1
Staircore WC WC WC Access. Risers Lift Lift Staircore Fire Lobby Staircore Fire Lobby Staircore Fire Lobby Staircore Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm RECEPTION BREAKOUT OPEN PLAN 56 DESKS OPEN PLAN 42 DESKS OPEN PLAN 58 DESKS BREAKOUT BREAKOUT TEA PREP/ KITCHEN BREAKOUT MEETING ROOM MEETING ROOM COMMS OPEN PLAN 9 DESKS BREAKOUT MEETING ROOM MEETING ROOM MEETING ROOM OPEN PLAN 40 DESKS 3 PEOPLE 11 SQM 7 PEOPLE 20 SQM 4 PEOPLE 15 SQM 6 PEOPLE 19 SQM 6 PEOPLE 21 SQM BREAKOUT MEETING ROOM 2 PEOPLE 9 SQM 6 PEOPLE 21 SQM TRAINING MEETING ROOM Drawn: NOTES: ALL DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES TO BE ADVISED PROIR TO CONSTRUCTION. ALL DEMOLITIONS TO BE CARRIED OUT IN ACCORDANCE WITH RELEVANT CODE OF PRACTICE & METHOD STATEMENT BY MAIN CONTRACTOR. LOCATION OF MAINS CIRCUIT BOARD,SIZE OF LOCATION TO BE AGREED WITH ELECTRICAL CONTRACTOR /LANDLORD/ BUILDING CONTROL. ALL DRAINAGE SYSTEMS TO BE ADEQUATELY VENTED. ALL MECHANICAL DUCTING WILL HAVE FIRE DAMPER AT JUNCTION BETWEEN FIRE BARRIERS. ALL HEATING & LIGHTING SYSTEMS TO COMPLY WITH SECTION 2 OF THE TECHNICAL BOOKLET PART F. PROPOSED ALTERATIONS TO BE APPROVED BY LANDLORD PRIOR TO COMMENCEMENT OF WORKS ALL WORK TO BE CARRIED OUT MUST BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS ALL ELECTRICAL INSTALLATIONS TO COMPLY WITH CURRENT RECI REGULATIONS. EMERGENCY LIGHTING SYSTEM TO BE PROVIDED IN ACCORDANCE WITH I.S 3217/BS 5266, PART 1 EXIT SIGNS AND MARKINGS TO BE INSTALLED IN ACCORDANCE WITH BS 5499 PART 1;'90 AND PART 2;'86 ALL CEILING HEIGHTS TO BE CONFIRMED ON-SITE AND APPROVED BY DESIGNER PRIOR TO COMMENCEMENT OF WORKS GA PLAN CONTRACTOR TO CHECK ALL DIMENSIONS FROM DRAWINGS TO SITE & NOTIFY THE DESIGNER OF ANY DISCREPANCIES PRIOR TO FABRICATION TO ALLOW FOR MODIFICATIONS. DISCREPANCIES NOT BROUGHT TO THE ATTENTION OF THE DESIGNER WILL BETHE RESPONSIBILITY OF THE RELEVANT CONTRACTOR. THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL SPECIFICATIONS & ALL RELEVANT DESIGN, ENGINEERS & SPECIALIST DRAWINGS. THE CONTRACTOR MUST ADVISE ON ALL DETAILS TO ENSURE STABILITY & STRENGTH OF CONSTRUCTION ALL MATERIALS TO BEMATCHED & BALANCED AS APPROPRIATE. THE WORKS DESCRIBED & SPECIFIED ON THIS DRAWING & ASSOCIATED DRAWINGS SHALL BE UNDERTAKEN IN ACCORDANCEWITH CURRENT HEALTH & SAFETY PLAN PREPARED BY THE PLANNING SUPERVISOR FOR THE PROJECT. PROJECT STAGE DISCUSSION DRAWING COMMENTS DRAWING REVISIONS JOHN KELLY TEST FLOOR FIT: OPTION 3_Combined Layout AS SHOWN COR 01 10 19 BROOMHILL A2 P-03 19-51 Drawing Title : Project : Dwg No : Client : Scale : Date : Job Ref : Rev No. Rev Description Rev Date Initials Size : THIS DESIGN IS THE COPYRIGHT OF 21 SPACES DESIGN LTD. AND MAY NOT BE REPRODUCED WITHOUT CONSENT 149 The Strand North Strand Road Dublin 3, Ireland Tel: +353(0)1 442 9312 www .21spaces .com info@21spaces .com twitter.com / 21spaces FLOOR TEST FIT: NO. 3 Combined Open Plan and Private Offices Individual work stations: 239 Open plan work stations: 205 Private Offices: 7 1 x 07 people 3 x 06 people 1 x 04 people 1 x 03 people 1 x 02 people Meeting rooms: 7 4 x 04 person 2 x 06 person 1 x 10 person Training Room Breakout spaces: 7 Reception Kitchen Ladies and Gents w/c Comms Room

1951 (D) Broomhill Office Test Fit Plans B 191001...THIS DESIGN IS THE COPYRIGHT OF 21 SPACES DESIGN LTD. AND MAY NOT BE REPRODUCED WITHOUT CONSENT 149 The Strand North Strand Road

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1951 (D) Broomhill Office Test Fit Plans B 191001...THIS DESIGN IS THE COPYRIGHT OF 21 SPACES DESIGN LTD. AND MAY NOT BE REPRODUCED WITHOUT CONSENT 149 The Strand North Strand Road

Staircore

WC

WC

WCAccess.

