Johor Bahru City Centre
Part 3 Physical Planning Initiatives
CHAPTER 13
Section B Planning and Implementation
13 - 1
NUSAJAYA
JB CITY CENTRE PASIRGUDANG
SENAIULU
TIRAM
KULAI
KEMPAS
PEKANNENAS
KUKUP
13.1 Introduction
Johor Bahru, capital city of the State of Johor, has its area defined
within the Inner Ring Road – 1124.97 acres of land extending from
the inner ring road to Jalan Abu Bakar - Jalan Tun Dr Ismail. Its dense
development and clearly by defined streets, made up of a hierarchy
of major and minor roads, that leads to the Johor Bahru waterfront
is accessorised with high commercial and government institutional
activities. The capital city has a strong iconic building, Sultan Ibrahim
Building on Bukit Timbalan that currently houses the State Administration.
Skyscrapers clustered within the city centre houses banks, regional
offices and large corporations; especially those along Jalan Tun Abdul
Razak, Jalan Wong Ah Fook and Jalan Trus. The low scale development,
dominated by traditional shop houses and retail outlets of high
pedestrian activity, are found in the southern part along Jalan Meldrum,
Jalan Segget and Jalan Ibrahim.
The Johor Bahru city is growing northwards and now a high pattern of
linear development can be seen along the northern part of Jalan Tun
Abdul Razak towards Skudai and Senai.
While there has been some recent signs of revival in the retail sector,
there is a need to create a shopping street or ‘golden mile’ of shopping
haven in Johor Bahru. This is necessary in order to revitalise the once
renowned strength of the city in retail and trading.
Figure 13.1: Location Map of Johor Bahru CBD in Context of SEC
Source: SJER CDP 2025
Johor Bahru City Centre
A. Existing Use and Activities
The Johor Bahru city centre has currently a blend of activities. As the
capital city, a large part of the city centre is devoted to the state
administration departments. This is reflected in the 34.9% use of land
in the city as institutional and government reserves, the single largest
category in the city. Land use by other sectors such as residential
and commercial are relatively lower especially when compared to
the amount of infrastructure available in the city centre. Hence, the
composition of infrastructure with respect to the activities carried out
needs to be more balanced in order for Johor Bahru to enhance its
position as the main city centre for SJER.
chapter 13
13 - 2
SECTION B PLANNING AND IMPLEMENTATION
Abu Bakar Mosque
Grand Palace Bukit Timbalan
Bukit Cagar
No Land Use Activities Acreage (ac) %
1 Housing 144.48 12.842 Commercial and Retail 75.56 6.723 Institutional and
Government Reserves392.80 34.92
4 Mixed Development 102.45 9.115 Promenade 28.00 2.49
6 Roads and Rail 179.03 15.91
7 Free Access Zone 68.42 6.08
8 Open Space and Undeveloped Land 105.20 9.359 Infrastructure and Utilities 29.03 2.58
TOTAL 1124.97 100.00
Table 13.1: Existing Land Use
Figure 13.2: Johor Bahru City Centre and Land Use Activities
Source: SJER CDP 2025
Source: SJER CDP 2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 3
The development of the city encroaches into the boundaries of
these urban villages especially areas along the inner ring road. Such
encroachment leads to development pressure on these villages, which
were once prime residential areas of Johor Bahru. Significant effort is
therefore required to better the quality of life in these urban villages. In
the long term, these villages should be sensitively redeveloped to create
better planned neighbourhoods with amenities and utilities.
B. Residential Development
Johor Bahru city centre is experiencing an increase in residential
communities where old government housing lands, on Bukit Saujana
and Jalan Yahya Awal, have been transformed to make way for higher
density housing. Concurrently, this has increased the city’s population;
an important factor of the city’s livelihood. As at 2005, it was estimated
that over 18,800 people spread over 139.32 acres of residential land
lived in the city centre. This increases the density of the city centre area
to a gross density of 15 people per acre – but still low compared to
other cities that assume the role of being a capital city.
C. Urban Villages
Johor Bahru city centre has several urban villages, Kg. Mahmoddiah, Kg.
Kubur, Kg. Wadi Hana and traces of Kg. Ngee Heng and Kg. Ah Siang,
within its defined boundary and this makes up the broader population
base of the city. These urban villages, which are mainly Malay villages,
accounts for up to 55.97 hectares of land and is estimated to have a
population of 5,597 people.
