12  DEP 31.38.01.15 (Ι) PipingClasses   Exploration and Production DEM-1 Feb-12 DEP 31.38.01.21 Compilation ofa Specification ForPipingSystems Sep-11  DEP 31.38.01.29 PipeSupports Feb-12 DEP 31.38.60.10 (Ι) Hot Tappingon Pipeline s, Pipingand Equipment Amended byCircular76/11 DEM-1 Feb-11 DEP31.46.00.31 (I) Acoustic Insulation forPiping- Amendments /Supplementsto ISO15665 Feb-12 DEP34.51.01.31 (I) Vertical Steel StorageTanks    Selection &Design DEM-1 Feb-11 (Amendmen ts/Supplementsto EN14015:2004) DEP34.51.11.30 (Ι) Mounded Horizontal Cylindrical VesselsforPressurised StorageofLPG at DEM-1 Feb-11 Ambient Temperature s(Endorsement of EEMUA190) DEP 34.51.90.10 DemolitionofStorageTanks (Endorsemen tof EEMUA154) Sep-12 DEP 70.08.10.11 Mechanical MaintenanceEquipment and Tools Sep-11 DEP 70.10.80.11 CleaningofEquipment WITHDRAWN  Jan-98 DEP 74.00.10.10 (Ι) Shop &Field PressureTestingof PipingSystems DEM-1 Feb-12 DEP80.36.00.30 (Ι) ReliefDevices- Selection, Sizing a ndSpecification  AmendedA01  Sep-12 DEM-1 Feb-12 DEP 80.46.30.11 (Ι) InterlockingSystemsforSafety/ReliefValves Amended byCircular66/11 &66/12 DEM-1 Feb-11 MECHANICAL ROTATING EQUIPMENT ENGINEERING    CFDH: UEP1R  (Saad Harrasy) Doc. ID Document Title Additional Notes Rev./DEM Date SP-1252 Specification forInstrument AirCompression Package Ver. 3 Sep-10  SP-2013 High Energy( 500kW)Centrifugal Pumps Ver. 2.0 Oct-11 SP-2030 LowEnergy(500kW) Centrifugal Pumps Amend’t /Suppl’t to DEP 31.29.02.30-Gen Ver. 0 Jun-05 SP-2033 Functional Specification forPDOMachineryHealth MonitoringSystems- MHMS Rev. 02 Jun-05 SP-2045 Procuremen tSpecificationfor BeamPumpUnits Rev. 5 May-12 SP-2054 Specification forCentrifugal CompressorPackages Rev. 3 Aug-08 PR-1565 String/PerformanceTestsProcedurefor Centrifugal Pumps Vers1.0 Jun-04  GU-396 EngineeringofProcessPumps Guideline Ver. 1.0 May-05 GU-397 EngineeringofProcessGas Compression Guideline Ver. 1.0 May-05 DEP31.25.00.10 HoistingFacilitiesAnd WeatherProtection ForRotatingEquipment Nov-08 DEP31.29.00.10 Installation ofRotatingEquipment - Amendments/Supplementsto APIRP 686 Sep-11 DEP31.29.00.30 Oil Mist Lubrication Systems Amended byCircular98/08  Jul-08 DEP31.29.00.32 Special PurposeGearUnits forPetroleum, Chemical &Gas IndustryServices Feb-12 - Amendment s/ Supplementsto API 613 DEP31.29.00.33 (Ι) ShaftSealing SystemsforCentrifugal andRotary Pumps Amendedby Circula r62/11 & A01  Sep-12 DEM-1 Feb-11 -Amendments/Supplementsto ISO21049:2004 DEP31.29.00.36 FlexibleCouplingsforMechanicalPower Transmission    Special PurposeApplications Dec-07 - Amendments/Supplementsto ISO 10441 DEP 31.29.00.39 Shaft SealingSystemsfor Centrifugal and RotaryPumps WITHDRAWN  Feb-11 - Selection, Testing&Installation DEP 31.29.00.41 Gears   Selection, Testing&Installation Feb-12 DEP31.29.02.11 Pumps   Selection, Testing &Installation Sep-12 DEP 31.29.02.30 ( Ι) CentrifugalPumps- Amendments/S upplementstoISO-13709:2003 Amended byCircular85/11 DEM-1 Feb-11 DEP31.29.06.30 Centrifugal Submerged MotorPumps(in Refrigerated Product or Pressurised Amended byCircular 52/11  Feb-11 StorageService) DEP31.29.12.30 ReciprocatingPositiveDisplacement Pumpsand MeteringPumps Amended byCirculars01/02, 25/04, 50/04 &84/08 Dec-99 - Amendments/S upplementsto API674 and API 675 DEP 31.29.22.11 (I)  PositiveDisplacement Pumps    Rotary(Amendments/Sup plementsto API676) Feb-12 DEP31.29.40.10 CompressorsSelection, Testing&Installation Sep-11 DEP 31.29.40.30 ( Ι) Axial, Centrifugal &ExpanderCompressors- Amendments/Suppleme ntsto APIStd 617 Amended byCircular86/11  DEM-1 Feb-11 DEP31.29.40.31 (Ι) ReciprocatingCompresso rs- Amendments/ supplementsto API 618 Amended byCircular82/11  DEM-1 Feb-11 DEP31.29.40.33 Packaged, IntegrallyGeared, Centrifugal Plant and Instrument AirCompressors Feb-12 - Amendments/Supplementsto API 672 DEP31.29.42.30 Liquid RingVacuumPumps And Compressors- Amendment/ Supplementsto APIStd 681 Feb-12 DEP31.29.47.30 Centrifugal Fans- Amendments/ Supplementsto ISO13705, AnnexE Sep-11 DEP.31.29.47.31 Centrifugal fansforpetroleum, chemical, and gasindustryservices Feb-12 (amendments /supplementstoAPI 673)  DEP31.29.47.32 Fans   Selection, Testing&Installation Feb-12 DEP31.29.60.32 (Ι) Lubrication, Shaft-Sealin gand Control Oil Systemand Auxiliaries Amended byCircular80/11 DEM-1 Feb-11 - Amendments/Supplementsto ISO 10438 DEP31.29.60.33 (Ι) Lubrication,Shaft-SealingandOil-ControlSystem    Selection, Testing&Installation Sep-11 DEP31.29.70.11 Combustion GasTurbines- Selection, Testing&Installation Sep-11 DEP31.29.70.31 (Ι) GasTurbinesfor thePetroleum, Chemic al and GasIndustryServices Amended byCircular64/11 DEM-1 Feb-11 - Amendments/Supplementsto API616 DEP31.29.70.32 GasTurbineCombustion AirIntakeAnd Exhaust Systems Feb-11 DEP31.29.80.30 Diesel Engines Dec-00 DEP31.29.90.30 SparkIgnited GasFuelled Engines Mar-01 SAFETY ENGINEERING    CFDH: MSE4 - (Anthony Sipkema) Doc. ID Document Title Additional Notes Rev./DEM Date HumanFactors Engineering DEP 30.00.60.10 ( Ι) Human FactorsEngineeringin Projects Feb-11 DEP 30.00.60.13 ( Ι) HumanFactorsEngineering    ValveAnalysis Sep-11 DEP 30.00.60.14 ( Ι) HumanFactorsEngineering   ApplicationDuringConstruction  Sep-12 DEP 30.00.60.15 ( Ι) HumanFactorsEngineering    Control RoomDesign Feb-12 DEP30.00.60.16 HumanFactorsEngineering    Human / MachineInterfaceDesign forSituation Awareness Owner: Control and Automation Aug-09 DEP30.00.60.18 HumanFactorsEngineering   DesignandProcurementof Skid-Packag edUnits Sep-12 DEP30.00.60.19 (Ι) HumanFactorsEngineering    Design forProcessSafety Critical Tasks Feb-11 DEP30.00.60.20 (Ι) HumanFactorsEngineering    WorkspaceDesign Sep-11 DEP30.00.60.21 (Ι) HumanFactorsEngineering    LabelingofFacilities, Equipment &Piping  Feb-12 FireEngineering  SP-1075 HSE Specification   Fire and Explosion RiskManagement Rev. 2.0 Jul-02 GU-230 Fire &Explosion RiskManagement Guidelines Rev. 2.0 Jul-02 DEP32.30.20.11 (Ι) Fire, Gasand SmokeDetection Syst ems - Owner: C&A Amended byCircular72/12  DEM-1 Sep-11 DEP80.47.10.30 (Ι) Assessment ofthe Fire Safe tyof OnshoreInstallations Amended byCircular38/11 DEM-1 Feb-11 DEP 80.47.10.31 ( Ι) ActiveFire Protection Systemsand Equipmen t forOnshoreFacilities Amended byCircular51/11 &38/12 DEM-1 Feb-11 DEP.80.47.10.32 ( Ι) Fire FightingAgentsand Portable/MobileFire FightingEquipment  Sep-11 forOnshoreApplications DEP80.47.10.33 (Ι) Fire FightingVehiclesand Fire Stations  Feb-12 Facility Layout  SP-1127 Specification forFacilitySiting, Layout &Spacing Ver. 3.0 Oct-10 SP-1190 Design forSourService Specification Ver 3.0 Sep-11 DEP 34.17.10.35 ( Ι) Sitingof OnshoreOccupied Portable Buildin gs  Owner: Civil DEM-1 Feb-11 DEP80.00.10.10 (Ι) AreaClassification Amended byCircular63/12 DEM-1 Feb-11 DEP80.00.10.11 (Ι) LayoutofOnshore Facilities Amendedby Circular68/11 &43/12 DEM-1 Feb-11 and AmendmentA03 Sep-12  HEMP/HSECases SP-1258 Technical SafetyEngineering- QuantitativeRiskAssessment Specification Rev. 3.0 Jul-10 SP-2062 Specification forHSE Cases Ver. 1 Mar-11 PR-1696 HAZOP Procedure Owner:ProcessEngineering Rev. 3 Jun-12 GU-648 GuideforApplying ProcessSafetyin Proje cts  Rev. 1 Dec-10 EP95-0230 HSESGuideline   Design 1995 EP2005-0300 Hazard and EffectsManagement Process(HEMP)    General Requirements Ver. 1 Aug-04 EP2009-9009 SafetyCritical Element Management Manual 2nd Edition Feb-09 EP95-0312 HAZID Rev. 0 Sep-95  EP95-0314 Physical EffectsModelling Rev. 0 Oct-98 Other Health & Safety SP-1232 PublicHealth NEWREQUIREMENT(OwnerMCOH) Ver. 5.0 Jun12 SP-1234 HSE Specification- Personal ProtectiveEquipment (OwnerMSE1) Rev. 3 Aug-12 PR-1232 