A week ago amidst rhetoric and fanfare a so-called ldquospecial packagerdquo worth Rs 125

lakh crore has been announced for the state of Bihar Since then supported by repeated

government advertisements an assertion has been made claiming that a great favor has

been bestowed upon the people of the state Not just that there has been a sudden flurry

of activities including a part of the Government of India (GoI) machinery to hastily put

together a narrative that this package has the potential to change the face of Bihar

However a closer look reveals that against the much hyped claim of Rs 125 lakh crore

at least Rs 108 lakh crore ie 87 of the so called special package worth projects is

nothing but a mere repackaging of old schemes appropriation of pre-approved allocations

for old ones and continued contributions to ongoing schemes which were announced by

various ministries at different points of time in the past Further few new items totaling to

the tune of about Rs 6000 crore are a part of the package for which there is not even a

shred of evidence of planning or work on ground Thus in totality at the very best the so

called Rs 125 lakh crore package will not provide anything more than Rs 10368 crore as

additional or incremental resource to the state of Bihar This Rs 10368 crore too in the

absence of a defined timeline or disbursement modalities hardly means anything to the

state

In light of these when we look at much hyped claim of Rs125 lakh crore it is obvious

that this is nothing but an effort to narrate a fairy tale to the people of Bihar Anyone who

wants to have an objective look at the facts and figures of the package needs to have a

look at this on four fundamental parameters

(1)What is the actual size of the package Some will have you believe that the total sum being channeled into the state of Bihar is

Rs 125 lakh crore But this grand figure is nothing short of deception A large chunk of

the special package up to the tune of Rs 108667 lakh crore of the Rs 125 lakh crore is

coming out of the money already promised to the state of Bihar for on-going and pre-

3

approved development endeavours and schemes This same figure is now being passed

off as new money or investment

To cite an example this package claims to earmark an additional Rs 54713 crore for 41

projects for building highways bridges amp rail overbridges But the reality is that much

before this announcement 37 out of these 41 projects worth Rs 47553 crore were

already approved or approved in principle between 2007 and 2015 This leaves us with

only 4 projects worth Rs 7160 crore (a meager 13 of the otherwise lavish sounding Rs

54713 crore) as the potential new initiatives (Further details on the same may be seen in

the later part of this document)

(2) What is the exact contribution of the government of India vis-agrave-vis other stakeholders

Assuming that there is indeed some marginal benefit that the GoI is bestowing upon Bihar

by way of this package what logically follows is the question - what portion of this

incremental benefit is in fact coming from the governmentrsquos kitty Is the GoI taking sole

responsibility vis-agrave-vis this incremental resource or are there other stakeholders who are

also being made to contribute to this Also there is no mention or acknowledgement of

state governmentrsquos contributions either as part of monetary contribution or that of land for

any of the proposed projects For example in this package Rs 10000 crore has been

allocated to the SJVN thermal power plant in Buxar This constitutes almost 62 of the

funds earmarked under the head of electricity ndash one of the big ticket items in the package

SJVN a Public Sector Undertaking has not released an investment proposal against this

project till date and it is not clear which all stakeholders it will involve In any case the

debt equity ratio for power sector projects across the country is 15 There is a vein of

ambiguity that runs throughout this announcement

(3) What is the time period within which the benefits of this package would be accrued

Should the special package in fact be offering some incremental benefit to Bihar and

assuming that the GoI would primarily be financing this incremental benefit then what is

4

the time period within which this money will be made available to the state in its entirety

Would this money accrue to the state in 1 year 5 years or many years Nowhere there is

even a hint of a time frame within which any fund so promised will be released to the state

or invested in it

(4) What are the modalities through which these benefits will be realized and reach the state Finally assuming that there is in fact some incremental money in the package that the GoI

will by itself provide to the state over a period of time the logical next step is to ask ndash How

will this money be disbursed Will it be given to the state government Will it be routed

through a third party Who might those be Till date there is no specific notification from

the GoI which informs the Government of Bihar andor its various department of the

incremental benefit in the package the timelines and the mechanisms of disbursement or

the exact change from what was earlier approved

No wonder since the last few days of the announcement many analysts and

commentators have highlighted that the Ministry of Finance is not seen to be scrambling

to find resources Indeed there is no reason for worry as it is obvious that the ministry

doesnrsquot have to provide for any of these additional allocations from within the Union

budget

It is therefore clear that this special package for Bihar announced just before elections is

nothing but well conceived packaged myth devised to influence people manufacture

euphoria and create noise without any substance The GoI is trying to mislead people in

the name of development by smoke screening facts with reassuring figures The basic

tenets of Cooperative Federalism have not only been undermined but also unduly

compromised which has violated the trust of people of Bihar

5

SNAPSHOT

A closer look reveals that against the claim of Rs 125 Lakh crores at least Rs 108

lakh crore worth projects is nothing but a mere repackaging of old schemes

appropriation of pre-approved allocations for old ones and continued contributions to

ongoing schemes which were announced by various ministries at different points of time

in the past Further few new line items totaling to the tune of about Rs 6000 crores

are a part of the package for which there is not even a shred of evidence of planning or

work on ground Thus in totality at very best the so called Rs 125 lakh crores

package will not provide anything more than Rs10368 crores as additional or

incremental resource to the state of Bihar This Rs 10368 crores too in the absence

of a defined timeline or disbursement modalities hardly means anything to the state

SNAPSHOT

SNo ldquoSpecial Packagerdquo Actual Status Sector Project Cost Previously New and Cost with no (in Cr) sanctioned Incremental trace what-so- cost (In Cr) budgetary ever on ground allocation (In (In Cr) Cr)

1 National Highways 54713 47553 7160 2 Rural Development 13820 13820 3 Petroleum and 21476 21127 224 125 Natural Gas 4 Civil Aviation 2700 2700 5 Higher Education 1000 50 950 6 Skill Development 1550 300 1250 7 Agriculture 3094 400 2694 8 Railways 8871 8446 423 9 Power 16130 16130

10 Telecom 449 449 11 Tourism 600 600 12 Health 600 240 360

125003 108667 10368 5968 Adjusted for approximation

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 2: 1.25lakhcrore package to bihar

2

A week ago amidst rhetoric and fanfare a so-called ldquospecial packagerdquo worth Rs 125

lakh crore has been announced for the state of Bihar Since then supported by repeated

government advertisements an assertion has been made claiming that a great favor has

been bestowed upon the people of the state Not just that there has been a sudden flurry

of activities including a part of the Government of India (GoI) machinery to hastily put

together a narrative that this package has the potential to change the face of Bihar

However a closer look reveals that against the much hyped claim of Rs 125 lakh crore

at least Rs 108 lakh crore ie 87 of the so called special package worth projects is

nothing but a mere repackaging of old schemes appropriation of pre-approved allocations

for old ones and continued contributions to ongoing schemes which were announced by

various ministries at different points of time in the past Further few new items totaling to

the tune of about Rs 6000 crore are a part of the package for which there is not even a

shred of evidence of planning or work on ground Thus in totality at the very best the so

called Rs 125 lakh crore package will not provide anything more than Rs 10368 crore as

additional or incremental resource to the state of Bihar This Rs 10368 crore too in the

absence of a defined timeline or disbursement modalities hardly means anything to the

state

In light of these when we look at much hyped claim of Rs125 lakh crore it is obvious

that this is nothing but an effort to narrate a fairy tale to the people of Bihar Anyone who

wants to have an objective look at the facts and figures of the package needs to have a

look at this on four fundamental parameters

(1)What is the actual size of the package Some will have you believe that the total sum being channeled into the state of Bihar is

Rs 125 lakh crore But this grand figure is nothing short of deception A large chunk of

the special package up to the tune of Rs 108667 lakh crore of the Rs 125 lakh crore is

coming out of the money already promised to the state of Bihar for on-going and pre-

3

approved development endeavours and schemes This same figure is now being passed

off as new money or investment

To cite an example this package claims to earmark an additional Rs 54713 crore for 41

projects for building highways bridges amp rail overbridges But the reality is that much

before this announcement 37 out of these 41 projects worth Rs 47553 crore were

already approved or approved in principle between 2007 and 2015 This leaves us with

only 4 projects worth Rs 7160 crore (a meager 13 of the otherwise lavish sounding Rs

54713 crore) as the potential new initiatives (Further details on the same may be seen in

the later part of this document)

(2) What is the exact contribution of the government of India vis-agrave-vis other stakeholders

Assuming that there is indeed some marginal benefit that the GoI is bestowing upon Bihar

by way of this package what logically follows is the question - what portion of this

incremental benefit is in fact coming from the governmentrsquos kitty Is the GoI taking sole

responsibility vis-agrave-vis this incremental resource or are there other stakeholders who are

also being made to contribute to this Also there is no mention or acknowledgement of

state governmentrsquos contributions either as part of monetary contribution or that of land for

any of the proposed projects For example in this package Rs 10000 crore has been

allocated to the SJVN thermal power plant in Buxar This constitutes almost 62 of the

funds earmarked under the head of electricity ndash one of the big ticket items in the package

SJVN a Public Sector Undertaking has not released an investment proposal against this

project till date and it is not clear which all stakeholders it will involve In any case the

debt equity ratio for power sector projects across the country is 15 There is a vein of

ambiguity that runs throughout this announcement

(3) What is the time period within which the benefits of this package would be accrued

Should the special package in fact be offering some incremental benefit to Bihar and

assuming that the GoI would primarily be financing this incremental benefit then what is

4

the time period within which this money will be made available to the state in its entirety

