6
SD NOT TO SCALE PIPE HANGER SUPPORT SUPPORT NUT MIN 9 lb/cft DENSITY RIGID INSULATION AT SHIELD GALVANIZED INSULATION SHIELD 12" LONG HEAVY DUTY CLEVIS HANGER NOTE: 1. SEE SPECIFICATION FOR HANGER SIZES. NOT TO SCALE IN-FLOOR MANIFOLD DETAIL 120V / 24V TRANSFORMER, 24V VALVE AND THERMOSTAT. MECHANICAL CONTRACTOR TO PROVIDE AND INSTALL A NOTES: SUPPLY PIPING (BY MECH CONTRACTOR) RETURN PIPING (BY MECH CONTRACTOR) SUPPLY MANIFOLD RETURN MANIFOLD CONTROL VALVE ISOLATION VALVE CAPPED VALVE HEAD SUPPLY PIPING TO IN-FLOOR LOOP RETURN PIPING FROM IN-FLOOR LOOP ISOLATION VALVE D 2D STRAIGHT (MIN) NOT TO SCALE INLINE PUMP DETAIL SHUTOFF VALVE STRAINER FLEX CONNECTION (TYP) %%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE WALL MOUNTED BOILER DETAIL SCREWED CAP AT BOILER PIPING HIGH POINTS - PROVIDE LIMIT AND OPERATING CONTROLS. - PROVIDE LOW WATER CUT-OFF. NOTES: - BOILER TO BE UL AND ASME RATED. RELIEF VALVE (30 PSI) ASME PRESSURE/TEMP VENT & COMBUSTION AIR INTAKE MANUAL AIR VENT W/ REDUCE/INCREASE AS REQD ROUTE CONDSATE GAS HWS & HWR TO FLOOR DRAIN NOT TO SCALE HOT WATER CABINET UNIT HEATER PIPING DETAIL (TWO-WAY VALVE) HEATING COIL LINE-VOLTAGE RETURN AIR UNION REQUIRED ON STEEL PIPE ONLY (TYPICAL) BALL VALVE UNION REQUIRED ON STEEL PIPE ONLY (TYPICAL) CONCENTRIC REDUCER AS REQUIRED (TYPICAL) LINE VOLTAGE TWO-WAY MANUAL VENT VALVE MANUFACTURERS MINIMUM RECOMMENDED DISTANCE AUTOMATIC BALANCING VALVE AUTOFLOW MODEL-YR HOT WATER RETURN HOT WATER SUPPLY CONTROL VALVE BY MANUFACTURER THERMOSTAT BY MANUFACTURER T NOT TO SCALE WALL VENT TERMINATION DETAIL WALL EXHAUST AIR MC TO PAINT FLASHING TO MATCH EXTERIOR WALL SLOPE TOWARDS BOILER EXHAUST AIR FROM BOILER INTAKE AIR TO BOILER T NOT TO SCALE IN-FLOOR HEATING DETAIL 2" RIGID INSULATION TEMPERATURE SENSOR PROBE (CONDUIT REQUIRED WITHIN SLAB) TUBING STAPLED TO CONC SLAB LOOSE FILL (SAND) TEMPERATURE SENSOR WIRING PROVIDED BY OTHERS VAPOR BARRIER INSULATION (TYP) RUN SENSOR WIRE TO EXTERIOR WALL UP INTERIOR WALL TEMPERATURE CONTROLLER PROVIDED BY OTHERS NOT TO SCALE MECHANICAL PIPING SCHEMATIC NOT TO SCALE CONDENSATE DRAIN DETAIL POSITIVE PRESSURE 4 B A D C 1 1/2" PIPE 2" PIPE D 1" PIPE 1 1/4" PIPE - 50 TONS-UP - 30 TONS-50 TONS - 5 TONS-30 TONS - UP TO 5 TONS COOLING TONS CLEAN OUT COIL DRAIN DRAIN NIPPLE PITCH COOLING CLEAN OUT RUN PIPE TO OPEN SITE OR FLOOR DRAIN NOTE: * SP EQUALS POSITIVE STATIC PRESSURE AT FAN DISCHARGE FOR BLOW THROUGH AIR HANDLING UNIT. A = SP*+1/2" B = 1/2" (MIN) C = A+B+D DRAIN PAN MECH UNIT OR 7 AI DI AO DO - - 24x12 T S 1 BT HIGH CAPACITY AIR VENT AQUASTAT 1 1/2" ECM DI DO P 2 AI AO ROUTE TO FLOOR DRAIN 1 AS INTERLOCK PUMP OPERATION WITH BT-1 AQUASTAT 1 B DO DI 1 P CONTRACTOR TO WIRE CIRCULATING PUMP TO BOILER RELAY ECM AI AO BY MANUFACTURER CONTROLLER DI DO 1 1/2" 1 1/2" 1 1/2" 1 1/2" 1 ET 1 1/2" 1 1/4" HWS TO MAN-1 1 1/4" HWR FROM MAN-1 1 1/4" HWS TO CUH-1 1 1/4" HWR FROM CUH-1 1 1/4" 1 1/4" ABBREVIATIONS GENERAL MECHANICAL NOTES MECHANICAL PIPING LEGEND MECHANICAL HVAC LEGEND A AMP ADD ADDENDUM ADDL ADDITIONAL ADJ ADJUSTABLE AFF ABOVE FINISH FLOOR AFG ABOVE FINISH GRADE AHU AIR HANDLER UNIT AI ANALOG INPUT ALT ALTERNATE ANNC ANNUNCIATOR AO ANALOG OUTPUT APPRX APPROXIMATE ARCH ARCHITECT, ARCHITECTURAL BDD BACK DRAFT DAMPER BLDG BUILDING BI BLACK IRON BOD BOTTOM OF DUCTWORK BOP BOTTOM OF PIPE BOT BOTTOM BSMT BASEMENT BTUH BRITISH THERMAL UNIT PER HOUR BTWN BETWEEN C CENTER CD CEILING DIFFUSER CFM CUBIC FEET PER MINUTE CHAR CHARACTERISTICS CI CAST IRON CIRC CIRCUIT CL %%153 CENTERLINE CLR CLEAR CO CLEAN OUT COL COLUMN COMP COMPRESSOR CONC CONCRETE COND CONDENSATE CONT CONTINUOUS COP COEFFICIENT OF PERFORMANCE CR CEILING REGISTER CW CHILLED/COLD WATER CWR COLD WATER RETURN CWS COLD WATER SUPPLY DB DRY BULB DEG DEGREE DEPT DEPARTMENT DET DETAIL DF DRINKING FOUNTAIN DG DOOR GRILLE DI DIGITAL INPUT DIA OR DIAMETER DIM DIMENSION DN DOWN DO DIGITAL OUTPUT DW DEIONIZED WATER DWG DRAWING EA EXHAUST AIR EAT ENTERING AIR TEMPERATURE EC ELECTRICAL CONTRACTOR ECM ELECTRONIC CONTROL MODULE EER ENERGY EFFICIENCY RATIO EF EXHAUST FAN EG EXHAUST GRILLE EL ELEVATION ELEC ELECTRICAL ELEV ELEVATOR ELT ENTERING LIQUID TEMPERATURE EQ EQUAL EQUIP EQUIPMENT ERU ENERGY RECOVERY UNIT ESP EXTERNAL STATIC PRESSURE EST ESTIMATE OR ESTIMATED ET DIAPHRAGM EXPANSION TANK ETR EXISTING TO REMAIN EWT ENTERING WATER TEMPERATURE EXIST EXISTING F&T FLOAT AND THERMOSTATIC FA FRESH AIR FCO FLOOR CLEANOUT FD FLOOR DRAIN FLR FLOOR FPM FEET PER MINUTE FT FOOT (FEET) FURN FURNACE GA GAUGE/GAGE GAL GALLON GALV GALVANIZED GC GENERAL CONTRACTOR GPM GALLONS PER MINUTE GYP GYPSUM HB HOSE BIB HORIZ HORIZONTAL HP HORSEPOWER HT HEIGHT HW HOT WATER HWR HOT WATER RETURN HWS HOT WATER SUPPLY I/O INPUT/OUTPUT IA INSTRUMENT AIR IE INVERT ELEVATION IN INCH INSUL INSULATION J-BOX JUNCTION BOX LAT LEAVING AIR TEMPERATURE LB POUND LLT LEAVING LIQUID TEMPERATURE LOC LOCATION LPR LOW PRESSURE RETURN LPS LOW PRESSURE STEAM LV LOW VOLTAGE LWT LEAVING WATER TEMPERATURE MA MAKE-UP AIR OR MIXED AIR MAX MAXIMUM MBH 1000 BTU PER HOUR MC MECHANICAL CONTRACTOR MCA MINIMUM CIRCUIT AMPS MECH MECHANICAL MIN MINIMUM MFR MANUFACTURER NC NURSE CALL NFC NOT FOR CONSTRUCTION NIC NOT IN CONTRACT NTS NOT TO SCALE OA OUTSIDE AIR OC ON CENTER OED OPEN END DUCT OPNG OPENING OPP OPPOSITE P PUMP PC PLUMBING CONTRACTOR PERP PERPENDICULAR PLBG PLUMBING PNL PANEL PPH POUNDS PER HOUR PRES PRESSURE PSF POUNDS PER SQUARE FOOT PSI POUNDS PER SQUARE INCH PSIG POUNDS PER SQUARE INCH GAUGE PWR POWER QTY QUANTITY R RADIUS RA RETURN AIR RD ROOF DRAIN REL RELIEF REQD REQUIRED REV REVERSE OR REVISION RG RETURN AIR GRILLE RPM REVOLUTIONS PER MINUTE RTU ROOF TOP UNIT SA SUPPLY AIR SAN SANITARY SCH SCHEDULE SECT SECTION SEP SEPARATOR SF SQUARE FEET SG SUPPLY GRILLE SHT SHEET SHWR SHOWER SIM SIMILAR SP STATIC PRESSURE SPEC SPECIFICATIONS SQ SQUARE SS STAINLESS STEEL STM STEAM T&B TEST AND BALANCE OR TOP AND BOTTOM T&P TEMPERATURE AND PRESSURE RELIEF VALVE TEMP TEMPERATURE OR TEMPORARY TG TRANSFER GRILLE TYP TYPICAL UNO UNLESS NOTED OTHERWISE V VOLT VAR VARIABLE OR VARIES VEL VELOCITY VERT VERTICAL VFD VARIABLE FREQUENCY DRIVE VOL VOLUME VS VENT STACK VTR VENT THRU ROOF W/ WITH W/IN WITHIN W/O WITH OUT WB WET BULB WC WATER COLUMN (INCHES OF) WCO WALL CLEANOUT WG WATER GAUGE WOG WATER, OIL, GAS WP WEATHER PROOF WP WORKING PRESSURE WT WEIGHT 1. ALL WORK SHALL BE IN COMPLIANCE WITH STATE AND LOCAL CODES. 2. THE CONTRACTOR SHALL PAY FOR ALL FEES, PERMITS, LICENSES, ETC., NECESSARY FOR PROPER COMPLETION OF THE WORK. 3. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS. 4. VERIFY ALL EXISTING CONDITIONS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN CONTRACT DRAWINGS AND ACTUAL CONDITIONS. 