Network Rail 2010 Route Plans Update – Route I Route I: London & East Midlands Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond. In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan. Should you require any further information, please contact the Route Plan 2011 mailbox at [email protected]. Appendix A: Updated Route Map Appendix B: Updated Capability Maps where a change has occurred since March 2010 Appendix C: Updated list of CP4 enhancements Appendix D: Constraints and issues on the route Summary of alterations Reference Data Location in Route Plan Change Page 3 Route Map Page 3 Closed line at Rufford Figures 4 to 7 Capability maps Page 6 Electrification – removed Rufford branch from map Route Availability – removed Rufford branch from map Linespeed – removed Rufford branch from map Gauge – removed Rufford branch and an error has been rectified so that the route between London St Pancras International and Kentish Town is shown as W6 instead of W7. Figure 11 Forecast end of year PPM Page 12 CrossCountry 88.3% East Midlands Trains 92.0% First Capital Connect 89.2% Northern Rail 90.7% The above is based on 2010/2011 Period 11 data.

12400_Route I - London and East Midlands 2011 Update

Embed Size (px)

DESCRIPTION

London East midlands

Citation preview

Page 1: 12400_Route I - London and East Midlands 2011 Update

Network Rail 2010 Route Plans Update – Route I

Route I: London & East Midlands

Route Plans are generally published on an annual basis including the most up-to-date position at that point in time. In 2011 we will be publishing information on a route basis as part of our Initial Industry Plan in the Autumn covering CP5 and beyond.

In the meantime we have retained the 2010 Route Plans, updated where appropriate with current information including our plans to the end of CP4. This document, therefore, should be read in conjunction with the equivalent 2010 Route Plan.

Should you require any further information, please contact the Route Plan 2011 mailbox at [email protected].

Appendix A: Updated Route Map

Appendix B: Updated Capability Maps where a change has occurred since March 2010

Appendix C: Updated list of CP4 enhancements

Appendix D: Constraints and issues on the route

Summary of alterations

Reference Data Location in Route

Plan

Change

Page 3 Route Map Page 3 Closed line at Rufford

Figures 4 to 7 Capability maps Page 6 Electrification – removed Rufford branch from map

Route Availability – removed Rufford branch from map

Linespeed – removed Rufford branch from map

Gauge – removed Rufford branch and an error has

been rectified so that the route between London St

Pancras International and Kentish Town is shown as

W6 instead of W7.

Figure 11 Forecast end of

year PPM

Page 12 CrossCountry 88.3%

East Midlands Trains 92.0%

First Capital Connect 89.2%

Northern Rail 90.7%

The above is based on 2010/2011 Period 11 data.

Page 2: 12400_Route I - London and East Midlands 2011 Update

2

Network Rail 2011 Route Plans Update – Route I

Appendix A: Updated Route Map

Key to diagrams

Page 3: 12400_Route I - London and East Midlands 2011 Update

Route I London and East Midlands

KeyPrimarySecondaryRuralFreight only

The line shading indicatesstrategic route sectionswhich are numbered on the map

Shireoaks JcnsRoute H

Route G

Route G

Route G

Helpston Jcn

Route G

Route H

Route H

Tapton Jcn

Calverton branch(mothballed)

High Marnham

Shirebrook Jcns

Kirkby Lane End Jcn

Clay Cross South Jcn

Pye Bridge Jcn

SheetStores

Jcn

Trowell Jcn

Ambergate South Jcn

TrentEast Jn

Stenson Jcn

Swaines Park

Leicester Jcn

Branston Jcn

Wichnor Jcn

NuneatonJcns

Croft Quarry

Stud FarmQuarry

Bardon HillQuarry

Birmingham Curve Jcn

North Stafford Jcn

London Road Jn

Toton JcnToton Depot

Meadow Lane Jcn

Attenborough Jcn

Trent South JcnRatcliffe Power Station

SystonJcns

Mountsorrel Quarry

Glen Parva Jcn

Kettering North Jcn

Route N

Brent Curve Jcn

Carlton Road Jcn

Cricklewood Freight Facility

Radlett Stone Terminal

Cricklewood Curve Jcn

Gospel Oak Jcn

Junction Road Jcn

Kentish Town Jcn

ChurchyardSidings

Route E

Route E

FARRINGDON

LONDON BLACKFRIARSRoute B

Route N

Route M

Route M

Route N

To Caldon Low (not in regular use)