Would this money accrue to the state in 1 year 5 years or many years Nowhere there is

even a hint of a time frame within which any fund so promised will be released to the state

or invested in it

(4) What are the modalities through which these benefits will be realized and reach the state Finally assuming that there is in fact some incremental money in the package that the GoI

will by itself provide to the state over a period of time the logical next step is to ask ndash How

will this money be disbursed Will it be given to the state government Will it be routed

through a third party Who might those be Till date there is no specific notification from

the GoI which informs the Government of Bihar andor its various department of the

incremental benefit in the package the timelines and the mechanisms of disbursement or

the exact change from what was earlier approved

No wonder since the last few days of the announcement many analysts and

commentators have highlighted that the Ministry of Finance is not seen to be scrambling

to find resources Indeed there is no reason for worry as it is obvious that the ministry

doesnrsquot have to provide for any of these additional allocations from within the Union

budget

It is therefore clear that this special package for Bihar announced just before elections is

nothing but well conceived packaged myth devised to influence people manufacture

euphoria and create noise without any substance The GoI is trying to mislead people in

the name of development by smoke screening facts with reassuring figures The basic

tenets of Cooperative Federalism have not only been undermined but also unduly

compromised which has violated the trust of people of Bihar

5

SNAPSHOT

A closer look reveals that against the claim of Rs 125 Lakh crores at least Rs 108

lakh crore worth projects is nothing but a mere repackaging of old schemes

appropriation of pre-approved allocations for old ones and continued contributions to

ongoing schemes which were announced by various ministries at different points of time

in the past Further few new line items totaling to the tune of about Rs 6000 crores

are a part of the package for which there is not even a shred of evidence of planning or

work on ground Thus in totality at very best the so called Rs 125 lakh crores

package will not provide anything more than Rs10368 crores as additional or

incremental resource to the state of Bihar This Rs 10368 crores too in the absence

of a defined timeline or disbursement modalities hardly means anything to the state

SNAPSHOT

SNo ldquoSpecial Packagerdquo Actual Status Sector Project Cost Previously New and Cost with no (in Cr) sanctioned Incremental trace what-so- cost (In Cr) budgetary ever on ground allocation (In (In Cr) Cr)

1 National Highways 54713 47553 7160 2 Rural Development 13820 13820 3 Petroleum and 21476 21127 224 125 Natural Gas 4 Civil Aviation 2700 2700 5 Higher Education 1000 50 950 6 Skill Development 1550 300 1250 7 Agriculture 3094 400 2694 8 Railways 8871 8446 423 9 Power 16130 16130

10 Telecom 449 449 11 Tourism 600 600 12 Health 600 240 360

125003 108667 10368 5968 Adjusted for approximation

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 3: 1.25lakhcrore package to bihar

3

approved development endeavours and schemes This same figure is now being passed

off as new money or investment

To cite an example this package claims to earmark an additional Rs 54713 crore for 41

projects for building highways bridges amp rail overbridges But the reality is that much

before this announcement 37 out of these 41 projects worth Rs 47553 crore were

already approved or approved in principle between 2007 and 2015 This leaves us with

only 4 projects worth Rs 7160 crore (a meager 13 of the otherwise lavish sounding Rs

54713 crore) as the potential new initiatives (Further details on the same may be seen in

the later part of this document)

(2) What is the exact contribution of the government of India vis-agrave-vis other stakeholders

Assuming that there is indeed some marginal benefit that the GoI is bestowing upon Bihar

by way of this package what logically follows is the question - what portion of this

incremental benefit is in fact coming from the governmentrsquos kitty Is the GoI taking sole

responsibility vis-agrave-vis this incremental resource or are there other stakeholders who are

also being made to contribute to this Also there is no mention or acknowledgement of

state governmentrsquos contributions either as part of monetary contribution or that of land for

any of the proposed projects For example in this package Rs 10000 crore has been

allocated to the SJVN thermal power plant in Buxar This constitutes almost 62 of the

funds earmarked under the head of electricity ndash one of the big ticket items in the package

SJVN a Public Sector Undertaking has not released an investment proposal against this

project till date and it is not clear which all stakeholders it will involve In any case the

debt equity ratio for power sector projects across the country is 15 There is a vein of

ambiguity that runs throughout this announcement

(3) What is the time period within which the benefits of this package would be accrued

Should the special package in fact be offering some incremental benefit to Bihar and

assuming that the GoI would primarily be financing this incremental benefit then what is

4

the time period within which this money will be made available to the state in its entirety

Would this money accrue to the state in 1 year 5 years or many years Nowhere there is

even a hint of a time frame within which any fund so promised will be released to the state

or invested in it

(4) What are the modalities through which these benefits will be realized and reach the state Finally assuming that there is in fact some incremental money in the package that the GoI

will by itself provide to the state over a period of time the logical next step is to ask ndash How

will this money be disbursed Will it be given to the state government Will it be routed

through a third party Who might those be Till date there is no specific notification from

the GoI which informs the Government of Bihar andor its various department of the

incremental benefit in the package the timelines and the mechanisms of disbursement or

the exact change from what was earlier approved

No wonder since the last few days of the announcement many analysts and

commentators have highlighted that the Ministry of Finance is not seen to be scrambling

to find resources Indeed there is no reason for worry as it is obvious that the ministry

doesnrsquot have to provide for any of these additional allocations from within the Union

budget

It is therefore clear that this special package for Bihar announced just before elections is

nothing but well conceived packaged myth devised to influence people manufacture

euphoria and create noise without any substance The GoI is trying to mislead people in

the name of development by smoke screening facts with reassuring figures The basic

tenets of Cooperative Federalism have not only been undermined but also unduly

compromised which has violated the trust of people of Bihar

5

SNAPSHOT

A closer look reveals that against the claim of Rs 125 Lakh crores at least Rs 108

lakh crore worth projects is nothing but a mere repackaging of old schemes

appropriation of pre-approved allocations for old ones and continued contributions to

ongoing schemes which were announced by various ministries at different points of time

in the past Further few new line items totaling to the tune of about Rs 6000 crores

are a part of the package for which there is not even a shred of evidence of planning or

work on ground Thus in totality at very best the so called Rs 125 lakh crores

package will not provide anything more than Rs10368 crores as additional or

incremental resource to the state of Bihar This Rs 10368 crores too in the absence

of a defined timeline or disbursement modalities hardly means anything to the state

SNAPSHOT

SNo ldquoSpecial Packagerdquo Actual Status Sector Project Cost Previously New and Cost with no (in Cr) sanctioned Incremental trace what-so- cost (In Cr) budgetary ever on ground allocation (In (In Cr) Cr)

1 National Highways 54713 47553 7160 2 Rural Development 13820 13820 3 Petroleum and 21476 21127 224 125 Natural Gas 4 Civil Aviation 2700 2700 5 Higher Education 1000 50 950 6 Skill Development 1550 300 1250 7 Agriculture 3094 400 2694 8 Railways 8871 8446 423 9 Power 16130 16130

10 Telecom 449 449 11 Tourism 600 600 12 Health 600 240 360

125003 108667 10368 5968 Adjusted for approximation

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 4: 1.25lakhcrore package to bihar

4

the time period within which this money will be made available to the state in its entirety

Would this money accrue to the state in 1 year 5 years or many years Nowhere there is

even a hint of a time frame within which any fund so promised will be released to the state

or invested in it

(4) What are the modalities through which these benefits will be realized and reach the state Finally assuming that there is in fact some incremental money in the package that the GoI

will by itself provide to the state over a period of time the logical next step is to ask ndash How

will this money be disbursed Will it be given to the state government Will it be routed

through a third party Who might those be Till date there is no specific notification from

the GoI which informs the Government of Bihar andor its various department of the

incremental benefit in the package the timelines and the mechanisms of disbursement or

the exact change from what was earlier approved

No wonder since the last few days of the announcement many analysts and

commentators have highlighted that the Ministry of Finance is not seen to be scrambling

to find resources Indeed there is no reason for worry as it is obvious that the ministry

doesnrsquot have to provide for any of these additional allocations from within the Union

budget

It is therefore clear that this special package for Bihar announced just before elections is

nothing but well conceived packaged myth devised to influence people manufacture

euphoria and create noise without any substance The GoI is trying to mislead people in

the name of development by smoke screening facts with reassuring figures The basic

tenets of Cooperative Federalism have not only been undermined but also unduly

compromised which has violated the trust of people of Bihar

5

SNAPSHOT

A closer look reveals that against the claim of Rs 125 Lakh crores at least Rs 108

lakh crore worth projects is nothing but a mere repackaging of old schemes

appropriation of pre-approved allocations for old ones and continued contributions to

ongoing schemes which were announced by various ministries at different points of time

in the past Further few new line items totaling to the tune of about Rs 6000 crores

are a part of the package for which there is not even a shred of evidence of planning or

work on ground Thus in totality at very best the so called Rs 125 lakh crores

package will not provide anything more than Rs10368 crores as additional or

incremental resource to the state of Bihar This Rs 10368 crores too in the absence

of a defined timeline or disbursement modalities hardly means anything to the state

SNAPSHOT

SNo ldquoSpecial Packagerdquo Actual Status Sector Project Cost Previously New and Cost with no (in Cr) sanctioned Incremental trace what-so- cost (In Cr) budgetary ever on ground allocation (In (In Cr) Cr)

1 National Highways 54713 47553 7160 2 Rural Development 13820 13820 3 Petroleum and 21476 21127 224 125 Natural Gas 4 Civil Aviation 2700 2700 5 Higher Education 1000 50 950 6 Skill Development 1550 300 1250 7 Agriculture 3094 400 2694 8 Railways 8871 8446 423 9 Power 16130 16130

10 Telecom 449 449 11 Tourism 600 600 12 Health 600 240 360

125003 108667 10368 5968 Adjusted for approximation

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 5: 1.25lakhcrore package to bihar

5

SNAPSHOT

A closer look reveals that against the claim of Rs 125 Lakh crores at least Rs 108

lakh crore worth projects is nothing but a mere repackaging of old schemes

appropriation of pre-approved allocations for old ones and continued contributions to

ongoing schemes which were announced by various ministries at different points of time

in the past Further few new line items totaling to the tune of about Rs 6000 crores

are a part of the package for which there is not even a shred of evidence of planning or

work on ground Thus in totality at very best the so called Rs 125 lakh crores

package will not provide anything more than Rs10368 crores as additional or

incremental resource to the state of Bihar This Rs 10368 crores too in the absence

of a defined timeline or disbursement modalities hardly means anything to the state