ProcessSafetyReview(FormerlyDesign IntegrityReview)  Ver. 2.0 Feb-12 DEP31.10.00.31 (Ι)  NoiseControl (Amendmen ts/Supplementsto ISO15664)  Feb-12 ANSI/1SEAZ358.1-2009 American National Standard forEmergencyEyewash and ShowerEquipment Sep-09 Notes: 1. This Do cume nt can be acce ssed fr om Live Link: http://sww4.pd o.shell.om/ CMFportal/Defa ult.aspx 2. DEP’s (V35   Sep-12) are Shell Documents and can be accessed from: http://swwep-deps.shell.com / a) No te: as of v32, new/revisions to DEP’s are split into ‘Specification’and ‘Informative’    See Tabs at top of DEPweb-page (Ι) denotes the DEP’s where this Specification and Informative split has been implemented  3. PDO Management Sys tem Documents are avai lable on Live link: http://sww4.pdo .shell.om/CMFportal/Defau lt.aspx PDO Hierarchy: a) CMF Corporate Management Framework Mandatory  b) PL Policy Mandatory c) CP Code of Practice Mandatory d) SP Specification Mandatory e) PR Procedure Mandatory f) GU Guideline Non-Mandatory 4. The Hardcopy of this Doc ument (Wall Chart) is issued every 6 Months in Arrea rs    The document may be revised between hard-copy issues   please check Livelink for latest revision 5. All changes since l ast re visio n are sho wn in BOLD 6. Please notify UEP I of any revisions required to this wallchart Revision: 18a Issue Date: Nov 2012 CAUTION MAKE SURE YOU HAVE LATEST REVISION (CHECK IN LIVELINK or SHELL DEP WEBSITE) FEED OFFICE ENGINEERING    Manager: UEP1 - (Paul Bennington) ** FOR USE IN FEED OFFICE ONLY** Doc. ID Document Title Additional Notes Rev./DEM Date FEEDOffice Management PR-1741 FEEDOffice- QualityManagement SystemManual Rev. A06 Apr-12  PR-1742 FEEDOffice- Risk& OpportunityManagemen t Procedure Rev. A02 Apr-11 PR-1743 FEEDOffice- Project On-BoardingProcedure Rev. A03 May-11 PR-1764 FEEDOffice- Newentrant Induction ProgramProcedure Rev. A04 Apr-11  PR-1765 FEEDOffice- KnowledgeManagement (LessonsLearned) Rev. A02 May-11 PR-2004 FEEDOffice   MonthlyProject ReviewProcedure  Rev. A01 Feb-12 HSE/Techni cal Safety  PR-1744 FEEDOffice   ManagingSafetyDuringVisitsto Vendorand ContractorSites  Rev. A02 May-11 PR-1776 FEEDOffice-  HSE Action Close-out Procedure Rev. A02 May-11 Engineering SP-2067 FEEDOffice- PDMS Model specification  Rev. A01 Sept-08 PR-1727 FEEDOffice- Preparation of"Basis forDesign"Procedure Rev. A02 May-11 PR-1728 FEEDOffice- Preparation ofProject Specification (FEEDOutput)Procedure Rev. A02 May-11 PR-1729 FEEDOffice- Technical IntegrityDuringDesign &Execution PhaseProcedure Rev. A02 Oct-09 PR-1730 FEEDOffice- Engineering&ProjectsCalculation Procedure Rev. A02 May-11 PR-1733 FEEDOffice   Te ch nic al Inf or mat ionNot eProcedur e Re v. A04 Oc t- 12 PR-1734 FEEDOffice   ProcessSystemDesign ReviewProcedure Rev. A02 May-11 PR-1735 FEEDOffice- Codesand StandardsProcedure Rev. A01 May-11 PR-1736 FEEDOffice- Site Survey Procedure Rev. A03 Oct-12 PR-1749 FEEDOffice- RegisterofHolds Procedure Rev. A02 Sep-11 PR-1750 FEEDOffice-  Contract and Third PartyServicesManagement Procedure Rev. A04 Apr-11 PR-1752 FEEDOffice   Project Execution Procedure(DefinePhase) Rev. A02 Nov-09 PR-1768 FEEDOffice- Project Deliverables- Checkingand Approval Procedure Rev. A03 Jun-10  PR-1773 FEEDOffice-  EquipmentSupplierDocumentRequirementsProcedure Rev. A04 May-12 PR-1778 FEEDOffice- Standard Calculation Spreadsheet QC Procedure Rev. A02 May-11  PR-1938 FEEDOffice   ChangeControl Procedure Rev. A01 Apr-10 PR-1939 FEEDOffice   Multi-DisciplineEquipment Data Sheet Specification Procedure Rev. A01 Apr-10 GU-603 FEE DOff ice- Projec t Del ive rab lesGu ide lin eORP Pha se3: Def ine Rev . A02 Apr-1 1 Cost & Planning PR-1737 FEEDOffice-  FinanceFlowProcedure Rev. A02 Apr-10 PR-1738 FEEDOffice- BusinessReviewProcedure Rev. A02 Feb-12 PR-1746 FEEDOffice- TimewritingProcedure Rev. A02 May-11 PR-1770 FEEDOffice- Planning&Progress ReportingProcedure Rev. A02 Apr-10 PR-1771 FEEDOffice- Cost PlanningWork-flowProcedure Rev. A02 May-11 GU-616 FEEDOffice- Standard CTR Catalogue Rev. A03 Apr-10 GU-640 FEEDOffice   CTR CatalogueTemplate(MinorProjects) Rev. A01 Nov-10 Quality Management PR-1726 FEEDOffice- Control ofQMS DocumentsProcedure Rev. A04 Apr-12 PR-1745 FEEDOffice- CustomerFeedbackProcedure Rev. A04 Apr-12  PR-1756 FEEDOffice-  Control ofNon-Conformance, Correctiveand PreventativeActions Rev. A03 Apr-12  PR-1772 FEEDOffice- Management ReviewProcedure Rev. A03 Apr-12 Information Management PR-1722 FEEDOffice-  Information Management Servicesto FEEDOfficeProcedure Rev. A02 Feb-11  PR-1723 FEEDOffice- Information Documentsand RecordsProcedure Rev. A03 Jun-10  PR-1725 FEEDOffice- Supplierdocument Procedure Rev. A02 Jun-11  PR-1761 FEEDOffice-  Hand-overDocumentation Procedure Rev. A02 May-11  GU-600 FEEDOffice-  Livelink &Assai Usage Rev. A02 Feb-11 Document N o : GU-611 Document Owner: UEPI SECURITY   CFDH: UIC (Salim Ambusaidi) Doc. ID Document Title Additional Notes Rev./DEM Date SP-1279 Specification forCivil &BuildingConstruction    Owner:Civil Engineering  ChapterP   Fences &Gates Ver. 2.0 Dec-09 SP-2084 SpecificationforIP VideoSurveillance, PerimeterSecurity &Access  Ver. 2 Jul-12 Control Systems QUALITY MANAGEMENT   CFDH: UEQ - (Gary B riston) PL-15 QualityManagementPolicy 2008Edition CP-190 Project Engineering: QualityManagement SystemforProject Delivery: CodeofPractice Ver. 1 Oct-09 PR-1858 MaterialHandling,Storageand PreservationProcedure  Rev. 0 Oct-09 PR-1866 Quality AuditProcedure NEWREQUIREMENT Rev. A01 Mar-10 PR-1964 Equipment and/orMaterialsReceipt Inspection Procedure Rev. A1 Dec-10 PR-1984 CriticalityRatingProcedure Ver. 1.0 Jun -11 SP-1122 Specification forProject QualityPlan Ver. 2.02 Feb-08 SP-1171 SpecificationforQuality Managemen tSystemRequiremen tsfor Ver. 3,0 Jun-12 ProductandService SP-2061 Func ti o na lT e chni cal Direct or ates- Te chni ca l Author it ySyst em Re v. 2. 0 Jun- 10 GU-398 GuidelinesonScopeand AreasCoveredDuring Vendor/Con tractorEvaluation NEWREQUIREMENT Rev. 2.0 Apr-09 &Assessment DEP82.00.10.10 Project QualityAssurance Feb-12 Lifting & Hoisting   SP-1251 TrainingRequirementsforLiftingOperationsPersonnel Ver. 4.0 Sep-11 PR-1708 Liftin g& HoistingProcedure   Part 1: Framework Ver. 1 Sep-11    Part 2: Inspection, Testingand Certification PR-1709 Lifting&Hoisting   Lift Planning/ Execution Procedure Ver. 1 Sep-11 PR-1710 Lifting EquipmentNumbering NEWREQUIREMENT Ver. 0 Apr-12 TELECOMS - UIID (Said Shidhani) SP-1265 Specification forADSS Fibre-OpticCablesand KeyAccessories Ver. 2.0 Aug-08 SP-1266 Specification forInstallation ofADSS FibreOpticCables Ver. 2.0 Aug-06 SP-2004 FibreOptic Cable InstallationSpecificatio ns Ver. 5.0 Jul-12 SP-2084 SpecificationforIP VideoSurveillance, PerimeterSecurity NEWREQUIREMENT Ver. 2 Jul-12 &AccessControl Systems DEP 32.71.00.10 ( Ι) PlantTelecommunicat ion NEWREQUIREMENT DEM-1 Feb-10 DEP.32.71.00.11  Telecommu nicationsStandards NEWREQUIREMENT May-04 DEP.32.71.00.14  Telecommu nicationsTowerand GuyedMasts NEWREQUIREMENT Dec-08 INFORMATION MANAGEMENT / ENGINEERING DESIGN SYSTEMS   UEPI (Philippa De Glanville) CP-139 Corporate Data Management Ver. 3.0 Feb-09 SP-2065 DocumentManagemen tfor Projects Rev. 4.0 Aug-12 SP-2067 PDMSModelSpecification NEWREQUIREMENT RevA02 Oct-12 SP-2099 2DDrafting Specification NEWREQUIREMENT Ver. 1.0 Jul-12 SP-2122 ProjectIMSpecification Ver. 1.0 Oct-11 SP-2133 Project‘EngineeringDesignSystems’(EDS)Specification  Ver. 1.0 Feb-12 SP-2144 ProjectEngineering   Engineering P rojectIM ‘ScopeofWork’   TenderContractInput NEWREQUIREMENT Rev. 1 Aug-12 DEP 82.00.10.30 (Ι) EngineeringInformation Specification (EIS) Feb-12