Name of Urban Villages Acreage (hectares)
Kampung Mahmoddiah 11.35Kampung Ngee Heng 1.17Kampung Gertak Merah 10.77Kampung Kubur 7.41Kampung Masjid 3.85
Kampung Wadi Hana 21.42
TOTAL 55.97
Table 13.2: Urban Villages in Johor Bahru City
Figure 13.3: Existing Malay urban villages in City Centre
Source: SJER CDP 2025
Kg. Wadi Hana
Kg. Ngee Heng
Kg. MahmoddiahKg. Kubur
Kg. Gertak Merah
Source: SJER CDP 2025
Kg. Mahmoddiah
Kg. Wadi Hana
Kg. Ngee Heng
Source: SJER CDP 2025
SECTION B PLANNING AND IMPLEMENTATION
The shop houses along Jalan Tun Abdul Razak, Jalan Selat Tebrau,
Jalan Ibrahim, Jalan Trus and Jalan Wong Ah Fook are where traders
from Arab, India and China used to come to trade spices and tobacco
and there are more than 246 shophouses with great heritage value that
can be found here – mostly built in the 1920’s.
E. Recent Development
The latest addition of development in the city centre is the Johor
International Convention Centre (JICC), also known as Persada Johor.
It is located on a 2.43 hectare site next to the Puteri Pacific Hotel. The
convention centre has a built-up area of 24,022 sq.m. (258,579 sq.ft.).
It will be the leading multi-purpose facility in Johor where various trade
shows and conventions will be held. The convention centre has a
maximum capacity of up to 3500 delegates.
Other future development in Johor Bahru, of a sizeable scale, will be the
Integrated Southern Gateway (Gerbang Selatan Bersepadu) complex.
It comprises mainly of the Customs Office; immigration and quarantine
complex (almost 230,000 sq.m), and the Immigration checkpoint and
the Johor Bahru Sentral; a transportation hub that will integrate trains
and buses and in the future light rail system for the city.
D. Heritage in Johor Bahru City Centre
The city of Johor Bahru has a rich history that dates as early as the 16th
century. The urbanisation of Johor began in 1855 when its ruler, of the
Temenggong Lineage, marked the beginning of Modern Johor. This was
followed later by the 21st Sultan of Johor – Sultan Abu Bakar (1862-1895)
who laid the foundation for developing Johor into a modern state. This
has transformed Johor Bahru from a fishing village into a thriving city.
Today the city reflects its rich history through buildings like the Sultan
Ibrahim Building, the Sultan Abu Bakar Mosque, and the Grand Palace
or Istana Besar Johor. The Istana Besar boasts a distinct Anglo-Malay
architecture and houses the museum where priceless treasures of
the Royal Collection are showcased. In addition the Johor Bahru
Railway Station and Maktab Sultan Abu Bakar (English College) are
also significant landmarks. These buildings have become an important
part of Johor Bahru’s urban fabric and are heritage landmarks of the
city. These buildings are significant not only from Johor but also from a
national standpoint as many historical events of national importance
has occured here. Thus, it is important that these buildings be retained
and classified as the heritage of the city.
Figure 13.4: Heritage Shophouse Buildings in Johor Bahru City
Source: SJER CDP 2025
Bukit Timbalan Shophouses in Johor Bahru
13 - 4
2006-2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 5
F. Government Reserves/Special Use
Most of the land in the city centre cannot be developed especially
those classified under special land uses like the Grand Palace (Istana
Besar), the Abu Bakar Mosque and the Bukit Timbalan. There are also
many lands owned by government institutions that houses established
schools and government quarters. These government reserve lands
possess prime property value and the limitations to develop these lands
have led to other solutions in overcoming the challenge in making the
city alive and vibrant. These special land usages can be integrated with
the new development because non-economic and non-heritage value
land can still be put to better use under the CDP.
G. Land Supply in Johor Bahru City Centre
With exisitng developments and the large portions designated for
special use, Johor Bahru has limited land supply. The following areas
listed below have been identified as potential areas for development or
redevelopment
Table 13.3: Potential Land Supply for Development in Johor Bahru
Activities in Johor Bahru City
Potential Use and Supply for New Land
Land Acreage (hectares)
Special Uses Bukit Serene Palace,Royal Cemetery,Sultan Abu Bakar Mosque.
To be preserved as landmarks and statement of history and culture to the city.
68.16
CIQ – Areas committed for integrated development.
To become a major catalyst for the eastern part of Johor Bahru City.
31.69
Bukit Timbalan – State administration that will be moved to Nusajaya.
It has the potential to be developed as the Centre for Arts and Culture of Johor as well as a Museum. Bukit Timbalan’s extensive area can then be opened up as part of the city’s greenery.
11.20
Activities in Johor Bahru City
Potential Use and Supply for New Land
Land Acreage (hectares)
Traditional Shophouses – In the vicinity of Jalan Trus, Jalan Dhoby, Jalan Meldrum.
To be preserved and conserved; especially the traditional shop houses that are already identified as heritage buildings. In-fill development are encouraged, however design controls need to be enforced.
na
Government Land/UseGovernment quarters, former prison and vacant lands.
It has the potential to be redevelop as current use is uneconomical in context of city centre status of Johor Bahru
4.48
Coastal WaterfrontRoads and pockets of commercial development
It has potential to be developed for public usage; parks, plazas and low rise commercial can create a new waterfront for Johor Bahru City
149.13
Established housing and commercial developmentResidential, offices, shopping complex and hotels etc.
