20
144

144 - GRL · as SPT, and other relevant information. The soil boring should be in the vicinity of the load test pile and extend below the pile toe. Pile driving log (or at least the

Embed Size (px)

Citation preview

144

145

146

147

148

149

150

151

152

153

154

155

156

157

158

159

160

161

162

163