1 SAE Power Lines srl - April 2009 Head Quarters/ Registered Office : Viale T.Edison, 50 20099 - Sesto S. Giovanni (MI) Italy 1926 - 2009 more then 80 years in the Transmission field

1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

Embed Size (px)

Citation preview

Page 1: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

1

SA

E P

ow

er

Lin

es s

rl

-A

pril 2

009

Head Quarters/ Registered Office :Viale T.Edison, 50

20099 - Sesto S. Giovanni (MI)

Italy

1926 - 2009

more then 80 years in the

Transmission field

Page 2: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

2

SA

E P

ow

er

Lin

es s

rl -

April 2

009

Index

1. Company History

2. Company Business

3. Experience

4. Competences

5. Engineering Competences

6. TL’s Special projects

Page 3: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

3

SA

E P

ow

er

Lin

es s

rl -

April 09

1. Company History

SAE S.p.A. is founded to perform the first railway electrification project in

Italy (Bolzano-Brennero line)

SADELMI starts operations in Argentina.

Main activities: power generation, transmission and distribution, industrial

plants and infrastructures

SAE and SADELMI merge and following the acquisition by ABB group,

they originate ABB Sae Sadelmi. The new company acquires Soimi, ABB

Generatori, ABB Flakt Italy and Rebosio, thus strengthening its role of

engineering and contracting company.

ABB Sae Sadelmi divided in two different companies:

•ABB Sae S.p.A

•ABB Sadelmi S.p.A.

ABB Sae divided in two different units:

•ABB Sae Transmission

•ABB Sae Distribution

1926

1988

1998

2000

2005

1947

ABB decision to exit the Powerlines Business.

The Italian ABB Unit sold with the name of: SAE Power Lines

ATSL acquires 100% of the SAE Power Lines share capital2008

Page 4: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

4

SA

E P

ow

er

Lin

es s

rl -

April 09

2. Company Business

Transmission & Distribution (T&D)

• OHTL AC and DC on turnkey basis

• OHTL AC and DC rehabilitation

• Substations on turnkey basis

• Substations rehabilitation

SAE PL acts mainly as a Contracting Company for turn key projects in

the following business areas:

Page 5: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

5

SA

E P

ow

er

Lin

es s

rl -

April 09

3. Experience

SAE Power Lines has worldwide experience in developing

and executing projects as:

EPC Contractor

Partner for Concession Projects and/or merchant systems

Consortium Leader or Consortium Partner

Nominated sub-contractor for partial scope of works

Member of large Consortia for transmission and distribution

schemes (e.g. lines and substations)

Page 6: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

6

SA

E P

ow

er

Lin

es s

rl -

April 09

3. Experience

Alliances and partnerships have been developed over the decades in order

to guarantee the highest levels of reliability and cost competitiveness while

delivering to the highest standards of quality.

Typically SAE Power Lines has consolidated relationships with the following

network of partners:

Detailing firms

Soil and land surveyors

Conductor manufacturers

Steel tower manufacturers

Insulator and line hardware manufacturers

Page 7: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

7

SA

E P

ow

er

Lin

es s

rl -

April 09

3. Experience

Company presence over the years

Turnkey Projects

Engineering and/or supply only

Page 8: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

8

SA

E P

ow

er

Lin

es s

rl -

April 09

3. Experience

Overhead Transmission Lines

during the last 10 years:

more than 3,000 Km

Page 9: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

9

SA

E P

ow

er

Lin

es s

rl -

April 09

3. Experience

The company has a highly skilled and competent

permanent workforce and has access through his

historical ties to resources on contract and/or temporary

basis for:

• Engineering

• Site Management/Supervision

• Construction

making it possible to manage a large number of projects

Page 10: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

10

SA

E P

ow

er

Lin

es s

rl -

April 09

The competences present in SAE PL give the company the

highest expertise available in the Transmission & Distribution

market in the field of:

• Marketing and Sales

• Engineering

• Project Management

• Supply Chain Management

• Site and Construction Management

• QA/QC and Safety

This asset is well known and valued by our worldwide Customers

4. Competences

Page 11: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

11

SA

E P

ow

er

Lin

es s

rl -

April 09

General

• Strong domestic and international experience and presence

• Full T/Lines EPC contracting business process ownership and knowledge

• Unique track records and qualification standing

Marketing & Sales

• Strong Knowledge of Markets and Customers

• Deep partnerships and consortia Culture

• Project development

• Sub-suppliers and sub-contractors knowledge

4. Competences

Page 12: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

12

SA

E P

ow

er

Lin

es s

rl -

April 09

4. Competences

T&D Engineering – Transmission Lines

• Geo-technical: soil investigation, soil stability analysis and tests.