SNAPSHOT

SNo ldquoSpecial Packagerdquo Actual Status Sector Project Cost Previously New and Cost with no (in Cr) sanctioned Incremental trace what-so- cost (In Cr) budgetary ever on ground allocation (In (In Cr) Cr)

1 National Highways 54713 47553 7160 2 Rural Development 13820 13820 3 Petroleum and 21476 21127 224 125 Natural Gas 4 Civil Aviation 2700 2700 5 Higher Education 1000 50 950 6 Skill Development 1550 300 1250 7 Agriculture 3094 400 2694 8 Railways 8871 8446 423 9 Power 16130 16130

10 Telecom 449 449 11 Tourism 600 600 12 Health 600 240 360

125003 108667 10368 5968 Adjusted for approximation

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 6: 1.25lakhcrore package to bihar

6

DETAILED ANALYSIS Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

I National Highways

A Projects under process for awardbidding stage

82 Biharsharif ndash 39954 39954 2012 Pre-approved Repeated under the Special Package

Barbigha ndash Mokama Ministry had selected this stretch under NHDP Phase IV in February 2012

section of NH-

82NHDP Phase-IV Ref GoBGoI Communication

30 4- laning of Patna- 492 492 2007 Pre-approved Repeated under the Special Package

Koilawar section of Ministry had included this in NHDP Phase III which was selected in April

NH 30

2007

30amp84 4- laning of Koilawar- 750 750 2007 Pre-approved

Ref GoBGoI Communication

Bhojpur section of

NH-30 and NH-84

84 4 laning of Bhojpur- 595 595 2007 Pre-approved

Baxar section of NH-

84

31 4 laning of 970 970 2007 Pre-approved Repeated under the Special Package

Bakhtiyarpur-Mokama Included in NHDP Phase III which was selected in April 2007

section of NH-31

Ref GoBGoI Communication

31 New 4-laned bridge 520 520 2007 Pre-approved

across river Ganga at

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 7: 1.25lakhcrore package to bihar

7

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Mokama on NH-31

31 4lane of Simaria ndash 106258 106258 2007 Pre-approved

Khagaria on NH-

31NHDP Phase-III

30A km 00-km 696 of 5912 5912 2013 Pre-approved Repeated under the Special Package

Fatua-Harnaut-Barh AA was issued by Ministry vide MoRTHE letter number RWNH-

section of NH-30A

12013212010SP(A7)P-9 dated 20112013

Ref GoBGoI Communication

104 Upgradation of 70144 70144 2010 Pre-approved Repeated under the Special Package

Sheohar-Sitamarhi- Final DPR was submitted to the Ministry on 10052010

Jaynagar-Narahiya

(km 40-217) of NH Ref GoBGoI Communication

104 in three

packages

106 Upgradation of 57534 57534 2014 Pre-approved Repeated under the Special Package

Birpur-Bihpur (km 0- AA was issued by Ministry vide MoRTHE letter number RWNH-

106) section of NH-

12013192010SP(B3)P-9 dated 212014

106

Ref GoBGoI Communication

85 2-laning with paved 74806 74806 2007 Pre-approved Repeated under the Special Package

shoulder of Gopalganj Included in NHDP Phase III which was selected in April 2007

- Chhapra section

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 8: 1.25lakhcrore package to bihar

8

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Ref httpwwwnhaiorgphase3uiasp

28B Widening and 8861 8861 2015 Pre-approved Repeated under the Special Package

strengthening to 2- AA has been issued by Ministry vide MoRTHE letter number RWNH-

lane with paved

12014982014BRNH-3 dated 3032015

shoulder amp geometric

improvement Betiah - Ref GoBGoI Communication

Khushinagar

Section from km

2500 to km 4000 on

EPC mode

28B Strengthening and 2068 2068 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141012015BRNH-3 dated 3132015

from km 65 to 97 on

EPC mode Ref GoBGoI Communication

102 2-laning with paved 42058 42058 2012 Pre-approved Repeated under the Special Package

shoulder of Chhapra - Ministry had selected this stretch under NHDP Phase IV in February 2012

Rewaghat -

Muzaffarpur Ref GoBGoI Communication

133 Strengthening and 2804 2804 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141122015BRNH-3 dated 3132015

from km 000 to

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 9: 1.25lakhcrore package to bihar

9

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

10903 Ref GoBGoI Communication

327A Strengthening amp 7755 7755 2015 Pre-approved Repeated under the Special Package

Widening to 2 Lane AA has been issued by Ministry vide MoRTHE letter number RWNH-

with Paved Shoulder

120141132015BRNH-3 dated 3132015

from km 000 to

25010 on EPC mode Ref GoBGoI Communication

327E Strengthening amp 6452 6452 2015 Pre-approved Repeated under the Special Package

widening work of AA has been issued by Ministry vide MoRTHE letter number RWNH-

existing 2-Lane to

12014902015BRNH-3 dated 3132015

two lane with paved

shoulder from Km Ref GoBGoI Communication

93612 to Km

98000

57A 4 laning of 200 200 2007 Pre-approved Repeated under the Special Package

Forbesganj-Jogbani Included in NHDP Phase III which was selected in April 2007

section of NH-57A

Ref GoBGoI Communication

83 4 laning of Patna - 123198 123198 2007 Pre-approved Repeated under the Special Package

Gaya - Dobi section Included in NHDP Phase III which was selected in April 2007

of NH 83 with JICA

ODA loan assistance Ref httpwwwnhaiorgphase3uiasp

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 10: 1.25lakhcrore package to bihar

10

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

80 Construction of 268 24053 2013 Pre-approved Repeated under the Special Package Only a marginal increase from

Bhagalpur Bypass allocation previously sanctioned cost as on 14022013

Ref GoBGoI Communication

Total 999124 996377

B Projects in the Pipeline

SlNo Project Cost (Rs Crore)

1 4 laning of Mokama- 810 810 Same scheme as NH 31 that has been duplicated under the so-called special package

Khagariya section of

NH-31

2 Bridge at Munger 236187 236187 2013 On-going Repeated under the Special Package

project Approach work awarded in November 2013 and terminated in March

2015 by NHAI Bridge work is being executed by Railways

Ref GoBGoI Communication

3 Development to 2- 1000 1000 2012 Pre-approved Repeated under the Special Package

laned with paved Ministry has selected this stretch under NHDP Phase IV in February 2012

shoulder of

Maheshughat- Ref GoBGoI Communication

Saharsa-Purnia

section of NH-107

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 11: 1.25lakhcrore package to bihar

11

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

4 Development of 700 700 2012 Pre-approve Repeated under the Special Package

Manjholi-Chirkot Declared as NH on 22022012 Ministry has selected this stretch under

section

NHDP Phase IV in February 2012

Ref GoBGoI Communication

5 46 laning of Patna 1500 1500 2015 Pre-approved Repeated under the Special Package

Ring Road Ministry has selected this stretch under NHDP Phase VII

Ref GoBGoI Communication

6 4 laning of 250 250 2015 Pre-approved Repeated under the Special Package

Kishanganj Bypass at Ministry has selected this stretch under NHDP Phase VII

NH-31

Ref GoBGoI Communication

7 4-laning of Munger- 1200 1200 Pre-approved Repeated under the Special Package

Mirzachowki section Under DPR Stage

of Nh-80

8 Development to 2- 680 680 2015 Pre-approved Repeated under the Special Package

lane with paved Approved in Annual Plan for the year 2015-16 Quotation has been invited

shoulder of sections

for award of DPR work

on NH-2C NH80

NH81 NH99 and Ref GoBGoI Communication

NH527 A

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 12: 1.25lakhcrore package to bihar

12

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

9 Construction of MG 2800 2800 2015 Pre-approved Repeated under the Special Package

Setu with JICA JFE Engineering Corporation Japan has submitted the final report to

assistance

Ministry in the month of February 2015 Administrative approval for the

work is yet awaited

Ref GoBGoI Communication

10 Construction of 3000 3000 2015 Pre-approved Repeated under the Special Package

bridge across Kosi To be approved under NHO This scheme is not included in annual plan

river an Km 136 of

for the year 2015-16 DPR under progress in the ministry

NH-106

Ref GoBGoI Communication

Ensuring Connectivity Across Major Rivers

11 Bridge on river Ganga 2000 2000 Pre-approved Repeated under the Special Package

connecting Manihari Under DPR stage by NHAI

in Bihar to Sahibganj

in Jharkhand Ref GoBGoI Communication

12 Bridge over river 2000 _ _ Potential new No groundwork has taken place

Sone connecting project Not intimated to State RCD yet

Panduka(Nauhata) on

NH-2C in Bihar and

Shrinagar(Garhwa

District) in Jharkhand

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 13: 1.25lakhcrore package to bihar

13

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

13 A new 4-laned bridge 5000 5000 Pre-approved Repeated under the Special Package

on river Ganga Feasibility report is under preparation by Indian Academy of Highway

parallel to existing MG

Engineers Noida

Setu

Ref GoBGoI Communication

14 Improving 6600 6600 2015 Pre-approved Repeated under the Special Package

Connectivity- 7 Nos NHs Length-436 have already been declared as NH In the annual

Declaration of New

plan approved for the year 2015-16 provision for DPR work of NH 219

National Highway and

has been made and construction of 2 lane with paved shoulder of NH

its development

527A amounting to Rs 16000 cr has been included

Ref GoBGoI Communication For other stretches there is no provision in

the annual plan

15 New National 960 _ _ Potential New No groundwork has taken place

Highway connecting Project New project yet not declared as NH

Buxar on NH-84-

Chausa-Ramgarh-

Mohania on NH-2

Projects under ldquoBharatmala Programmerdquo

16 Roads connecting 1800 1800 2015 Pre-approved Repeated under the Special Package

Raxaul and Sonbarsa This is not a specific project for the state of Bihar New project of