5. EXISTING UTILITIES TO BE ABANDONED SHALL BE PROPERLY DISCONNECTED AND CAPPED AS REQUIRED BY CODE OR LOCAL ORDINANCE. 6. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. ADDITIONAL DATA SHALL BE FROM THE ENGINEER THROUGH WRITTEN CLARIFICATION ONLY. VERIFY ALL EXISTING CONDITIONS, ELEVATIONS, AND DIMENSIONS BEFORE PROCEEDING WITH ANY PORTION OF ANY WORK. THE CONTRACTOR SHALL PROVIDE ALL OFFSETS AND TRANSITIONS REQUIRED TO MEET EXISTING CONDITIONS. 7. THE CONTRACTOR SHALL PERFORM WORK IN A SKILLED AND PROFESSIONAL MANNER. 8. ALL CONTRACTORS ARE RESPONSIBLE TO FIELD COORDINATE WORK SCHEDULE WITH OWNER REPRESENTATIVE. 9. THE CONTRACTOR SHALL WORK AND COORDINATE WITH THE OTHER TRADES. 10. ALL EQUIPMENT SHALL BE NEW AND IN UNDAMAGED CONDITION. ANY EQUIPMENT FOUND DEFECTIVE SHALL BE IMMEDIATELY REMOVED FROM THE PROJECT. 11. PROVIDE 3 COPIES OF AN OPERATION AND MAINTENANCE MANUAL FOR ALL MAJOR EQUIPMENT REQUIRING SERVICE. MAJOR EQUIPMENT INCLUDES BUT IS NOT LIMITED TO COILS, FANS, AND CONTROL WIRING DIAGRAMS. EACH PIECE OF EQUIPMENT SHALL STATE THE CONTRACT DATE AND THE NAME, ADDRESS AND PHONE NUMBER FOR THE PRIME CONTRACTOR, SUBCONTRACTOR PERFORMING THE INSTALLATION, AND THE LOCAL VENDOR FOR SPARE PARTS. THE MANUALS SHALL CONTAIN MAINTENANCE INSTRUCTIONS REQUIRED FOR THE INSTALLED EQUIPMENT. MANUALS SHALL BE BOUND IN A THREE RING HARD COVER BINDER. O & M MANUALS SHALL BE SUBMITTED TO THE OWNER PRIOR TO FINAL WALK THROUGH OF THE PROJECT. 12. CONTRACTOR SHALL SUBMIT A CERTIFIED REPORT INDICATING SYSTEM PERFORMANCE INCLUDING, BUT NOT LIMITED TO, VOLTAGE AND AMPERAGE MEASUREMENTS OF ALL EQUIPMENT GREATER THAN 1/3 H.P. WATER BALANCE MEASUREMENTS OF EACH COIL AND PUMP. AIR BALANCE MEASUREMENTS OF OUTSIDE AIR DELIVERY, AIR HANDLING UNIT SUPPLY, SUPPLY DIFFUSERS, EXHAUST AND RETURN GRILLES. AIR BALANCE SHALL BE WITHIN 10% OF DESIGN CONDITIONS. THE REPORT CERTIFICATION SHALL BE AS FOLLOWS: I (name) of (company) CERTIFY THAT ALL MEASUREMENTS, FIGURES AND STATEMENTS INDICATED IN THIS REPORT WERE TAKEN BY ME OR UNDER MY SUPERVISION AND ARE ACCURATE AS OF (date). DESIGN FLOWS WERE BASED UPON PLANS DATED (xx/xx/xx). ONLY AFTER ALL OF THE EQUIPMENT IS INSTALLED AND PROPER OPERATION IS VERIFIED. 14. MECHANICAL CONTRACTOR TO REPAIR ANY DAMAGE DONE TO THE FIRE PROOFING WHILE INSTALLING THE MECHANICAL TRADES. SEAL ALL PENETRATIONS THROUGH RATED STRUCTURES WITH UL LISTED FIRE SEAL DESIGNED FOR THE SPECIFIED APPLICATION. 15. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC AND ADJACENT PROPERTIES FROM DAMAGE THROUGHOUT CONSTRUCTION. 16. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1) YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OR AS OTHERWISE REQUIRED IN THE SPECIFICATIONS. 17. MECHANICAL CONTRACTOR TO INSTALL ON THE BOILERS WATER LINE FLEX CONNECTORS, MUFFLERS AND VIBRATION PADS. FLEX CONNECTORS, MUFFLERS AND VIBRATION ARE PADS PROVIDED BY THE BOILER MANUFACTURER. 18. MECHANICAL CONTRACTOR TO INCLUDE THE TEST AND BALANCE, AND ANY PERMIT FEES IN THEIR BID. 19. MECHANICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT WEIGHTS, SIZES, LOCATIONS AND OPENINGS REQUIRED AND SHALL COORDINATE ANY CHANGES WITH THE ARCHITECT. 20. UPON PROJECT COMPLETION, RECORD (AS-BUILT) DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE OWNER AND ENGINEER. ALL CHANGES IN PIPING AND DUCTWORK ARRANGEMENTS SHALL BE NOTED ON THE RECORD DRAWINGS. AUTOMATIC AIR VENT WATER FLOW MEASURING DEVICE PIPE ANCHOR PIPE GUIDE / SLEEVE STRAINER WITH BLOWDOWN DRAIN VALVE FLOW DIRECTION ARROW STEAM TRAP & DRIP ASSEMBLY T MANUAL AIR VENT (MAV) THREE-WAY VALVE PUMP STRAINER THERMOMETER TWO-WAY VALVE BALL VALVE/SHUT-OFF VALVE CIRCUIT SETTER SILENT CHECK VALVE UNION PRESSURE RELIEF VALVE PRESSURE GAUGE PRESSURE/TEMPERATURE PORT PT AIR SEPARATOR BALANCING VALVE ELBOW DOWN TO TEE ELBOW DOWN DOUBLE ELBOW DOWN END CAP TEE UP TEE DOWN ELBOW UP DOUBLE ELBOW DOWN (AT CORNER) PUMP OR PRESSURE DIFFERENTIAL SENSOR DP FLOW CONTROL VALVE W/ DP DIFFERENTIAL PRESSURE SENSOR PRESSURE REDUCING VALVE GLOBE VALVE NEW TO EXISTING PIPE CONNECTION SHUT-OFF COCK VACUUM BREAKER STEAM GAUGE SIPHON DIGITAL OUTPUT ANALOG OUTPUT DIGITAL INPUT ANALOG INPUT REDUCER TYPICAL TEE CONNECTION (PLANS ONLY) SUCTION DIFFUSER W/ STRAINER AND BLOWDOWN FLEX CONNECTION BUTTERFLY VALVE COIL PIPE VIEW TEE ELBOW TRIPLE DUTY VALVE AIR DUCT (DOWN) EXHAUST AIR DUCT (UP) EXHAUST AIR DUCT (DOWN) RETURN AIR DUCT (UP) RETURN AIR DUCT (DOWN) OUTSIDE OR SUPPLY DUCT SIZE SUPPLY AIR CEILING DIFFUSER RETURN AIR GRILLE NEW DUCTWORK PIPE PENETRATION THROUGH FIRE RATED WALL CALL-OUT CFM MANUAL BALANCING DAMPER EXHAUST AIR GRILLE THERMOSTAT X SCHEDULED EQUIPMENT TAG SMOKE DAMPER (X=S) FIRE DAMPER (X=F) FIRE/SMOKE DAMPER (X=C) EXISTING DUCTWORK P MOTORIZED DAMPER M FLEX DUCT REMOTE SENSOR OUTSIDE OR SUPPLY AIR DUCT (UP) CALL-OUT CFM OR DIFFUSER, GRILLE, AND REGISTER CALL-OUTS AD ACCESS DOOR AF AIR FILTER B BOILER BDD BACK DRAFT DAMPER BT BUFFER TANK CD CEILING DIFFUSER EF EXHAUST FAN EFH ELECTRIC FAN FORCED HEATER EG EXHAUST GRILLE ET EXPANSION TANK FD FIRE DAMPER H HUMIDIFIER HX HEAT EXCHANGER L LOUVER MD MOTOR OPERATED DAMPER NC NORMALLY CLOSED NO NORMALLY OPEN OA OUTSIDE AIR OED OPEN END DUCT RA RETURN AIR RG RETURN AIR GRILLE RH HOT WATER RE-HEAT SA SUPPLY AIR SF SUPPLY FAN SG SUPPLY GRILLE SR SUPPLY REGISTER TG TRANSFER GRILLE UH UNIT HEATER CEILING DIFFUSER W/BLANKOFF 13. PROVIDE 2 HOURS OF OWNER TRAINING FOR THE INSTALLED EQUIPMENT. TRAINING SHALL BE HELD O I 8 3 2 1 5 6 NOTE: FILL SYSTEM TO 20 PSIG. 9 A B C D E F G H 1 2 3 4 5 6 7 H G F E D 7 6 5 4 3 2 1 Copyright BWBR I hereby certify that this plan, specification or report was prepared by me or under my direct supervision and that I am a duly Licensed Architect under the laws of the State of Minnesota. Name Date Reg. No. Date Item Sheet No. Sheet Title Comm. No. Drawn This Sheet may be a Reduced Copy. The bar above is 1" long on a Full Size Sheet. Drawing Scales apply to Full Size Sheets. This document may be an electronic file or may be printed from an electronic file provided to the user. It is the sole responsibility of the user to ensure that the content and quality is consistent with the content and quality of the paper documents on file at BWBR. C B A Issued For Consultants 651.222.3701 Saint Paul, MN 55102 380 St. Peter Street, Ste. 600 bwbr.com NORTH BARSTOW PARKING STRUCTURE MEP PROJECT # B26.14.02 1/28/2015 7:43:39 PM TJG MECHANICAL TITLE SHEET 800 3.2014105.00 Issue Date MECHANICAL SHEET INDEX 800 MECHANICAL TITLE SHEET 801.H FIRST TIER HVAC PLAN 802.H SECOND TIER HVAC PLAN 803.H THIRD TIER HVAC PLAN 850 MECHANICAL ENLARGED PLANS AND SECTIONS 870 MECHANICAL SCHEDULES 100% CONSTRUCTION DOCUMENT ISSUE 01/28/2015

