ICON ENGINEERING SERVICESP R O F I L E

Page 2: 13.ICON Brochure
Page 3: 13.ICON Brochure
Page 4: 13.ICON Brochure

2 IES

Page 5: 13.ICON Brochure

C O N T E N T SVision 4

Philosophy and Mission 5

History 6

About CEO 8

Activities at a glance 10

Equipment 12

Bored Pile 22

Driven Concrete Pile 30

Pile Load Test 34

High Strain Dynamic Testing of Pile 38

Pile Integrity Testing Work 44

Geotechnical Investigation Work 45

List of few major clients 46

Page 6: 13.ICON Brochure

4 IES

Our vision is to be a vanguard of comprehensive

geotechnical engineering service provider in

the country by power of knowledge, technology,

machinery and human resources. Our prime vision is

to develop present geotechnical engineering practice

by incorporating modern technology practiced

in developed world and to improve skills of local

engineers and entrepreneurs.

We believe in commitment to the profession,

advancement of technology and provide the best

services to the client.

Vision

Bridge 01, Hatirjheel Intregrated Development Project1200φ Depth-32m, Nos-86 bored RC pile constructed by IES

Page 7: 13.ICON Brochure

5 IES

Long back, in mid fifties of the last century, geotechnical

engineering services i.e. soil investigation and bored pile

construction has been introduced in the then East Pakistan

under the entrepreneurship of Swiss Boring, later, the

company switched over to Soiltech International Ltd in

the year of 1971, just after independence of the country.

Other than Soiltech International Ltd, few other company

grew under the leadership of local engineer, and started

practicing geotechnical engineering in real life project. But

work volume failed to attract others to this profession.

Over time, economy of the country gained momentum and

development work volume amplified but this specialized

geotechnical engineering did not move forward, rather, we

want to say, quality and services declined. Non-professionals

dominated the industry and in most cases people took it

simply as business. Now it's time to set a new benchmark

and set on our missions are to:

• Incorporate updated technology.

• Procure modern equipment and instrument.

• Improve skills of local engineers and entrepreneur.

• Develop human resources.

Philosophy & Mission

Page 8: 13.ICON Brochure

6 IES

Setting Up: 1991- 1997IES launched late in 1991 by Engr. Abu Mohammed Masud, without any financial investment and without any employee on payroll. Onset a very small geotechnical laboratory setup in a rented garage. In early 1992, Beximco Engineering Ltd awarded a small contract of bored pile work for Rangunia – Hathazaree electrical transmission line at Chittagong. That was the beginning and later in following years IES did many small diameter bored pile construction project and completed successfully. Few of them are can mentioned here- UGC building, laundry building of Hotel Sonergaon, Parishankhyan Bhaban at Agargaon, Twin tower, Concord Grand at Shantinagar, Concord Regency at Panthapath, Golf Heights at Banani, ShundarbanTechnopark at Darussalam etc and many other small building projects.

Decade for Stabilization: 1998- 2007 Onset IES faced a lot of troubles due to faulty workmanship of out sourced mechanical work that resulted in huge backlog and idle time. To overcome the crisis, IES set-up one mechanical workshop and started repair and maintenance of their own equipment and machines and IES got new momentum in site works.

During this period we have constructed bored pile by conventional method for many prestigious projects having national importance. Off them we may mentioned bored pile for Hatubhanga bridge

on Bangshi river at Mirzapore, Crown Cement Ltd at Mukterpur, Dhaka-Sylhet highway under Ircon International Ltd, Hz Shah Paran Bridge on Sylhet bi-pass road, Lafarge Surma Cement plant at Chattak under Lerson &Toubru Ltd, Kin Bridge Sylhet etc and many other projects.

During this period IES also started non-destructive pile testing work – PIT, Pile integrity test and PDA, High Strain Dynamic Testing for quality assurance test of pile foundation. Also, procured equipment for high tonnage pile load test work and conducted many pile load test having test load more than 500 ton.

Stage of Development: 2007-2012In 2007, we had under taken a large diameter bored pile work for Arch bridge on Gulshan Lake between Banani and Gulshan. Technical specification restricted the rotary boring method to follow. IES have rented one table drive rotary drilling rig for the work but failed to accomplish drilling. As a result, engineers and workers had been humiliated and insulted by the client and consultant. IES took that as challenge and started brain storming to develop a machine to accomplish the job. Finally, collected old components from Dholaykhal and assembled in their own workshop to make a drilling machine and finally succeeded and finished the piling work by newly developed rotary boring machine. This is a mile stone development of IES which boosted engineers and workers to go ahead. Presently, IES have big fleet of

History

Page 9: 13.ICON Brochure

7 IES

mechanical rotary boring machine for bored pile

construction and successfully used in many prestigious projects of the country like- Hatirjheel integrated development project, Mirpur-airport road flyover, box girder bridge on river Brhammaputra at Gaffargaon, Y-bridge on river Titas at Bancharampur, bridges on Mahananda at Chapai, Gangachara bridge on river Teesta in Rangpur etc.

Another new division started on by procuring new diesel hammers and pile drivers to undertake many projects. Such as the 22,000 Flat construction project of RAJUK. IES procured new diesel hammers from Delmag, and now, have a fleet of diesel hammers ranging from D22 to D46 with pile drivers and are on the top of the list of contractors having highest number and heaviest diesel hammers and pile drivers.

