Page 1: 18-20  November  2009 Geneva

18-20 November 2009Geneva

Innovative transport product«Trans-Siberian Railway for 7 days»

Head of the Department of economic conjuncture and strategic development Russian Railways

Dmitry MACHERET

Page 2: 18-20  November  2009 Geneva

Russian market of container railway transportation

Volume of container railway transportation in Russia, thousands TEU

Structure of container railway transportation in 2008

Russia – China

Russia– Republic of Korea

Russia – Japan

Volume of container railway transportation along the Trans-Siberian Railway in 2008

270 000 TEU

104 000 TEU2005

2008 in 2,6 times

206 000 TEU

55 000 TEU2005

2008 in 3,8 times

57 000 TEU

22 000 TEU2005

2008 in 2,6 times

Including transit 29 000 TEU2008

Total 587 000 TEU

Export, import container transportation

2005 2006 2007 20080

500

1000

1500

2000

2500

3000

1713 18462130

2466

550 682913

1180

185 115 153 155

Total Export, Import Transit

CAGR 12,9%

*CAGR - Compound Annual Growth Rate

1

Domestictransportation45,9%

Page 3: 18-20  November  2009 Geneva

Main objectives for infrastructure development of the Trans-Siberian Railway

Development of cross-border stations Zabaikalsk, Naushki

Completing the construction of the double track on the

line Karymskaya – Zabaykalsk with the

possibility of electrification

Construction (second stage) of the railway bridge across

the Amur river, near Khabarovsk

Development of Nakhodka port-railway junction to operate ports of Vostochny

and Nakhodka2

Construction of new container terminals

Reconstruction of stations in order to handle 71 wagon trains

Modernization and enhancement of energy supply, IT, communications and automatic systems

Construction of new tracks around Perm and Chita rail junctions

Page 4: 18-20  November  2009 Geneva

Formation stages of product «The Trans-Siberian Railway for 7 days»

910 km/day 1100 km/day

1200 km/day

1300 km/day 1400 km/day

Reduction of quantity and duration of stay

Increase in throughput and routeing speed

Throughput increase

Increase in routeing speed

- New car development

Nakhodka– Krasnoe 9847 km

Updating of standard and legal base

Optimisation of warranty leg

Increase in throughput and routeing speed

Adoption of automatic control system with use of «the electronic waybill»

Increase in throughput and routeing speed 1500

km/day

10,8 days9,0 days

8,2 days7,6 days

7 days6,6 days

2008

(37,9 km/h ) (45,8 km/h ) (50,0 km/h ) (54,2 km/h ) (58,3 km/h ) (62,5 km/h )

20102009 2011 2012 2015and further

2009 2010 2011 2012

Technological improvement

Organizational actions

Change of legal base

Improvement of the tariff policy

Technical improvement

3

Page 5: 18-20  November  2009 Geneva

International projects of Russian Railways

Project of 1520 broad line construction to Bratislava and

Wien

Participation in development of Mongolian

Railway

Cooperation with Chinese railways in organizing Euro-Asian treight market

Reconstruction of Hassan-Rajin section and container

terminal construction in Port Rajin

Railway and ferry-boat traffic Ust-Luga – Baltiisk - Zassnits

Establishment of joint venture between «TransСontainer» and «Kaztransservice»

Joint venture «Trans-Eurasia Logistics» with DB AG company is created to organize transportation of container cargoes on

transcontinental routes

«TransContainer» rents Slovak terminal Dobra

The new joint Russian-Chinese enterprise will act as a route which

is passing through frontier post Zabaykalsk - Manchuria

Making-up of international alliances between the interested railways is the necessary condition of railway transportation competitive advantages realization on the Eurasian direction. 4

Page 6: 18-20  November  2009 Geneva

Target priorities of product «The Trans-Siberian Railway for 7 days»

5

Improving transportation

service

Targetpriorities of

«Transsib in 7 days»

Technological changes

Infrastructure development

Legal base perfection

Tariff regulation

• Adoption of the wide Rules of container transportation• The international normative base improvement