Route N

Stoke Jcn

Manton Jcn

Allington Jcns

Nottingham Branch Jcn

Newark Crossing Jcns

Newark Crossing

Wigston Jcns

Knighton South Jcn

Kettoncement works

Elstow aggregates terminal

LentonJns

Mansfield Jn NetherfieldJcn

Rectory Jcn TerminalRadford Jn

Woodend Jcn

WelbeckCollieryJcn Clipstone

Jcns Thoresby

(not in regular use)Rufford

WarsopJcn

NUNEATON

LICHFIELDTRENT VALLEY

BEDFORD ST JOHNS

GRANTHAM

NEWARK NORTH GATE

SHEFFIELD

PETERBOROUGH

MANSFIELDWOODHOUSE

MANSFIELDMATLOCK

DERBY

NOTTINGHAM

KETTERING

LEICESTER

BEDFORD

LONDON ST PANCRAS INTERNATIONAL

LUTON

CHESTERFIELD NEWARK CASTLE

MARKET HARBOROUGH

WORKSOP

STOKE-ON-TRENT

WhitwellCreswell

Langwith WhaleyThorns

Alfreton

Langley Mill Carlton

Burton Joyce

Lowdham

Thurgarton

BleasbyFiskerton

Rolleston

Peartree

Hinckley

NarboroughSouth Wigston

Sileby

Barrow upon Soar

Loughborough

Shirebrook

Kirkby-in-Ashfield

Sutton Parkway

Bulwell

HucknallNewstead

Matlock BathCromford

WhatstandwellAmbergate

Belper

Duffield

Spondon AttenboroughBeeston

MeltonMowbray

Oakham

NetherfieldRadcliffe

Stamford

BinghamAslockton

Elton & OrstonBottesford

Wellingborough

Syston

Flitwick

Harlington

Leagrave

Luton Airport Parkway

Harpenden

St Albans

Radlett

Elstree & Borehamwood

Mill Hill Broadway

Hendon

Cricklewood

West Hampstead Thameslink

Kentish Town

Tutbury& Hatton

Willington

Burton-on-Trent

Uttoxeter

BlytheBridge

Longton

LongEaton

East Midlands Parkway

Route G

Werrington Jcn

Sleaford Jcns

BOSTON

SKEGNESS

SLEAFORD

Havenhouse

Wainfleet

ThorpeCulvert

Ancas

ter

Rauce

by

Heckington

SwinesheadHubberts

Bridge

Route G

RETFORD

CORBY

SPALDING

LINCOLN

TAMWORTH

(Out of use)

01

02

03

04

05

06

07

09

10

11

98

98

98

98

98

99

99

99

99

99

99

99

99

99

08

A

E

CB

D

F

MS

ZAS

S

AL

AL

W

AW

O

E

HQ

S

R

M

JF

Z

Z

Z

Z

Z

F

F

F

F

F

N

N

AK AK

AG

AM

AM

AM

AN

AX

AJ

AJ

AR

AT AU

AZ AZ

C

P

G

M

M

U T

X

AB

AB

ABAG

AH

AD

AD

Page 4: 12400_Route I - London and East Midlands 2011 Update

3

Network Rail 2010 Route Plans Update – Route I

Appendix B: Updated capability map

Linespeed Electrification

Route Availability Gauge

Page 5: 12400_Route I - London and East Midlands 2011 Update

Netw

ork Rail 2011 R

oute Plans U

pdate – Route I

4

Appendix C: Infrastructure investment in CP4

Figure 17 Infrastructure Investment in CP4

Implementation date Project Project description Output change Funding GRIP stage

2009/10 Corby Project Completed

2009/10 Trent East Jn doubling Project Completed

2009/10 Kettering to Harrowden Project Completed

2009/10 Sheet Stores Jn Project Completed

2009/10 Derby to Stoke Renewals

Project Completed

2009/10 Robin Hood line performance

Project Completed

2009/10 Leicester Carriage Siding

Project Completed

2010 Luton Station to High Town Bridge enhancements

Project Completed

2010 Derby Etches Park Project Completed

2010 Chesterfield Provide new platform Increased capacity, improved performance and Seven Day Railway benefits

Seven Day Railway Fund 7

2010 Radlett Jn Project Completed

2010/11 Leicester, North Jn to Trent South Jn

Project Completed

2009-2014 F National Station Improvement Programme

Enhancements to Derby, Leicester, Skegness, Loughborough, Kettering and Burton-on-Trent

