    Site Name Square Tower , 40M, 160 kmph Soil Bearing Capacity 5 T/SqM

    Description & Values Of SymbolsCement Concrete Sizes

    Symbol Description Value Units

    th_pcc Thickness of PCC 100 mm

    s_pcc Side of PCC below the slab 7600 mm

    d_foundation _bgl Depth of Foundation below ground level 2200 mm

    s_slab Side of slab, Length or width 7500 mm

    th_slab Thickness of Slab 400 mm

    d_p.beam_asb Depth of Primary Beam above Slab bottom 800 mm

    d_p.beam_ast Depth of Primary Beam above Slab Top 400 mm

    d_column_bgl Depth of Column below ground Level( d_foundation_bgl -th_slab)) 1700 mm

    cc_tower Tower Base Width, Back to back of tower legs 6000 mmcc_colums Center to center distance of Twr Leg Colums 5890 mm

    h_foundation_agl Height of Foundation above Ground Level 400 mm

    w_p.Beam Width of Primary Beam 600 mm

    s_Column Side of (square)Column, for tower, width or depth 600 mm

    d_column_slab.end Distance from end of Slab to center of column 805 mm

    SECONDARY BEAMS ON SLAB NOT APPLICABLE

    Number of full Length Secondary Beams 0 Nos

  • 8/3/2019 160Kmph Found Detail AUG 2

    2/14

    Number of full Length Secondary Beams 0 Nos

    BAR BENDING SCHEDULE

    160 kmph RAFT FOUNDATIONHeight of Tower 40.00 Meters Cover For Column 40 mm

    SBC of Soil 5.00 T/SQM Cover For Beam 40 mmCover For Slab 25 mm

    Drawing Descrip Bar Shape Dia of Size Size Size Qty in Nos Tot Length Unit Tot Weight

    Reference Name Rebar a b c both ways Each Pc. weight of Bar in kg

    Name mm mm mm mm Or total for 4 Meters Kg/M in all BeamBeam/Colum Column/slab

    P1 COLUMN B 16 2452 300 - 64 2.752 1.58 278.20

    R1 Rings for Column E 8 528 528 75 32 2.262 0.39 28.58

    R2 Small Column Rings E 8 528 396 75 44 1.998 0.39 34.72

    B1 , B2 Bottom of Slab A 16 7450 - - 40 7.45 1.58 470.70T1,T2 Top of Slab A 16 7450 - - 40 7.45 1.58 470.70

    M1 Top of Main Beam C 16 6410 100 16 6.61 1.58 167.05

    M2 Bot Of Main Beam C 16 6410 100 16 6.61 1.58 167.05

    R3 Ring for beams E 8 520 760 75 216 2.71 0.39 231.15

    Top of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Bot Of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Ring for Sec beams, If applicable E 8 0 0 75 0 0.15 0.39 0.00

    C1 Chairs C1 D 16 500 359 200 24 1.618 1.58 61.34

    Side Bars for high P beam A 16 6410 100 - 8 6.61 1.58 83.53Total Weight of steel 1993.03 K

    Add 5% wastage 2092.68

    Alternate Sizes of rebars allowed with Qty for each

    Column B -

    Notes:

    1. Dimensions of Bars are along the center Lines.

    2. All dimensions are in mm unless otherwise stated.

    3. Bending of bars to be done as per IS 2502-1963.4. Splicing of bars should not be more than 50%. Length of splice as per Standards

    5. A clear cover of size as described above is to be provided to main rebars.

  • 8/3/2019 160Kmph Found Detail AUG 2

    3/14

    Site Name Square Tower , 40M, 160 kmph Soil Bearing Capacity 7.5 T/SqM

    Description & Values Of SymbolsCement Concrete Sizes

    Symbol Description Value Units

    th_pcc Thickness of PCC 100 mm

    s_pcc Side of PCC below the slab 7300 mm

    d_foundation _bgl Depth of Foundation below ground level 2300 mm

    s_slab Side of slab, Length or width 7200 mm

    th_slab Thickness of Slab 400 mm

    d_p.beam_asb Depth of Primary Beam above Slab bottom 800 mm

    d_p.beam_ast Depth of Primary Beam above Slab Top 400 mm

    d_column_bgl Depth of Column below ground Level( d_foundation_bgl -th_slab)) 1800 mm

    cc_tower Tower Base Width, Back to back of tower legs 6000 mm

    cc_colums Center to center distance of Twr Leg Colums 5890 mm

    h_foundation_agl Height of Foundation above Ground Level 400 mm

    w_p.Beam Width of Primary Beam 600 mm

    s_Column Side of (square)Column, for tower, width or depth 600 mm

    d_column_slab.end Distance from end of Slab to center of column 655 mm

    SECONDARY BEAMS ON SLAB NOT APPLICABLE

    Number of full Length Secondary Beams 0 Nos

  • 8/3/2019 160Kmph Found Detail AUG 2

    4/14

    Excavation , assuming vertical digging 127.90 Cum

  • 8/3/2019 160Kmph Found Detail AUG 2

    5/14

    BAR BENDING SCHEDULE

    160 kmph RAFT FOUNDATIONHeight of Tower 40.00 Meters Cover For Column 40 mm

    SBC of Soil 7.50 T/SQM Cover For Beam 40 mmCover For Slab 25 mm

    Drawing Descrip Bar Shape Dia of Size Size Size Qty in Nos Tot Length Unit Tot Weight