• Competitive tariffs• Stability of tariff policy• Stabilization of tariff

validities to 2 – 3 years• Setting container

transportation tariffs for a container carriage and for a container train

• Infrastructural high-speed limitations removal

• Modernization and construction of new container terminals

• Easy document turnover

• Compliance with train schedule

• Regularity of transportation service

• Speed increase up to 90 km/h

• Updating of a rolling stock

• Modern information systems introduction

Page 7: 18-20  November  2009 Geneva

- setting the specialized arrival-departure ways for container trains at railway stations

- coordination of locomotives and locomotive brigades with container trains- installation of first priority technical and commercial surveys for container trains

and overlapping of servicing deports and stations of locomotive change

- stage-by-stage increase of routing speed of container trains from 910 km/day now to 1400 km/day in 2012 on the basis of the improvement of technology of their passing and setting the maximum speed up to 90 km/h

- development of information systems, including introduction of uniform electronic document turnover and the electronic-digital signature, and automated system of customs bodies preliminary informing and declaring of cargoes

Technological improvement

Organizational actions

- infrastructural high-speed restrictions removal up to opportunities of a rolling stock

- modernization and construction of the new container terminals, capable to accept full container trains and provide fast and effective processing of trains, including fast transshipment of containers from one train to another

Technical improvement

The basic actions for formation and promotion of product «The Trans-Siberian Railway for 7 days»

6

Page 8: 18-20  November  2009 Geneva

- stabilization of tariff validities for container transportation up to 2-3 years- setting container transportation tariffs for a container car and for a container train

(now the tariff is set for a container)- consideration of replacement of cargoes support and protection by insurance and

complex decrease of railway-irrelevant component of the through tariff of door-to-door delivery

Tariff regulation

- introduction of additions and amendments into clause 13 of Federal statute «The Charter of a railway transportation of the Russian Federation» regarding its requirements for container trains

- adoption of of Rules of transportation by container trains regulating the order and conditions of cargoes transportation in large-capacity universal and specialized containers

- improvement of normative base within the framework of the Agreement on the international railway cargo service (SMGS)

-development and adoption of the law «About transit transportations through territory of the Russian Federation»

Legal base perfection

The basic actions of formation and promotion of product «The Trans-Siberian Railway for 7 days»

7

Page 9: 18-20  November  2009 Geneva

Development of product «The Trans-Siberian Railway for 7 days» in 2009

8

2 threads of the accelerated container train are installed on a route Nakhodka – Moscow. Train passes the distance of 9270 km for less than 8

days. Average route speed - over 1160 km/day

The joint working group with the Belarus Railway is created for prolongation of a «The Trans-

Siberian Railway for 7 days» route up to station Brest.

Certain parameters of platform design completion are set to increase the maximum

speed of container train up to 90 km/h.

Reasoning for the additions to be introduced in the operating normative base is prepared to achieve the key parameters of product «The

Trans-Siberian Railway for 7 days».

√√√

Page 10: 18-20  November  2009 Geneva

Krasnoe

Nakhodka

Tyumen

Sverdlovsk

Novosibirsk

KhabarovskChita

Krasnoyarsk

Nizhny Novgorod

Irkutsk

Moscow

PetrovskyZavod

TayshetKarymskaya

9

Perspective communication links for attraction of additional transportation volumes on the Russian part of international corridor «East-West»

Finland

China KoreaJapan

GermanyPoland

Ukraine

Austria

EstoniaLatvia

LithuaniaCzech

RepublicSlovakia

HungarySlovenia

It is necessary to integrate the efforts of all participants of transport-logistical chain

In 2015 perspective transportation volumes of transit container cargoes in Eurasian

communication, gravitating to the Trans-Siberian Railway, are estimated at a level of more than 500 thousand TEU for expensive

cargoes, sensitive to terms of delivery.Including empty containers traffic – at a level

of 700 thousand TEU.

Page 11: 18-20  November  2009 Geneva

Thank you for your attention!