800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

SD

NOT TO SCALEPIPE HANGER SUPPORT

SUPPORT NUT

MIN 9 lb/cftDENSITY RIGIDINSULATIONAT SHIELD

GALVANIZEDINSULATIONSHIELD 12" LONG

HEAVY DUTYCLEVIS HANGER

NOTE:1. SEE SPECIFICATION FOR HANGER SIZES.

NOT TO SCALEIN-FLOOR MANIFOLD DETAIL

120V / 24V TRANSFORMER, 24V VALVE AND THERMOSTAT.MECHANICAL CONTRACTOR TO PROVIDE AND INSTALL ANOTES:

SUPPLY PIPING (BYMECH CONTRACTOR)

RETURN PIPING (BYMECH CONTRACTOR)

SUPPLYMANIFOLD

RETURNMANIFOLD

CONTROLVALVE

ISOLATIONVALVE

CAPPED VALVEHEAD

SUPPLY PIPING TOIN-FLOOR LOOP

RETURN PIPING FROMIN-FLOOR LOOP

ISOLATIONVALVE

D

2D STRAIGHT (MIN)

NOT TO SCALEINLINE PUMP DETAIL

SHUTOFF VALVE

STRAINER

FLEX CONNECTION (TYP)

%%152 1 1/4"x1 1/4"x1/8"

U-BOLT PROVIDENEOPRENEGASKET @U-BOLT

NEOPRENEBLOCK

NEOPRENEWASHER

TRIPLE DUTYVALVE

PTPT

NOT TO SCALEWALL MOUNTED BOILER DETAIL

SCREWED CAP AT BOILERPIPING HIGH POINTS

- PROVIDE LIMIT AND OPERATING CONTROLS.- PROVIDE LOW WATER CUT-OFF.NOTES:

- BOILER TO BE UL AND ASME RATED.

RELIEF VALVE (30 PSI)ASME PRESSURE/TEMP

VENT & COMBUSTION AIR INTAKE

MANUAL AIR VENT W/

REDUCE/INCREASE AS REQD

ROUTE CONDSATE

GAS

HWS & HWR

TO FLOOR DRAIN

NOT TO SCALEHOT WATER CABINET UNIT HEATER PIPING DETAIL

(TWO-WAY VALVE)

HEATING COIL

LINE-VOLTAGE RETURN AIR

UNION REQUIREDON STEEL PIPEONLY (TYPICAL)

BALL VALVE

UNION REQUIREDON STEEL PIPEONLY (TYPICAL)

CONCENTRIC REDUCERAS REQUIRED (TYPICAL)

LINE VOLTAGE TWO-WAY

MANUAL VENT VALVE

MANUFACTURERS MINIMUMRECOMMENDED DISTANCE

AUTOMATIC BALANCING VALVEAUTOFLOW MODEL-YR

HOT WATER RETURNHOT WATER SUPPLY

CONTROL VALVEBY MANUFACTURER

THERMOSTAT BY MANUFACTURER

T

NOT TO SCALEWALL VENT TERMINATION DETAIL

WALL

EXHAUST AIR

MC TO PAINT FLASHING TOMATCH EXTERIOR WALL

SLOPE TOWARDSBOILER

EXHAUST AIRFROM BOILER

INTAKE AIR TOBOILER

T

NOT TO SCALEIN-FLOOR HEATING DETAIL

2" RIGID INSULATION

TEMPERATURE SENSOR PROBE(CONDUIT REQUIRED WITHIN SLAB)

TUBING STAPLED TO

CONC SLAB

LOOSE FILL (SAND)

TEMPERATURE SENSOR WIRING

PROVIDED BY OTHERS

VAPOR BARRIER

INSULATION (TYP)

RUN SENSOR WIRE TO

EXTERIOR WALL

UP INTERIOR WALL

TEMPERATURE CONTROLLER

PROVIDED BY OTHERS

NOT TO SCALEMECHANICAL PIPING SCHEMATIC

NOT TO SCALECONDENSATE DRAIN DETAILPOSITIVE PRESSURE

4

BA

D

C

1 1/2" PIPE2" PIPE

D1" PIPE1 1/4" PIPE

- 50 TONS-UP- 30 TONS-50 TONS- 5 TONS-30 TONS- UP TO 5 TONSCOOLING TONS

CLEAN OUT

COIL DRAIN

DRAIN NIPPLE

PITCH COOLING

CLEAN OUT

RUN PIPE TO OPEN SITEOR FLOOR DRAIN

NOTE:* SP EQUALS POSITIVE STATIC PRESSURE AT FAN DISCHARGEFOR BLOW THROUGH AIR HANDLING UNIT.