To be enhanced with streetscape beautification programmes and incorporated into the whole city planning.
na
13.2 Goal
GOAL:JB 1: Regenerate Johor Bahru into a vibrant economic centre while
preserving its cultural and heritage values.
The key development strategy for the SEC is to regenerate Johor Bahru
into a vibrant economic centre while preserving its cultural and heritage
values. Existing cities like Johor Bahru has much to offer as its heritage
and cultural values are important urban elements that give soul and
character to the city.
Thus, the development of SJER and the economic revitalisation of SEC
must not neglect Johor Bahru as an important urban centre that has
existed since the 20th Sultan; Temenggong Tun Daeng Ibrahim officially
declared Johor Bahru as the Johor state capital that we know today.
13 - 6
SECTION B PLANNING AND IMPLEMENTATION
Bukit Cagar
BukitTimbalan
Grand Palace
Abu Bakar Mosque
Conservation & Heritage ZoneHeritage Park Zone 1New Emerging CommunitiesAreas Potential for RedevelopmentRoyal Heritage Cemetery ZoneExisting & In-fill Development ZoneIntegrated New DevelopmentNew Coastal DevelopmentBoundary
Figure 13.5: Proposed Land Use Activities for Johor Bahru City Centre
Regenerating Johor Bahru city needs a comprehensive plan that
will include action plans such as urban redevelopment and urban
beautification.
Though Johor Bahru is not as old as some cities and towns in Malaysia,
regeneration is part of the evolution stage of town planning and it can
play a major role in enhancing the urban landscape of Johor Bahru
that has, over the years, been neglected due to urbanisation. Such
programme will also make inner city living more viable as more parks
and amenities can be made available.
Source: SJER CDP 2025
Various areas will be identified for enhancement and proposals for
renovation and reinvestment will benefit the city from the economic
and social aspects. An important aspect of urban regeneration is the
need to be sensitive to preserve and even enhance the sense of local
community that has been built over many generations.
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 7
13.3 Objectives
Objective 1- Create a distinct Central Business District (CBD)Johor Bahru lacks the focal point that most world-class cities have. This
undefined core area is one of the key elements that is currently missing
in the city centre. This focal point would help to further reemphasise its
importance as a major business centre. By creating an urban core in the
city centre, it could further enhance real estate values in the vicinity to
create opportunities for new development areas that is lacking in the
city centre.
Objective 2 - Encourage diversity in terms of land use, activities and built formThis requires an enhancement of existing uses complemented by the
introduction of new ones within the city. Diversity should encourage
retail, commercial, office, residential, entertainment, cultural and both
active and passive recreational uses in the city centre.
Objective 3 - Encourage Brownfield DevelopmentDue to limited land supply in the central area, brownfield and in-fill
development are to be encouraged. Uneconomical use of prime lands
must be avoided. Instead, developments that create new land banks
for real estate development should be explored to enhance the city’s
needs for quality living environment and sustainable developments.
Objective 4 - Encourage living in the cityIn order to sustain the city centre, people must be encouraged to
live in the city. This will allow the city to grow and ensure a sustainable
economy for the city. As a city that wants to attract international
businesses, 24-hour activities are important. Currently, the percentage
of people living in the city is low and mostly made up of those staying in
the government quarters and the Malay urban villages. Even so, these
are currently low density and low quality homes.
Objective 5 - Foster physical continuity and connectivityJohor Bahru city centre needs physical continuity spaces to allow the
freedom of movement as this is in line with prioritising the pedestrians.
Furthermore, there is a need to upgrade the public transportation
system.
Objective 6 - Reinforce the unique local character and heritage featuresHeritage references should be incorporated into the designs used
for in-fill developments that are within conservation areas. The new
developments at certain designated zones should complement the
local character of the area.
Objective 7 - Preserve and enhance natural environmentEvery effort to be made to enhance and preserve the natural
environment and access to it in respect of rivers, mangrove areas, forest
reserves in the city.
Objective 8 - Promote a vibrant cultural atmosphereArts, entertainment and other cultural activities are vital elements of
the city centre and these activities should be encouraged since it also
promotes economic development, tourism, international prestige and
improves the quality of life.
Objective 9 - Preserve important view corridorsWithin the city centre, there are significant views and vistas, including
the Straits of Tebrau, Bukit Timbalan, the Grand Palace – Istana Besar
and the Sultan Abu Bakar Mosque. This needs to be preserved.
Objective 10 - Promote public artPublic art reflects the identity of a city and it is the voice of the local
communities and helps to strengthen relationships between diverse
groups. As the southern gateway of the country, Johor Bahru will be
able to showcase the country’s arts heritage to visitors. Public art will be
displayed in allotted areas around the city.
Objective 11 - Promote approriate street activityCreate public activities along the streets, including sidewalks, seating
areas and dedicated areas for vendors. New development that
accommodates intense street level activity should be encouraged.