    Reference Name Rebar a b c both ways Each Pc. weight of Bar in kg

    Name mm mm mm mm Or total for 4 Meters Kg/M in all BeamBeam/Colum Column/slab

    P1 COLUMN B 16 2552 300 - 64 2.852 1.58 288.31

    R1 Rings for Column E 8 528 528 75 40 2.262 0.39 35.73

    R2 Small Column Rings E 8 528 396 75 44 1.998 0.39 34.72

    B1 , B2 Bottom of Slab A 16 7150 - - 38 7.15 1.58 429.16T1,T2 Top of Slab A 16 7150 - - 38 7.15 1.58 429.16

    M1 Top of Main Beam C 16 6410 100 20 6.61 1.58 208.82

    M2 Bot Of Main Beam C 16 6410 100 16 6.61 1.58 167.05

    R3 Ring for beams E 8 520 760 75 216 2.71 0.39 231.15

    Top of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Bot Of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Ring for Sec beams, If applicable E 8 0 0 75 0 0.15 0.39 0.00

    C1 Chairs C1 D 16 500 359 200 24 1.618 1.58 61.34

    Side Bars for high P beam A 16 6410 100 - 8 6.61 1.58 83.53Total Weight of steel 1968.96 Kg

    Add 5% wastage 2067.41

    Alternate Sizes of rebars allowed with Qty for each

    Column B -

    Notes:

    1. Dimensions of Bars are along the center Lines.

    2. All dimensions are in mm unless otherwise stated.

    3. Bending of bars to be done as per IS 2502-1963.

    4. Splicing of bars should not be more than 50%. Length of splice as per Standards

  • 8/3/2019 160Kmph Found Detail AUG 2

    6/14

    5. A clear cover of size as described above is to be provided to main rebars.

  • 8/3/2019 160Kmph Found Detail AUG 2

    7/14

    Site Name Square Tower , 40M, 160 kmph Soil Bearing Capacity 10 T/SqM

    Description & Values Of SymbolsCement Concrete Sizes

    Symbol Description Value Units

    th_pcc Thickness of PCC 100 mm

    s_pcc Side of PCC below the slab 7100 mm

    d_foundation _bgl Depth of Foundation below ground level 2300 mm

    s_slab Side of slab, Length or width 7000 mm

    th_slab Thickness of Slab 400 mm

    d_p.beam_asb Depth of Primary Beam above Slab bottom 800 mm

    d_p.beam_ast Depth of Primary Beam above Slab Top 400 mm

    d_column_bgl Depth of Column below ground Level( d_foundation_bgl -th_slab)) 1800 mm

    cc_tower Tower Base Width, Back to back of tower legs 6000 mm

    cc_colums Center to center distance of Twr Leg Colums 5890 mm

    h_foundation_agl Height of Foundation above Ground Level 400 mm

    w_p.Beam Width of Primary Beam 600 mm

    s_Column Side of (square)Column, for tower, width or depth 600 mmd_column_slab.end Distance from end of Slab to center of column 555 mm

    SECONDARY BEAMS ON SLAB NOT APPLICABLE

    Number of full Length Secondary Beams 0 Nos

    d_s.beam_asb Depth of secondary Beam above Slab Bottom, If applicable 0 mm

    W_s.Beam Width of Secondary Beam, If applicable 0 mm

    LADDER FOUNDATION NOT APPLICABLE

    s Col stairs Side of ( square) Column for staircase 450 mm

  • 8/3/2019 160Kmph Found Detail AUG 2

    8/14

    BAR BENDING SCHEDULE

    160 kmph RAFT FOUNDATION

    Height of Tower 40.00 Meters Cover For Column 40 mmSBC of Soil 10.00 T/SQM Cover For Beam 40 mm

    Cover For Slab 25 mm

    Drawing Descrip Bar Shape Dia of Size Size Size Qty in Nos Tot Length Unit Tot Weight

    Reference Name Rebar a b c both ways Each Pc. weight of Bar in kg

    Name mm mm mm mm Or total for 4 Meters Kg/M in all Beam

    Beam/Colum Column/slab

    P1 COLUMN B 16 2552 300 - 64 2.852 1.58 288.31

    R1 Rings for Column E 8 528 528 75 40 2.262 0.39 35.73

    R2 Small Column Rings E 8 528 396 75 44 1.998 0.39 34.72B1 , B2 Bottom of Slab A 16 6950 - - 40 6.95 1.58 439.11