During this time IES have widened and introduced High Strain Dynamic Pile Test by procuring two sets of Pile Driving Analyzers and Pile Integrity Testers from Pile Dynamics Inc, USA and engineers and technicians obtained certification from overseas training and proficiency test from PDCA & PDI.

IES, procured 2500 ton and 1500 ton test setups and expanded their ability to conduct static pile load test up to 2500 ton. IES also procured half dozen vibrating wire load cells, displacement transducers, 16 channel data loger, readout unit fot instrumentation of static pile load test. This is anew horizon and IES become only service provider for instrumented pile load test.

Advancement with New Technology: 2013 onwardSince inception IES always looked forward with a vision to utilize modern machineries and practices essential for geotechnical engineering; and develop human resources on par with the international geotechnical sector. All their focuses are being collectively directed to become a leader of this nation’s geotechnical service providers. This has already been achieved and become the only piling and testing contractor in the country, who have introduced: Hydraulic drilling rig for bored cast-in-situ pile; fleet of new diesel hammers; CFA piling; performing static axial load tests using the most sophisticated and precise instruments—displacement transducers and load cell; and introducing dynamic testing of piles.

IES have also taken initiatives to modernize the nation’s geotechnical investigation sector. At present, IES is the only geotechnical firm to implement the usage of auto-trip hammer to carryout standard penetration test (SPT) and developed double tube thin walled vacuum sampler for collection of undisturbed soil samples. In addition, the entire operation is digitally recorded and submitted to our clients. In the process, the quality assurance is also guaranteed. Furthermore, it is also in our intention to introduce internationally accepted CPT; and seismic survey to clearly map out geotechnical features of a particular location.

Page 10: 13.ICON Brochure

8 IES

Obtained graduation degree in civil engineering from Rajshahi

Engineering College, Rajshahi, Bangladesh and started career

as junior engineer for construction of slipway for Chittagong

Port Authority and then joined specialized geotechnical

engineering German company, Soiltech International Ltd,

pioneer of geotechnical engineering in Bangladesh. During

four and half years service in Soiltech International Ltd he

himself experienced boring and installation of water wells,

construction of bored pile, driven cast-in place pile, geotechnical

investigation, pile load testing work done for different project

and started career as geotechnical engineer.

Then, went abroad worked in a geotechnical investigation and

material testing laboratory in Jeddah, KSA. He was responsible

there for doing geotechnical investigation work, asphalt mix

design, compaction test, CBR test, Marshall stability and flow

test on asphalt concrete, non-destructive concrete testing by

using ultra-sonic pulse machine and Schmidt hammer and

other routine concrete testing in laboratory.

After returning home he joined DRILLTECH and did ground

improvement work such as dynamic consolidation, ground

improvement by sand injection, construction of stone column,

determination of lateral deformation of soil by using pressure

meter, boring and installation of water well for drinking

purposes etc. During the period he became experienced in

developing equipment for different purposes.

Started his own business in 1991 under the banner of ICON

ENGINEERING SERVICES based only on past experience and

personal contact. Construction of bored RC pile, geotechnical

investigation, pile load test and driving pre-cast concrete pile

works were the main stream of the business at the beginning.

About CEOAbu Mohammed MasudB Sc Engg (Civil), FIEB

Page 11: 13.ICON Brochure

9 IES

Page 12: 13.ICON Brochure

10 IES

Activities at a glance

Summary Activities• Large Diameter Bored Casi-in-situ Pile, Especially Deep Piles. Capable to install any diameter bored pile at any depth.• Driving & Construction of Concrete Driven Piles. Capable to undertake project of any size.• Static Compression, Uplift and Lateral Pile Load Test. Capable to conduct pile load test up to 2500 ton.• Dynamic Pile Load Test & Pile Itegrity Test. Capable to test any size of pile.• Geotechnical Investigation/ Survey. For reliable, authentic and precise services.

Mile Stone Projects Acomplished• Padma Bridge, Janjeera Aproach. Bored Pile- 1200φ 40m Static Compression Pile Load test- 1350t Geotechnical Investigation• 22000 flat project of RAJUK Driving and constrction of concrete 28 to 33 m long 400mm square pre-cast pile. Static Compression Pile Load test. Dynamic load test, PDA Geotechnical Investigation• Maghbazer-Mouchack Flyover Static Compression Pile Load Test-650t Dynamic Load Test, PDA- 1500t Geotechnical Investigation• Ashugonj 450 CC Pwer Plant Static Pile Load Test, Anchor Method-1265t max• Saidabad Water Treatment Plant Phase-II Static Compression Pile Load test-800t max Pile Uplift Test- 250t Pile Dynamic Load Test, PDA Cross-hole Sonic Logging• Mirpur-Airport Road Flyover Bored Pile-1000φ 43m• Hatirjheel Integrated Development Project Bored Pile-1000φ & 750φ Pile Dynamic Load Test, PDA Static Compression Pile Load test 550t max• Mayor Hanif Flyover Pile Dynamic Load Test, PDA Pile Integrity Test, PIT• Laferge Shurma Cemement Plant Bored Pile Pile Dynamic Load Test, PDA- 1200t

Exceptional Activities

Bored Pile WorkIntroduced few activities to improve bored pile qualities.• Driving long (15m max) temporary steel casing by vibro-hammer.• Drilling by hydraulic rig. • Borehole cleaning just before pouring concrete under suction by air lift pumping.• Impact flashing of borehole by using a seperator.