Efforts made in Jalan Meldrum and Jalan Wong Ah Fook should be
continued throughout the inner part of Johor Bahru city that is still within
a 300 – 400m radius; accessible to pedestrians.
13 - 8
SECTION B PLANNING AND IMPLEMENTATION
380m
Objective 12 – Enhance the Waterfront areas of Johor Bahru City
A special feature of Johor Bahru City is the waterfront area that faces
Singapore. Opportunities should be taken to enhance the waterfront
area with priorities are focused on having public parks and plazas.
13.4 New Business District for Johor Bahru City
KEY DIRECTION:JB 2: Create a New Business District for Johor Bahru that will enhance
the physical, economic and social environment of the city centre.
Johor Bahru needs a strong sense of place that is attractive, appealing
and marketable. People interpret places in relation to their existing
surroundings. If new buildings and spaces are to inspire confidence in
investors and local communities, they should be designed to reinforce
local identity, both cultural and physical, conserve the best features
and respond to local patterns of circulation and use. This is particularly
important for brownfield sites where such development represents an
opportunity to reclaim an area often perceived as degraded and not
cost-effective.
Figure 13.6: Walking radius within the City Centre
Source: SJER CDP 2025
Jalan Tun Abdul Razak, Jalan Wong Ah Fook and Jalan Bukit Timbalan
area is currently the focal point of the city; it is where the hive of activity
is. The area is the site of important buildings such as the office of the
Johor Bahru City Council, Kota Raya shopping mall, the Ansar building,
the Puteri Pacific Hotel (an urban development project built over what
used to be Kampung Pahang) and Sultan Ibrahim Building at Bukit
Timbalan, itself an iconic symbol of Johor Bahru. A new convention
centre, Persada Johor will add value to the city centre. This area is
almost fully built-up though there are small pockets of land, which will
need quality in-fill development.
Therefore, there is a need to look at areas beyond this current focal
point area; where quality urban spaces can be created and new
opportunities for inner city developments can take place. The area
outlined by Jalan Abdul Rahman Andak – Jalan Ayer Molek, where the
former prison and the government quarters are, have great potential
to become part of the urban core for Johor Bahru city centre. When
combined with the existing core area, Jalan Bukit Timbalan, a new CBD
for Johor Bahru city centre can be created.
Figure 13.7: The City Centre and Proposed New Business District
Source: SJER CDP 2025
Johor Bahru City Centre1124.97 ac
Johor Bahru New CBD392.40 ac
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 9
The Development Approach
In creating a new business district for Johor Bahru, the approach is to
create a new and bigger core area for the city. The new business district
will create a new business address for the city that must be of a sizeable
size of land development.
Thus, the proposed new CBD for Johor Bahru will encompass a total
area of 392.40 acres of land or 35.2% of Johor Bahru city centre.
Planning Precincts
The proposed CBD covers an area of 436.58 acres of land and three
main precincts have been defined for the proposed CBD that will
require comprehensive planning and development. The planning
precincts identified are:
• The Johor Bahru City Waterfront Precinct;
• The Heritage Precinct; and
• The Business and Central Park Precinct.
Figure 13.8: Development approach of the proposed CBD
Functions of the Three Precincts
The three identified precincts have three distinct functions that will
enhance the role of the CBD.
Table 13.4: Functions of Three Main Precincts in CBD
Precinct Function of Area
The Johor Bahru City Waterfront Precinct- A Land Reclamation and Urban Beautification Programme
• Public Space and
Recreation
• Retail and Tourist Shopping
• Dining and Entertainment
• Festival Market – Local
Crafts
The Heritage Precinct- A Conservation Programme
• Arts & Culture
• Administration
• Small Professional Offices
• Tourism – Hotels and Tourist
Operators
• Retail
The Business and Central Park Precinct- A Redevelopment Programme
• Financial and Business
Centres
• Central Park and Open
Spaces
• Mixed and Integrated
Development
• Residential – Apartments
and Service Apartments
• Corporate Offices
• Big Box Retail Centres
(Malls)
• Tourism – 5 star Hotels
• Convention
Source: SJER CDP 2025
Source: SJER CDP 2025
13 - 10
SECTION B PLANNING AND IMPLEMENTATION
13.5 The Master Plan of Johor Bahru the Proposed CBD
The master plan for the CBD is intended to regenerate the older and
uneconomical land into prime properties; but most importantly, it will
create the much needed public spaces and public amenities in the city
to meet the needs of its increasing young population.
A. Creating Parks and Public Realms
More than 35.51 acres of land will be dedicated to parks and public
realms. These spaces do not only enhance the built environment of the
area but also provides the ‘breathing’ space a city needs. A Central
Park of 18.5 acres of land will be created in the Business and Central
Park Precinct as a main feature of the urban redevelopment program.
The Central Park takes the design of a linear park so as to enhance
properties surrounding it and to allow easy public access from various
points of the CBD.