197638697 PDO Guide to Engineering Standards and Procedures

Embed Size (px)

DESCRIPTION

PDO guide

Citation preview

  • PDO ENGINEERING STANDARDS AND PROCEDURES PROJECT MANAGEMENT CFDH: UEP - (Julian Masters)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    Project Engineering

    CP-117 Project Engineering Code of Practice Rev. 5.0 Jan-12

    CP-122 Health, Safety and Environment Management System Manual Ver. 5.0 Jul-11

    CP-131 Risk and Opportunity Management Code of Practice Ver. 3.0 Dec-06

    CP-206 Management of Change Code of Practice Rev. 1.0 Nov-11

    PR-1150 Project Close Out Procedure Engineering CAPEX & OPEX Projects Ver. 3.0 Apr-04

    PR-1153 Field Trouble Report Procedure Ver. 2.0 Feb 06

    PR-1247 Project Management of Change Procedure Ver. 4.1 May-12

    PR-1358 Procedure for Concept Selection and Preparing a Basis for Design Ver. 2.0 Dec-04

    PR-1979 Procedure for Project Delivery Assurance Boards (PDABs) Rev. 1 Mar-11

    SP-1134 Specification for Detailed Design and Engineering of Oil & Gas Facilities Rev. 1.0 Aug-06

    SP-2050 Specification for Construction Activities on Oil, Gas and Utility Facilities Projects Ver. 1.0 Jul-06

    SP-2100 Contract Cost Engineering Specification Ver. 1.0 Dec-09

    GU-484 Project Engineering Scheduling & Reporting Guideline Ver.2.0 Feb-11

    GU-556 Guideline for Vendor Project Document Deliverables Rev.1.0 Feb-07

    GU-569 Project Cost Engineering Rev.1.0 Jan-07

    GU-663 Project Controls Plan Guideline Rev. 0 Jun-11

    DEP 00.00.07.10 Design Class Tables Complex and/or High Value projects only - Evaluate & justify on case by case basis Sept-11

    DEP 01.00.09.10 () Operational Tagging Requirements Feb-12

    DEP 30.10.01.10 Requisitions Index Feb-12

    DEP 70.10.90.11 () Spares Parts Feb-12

    DEP 82.00.10.12 Life Cycle Costing (Endorsement of ISO 15663-1) Feb-11

    Design / Drafting

    SP-1131 Specification for Hand Over and As Built Documentation Ver. 3.0 May-06

    SP-1132 Specification for Plant Design Reference Manual Ver. 3.0 Apr-06

    SP-2047 Specification for the Preparation and Content of Engineering Drawings Ver. 2.0 Feb-10

    PR-1666 Project Drawing Procedure Ver. 1.0 May-06

    DEP 00.00.06.06 Standard Drawings Index Sep-12

    DEP 00.00.07.30 () Application of a functional specification Sep-12

    (endorsement of ISO 13879, ISO 13880 and ISO/TR 13881)

    DEP 02.00.00.10 Preparation & Microfilming of Technical Drawings Amended by Circulars 15/99, 64/01 & 56/03 Oct-95

    Standards Administration

    PR-1561 WinPCS Procedure Rev. 0 Mar-04

    GU-453 Guidelines for WinPCS Users Rev. 02 Jul-06

    ORM Opportunity Realisation Manual Apr-10

    DEP 00.00.00.30 () Procedure for Global Technical Standards Publications Sep-12

    DEP 00.00.05.05 Global Technical Standards Index Sep-12

    DEP 00.00.10.05 Standard Forms Index Sep-12

    DEP 00.00.20.10 The Use of SI Quantities Endorsement of ISO-31, ISO-1000 & ISO 80000 Feb-11

    MATERIALS SELECTION & CORROSION ENGINEERING CFDH: UEOC - (Nasser Behlani)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    General -

    CP-208 Corrosion Management Code of Practice NEW REQUIREMENT Ver. 1.0 Jul-12

    SP-1128 Specification for Cathodic Protection Design Ver. 2.0 Dec 05

    SP-1129 Specification for Construction, Installation and Commissioning of Cathodic Protection Systems Ver. 2.0 Sep-05

    SP-1130 Specification for Cathodic Protection Materials and Equipment Rev. 1.0 Sep-99

    SP-1136 Cathodic Protection Drawings Ver. 2.0 Dec 05

    SP-1189 Specification for Duplex Stainless Steel Line Pipe - Amendments/Supplements to API 5LC REPLACES DEP 31.40.20.34 Ver. 1.0 Dec-00

    SP-1195 Specification for the Wall Thickness Measurement of Pipelines by Automated Ver. 1.0 Jan-01

    Ultrasonic Techniques

    SP-1246 Specification for Painting and Coating of Oil and Gas Production Facilities Ver. 2.0 Apr-10

    (Parts 1 to 5)

    SP-2034 Specification for Internal FBE Coating of Line Pipe Ver. 1.0 Sep 05

    (Amendments/Supplements to API REP 5L7)

    SP-2041 Specification for Cracking Resistant Materials in H2S Containing Environment Ver. 2 Mar-11

    SP-2092-1 GRP Specification Part 1 (Qualification & Manufacturing) Ver. 0 Jan-10

    SP-2094 Specification for Polyethylene Liners in Carbon Steel Flowlines & Pipelines Ver. 0 Aug-10

    SP-2095 Internal Liquid Coating for Carbon Steel Piping and Line Pipes Ver. 1.0 Sept-09

    PR-1180 Performance Testing of Coating Systems for Pipeline Rehabilitation Ver. 2.0 Nov-05

    PR-1234 Safe Working Procedures for Cathodic Protection Systems Ver. 2.0 Mar-01

    PR-1503 Procedure for Determining Pipelines Assessed Corrosion Rate (ACR) Ver. 2.0 Dec-09

    PR-2006 Replacement (Like/Like) of Carbon Steel / Other Spools Connected to GRP Lines Ver. 1.0 Nov-11

    GU-368 Guidelines For The Protection Of Buried Sections of Surface Laid Pipelines/Flowlines Rev. 0 May-00

    GU-475 Corporate Flowline Materials Selection Guideline Ver. 1.0 Sep-04

    GU-486 Screening & Monitoring Bacteria Guidelines Ver. 1.0 Oct 05

    GU-637 Sour Wells Completion, Material Selection Guidelines Ver. 1.0 May-10

    DEP 30.10.02.11 Metallic Materials-Selected Standards Feb-12

    DEP 30.10.02.13 () Non-Metallic Materials-Selection & Application Feb-12

    DEP 30.10.02.14 () Carbon Steel Corrosion Engineering Manual for Upstream Facilities DEM-1 Feb-11

    DEP 30.10.02.31 () Metallic Materials-Prevention of Brittle Fracture in New Assets Amended by Circular 59/11 DEM-1 Feb-11

    DEP 30.46.00.31 () Thermal Insulation Amended by Circular 70/12 Sep-12

    Revised by Amendment A02 Sept-12 DEP 30.48.00.31 Protective Coatings for Onshore Facilities Amended & Supplemented by SP-1246 Jan-09

    DEP 30.48.00.32 () Coating of Fasteners Feb-12

    DEP 30.48.30.31 () Cement Lining of Pipes (Based on EN 10298) Sep-12

    DEP 30.48.40.31 Thermal Spray Coatings of Aluminium Feb-12

    DEP 30.48.41.31 Electroless Nickel Plating - Amendments/Supplements to ASTM B 733 Jan-08

    DEP 30.48.60.10 Rubber-Lined Process Equipment Sep-12

    DEP 31.10.00.10 () Positive Material Identification (PMI) Program DEM-1 Sep-11

    DEP31.24.40.31 () Materials for High Temperature Conversion Process Furnace Parts Feb-12

    DEP 31.40.10.20 Spoolable Fibre-Reinforced Plastic Pipes Sep-12

    DEP 31.40.20.32 (I) CRA Clad or Lined Steel Pipe - Amendments/Supplements to API Spec 5LD Sep-11

    DEP 31.40.30.31 () External Polyethylene & Polypropylene Coating for Line Pipe Feb-11

    - Amendments/Supplements to ISO/DIS 21809-1:2009

    DEP 31.40.30.32 External Fusion-Bonded Epoxy Powder Coating for Line Pipe Feb-11

    - Amendments/Supp;ements to ISO 21809-2:2007

    DEP 31.40.30.34 Thermoplastic Lined Pipelines Amended by Circulars 05/02 & 39/08 Dec-99

    DEP 31.40.30.35 Internal Coating of Line Pipe for Non-Corrisive Gas Transmission Service Sep-12

    - Amendments/Supplements to ISO 15741

    DEP 31.40.30.37 External Field Joint and Rehabilitation Coating Systems for Line Pipe Jan-08

    DEP 39.01.10.11 () Selection Of Material For Life Cycle Performance (Upstream Facilities) Amended by Circular 35/12 DEM-1 Feb-11

    - Materials Selection Process

    DEP 39.01.10.12 () Selection of Materials for Life Cycle Performance (Upstream Facilities) Amended by A01 Sep-12 DEM-1 Feb-12

    Equipment

    DEP 39.01.10.32 () Specification of nickel base alloy 718 (UNS N07718) for oil and gas drilling and Amended by Circular 36/12 DEM-1 Feb-11

    production equipment (amendments/supplements to API spec 6A718)

    DEP 70.10.70.11 () Preservation of New and Old Equipment Standing Idle Feb-11

    Welding -

    SP-1097 Specification for Welding of Duplex Stainless Steel Pipelines Ver. 2.0 May-05

    - Amendments/Supplements to API Std 1104

    SP-1167 Specification for Welding on Pressurised Pipes Ver. 2.0 Oct-06

    SP-1173 Specification for Welding on On-Plot Pipe-Work REPLACES DEP 31.38.01.31-GEN Ver. 1.3 May-08

    - Amendments/Supplements to ASME B31.3 & Amend/Suplt DEP 30.10.60.18-GEN

    SP-1174 Specification for Welding of Class 2 & Class 3 Pipelines Ver. 2.0 Dec-04

    - Amendments/Supplements to API Std 1104

    SP-1177 Specification for Welding of Class 1 Pipelines Ver. 2.0 Oct-05

    - Amendments/Supplements to API Std 1104

    PR-1272 Standard Welding Procedure Qualification Records for On-Plot Piping Ver. 2.0 Jun-05