Driven Pile Work• Drivavility analysis for driven concrete and steel pile.• Hammer performance analysis.• Introduced brand new single acting diesel hammer.• Automatic blow count by ESAXIMETER.

Pile Load Test Work• Load measurement by vibrating wire load cell.• Settlement meassured by dispalcement transducer.• Digital data collection by 16-channel data logger.• Concrete strain monitoring by embeded strain gauges.• Capable to conduct 2,500t static compression pile load test.• Capable to conduct 1,200t uplift pile load test.• Having 1,500t concrete block

Quality Assurance of Pile• Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser.• Test done by certified engineers having profficiency certification by PDCA & PDI, USA.

Geotechnical Investigation• Use hydraulic cat head to carryout SPT – the most perfect technique.• Introduced auto-trip gear for conducting Standard Penetration Test, SPT.• Authentic SPT blow count- each & every operation captured by video footage.• Capable to drill upto 250m by using rotary boring machine.• Static sounding by electronic CPT.

Page 13: 13.ICON Brochure

Exceptional Activities

Bored Pile WorkIntroduced few activities to improve bored pile qualities.• Driving long (15m max) temporary steel casing by vibro-hammer.• Drilling by hydraulic rig. • Borehole cleaning just before pouring concrete under suction by air lift pumping.• Impact flashing of borehole by using a seperator.

Driven Pile Work• Drivavility analysis for driven concrete and steel pile.• Hammer performance analysis.• Introduced brand new single acting diesel hammer.• Automatic blow count by ESAXIMETER.

Pile Load Test Work• Load measurement by vibrating wire load cell.• Settlement meassured by dispalcement transducer.• Digital data collection by 16-channel data logger.• Concrete strain monitoring by embeded strain gauges.• Capable to conduct 2,500t static compression pile load test.• Capable to conduct 1,200t uplift pile load test.• Having 1,500t concrete block

Quality Assurance of Pile• Dynamic pile load test and dynamic analysis by PAX-8 PDA analyser.• Test done by certified engineers having profficiency certification by PDCA & PDI, USA.

Geotechnical Investigation• Use hydraulic cat head to carryout SPT – the most perfect technique.• Introduced auto-trip gear for conducting Standard Penetration Test, SPT.• Authentic SPT blow count- each & every operation captured by video footage.• Capable to drill upto 250m by using rotary boring machine.• Static sounding by electronic CPT.

11 IES

Page 14: 13.ICON Brochure

12 IES

Equi

pmen

t

Sl Item Qty

Bore

d pi

le d

ivis

ion

1 Hydraulic rotary boring rig for construction of large diameter boredRC pile - Soilmec SR-30

One

2 Hydraulic rotary boring rig for construction of large diameter bored RC pile - MAIT HR-180 One

3 Hydraulic powered double clamped vibrotary Hammer (300 HP) - ICE model 1423C One

4 Mechanical table drive rotary boring machine for construction of large diameterbored RC pile, diameter upto 1500 mm

Nine set

5 Tripod and winch based percussion boring machine for bored RC pile Nine set

6 Drum type motorised bentonyte mixing cyclone complete Four set

7 Screw type air compressor AIRMAN PDS125S, Japan Two set

8 Vacuum priming centrifugal pump for RCD drilling One set

Driv

en p

ile d

ivis

ion

1 Open ended single acting diesel hammer

1.1 Delmag D 46, Germany Two set

1.2 WICE D 46, ICE Netherland One set

1.3 WICE D 36, ICE Netherland Two set

1.4 Delmag D 30, Germany One set

1.5 Delmag D 36, Germany One set

1.6 K35, Kobe Japan Two set

1.7 K25, Kobe Japan One set

1.8 IDH22, IHI Netherland One set

2 Pile driver

2.1 Skid mounted Pile driver Six set

2.2 Footstep hydraulic pile driver TDJB62B, NHM China One set

3 E-SAXIMETER: for hammer blow count during pile driving, PDI USA One

Own plant and machinery

Page 15: 13.ICON Brochure

13 IES

Stat

ic Pi

le lo

ad te

st

1 2500 ton capacity 1700x12000 Plate Girder One set

2 1500 ton capacity 1320x8000 Plate Girder One set

3 Hot rolled standard I-Beam 150 ton

4 Hydraullic jack 800 ton capacity, India One

5 Hydraullic jack 800 ton capacity, CSLS-80012, Singapore Two

6 Hydraullic jack 100-600 ton capacity Eight

7 Vibrating-wire Load Cells 100-2000 ton capacity, 4900 Geokon USA Five

8 Automatic datalogger CR 800 model 8025-3X, Geokon USA One

9 Readout unit GK-405, Geokon USA One

10 Displacement transducer 4450-1, Geokon USA Ten

11 Concrete embedment Strain Gauge 4200 A-2, Geokon USA

12 Concrete blocks for counterweight 1600 ton

13 Concrete cribbing block 200 ton

Non-

dest

ruct

ive

test

ing 1 High strain dynamic pile test, PDA

1.1 Pile driving analyser, PDA including radio device etc plus software: CAPWAP, ICAP , GRL WEAP & PDI plot, model PAX-8 & PAX-4, pile dynamics inc, USA