B. Network of Greens and Pedestrian
The Central Park will be part of a network of parks in the city centre. A
network of pedestrian linkage provides connectivity to the overall CBD
area that links residential areas to offices and shopping areas. The park
system will include the Bukit Timbalan Park, which will be opened to the
public once the state administration moves to Nusajaya, and eventually
terminates at the park in the Johor Bahru Waterfront precinct.
Figure 13.10: Illustrative Master Plan for Johor Bahru CBD
Figure 13.9: Green and Pedestrian Network
Pedestrian NetworkGreen Network
Source: SJER CDP 2025Source: SJER CDP 2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 11
C. A New Business Address and Economic Opportunities
The redevelopment of Johor Bahru CBD is to provide a new premium
address in Johor Bahru. New land banks are created around the Central
Park and this will be offered as prime business offices and retail spaces.
These new space provides opportunities for new economic initiatives to
be sited here. Creative industry initiatives can be one of the major uses
of activities here. This will also lead to demand for inner city living and
retail spaces that the Johor Bahru Business and Central Park precinct
needs.
Seventeen parcels of land can be partitioned over the 93.22 acres of
space. These potential sites ranges from 1.5 to 10 acres plot of land and
its prospective use and its guiding plot ratios are indicated below. This
illustrates the potential of development available within the new CBD area.
Table 13.5: Potential Land made available in New CBD
AMPHITHEATRE
GARDEN
CENTRAL PLAZA
RIVER
Figure 13.11: Illustrative Master Plan for Johor Bahru Central Park
Source: SJER CDP 2025
Plot Acreage (ac) Potential and Prefered
Use
1 5.39 MIXED USE
2 11.14 MIXED USE
3 7.71 MIXED USE
4 3.39 COMMERCIAL
5 10.54 MIXED USE
6 3.32 COMMERCIAL
7 3.07 COMMERCIAL
8 8.06 RESIDENTIAL
9 6.60 COMMERCIAL
10 3.42 RESIDENTIAL
11 1.67 COMMERCIAL
12 4.56 COMMERCIAL
13 5.27 RESIDENTIAL
14 5.30 MIXED USE
15 5.88 RESIDENTIAL
16 2.29 COMMERCIAL
17 2.13 COMMERCIAL
18 3.48 COMMERCIAL
TOTAL 93.22 Source: SJER CDP 2025Note : Based on Table 13.5, it is estimated that the total built up area of 18 million sq. ft of commercial floor space can be made available to new business opportunities and investors.
13 - 12
SECTION B PLANNING AND IMPLEMENTATION
Figure 13.12: Plan Indicating New Plots Potentially Developed in the CBD Figure 13.13: City Structure
Source: SJER CDP 2025
D. Enhancing the City Structure
The existing landmark, Bukit Timbalan, will remain as the main landmark
that can be perceived from the 3 precincts and a secondary landmark
will be introduced to enhance its orientation within the CBD.
Gateways are also introduced to welcome visitors and prospective
investors to the CBD. Several of these gateway points have been
identified and are mainly built along all major entrances into the area.
These gateways are just elements of the landscape or buildings that
reflect the element of entering an important area.
The axis line that runs through the new proposed CBD area helps to
organise the public spaces and it terminates at the Johor Bahru City
Waterfront Precinct.
Source: SJER CDP 2025
To enhance the urban fabric, existing roads within the city will be
connected to the surrounding area via existing main roads of Jalan
Tun Abdul Razak - Jalan Wong Ah Fook, and Jalan Trus - Jalan Ayer
Molek. Jalan Trus and Jalan Ayer Molek will be enhanced with new
streetscapes. Connectivity to the surrounding areas will be emphasised
to ensure permeability into the city centre.
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 13
E. New Land Use Structure
The three main zones will feature different functions and features
to create a vibrant CBD for Johor Bahru. It will ensure that new
developments will blend well with the existing heritage fabric of the city
– landmarks and icons that relate to the history of the city. The following
table indicates the new land use structure and what the plan provides:
Land Use Structure of CBD Land Area (acres)
New Land Parcels 42.37
Government Buildings 44.39
Central Park 5.10
Pocket Parks, Open Space and Plazas 17.86
Public Amenities
• Schools
• Places of Worship
26.94
6.52
Other Existing Development Preserved 146.62
Others – roads etc 102.60
Total land Acreage 392.40
Source: SJER CDP 2025
F. Development Control
The controlling factors for the new CBD will be the floor area
requirement. In general, the ratio of the Central Planning Area gross plot
is 1: 5.0. However, when translated into detailed plots, the result is a plot
ratio ranging from a minimum 2.0 to a maximum 6.0.