    PR-1274 Standard Welding Procedure Qualification Records For Class 2 Pipelines Ver. 2.0 Jun-05

    PR-1276 Standard Procedure Qualification Records for Welding on to Pressurised Pipes Ver. 2.0 Jun-05

    PR-1659 Pipeline Emergency Repair PQRS Welding / Pipeline Procedures Ver. 1.0 Oct 05

    DEP 30.10.60.18 Welding of Metals Amended and Supplemented by SP-1173 Feb-12

    - Amendments/ Supplements to API RP 582

    DEP-30.10.60.30 () Welding on Pressurised Pipes Amended and Supplemented by SP-1167 DEM 1 Feb-11

    - Amendments/Supplements to ANSI / API RP 1107 Amended by Circular 60/11

    DEP-30.10.60.31 Oxidation of Stainless Steel Weldments Dec-98

    DEP 61.40.20.30 () Welding of Pipelines and Related Facilities Amended by Circular 07/12 DEM 1 Feb-11

    (Amendments/Supplements to ISO 13847:2000)

    Inspection-

    PR-1013 Static Equipment Inspection and Maintenance Procedure Ver. 3.0 May-05

    GU-256 Static Equipment Inspection Guideline Ver. 2.0 May-05

    GU-363 Guideline for the Use of Scaffolding Ver. 1.0 Aug-00

    GU-432B Guideline for Automated Ultrasonic Testing Scope Ver. 1.0 May-03

    Definition for Class 1 Piggable Pipelines

    GU-450 Guideline for Inspection and Integrity Assessment of Ver. 1.0 Nov-03

    Carbon Steel Non-Piggable Pipelines

    DEP 30.55.03.30 Validation of NDE for Fabrication Inspection Feb-12

    DEP 61.10.08.11 Field Inspection prior to Commissioning of Mechanical Equipment Feb-11

    PROCESS ENGINEERING CFDH: OSE/1 - (Said Alawi)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    CP-200 Water Management Code of Practice Ver. 1.0 Nov-11

    SP-1125 Isolation of Process Equipment Specification Rev. 4.0 Jun-12

    SP-1126 Drain Systems Specification Ver. 3.0 Jun-12

    SP-1166 Specification for Identification of On-Plot Pipework Ver. 2.0 Sep-04

    SP-1190 Design for Sour Service Specification Owner: Safety Engineering Ver. 3.0 Sep-11

    PR-1696 HAZOP Procedure Contact OSE/1 & MSE4 Before Use Rev. 3 Jun-12

    GU-665 Water Treatment Strategy Ver. 0 Oct-11

    DEP 01.00.01.30 () Definition & Determination of Temperature, Pressure and Toxicity Levels DEM-1 Feb-12

    DEP 01.00.02 11 () Preparation of Process Flow Schemes & Process Engineering Flow Schemes DEM-1 Feb-11

    DEP 01.00.02.12 () Preparation of Safeguarding Memoranda & Process Safeguarding Flow Schemes DEM-1 Feb-11

    DEP 20.04.10.10 Glycol Type Gas Dehydration System Amended by Circulars 50/06, 74/08 & 05/10 Jan-05

    DEP 20.05.50.10 () Heat Transfer Fluid (HTF) Systems Amended by Circular 42/11 DEM-1 Feb-11

    DEP 20.05.60.10 () Fuel Systems Amended by Circular 27/11 DEM-1 Feb-11

    DEP 20.21.00.31 Fouling Resistance For Heat Transfer Equipment Feb-11

    DEP 30.05.10.30 () Nitrogen / Oxygen Supply & Distribution System DEM-1 Feb-12

    DEP 30.10.05.11 Plant Model Construction & Review Feb-12

    DEP 30.75.10.10 () Steam, Condensate and Boiler Feed Water Systems DEM-1 Feb-12

    DEP 31.22.05.11 Gas/Liquid Separators - Type Selection and Design Rules Feb-12

    DEP 31.22.05.12 Liquid/Liquid and Gas/Liquid/Liquid Separators - Type Selection and Design Rules Feb-12

    DEP 37.05.10.11 () Diesel Oil Systems DEM-1 Feb-12

    DEP 80.10.10.31 () Breathing Air & Supply Systems NEW REQUIREMENT TBC Sep-12

    DEP 80.45.10.10 () Design of Pressure Relief, Flare and Vent Systems Amended A01 Sep-12 DEM-1 Feb-12 DEP 80.45.10.11 () Overpressure and Under-pressure Prevention and Protection DEM-1 Feb-12

    DEP 80.45.10.12 () Emergency Depressuring and Sectionalizing Amended by Circular 77/12 DEM-1 Feb-11

    Amended A03 Sep-12 DEP 80.45.11.12 () Flare Details (Amendments/Supplements to ISO 25457) Amended by Circular 01/12 DEM-1 Feb-11

    (No Doc No) De-oiling Manual Ver 2.0 Dec-10

    EP 95-0312 HAZID Hazard Identification Technique Rev. 0 Sep-95

    EP 95-0313 HAZOP Hazard & Operability Technique Rev. 0 Oct-95

    EP 98-5632 Best Practices Guide - Gas Sweetening Technology Dec-98

    EP 99-5266 Removal of Heavy Metals from Waste Water Desk Study Feb-99

    EP 99-5508 Key Multiphase and Hydrate Learning Points from the Main Gas Condensate Sep-99

    Systems in the Shell Group

    EP 99-5806 Best Practice in Produced Water Treatment Dec-99

    EP 2003-5184 Shell Expro Topsides Solids Management Guide Sep-03

    EP 2007-5644 EP Guideline on Process Safeguarding Nov-07

    EPTL-GL-PRO-0001 Global Process Engineering Guideline Facility Line Sizing Dec-08

    GS 06.53139 Guide for Fluid Characterization using C7PLUS Method in HYSYS Dec-06

    GS 08.53105 Hydrate Guidelines Aug-08

    GS 09.50282 Flow Assurance Guideline Jan-09

    GS 09.51858 Guidelines for the Hydraulic Design and Operation of Multiphase Flow Pipeline Systems Previously GS.06.50701 May-09

    GS 09.53369 Plant and Pipeline Depressuring Guideline Dec-09

    GS 10.50828 Heat Exchanger Selection Guideline Previously EP 2005-5186 Apr-10

    SR 11.11103 Guide for Fluid Characterization using C7PLUS Method in UNISIM Apr-11

    ELECTRICAL ENGINEERING CFDH: UIE (UEE2) - (Mohammed Aghbari)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    Electrical Equipment SP-1099 Electrical Infrastructure - Specification for Electrical Installation Practice Ver. 5.0 Dec-06

    SP-1100 Specification for Testing & Commissioning of Electrical Equipment Ver. 3.0 Jun 04

    SP-1101 Electrical Infrastructure Specification for installation of Overhead Transmission Ver. 2.0 May-08

    Lines

    SP-1102A Electrical Infrastructure Specification for Design of 33kV Overhead Power Ver. 6.0 Aug-08

    Lines on Wooden Poles

    SP-1102B Electrical Infrastructure Specification for Design of 33kV Overhead Power Ver. 7.1 Dec-10

    Lines on Concrete Poles

    SP-1103 Electrical Engineering Guidelines Amendt/Supplt to DEP 33.64.10.10-Gen (Feb-11) Ver. 5.0 Oct-11

    SP-1105 Electrical Infrastructure - Electrical Standard Drawings List Ver. 4.0 May-06

    SP-1106 Electrical Infrastructure - Specification for Coding and Identification of Ver. 2.0 May-08

    Overhead Line Systems

    SP-1107 Electrical Infrastructure - Specification for Electrical Protection System Ver. 3.0 Jul-08

    SP-1109 Specification for Earthing and Bonding Ver. 4.0 Mar-04

    SP-1110 Electrical Infrastructure - Specification for Electrical Supplies for Mobile Camps Ver. 5.0 May-06

    SP-1111 Electrical Infrastructure - Specification for Temporary Electrical Supplies Ver 4.0 Apr-06

    for Construction & Maintenance Work

    SP-1112 Electrical Infrastructure - Electrical Specification for Drilling Rigs Ver. 4.0 Apr-06

    SP-1113 Electrical Infrastructure - Specification for 132kV Substation Ver. 4.0 Apr-08

    SP-1114A Electrical Infrastructure - Specification for Design of 132kV Overhead Power

    Lines on Wooden Poles Ver. 4.0 May-08

    SP-1114B Electrical Infrastructure Specification for Design of 132/220 kV Overhead Ver 2.0 May-08

    Power Lines on Steel Towers

    SP-1114C Electrical Infrastructure Specification for Design of TWIN ELM 132kV Ver. 2 Dec-10

    Overhead Power Lines on Concrete Poles

    SP-1115 Specification for Digital Power Line Carrier Communication System Ver 2.0 Jun-04

    SP-1116 Electrical Infrastructure - Specification for SCADA of Electrical System Ver. 3.0 Jan-07

    SP-1117 Specification for Power Transformers Amendt/Supplt to DEP-33.65.40.31-Gen (Oct-01) Ver. 4.0 Nov-03

    SP-1118 Specification for Power Station Ver. 2.0 Oct-04

    SP-1119 Specifications for Electrical Machines Cage Induction Types Amendt/Supplt to DEP 33.66.05.31-Gen (Jan-99) Ver. 4.0 Jun-06

    SP-1120 Specifications for High Voltage Switchgear and Control Assemblies Amendt/Supplt to DEP 33.67.51.31-Gen (Jul-98) Ver. 3.0 Jun-04

    SP-1121 Specifications for Low Voltage Switchgear and Control Assemblies Amendt/Supplt to DEP 33.67.01.31-Gen (Jan-98) Ver 4.0 Jun-05

    SP-1144 Infrastructure Power Systems Department Oil and Gas Directorate Service Ver. F May-05

    Level Agreement

    SP-1242 HSE Specification for Activities in the Vicinity of Overhead Power Lines Ver 4.0 Oct-04

    SP-1267 Specification for Synchronous AC Machines Amendt/Supplt to DEP-33.65.11.31-Gen (Jan 99) Ver.2.0 Jun-06

    PR-1168 Power Systems Emergency Response Procedure Ver 7.0 Mar-09

    Volume VII: Power Systems Operstions Interior

    PR-1259 Infrastructure Management Procedure Ver. 2.0 Sep-99

    PR-1265 Procedures for Maintaining Power System Network Models Ver. 2.0 Nov-06

    PR-1353 Electrical System Faults & Analysis Procedure Ver. 4.0 Jun-05

    PR-1421 Infrastructure Power Systems Department MHEW Interconnector Operation Ver 3.0 Dec-04