(Parallel to Indo-

central government intimated to state RCD on 31072015 It includes

Nepal Border)

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 14: 1.25lakhcrore package to bihar

14

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

17 Chakia- Bargainia 1000 1000 2015 Pre-approved 13249 kms of road length across all over India out of which only 558

connectivity Kms falls in Bihar

Ref GoBGoI Communication

Projects For Improving Connectivity Of Places Of Religious Interest

18 Development of 1160 1160 2015 Pre-approved

Rampur -Khajuriya -

Kesariya end of NH-

722 to 4 lane

standard

19 Development of 5000 5000 2015 Pre-approved

Umgaon-Basopatti-

Benipatti-Rahua-

Madhubani-Rampatti-

Awam-Laufa-Bheja-

Supaul-Mehsi-

Saharsa which

connects Uchchait

Bhagwati Sthan to

Mehsi Taraesthan to

2 lane with paved

shoulder or 4-lane

standard with a

bridge over river Kosi

20 Development of Ram- 4000 4000 2015 Pre-approved

Janki Marg as already

declared recently part

of which falls in Bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 15: 1.25lakhcrore package to bihar

15

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

from UP Bihar Border

to Siwan-Madhubani-

Sitamarhi-Indo-Nepal

Border to 4 lane

standard

21 12 ROBs 900 900 2014 Pre-approved DPR consultant appointed by Ministry in September 2014 DPR under

progress

Total 4472187

Grand Total for NH 5471311 47553

II RURAL DEVELOPMENT

To complete about 13820 13820 _ Pre-approved Already accruable to the State Appropriation under Special Package

22500 km of PMGSY Committed liability of the GoI that theyre trying to pass off as special

roads in Bihar

package The amount under special package is what is anyway accruable

to Bihar under PMGSY

Ref GoBGoI Communication

III Petroleum and Natural Gas

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 16: 1.25lakhcrore package to bihar

16

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 The Barauni Refinery 12000 12000 2015 Pre-approved Repeated under Special Package

would be expanded Pre-announced by Minister in January 2015 under 25000 Crore

from 6 million tons to

upgradation exercise by PNG Ministry In a response to a Rajya Sabha

9 million tons

question Ministry clarified that Rs 3050 crore was being used by IOCL

for modernizationupgradation of Barauni Refinery

Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

RAJYA SABHA UNSTARRED QUESTION NO2342

2 A Polyproplene 3500 3500 2007 Pre-approved Repeated under Special Package

Recovery Plant for Pre-announced by Minister in January 2015 under 25000 Crore

petro-chemical

upgradation exercise by PNG Ministry

products would also

be set up Ref httpwwwbusiness-standardcomarticleeconomy-policycentre-

promises-rs-25k-cr-worth-oil-and-gas-projects-to-bihar-

115011800750_1html

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 17: 1.25lakhcrore package to bihar

17

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

3 The implementation 2300 2300 2015 Pre-approved Repeated under special package

of the 617 Kms Phase I of this project commenced on 25th of May 2015 Under the first

pipeline relating to

phase a length of 750 kms pipeline is being constructed with a budget of

Bihar in Jagdishpur-

3975 cr

Haldia pipeline

Ref httpwwwthehindubusinesslinecomcompaniesjagdishpurhaldia-

pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissionhtml

4 Raxaul Amlekhganj 200 200 2015 Pre-approved Repeated under special package

pipeline MoU for this pipeline was signed on 12th of August 2015 between IOCL amp

NOC IOCL is funding this project with a budget of 200 cr In exchange the

government of Nepal (which isnrsquot sharing the budget) will purchase

products from IOCL for next 15 years This deal is part of making

relationship between India and Nepal not for the upliftment of the state

Ref httppibnicinnewsitepmreleasesaspxmincode=20

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 18: 1.25lakhcrore package to bihar

18

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

5 Extension of Paradip- 1800 1800 2015 Pre-approved Repeated under special package

Haldia- Durgapur LPG IOCL has approved this project in January 2015 with a budget of 1823 cr

pipeline

(Though it is unclear about when this project started and what its status is

now)

Ref httparticleseconomictimesindiatimescom2015-02-

02news58711771_1_lpg-import-facility-indian-oil-corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannouncementsothers

outcome-of-board-meetingarticle6848722ece

6 New LPG Plant at 110 _ _ No No groundwork has taken place

Muzaffarpur groundwork

has taken

place

7 Creation of additional 15 _ _ No No groundwork has taken place

capacity for LPG groundwork

plant at Patna has taken

place

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 19: 1.25lakhcrore package to bihar

19

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

8 Implementation of BS 1500 1327 2015 Pre-approved Repeated under Special Package with 173cr as potentially incremental

IV fuel at Barauni IOCL approved a budget of 1327 cr in May 2015 for this upgradation at

Refinery

Barauni Plant

Ref httparticleseconomictimesindiatimescom2015-02-

16news59197033_1_gujarat-refinery-ioc-indian-oil-corp

httpenvironmentclearancenicinwritereaddataEIA11062015XL38J3Q0

Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=36369amptID=8

9 Augmentation of 45 _ _ Potentially No formal intimation received from GoI as yet

Patna LPG Plant from New Project

60 to 120 TMTPA

10 Upgradation of 6 _ _ Potentially No formal intimation received from GoI as yet

Purnea LPG Plant New Project

Total 21476 21127

IV CIVIL AVIATION

1 Construction of a 2000 _ _ No No groundwork has taken place

Greenfield Airport at groundwork

Patna done till now

2 Development of Gaya 300 _ _ No No groundwork has taken place

Airport for Airbus groundwork

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 20: 1.25lakhcrore package to bihar

20

Under the ldquoSpecialrdquo Package Actual Status Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 321-200 type of done till now aircraft operations with new terminal building and apron runway extension CAT-I approach lighting 3 Development of 250 _ _ No No groundwork has taken place Raxaul Airport for groundwork ATR-72 Q-400 type done till now of aircrafts for VFR operations 4 Development of Civil 150 _ _ No No groundwork has taken place Enclave at Purnea groundwork Airport for Airbus done till now 321-200 type of aircraft Total 2700

V HIGHER EDUCATION

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 21: 1.25lakhcrore package to bihar

21

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

1 Establishment of a 500 _ _ Potential New The identification of land selection of site nor formation of DPR for the

Central University Project University has been done till date

near Bhagalpur at the Sanctioned cost is also significantly lower than what state recently spent

historic site of

on Agriculture College in Kishanganj

Vikramshila University

2 Establishment of IIM 500 50 2015 Pre-approved Repeated under the Special Package with incremental benefit of Rs 450

Bodh Gaya crores

The Finance Minister had already announced in budget 2014-15 to set up

5 IIMs and 5 IITs one of which was at Bodh Gaya and allocated 500

crore for it

The state government has provided with 119 acres of land for IIM

Bodhgaya whose cost would come out to be more than 1000 crore

Ref GoBGoI Communication

Total 1000 50

VI SKILL DEVELOPMENT

1 To train one lakh 300 _ _ No Repeated under Special Package

youth under Pradhan groundwork Already accruable to Bihar under Skill India Mission if at all According to

Mantri Kaushal Vikas done till now

the information made available the fund will be disbursed through GoI

Yojana

agencies itself hence will not be accrued to Bihar Government There is no

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 22: 1.25lakhcrore package to bihar

22

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

2 25000 youth to be shred of evidence of planning or work on the ground

trained in Power Ref GoB Communication

sector

3 Mega Skill University 1250 _ _ Potential New The project was announced in April Land to be made available by the

in Bihar Project GoB Till date no land has been identified neither has the GoB been

intimated on how much land is actually needed

Total 1550

VII AGRICULTURE

1 Upgradation of PUSA 400 400 2015 Pre-approved Repeated under the Special Package

(Bihar) to the level of On Jan 15 2015 an MoU was signed between GoB and GoI for the 400cr

a Central Agricultural

allocation of PUSA agricultural university upgradation

University

Ref httpwwwbusiness-standardcomarticlepti-storiesmou-

signed-for-central-agriculture-university-in-bihar-115012500760_1html

2 Development of 200 _ _ No No groundwork has taken place

fisheries groundwork

done till now

3 Farm Water 750 _ _ No No groundwork has taken place

Management (Micro groundwork

irrigation creation of done till now

water resources)

4 Development of 600 _ _ No No groundwork has taken place

groundwork

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 23: 1.25lakhcrore package to bihar

23

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks

ed Cost

(cr)

Storage Capacity done till now

5 Farm Mechanization 600 _ _ No No groundwork has taken place

groundwork

done till now

6 Seed production 300 _ _ No No groundwork has taken place

systems groundwork

done till now

7 National Research 30 _ _ No No groundwork has taken place

Centre on Integrated groundwork

Farming System done till now

Motihari Bihar

8 Construction of new 214 _ _ No No groundwork has taken place

godowns at Supaul groundwork

Madhepura Hazipur done till now

and Chakia Bazar

Total 3094 400

VIII RAILWAYS

A DoublingTripling of Railway Line

1 Rampur Dumra - Tal - 938 8921682 2015- Pre-approved Repeated under the Special Package

Rajendrapul Addl 16 Ref Railway Budget 2015-16

Bridge and doubling -

14 Km length httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 24: 1.25lakhcrore package to bihar

24

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

2 Hajipur - Bachwara - 756 720 _budgetBudget_2015-16Pink_Book_2015-16ECRpdf

72 kms

3 Samastipur - 399 380

Darbhanga 38 kms

4 Kiul - Gaya 123 kms 1292 1230

5 3rd line between 4725 4500

Dhanbad - Sonnagar

(partly in Bihar ) -

429 kms

B Railway Electrification

1 Kiul - Tilaiya 87 kms 85 8049 2015- Pre-approved Repeated under special table

16 Ref Railway Budget 2015-16

2 Valmikinagar - 397 37768

Narkatiaganj-Sugauli-

Muzaffarpur including httpwwwindianrailwaysgovinrailwayboarduploadsdirectoratefinance