Table 13.6: Land Use Structure of CBD
Plot Acreage (Hec) Plot Ratio Max Height
1 5.39 6 26
2 11.14 4 26
3 7.71 5 26
Source: SJER CDP 2025
>20 Storey20-16 Storey<16 Storey
Side Parking / Surface ParkingBasement Parking
Figure 13.14: Building Height Control
Figure 13.15: Side Parking/Park ing Areas
Table 13.7: The Control Factors
Plot Acreage (Hec) Plot Ratio Max Height
4 3.39 6 20
5 10.54 3 20
6 3.32 6 20
7 3.07 6 20
8 8.06 4 20
9 6.60 4 20
10 3.42 6 20
11 1.67 2 4
12 4.56 4 16
13 5.27 4 16
14 5.30 4 16
15 5.88 4 16
16 2.29 6 14
17 2.13 6 14
18 3.48 5 14
Source: SJER CDP 2025 Source: SJER CDP 2025
13 - 14
SECTION B PLANNING AND IMPLEMENTATION
MIXED DEVELOPMENT MIXED DEVELOPMENT
CENTRAL PARK
EXISTING TNB BUILDING
RESIDENTIAL (CONDOMINIUM)
EXISTING SCHOOL
RESIDENTIAL (CONDOMINIUM)
MIXED DEVELOPMENT
COMMERCIAL
PARK
COMMERCIAL
MIXED DEVELOPMENT
COMMERCIAL
EXISTING SHOP
RESIDENTIAL (CONDOMINIUM)
EXISTING CHURCH
Figure 13.16: The Business and Central Park District Illustrative Master Plan
Source: SJER CDP 2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 15
13.6 The Johor Bahru Waterfront Precinct
The Johor Bahru Waterfront Precinct is important to Johor Bahru. It
creates a new image that would connect the current development
of the Conservation and Heritage Precinct to the waterfront areas.
However, the new Selat Tebrau road to a certain extent has separated
the city’s activities from the waterfront.
The approach now is to bring the whole CBD into one contiguous level
of activity by integrating Conservation and Heritage Precinct with the
Johor Bahru Waterfront Precinct. In doing so, connectivity between
these two precincts is transform into a seamless development flow.
Figure 13.17: Extend the streets and commercial activity of the City Centre to the Waterfront
Figure 13.18: Extend the Waterfront into the City’s Activities
Figure 13.19: Overcome the barrier of Selat Tebrau main thoroughfare and highway
Source: SJER CDP 2025
Source: SJER CDP 2025
Source: SJER CDP 2025
13 - 16
SECTION B PLANNING AND IMPLEMENTATION
The opportunity to create a waterfront land bank is now possible. This
will lead to a new sizeable public waterfront space. Reclamation works
has to be undertaken and it will involve 38.23 acres of land to create this
new Johor Bahru Waterfront.
Figure 13.22: The Waterfront Development Land Use Zoning
Source: SJER CDP 2025
Land Use and Activities Land Acreage
Waterfront commercial 17.48 acres
Johor Bahru Waterfront Park 19.40 acres
Roads and Infrastructure 1.35 acres
Total 38.23 acres
2.16 ac 10.82 ac
4.50 ac
16.77 ac
1.67 ac
1.33 ac
Commercial Waterfront Development Parks
Table 13.8: The Propose Use and Activities
Source: SJER CDP 2025
Figure 13.20: Extend the Pedestrian Connectivity to New Developments
Source: SJER CDP 2025
Connectivity will be addressed in order to have Heritage Precinct
connected to the new Waterfront Precinct. Link ways in the form
of pedestrian overhead bridges will connect the buildings on the
waterfront. Underpass link ways should also be created at two points of
the land to have as many connections as possible thus making the area
more accessible to pedestrians.
The new waterfront development must have a sense of space so as
not to create an obstruction to the waterfront. Building blocks must not
be too long in order to ensure enough visual impact including through
corridors.
Measuring 750m X 50m, the new waterfront will be a new focal point
for a public space in front of Selat Tebrau. It will have acres of public
open space where passive and active recreational facilities will be
provided. The commercial activities proposed here will be of low-rise
development – buildings can only be up to three storeys high or not
more than 12 meters. This is to ensure that certain icons of the city are
not visually affected by the new development.
Another important contributing factor of this development onto the city
is the restoration of abandoned shopping malls that have been badly
affected by poor accessibility to the main commercial centre of the city.
Figure 13.21: Visual Analysis towards Waterfront Development
Source: SJER CDP 2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 17
13.7 The Conservation and Heritage Precinct
The main objective of this development is to establish a high quality
urban design and built form within the area. In doing so, it is hoped
that the rejuvenation and beautification of this area will contribute
significantly to the already unique and dynamic atmosphere.
The approach is to reinforce the unique character established here. Past
developments within the area have acknowledged the historical and
cultural significance of this precinct. As future developments must also
provide for long-term enhancement of the area, it is important that its
unique character is reinstated.
Preservation and conservation are an integral part of a city’s growth
as it is a vital link to past development. Colonisation has influenced the
building design and introduced a new architectural language and
building technology to Johor Bahru in that era. The architecture can still
be seen in some parts of the city and it is historically and architecturally
unique. Badan Warisan Malaysia has identified several buildings for
conservation and preservation. However, the development control over
buildings and its built environment of areas within the vicinity of these
zones is very much lacking. Developments within the vicinity need to
be controlled to ensure new buildings are complementary in scale and
character and do not deteriorate the overall character of the area.