A = SP*+1/2"B = 1/2" (MIN)C = A+B+D

DRAIN PANMECH UNIT OR

7

AI

DI

AO

DO

--

24x12

T

S

1BT

HIGHCAPACITY AIR

VENT

AQUASTAT

1 1/2"

ECM

DI DO

P2

AI AO

ROUTE TOFLOOR DRAIN

1AS

INTERLOCK PUMPOPERATION WITHBT-1 AQUASTAT

1B

DODI

1P

CONTRACTOR TO WIRECIRCULATING PUMP TOBOILER RELAY

ECM

AIAO BY MANUFACTURER

CONTROLLER

DIDO

1 1/2"

1 1/2"1 1/2"1 1/2"

1ET

1 1/2"1 1/4" HWS TO MAN-1

1 1/4" HWR FROM MAN-1

1 1/4" HWS TO CUH-1

1 1/4" HWR FROM CUH-1

1 1/4" 1 1/4"

ABBREVIATIONSGENERAL MECHANICAL NOTES MECHANICAL PIPING LEGEND MECHANICAL HVAC LEGENDA AMPADD ADDENDUMADDL ADDITIONALADJ ADJUSTABLEAFF ABOVE FINISH FLOORAFG ABOVE FINISH GRADEAHU AIR HANDLER UNITAI ANALOG INPUTALT ALTERNATEANNC ANNUNCIATORAO ANALOG OUTPUTAPPRX APPROXIMATEARCH ARCHITECT, ARCHITECTURAL

BDD BACK DRAFT DAMPERBLDG BUILDINGBI BLACK IRONBOD BOTTOM OF DUCTWORKBOP BOTTOM OF PIPEBOT BOTTOMBSMT BASEMENTBTUH BRITISH THERMAL UNIT PER HOURBTWN BETWEEN

C CENTERCD CEILING DIFFUSERCFM CUBIC FEET PER MINUTECHAR CHARACTERISTICSCI CAST IRONCIRC CIRCUITCL %%153 CENTERLINECLR CLEARCO CLEAN OUTCOL COLUMNCOMP COMPRESSORCONC CONCRETECOND CONDENSATECONT CONTINUOUSCOP COEFFICIENT OF PERFORMANCECR CEILING REGISTERCW CHILLED/COLD WATERCWR COLD WATER RETURNCWS COLD WATER SUPPLY

DB DRY BULBDEG DEGREEDEPT DEPARTMENTDET DETAILDF DRINKING FOUNTAINDG DOOR GRILLEDI DIGITAL INPUTDIA OR DIAMETERDIM DIMENSIONDN DOWNDO DIGITAL OUTPUTDW DEIONIZED WATERDWG DRAWING

EA EXHAUST AIREAT ENTERING AIR TEMPERATUREEC ELECTRICAL CONTRACTORECM ELECTRONIC CONTROL MODULEEER ENERGY EFFICIENCY RATIOEF EXHAUST FANEG EXHAUST GRILLEEL ELEVATIONELEC ELECTRICALELEV ELEVATORELT ENTERING LIQUID TEMPERATUREEQ EQUALEQUIP EQUIPMENTERU ENERGY RECOVERY UNITESP EXTERNAL STATIC PRESSUREEST ESTIMATE OR ESTIMATEDET DIAPHRAGM EXPANSION TANKETR EXISTING TO REMAINEWT ENTERING WATER TEMPERATUREEXIST EXISTING

F&T FLOAT AND THERMOSTATICFA FRESH AIRFCO FLOOR CLEANOUTFD FLOOR DRAINFLR FLOORFPM FEET PER MINUTEFT FOOT (FEET)FURN FURNACE

GA GAUGE/GAGEGAL GALLONGALV GALVANIZEDGC GENERAL CONTRACTORGPM GALLONS PER MINUTEGYP GYPSUM

HB HOSE BIBHORIZ HORIZONTALHP HORSEPOWERHT HEIGHTHW HOT WATERHWR HOT WATER RETURNHWS HOT WATER SUPPLY

I/O INPUT/OUTPUTIA INSTRUMENT AIRIE INVERT ELEVATION

IN INCHINSUL INSULATION

J-BOX JUNCTION BOX

LAT LEAVING AIR TEMPERATURELB POUNDLLT LEAVING LIQUID TEMPERATURELOC LOCATIONLPR LOW PRESSURE RETURNLPS LOW PRESSURE STEAMLV LOW VOLTAGELWT LEAVING WATER TEMPERATURE

MA MAKE-UP AIR OR MIXED AIRMAX MAXIMUMMBH 1000 BTU PER HOURMC MECHANICAL CONTRACTORMCA MINIMUM CIRCUIT AMPSMECH MECHANICALMIN MINIMUMMFR MANUFACTURER

NC NURSE CALLNFC NOT FOR CONSTRUCTIONNIC NOT IN CONTRACTNTS NOT TO SCALE

OA OUTSIDE AIROC ON CENTEROED OPEN END DUCTOPNG OPENINGOPP OPPOSITE

P PUMPPC PLUMBING CONTRACTORPERP PERPENDICULARPLBG PLUMBINGPNL PANELPPH POUNDS PER HOURPRES PRESSUREPSF POUNDS PER SQUARE FOOTPSI POUNDS PER SQUARE INCHPSIG POUNDS PER SQUARE INCH GAUGEPWR POWER

QTY QUANTITY

R RADIUSRA RETURN AIRRD ROOF DRAINREL RELIEFREQD REQUIREDREV REVERSE OR REVISIONRG RETURN AIR GRILLERPM REVOLUTIONS PER MINUTERTU ROOF TOP UNIT

SA SUPPLY AIRSAN SANITARYSCH SCHEDULESECT SECTIONSEP SEPARATORSF SQUARE FEETSG SUPPLY GRILLESHT SHEETSHWR SHOWERSIM SIMILARSP STATIC PRESSURESPEC SPECIFICATIONSSQ SQUARESS STAINLESS STEELSTM STEAM

T&B TEST AND BALANCE OR TOPAND BOTTOM

T&P TEMPERATURE AND PRESSURERELIEF VALVE

TEMP TEMPERATURE OR TEMPORARYTG TRANSFER GRILLETYP TYPICAL

UNO UNLESS NOTED OTHERWISE

V VOLTVAR VARIABLE OR VARIESVEL VELOCITYVERT VERTICALVFD VARIABLE FREQUENCY DRIVEVOL VOLUMEVS VENT STACKVTR VENT THRU ROOF

W/ WITHW/IN WITHINW/O WITH OUTWB WET BULBWC WATER COLUMN (INCHES OF)WCO WALL CLEANOUTWG WATER GAUGEWOG WATER, OIL, GASWP WEATHER PROOFWP WORKING PRESSUREWT WEIGHT

1. ALL WORK SHALL BE IN COMPLIANCE WITH STATE AND LOCAL CODES.

2. THE CONTRACTOR SHALL PAY FOR ALL FEES, PERMITS, LICENSES, ETC., NECESSARY FOR PROPERCOMPLETION OF THE WORK.

3. INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.

4. VERIFY ALL EXISTING CONDITIONS. NOTIFY ENGINEER OF ANY CONFLICTS BETWEEN CONTRACTDRAWINGS AND ACTUAL CONDITIONS.

5. EXISTING UTILITIES TO BE ABANDONED SHALL BE PROPERLY DISCONNECTED AND CAPPED ASREQUIRED BY CODE OR LOCAL ORDINANCE.

6. THESE DRAWINGS ARE DIAGRAMMATIC AND SHALL NOT BE SCALED. ADDITIONAL DATA SHALL BE FROMTHE ENGINEER THROUGH WRITTEN CLARIFICATION ONLY. VERIFY ALL EXISTING CONDITIONS,ELEVATIONS, AND DIMENSIONS BEFORE PROCEEDING WITH ANY PORTION OF ANY WORK. THECONTRACTOR SHALL PROVIDE ALL OFFSETS AND TRANSITIONS REQUIRED TO MEET EXISTINGCONDITIONS.