Two set

1.2 Hammer, guide, trip gear etc. Four set

2 Pile integrity tester, PIT, model PIT-V, pile dynamics inc, USA One unit

3 SPT-Analyzer One set

Page 16: 13.ICON Brochure

14 IES

Conc

rete

eqp

t 1 Greaves 65XL concrete transit mixture truck, TATA 2516, 7 m3 capacityTwo set

2 SIMEM JUMPER 750 batching plant, 30 m3/hr One

3 Putzmeister concrete pump-BSA 1407 One

4 LIUGONG CLG 853 Wheel loader, 3 ton capacity One

5 Concrete mixture machine Sixteen

Pow

er g

ener

ator

Electrical Power Generator

1 150 KVA diesel generator model P-150E, FG Wilson, England One

2 100 KVA diesel generator model P-100, FG Wilson,England Two set

3 30 KVA diesel generator, SDMO & FG Wilson Five

4 Diesel engine powered A/C generator. Ten unit

5 Diesel engine powered DC arc welding mc Tow unit

6 Welding transformers 200 amps Twelve set

Vehi

cles 1 Sedan Car Two

2 Pickup Trucks Three

3 Motor bike Six

Geot

echn

ical s

urve

y

1 Spindle type rotary boring machine

1.1 Model TBM-88, Toney Boring Japan Two

1.2 Model YBM-2Z, Japan One

1.3 Model IES-100 One

2 Cable tool/percussion boring equipment Ten unit

3 Plate bearing (surface) testing equipment- including bearing plate, hydraulic jack, dial gauges, reaction frame.

Two set

4 Dynamic cone penetration testing equipment. Two set

5 Leveling machine Sokia-B20 One unit

6 Complete soil machineries laboratory One lot

Page 17: 13.ICON Brochure

15 IES

Hydraulic rotary boring rig for construction of large diameter bored RC pilesoilmec SR-30, Italy

Hydraulic rotary boring rig for construction of large diameter bored RC pileMAIT HR-180, Italy

DMS control pannel of hydraulic rigsoilmec SR-30

Page 18: 13.ICON Brochure

16 IES

Hydraulic powered doubleclamped vibrotary hammermodel ICE 1423C, Netherland

Motorized Hydraulic power packmodel ICE 300PP, Netherland

Air compressor (screw type) AIRMAN model PDS125S, Japan

Page 19: 13.ICON Brochure

17 IES

Footstep hydraulic pile drivermodel TDJB62B, NHM China

Open ended single acting diesel hammerfor driving pre-cast concrete pileDELMAG model D36, Germany

Concrete batching plant, capacity 30 m3/hr SIMEM JUMPER 750, Italy

Page 20: 13.ICON Brochure

18 IES

Concrete stationarty pump, Putzmeister model 1407C, Germany

Wheel loader, LIUGONGmodel CLG853, China

Concrete transit mixture truck capacity 7cem on TATA carrier and drum GREAVESmodel 65XL, India

Page 21: 13.ICON Brochure

19 IES

Mechanical Table drive rotary boring machine for construction for constructionof large diameter bored RC pile

Spindle type rotary drilling machine for deep boring and coring, Toney Boring

model TBM-88, Japan

Steel plate girder, 1700mm X 12000mmfor pile load test

Spindle type rotary drilling machine for deep boring and

coring model IES-100

Spindle type rotary drilling machine for deep boring and coring YBM Boring Co.model YBM-2Z, Japan

Page 22: 13.ICON Brochure

20 IES

Pile integrity testerPDI model PIT-V, USA

Pile signal analizer, TDR2, UK

PDA hardware set; Data acquisition unitmodel PAX-8 & PAX-4, with accelerometer, strain

gauges and accessories, Pile Dynamic Inc, USA

Pocket penetrometer

Page 23: 13.ICON Brochure

21 IES

800 ton capacity singel actinghydraulic jack with spherical seat

SUNRUN model CSLS-80012, Taiwan

Impact hammer blow counterSAXIMETER, Pile Dynamics Inc., USA

Motorized hydraulic power pack, 40 L tankSUNRUN model SPE-2, Taiwan

Vibrating-wire load cells, data logger, readout unit,strain gauges displacement transducerand accessories (100-2000ton)GEOKON, USA, 4900

Page 24: 13.ICON Brochure

22 IES22Bo

red

Pile Bored cast-in-situ RC pile technology is the most popular

deep foundation construction method, which introduced

in the country, by few foreign companies, since mid fifties

of last century. Unfortunately, no significant advancement

have been accomplished to improve quality, rather than

acquire few hydraulic powered rotary boring rig by general

contractors in last three to four years. Introduction of such

sophisticated hydraulic rigs is definitely a forward step but

machines by themselves do not ensure good quality.

We are Emphasising on the construction technique that

may ensure quality of bored pile as well as the economy.

We feel that quality of bored pile can be ensured by adding

a few activities in methodology such as skills of worker,

overall management and few techniques. Based on our

past experience and knowledge, we have developed and

established following activities, which can improve quality of

bored pile substantially.

Essence of our services:

• Develop proper methodology.

• Use proper equipment.

• Central quality control management.

• Proper borehole flashing technique.

• Proper concrete pouring technique.

Name of few completed Bored Pile works2013-14

1200φ & 1000φ bored pile for Gangachara bridge over river

Teesta at Rangpur under LGED. Main contractor- WMCE-

NAVANA JV.