Sugauli-Raxaul 240 _budgetBudget_2015-16Pink_Book_2015-16COREpdf

kms

3 Ammapali Halt - Kiul 279 26596

including Tinpahar-

Rajmahal (Part of

Bonidanga link

cabinBonidanga-

Barharwa-

Sahibgang-Kiul

section incl Tinpahar-

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 25: 1.25lakhcrore package to bihar

25

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) Rajmahal) Length 247 kms Total 8870 8446 IX POWER

1 Construction of 1300 10000 10000 2013 Pre- Repeated under Special Package MW Power plant at approved Buxar PIB has Stage II recently appraised the project and recommended Rs 437 cr as pre- investment activity to kick start the project

2 Deen Dayal Upadhyay 5880 5880 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme Gram Vidyut Yojana Biharrsquos share already fixed with no intimation of new allocations Appropriation under Special Package

Ref httprggvygovinrggvyrggvyportaldynamicPFP-Phase2html httprggvygovinrggvyrggvyportalmemoDDUGJY_Guidelinespdf

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 26: 1.25lakhcrore package to bihar

26

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Under Integrated 250 250 _ Pre-approved Already accruable to the State under the Centrally sponsored scheme

Power Development Biharrsquos share already fixed with no intimation of new allocations Scheme (IPDS) Appropriation under Special Package

Ref httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Guidelines- ver21-311214pdf httpwwwapdrpgovinForm_IPDSIPDS_Summary_Sanctioned Total 16130 16130 X TELECOMMUNICATION ndash DIGITAL BIHAR 1 1000 new BTS 250 _ _ No Appropriation under Special Package Already accruable to Bihar under

(towers) to be groundwork Skill India Mission if at all No groundwork has taken place installed in Bihar done till now

2 Setting up of 2 new 20 _ _ No Appropriation under Special Package Already accruable to Bihar under

STPI centres groundwork Skill India Mission if at all No groundwork has taken place (Software Technology done till now Park of India) in Darbhanga and Bhagalpur and Rural BPO scheme for small towns and rural areas This will help in promoting the IT entrepreneurs and startups in Bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 27: 1.25lakhcrore package to bihar

27

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 3 Setting up 2 new 14 _ _ No Appropriation under Special Package Already accruable to Bihar under

NIELIT Centres in groundwork Skill India Mission if at all No groundwork has taken place Muzaffarpur and done till now Buxar apart from upgrading the existing centre in Patna Medical Incubator at IIT Patna Electronics and ICT Academy at NIT Patna 4 Electronic 150 _ _ No Appropriation under Special Package Already accruable to Bihar under

Manufacturing groundwork Skill India Mission if at all No groundwork has taken place clusters in Bihar for done till now which 50 subsidy for greenfield and 75 subsidy for Brownfield EMCs are available 5 30 Wi-Fi hotspots will 15 _ _ No Appropriation under Special Package Already accruable to Bihar under

be rolled out in Bihar groundwork Skill India Mission if at all No groundwork has taken place by BSNL at prominent done till now tourist places such as Rajgir Vaishali Gaya Nalanda and Patna Total 449

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 28: 1.25lakhcrore package to bihar

28

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr)

XI TOURISM 1 Vaishali and 200 200 2015 Pre-approved Repeated under the Special Package

Bodhgaya The Union tourism ministry had cleared this project in July 2015

development along

with other places in Ref

Buddhist circuit

httpwwwtelegraphindiacom1150719jspfrontpagestory_32446jsp

including Vikramshila

Vdntrvmqqkp

2 Sultanganj to Deoghar 50 50

project

3 Patna Sahib under 50 50

Prasad

4 Mahatma Gandhi 50 50

Circuit

5 Ramayan Circuit 100 100

6 Jain Circuit including 50 50

Champa puri

7 circuit for Mandar 50 50

Hills and Ang Pradesh

8 IITTM chapter in Bihar 50 50

Total 600 600

XII HEALTH

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 29: 1.25lakhcrore package to bihar

29

Under the ldquoSpecialrdquo Package Actual Status

Project Name Project Cost (cr) Sanction Year Status Remarks ed Cost

(cr) 1 Upgradation of 3 600 240 2015 Pre-approved Repeated under Special Package

Medical colleges with Health Funds had already been approved in 2014-15 for two medical

at Patna Bhagalpur proposed

colleges in Darbhanga and Muzaffarpur Rest three in Patna Bhagalpur

amp Gaya under incremental

and Gaya have now been sanctioned Central share per medical college is

PMMSY in Bihar allocation of

Rs120 crore and state share is 30 crores Therefore Rs 240 crore was

360 cr

already approved and Rs 360 crore is the new approval announced

Ref httppibnicinnewsitePrintReleaseaspxrelid=115701

Total 600 600

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 30: 1.25lakhcrore package to bihar

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

िीत सपताह िड़ ही धमधाम स लिहार क लिए 125 िाख करोड़ रपय क तथाकलथत ldquoसपशि पकजrdquo की घोषणा की गयी तभी स

करोड़ो सरकारी रपयो को खचच कर क यह परचाररत लकया जा रहा ह लक यह पकज लिहार वालसयो पर एक लवशष कपा क समान ह

इतना ही नही सरकारी मशीनरी को साथ िकर समाज क एक वगच दवारा हड़िड़ी म कछ कायचकरम भी चिाय जा रह ह जो यह ितान

की जलििाजी म ह लक यह पकज कस लिहार की तसवीर ििि िगा

125 िाख करोड़ क इस हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़ (जो लक पर

पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ और

पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह लवलभनन मतराियो दवारा अिग अिग समय पर इन योजनाओ

और पररयोजनाओ की घोषणा की गयी थी इसक अिावा इस पकज म 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

इस पररपकषय म जि हम 125 िाख करोड़ क िहपरचाररत िावो को िखत ह तो साफ़ समझ आता ह लक लिहार वालसयो को परी कथा

सनान का यह कतय शमचनाक और धतच ह कोई भी वयलकत इस पकज क तथयो और आकड़ो का लनषपकष आकिन इन चार मखय

लिनिओ क आधार पर कर सकता ह

1 इस पकज का असिी आकार कया ह

समाज क एक वगच क कछ िोग कह रह ह लक लिहार क लवकास क लिए कि 125 िाख करोड़ की रालश परवालहत की जा रही

ह िलकन यह रालश लजतनी िड़ी ह जनता क लिए यह उतना ही िड़ा छिावा ह 125 िाख करोड़ की रालश म स 108667 िाख

करोड़ की पवच लनधाचररत रालश पहि स परसतालवत और वतचमान म चि रही योजनाओ और पररयोजनाओ क लिए िय ह यहा पर इसी

रालश को नया िना कर नए लनवश क रप म परिलशचत लकया जा रहा ह

उिहारण क तौर पर यह पकज राज मागच पि और रिव ओवर लिज लनमाचण क 41 पररयोजनाओ क लिए 54713 करोड़ की रालश

िन का िावा करता ह िलकन भारत सरकार यह नही िताती ह लक इस लवशष पकज की घोषणा क पहि ही इन 41 पररयोजनाओ म

स 37 पररयोजनाओ पर 47553 करोड़ की रालश खि भारत सरकार न ही 2007 स 2015 क िीच आवलित की थी इसक िाि

िची 7160 करोड़ की रालश परसतालवत चार नई पररयोजनाओ क लिए ह (इस पर अनय लववरण िसतावज क आलखर म िख जा

सकत ह)

2 अनय साझिारो क पररपरकषय म भारत सरकार का असिी लवततीय सहयोग कया होगा

अगर यह मान लिया जाय लक इस पकज क कपा सवरप जो भी थोड़ी िहत सहायता भारत सरकार स लमिन वािी ह तो सवाभालवक

सवाि उठता ह लक इस वलिशीि सहायता का लकतना भाग भारत सरकार क लवततीय कोष स आ रहा ह कया भारत सरकार लिहार

को लवततीय ससाधन िन की परी लजममिारी िगी अथवा अनय साझीिार भी इसम सहायक भलमका लनभायग यहा भी उिहारण क

तौर पर िख तो भारत सरकार दवारा लवशष पकज क अतगचत िकसर म सतिज जि लवदयत लनगम पररयोजना (एसजवीएन) क लिए

10000 करोड़ रपय आवलित लकय गए ह यह पररयोजना लवशष पकज म लवदयत क लिए आवलित रालश का 62 भाग ह सतिज

जि लवदयत लनगम पललिक सकिर की पररयोजना ह और इसन अभी तक लनवश क लिए कोई भी परसताव पाररत नही लकया ह यह भी

साफ नही ह लक कौन कौन स साझीिार इस पररयोजना म लनवश करग धयातवय हो लक पर िश म उजाच सकिर की पररयोजनाओ का

डलि इलकविी 15 क अनपात म ह इस लवशष पकज की घोषणा म सचनाओ की असपषटता िगातार िनी हई ह

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 31: 1.25lakhcrore package to bihar

3 लकतनी समय सीमा क अनिर पकज म लिए गए िाभ परापत होग

अि यह िात उठती ह लक इस लवशष पकज क तहत जो अलतररकत रालश भारत सरकार स लिहार सरकार को िी जानी ह वह लिहार को

लकस समय सीमा तक महया करायी जायगी यह रालश एक वषच म लमिगी पाच वषो म लमिगी या लफर कई वषो म लमिगी इसका

कोई लयौरा नही ह पर िसतावज म समय सीमा का कही भी कोई लजकर नही ह यह भी नही िताया गया लक राजय म यह रालश कि