    Maintenance Procedure

    PR-1613 Procedure for Assessment of Protection Relay Testing Engineers Ver. 2.0 Jun-10

    GU-290 Infrastructure Power Systems Department Power Systems Asset Management Ver. 2.0 Apr-06

    GU-323 Infrastructure Power Systems Department - Key Business Control Ver. 3.0 May-06

    Documentation Guidelines

    DEP 33.64.10.10 () Electrical Engineering Design Amended & Supplemented by SP-1103 DEM 1 Feb-11

    DEP 33.64.10.12 (I) Electrical Supply and Generation-Design and Operation Sep-11

    DEP 33.64.10.32 (I) Electrical Network Monitoring and Control System for Industrial Sep-11

    Networks - Specification

    DEP 33.64.10.33 Electromagnetic Compatibility (EMC) Sep-12

    DEP 33.65.11.31 (I) Synchronous AC Machines Amendments/Supplements to IEC 60034-1 & Amended and Supplemented by SP-1267 Feb-12

    IEC 60034-14

    DEP 33.65.11.32 Packaged Unit AC Generator Sets Apr-03

    DEP 33.65.40.31 (I) Power Transformers Amendments/Supplements to IEC 60076-01 & Amended and Supplemented by SP-1117 Sep-11

    IEC 60076-11

    DEP 33.65.50.31 () Static DC Uninterruptible Power Supply (DC UPS) Units DEM-1 Feb-11

    DEP 33.65.50.32 () Static AC Uninterruptible Power Supply Unit (Static A.C.UPS unit) DEM-1 Feb-11

    DEP 33.65.60.30 (I) Solar Power Systems Feb-12

    DEP 33.66.05.31 (I) Electrical Machines - Cage-Induction Types Amendments/Supplements Amended and Supplemented by SP-1119 Feb-12

    to IEC 60034-1 & IEC 60034-14

    DEP 33.66.05.33 (I) AC Electrical Variable Speed Drive Systems Feb-12

    DEP 33.67.01.31 () Low Voltage Switchgear & Control Gear Assemblies Amended and Supplemented by SP-1121 Feb-11

    Amendments/Supplements to IEC 60439-1

    DEP 33.67.51.31 (I) High-Voltage Switch Gear and Control Gear Assemblies for Rated Voltages Amended and Supplemented by SP-1120 Feb-12

    between 1kV & 52kV Amendments/Supplements to IEC 62271-200

    DEP 33.68.30.32 Electrical Trace Heating Sep-10

    DEP 33.68.30.33 Electrical Process Heaters Nov-06

    DEP 63.10.08.11 (I) Field Commissioning & Maintenance of Electrical Installations & Equipment Sep-11

    Electrical Safety Operational Procedures (ESOPs)

    SP-1145 Guide to Safety Operability (SAFOP) Studies on Electrical Systems Ver. 3.0 Oct-03

    PR-1947 Electrical Safety Rules Ver. 8.0 Aug-10

    PR-1948 Electrical Safety Operating Procedures Ver. 9.0 May-10

    CIVIL ENGINEERING CFDH: UEP1C (UEB) - (Hilal Aghbari)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    Civil / Structures -

    SP-1143 Specifications for Earthmoving & Construction Equipment NEW REQUIREMENT Rev. 2 May-12

    SP-1274 Specification for Civil & Buildings Construction - Materials Testing Ver. 2.0 Dec-09

    SP-1275 Specification & Criteria for Design of Civil & Building Works Ver. 2.0 Dec-09

    SP-1277 Specification for Transportable Accommodation Units Ver. 2.0 Dec-09

    SP-1279 Specification for Civil & Building Construction Ver. 2.0 Dec-09

    SP-1281 Engineering Specification for Safe Road Works Ver. 2.0 Dec-09

    SP-1282 Specification for Reinforced Concrete - Production & Construction Ver. 2.0 Dec-09

    SP-1284 Specification for Sign & Signboards - Standard Signs Catalogue Ver. 2.0 Dec-09

    GU-628 Guide to Civil & Buildings Standard Drawings Ver 2.0 Dec-09

    GU-629 Guideline for Application & Selection of Standard Pipe Supports Ver 1.0 Dec-09

    GU-630 Guideline to Design & Construction of Swimming Pools Ver 2.0 Dec-09

    GU-631 Guideline for Sunshade Specification, Design Requirements & Standard Drawings Ver 1.0 Dec-09

    DEP 34.00.01.30 (I) Structural Design & Engineering of Onshore Structures Sep-11

    DEP 34.11.00.10 (I) Onshore & Nearshore Site Investigations Sep-11

    DEP 34.11.00.11 (I) Site Preparations & Earthworks Including Tank Foundations and Tank Farms Sep-11

    DEP 34.11.00.12 () Geotechnical & Foundation Engineering Onshore Amended by Circular 99/11 & 68/12 Feb-11

    & Amendment A03-Sep-12

    DEP 34.13.20.31 (I) Road Paving , Surfacing, Slope Protection & Fencing Sep-11

    DEP 34.14.20.31 () Drainage systems and primary treatment facilities Amended by Circular 55/11 DEM-1 Feb-11

    DEP 34.17.00.32 () Design & Engineering of Buildings Amended/Supplemented by SP-1275 Sep-12

    DEP 34.17.10.30 () Design of Blast Resistant Onshore Buildings, Control Rooms, & Field Auxiliary Rooms DEM-1 Feb-12

    DEP 34.17.10.31 Laboratories Sep-12

    DEP 34.17.10.33 () Portable Blast-Resistant Modules Amended by Circular 71/11 & 42/12 DEM-1 Feb-11

    DEP 34.17.10.35 () Siting of Onshore Occupied Portable Buildings DEM-1 Feb-11

    DEP 34.19.20.11 () Fireproofing of Steel Structures Amended by Circular 03/12 DEM-1 Feb-11

    DEP 34.19.20.31 (I) Reinforced Concrete Structures Sep-11

    DEP 34.24.26.31 Chimneys selection, design and engineering (based on EN 1992-1-1, Sep-12

    EN 1993-3-2, EN 1443, EN 13084 Parts 1, 2, 4, 5, 6, 7 and 8)

    DEP 34.28.00.31 (I) Onshore Steel Structures Sep-11

    DEP 34.28.00.33 (I) Onshore Ancillary Steel Structures Amended by Circular 52/12 Sep-11

    Building Services -

    SP-1285 Specification for Civil & Building Services Ver. 2.0 Dec-09

    DEP 31.76.10.10 Heating, Ventilation and Air Conditioning for Plant Building Amended by Circular 43/08 Jul-98

    DEP 31.76.10.11 Installation, Testing and Balancing, and Commissioning of HVAC Systems Apr-06

    DEP 34.14.20.31 () Drainage systems and primary treatment facilities Amended by Circular 55/11 DEM-1 Feb-11

    PIPELINE & FLOWLINE ENGINEERING CFDH: UIPT(UEL) - (Said Asmi)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    SP-1032 Specification for the Design, Operation, Maintenance & Inspection Ver. 3.0 Sep-11

    of Pipeline Block Valve Stations

    SP-1199 Procurement Specification for Pipeline Split Tees Ver. 2.0 May-11

    SP-1208 Pipeline Construction Specification Ver. 3.0 Mar-11

    SP-1210 Pipeline Operations and Maintenance Ver. 2.0 Dec-03

    SP-1211 Onshore Pipeline Engineering Ver. 3.0 Jan-11

    SP-1212 DEP 31.40.40.38-PDO Hydrostatic Pressure Testing of New Pipelines Based on DEP 31.40.40.38-Gen (Jan-10) Rev. 2.0 Mar-11

    SP-1235 DEP 31.40.60.12-PDO Pipeline Repairs (Supplement to ASME B31.4 & B31.8) Based on DEP 31.40.60.12-Gen (Jan-10) Rev. 2.0 Mar-11

    SP-1236 DEP 31.40.21.31-PDO Pipeline Isolating Joints - Amendments/Supplements to MSS SP-75 Based on DEP 31.40.21.31-Gen (1999) Ver. 1.0 Dec 02

    PR-1067 Infrastructure - Emergency Response Document Part III Contingency Plans Ver. 8.0 Jul-09

    - Vol. 4: Main Oil Line

    PR-1146 Engineering and Operations - Flowline Cold Cutting Procedure Ver. 3.0 Dec-06

    PR-1235 Main Oil Line System - Management Procedure Rev. 02 Jun-08

    PR-1236 South Oman Gas Line System - Management Procedure Rev. 02 Jun-08

    PR-1416 Procedures for the Use of Pipe-RBA Methodology Rev. 1 Mar-03

    PR-1504 Facilities Change Proposal Procedure for Main Oil Line, South Oman Gas Line Rev. 0 Feb-02

    and MAF Terminal

    PR-1506 Pipeline Hot Tap Management Procedure Rev. 01 Oct-02

    PR-1522 Procedure for Analysis of Pipeline Road Crossing Rev. 1.0 May-12

    PR-1629 Installation of Epoxy Grouted Sleeve & Clock Spring Repairs Ver. 2.0 Dec-09

    PR-1642 Procedure for COSASCO Retrieving Equipment Operation, Corrosion Monitoring Ver. 2.0 Dec-09

    and Weight Loss Coupon Analysis

    PR-1799 Procedure for Emergency Pipeline Repair Material Management Ver. 1.0 Sep-08

    GU-379 Pipeline Emergency Repair Manual (Class 1 Pipelines) Rev. 5.0 May-12

    GU-501 Excavation and Working Around Live Pipelines Rev. 2.0 Sept-11

    DEP 31.38.60.10 () Hot Tapping on Pipelines, Piping and Equipment - Owner Mechanical Static Amended by Circular 76/11 DEM-1 Feb-11

    DEP 31.40.10.12 () Design Of Multiple-pipe Slug Catchers Amended by Circular 19/12 DEM-1 Feb-11

    DEP 31.40.10.13 () Design of Pipeline Pig Trap Systems Amended by Circular 84/11 DEM-1 Feb-11

    DEP 31.40.10.16 Upheaval Buckling of Pipelines Apr-06

    DEP 31.40.20.33 () Line Pipe Induction Bends - Amendments / Supplements to ISO 15590-1 Amended by Circular 102/11 & 56/12 DEM-1 Feb-11