    T1,T2 Top of Slab A 16 6950 - - 40 6.95 1.58 439.11

    M1 Top of Main Beam C 16 6410 100 20 6.61 1.58 208.82

    M2 Bot Of Main Beam C 16 6410 100 20 6.61 1.58 208.82

    R3 Ring for beams E 8 520 760 75 216 2.71 0.39 231.15

    Top of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Bot Of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Ring for Sec beams, If applicable E 8 0 0 75 0 0.15 0.39 0.00

    C1 Chairs C1 D 16 500 359 200 24 1.618 1.58 61.34

    Side Bars for high P beam A 16 6410 100 - 8 6.61 1.58 83.53

    Total Weight of steel 2030.63 Kg

    Add 5% wastage 2132.16

    Alternate Sizes of rebars allowed with Qty for each

    Column B -

    Notes:

    1. Dimensions of Bars are along the center Lines.

    2. All dimensions are in mm unless otherwise stated.

    3. Bending of bars to be done as per IS 2502-1963.

    4. Splicing of bars should not be more than 50%. Length of splice as per Standards

    5. A clear cover of size as described above is to be provided to main rebars.

  • 8/3/2019 160Kmph Found Detail AUG 2

    9/14

  • 8/3/2019 160Kmph Found Detail AUG 2

    10/14

    apes o arsShape

    SHAPE DESCRIPTION Name

    a A

    b Ba

    Cb a b

    Db a b

    c c

    a Ec c b

    b

    a

    Fb

  • 8/3/2019 160Kmph Found Detail AUG 2

    11/14

    a

    b

  • 8/3/2019 160Kmph Found Detail AUG 2

    12/14

    Site Name Square Tower , 40M, 160 kmph Soil Bearing Capacity 15 T/SqM

    Description & Values Of SymbolsCement Concrete Sizes

    Symbol Description Value Units

    th_pcc Thickness of PCC 100 mm

    s_pcc Side of PCC below the slab 7100 mm

    d_foundation _bgl Depth of Foundation below ground level 2300 mm

    s_slab Side of slab, Length or width 7000 mm

    th_slab Thickness of Slab 350 mm

    d_p.beam_asb Depth of Primary Beam above Slab bottom 800 mm

    d_p.beam_ast Depth of Primary Beam above Slab Top 450 mm

    d_column_bgl Depth of Column below ground Level( d_foundation_bgl -th_slab)) 1850 mm

    cc_tower Tower Base Width, Back to back of tower legs 6000 mm

    cc_colums Center to center distance of Twr Leg Colums 5890 mm

    h_foundation_agl Height of Foundation above Ground Level 400 mm

    w_p.Beam Width of Primary Beam 600 mm

    s_Column Side of (square)Column, for tower, width or depth 600 mm

    d_column_slab.end Distance from end of Slab to center of column 555 mm

    SECONDARY BEAMS ON SLAB NOT APPLICABLE

    Number of full Length Secondary Beams 0 Nos

  • 8/3/2019 160Kmph Found Detail AUG 2

    13/14

    BAR BENDING SCHEDULE

    RAFT FOUNDATION160kmph Height of Tower 40.00 Meters Cover For Column 40 mm

    SBC of Soil 15.00 T/SQM Cover For Beam 40 mmCover For Slab 25 mm

    Drawing Descrip Bar Shape Dia of Size Size Size Qty in Nos Tot Length Unit Tot Weight

    Reference Name Rebar a b c both ways Each Pc. weight of Bar in kg

    Name mm mm mm mm Or total for 4 Meters Kg/M in all Beam

    Beam/Colum Column/slab

    P1 COLUMN B 16 2552 300 - 64 2.852 1.58 288.31

    R1 Rings for Column E 8 528 528 75 40 2.262 0.39 35.73

    R2 Small Column Rings E 8 528 396 75 44 1.998 0.39 34.72

    B1 , B2 Bottom of Slab A 16 6950 - - 46 6.95 1.58 504.98T1,T2 Top of Slab A 16 6950 - - 46 6.95 1.58 504.98

    M1 Top of Main Beam C 16 6410 100 20 6.61 1.58 208.82

    M2 Bot Of Main Beam C 16 6410 100 20 6.61 1.58 208.82

    R3 Ring for beams E 8 520 760 75 216 2.71 0.39 231.15

    Top of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Bot Of Sec Beam, If applicable C 16 6490 100 0 6.69 1.58 0.00

    Ring for Sec beams, If applicable E 8 0 0 75 0 0.15 0.39 0.00

    C1 Chairs C1 D 16 500 309 200 24 1.518 1.58 57.55

    Side Bars for high P beam A 16 6410 100 - 8 6.61 1.58 83.53Total Weight of steel 2158.57 Kg

    Add 5% wastage 2266.50Alternate Sizes of rebars allowed with Qty for each

    Column B -

    Notes:

    1. Dimensions of Bars are along the center Lines.

    2. All dimensions are in mm unless otherwise stated.

    3. Bending of bars to be done as per IS 2502-1963.

    4. Splicing of bars should not be more than 50%. Length of splice as per Standards5. A clear cover of size as described above is to be provided to main rebars.