Preservation and conservation of a building, however, is insufficient
to create a unique city. Therefore there is a need to retain history,
architectural style and ambiance of the entire area to bring back the
city’s livelihood.
This area needs to encourage intense street level activity for the public
at locations such as sidewalks, seating areas, vendors, public arts etc.
The area should be able to instil a vibrant cultural atmosphere where
arts, entertainment, and other cultural activities add richness and
vitality to daily lives. Such activities are encouraged because they
promote economic development, tourism, international prestige and an
improved quality of life for Johor Bahru.
Creating spaces for public art as part of public areas can also enhance
the urban environment of the area. Public art reflects the identity of a
city and gives voice to community and builds relationships between
diverse groups. Public art within the plan area can create a civic
splendour that expresses its history, identity and culture.
It is important that meaningful heritage references are incorporated into
in-fill developments. Equally important is to avoid elements of historical
imagery, ‘Fake Old’ or kitsch within projects; where a proposed building
mimics a heritage building.
KEY DIRECTIONS:H1: Designate the Heritage Precinct of Johor Bahru CBD as a
Preservation and Conservation area.H2: Preservation and conservation of existing buildings and sites
need to be continuously enforced.H3: Effort should be made to protect the feature of the heritage
zone and the enhancement of the streetscape and new buildings within the vicinity of the conservation buildings and areas.
Figure 13.23: The Concept Master Plan
Source: SJER CDP 2025
13 - 18
SECTION B PLANNING AND IMPLEMENTATION
Early Shop House
Neo-Classical
Eclectic Style
Colonial
Style
A. Preserve and Conserve Heritage Buildings
The aim of preservation is to safeguard monuments or landmarks of the
past. However, conservation is applied to buildings within conservation
zone or a series of buildings within a block. Based on the inventory by
Badan Warisan Malaysia, there are several pre-war buildings in the city
centre. Most of the heritage buildings were designed with different
architectural styles found such as the Early Shop Houses, the Neo-
Classical, Eclectic styles and Colonial styles. Attention should also be
given to protect the surviving buildings and efforts must be made to
create suitable setting for the buildings. New inventories of buildings
and sites of heritage values should continuously be done to ensure its
protection and conservation.
Figure 13.25: Early Shophouse Designs
Source: Pemeliharaan Warisan Rupa Bandar, Badan Warisan
B. Protecting the Setting of Heritage Area
Several ways can be implemented to protect the heritage setting such
as reviving activities, compatibility of in-fill buildings, and recreation of
heritage.
The new buildings shall respond to the heritage buildings by means
of scale and form where its height, properties and rhythm must be
synchronised with its surroundings. New buildings adjacent to the
heritage zones should generally be similar and if necessary lowered to
blend well with the heritage features.
Negative impacts of new developments within or on the neighbouring
heritage zones shall be minimised, for example larger massing of the
new development should be located furthest from the heritage feature
with smaller elements located closest.
If possible, scale, proportions, colour, materials and architectural
design of the new development, especially at lower levels, should be
compatible with the neighbouring heritage zone.
Figure 13.24: Approach to Development
Conservation & Preservation
Segget Revitalization
Street Improvement
Connectivity
Pocket Park
Refurbishment / Maintain Buildings
Source: SJER CDP 2025
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 19
New developments can also consider creating a sense of history
through new architectural forms and materials with respect to the
heritage buildings to provide interest and contrast with the general
urban area.
Figure 13.26: The massing for new building shall follow the proportions and the scale of the existing heritage building
Source: Pemeliharaan Warisan Rupa Bandar, Badan Warisan
Source: Pemeliharaan Warisan Rupa Bandar, Badan Warisan
13.8 Revitalisation of Sungai Segget
A. Significance of Sungai Segget
In the 1800s when Singapore was part of the Malay States, the Johor
ruler then, Temenggong Ibrahim, adopted the Kangchu System
introduced by Sir Stamford Raffles in Singapore. Thus, cultivation of
pepper and gambir became widespread as Chinese immigrants settled
in Johor Bahru. Boats or sampans were the main mode of transport for
traders who plied the rivers to trading posts in Johor. Running parallel
to Jalan Wong Ah Fook, Sungai Segget was a major waterway that
leads to Johor Bahru’s main thoroughfare. For decades the river was
infamous for the pungent stink of rotting refuse as it was also a dumping
ground for waste matter from the people living along its banks. The
repulsive smell, most acute at low tide, would permeate the whole
neighbourhood. When the tide was high, water flooded the upper
reaches of Sungai Segget as its river mouth opened into the Straits of
Johor. To regulate water levels at high tide and to control traffic, a sea-
gate was thus constructed at the river mouth. Interestingly thereafter,
the river was referred to as “sea-gate” but through the years, the locals
probably mispronounced the word, turning it into what we now know as
Segget. In recent years, the Government has undertaken cleaning and
beautifying projects in several stages, which include massive dredging,
widening and reinforcement of this waterway.