    DEP 31.40.20.37 () Line Pipe for Critical Service - Amendments / Supplements to ISO 3183:2007 Amended by Circular 100/11 DEM-1 Feb-11

    DEP 31.40.21.30 Pipeline Fittings- Amendments / Supplements to ISO-15590-2 Jun-07

    DEP 31.40.21.31 Pipeline Isolation Joints - Amendments / Supplements to ISO 15590-2 Sep-11

    DEP 31.40.21.33 Pig Signallers : Intrusive Type Sep-11

    DEP 31.40.21.34 Carbon And Low Alloy Steel Pipeline Flanges For Use in Oil & Gas Operations Jun-07

    - Amendments/Supplements to ISO 15590-3

    DEP 31.40.50.30 (I) Pre-commissioning of Pipelines Sep-11

    DEP 31.40.60.11 Pipeline Leak Detection Amended by Circular 41/08 Sep-02

    CONTROL & AUTOMATION ENGINEERING CFDH: UEOA2 (UES) - (Salim Hinai)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    Instrument Equipment

    SP-1089 Instrument Impulse Lines WITHDRAWN Replaced by DEP 32.37.10.11 Ver 1.0 Jan 01

    SP-1090 Instrument Signal Lines Based on DEP 32.37.20.10 (May 2004) Ver. 2.0 Dec 05

    SP-1206 C & A Standard Drawings Ver. 2.0 Dec-10

    SP-1243 Corporate Philosophy for Control and Automation Ver. 2.0 Jun-11

    SP-1245 Fieldbus Control System Specification Ver. 3.0 Dec-10

    SP-2098 Smart Plant Instrumentation Specification NEW REQUIREMENT Ver. 2.0 May-12

    SP-2121 DACA PCD Systems Access & Control Management Ver. 1.0 Dec-11

    PR-1094 Instrumented Protective Functions Test Procedure Rev. 1.0 Aug-04

    PR-1293 Main Oil Line (MOL) Metering Systems Verification Procedure Rev. 1 May-09

    PR-1304 Product Flow Measurement Rev. 3.0 Jul-11

    PR-1315 Measurement Equipment Calibration/Recertification Procedure Rev. 2.0 Aug-11

    PR-1619 Mina Al Fahal Terminal Oil Material Balance Rev. 1.0 Mar-11

    PR-1620 Mina Al Fahal Terminal Dip Procedure Rev. 2.0 Sep-10

    PR-1809 Production Measurement Management System Procedure Ver 1.0 Nov-08

    PR-1995 DACA PCDP & PCD Systems Access Request Procedures Ver. 1.0 Dec-11

    PR-1996 Venturi Based Wet Gas Meter (WGM) Sizing, Commissioning, Update & Review Rev. 1.0 Nov-11

    GU-437 SIL Assessment & Implementation Guidelines Ver. 2.0 May-09

    GU-513 Guidelines for Alarm Management and Rationalisation Ver. 2.0 Dec-09

    GU-656 Guideline for the use of Level Measuring Instruments Rev. 1.0 Sep-11

    DEP 30.00.60.15 () Human Factors Engineering Control Room Design Feb-12

    DEP 30.00.60.16 Human Factors Eng. Human/Machine Interface Design for Situation Awareness REPLACES SP-1192 Aug-09

    DEP 31.40.70.30 () Quarter Turn Actuators for On/Off Valves Amended by Circular 50/11 DEM-1 Feb-11

    DEP 32.01.20.12 Process Control Domain - Feb-12

    - Enterprise industrial automation information technology and security

    DEP 32.01.23.17 () Process Control Domain Security Requirements for Suppliers DEM-1 Feb-11

    DEP 32.01.40.31 () Requirements for Real-Time Production Operations and Production-Critical Feb-12

    Real-Time Data

    DEP 32.10.03.10 () Instrument Symbols and Identification on Process Engineering Flow Schemes DEM-1 Feb-11

    DEP 32.24.20.44 () Instrumentation Control & Protection for Fired Equipment DEM-1 Feb-12

    DEP 32.29.20.10 (I) Safeguarding & Instrumented Protective Functions for Rotating Equipment Amended by Circular 74/11 DEM-1 Feb-11

    DEP 32.30.20.11 (I) Fire, Gas and Smoke Detection Systems Amended by Circular 72/12 DEM-1 Sep-11

    DEP 32.30.20.14 (I) Instrument Asset Management Feb-12

    DEP 32.30.20.15 (I) DCS Basic Application Standards Sep-11

    DEP 32.30.20.16 Baselayer Control Applications Sep-11

    DEP 32.30.20.17 Integration Of Motor Controls Into BPCS Feb-12

    DEP 32.30.20.18 Real Time Optimisation Project Standards NEW REQUIREMENT TBC Sep-12

    DEP 32.31.00.32 () Instruments for Measurement and Control Amended by Circular 73/11 & 46/12 Feb-11

    DEP 32.31.00.34 (I) Instrumentation Documents and Drawings Sep-11

    DEP 32.31.09.31 (I) Instrumentation for Equipment Packages Amended by Circular 47/12 Sep-11

    DEP 32.31.50.10 On-line Process Analysers Sep-12

    DEP 32.31.50.13 Analyser Housing Sep-12

    DEP 32.32.00.11 Turbine Fiscal Metering Systems for Liquid Hydrocarbons Sep-12

    DEP 32.32.00.12 Fiscal Flow Measurement of Natural Gas Amended by Circular 11/10 Jun-07

    DEP 32.36.01.17 () Control Valves Selection, Sizing & Specifications Amended by Circular 06/12 & (A03 Sep-12) DEM-1 Feb-11 DEP 32.37.10.11 () Installation of On-Line Instruments NEW REQUIREMENT Replaces SP-1089 Sep-12

    DEP 32.45.10.10 () Instrumentation of Depressuring Systems Amended by Circular 49/11 DEM-1 Feb-11

    DEP 32.80.10.10 () Instrumented Protective Functions (IPF) Amended by Circular 72/11 DEM-1 Feb-11

    DEP 32.80.10.14 (I) Alarm Management Amended by Circular 43/11 DEM-1 Feb-11

    DEP 61.38.10.10 Shop and Field Fabrication of Orifice Meter Runs Feb-12

    DEP 62.10.08.11 () Inspection & Functional Testing of Instruments Amended by Circular 11/12 DEM-1 Feb-11

    MECHANICAL STATIC EQUIPMENT ENGINEERING CFDH: UEP1S - (Abdulnabi Balushi)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    SP-1188 Chemical Injection Skids Rev. 5 May-10

    SP-1200 Procurement Specifications for Pipeline Check Valves Ver. 2.0 Sep-11

    SP-1201 Procurement Specification for Pipeline Ball Valves Ver. 2.0 Sep-11

    SP-2020 Flange Connections - Bolt Tourquing & Tensioning Ver. 0 Jan-06

    SP-2039 Mechanical Standard Drawings Ver. 1.0 Sep-05

    SP-2044 Specification for Screwed Fittings Rev. 1.0 Nov-05

    SP-2051 Specification for Flushing, Pressure Testing, Pickling and Sensitive Leak Testing Ver. 2.0 May-10

    of Mechanical Equipment and Piping

    SP-2069 Mechanical Engineering - Specification for Pressure Vessels Ver. 0 Sep-08

    SP-2070 Mechanical Engineering - Specification for Air Cooled Heat Exchangers Ver. 1 Jun-10

    DEP 30.06.10.11 () Equipment in LPG Installations DEM-1 Feb-11

    DEP 30.06.10.12 () Pressurised Bulk Storage Installations for LPG Amended by Circular 58/11 DEM-1 Feb-11

    DEP 30.06.10.13 () LPG Bulk Transfer & Transportation Amended by Circular 34/11 DEM-1 Feb-11

    DEP 30.06.10.18 () Pressurised Bulk Storage Installations for LPG At Customer Premises Feb-12

    DEP 30.48.60.13 Design and installation of chemical-resistant brick lining for Process Sep-12

    equipment (based on EN 14879-Parts 1, 4 and 6)

    DEP 30.75.10.10 () Steam, Condensate and Boiler Feed Water Systems DEM-1 Feb-12

    DEP 30.75.10.30 Water Tube Boilers Amended by Circular 48/12 Dec-08

    DEP 31.06.11.11 () Loading Facilities for Bulk Road Vehicles Amended by Circular 83/11 DEM-1 Feb-11

    DEP 31.10.03.10 Symbols & Identification System Mechanical Feb-12

    DEP 31.20.20.31 Internals for Columns Amended by Circular Sep-12 Feb-12

    DEP 31.21.01.11 () Printed Circuit Heat Exchangers Selection & Application DEM-1 Feb-12

    DEP 31.21.01.12 () Shell & Tube Heat Exchangers Selection & Application DEM-1 Feb-12

    DEP 31.21.01.13 () Welded Plate-Bloc Heat Exchangers Application, Design & Fabrication Feb-12

    DEP 31.21.01.30 () Shell & Tube Heat Exchangers - Amendments/Supplements to ISO 16812 Amended by Circular 13/12 DEM-1 Feb-11

    DEP 31.21.01.32 () Plate & Frame Heat Exchangers- Amendments/Supplements to ISO15547-1:2005 DEM-1 Feb-12

    DEP 31.21.01.33 () Printed Circuit Heat Exchangers Design & Fabrication Amended by Circular 44/11 DEM-1 Feb-11

    DEP 31.21.01.36 () Heat Exchangers for Packaged Equipment Design & Fabrication Feb-12

    DEP 31.21.70.10 () Air-Cooled Heat Exchangers; Selection and Application Amended by Circular 98/11 DEM-1 Feb-11

    DEP 31.21.70.31 () Air-cooled Heat Exchangers - Amendments/Supplements to ISO13706 Amended by Circular 08/12 DEM-1 Feb-11

    DEP 31.22.10.35 Manufacturing Report for Pressure Vessels Sep-12

    DEP 31.22.20.31 () Pressure Vessels - Based on ASME Section VIII Amended by Circular Sep-12 DEM-1 Feb-12

    DEP 31.22.30.14 Glass-Fibre Reinforced Plastic Vessels Sep-12

    DEP 31.24.00.30 () Fired Heaters - Amendments/Supplements to ISO13705 Amended by Circular 97/11 DEM-1 Feb-11

    DEP 31.24.00.31 Calculation of Heater-Tube Thickness- Endorsement of ISO 13704 Dec-07