1000φ bored pile for Khilgaon Flyover loop atKhilgaon,

Dhaka under LGED. Main contractor- WMCE-NAVANA JV

1200φ & 1000φ bored pile for bridge over river Kaliganga at

Manikgonj under LGED. Main contractor- WMCE-NAVANA JV

1200φ & 1000φ bored pile for bridges at different location

Comilla under Eastern Bangladesh Bridge Improvement

Project of RHD contract CP-03. Main contractor- Monico-

DIENCO JV

2012-2013

1000φ 45m deep bored pile for bridge on river Mahananda

at Chapai Nawabgonj under LGED. Main contractor- WMCE-

NAVANA JV

1200φ & 1000φ 52m deep bored pile for bridge on

river Titash at Bancharampur Comilla under LGED. Main

contractor- WMCE-NAVANA JV

Page 25: 13.ICON Brochure

23 IES

Hazrat Shah Paran Bridge on Sylhet Bypass,pile foundation constructed by IES

2011-2012

1250φ & 750φ 52m deep bored pile for Gaffargaon-Shaltia

bridge at Gaffargaon, Mymensingh under LGED. Main

contractor- Mir Akhter Husssin Ltd

1000φ & 750φ 43m deep bored pile for Mirpur-Airport

Road Flyover, Dhaka under 16 ECB, Corp of Engineers

Bangladesh Army. Main contractor- Mir Akhter Hossain Ltd

2010-11

900φ & 750φ 33m deep bored pile for bridge- at Uttara 3rd

Dhaka, Phase under RAJUK. Main contractor- Monico Ltd

1000φ 28m deep bored pile for bridge number: 01, 03,

04 for Hatirjheel- Begunbari Khal Intigrated Development

Project, Dhaka under 16 ECB, Corp of Engineers

Bangladesh Army.

2009-10

900φ & 1000φ 30m deep pile for clinker silo at

Meghnaghat, Narayengonj. Client- Unique Cement Ltd

2007-08

1200φ 58m deep pile for Kanaighat bridge of LGED over

river Surma at Sylhet. Main contractor- Abdul Monem Ltd,

Bangladesh

900φ 30m deep pile for Banani-Gulshan link bridge LGED

on Banani-Gulshan road, Dhaka. Main contractor- Abdul

Monem Ltd, Bangladesh

2006-07

1000φ 33m deep pile for Kin Bridge of RHD over river

Surma at Sylhet. Main contractor- Abdul Monem Ltd,

Bangladesh

2003-04

750φ 28m deep pile for 3rd Surma Shah Paran Bridge over

river Surma at Sylhet under STJRIP project of RHD. Main

contractor- Monico Ltd

750φ 27m deep pile for 225m long Hatubhanga RC

Guarder Bridge over river Bangshi at Mirzapore. Main

contractor- Monico Ltd

2003-04

1000φ & 600φ 25m deep pile for LAFARGE SURMA

CEMENT PLNT at Chattak, Sylhet. Main contractor- Laersen &

Toubro Ltd, India

2002-03

900φ & 750φ pile for Dhaka-Sylhet Road Project Contract

1-B Aushkandi-Sylhet Section under RRMP-III Project of

RHD. IRCON International Ltd, India

Page 26: 13.ICON Brochure

24 IES

Construction work of 450 MW combined cycle power plant (north), Ashugonj600φ Depth -30m bore RC pile constructed by IES

Page 27: 13.ICON Brochure

25 IES

Construction work of PGCB Head Office building, Dhaka1000φ Depth -44m Nos-330 bore RC pile constructed by IES

810m PC box girder bridge, Gaforgaon, Mymensingh700φ & 1250φ, Depth-38m & 52m Nos-203 bored RC pile constructed by IES

Page 28: 13.ICON Brochure

26 IES

Bridge No-4, Hatirjheel Integrated Development Project, Dhaka900φ, Depth-26m, Nos-91 bored RC pile constructed by IES

Bridge 01, Hatirjheel Intregrated Development Project, Dhaka1200φ Depth-32m, Nos-86 bored RC Pile constructed by IES

Banani-Gulshan link bridge LGED on Banani-Gulshan road, Dhaka 900φ, Depth-30m bored RC pile constructed by IES

Page 29: 13.ICON Brochure

27 IES

Mirpur-Airpoet Road & Overpass atBanani Rail Corssing (part-1)

1000φ, Depth-43m, Nos-243bored RC pile constructed by IES

Mohanondha Bridge, Chapainawabgong 1000φ, Depth -45m

Nos-54 constructed by IES

Construction work of PGCB Head Office building, Dhaka1000φ Depth -44m borehole flashing by air lift pumping

under reverse flow done by IES

Page 30: 13.ICON Brochure

28 IES

Clinker SILO, Fresh Cement, Meghna Ghat, Narayangonj1000φ, Depth- 27.50mNos-132 bored RC pile constructed by IES

Overpass-02, Hatirjheel Integrated Development Project Dhaka750φ Depth-26m, Nos-96 bored RC pile constructed by IES

Bridge no-10, 3rd phase of Uttara Model Town, Dhaka900φ & 1000φ, Depth-32m,Nos-118 bored RC pile constructed by IES

Page 31: 13.ICON Brochure

29 IES

Construction work of PGCBHead Office building, Dhaka

7 m long casing drivingvibratory hammer done by IES

Permanent casing driving for1000φ bored RC pile at bridge over

Kaliganga river, Manikgonj done by IES

New Academy Building,American International School Dhaka

750φ, Depth-14mNos-42 bore RC pile constructed by IES

Page 32: 13.ICON Brochure

30 IES

Driv

en C

oncr

ete

Pile

Timber trunks were used as foundation piles in ancient times

but, with time, steel and concrete took over as the preferred

materials. Driven pile technology was first introduced in

Bangladesh for the first sea port in Chittagong. Large steam

and pneumatic hammers were used in that project. But after

independence of Bangladesh in 1971, the technology not

moved forward.