B. Reviving Sungai Segget
In reviving Sungai Segget, some key objectives identified are:
KEY DIRECTION:
CLEAN AND ENHANCE SUNGAI SEGGET AS A RIVER PARK
SYSTEM By:
• Opening up Segget River and execute beautification
programme.
• Execute river catchment management in terms of planning
and development controls for the various land use and
activities.
• Better environmental management of stormwater/runoff to
prevent and manage pollutants from entering the river system.
Figure 13.27: Example of Conservation of Old Shophouses
13 - 20
SECTION B PLANNING AND IMPLEMENTATION
C. Managing Sungai Segget
Healthy river catchment will create healthy water environment. Poor
catchment will have direct impact on the water quality. Sungai Segget
water quality is directly related to land use and activities taking place
within its catchment area. Based on this, the proposed approach is to
focus on the land uses and activities taking place within its catchments.
It is crucial that polluting activities and land use be identified and
prioritised so that specific management and control measures can be
formulated and implemented according to the magnitude of pollution;
risks to the receiving rivers and beneficial use of the rivers.
River Catchment Description
Sungai Segget Catchment area is about 3.6 sq.km.(360
hectares)only.
Smallest river draining into Selat Johor.
Total length – 4km.
Originates from Kebun Teh and Taman Century
areas.
Discharge into Selat Johor i.e. 200m from
Causeway.
Tidal gate at river outlet regulates the flow of river.
Table 13.9: Sungai Segget Catchment Description
Source: Regional Environmental Assessment Study, SJER, UKM, 2006
D. Planning Controls
• Phase out incompatible development such as industries and
sewerage plants along the river corridor and impose stringent
requirements for development along river corridor.
• Formulate specific guidelines for development along the river
corridor and catchment area.
• Relocating of street hawkers into food centres with water supply
and sewered wash areas.
• Upgrade and enhance the facilities for hawkers and gradually
reduce the number of hawkers that occupy the road shoulders,
side or back lanes; by establishing proper hawker centres.
• Provide incentives for developments that utilise river as its main
feature. In doing so, people or businesses along the rivers can
take ownership of the rivers within their frontage and help in
monitoring the quality of the river.
E. Beautify Sungai Segget
A beautification program should be undertaken for Sungai Segget and
turn it into the new ‘life line’ for the city. Not only will the beautification
effort overcome various environmental issues but it will also be a gift
that can be given back to Johor Bahru.
As the river is already lined, beautifying Sungai Segget can be done at
two levels, at the water level as well as at the upper level. Shop houses
facing the river can take advantage by adopting the frontages of the
river and help maintain the cleanliness of the river.
SungaiSegget
Figure 13.28: Location of Sungai Segget
Source: SJER CDP 2025
River Catchment Description
Water Quality
Class IV, DOE (2003)
Contributing Factors to pollution
Partially treated sewage from domestic and
commercial premises.
JOHOR BAHRU CITY CENTRE
CHAPTER 13 | PART 3
13 - 21
LANDUSE ACREAGE MIXED USE 46.32
OPEN SPACE 20.60 INFRASTRUCTURE 5.65
TOTAL 72.57
BUKIT TIMBALAN
CITY SQUARE
ABU BAKAR MOSQUE
PROPOSED FREE ACCESS ZONE
Figure 13.29: Illustrative Master Plan of Beautification of Sg. Segget
Source: SJER CDP 2025
Shop houses
Sungai Segget
Jalan Wong Ah Fook 4.5m
3m
3m
13.9 Proposed Free Access Zone in Johor Bahru City
As described in Chapter 9, proposed Free Access Zone (FAZ) will be
planned on the eastern part of the Causeway. The 72.57 acres of land
will allow free access for visitors from Singapore where a direct linkage
to the FAZ will be constructed.
Subject to approval by the SJA and the other authorities, the proposed
FAZ will attract international visitation and will promote and enhance
SJER as an international zone. Here, mixed use activities are allowed
where offices, retail spaces, hotels and entertainment outlets will be
developed as its core activities.
The FAZ area will also be enhanced with a 20 acre promenade and
open space which links the area to the whole water front of the western
part of the Causeway of Johor Bahru city via pedestrian access.
Figure 13.30: Location of FAZ in Johor Bahru City Centre
Source: SJER CDP 2025
13 - 22
SECTION B PLANNING AND IMPLEMENTATION
MIXED USE 13.07 ac
MIXED USE 9.68 ac
MIXED USE 11.17 ac
MIXED USE 12.40 ac
OPEN SPACE 20.60 ac
Figure 13.31: Proposed Land Use Zoning of FAZ in Johor Bahru City Centre
Source: SJER CDP 2025
Figure 13.32: Illustration Master Plan of FAZ in Johor Bahru City Centre
Source: SJER CDP 2025