    DEP 31.24.40.12 Fabric Expansion Joints- Endorsement of RAL-GZ719 Sep-12

    DEP 31.27.21.10 () Filters for Removing Particles from Hydroprocessor Feeds Feb-12

    - Type Selection and Design Rules

    DEP 31.36.10.30 () Hydraulic Systems for the Operation of On/Off Valves in Protective Functions Amended by Circular 65/11 DEM-1 Feb-11

    DEP 31.37.00.11 () Instrument Air Supply DEM-1 Feb-12

    DEP 31.38.01.10 () Piping Classes Basis of Design DEM-1 Feb-12

    DEP 31.38.01.11 () Piping - General Requirements Amended A01 Sep-12 DEM-1 Feb-12 DEP 31.38.01.12 () Piping Classes - Refining And Chemicals DEM-1 Feb-12

    DEP 31.38.01.13 Compilation of Bill of Material for Piping Isometrics Feb-12

    DEP 31.38.01.15 () Piping Classes Exploration and Production DEM-1 Feb-12

    DEP 31.38.01.21 Compilation of a Specification For Piping Systems Sep-11

    DEP 31.38.01.29 Pipe Supports Feb-12

    DEP 31.38.60.10 () Hot Tapping on Pipelines, Piping and Equipment Amended by Circular 76/11 DEM-1 Feb-11

    DEP 31.46.00.31 (I) Acoustic Insulation for Piping- Amendments/Supplements to ISO 15665 Feb-12

    DEP 34.51.01.31 (I) Vertical Steel Storage Tanks Selection & Design DEM-1 Feb-11

    (Amendments/Supplements to EN14015:2004)

    DEP 34.51.11.30 () Mounded Horizontal Cylindrical Vessels for Pressurised Storage of LPG at DEM-1 Feb-11

    Ambient Temperatures (Endorsement of EEMUA 190)

    DEP 34.51.90.10 Demolition of Storage Tanks (Endorsement of EEMUA 154) Sep-12

    DEP 70.08.10.11 Mechanical Maintenance Equipment and Tools Sep-11

    DEP 70.10.80.11 Cleaning of Equipment WITHDRAWN Jan-98

    DEP 74.00.10.10 () Shop & Field Pressure Testing of Piping Systems DEM-1 Feb-12

    DEP 80.36.00.30 () Relief Devices - Selection, Sizing and Specification Amended A01 Sep-12 DEM-1 Feb-12 DEP 80.46.30.11 () Interlocking Systems for Safety/Relief Valves Amended by Circular 66/11 & 66/12 DEM-1 Feb-11

    MECHANICAL ROTATING EQUIPMENT ENGINEERING CFDH: UEP1R (Saad Harrasy)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    SP-1252 Specification for Instrument Air Compression Package Ver. 3 Sep-10

    SP-2013 High Energy ( 500kW) Centrifugal Pumps Ver. 2.0 Oct-11

    SP-2030 Low Energy (500kW) Centrifugal Pumps Amendt/Supplt to DEP 31.29.02.30-Gen Ver. 0 Jun-05

    SP-2033 Functional Specification for PDO Machinery Health Monitoring Systems - MHMS Rev. 02 Jun-05

    SP-2045 Procurement Specification for Beam Pump Units Rev. 5 May-12

    SP-2054 Specification for Centrifugal Compressor Packages Rev. 3 Aug-08

    PR-1565 String/Performance Tests Procedure for Centrifugal Pumps Vers 1.0 Jun-04

    GU-396 Engineering of Process Pumps Guideline Ver. 1.0 May-05

    GU-397 Engineering of Process Gas Compression Guideline Ver. 1.0 May-05

    DEP 31.25.00.10 Hoisting Facilities And Weather Protection For Rotating Equipment Nov-08

    DEP 31.29.00.10 Installation of Rotating Equipment - Amendments /Supplements to API RP 686 Sep-11

    DEP 31.29.00.30 Oil Mist Lubrication Systems Amended by Circular 98/08 Jul-08

    DEP 31.29.00.32 Special Purpose Gear Units for Petroleum, Chemical & Gas Industry Services Feb-12

    - Amendments / Supplements to API 613

    DEP 31.29.00.33 () Shaft Sealing Systems for Centrifugal and Rotary Pumps Amended by Circular 62/11 & A01 Sep-12 DEM-1 Feb-11 - Amendments/Supplements to ISO 21049:2004

    DEP 31.29.00.36 Flexible Couplings for Mechanical Power Transmission Special Purpose Applications Dec-07

    - Amendments/Supplements to ISO 10441

    DEP 31.29.00.39 Shaft Sealing Systems for Centrifugal and Rotary Pumps WITHDRAWN Feb-11

    - Selection, Testing & Installation

    DEP 31.29.00.41 Gears Selection, Testing & Installation Feb-12

    DEP 31.29.02.11 Pumps Selection, Testing & Installation Sep-12

    DEP 31.29.02.30 () Centrifugal Pumps - Amendments/Supplements to ISO-13709:2003 Amended by Circular 85/11 DEM-1 Feb-11

    DEP 31.29.06.30 Centrifugal Submerged Motor Pumps (in Refrigerated Product or Pressurised Amended by Circular 52/11 Feb-11

    Storage Service)

    DEP 31.29.12.30 Reciprocating Positive Displacement Pumps and Metering Pumps Amended by Circulars 01/02, 25/04, 50/04 & 84/08 Dec-99

    - Amendments/Supplements to API 674 and API 675

    DEP 31.29.22.11 (I) Positive Displacement Pumps Rotary (Amendments/Supplements to API 676) Feb-12

    DEP 31.29.40.10 Compressors Selection, Testing & Installation Sep-11

    DEP 31.29.40.30 () Axial, Centrifugal & Expander Compressors - Amendments/Supplements to API Std 617 Amended by Circular 86/11 DEM-1 Feb-11

    DEP 31.29.40.31 () Reciprocating Compressors - Amendments/supplements to API 618 Amended by Circular 82/11 DEM-1 Feb-11

    DEP 31.29.40.33 Packaged, Integrally Geared, Centrifugal Plant and Instrument Air Compressors Feb-12

    - Amendments/Supplements to API 672

    DEP 31.29.42.30 Liquid Ring Vacuum Pumps And Compressors - Amendment/Supplements to API Std 681 Feb-12

    DEP 31.29.47.30 Centrifugal Fans - Amendments/Supplements to ISO 13705, Annex E Sep-11

    DEP.31.29.47.31 Centrifugal fans for petroleum, chemical, and gas industry services Feb-12

    (amendments/supplements to API 673)

    DEP 31.29.47.32 Fans Selection, Testing & Installation Feb-12

    DEP 31.29.60.32 () Lubrication, Shaft-Sealing and Control Oil System and Auxiliaries Amended by Circular 80/11 DEM-1 Feb-11

    - Amendments/Supplements to ISO 10438

    DEP 31.29.60.33 () Lubrication, Shaft-Sealing and Oil-Control System Selection, Testing & Installation Sep-11

    DEP 31.29.70.11 Combustion Gas Turbines - Selection, Testing & Installation Sep-11

    DEP 31.29.70.31 () Gas Turbines for the Petroleum, Chemical and Gas Industry Services Amended by Circular 64/11 DEM-1 Feb-11

    - Amendments/Supplements to API 616

    DEP 31.29.70.32 Gas Turbine Combustion Air Intake And Exhaust Systems Feb-11

    DEP 31.29.80.30 Diesel Engines Dec-00

    DEP 31.29.90.30 Spark Ignited Gas Fuelled Engines Mar-01

    SAFETY ENGINEERING CFDH: MSE4 - (Anthony Sipkema)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    Human Factors Engineering DEP 30.00.60.10 () Human Factors Engineering in Projects Feb-11

    DEP 30.00.60.13 () Human Factors Engineering Valve Analysis Sep-11

    DEP 30.00.60.14 () Human Factors Engineering Application During Construction Sep-12

    DEP 30.00.60.15 () Human Factors Engineering Control Room Design Feb-12

    DEP 30.00.60.16 Human Factors Engineering Human / Machine Interface Design for Situation Awareness Owner: Control and Automation Aug-09

    DEP 30.00.60.18 Human Factors Engineering Design and Procurement of Skid-Packaged Units Sep-12

    DEP 30.00.60.19 () Human Factors Engineering Design for Process Safety Critical Tasks Feb-11

    DEP 30.00.60.20 () Human Factors Engineering Workspace Design Sep-11

    DEP 30.00.60.21 () Human Factors Engineering Labeling of Facilities, Equipment & Piping Feb-12

    Fire Engineering SP-1075 HSE Specification Fire and Explosion Risk Management Rev. 2.0 Jul-02

    GU-230 Fire & Explosion Risk Management Guidelines Rev. 2.0 Jul-02

    DEP 32.30.20.11 () Fire, Gas and Smoke Detection Systems - Owner: C&A Amended by Circular 72/12 DEM-1 Sep-11

    DEP 80.47.10.30 () Assessment of the Fire Safety of Onshore Installations Amended by Circular 38/11 DEM-1 Feb-11

    DEP 80.47.10.31 () Active Fire Protection Systems and Equipment for Onshore Facilities Amended by Circular 51/11 & 38/12 DEM-1 Feb-11

    DEP.80.47.10.32 () Fire Fighting Agents and Portable/Mobile Fire Fighting Equipment Sep-11

    for Onshore Applications

    DEP 80.47.10.33 () Fire Fighting Vehicles and Fire Stations Feb-12

    Facility Layout SP-1127 Specification for Facility Siting, Layout & Spacing Ver. 3.0 Oct-10

    SP-1190 Design for Sour Service Specification Ver 3.0 Sep-11

    DEP 34.17.10.35 () Siting of Onshore Occupied Portable Buildings Owner: Civil DEM-1 Feb-11

    DEP 80.00.10.10 () Area Classification Amended by Circular 63/12 DEM-1 Feb-11

    DEP 80.00.10.11 () Layout of Onshore Facilities Amended by Circular 68/11 & 43/12 DEM-1 Feb-11

    and Amendment A03 Sep-12

    HEMP/HSE Cases SP-1258 Technical Safety Engineering - Quantitative Risk Assessment Specification Rev. 3.0 Jul-10

    SP-2062 Specification for HSE Cases Ver. 1 Mar-11

    PR-1696 HAZOP Procedure Owner: Process Engineering Rev. 3 Jun-12

    GU-648 Guide for Applying Process Safety in Projects Rev. 1 Dec-10

    EP95-0230 HSES Guideline Design 1995

    EP2005-0300 Hazard and Effects Management Process (HEMP) General Requirements Ver. 1 Aug-04