Currently, Public Works Department and other government

and private organizations emphasis the use of concrete

pre-cast driven piles for building foundations. Considering

the market demand, IES procured numbers of new and

refurbished open end diesel hammers and pile drivers. At

the moment, IES has a fleet of diesel hammer based pile

drivers and skilled workers.

IES, also equipped with sophisticated software GRL WEAP

for drivability analysis and automatic hammer blow counter

ESAXIMETER of Pile Dynamics Inc, USA. Drivability analysis

and hammer performance test enable piling contractor to

select most appropriate hammer for driving piles.

Page 33: 13.ICON Brochure

31 IES

Major work done Driven Pile

2013-2014

350mm square 18m long 650 nos pre-cast pile for Judicial

Complex, Laksmipur under Public Works Department.

350mm square 33m long 2500 nos pre-cast pile for Shahid

Sayed Najrul Islam Medical College Hospital, Kishoregonj

Public Works Department.

2012-2013

400 mm square 35 m long 3800 nos pre-cast pile for Uttara

Apartment Project under RAJUK, Dhaka.

2011-2012

350mm square 15m long 617 nos pre-cast pile for Baridhara

Crown, Baridhara, Dhaka. Main contractor-

2010-2011

375mm square 19m long pre-cast pile for RAB-7 Head

Quarter Patenga, Chittagong under Public Works Department,

Chittagong.

2010-2011

350mm square 23m long 200 nos pre-cast pile for Jessore

Madical College Hospital, Jessore under Public Works

Department.

2009-2010

350mm square 15m long 1100 nos pre-cast pile for Advance

Police Town at Saver, Gazipur

2010-2011

375mm square 18m long pre-cast pile for Petromax Refinary

at Mongla, Bagerhat.

2009-2010

400mm square 18m long pre-cast pile for bridge- at

Keranigonj,Dhaka, under In Land Container Terminal (ICT) at

Pangaon, Dhaka of BIWTA.

Page 34: 13.ICON Brochure

32 IES

Uttara Apartment Project, Dhaka400mm square, 35m long, Nos-3800pre-cast pile, D46 diesel hammer in operation

Lifting of 350mm square 23m longpre-cast concrete pile to check the damagedetected by high strain dynamic test of pile

Page 35: 13.ICON Brochure

33 IES

Syed Nazrul Islam Medical College, Kishoregonj350mm square 33m long,

Nos-2800 pre-cast pile constructed by IES

Petromax Refinery Project, Mongla350mm square, 15m long,

Nos- 590 pre-cast pile K35 diesel hammer in operation

Page 36: 13.ICON Brochure

34 IES

Pile

Load

Test To evaluate movement and deformation of pile

shaft under load are the main objectives of pile load

test. During early stages, IES started pile load test

work, their 1st job was to conduct pile load test in

compression on a pre-cast concrete pile for a bridge

at Talma, PS- Boda, District- Panchagar under Local

Government Engineering Department. Journey

started at Talma with a 60t static axial pile load test,

presently capable and equipped to conduct very high

tonnage load test, up to 2500 ton test. We are now on

the top of the list of pile load testing contractor of the

country.

Apart from these, IES is now fully equipped with all

the latest technology and devices used in industrially

and technologically advanced countries. Very recently,

IES has introduced instrumented pile load test. Few of

them are mentioned below:

• Measuring applied load by load cell, up to 2000

ton,

• Pile movement measured by displacement

transducer.

• Use of hemi-spherical seat to minimize eccentric

load.

• Data logger and electric readout unit for electronic

data acquisition.

• Measuring deformation of concrete pile shaft

by using onetime concrete embedment strain

gauges at different level of pile shaft.

Presently, following pile load test services available

with us:

• High tonnage static axial compression pile load

test by kentledge method using concrete block.

• High tonnage static axial compression pile load

test by anchor method.

• High tonnage static axial uplift/ tensile pile load

test.

• Lateral pile load test.

1350 ton compressive load test by kent ledge method with 1500 ton surchange load capacity concrete block at

Zanjira approach road & selected bridge end facilities ICB: PMB/Approach Road/01 Project done by IES

Few Major WorksTest Load Project/Year Qty.

900-1350 ton Padma Bridge Approach Road- 2014 10

750-1250 ton 450 MW Ashugonj South TPP - 2013 6

550 ton Khilgaon Flyover Loop- 2013 1

650 ton Mogbazar-Mouchak Flyover- 2013 1

350- 550 ton Eastern bridge Project, Comilla 10

350- 550 ton Eastern bridge Project, Chittagong 10

550- 800 ton Mirpur-Airport Road Flyover 3

Page 37: 13.ICON Brochure

35 IES

Dhaka-Chittagong railway development project(Truck doubling between Laksham-Chinki Astana)

700 ton compressive load testby anchor method done by IES

450 MW combined cyclepower plant (south), Ashugonj

1250 ton compressive loadtest by anchore method done by IES

Upgradation of Khulna 225 MWcombined cycle power plant, Khulna

600 ton compressive loadtest by anchore method done by IES

Page 38: 13.ICON Brochure

36 IES

Vibrating-wire load cells, data logger, readout unit, strain gaugesdisplacement transducer and accessories (100-2000ton) GEOKON, USA, 4900