तक लनवश की जाएगी

4 लकन तरीको क माधयम स इस पकज क िाभ सभव होग और राजय तक पहचग

आलखर म यह मानत हए लक भारत सरकार इस पकज क तहत कछ रालश एक समय सीमा म राजय को परिान करगी तो अगिा परशन

यह उठता ह लक यह रालश कस लवतररत की जाएगी कया यह रालश राजय सरकार को िी जाएगी कया इस लकसी तीसर पकष क

माधयम स लिया जाएगा अगर ऐसा होता ह तो वह तीसरा पकष कौन होगा अि तक भारत सरकार दवारा लिहार सरकार को या इसक

लकसी भी लवभाग को पकज की अलतररकत रालश क लवषय म लवतत क लवतरण की समय सीमा और लवतरण परणािी क समिनध म या

पहि स परसतालवत योजना म लकसी भी िििाव की कोई भी अलधसचना परापत नही हई ह

ऐस म आियच नही ह लक लपछि लिनो म कछ लवशलषको न इस िात की चचाच की ह लक न ही लवतत मतरािय ससाधनो को खोजन की

लचता कर रहा ह और न ही लवतत मतरी परशान ह लचता की जररत भी नही ह कयोलक इन सभी अलतररकत आविनो को कनरीय िजि स

िना नही ह

अतः यह लििकि साफ़ ह लक यह लवशष पकज लिहार क लवधानसभा चनाव क मातर इस वजह स परचाररत लकया जा रहा ह लजसस

िोगो को भरलमत लकया जा सक झठ उतसाह का माहौि िनाया जा सक और लिना लकसी आधार क हवाई महि खड़ लकया जा सक

कोऑपरलिव फडरलिसम क िलनयािी लसिातो की अनिखी करत हए लिहार क िोगो क लवशवास क साथ धोखाधड़ी की ह

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 32: 1.25lakhcrore package to bihar

सनपशॉि

पकज पॉलिलिकस लिहार को लिए गय 125 िाख करोड़ क सपशि पकज का सच

125 िाख करोड़ क सपशि पकज क हवाई िाव को अगर धयान स िखा जाए तो यह िात साफ़ हो जाती ह लक 108 िाख करोड़

(जो लक पर पकज का 87 ह) का पकज कछ और नही िललक कई परानी पहि स परसतालवत और वतचमान म चि रही योजनाओ

और पररयोजनाओ क लिए आवलित रालश क योग की lsquoरीपकलजगrsquo भर ह 6000 करोड़ रपय की कछ नई पररयोजनाय ितायी गयी ह

लजनक लनयोजन और लकरयानवयन क िार म कोई भी जानकारी साझा नही की गयी ह इस परकार 125 िाख करोड़ रपय क इस

पकज म अलतररकत एव वलिशीि सहायताओ की कि रालश मातर 10368 करोड़ ही ह लकसी लनलित समय सीमा और एक लनणीत

लवतरण परणािी क अभाव म 10368 करोड़ की रालश भी इस पकज को िगभग नगणय घोलषत करती ह

सनपशॉि

तथाकलथत ldquoसपशि पकजrdquo असि लसथलत

करस

सकिर

पररयोजना की

िागत

(करोड़ म)

पवच सवीकत िागत

(करोड़ म)

नयी और िजि स

वलिशीि आविन

(करोड़ म)

पररयोजनाओ की िागत

जो अभी धराति पर

नही ह (करोड़ म)

1 राषरीय राजमागच 54713 47553 7160

2 गरामीण लवकास 13820 13820

3 परोलियम और पराकलतक

गस

21476 21127 224 125

4 नागररक उडडयन 2700 2700

5 उचच लशकषा 1000 50 950

6 कौशि लवकास 1550 300 1250

7 कलष 3094 400 2694

8 रि 8871 8446 423

9 उजाच 16130 16130

10 िरसचार 449 449

11 पयचिन 600 600

12 सवासथय 600 240 360

125003 108667 10368 5968

िगभग रालश

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 33: 1.25lakhcrore package to bihar

लवसतत लवशलषण

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

I राषरीय राजमागच

A अवाडचलिलडग सतर की परलकरया म पररयोजनाए

82

लिहार शरीफ-

िरिीघा- एनएच-

82 का मोकामा

सकसन एनएचडीपी

फज IV

39954 39954 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

यह भाग एनएचडीपी फज IV क अतगचत फरवरी 2012 म मतरािय दवारा

सवीकत

Ref लिहार सरकारभारत सरकार सवाि

30

एनएच 30 क

पिना- कोइिावार

सकसन को 4-िन

करना

492 492 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

30amp84

एनएच 30 और 84

क कोइिवर-

भोजपर सकसन को

4 िन करना

750 750 2007 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 34: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

84

एनएच 84 क

भोजपर िकसर

सकसन को 4 िन

करना

595 595 2007 पहि स सवीकत

31

एनएच 84 क

िलखतयार पर

मोकामा सकसन को

4 िन करना

970 970 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

31

मोकामा म गगा निी

पर 4 िन का पि

(एनएच 31)

520 520 2007 पहि स सवीकत

31

लसमररया-खगररया

को 4 िन एनएच

31 एनएचडीपी

फज III

106258 106258 2007 पहि स सवीकत

30A फतआ-हरनौत ndash

िाढ़ सकसन का

लकमी00-लकमी

5912 5912 2013 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवरा जारी MoRTHE ििर निर RWNH-

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 35: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

696 एनएच 30A

12013212010SP(A7)P-9 लिनाक 20112013

Ref लिहार सरकारभारत सरकार सवाि

104

लशवहर-सीतामढ़ी-

जयनगर-नरलहया का

उननलतकरण (लकमी

40-217) एनएच

104 3 पकज म

70144 70144 2010 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

मतरािय को फाइनि डीपीआर लिया गया 10052010

Ref लिहार सरकारभारत सरकार सवाि

106

िीरपर-िीहपर

(लकमी 0-106) का

उननलतकरण एनएच

106

57534 57534 2014 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12013192010SP(B3)P-9 लिनाक 212014

Ref लिहार सरकारभारत सरकार सवाि

85

गोपािगज-छपरा

सकसन को पककी

पिरी क साथ 2 िन

करना

74806 74806 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म मतरािय दवारा अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 36: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

28B

ईपीसी मोड पर

िलतया- कशीनगर

सकसन क लकमी

25-40 का

चौड़ीकरण

शलकतकरण

जयालमतीय

उननतीकरण क साथ

2 िन करना

8861 8861 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

12014982014BRNH-3 लिनाक 3032015

Ref लिहार सरकारभारत सरकार सवाि

28B

लकमी 65-97 का

चौड़ीकरण और

शलकतकरण पककी

पिरी क साथ िो

िन करना

2068 2068 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141012015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

102

छपरा-रवघाि-

मजफफरपर का

पककी पिरी क साथ

2 िन करना

42058 42058 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म फरवरी 2012 म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 37: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

133

पककी पिरी क साथ

2 िन चौड़ीकरण

शलकतकरण लकमी

000 स 10903

2804 2804 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर निर RWNH-

120141122015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

327A

पककी पिरी क साथ

2 िन करना

शलकतकरण और

चौड़ीकरण लकमी

000 स 25010

तक ईपीसी मोड पर

मजित amp पककी

पिरी क साथ 2 िन

का चौड़ीकरण

लकमी 000 स

25010

ईपीसी मोड पर

7755 7755 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जारी MoRTHE ििर नमिर RWNH-

120141132015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 38: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

327E

2 िन स 2 िन तक

पककी पिरी क साथ

शलकतकरण और

चौड़ीकरण लकमी

93612 स 9800

तक

6452 6452 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

AA मतरािय दवारा जरी MoRTHE ििर निर RWNH-

12014902015BRNH-3 लिनाक 3132015

Ref लिहार सरकारभारत सरकार सवाि

57A

फारलिसगज-

जोगिानी सकसन

को 4 िन करना

एनएच 57A

200 200 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

83

पिना-गया-डोिी

सकसन को 4 िन

करना एनएच 83

JICA ODA िोन

क साथ

123198 123198 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज III म अपरि 2007 म सलममलित

Ref httpwwwnhaiorgphase3uiasp

80 भागिपर िाईपास

का लनमाचण 268 24053 2013 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया लसफच 14022013 को िी

गयी िागत म िस थोड़ स िढ़ोततरी क साथ

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 39: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 999124 996377

B पररयोजनाय जो पाइपिाइन म ह

करस पररयोजना िागत (करोड़

रपय)

1

मोकामा-खगररया

सकसन को 4 िन

करना एनएच-31

810 810 एनएच 31 की सकीम लजस लफर स सपशि पकज क अनिर िाया गया ह

2 मगर म पि 236187 236187 2013 कायचरत पररयोजना

सपशि पकज क अतगचत ििारा िताया गया एनएचएआई दवारा नवमिर

2013 म काम शर लफर माचच 2015 म काम िि अि रिव दवारा काम

शर

Ref लिहार सरकारभारत सरकार सवाि

3

महशघाि-सहरसा-

पलणचया सकसन तक

पककी पिरी क साथ

2 िन एनएच-

107

1000 1000 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 40: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

4 मझोिी- लचरकोि

सकसन का लवकास 700 700 2012 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया 22022012 को एनएच

घोलषत एनएचडीपी फज IV म मतरािय दवारा फरवरी 2012 म सलममलित

Ref लिहार सरकारभारत सरकार सवाि

5 पिना ररग रोड को

46 िन करना 1500 1500 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

6

लकसनगज िाईपास

को 4 िन करना

एनएच-31

250 250 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचडीपी फज VII म मतरािय दवारा सलममलित

Ref लिहार सरकारभारत सरकार सवाि

7

मगर-लमजाचचौकी

सकसन को 4 िन

करना एनएच-80

1200 1200 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

डीपीआर सतर पर

8 2 िन पककी पिरी

का लनमाचण एनएच-

2C एनएच 80

680 680 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

2015-16 क वालषचक पिान म सवीकत डीपीआर कायच क कोिशन क

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 41: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच 81 एनएच