    EP2009-9009 Safety Critical Element Management Manual 2nd Edition Feb-09

    EP95-0312 HAZID Rev. 0 Sep-95

    EP95-0314 Physical Effects Modelling Rev. 0 Oct-98

    Other Health & Safety SP-1232 Public Health NEW REQUIREMENT (Owner MCOH) Ver. 5.0 Jun 12

    SP-1234 HSE Specification - Personal Protective Equipment (Owner MSE1) Rev. 3 Aug-12

    PR-1232 Process Safety Review (Formerly Design Integrity Review) Ver. 2.0 Feb-12

    DEP 31.10.00.31 () Noise Control (Amendments/Supplements to ISO 15664) Feb-12

    ANSI/1SEA Z358.1-2009 American National Standard for Emergency Eyewash and Shower Equipment Sep-09

    Notes: 1. This Document can be accessed from LiveLink: http://sww4.pdo.shell.om/CMFportal/Default.aspx

    2. DEPs (V35 Sep-12) are Shell Documents and can be accessed from: http://swwep-deps.shell.com/ a) Note: as of v32, new/revisions to DEPs are split into Specification and Informative See Tabs at top of DEP web-page

    () denotes the DEPs where this Specification and Informative split has been implemented

    3. PDO Management System Documents are available on Livelink: http://sww4.pdo.shell.om/CMFportal/Default.aspx

    PDO Hierarchy:

    a) CMF Corporate Management Framework Mandatory b) PL Policy Mandatory

    c) CP Code of Practice Mandatory

    d) SP Specification Mandatory

    e) PR Procedure Mandatory

    f) GU Guideline Non-Mandatory

    4. The Hardcopy of this Document (Wall Chart) is issued every 6 Months in Arrears The document may be

    revised between hard-copy issues please check Livelink for latest revision

    5. All changes since last revision are shown in BOLD

    6. Please notify UEPI of any revisions required to this wallchart

    Revision: 18a

    Issue Date: Nov 2012

    CAUTION MAKE SURE YOU HAVE LATEST REVISION (CHECK IN LIVELINK or SHELL DEP WEBSITE)

    FEED OFFICE ENGINEERING Manager: UEP1 - (Paul Bennington) ** FOR USE IN FEED OFFICE ONLY**

    Doc. ID Document Title Additional Notes Rev./DEM Date

    FEED Office Management

    PR-1741 FEED Office - Quality Management System Manual Rev. A06 Apr-12

    PR-1742 FEED Office - Risk & Opportunity Management Procedure Rev. A02 Apr-11

    PR-1743 FEED Office - Project On-Boarding Procedure Rev. A03 May-11

    PR-1764 FEED Office - New entrant Induction Program Procedure Rev. A04 Apr-11

    PR-1765 FEED Office - Knowledge Management (Lessons Learned) Rev. A02 May-11

    PR-2004 FEED Office Monthly Project Review Procedure Rev. A01 Feb-12

    HSE/Technical Safety

    PR-1744 FEED Office Managing Safety During Visits to Vendor and Contractor Sites Rev. A02 May-11

    PR-1776 FEED Office - HSE Action Close-out Procedure Rev. A02 May-11

    Engineering

    SP-2067 FEED Office - PDMS Model specification Rev. A01 Sept-08

    PR-1727 FEED Office - Preparation of "Basis for Design" Procedure Rev. A02 May-11

    PR-1728 FEED Office - Preparation of Project Specification (FEED Output) Procedure Rev. A02 May-11

    PR-1729 FEED Office - Technical Integrity During Design & Execution Phase Procedure Rev. A02 Oct-09

    PR-1730 FEED Office - Engineering & Projects Calculation Procedure Rev. A02 May-11

    PR-1733 FEED Office Technical Information Note Procedure Rev. A04 Oct-12

    PR-1734 FEED Office Process System Design Review Procedure Rev. A02 May-11

    PR-1735 FEED Office - Codes and Standards Procedure Rev. A01 May-11

    PR-1736 FEED Office - Site Survey Procedure Rev. A03 Oct-12

    PR-1749 FEED Office - Register of Holds Procedure Rev. A02 Sep-11

    PR-1750 FEED Office - Contract and Third Party Services Management Procedure Rev. A04 Apr-11

    PR-1752 FEED Office Project Execution Procedure (Define Phase) Rev. A02 Nov-09

    PR-1768 FEED Office - Project Deliverables - Checking and Approval Procedure Rev. A03 Jun-10

    PR-1773 FEED Office - Equipment Supplier Document Requirements Procedure Rev. A04 May-12

    PR-1778 FEED Office - Standard Calculation Spreadsheet QC Procedure Rev. A02 May-11

    PR-1938 FEED Office Change Control Procedure Rev. A01 Apr-10

    PR-1939 FEED Office Multi-Discipline Equipment Data Sheet Specification Procedure Rev. A01 Apr-10

    GU-603 FEED Office - Project Deliverables Guideline ORP Phase 3: Define Rev. A02 Apr-11

    Cost & Planning

    PR-1737 FEED Office - Finance Flow Procedure Rev. A02 Apr-10

    PR-1738 FEED Office - Business Review Procedure Rev. A02 Feb-12

    PR-1746 FEED Office - Time writing Procedure Rev. A02 May-11

    PR-1770 FEED Office - Planning & Progress Reporting Procedure Rev. A02 Apr-10

    PR-1771 FEED Office - Cost Planning Work-flow Procedure Rev. A02 May-11

    GU-616 FEED Office - Standard CTR Catalogue Rev. A03 Apr-10

    GU-640 FEED Office CTR Catalogue Template (Minor Projects) Rev. A01 Nov-10

    Quality Management

    PR-1726 FEED Office - Control of QMS Documents Procedure Rev. A04 Apr-12

    PR-1745 FEED Office - Customer Feedback Procedure Rev. A04 Apr-12

    PR-1756 FEED Office - Control of Non-Conformance, Corrective and Preventative Actions Rev. A03 Apr-12

    PR-1772 FEED Office - Management Review Procedure Rev. A03 Apr-12

    Information Management

    PR-1722 FEED Office - Information Management Services to FEED Office Procedure Rev. A02 Feb-11

    PR-1723 FEED Office - Information Documents and Records Procedure Rev. A03 Jun-10

    PR-1725 FEED Office - Supplier document Procedure Rev. A02 Jun-11

    PR-1761 FEED Office - Hand-over Documentation Procedure Rev. A02 May-11

    GU-600 FEED Office - Live link &Assai Usage Rev. A02 Feb-11

    Document No: GU-611 Document Owner: UEPI

    SECURITY CFDH: UIC (Salim Ambusaidi)

    Doc. ID Document Title Additional Notes Rev./DEM Date

    SP-1279 Specification for Civil & Building Construction Owner: Civil Engineering Chapter P Fences & Gates Ver. 2.0 Dec-09

    SP-2084 Specification for IP Video Surveillance, Perimeter Security & Access Ver. 2 Jul-12

    Control Systems

    QUALITY MANAGEMENT CFDH: UEQ - (Gary Briston)

    PL-15 Quality Management Policy 2008 Edition

    CP-190 Project Engineering: Quality Management System for Project Delivery: Code of Practice Ver. 1 Oct-09

    PR-1858 Material Handling, Storage and Preservation Procedure Rev. 0 Oct-09

    PR-1866 Quality Audit Procedure NEW REQUIREMENT Rev. A01 Mar-10

    PR-1964 Equipment and/or Materials Receipt Inspection Procedure Rev. A1 Dec-10

    PR-1984 Criticality Rating Procedure Ver. 1.0 Jun -11

    SP-1122 Specification for Project Quality Plan Ver. 2.02 Feb-08

    SP-1171 Specification for Quality Management System Requirements for Ver. 3,0 Jun-12

    Product and Service

    SP-2061 Functional Technical Directorates - Technical Authority System Rev. 2.0 Jun-10

    GU-398 Guidelines on Scope and Areas Covered During Vendor/Contractor Evaluation NEW REQUIREMENT Rev. 2.0 Apr-09

    & Assessment

    DEP 82.00.10.10 Project Quality Assurance Feb-12

    Lifting & Hoisting

    SP-1251 Training Requirements for Lifting Operations Personnel Ver. 4.0 Sep-11

    PR-1708 Lifting & Hoisting Procedure Part 1: Framework Ver. 1 Sep-11

    Part 2: Inspection, Testing and Certification

    PR-1709 Lifting & Hoisting Lift Planning / Execution Procedure Ver. 1 Sep-11

    PR-1710 Lifting Equipment Numbering NEW REQUIREMENT Ver. 0 Apr-12

    TELECOMS - UIID (Said Shidhani)

    SP-1265 Specification for ADSS Fibre-Optic Cables and Key Accessories Ver. 2.0 Aug-08

    SP-1266 Specification for Installation of ADSS Fibre Optic Cables Ver. 2.0 Aug-06

    SP-2004 Fibre Optic Cable Installation Specifications Ver. 5.0 Jul-12

    SP-2084 Specification for IP Video Surveillance, Perimeter Security NEW REQUIREMENT Ver. 2 Jul-12

    & Access Control Systems

    DEP 32.71.00.10 () Plant Telecommunication NEW REQUIREMENT DEM-1 Feb-10

    DEP.32.71.00.11 Telecommunications Standards NEW REQUIREMENT May-04

    DEP.32.71.00.14 Telecommunications Tower and Guyed Masts NEW REQUIREMENT Dec-08

    INFORMATION MANAGEMENT / ENGINEERING DESIGN SYSTEMS UEPI (Philippa De Glanville)

    CP-139 Corporate Data Management Ver. 3.0 Feb-09

    SP-2065 Document Management for Projects Rev. 4.0 Aug-12

    SP-2067 PDMS Model Specification NEW REQUIREMENT Rev A02 Oct-12

    SP-2099 2D Drafting Specification NEW REQUIREMENT Ver. 1.0 Jul-12

    SP-2122 Project IM Specification Ver. 1.0 Oct-11

    SP-2133 Project Engineering Design Systems (EDS) Specification Ver. 1.0 Feb-12

    SP-2144 Project Engineering Engineering Project IM Scope of Work Tender Contract Input NEW REQUIREMENT Rev. 1 Aug-12

    DEP 82.00.10.30 () Engineering Information Specification (EIS) Feb-12