Improved station facilities National Station Improvement Programme

various

2010/11 P Castle Donnington Connection to new freight terminal New freight operators Third Party 5

2010/11 AR Mountsorrel Level Crossing

Removal of level crossing and replace with a footbridge

Removal of future safety risk. To prevent TSR Network Rail S&E funding 4

2010/11 AT Loughborough Station Car Park

To increase car parking to 327 spaces To meet passenger growth, encourage new business

RAB funded 6

Page 6: 12400_Route I - London and East Midlands 2011 Update

5

Netw

ork Rail 2011 R

oute Plans U

pdate –R

oute I

Figure 17 Infrastructure Investment in CP4

Implementation date Project Project description Output change Funding GRIP stage

2010/11 AU Loughborough Access For All

To provide step free access to platforms 2 and 3, improve safety and allow for future linespeed improvements by removing the barrow crossing

DDA compliant Footbridge DfT funded 4

2010/11 R Wellingborough Station A new station footbridge Improved station facilities Periodic Review 2008/Access for All

6

2009-2012 M MML St Pancras International – Sheffield LSI

Enhanced infrastructure capability Improved journey times Periodic Review 2008 3

2010-2015 H Flitwick Station Provision of a station interchange, additional car parking and improvements to the station building

Improved interchange and station access facilities

Central Bedfordshire Council

3

2010/11 S Thameslink Programme Platform extensions completed at Leagrave, Luton, Luton Airport Parkway and St Albans

Improved capacity and new journey opportunities

Periodic Review 2008 7

2011/12 S Thameslink Programme Platform extensions underway at Bedford, Flitwick, Harlington, Harpenden, Mill Hill Broadway and West Hampstead Thameslink

Improved capacity and new journey opportunities

Periodic Review 2008 6

2011/12 S Thameslink Programme Major works including revised track layout (including Bedford Station area), new Midland Road crossovers at St Pancras platforms A/B, amendments to the OHLE switching arrangements, platform extensions between Kentish Town and Bedford, stabling facilities at Bedford and Cricklewood, and new customer information service facilities

Improved capacity and new journey opportunities

Periodic Review 2008 6

2011/12 AH Robin Hood Line and Kirkby Summit Recontrol

Signalling renewals Renewal Periodic Review 2008 4

2011/12 T Nottingham Hub. Redevelopment, potential additional platform, improved waiting/retail facilities

Enhanced station and interchange facilities Third Party/Network Rail 4

2011/12 C Leicester Jn Renewal of S & C Renewal Periodic Review 2008 5

2011 N Peterborough – Nuneaton

Gauge clearance of the route and incremental capacity improvements between Peterborough and Nuneaton in connection with the port developments at Felixstowe and

To accommodate the carriage of deep sea container traffic on standard deck height wagons as an alternative route to operating via London and the West Coast Main Line and to provide increased capacity to meet

Transport Innovation Fund 7

Page 7: 12400_Route I - London and East Midlands 2011 Update

Netw

ork Rail 2011 R

oute Plans U

pdate – Route I

6

Figure 17 Infrastructure Investment in CP4

Implementation date Project Project description Output change Funding GRIP stage

Bathside Bay growth in freight train demand associated with the aforementioned ports

2011 AV Burton-upon-Trent Bridge strengthening and forecourt works

Improve station facilities In development for Third Party funding

3

2011 AL Enhanced signalling at Harpenden and Radlett

Enhanced signalling arrangements for trains crossing between the fast and slow lines

Improved performance Performance Fund 5

2011 AS West Hampstead New station building Improved station facilities Network rail Discretionary Fund

5

2011 G Derby Station Master Plan Phase 1

Enhancements to the transport interchange facilities

Improved transport interchange facilities Third Party 4

2011 O Luton Station Redevelopment of the station Improved station facilities and footfall capacity Third Party / Network Rail Discretionary Fund

2

2011 O Luton Station New car park Improved station facilities and footfall capacity Third Party / Network Rail Discretionary Fund