99 and एनएच

527 A सकसन पर

लिए आमतरण लिया गया ह

Ref लिहार सरकारभारत सरकार सवाि

9

महातमा गाधी सत

का लनमाचण

जआईसीए क साथ

2800 2800 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जापान क जईएफ इजीलनयररग कारपोरशन न आलखरी ररपोिच मतरािय को

फरवरी 2015 म सौपी परशासलनक सवीकलत का आना िाकी

Ref लिहार सरकारभारत सरकार सवाि

10

कोसी निी पर लकमी

136 पि का

लनमाचण एनएच

106

3000 3000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचओ क अतगचत सवीकत होना ह 2015-16 क वालषचक पिान म

शालमि नही मतरािय क अतगचत डीपीआर परलकरया म

Ref लिहार सरकारभारत सरकार सवाि

Ensuring Connectivity Across Major Rivers

11

मलनहारी लिहार स

सालहिगज

झारखणड तक गगा

निी पर पि का

2000 2000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

एनएचएआई क अतगचत डीपीआर सतर पर

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 42: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लनमाचण Ref लिहार सरकारभारत सरकार सवाि

12

सोन निी पर पाडका

(नौहािा) को जोड़न

वाि पि का

लनमाचण एनएच 2C

पर शरीनगर लजिा-

गढ़वा झारखड

2000 _ _ सभालवत नयी पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

सिि आरसीडी को जानकारी नही

13

गगा निी पर महातमा

गाधी पि क

समानतर 4 िन क

नए पि का लनमाचण

5000 5000 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

इलडयन एकडमी ऑफ़ हाईव इजीलनयसच नोएडा क अतगचत फीलजलिलििी

ररपोिच तयार लकया जा रहा ह

Ref लिहार सरकारभारत सरकार सवाि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 43: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

14

कनलकिलविी को

िढ़ात हए नए हाइव

क लनमाचण की

घोषणा और उनपर

कायच

6600 6600 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

सात नए नशनि हाइव 436 लकमी िमि मागच को 2015-16 वालषचक

पिान म एनएच घोलषत लकया गया एनएच 219 का डीपीआर तयार और

एनएच 527A का पककी पिरी क साथ 2 िन करन क लिय 166 करोड़

की िागत जड़ी ह

Ref लिहार सरकारभारत सरकार सवाि

15

एनएच-84 पर

िकसर और एनएच-

2 पर चौसा-रामगढ़-

मोहलनया को जोड़न

वाि नय नशनि

हाइव का लनमाचण

960 _ _ सभालवत नई पररयोजना

जमीनी सतर पर कोई कायच नही शर हआ ह

नयी पररयोजना को को अभी तक नशनि हाइव नही घोलषत लकया गया ह

ldquoभारतमािा कायचकरमrdquo क अतगचत पररयोजनाए

16 रकसौि और

सोनिरसा को जोड़न

वािी सड़क

1800 1800 2015 पहि स सवीकत सपशि पकज क अतगचत ििारा िताया गया

यहलिहार क लिए लवशष पररयोजना नही ह 31072015 को सिि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 44: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

(भारत-नपाि सीमा

क समानतर)

आरसीडी को क र सरकार की नई पररयोजनाओ की जानकारी िी गयी

लजसम िश भर की 13249 लकमी की िमिाई क मागच ह और उसम स 558

लकमी लिहार क अनिर आयग

Ref लिहार सरकारभारत सरकार सवाि 17 चलकया-िरगलनया

का जड़ाव 1000 1000 2015 पहि स सवीकत

धालमचक सथिो को जोड़न वािी पररयोजनाए

18

रामपर-खजररया-

कसररया एनएच

722 क अत तक 4

िन क सिणडडच तक

लवकास

1160 1160 2015 पहि स सवीकत

19

उचचत भगवती

सथान स महसी

तारासथान को जोड़न

वािी उमगाव-

िसोपतती-िलनपतती-

रहआ-मधिनी-

रामपतती-आवाम-

िउफा-भजा-

सपौि-महसी-

5000 5000 2015 पहि स सवीकत

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 45: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सहरसा मागच को

पककी पिरी क साथ

2 िन या 4 िन क

सिणडडच का करना

कोसी पर एक पि

क साथ

20

कछ समय पहि

घोलषत राम-जानकी

मागच का 4 िन

सिणडडच का लवकास

जो उततर परिश

लिहार की सीमा स

लसवान-मधिनी-

सीतामढ़ी-भारत-

नपाि सीमा तक

जाती ह

4000 4000 2015 पहि स सवीकत

21 12 रि पिो का

लनमाचण 900 900 2014 पहि स सवीकत

डीपीआर परलकरया म ह मतरािय दवारा लसतमिर 2014 म डीपीआर

सिाहकार की लनयलकत की गयी ह

Total 4472187

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 46: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

एनएच क लिए परा

िोिि 5471311 47553

II गरामीण लवकास

लिहार म परधानमतरी

गराम सड़क योजना

क अतगचत 22500

लकमी िमिाई क

सड़क का लनमाचण

13820 13820 _ पहि स सवीकत

राजय को पहि स लमिता रहता ह सपशि पकज म जोड़ लिया गया ह

यह भारत सरकार का परलतिि िालयतव ह लजस लवशष पकज क माधयम स

लिखन का परयास ह परधानमतरी गराम सड़क योजना दवारा वस भी लिहार

राजय को परापत होना ह

Ref लिहार सरकारभारत सरकार सवाि

III परोलियम और पराकलतक गस

1

िरौनी ररफाइनरी का

6 िन स 9 िन तक

लवसतार

12000 12000 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

परोलियम और पराकलतक गस मतरािय दवारा जनवरी 2015 म 25000

करोड़ क साथ उननतीकरण की घोषणा

(राजयसभा म एक परशन क जवाि म मतरािय न साफ़ लकया था लक िरौनी

ररफाइनरी क नवीनीकरण उननतीकरण क लिए आईओएिसी दवारा 3050

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 47: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

करोड़ का उपयोग

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

राजय सभा अनसिाड परशन न2342

2

परो-कलमकि

उतपािो क लिए एक

पोिीपरोिन पिाि

की सथापना

3500 3500 2007 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

जनवरी 2015 म परोलियम और गस मतरािय दवारा 25000 करोड़ की

रालश क दवारा उननतीकरण की पवच-घोषणा

Ref httpwwwbusiness-standardcomarticleeconomy-

policycentre-promises-rs-25k-cr-worth-oil-and-gas-projects-to-

bihar-115011800750_1html

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 48: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

जगिीशपर-हललिया

पाइपिाइन क

अतगचत लिहार स

समिलधत 617

लकमी पाइपिाइन

का लकरयानवयन

2300 2300 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पररयोजना का पहिा फज 25 म 2015 स शर लजसक अतगचत 750

लकमी िमिी पाइपिाइन का लनमाचण होना ह लजसकी िागत 3975 करोड़

रपय ह Ref

httpwwwthehindubusinesslinecomcompaniesjagdishpu

rhaldia-pipeline-project-commencedarticle7244578ece

httpwwwgailonlinecomfinal_sitepdf2015GAIL-

29May-1pdf

httpwwwgailonlinecomfinal_sitenaturalgas_transmissi

onhtml

4 रकसौि अमिखगज

पाइपिाइन 200 200 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

आईओएिसी और एनओसी क िीच पाइपिाइन क लिए 12 अगसत

2015 को MoU पर हसताकषर हआ ह आईओएिसी इस परोजकि म 200

करोड़ क िजि की रालश ि रहा ह लजसक ििि म नपाि सरकार (अभी

तक िजि का लववरण साझा नही) अगि 15 सािो तक आईओएिसी स

उतपाि खरीिगा अतः यह साफ़ ह की यह समझौता भारत नपाि क सिधो

को िढ़ान क लिए ह लिहार क लवकास क लिए नही Ref

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 49: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

httppibnicinnewsitepmreleasesaspxmincode=20

5

पारािीप - हललिया -

िगाचपर LPG

पाइपिाइन का

एकसिशन

1800 1800 2015 पहि स सवीकत

सपशि पकज क अतगचत िोिारा िताया गया

आईओएिसी न इस परोजकि को मज़री जनवरी 2015 म 1832 करोड़ क

िजि क साथ ही ििी थी

Ref httparticleseconomictimesindiatimescom2015-

02-02news58711771_1_lpg-import-facility-indian-oil-

corporation-ioc

httpwwwthehindubusinesslinecomcompaniesannounce

mentsothersoutcome-of-board-meetingarticle6848722ece

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 50: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6 मज़फफरपर म नया

एिपीजी पिाि 110 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

पिना क एिपीजी

पिाि की वलि को

िढ़ाना

15 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

िरौनी ररफइनरी म

िीएस IV ईधन का

लकरयानवयन

1500 1327 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया सभवतः 173 करोड़ की

अलतररकत रालश परापत हो

आईओएिसी न मई 2015 म िरौनी पिाि क लिए 1327 करोड़ का िजि

सवीकत

Ref httparticleseconomictimesindiatimescom2015-

02-16news59197033_1_gujarat-refinery-ioc-indian-oil-

corp

httpenvironmentclearancenicinwritereaddataEIA1106

2015XL38J3Q0Annexure-documentofEIApdf

httpswwwioclcomaboutusNewsDetailaspxNewsID=3

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 51: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

6369amptID=8

9

पिना एिपीजी

पिाि का लवसतार -

60 TMTPA स

120 TMTPA तक

45 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

10

पलणचया एिपीजी

पिाि का

उननलतकरण

6 _ _ सभालवत नयी पररयोजनाय

अभी तक भारत सरकार दवारा कोई औपचाररक सचना नही परापत की गयी

Total 21476 21127

IV नागररक उडडयन

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 52: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