7. THE CONTRACTOR SHALL PERFORM WORK IN A SKILLED AND PROFESSIONAL MANNER.

8. ALL CONTRACTORS ARE RESPONSIBLE TO FIELD COORDINATE WORK SCHEDULE WITH OWNERREPRESENTATIVE.

9. THE CONTRACTOR SHALL WORK AND COORDINATE WITH THE OTHER TRADES.

10. ALL EQUIPMENT SHALL BE NEW AND IN UNDAMAGED CONDITION. ANY EQUIPMENT FOUND DEFECTIVESHALL BE IMMEDIATELY REMOVED FROM THE PROJECT.

11. PROVIDE 3 COPIES OF AN OPERATION AND MAINTENANCE MANUAL FOR ALL MAJOR EQUIPMENTREQUIRING SERVICE. MAJOR EQUIPMENT INCLUDES BUT IS NOT LIMITED TO COILS, FANS, ANDCONTROL WIRING DIAGRAMS. EACH PIECE OF EQUIPMENT SHALL STATE THE CONTRACT DATE AND THENAME, ADDRESS AND PHONE NUMBER FOR THE PRIME CONTRACTOR, SUBCONTRACTOR PERFORMINGTHE INSTALLATION, AND THE LOCAL VENDOR FOR SPARE PARTS. THE MANUALS SHALL CONTAINMAINTENANCE INSTRUCTIONS REQUIRED FOR THE INSTALLED EQUIPMENT. MANUALS SHALL BE BOUNDIN A THREE RING HARD COVER BINDER. O & M MANUALS SHALL BE SUBMITTED TO THE OWNER PRIOR TOFINAL WALK THROUGH OF THE PROJECT.

12. CONTRACTOR SHALL SUBMIT A CERTIFIED REPORT INDICATING SYSTEM PERFORMANCE INCLUDING,BUT NOT LIMITED TO, VOLTAGE AND AMPERAGE MEASUREMENTS OF ALL EQUIPMENT GREATER THAN1/3 H.P. WATER BALANCE MEASUREMENTS OF EACH COIL AND PUMP. AIR BALANCE MEASUREMENTS OFOUTSIDE AIR DELIVERY, AIR HANDLING UNIT SUPPLY, SUPPLY DIFFUSERS, EXHAUST AND RETURNGRILLES. AIR BALANCE SHALL BE WITHIN 10% OF DESIGN CONDITIONS. THE REPORT CERTIFICATIONSHALL BE AS FOLLOWS:

I (name) of (company) CERTIFY THAT ALL MEASUREMENTS, FIGURES AND STATEMENTS INDICATED INTHIS REPORT WERE TAKEN BY ME OR UNDER MY SUPERVISION AND ARE ACCURATE AS OF (date).DESIGN FLOWS WERE BASED UPON PLANS DATED (xx/xx/xx).

ONLY AFTER ALL OF THE EQUIPMENT IS INSTALLED AND PROPER OPERATION IS VERIFIED.

14. MECHANICAL CONTRACTOR TO REPAIR ANY DAMAGE DONE TO THE FIRE PROOFING WHILE INSTALLINGTHE MECHANICAL TRADES. SEAL ALL PENETRATIONS THROUGH RATED STRUCTURES WITH UL LISTEDFIRE SEAL DESIGNED FOR THE SPECIFIED APPLICATION.

15. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO PROTECT THE PUBLIC ANDADJACENT PROPERTIES FROM DAMAGE THROUGHOUT CONSTRUCTION.

16. THE CONTRACTOR SHALL GUARANTEE ALL WORKMANSHIP AND MATERIALS FOR A PERIOD OF ONE (1)YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OR AS OTHERWISE REQUIRED IN THESPECIFICATIONS.

17. MECHANICAL CONTRACTOR TO INSTALL ON THE BOILERS WATER LINE FLEX CONNECTORS, MUFFLERSAND VIBRATION PADS. FLEX CONNECTORS, MUFFLERS AND VIBRATION ARE PADS PROVIDED BY THEBOILER MANUFACTURER.

18. MECHANICAL CONTRACTOR TO INCLUDE THE TEST AND BALANCE, AND ANY PERMIT FEES IN THEIR BID.

19. MECHANICAL CONTRACTOR SHALL VERIFY ALL EQUIPMENT WEIGHTS, SIZES, LOCATIONS ANDOPENINGS REQUIRED AND SHALL COORDINATE ANY CHANGES WITH THE ARCHITECT.

20. UPON PROJECT COMPLETION, RECORD (AS-BUILT) DRAWINGS SHALL BE PROVIDED BY THECONTRACTOR TO THE OWNER AND ENGINEER. ALL CHANGES IN PIPING AND DUCTWORKARRANGEMENTS SHALL BE NOTED ON THE RECORD DRAWINGS.

AUTOMATIC AIR VENT

WATER FLOW MEASURING DEVICE

PIPE ANCHOR

PIPE GUIDE / SLEEVE

STRAINER WITH BLOWDOWN

DRAIN VALVE

FLOW DIRECTION ARROW

STEAM TRAP & DRIP ASSEMBLYT

MANUAL AIR VENT (MAV)

THREE-WAY VALVE

PUMP

STRAINER

THERMOMETER

TWO-WAY VALVE

BALL VALVE/SHUT-OFF VALVE

CIRCUIT SETTER

SILENT CHECK VALVE

UNION

PRESSURE RELIEF VALVE

PRESSURE GAUGE

PRESSURE/TEMPERATURE PORTPT

AIR SEPARATOR

BALANCING VALVE

ELBOW DOWN TO TEE

ELBOW DOWN

DOUBLE ELBOW DOWN

END CAP

TEE UP

TEE DOWN

ELBOW UP

DOUBLE ELBOW DOWN (AT CORNER)

PUMPOR

PRESSURE DIFFERENTIAL SENSORDPFLOW CONTROL VALVE W/

DPDIFFERENTIAL PRESSURE SENSOR

PRESSURE REDUCING VALVE

GLOBE VALVE

NEW TO EXISTING PIPE CONNECTION

SHUT-OFF COCK

VACUUM BREAKER

STEAM GAUGE SIPHON

DIGITAL OUTPUT

ANALOG OUTPUT

DIGITAL INPUT

ANALOG INPUT

REDUCERTYPICAL TEE CONNECTION (PLANS ONLY)

SUCTION DIFFUSER W/ STRAINERAND BLOWDOWN

FLEX CONNECTION

BUTTERFLY VALVE

COIL

PIPE VIEW

TEE

ELBOW

TRIPLE DUTY VALVE

AIR DUCT (DOWN)

EXHAUST AIR DUCT (UP)

EXHAUST AIR DUCT (DOWN)

RETURN AIR DUCT (UP)

RETURN AIR DUCT (DOWN)

OUTSIDE OR SUPPLY

DUCT SIZE

SUPPLY AIR CEILING DIFFUSER

RETURN AIR GRILLE

NEW DUCTWORK

PIPE PENETRATION THROUGHFIRE RATED WALL

CALL-OUTCFM

MANUAL BALANCING DAMPER

EXHAUST AIR GRILLE

THERMOSTAT

X

SCHEDULED EQUIPMENT TAG

SMOKE DAMPER (X=S)FIRE DAMPER (X=F)

FIRE/SMOKE DAMPER (X=C)

EXISTING DUCTWORK

P

MOTORIZED DAMPERM

FLEX DUCT

REMOTE SENSOR

OUTSIDE OR SUPPLYAIR DUCT (UP)

CALL-OUT CFMOR

DIFFUSER, GRILLE, AND REGISTER CALL-OUTS

AD ACCESS DOOR

AF AIR FILTER

B BOILER

BDD BACK DRAFT DAMPER

BT BUFFER TANK

CD CEILING DIFFUSER

EF EXHAUST FAN

EFH ELECTRIC FAN FORCED HEATER

EG EXHAUST GRILLE

ET EXPANSION TANK

FD FIRE DAMPER

H HUMIDIFIER

HX HEAT EXCHANGER

L LOUVER

MD MOTOR OPERATED DAMPER

NC NORMALLY CLOSED

NO NORMALLY OPEN

OA OUTSIDE AIR

OED OPEN END DUCT

RA RETURN AIR

RG RETURN AIR GRILLE

RH HOT WATER RE-HEAT

SA SUPPLY AIR

SF SUPPLY FAN

SG SUPPLY GRILLE

SR SUPPLY REGISTER

TG TRANSFER GRILLE

UH UNIT HEATER

CEILING DIFFUSER W/BLANKOFF

13. PROVIDE 2 HOURS OF OWNER TRAINING FOR THE INSTALLED EQUIPMENT. TRAINING SHALL BE HELD

OI

8

3 2 1

56

NOTE:FILL SYSTEM TO 20 PSIG.