Saidabad water treatment plant project phase-II250 ton uplift test done by IES

Hydraulic jack, dial gauges placement for1350 ton compressive load test atZanjira approach road & selected bridge end facilitiesICB: PMB/Approach Road/01 project done by IES

Page 39: 13.ICON Brochure

37 IES

Bibiyana Expansion ProjectVertical Compression Load test

by Anchore Method done by IES

2nd Titas along with approach rail linewith all other related work

750 ton compressive load testby kent ledge method done by IES

Moghbazar-Mouchak Flyover Project. WO-06625 ton compressive load test

by kent ledge method done by IES

Page 40: 13.ICON Brochure

38 IES

High

Stra

in D

ynam

ic Te

stin

g of

Pile Estimation of pile capacity by using driving formula

were introduced in early 1940s by very prominent

engineer including Karl Terzhaghi. About a decade

later EA Smith of Raymond Pile Driving Company

developed a numerical method to estimate pile

capacity using wave propagation. Dynamic formulas

have largely been replaced by more accurate wave

equation analysis and high strain dynamic testing,

although formulas are still occasionally used in spite

of their inaccuracies and the fact that they cannot

predict stresses during driving.

Now a day, the PILE DRIVING ANALYZER system

(PDA) is the most widely employed system for

Dynamic Load Testing and pile driving monitoring

worldwide to asses the capacity of piles, PDA also

evaluates resistance profile, skin and toe resistance.

shaft integrity and investigates driving stresses and

hammer performance during pile installation.

IES procured two PDA hardware set (PAX-8 & PAX-4)

and software and have been practicing since last

few years. Few of IES engineers also took overseas

training to obtain proficiency certificate, please visit

www.pdaproficiencytest.com to see proficiency

level. Since the beginning we did PDA for projects

like, Lafarge Surma Cement Plant, 150 MW

Shikolbaha Picking Power Plant, Mayor Hanif Flyover

project, Saidabad Water Treatment Plant, Dhaka,

Hatirjheel project, 334 MW Duel Fuel Power Plant

at Meghnaghat, 443 MW Bibiana II Power Plant,

Mogbazar-Mouchak Flyover, 22000 Flat Project of

RAJUK and many more.

PAX pile driving analyzer used in high strain dynamic testing of pile

Page 41: 13.ICON Brochure

39 IES

Major PDA work finished• Syed Nazrul Islam Medical College, Kishoreganj

• 250 MW Power Plant, Burhanuddin, Bhola

• 443 MW Power Plant Bibiana-II,

• 334 MW Duel Fuel Power Plant, Meghnaghat, Narayengonj

• 22000 apartment project at Uttara 3rd phase, Dhaka

• Mayor Hanif Flyover, Dhaka

• Hatirjheel Integrated Development project, Dhaka

Equipment for PDA• Pile Dynamic Analyzer model PAX-8 and PAX-4 of Pile Dynamics Inc, USA

• Smart strain gauges

• Accelerometer piezoelectric and piezoresistive

Please visit www.pdaproficiencytest.com to see the list of certified Engineers for PDA Worldwide

Engineer's proficiency certificate for high strain dynamic testing of pile

Page 42: 13.ICON Brochure

40 IES

Strain transducer and accelerometer settingduring high strain dynamic testing of pile

Construction of 102m long Arch Bridge, Dhakacantonment- high strain dynamic testing of pile done by IES

Eastern bridge project contract-3, Kawtali bridgehigh strain dynamic testing of pile done by IES

Page 43: 13.ICON Brochure

41 IES

Bridge over Shikolbaha river, Chittagonghigh strain dynamic testing of pile done by IES

Dhaka-Chittagong Railway Development Project (DCRDP) Track doubling between Laksham and Chinki Astanahigh strain dynamic testing of pile done by IES

Moghbazar-Mouchak Flyover Project. WO-06high strain dynamic testing of pile done by IES

Page 44: 13.ICON Brochure

42 IES

546.600m long pre-stressed Girder Bridge over Mohanondha river, Chapainawabgonjhigh strain dynamic testing of pile done by IES

Sayed Nazrul Islam Medical College, Kishoregonjhigh strain dynamic testing of pile work done by IES

Force vs Velocity Graph shown afterhigh strain dynamic testing of pile field work

Page 45: 13.ICON Brochure

43 IES

344.908 MW (MET) Gas Fired combined cycle power plant, Bibiyana (II)

high strain dynamic testing workof pile done by IES

Zanjira approach road & selectedbridge facilities ICB: PMB/01

high strain dynamic testing workof pile done by IES

Saidabad water treatment plant phase-IIDhaka high strain dynamictesting of pile done by IES

Page 46: 13.ICON Brochure

44 IES

Pile

Inte

grity

Test

ing

Wor

k A pile integrity test is a method of testing deep

foundation to asses the defects, faults, change in

diameter of the pile shaft. The method also known as

low strain dynamic test, sonic echo test, and low strain

integrity test.

The technique is developed based on wave

propagation theory. A light impact is applied to a pile

top that produce a low strain. The impact produces

a compression wave that travels down the pile at a

constant wave speed and reflects when encounter a

change in cross sectional area or void/crack in material

or weak concrete.

This procedure is performed with a hand held hammer

to generate an impact, an accelerometer or geophone

placed on top of the pile to be tested to measure

the response to the hammer impact, and a data

acquisition and interpretation electronic instrument.