पिना म गरीनफीलड

हवाई अडड का

लनमाचण

2000 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

2

नए िलमचनि भवन

और एपरन रनव

लवसतार और CAT-

I परकाशन दलषटकोण

की सलवधा सलहत

एयरिस 321-200

परकार क लवमानो

को सचालित करन

क लिए गया हवाई

अडड का

उननलतकरण

300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

ज़मीनी सतर पर कोई कायच नही शर हआ ह

3

रकसौि हवाई अडड

का लवकास - VFR

सचािन क लिए

ATR-72 Q-

400 परकार क

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 53: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लवमानो की सलवधा

4

एयरिस 321-200

परकार क लवमानो क

लिए पलणचया हवाई

अडड पर लसलवि

एनकिव का लनमाचण

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

Total 2700

V उचच लशकषा

1

भागिपर क लनकि

लवकरमलशिा क पास

कनरीय

लवशवलवदयािय का

लनमाचण

500 _ _ सभालवत नयी पररयोजना

भलम क पहचान नही की गयी साईि की पहचान नही की गयी यलनवलसचिी

क लिए DPR का गठन नही लकया गया लचलनहत रालश भी हाि म हए

लकशनगज क कलष लवदयािय स काफी कम

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 54: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

2 आईआईएम

िोधगया का लनमाचण 500 50 2015 पहि स सवीकत

सपशि पकज क अनिर िहराया गया अलतररकत रालश 450 करोड़ लवतत

मतरी न 2014-15 क िजि अलभभाषण म 5 IIM और 5 IIT क लनमाचण

की घोषणा की ह िोधगया उसम स एक सथि ह उसक लिए 500 करोड़

की रालश ि जान की िात की गयी ह राजय सरकार न IIM िोधगया क

लिए 119 एकड़ की जमीन िी ह लजसकी िागत 1000 करोड़ स जयािा ह

Ref GoBGoI Communication

Total 1000 50

VI कौशि लवकास

1

परधान मतरी कौशि

लवकास योजना क

अतगचत एक िाख

यवाओ की रलनग 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अतगचत िोिारा िताया गया

लसकि इलडया लमशन क अनिर लिहार क लिए पवच लनयोलजत जानकारी क

अनसार भारत सरकार की अजलसओ दवारा फडस लिए जायग जमीन पर

योजना और कायच क सतर पर कोई हिचि नही

Ref लिहार सरकारभारत सरकार सवाि 2

25000 यवाओ

को पॉवर सकिर म

रलनग

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 55: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3 लिहार म मगा

लसकि यलनवलसचिी 1250 _ _ सभालवत नयी पररयोजना

यह पररयोजना अपरि म घोलषत कर िी गयी थी लिहार सरकार दवारा भलम

िी जाएगी आज तक लिहार सरकार को यह सचना नही िी गयी लक

लकतनी ज़मीन िी जानी ह

Total 1550

VII कलष

1

पसा लिहार क कलष

लवशवलवदयािय का

क रीय

लवशवलवदयािय क

रप म उननलतकरण

400 400 2015 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

पसा लवशवलवदयािय क उननतीकरण को िकर 15 जनवरी 2015 म क रीय

सरकार और राजय सरकार क िीच MoU प हसताकषर लकया गया

Ref httpwwwbusiness-standardcomarticlepti-

storiesmou-signed-for-central-agriculture-university-in-

bihar-115012500760_1html

2 मतसय पािन का

लवकास 200 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

3 फामच जि परिधन

(माइकरो लसचाई

जि ससाधनो का

750 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 56: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

सजन)

4 भडारण कषमता का

लवकास 600 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

5 कलष मशीनीकरण 600 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

6 िीज उतपािन

परणािी 300 _ _

ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

7

एकीकत कलष

परणािी क लिए

राषरीय अनसधान

क र मोलतहारी

लिहार

30 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

8

सपौि मधपरा

हाजीपर और

चलकया िाजार म

नए गोिामो का

लनमाचण

214 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह ज़मीनी सतर पर कोई कायच नही शर हआ ह

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 57: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

Total 3094 400

VIII रिव

A रिव िाइन की डिलिग लरलपिग

1

रामपर डमरा -ताि -

राजनर पि -

अलतररकत पि व

िोहरीकरण

938 8921682

2015-16 पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16ECRpdf

2 हाजीपर - िछवारा

- 72 लकमी 756 720

3 समसतीपर - िरभगा

- 38 लकमी 399 380

4 कयि -गया -123

लकमी 1292 1230

5 धनिाि - सोननगर

तीसरी िाइन 429

लकमी (कछ भाग

4725 4500

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 58: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिहार म )

B रिव इिलकरलफकशन

1 कयि - लतिया 87

लकमी 85 8049

2015-16

पहि स सवीकत

सपशि पकज क अतगचत ििारा िताया गया

Ref Railway Budget 2015-16

httpwwwindianrailwaysgovinrailwayboarduploadsdir

ectoratefinance_budgetBudget_2015-

16Pink_Book_2015-16COREpdf

2

वालमीलक नगर -

नरकलियागज-

सगौिी -

मज़फफरपर -

सगौिी -रकसौि

240 लकमी

397 37768

3

अममपािी हालि -

कयि तीनपहाड़

247 लकमी

279 26596

Total 8870 8446

IX उजाच

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 59: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

1

िकसर म 1300

मगावाि क पॉवर

पिाि लनमाचण (PIB

न पररयोजना म पवच

लनवश क लिए 437

करोड़ की रालश

िताई ह

10000 10000 2013 पहि स सवीकतसिज II सपशि पकज क अतगचत ििारा िताया गया

2 िीन ियाि उपधयाय

गराम लवदयत योजना 5880 5880 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref httprggvygovinrggvyrggvyportaldynamicPFP-

Phase2html

httprggvygovinrggvyrggvyportalmemoDDUGJY_Gui

delinespdf

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 60: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

3

इिीगरिड पॉवर

डविपमि सकीम क

अतगचत (IPDS)

250 250 _ पहि स सवीकत

क र लनयोलजत योजना क अनिर राजय को िय नयी रालश क िार म कोई

जानकारी नही सपशि पकज क अनिर समालहत

Ref

httpwwwapdrpgovinIPDS_Order_GuidelinesIPDS_Gu

idelines-ver21-311214pdf

httpwwwapdrpgovinForm_IPDSIPDS_Summary_San

ctioned

Total 16130 16130

X िरसचार - लडलजिि लिहार

1

लिहार म 1000 नए

िी िी एस िावर का

इसिािशन

250 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

2

िरभगा और

भागिपर म 2 नए

STPI क र िनाना

छोि शहरो और

गालमन इिाको क

20 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 61: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

लिए गरामीण BPO

योजना लिहार क

उदयलमयो और नए

वयावसालयको लिए

IT की सलवधा

3

मजफफरपर और

िकसर म 2 नए

NIELIT क र का

लनमाचण पिना क र

को अपगरड करना

IIT पिना म

मलडकि इनकयििर

और NIT पिना म

इिकरॉलनकस और

ICT अकािमी का

लनमाचण

14 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

4

लिहार म

इिकरॉलनक

मनयफकचररग

किसिर क लिए

150 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 62: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

गरीनफ़ीलड को 50

सललसडी और

िाउनफ़ीलड को 75

सललसडी महया

कराना

5

राजगीर वशािी

गया नाििा और

पिना जस पयचिक

सथिो क लिए

BSNL दवारा 30

वाई फाई हॉिसपॉि

को रोि आउि

करना

15 _ _ ज़मीनी सतर पर कोई कायच

नही शर हआ ह

सपशि पकज क अनिर समालहत लिहार को लसकि इलडया लमशन क तहत

लमिन वािा अि तक ज़मीन पर कोई लकरयानवयन नही हआ

Total 449

XI पयचिन

1

लवकरमलशिा और

िौि सलकच ि क

अनय सथानो क

साथ-साथ वशािी

200 200 2015 पहि स ही सवीकत सपशि पकज क अतगचत ििारा िताया गया

कनरीय पयचिन मतरािय न 2015 जिाई म इस पररयोजना को सवीकलत ि

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 63: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

और िोधगया का

लवकास

िी थी

Ref

httpwwwtelegraphindiacom1150719jspfrontpagestory

_32446jspVdntrvmqqkp

2

सलतानगज स

िवघर की

पररयोजना

50 50

3

PRASAD सकीम

क तहत पिना

सालहि

50 50

4 महातमा गाधी

सलकच ि 50 50

5 रामायण सलकच ि 100 100

6 चपा परी सलहत जन

सलकच ि 50 50

7

मिार लहलस और

अग परिश क लिए

सलकच ि

50 50

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह

Ref

httppibnicinnewsitePrintReleaseaspxrelid=115701

Total

600

600

Page 64: 1.25lakhcrore package to bihar

तथाकलथत सपशि पकज क अतगचत असि लसथलत

पररयोजना का नाम पररयोजना की

िागत (करोड़)

आवलित िागत

(करोड़) वषच लसथलत लिपणणी

8 लिहार म IITTM

अधयाय 50 50

Total 600 600

XII सवासथय

1

लिहार म PMMSY

क तहत पिना

भागिपर और गया

म 3 मलडकि

कॉिजो का

अपगरडशन

600 240

2015

पहि स ही सवीकत 360

करोड़ रपए का परसतालवत

अलतररक़त आविन

सपशि पकज क अतगचत ििारा िताया गया

सवासथय कषतर क अतगचत पहि स ही िरभगा और मजफफरपर म िो मलडकि

कॉिजो क लिए 2014-15 म मजरी ि िी गई थी पिना भागिपर और

गया म िाकी तीन कॉिजो की अि मजरी िी गई ह एक मलडकि कॉिज

क परलत क र की भागिारी 120 करोड़ की ह और राजय सरकार की 30

करोड़ अतः 240 करोड़ रपय की मज़री पहि स ही थी और कवि 360

करोड़ नयी अनमोलित रालश ह