9

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

43:3

9 PM

TJG

MECHANICAL TITLESHEET

800

3.2014105.00

Issue Date

MECHANICAL SHEET INDEX800 MECHANICAL TITLE SHEET801.H FIRST TIER HVAC PLAN802.H SECOND TIER HVAC PLAN803.H THIRD TIER HVAC PLAN850 MECHANICAL ENLARGED PLANS AND SECTIONS870 MECHANICAL SCHEDULES

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015

Page 2: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

UP

S S S S S SSSC CC

S S S S S SSSC CC

S S S S S S S S S S S S S S S S S S S S S S S S S S S

S S S S S S S S S S S S S S S S S S S S S

C

SSSSSSSSSS S

SS

SS

SS

SS

SS

SS

S

SSSSSSSSSSSSSSSSSSSSSSSSSS S

SS

C

C

S

DN

SS

UP

UP

1

2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

.5

z

ENTRY VESTIBULE A100-1

WATER SERVICE103

STAIR C100-4

STAIR B100-3

8501

CONNECT 1 1/4"HWS/R AT CUH-1

REFER TO SHEET 850FOR RADIANT INFLOORHEATING PLAN

CUH1

CUH-1 MOUNTEDTIGHT TO CEILING

EFH3

M.C. TO PROVIDE SHEET METAL COVERAROUND EXPOSED HWS/R PIPING.COVER MUST BE TAMPER PROOF ANDPAINTED TO MATCH CEILING.

TRASH104

ROUTE 1" CONDENSATE FROMAC-4B TO NEAREST FLOOR DRAINOR OPEN SITE PROVIDED BY P.C.

1. REFER TO MECHANICAL PIPING SCHEMATIC ON SHEET 800 FOR HWS/RPIPE SIZES.

2. EQUIPMENT MANUFACTURER TO PROVIDE REFRIGERANT PIPINGSIZED BASED ON ACTUAL INSTALLATION CONDITIONS.

3. MC SHALL PROVIDE AND INSTALL REFRIGERANT TRAPS AS REQUIREDBY EQUIPMENT MANUFACTURER.

4. MC SHALL CORDINATE FINAL EQUIPMENT LOCATION AND PIIPNG WITHALL INVOLVED TRADES.

GENERAL NOTES

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

43:4

4 PM

TJG

FIRST TIER HVAC PLAN

801.H

3.2014105.00

Issue Date

3/32" = 1'-0"

FIRST TIER HVAC PLAN1NORTH

TRUE

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015

Page 3: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

DN

S

SS

SS

S

S S S S S SSSC CC

S S S S S SSSC CC

S S S S S S S S S S S S S S S S S S S S S S S S S S S

S S S S S S S S S S S S S S S S S S S S S S SC

SSSSSSSSSS S

SS

SS

SS

SS

SS

S

SS

S

SSSSSSSSSSSSSSSSSSSSSSSSSSS S

SS

SSSSSSS

S S S S S

SSSSSSSSSSSS S SS

SS

SS

C

S S

S

S

S

S

S

S

S

S

S

S

S

S

S

C

C

DN

DNUP

UP

UP

T

1

2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

.5

z

BOILER ROOM202

DATA201

VESTIBULE A200-1

DATA203

STAIR C200-4

STAIR B200-3

8502

REFRIGERANTPIPING UP TO AC-4A

ROUTE 1" CONDENSATE DNTHRU FLOOR TO NEARESTFLOOR DRAIN OR OPEN SITE ONFIRST TIER PROVIDED BY P.C.

AC4B

EFH6

1. REFER TO MECHANICAL PIPING SCHEMATIC ON SHEET 800 FOR HWS/RPIPE SIZES.

2. EQUIPMENT MANUFACTURER TO PROVIDE REFRIGERANT PIPINGSIZED BASED ON ACTUAL INSTALLATION CONDITIONS.

3. MC SHALL PROVIDE AND INSTALL REFRIGERANT TRAPS AS REQUIREDBY EQUIPMENT MANUFACTURER.

4. MC SHALL CORDINATE FINAL EQUIPMENT LOCATION AND PIIPNG WITHALL INVOLVED TRADES.

GENERAL NOTES

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

43:5

0 PM

TJG

SECOND TIER HVACPLAN

802.H

3.2014105.00

Issue Date

3/32" = 1'-0"

SECOND TIER HVAC PLAN1NORTH

TRUE

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015

Page 4: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

S SC

S SC

S S SSSC CC

S S SSSC CC

S S S S S S S S S S S S S S S S S S S S S S S S S S S

CS S S S S S S S S S S S S S S S S S S S S S

C

SS

SS

SS

SS

SS

S

SS

S

SSSSSSSSSSSSSSSSSSSSSSSSSSS S

SS

S S S S S S

SS

SS

SS

SS

S

SSSSSSSSSS SSSSSSSSSSSSSSSSSSSS S SS

C

S

S

S

DN

DN

DN

1

2 3 4 5 6 7 8 9 10 11 12 13 14

A

B

C

D

.5

z

AC4A

AC3A

AC1A

4850

STORAGE301

VESTIBULE A300-1

UTILITY303

STAIR C300-4

5850

REFRIGERANTPIPING DN THRUFLOOR TO AC-4B

4" CONCRETEEQUIPMENT PAD (TYP)

4" CONCRETEEQUIPMENT PAD (TYP)

AC2A

REFRIGERANT PIPING DN THRUFLOOR TO AC-1B, AC-2B & AC-3B

STAIR B300-3

1. REFER TO MECHANICAL PIPING SCHEMATIC ON SHEET 800 FOR HWS/RPIPE SIZES.

2. EQUIPMENT MANUFACTURER TO PROVIDE REFRIGERANT PIPINGSIZED BASED ON ACTUAL INSTALLATION CONDITIONS.

3. MC SHALL PROVIDE AND INSTALL REFRIGERANT TRAPS AS REQUIREDBY EQUIPMENT MANUFACTURER.

4. MC SHALL CORDINATE FINAL EQUIPMENT LOCATION AND PIIPNG WITHALL INVOLVED TRADES.

GENERAL NOTES

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

43:5

4 PM

TJG

THIRD TIER HVAC PLAN

803.H

3.2014105.00

Issue Date

3/32" = 1'-0"

THIRD TIER HVAC PLAN1NORTH

TRUE

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015

Page 5: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

TT

T

UP

S

1

2

4850

AC3B

AC1B

ELECTRICAL ROOM102

ELEV EQUIP101

ENTRY VESTIBULE A100-1

5850

WALL MOUNTED AC UNITLOCATED ABOVE DOORAPPROXIMATELY 8'-0" AFF (TYP)

PROVIDE 1" CONDENSATE ROUTED TO NEARESTFLOOR DRAIN OR OPEN SITE PROVIDED BY P.C.