6

2011 AW Luton Airport Parkway Station

Create new forecourt on platform 1 for new ticket office and entrance, demolish current warehouse building and sell off unused land

Station Upgrade In development for Third party funding

3

2012 X Whitwell Tunnel Removal of tunnel Impact on maintenance, renewal savings Third Party 1

2012/13 U East Midlands resignalling: Nottingham station area enhancement element

Enhancements on the back of Nottingham station resignalling scheme

Capacity, performance and journey time improvements

Periodic Review 2008 4

2012/13 East Midlands Airport Rail Freight connection

Project Closed

2012/13 AG Nottingham to Grantham Recontrol

Signalling Renewals Renewal Periodic Review 2008 3

2012/13 AA East Midlands platform extensions

Measures to accommodate longer LDHS and interurban services

Increased capacity Periodic Review 2008 various

2012/13 J Bedford to Kettering Slow Line capacity improvements

Linespeed increase and an additional loop

Increased capacity to support Seven Day Railway Principles

Development funded by Seven Day Railway

3

2012/13 E Leagrave Renewal of S & C Renewal Periodic Review 2008 4

Page 8: 12400_Route I - London and East Midlands 2011 Update

7

Netw

ork Rail 2011 R

oute Plans U

pdate –R

oute I

Figure 17 Infrastructure Investment in CP4

Implementation date Project Project description Output change Funding GRIP stage

2012-2014 AJ Derby to Stoke Level Crossings

Level Crossings Renewals Renewal Periodic Review 2008 3

2012-2015 AK Syston to Peterborough Level Crossings

Level Crossings Renewals Renewal Periodic Review 2008 3

2013-2016 Peterborough to Nuneaton capacity increase

Project Closed (Incorporated into CP5 scheme for Leicester resignalling)

2012/13 AD Nottingham to Lincoln Development work to examine linespeed improvements

Increased linespeed Development funded by Third Party

2

2013/14 W Radlett Connection to new freight terminal New freight operations Third Party 2

2013/14 Z Hope Valley to London train lengthening

Development work to examine facilities required to accommodate longer and heavier freight trains

Increased capacity for freight Development funded by Strategic Freight Network

2

2013/14 AM Midlands routes gauge improvements (Water Orton – Doncaster)

Gauge clearance of various routes To accommodate the carriage of deep sea container traffic on standard deck height wagons

Subject to agreement 4

Tba Q Wixams (Elstow) New station To meet local housing developments Third Party 4

Tba AX Burnaston Cross rail freight connection

New eastbound and westbound rail connections to the NSS line

Rail freight link In development for Third party funding

3

Tba AY Willington C Power Station

Provide a new rail connection and siding to a new power station

New freight operations Third Party 3

Tba AZ Nottingham to Skegness Linespeed improvements Improve journey times Third party 2

Page 9: 12400_Route I - London and East Midlands 2011 Update

Netw

ork Rail 2011 R

oute Plans U

pdate – Route I

8

NRDF candidate schemes in CP4

Figure 18 Candidate NRDF schemes in CP4

Implementation date Project Project description Output change Funding GRIP stage

2011/12 AN Leicester (Burton) Jn – Clay Mills Enhanced turn in/turn out speeds at Leicester (Burton) Jn and Clay Mills plus upgrade of the Up goods line to passenger status

Reduced journey time and improved performance

Network Rail Discretionary Fund

2

2011/12 AB Nottingham to Sheffield linespeed increases.

Linespeed increases Increased capacity and improved performance Third Party / Network Rail Discretionary Fund

2

GRIP stages: 1 Output definition, 2 Pre-feasibility, 3 Option selection, 4 Single option selection, 5 Detailed design, 6 Construction, test and commission, 7 Scheme hand back, 8 Project close out

Page 10: 12400_Route I - London and East Midlands 2011 Update

9

Network Rail 2011 Route Plans Update – Route I

Capacity and operational constraints

A Nottingham station: complex station layout and curvature

B Leicester station: constrained station layout and curvature

C Wellingborough – Leicester – Syston: mixture of two and three tracks

D Bedford: constrained station layout

E Matlock – Ambergate: single line section

F Bulwell – Kirkby in Ashfield: single line section

Appendix D Constraints and issues on the route