• Civil: foundation design and testing.

• Structural: self supporting and guyed structures design and testing.

• Electrical: grounding, clearances analysis.

• Routing: GPS technology knowledge, satellite maps management, on

site application.

• Tower spotting: route profile definition, optimal distribution of the

transmission towers on the route profile.

• Telecommunication: OPGW and accessories management

Page 13: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

13

SA

E P

ow

er

Lin

es s

rl -

April 09

Project Management

• Strong experience in management of large composite projects worldwide

• Consortia management culture

• Effective supply chain control

• Great knowledge of logistic aspects

• Fast and efficient mobilization capacity

• Local operations within different cultures management

• Risk management

4. Competences

Page 14: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

14

SA

E P

ow

er

Lin

es s

rl -

April 09

Tender docs.

analysis

Proposal

preparation &

Bid submission

Guarantees

&

Final acceptance

Contract

negotiation and

signature

Site activities

(Civil Works

& Erection)

Commissioning

&

Handing over

Engineering

Project Management

Procurement & Logistics

Customer / Consultant

Sales

4. Competences

Project management

Page 15: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

15

SA

E P

ow

er

Lin

es s

rl -

April 09

Offshore Project Team

P.M. Controlling Supply Mngmt & Log.

Project

Director

Project

Engin.

Project

Planner

Project

Controller

Proc./Exp.

& Logistics

Site

ManagerQA/QC

Site Org. Support.

QA/QCP.M. Planning

Engineering

4. Competences

Project management

Page 16: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

16

SA

E P

ow

er

Lin

es s

rl -

April 09

4. Competences

Supply chain management

• Procurement of materials worldwide

• Material tracking

• Vendor List management

• Orders to subcontractors

• Shipping on door to door basis

• Construction equipment management

• Company and Project insurances

Site and Construction Management

• Mobilisation

• Construction method optimisation

• Planning and control of site costs and work schedule

• Subcontractors and own personnel management

• Local interface with customer and consultant

Page 17: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

17

SA

E P

ow

er

Lin

es s

rl -

April 09

4. Competences

QA/QC and Safety

• Quality System Management (ISO 9001)

• QA/QC planning and documentation for projects

• Processes definition and improvement

• QA internal auditing

• Quality control for supplies and works at sites

• QA training

Page 18: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

18

SA

E P

ow

er

Lin

es s

rl -

April 09

5. Engineering Competences

Structural Softwares:

TOWER: linear and non-linear analysis of

lattice structures by Power Line

Systems Inc.

ELDA: linear and non-linear analysis of

lattice structures (In house sw.)

TOSCA: optimisation of lattice structures

through linear analysis (In house sw.)

Page 19: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

19

SA

E P

ow

er

Lin

es s

rl -

April 09

Flexible OHTL design software

5. Engineering Competences

Page 20: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

20

SA

E P

ow

er

Lin

es s

rl -

April 09

Technical softwares for tower detailing and electrical clearances

BOCAD 3D In house software

5. Engineering Competences

Page 21: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

21

SA

E P

ow

er

Lin

es s

rl -

April 09

Drilled Caisson Foundation Rock Anchor Foundation

Grillage Foundation

Foundation design:

in house software's

5. Engineering Competences

Page 22: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

22

SA

E P

ow

er

Lin

es s

rl -

April 09

Line Design

– Plan and Profile

– Tower Spotting

– Sag and Tension

– Optimization of Tower Distribution

5. Engineering Competences

Page 23: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

23

SA

E P

ow

er

Lin

es s

rl -

April 09 DTM

(Data Terrain

Model)

Satellite

Image

+

Management of :

– Aerial photographs

– Satellite image

– DTM

5. Engineering Competences

Page 24: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

24

SA

E P

ow

er

Lin

es s

rl -

April 09

Processing data from satellite

– Orthorectified satellite image by

software with real coordinates

– Identification of major crossing

(road, pipelines, power lines, river)

and other constraints .