1 1/4" HWS/R UPTO BOILER ROOM

CUH1

6850

EFH1

EFH2

REFRIGERANT PIPINGUP TO AC-1A & AC-3A

5/8" PEX TUBING (10 TOTAL) WITH 1" ARMAFLEXINSULATION UP TO MAN-1 & DN TO ACTIVERADIANT INFLOOR HEATING CIRCUITS

FIRST TIER100'-0"

SECOND TIER112'-0"

ROOF (ALT 1 FOURTH TIER)134'-0"

THIRD TIER123'-0"

1 2

STAIR SUBMERGED BAY97'-1 1/2"

EAST END98'-10"

AC1B

AC3B

ELECTRICAL ROOM102

ELEV EQUIP101

BOILER ROOM202 DATA

201

STORAGE301

AC3A

AC1A

FIRST TIER100' - 0"

SECOND TIER112' - 0"

THIRD TIER123' - 0"

ROOF134' - 0"

1 2

FOURTH TIER - ALTERNATE134' - 0"

T/O CANOPY123' - 2"

5850

REFRIGERANT PIPING ROUTEDDN THRU FLOOR TO ASOCCIATEDINDOOR AC UNIT (TYP)

EFH2

EFH1

AC2B

EFH5

EFH4

AC2A

1" COND

1" COND

1 1/4" COND

ROUTE 1 1/4" COND TONEAREST FLOOR DRAIN OROPEN SITE PROVIDED BY P.C.

BOILER CONCENTRICVENT/INTAKE PIPING THRU WALL

3ø4ø

B1

1" COND

1 1/4" COND

P1

1

2

4850

5850

CONCENTRICBOILER VENT/INTAKEPIPING THRU WALL

ROUTE 1 1/4" HWS/R DNIN CHASE TO CUH-1LOCATED ON FIRST TIER

1" COND

BOILER ROOM202

DATA201

EFH5 AC

2B

B1

1MAN

AS1

ET1

P2

BT1

P1

6850

5/8" INFLOOR TUBING LEADERS SHALL BEINSULATED WITH 1" ARMAFLEX INSULATION.INSTALL UNISTRUT EVERY 10'-0" WITH PIPECLAMPS TO SECURE PIPING WITHIN CHASE.

EFH4

REFRIGERANTPIPING UP/DNSERVING AC-1 & AC-3

REFRIGERANTPIPING UP TO AC-2A

1" COND

1

2.5

ENTRY VESTIBULE A100-1

SLAB SENSOR

5/8" INFLOOR TUBING INSULATEDWITH 1" ARMAFLEX UP TO MAN-1LOCATED IN BOILER ROOM 202

RADIANT INFLOORTUBING SHALL BESPACED 6" O.C.

FIRST TIER100'-0"

SECOND TIER112'-0"

ROOF (ALT 1 FOURTH TIER)134'-0"

THIRD TIER123'-0"

C

EAST END98'-10"

4850

FIRST TIER100' - 0"

SECOND TIER112' - 0"

THIRD TIER123' - 0"

ROOF134' - 0"

C

FOURTH TIER - ALTERNATE134' - 0"

B1

AC3B

EFH5

AC3A

ELECTRICAL ROOM102

BOILER ROOM202

STORAGE301

AS1

3ø3ø

ET1

CUH1

BT1P

1P2

1MAN

6850

REFER TO RADIANT INFLOORHEATING PLAN ON SHEET 850FOR ADDITIONAL INFORMATION

1 1/4" COND

1" COND

ENTRY VESTIBULE A100-1

VESTIBULE A200-1

VESTIBULE A300-1

1 1/4" COND TO NEAREST FLOOR DRAINOR OPEN SITE PROVIDED BY P.C.

REFRIGERANT PIPING DNTHRU FLOOR TO ASSOCIATEDINDOOR UNIT (TYP)

1. REFER TO MECHANICAL PIPING SCHEMATIC ON SHEET 800 FOR HWS/RPIPE SIZES.

2. EQUIPMENT MANUFACTURER TO PROVIDE REFRIGERANT PIPINGSIZED BASED ON ACTUAL INSTALLATION CONDITIONS.

3. MC SHALL PROVIDE AND INSTALL REFRIGERANT TRAPS AS REQUIREDBY EQUIPMENT MANUFACTURER.

4. MC SHALL CORDINATE FINAL EQUIPMENT LOCATION AND PIIPNG WITHALL INVOLVED TRADES.

GENERAL NOTES

FIRST TIER100'-0"

SECOND TIER112'-0"

ROOF (ALT 1 FOURTH TIER)134'-0"

THIRD TIER123'-0"

1

STAIR SUBMERGED BAY97'-1 1/2"

EAST END98'-10"

FIRST TIER100' - 0"

SECOND TIER112' - 0"

THIRD TIER123' - 0"

ROOF134' - 0"

1

FOURTH TIER - ALTERNATE134' - 0"

5850

BOILER ROOM202

ELECTRICAL ROOM102

P2

ET1

1MAN

1 1/4" HWS/RTO CUH-1

AS1

ELEV EQUIP101

DATA201

STORAGE301

5/8" RADIANT INFLOORTUBING (10 TOTAL)LOCATED IN CHASE

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

44:0

3 PM

TJG

MECHANICAL ENLARGEDPLANS AND SECTIONS

850

3.2014105.00

Issue Date 1/2" = 1'-0"

ENLARGED MECHANICAL PLAN1

1/4" = 1'-0"

PARTIAL MECHANICAL SECTION4

1/2" = 1'-0"

ENLARGED BOILER ROOM PLAN2 1/4" = 1'-0"

RADIANT INFLOOR HEATING PLAN3NORTH

TRUE

NORTH

TRUE

NORTH

TRUE

1/4" = 1'-0"

PARTIAL MECHANICAL SECTION5

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015

1/4" = 1'-0"

PARTIAL MECHANICAL SECTION6

Page 6: 800web.ci.eau-claire.wi.us/bwbr/NBPS_800-Mech.pdf%%152 1 1/4"x1 1/4"x1/8" U-BOLT PROVIDE NEOPRENE GASKET @ U-BOLT NEOPRENE BLOCK NEOPRENE WASHER TRIPLE DUTY VALVE PT PT NOT TO SCALE

MAN#

B#

P#

AS#

ET#

#AC

#CUH

#EFH

#BT

INFLOOR HEATING SCHEDULE

BOILER SCHEDULE

PUMP SCHEDULE

AIR SEPARATOR SCHEDULE

DIAPHRAGM EXPANSION TANK SCHEDULE

MINI SPLIT A/C UNIT SCHEDULE

CABINET UNIT HEATER SCHEDULE

ELECTRIC FAN FORCED HEATER SCHEDULE

BUFFER TANK SCHEDULE

LOOP LENGTHMAX

250' 5/8"20 1-3NOTES

SUPPLY TEMPERATUREWATER (°F) DIFF. (°F)

1 REHAU 5/8" HEPEX& MODEL NO.

MANUFACTURERLOCATION

ENTRY VESTIBULE ASIZEPIPE

5CIRCUITS

# OF

8'

HEAD LOSSMAXIMUM

SENSORLOCATION

ENTRY VESTIBULE

SLAB

(GPM)@ MANIFOLD/ZONE

6.0(PER LOOP)

130

15MOCPSYSTEM

SUPPLYWATER

(°F)MBHINPUT

LOCATION MBHOUTPUT SUPPLY

(IN) (IN)

INTAKEVENT

(IN)VENT

EXHAUST

CHARELECTRICAL MANUFACTURER

& MODEL NO.BOILER ROOM LOCHINVAR WH-151120/13"1"1301351502021 3" 1-5

NOTES

NOTES:1. PROVIDE A LOW WATER & PUMP CONTROL CUT OFF.2. M.C. PROVIDE ALL COMPONENTS REQUIRED FOR WALL MOUNTING OF BOILER.3. M.C. SHALL PROVIDE CONCENTRIC VENTING KIT. INSTALL VENT AND INTAKE PIPING PER MANUFACTURER RECOMMENDATIONS.4. SELECTION BASED ON 25% PROPYLENE GLYCOL SOLUTION.5. PROVIDE AND INSTALL OUTDOOR TEMPERATURE SENSOR TO ENABLE OUTDOOR RESET OPERATION.

& MODEL NO.MANUFACTURERPUMP

SERVESLOCATION RPMTYPEFLOW(GPM)

DESIGNELECTRICAL

MAXIMUMSHUT OFFHEAD (FT)

MOTOR

CHAR HPDISCHARGE

(IN)SUCTION

(IN)

PUMP SIZE

IMPELLERBHPHEAD(FT) NOTES

1 -1 1/4"1 1/4"VARIABLE1/4--14INLINEB-1BOILER ROOM 20 1-4

NOTES:1. PROVIDE PUMP WITH ECM MOTOR.2. 25% PROPYLENE GLYCOL SOLUTION.3. SELECTION BASED ON 20° ∆T.4. E.C. SHALL PROVIDE AND INSTALL ELECTRICAL DISCONNECT.