Risers

Lift

Lift

Staircore

Fire Lobby

Staircore

Fire Lobby

Staircore

Fire Lobby

Staircore

Cle

ar O

peni

ng 8

25m

mC

lear

Ope

ning

825

mm

Clear Opening 825mm Clear Opening 825mmClear Opening 825mm Clear Opening 825mmClear Opening 825mmClear Opening 825mm

Clear Opening 825mm

Cle

ar O

peni

ng 8

25m

mC

lear

Ope

ning

825

mm

Cle

ar O

peni

ng 8

25m

mC

lear

Ope

ning

825

mm

Clear Opening 825mm Clear Opening 825mm Clear Opening 825mm

OPTION 3

Clear Opening 825mm

RECEPTION

BREAKOUT

OPEN PLAN56 DESKS

OPEN PLAN42 DESKS

OPEN PLAN58 DESKS

BREAKOUT

BREAKOUT

TEA PREP/ KITCHEN

BREAKOUT

MEETINGROOM

MEETINGROOM

COMMS

OPEN PLAN9 DESKS

BREAKOUT

MEETINGROOM

MEETINGROOM

MEETINGROOM

OPEN PLAN40 DESKS

3 PEOPLE11 SQM

7 PEOPLE20 SQM

4 PEOPLE15 SQM

6 PEOPLE19 SQM6 PEOPLE

21 SQM

BR

EAK

OU

T

MEETINGROOM

2 PEOPLE9 SQM

6 PEOPLE21 SQM

TRAINING

MEETING ROOM

Drawn:

NOTES:

ALL DIMENSIONS TO BE CHECKED ON SITE AND ANY DISCREPANCIES TO BE ADVISED PROIR TO CONSTRUCTION.

ALL DEMOLITIONS TO BE CARRIED OUT IN ACCORDANCEWITH RELEVANT CODE OF PRACTICE & METHOD STATEMENT BY MAIN CONTRACTOR.

LOCATION OF MAINS CIRCUIT BOARD,SIZE OF LOCATION TO BE AGREED WITH ELECTRICAL CONTRACTOR /LANDLORD/ BUILDING CONTROL.

ALL DRAINAGE SYSTEMS TO BE ADEQUATELY VENTED.

ALL MECHANICAL DUCTING WILL HAVE FIRE DAMPERAT JUNCTION BETWEEN FIRE BARRIERS.

ALL HEATING & LIGHTING SYSTEMS TO COMPLYWITH SECTION 2 OF THE TECHNICAL BOOKLET PART F.

PROPOSED ALTERATIONS TO BE APPROVED BY LANDLORD PRIOR TO COMMENCEMENT OF WORKS

ALL WORK TO BE CARRIED OUT MUST BE IN ACCORDANCE WITH THE MOST CURRENT BUILDING REGULATIONS

ALL ELECTRICAL INSTALLATIONS TO COMPLY WITH CURRENT RECI REGULATIONS.

EMERGENCY LIGHTING SYSTEM TO BE PROVIDED INACCORDANCE WITH I.S 3217/BS 5266, PART 1

EXIT SIGNS AND MARKINGS TO BE INSTALLED IN ACCORDANCE WITH BS 5499 PART 1;'90 AND PART 2;'86

ALL CEILING HEIGHTS TO BE CONFIRMED ON-SITE AND APPROVED BY DESIGNER PRIOR TO COMMENCEMENT OF WORKS

GA PLAN

CONTRACTOR TO CHECK ALL DIMENSIONS FROM DRAWINGS TO SITE & NOTIFY THE DESIGNER OF ANY DISCREPANCIES PRIOR TO FABRICATION TO ALLOW FOR MODIFICATIONS. DISCREPANCIES NOT BROUGHT TO THE ATTENTION OF THE DESIGNER WILL BETHE RESPONSIBILITY OF THE RELEVANT CONTRACTOR.

THIS DRAWING SHOULD BE READ IN CONJUNCTION WITH ALL SPECIFICATIONS & ALL RELEVANT DESIGN, ENGINEERS & SPECIALIST DRAWINGS.THE CONTRACTOR MUST ADVISE ON ALL DETAILS TO ENSURE STABILITY & STRENGTH OF CONSTRUCTION ALL MATERIALS TO BEMATCHED & BALANCED AS APPROPRIATE.

THE WORKS DESCRIBED & SPECIFIED ON THIS DRAWING & ASSOCIATED DRAWINGS SHALL BE UNDERTAKEN IN ACCORDANCEWITH CURRENT HEALTH & SAFETY PLAN PREPARED BY THE PLANNING SUPERVISOR FOR THE PROJECT.

PROJECT STAGE

DISCUSSION

DRAWING COMMENTS

DRAWING REVISIONS

JOHN KELLY

TEST FLOOR FIT: OPTION 3_Combined Layout

AS SHOWN COR

01 10 19

BROOMHILL

A2 P-0319-51

Drawing Title :

Project :

Dwg No :

Client :

Scale :Date :Job Ref :

Rev No.

Rev Description

Rev Date Initials

Size :

THIS DESIGN IS THE COPYRIGHT OF 21 SPACES DESIGN LTD. AND MAY NOT BE REPRODUCED WITHOUT CONSENT

149 The StrandNorth Strand Road

Dublin 3, IrelandTel: +353(0)1 442 9312

www.21spaces .cominfo@21spaces .com

twitter.com / 21spaces

FLOOR TEST FIT: NO. 3Combined Open Plan and Private Offices

Individual work stations: 239Open plan work stations: 205Private Offices: 71 x 07 people3 x 06 people1 x 04 people1 x 03 people1 x 02 people

Meeting rooms: 74 x 04 person2 x 06 person1 x 10 person

Training RoomBreakout spaces: 7ReceptionKitchen Ladies and Gents w/cComms Room