– Place the DTM data under the

image to know ground movement

– Choose the best line route to build

the new power line

5. Engineering Competences

Page 25: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

25

SA

E P

ow

er

Lin

es s

rl -

April 09

Use of PLS-CADD software to determine:

– Line-route profile

– Tower Spotting

– Stacking Chart

– Material list table

– 3D virtual line

5. Engineering Competences

Page 26: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

26

SA

E P

ow

er

Lin

es s

rl -

April 09

Environmental Impact

OHTLs are virtually located on the landscape to evaluate their impact

5. Engineering Competences

Page 27: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

27

SA

E P

ow

er

Lin

es s

rl -

April 09

HV Compact Lines

Voltage range up to 400 kV

Environmental advantages:

• Reduction of land occupation

• Reduction of visual impact

• Reduction of right of way

• Reduction of costs

• Reduction of electrical and magnetic

fields

380 kV TL

Dimension comparison

6. TL’s Special Projects

Page 28: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

28

SA

E P

ow

er

Lin

es s

rl -

April 09

New optimized Cold-formed

Sections from steel coils

• Low weight

• Reduced number of members

• Freedom in Tower design (triangular sect.)

Save in material, transport,

erection costs

Environmental Low impact

Cold Formed Technology

for

Power Transmission Lines

6. TL’s Special Projects

Page 29: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

29

SA

E P

ow

er

Lin

es s

rl -

April 09

6. TL’s Special Projects

Pearl River Crossing

500 kV Double Circuit Line

• Country: China

• Scope of work: Engineering, supply, erection and supervision

• Customer: Guangdong General Power Company, China

• Year: 1986-1988

• Voltage: 500 kV

• Number of circuits: 2

• Transmission Capacity: 1600 MW (per circuit)

• Crossing Spans: 931 m + 1547 m

• Height of Suspension Towers: 238 m

• Water Clearance: 70 m

• Weight of one Suspension Tower: 1,040 ton

Page 30: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

30

SA

E P

ow

er

Lin

es s

rl -

April 09

6. TL’s Special Projects

Messina Strait Crossing

380 kV Double Circuit Line

• Country: Italy

• Scope of work: Engineering, supply, erection and

supervision

• Customer: ENEL - Italy

• Year: 1955

• Voltage: 380 kV

• Number of circuits: 2

• Crossing Span: 3.416 m

• Height of Suspension Towers: 215 m

Page 31: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

31

SA

E P

ow

er

Lin

es s

rl -

April 09

Geshm Strait Crossing

230 kV Double Circuit Line

• Country: Iran

• Voltage: 230 kV

• Crossing Span: 1,600 m + 1,000 m

• Foundation: pre-fabricated concrete sea-submersed

• Scope of Work: Turn key contract

• Customer: K.R.E.C.O - Iran

• Year: 1989-1993

6. TL’s Special Projects

Page 32: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

32

SA

E P

ow

er

Lin

es s

rl -

April 09

6. TL’s Special Projects

Yangtze River Crossing

500 kV Double Circuit Line

• Country: China

• Scope of work: Turn key contract

• Customer: East China Electric Power Administration

• Year: 1987-1988

• Voltage: 500 kV

• Number of Circuits: 2

• Transmission Capacity: 2,250 MW (per circuit)

• Crossing Span: 1,820 m

• Height of Suspension Towers: 180 m

• Water Clearance: 48 m

• Weight of one Suspension Tower: 540 ton

Page 33: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

33

SA

E P

ow

er

Lin

es s

rl -

April 09

Pidiregas 407

400 kV Double Circuit Line

• Country: Mexico

• Customer: Commission Federal de Electricidad (CFE)

• Scope: 122 km Transmission Line at 400 kV d.c

from San Luis de Potosì to Anahuac,

plus a 400 kV S/S in Potosì

• Years: 2001 - 2003

6. TL’s Special Projects

Page 34: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

34

SA

E P

ow

er

Lin

es s

rl -

April 09

6. TL’s Special Projects

Pidiregas 409

400 kV Double Circuit Line - Mexico

• Country: Mexico

• Project: Manuel Moreno Torres – Julie

• Length: 120 km TL , plus Aranita Island Crossing

• Customer: Commission Federal de Electricidad (CFE)

• Crossing Spans: 4,500 m with 4 spans

• Years: 2002 - 2004

Page 35: 1926 - 2009 more then 80 years in the Transmission · PDF filemore then 80 years in the Transmission field. 2-9 Index 1. ... •Tower spotting: ... –Place the DTM data under the

35

SA

E P

ow

er

Lin

es s

rl -

April 09

OKPAI –

KWALE PP

NEW SS

ONITSHA

EXTENSION

SS

Okpai 450 MW Power Plant

330 kV Double Circuit Line - Nigeria

• Country: Nigeria

• Customer: Nigerian Agip Oil Company (NAOC)

• Scope: 56 Km Transmission Line and S/S, including

Niger River Crossing

• Years: 2002 - 2005

6. TL’s Special Projects