208/1

TOTAL FLOW

(IN)RETURN

1"

1 INLINE NO 3' 1 1/2" 1NOTES

HW LOOPSYSTEM (IN)DROP (FEET)

PRESSUREMAXIMUM

SIZESTRAINERTYPE

BOILER ROOMLOCATION

MANUFACTURER& MODEL NO.

BELL & GOSSET IAS 1-1/2GPM13.5

BUILDING HW LOOPBOILER ROOM1LOCATION SYSTEM

DIAMETER

BELL & GOSSET HFT-30& MODEL NO.

MANUFACTURERSYSTEM OPERATING

30MAXMIN

12

SYSTEM

1/2"

SIZE(IN)

CONNECTIONRANGE (GAUGE PSI)

PRE-

(PSIG)12

CHARGED

CAPACITY

4.42.5

VOLUME(GAL)

ACCEPT. MIN. TANKVOLUME

(GAL)

SIZE

11"14"(IN)

HEIGHT(IN)

-NOTES

NOTES:

NOTES:1. PROVIDE ALL REQUIRED TEMPERATURE CONTROL SENSOR AND VALVES. SEE PLANS FOR SLAB SENSOR LOCATION.2. PROVIDE RADIANT ZONE CONTROLLER FOR INFLOOR HEATERING OPERATION. PROVIDE ZONE CONTROLLER FROM TEKMAR CONTROL SYSTEMS OR AN APPROVED EQUAL MANUFACTURER.3. SYSTEM SHALL BE EQUIPPED TO HANDLE 30% PROPYLENE GLYCOL SOLUTION.

WILO STRATOS 1.25 3 x 30

MANUFACTURER& MODEL NO.TONNAGE

NOMINALINDOOR UNIT

ELEC.CHAR(LBS)(LOW)

REFRIG.TYPESEERCHAR

ELEC.OUTDOOR UNIT

MCAMANUFACTURER

& MODEL NO. NOTES1

MIN. WEIGHTCFM

NOTES:1. PROVIDE HEAT PUMP SYSTEM CAPABLE OF OPERATING IN BOTH HEATING AND COOLING MODES.2. M.C. TO INCLUDE PRE-CHARGED LINE KIT. INSULATE SUCTION LINE.3. M.C. TO PROVIDE MOUNTING BASE AND ANCHORING BOLTS FOR OUTDOOR UNIT, INSTALLATION BY G.C.4. M.C. TO PROVIDE DISCONNECT FOR INDOOR UNIT, WALL INSTALLATION BY E.C.5. M.C. TO PROVIDE DISCONNECT FOR OUTDOOR UNIT, INSTALLED BY E.C.6. INDOOR UNIT RECEIVES POWER FROM OUTDOOR UNIT THROUGH INTERCONNECTING WIRING PROVIDED AND INSTALLED BY E.C.7. M.C. TO PROVIDE AND INSTALL A HARD-WIRED WALL MOUNTED THERMOSTAT.8. ROUTE AND CONCEAL ALL REFRIGERANT LINES WITHIN LINESET PROTECTION COVER.9. M.C. TO PROVIDE UNIT WITH AN INVERTER-DRIVEN COMPRESSOR.10. M.C. TO PROVIDE WIND BAFFLE ALLOWING FOR LOW AMBIENT COOLING OPERATION DOWN TO 0° FAHRENHEIT.11. M.C. TO PROVIDE CONDENSATE PUMP WITH INDOOR UNIT. LINE VOLTAGE POWER SOURCE AND INTERCONNECTING WIRING PROVIDED AND INSTALLED BY E.C.

MOCP(LBS)WEIGHT OUTDOOR

UNIT ID

2

4 1-11AC-4A

1-11AC-2A

3 208/1 410A- 55 1-1125 MITSUBISHI PUZ-A36NHA4 705 24V DC MITSUBISHI PKA-36KA440175 AC-1A

1-1/2 208/1 410A15.2 3513 MITSUBISHI PUZ-A18NHA3 320 24V DC MITSUBISHI PKA-A18HAL20100

1-1/2 208/1 410A15.2 3513 MITSUBISHI PUZ-A18NHA3 320 24V DC MITSUBISHI PKA-A18HAL20100

INDOORUNIT ID

AC-4B

AC-2B

AC-1B

1LOCATION

MOTOR(# OF MOTORS @ HP)MBH PRES. DROP AMPS

101-1 ENTRY VESTIBULEHI / LOW

1-5NOTESHI / LOW GPM

WATER ELEC.CHAR

4.2115/1/60N/A2 @ 1/204.51430 / 915WALL OR CELING

CEILING 7.171

NOTES:1. SELECT COIL BASED ON 25% PROPYLENE GLYCOL SOLUTION AND A 130°F ENTERING FLUID TEMPERATURE.2. PROVIDE 2-ROW HIGH CAPACITY COIL.3. UNIT MOUNTED RETURN AIR THERMOSTAT PROVIDED BY MANUFACTURER.4. UNIT MOUNTED ELECTRICAL DISCONNECT PROVIDED BY MANUFACTURER.5. PROVIDE TAMPER PROOF ACCESS PANELS AND ACCESS DOORS.

RPMBLOWER

MANUFACTURER& MODEL NO.

MODINE CW-014

CFM

NOTES:1. PROVIDE HIGH CAPACITY AUTOMATIC AIR VENT FROM AIR SEPARATOR MANUFACTURER.

MANUFACTURER& MODEL NO.

1SPEEDSLOCATION CEILING

WALL ORSURFACE MOUNT?CFM KW CONTROL

RPMHI/LOW

101 - ELEVATOR EQUIPMENTAMPS NOTESCHAR.

ELECTRICAL

NOTES:1. UNIT SHALL BE PROVIDED WITH INTEGRAL DISCONNECT SWITCH.2. PROVIDE HEAVY DUTY SURFACE MOUNTING ENCLOSURE.

2 102 - ELECTRICAL ROOM

3 103 - WATER SERVICE

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

RECESSED OR

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

4 201 - DATA

5 202 - BOILER ROOM

6 203 - DATA

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

BERKO FRC4027N/A114.5277/14WALLSURFACE MOUNT100 1-2INTEGRALTHERMOSTAT

1-1135320 24V DC MITSUBISHI PKA-A18HALAC-3B3 AC-3A1-1/2 208/1 410A15.213 MITSUBISHI PUZ-A18NHA320100

2 -1 1/4"1 1/4"VARIABLE1/4--13.1INLINEHW LOOPBOILER ROOM 35 1-4208/1 WILO STRATOS 1.25 3 x 30

1 BOILER ROOM 30 20" 39.5" 390 1-1/2" LOCHINVAR - SQUIRE SBT030HW LOOP

DIAMETER(IN)

DIMENSIONS

SYSTEM LOCATIONVOLUME

(GAL) (LBS.)WEIGHTHEIGHT

(IN)CONNECTIONS

(IN)MANUFACTURER

& MODEL NO.DRAIN

(IN)CONNECTION

TYPENPT 3/4" 1

NOTES

SUPPLY / RETURNCONNECTION

(IN)1"

VENT

NOTES:1. AQUA STAT PROVIDED AND INSTALLED BY BUFFER TANK MANUFACTURER.

A

B

C

D

E

F

G

H

1 2 3 4 5 6 7

H

G

F

E

D

7654321

Copy

right

BW

BR

I hereby certify that this plan, specification or report was preparedby me or under my direct supervision and that I am a dulyLicensed Architect under the laws of the State of Minnesota.

Name

Date Reg. No.

DateItem

Sheet No.

Sheet Title

Comm. No. Drawn

This Sheet may be aReduced Copy.

The bar above is 1" long on a Full Size Sheet.Drawing Scales apply to Full Size Sheets.

This document may be an electronic file or maybe printed from an electronic file provided tothe user. It is the sole responsibility of the userto ensure that the content and quality isconsistent with the content and quality of thepaper documents on file at BWBR.

C

B

A

Issued For

Consultants

651.222.3701Saint Paul, MN 55102380 St. Peter Street, Ste. 600

bwbr.com

NORTH BARSTOWPARKING

STRUCTURE

MEP PROJECT # B26.14.02

1/28

/201

5 7:

44:0

4 PM

TJG

MECHANICALSCHEDULES

870

3.2014105.00

Issue Date

100% CONSTRUCTIONDOCUMENT ISSUE

01/28/2015