  • 8/2/2019 174300201ccle11

    1/14

    Alcatel-

    Lucent GSM

    B9/B10 9120 BSC

    Software Migration

    MPI20 / MDR1 - CCL

    BSS Document

    3BK 17430 0201 QZZZA Ed.11 1/ 14

  • 8/2/2019 174300201ccle11

    2/14

    B9/B10 Software Migration

    Release B10

    3BK 17430 0201 QZZZA Ed.11 2/ 14

  • 8/2/2019 174300201ccle11

    3/14

    Status RELEASED

    Short Title MPI20 / MDR1

    All rights reserved. Passing on and copying of this document, use

    and communication of its contents not permitted without written

    authorization from Alcatel-Lucent.

    3BK 17430 0201 QZZZA Ed.11 3/ 14

  • 8/2/2019 174300201ccle11

    4/14

    B9/B10 9120 BSC Software Migration

    MPI20 / MDR1 - CCL

    Identification

    Customer

    Country

    OMC-R Site Name: Address:

    Name: Address:

    Alacatel-LucentRepresentative (s)

    CustomerRepresentative (s)

    Customer ContractorRepresentative (s)

    Date, Time andDuration of Work

    Start End Duration

    General Remarksfrom Customer GeneralRemarks fromAlcatel-Lucent

    3BK 17430 0201 QZZZA Ed.11 4/ 14

  • 8/2/2019 174300201ccle11

    5/14

    Applicable Documents

    Fill in the edition of the applicable documents

    Document Title Document Reference Edition

    B9/B10 A9120 BSC Software Migration 3BK 17430 0201 RJZZA

    B10 BSS Methods Handbook 3BK 21268 AAAA PCZZA

    BSS Surveillance Handbook 3BK 21206 AAAA PCZZA

    BSS Configuration Handbook 3BK 21201 AAAA PCZZA

    BSS Configuration Rules 3BK 17430 5000 PGZZA

    Technical Status Information (TSI) 3BK 17430 0003 PCZZA

    B9 / B10 BSS Software Migration MPI20 / MDR1 Completion CheckList (CCL)

    3BK 17430 0201 RJZZA

    Applicable ITL

    Information

    Fill in the site data.

    OMC-R Hostname

    User Name

    Password

    Cases and Options

    Enter a cross for the applicable case or option.

    C1 Load SDP Package and CDE Table from the CD-ROM

    C2 Load CDE Table from the floppy

    C3 MFS is associated with the BSC.

    O1Suspend the software migration session before the "activate B10 Software Package"task because this task involves outage.

    O2Set spare GPU in the old (B9) MFS version when the last GPU (from telecom subrack) isrejected during the reverse procedure.

    Software & Documentation Versions

    Fill in the appropriate INITIAL and FINAL software versions.

    For BSS reshuffling methods, the INITIAL and FINAL versions are equal.For installation methods, the INITIAL version is "-".

    Initial Version Final Version

    OMC-R

    NPA

    RNO

    LASER

    BSS

    MFS

    DocumentationVersion

    3BK 17430 0201 QZZZA Ed.11 5/ 14

  • 8/2/2019 174300201ccle11

    6/14

    Results Table

    Fill intheResultsTableaccording to

    thefollowing rules:

    YES: Put a cross here if the task was performed

    NO: Put a cross here if the task was not performed

    N.A: Put a cross here if the task is not applicable

    S.A: Enter the number of solved anomalies

    N.S.A: Enter the number of non-solved anomalies

    Scenario Description

    Initial Checks

    YES NO N.A S.A N.S.A

    Global Checks

    CheckDirectories inExportOperationWindow

    Check Statusof SoftwareReplacement

    CheckPresence ofSDP Packageand CDE table

    Performed by Site DateStartTime

    EndTime

    Duration

    Backup Software Package

    YES NO N.A S.A N.S.A

    Backup BSCDatabase

    Check DLSBackup

    GenerateComplete BSSSoftwarePackage

    Copy packageto USBmemory stick

    Copy Package

    Using Ftp

    Performed by Site DateStartTime

    EndTime

    Duration

    3BK 17430 0201 QZZZA Ed.11 6/ 14

  • 8/2/2019 174300201ccle11

    7/14

    C3: Save B9 BSC Radio Configuration

    YES NO N.A S.A N.S.A

    C3: Save B9BSC Radio

    Configuration

    Performed by Site DateStartTime

    EndTime

    Duration

    Load New B10 Software Package

    YES NO N.A S.A N.S.A

    Load CDETable fromLocal Floppy

    Drive

    Load CDETable fromRemote SUNMachineFloppy Drive

    Performed by Site DateStartTime

    EndTime

    Duration

    Deactivate PM JobsYES NO N.A S.A N.S.A

    Deactivate PMJobs

    Performed by Site DateStartTime

    EndTime

    Duration

    Start Migration to B10

    YES NO N.A S.A N.S.A

    Disable DLSBackup

    Generate BSSDownloadSoftwarePackage

    Performed by Site DateStartTime

    EndTime

    Duration

    Download and Predownload New B10 Software PackageYES NO N.A S.A N.S.A

    Download

    3BK 17430 0201 QZZZA Ed.11 7/ 14

  • 8/2/2019 174300201ccle11

    8/14

    SoftwarePackage

    PredownloadSoftwarePackage

    O1: SuspendSoftwareMigration

    Performed by Site DateStartTime

    EndTime

    Duration

    Activate New B10 Software Package

    YES NO N.A S.A N.S.A

    O1: RestartSoftwareMigration

    ActivateSoftwarePackage

    Performed by Site DateStartTime

    EndTime

    Duration

    Resynchronize BSS with MFS

    YES NO N.A S.A N.S.A

    Resynchronize

    BSS with MFSPerformed by Site Date

    StartTime

    EndTime

    Duration

    3BK 17430 0201 QZZZA Ed.11 8/ 14

  • 8/2/2019 174300201ccle11

    9/14

    Final Checks

    YES NO N.A S.A N.S.A

    Check GPUSoftware

    Global Checks

    Test GSM Calls

    Test GPRSCalls

    Performed by Site DateStartTime

    EndTime

    Duration

    Accept New B10 Software Package

    YES NO N.A S.A N.S.A

    AcceptSoftware

    Package

    Close SoftwareManagementWindow

    Performed by Site DateStartTime

    EndTime

    Duration

    Activate PM Jobs

    YES NO N.A S.A N.S.A

    Activate PMJobs

    Performed by Site DateStartTime

    EndTime

    Duration

    3BK 17430 0201 QZZZA Ed.11 9/ 14

  • 8/2/2019 174300201ccle11

    10/14

    Reverse Procedure

    Reject Software Package

    YES NO N.A S.A N.S.A

    RejectSoftwarePackage

    Performed by Site DateStartTime

    EndTime

    Duration

    Open Software Management Window

    YES NO N.A S.A N.S.A

    Open SoftwareManagementWindow

    Performed by Site Date

    Start

    Time

    End

    Time

    Durati

    on

    Check GPU Software

    YES NO N.A S.A N.S.A

    Check GPUSoftware

    Performed by Site DateStartTime

    EndTime

    Duration

    Set Spare GPU

    YES NO N.A S.A N.S.A

    Set Spare GPUfor 9135 MFS

    Set Spare GPUfor 9130 MFSEvolution

    Performed by Site DateStart

    Time

    End

    Time

    Durati

    on

    Activate Backup PRC

    YES NO N.A S.A N.S.A

    ActivateBackup PRC

    Performed by Site DateStartTime

    EndTime

    Duration

    Activate PM Jobs

    3BK 17430 0201 QZZZA Ed.11 10/ 14

  • 8/2/2019 174300201ccle11

    11/14

    YES NO N.A S.A N.S.A

    Activate PMJobs

    Performed by Site DateStartTime

    EndTime

    Duration

    Activate SMS-CB

    YES NO N.A S.A N.S.A

    Activate SMS-CB

    Performed by Site DateStartTime

    EndTime

    Duration

    Resynchronize BSS and MFS

    YES NO N.A S.A N.S.A

    ResynchronizeBSS and MFS

    Performed by Site DateStartTime

    EndTime

    Duration

    3BK 17430 0201 QZZZA Ed.11 11/ 14

  • 8/2/2019 174300201ccle11

    12/14

    Abort Software Package

    YES NO N.A S.A N.S.A

    Abort SoftwarePackage

    Performed by Site DateStartTime

    EndTime

    Duration

    Enable DLS Backup

    YES NO N.A S.A N.S.A

    Enable DLSBackup

    Performed by Site DateStartTime

    EndTime

    Duration

    Close Software Management Window

    YES NO N.A S.A N.S.A

    Close SoftwareManagementWindow

    Performed by Site DateStartTime

    EndTime

    Duration

    3BK 17430 0201 QZZZA Ed.11 12/ 14

  • 8/2/2019 174300201ccle11

    13/14

    Unavailability Duration Sheet

    Fill in the unavailabilityduration sheetaccording to thefollowing rule:

    Section Title Title of the paragraph where the unavailability occured

    Unavailability type Tfor traffic interruption, Rfor traffic reduction, Sfor loss of supervision(T,R and S could be held simultaneously)

    Equipment Equipment with its number (eg BTS-1)

    Date Date expressed as: yy/mm/dd

    Start time Start time expressed as: hh/mm/ss

    End time End time expressed as: hh/mm/ss

    UnavailabilityType

    Equipment Date Start Time End Time

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    Section Title

    3BK 17430 0201 QZZZA Ed.11 13/ 14

  • 8/2/2019 174300201ccle11

    14/14

    Anomaly Sheet

    Fill in the unavailability durationsheet according to the followingrule:

    Section Title Title of the paragraph where the anomaly occured

    Brief description of the anomaly Summarize the anomaly (details must be in anomaly report)

    Anomaly report Anomaly report was sent or no

    Solved byName of the technician who solved the anomaly Date of anomalysolving

    Description Solved by

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    Section Title:

    Brief description of the anomaly:

    Anomaly report: Y/N

    Name:

    Date:

    3BK 17430 0201 QZZZA Ed.11 14/ 14