The test works well in concrete or timber foundations

that are not excessively slender. Usually the method is

applied to recently constructed piles that are not yet

connected to a structure

This method is standardized by ASTM with designation

D5882 “Standard Test Method for Low Strain Integrity

Testing of Piles”.

Pile Integrity tester, PDI, USA

Field PC

Geophone3.7kg Rubber Mallet

1.7kg Rubber Mallet

Page 47: 13.ICON Brochure

45 IES

Geot

echn

ical I

nves

tigat

ion

Wor

kGeotechnical investigation is an engineering practice

to evaluate soil and rock parameters those are required

for design a appropriate foundation of engineering

structure. Comprehensive, precise, detail and reliable

investigation can reduce construction cost, time

and human safety substantially. On the other hand

improper geotechnical investigation always deceives

or betrays engineers and entrepreneurs. Most of the

foundation designs are being done in Bangladesh

on the basis of SPT N-value. Many design engineers

need only SPT N-value. Due to versatility of SPT, many

correlations are available, which enables engineers

to estimate soil parameters like shear strength, unit

weight, relative density, volume compressibility etc. It

is very important to determine SPT N-value correctly,

precisely without forgery and fraudulent. Improper

instruments, instrumental error, human error,

deliberate intentions, fabrication of data in the field

by manipulation are the major cause of unreliable

SPT N-values. Upon pin pointing the causes, IES

introduced following activities in geotechnical

investigation, which can reduce un-reliabilities:

• Auto trip gear for releasing hammer- ensures

requsit energy and precludes human error.

• Proper instrument- precludes instrumental error.

• Capturization video footage of SPT activity by

digital camera- precludes data fabrication in field.

• SPT N-values re-counted from captured movie.

• Reliable lab test.

Oedometer for one dimensional consolidation test

Unconfined compression test apparatus

Page 48: 13.ICON Brochure

46 IES

Overseas Clients

MTHojgaard as, DemarkGeotechnical Investigation, Static compression & uplift pile load test, crosshole sonic logging, Pile integrity test and Pile dynamic test PDA for Saidabad Water Treatment Plant Phase-II of Dhk WASA

Simplex Infra Structure Ltd, IndiaTesting Work Gulistan-Jatrabari Flyover, Dhaka

Japan Weather Association, JapanRader station at Khepupara, Cox'sbaxer and Moulavibazer

Siam Tone Co., Ltd, ThailandRader station at Khepupara, Cox'sbaxer and Moulavibazer

Larsen & Toubro Ltd, IndiaLafarge Surma Cement Plant at Chattak

IRCON International Ltd, IndiaDhaka-Sylhet Road Project

The TATA Power Company Ltd, IndiaIshwardi-Khulna Power Transmission Project

China Geo Engineering Co, ChinaDhaka-Sylhet Road Project

China Harbor Engineering Co, ChainaAtrai river bridge on Hatikumrul-Banpara Road project

The First Northeast Electric Power Enginering Company (NEPC) 344.908 MW (NET) gas fired combined cycle power station at Bibiyana-II, Bangladesh337 MW/350 MW (NET) duel fuel combined cycle power plant Meghana Ghat, Bangladesh

LTL Global Engineering Services (Pvt.) Limited, Srilanka Constructio of 52.2 MW RAJ-LANKA power plant, Nator, Rajshahi, Bangladesh50 MW duel fuel (HFO/GAS) fired power plant, Jangalia, Comilla

Shimizu CorporationConstruction of public food storage under Peoples Republic of Bangladesh

HIFAB International ABSub regional Transport Project Preparatory Facility (Road Component: Package-2)

Rosatom Group, RussiaDrilling works at Rooppur Nuclear Power Plant

LIST OF FEW MAJOR CLIENTS

Page 49: 13.ICON Brochure

47 IES

Bangladesh Clients

Navana Construction Ltd.Monico Ltd.Mir Akter Hossain Ltd.Bangladesh RailwayAbdul Monem Ltd (AML)Islam Trading Consortium Ltd. (ITCL)Al-Amin Construction Ltd.United GroupRangs GroupConcord Engineering & Construction Ltd.Bangladesh Erectors Ltd.Pubali International Ltd.Square Pharmaceuticals Ltd.The ACME Laboratories Ltd.MI Cement Factory Ltd.Ruby Cement Heidelberg Cement GroupBuilding for Future Ltd. (BFL)Hamid Construction Ltd. (HCL)

Orion GroupSpectra Engineers Ltd.Bengle Development Corporation (BDC)National Civil EngineersMAX AutomobileToma Construction & Co. Ltd.Advanced Development TechnologiesM.M Builders & Engineers Ltd.Meghna Group of Industries LimitedNational Development Engineers Ltd. (NDE)Square Consumer Product Ltd.Dulal Brothers Ltd.Walton Hi-Tech Industries Ltd.ACI Ltd.Local Government Engineering Department (LGED)Public Works Department (PWD)Raod and Highways Department (RHD)Engineering Construction Battalion, Bangladesh Army

Bridge No-4, Hatirjheel Integrated Development Project, Dhaka 900φ, Depth-26m, Nos-91 bored RC pile constructed by IES

Page 50: 13.ICON Brochure

48 IES

Diesel hammer working principle

Cylinder

Fuel Pump

Strike Plate

Tripping Explosion Exhaust Scavanging

Ram

Air undercompression

Exhaust port

Anvil

Hammar cushion

Page 51: 13.ICON Brochure

Design: Nipun/DrikPhoto: Wahid Adnan/Drik

Production: Drik, ([email protected])