BARAKAH NUCLEAR POWER PLANT PROJECT
P ease Turn o your
mobile! Or Switch to
vibration mode!
BARAKAH NUCLEAR POWER PLANT PROJECT
Check! Right Now!
7/29/2019 107th HSJV Weekly Meeting
2/26
2/24/20
SCREEN
Dont Panic11
Switch Off All Electrical Equipment22
BARAKAH NUCLEAR POWER PLANT PROJECT
Dont Run, Walk Fast!33
Go to the Assembly Point44
Wait for the Final Instruction55
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
3/26
2/24/20
1. Previous Meeting
2. HSE Programs
1. Previous Meeting
2. HSE Programs
5. Weekly Inspection
6. Environmental Issues
5. Weekly Inspection
6. Environmental Issues
3. HSE Statistics
Performance per Area and Total
4. HSE Findings Summary
Findings analysis- cause
wise, Company, and Area
3. HSE Statistics
Performance per Area and Total
4. HSE Findings Summary
Findings analysis- cause
wise, Company, and Area
7. Action Plans7. Action Plans
BARAKAH NUCLEAR POWER PLANT PROJECT
HSE Findings by Company
Reported Near Miss Evaluation by Findings Score
HSE Findings by Company
Reported Near Miss Evaluation by Findings Score
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
4/26
2/24/20
NO.NO. ITEMSITEMS ACTIONACTION PLANSPLANS
ACTIONACTION
BYBY
DUEDUE
DATEDATE STATUSSTATUS
Everyone is invited on activity today, all staff are
advised to oin and su ort the 2013 HSE ObectivesBanner Signing
by affixing their signature on the banner, and
demonstrating their commitment in HSE objectives.
____ In ormaton
2Low Submission
of HSE Findings
Hwachonalthough on initial phase with their
construction will promote submission of HSE
findings and aim to exceed from the total findings
reported by HSJ V and KEPCO.
HwachonNext
Meeting
3High HSE
Seobon once again tops HSE findings after ratings
are applied on all raised issues. The organization willSeobon
Next
BARAKAH NUCLEAR POWER PLANT PROJECT
F n ngs revert back on next meeting on their planned
countermeasures.
ee ng
4EmergencyEvacuationProcedure
Copy of the emergency evacuation for identifiednon-permit required confined space at Power Block
will be forwarded to ENEC HSE Mr. Chris. The entry
access is located through a hole in dense set of
vertical rebars.
HSJ V Done
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion ::
Banner sign ing day last 18 Feb. 2013, 11:30 to 1:30 PM. Staff andBanner sign ing day last 18 Feb. 2013, 11:30 to 1:30 PM. Staff and
Management participated in the campaign for 2013 HSE Objective. SeniorManagement participated in the campaign for 2013 HSE Objective. Senior
Management personnel show their commitment for a safe constru ct ion.Management personnel show their commitment for a safe constru ct ion.
7/29/2019 107th HSJV Weekly Meeting
5/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Company Installed Stand by
Seo Yong 0 5
ADVAN 1 3
D&I 0 NA
Total 1 8
No. of winch (for emergency rescue) : 9 winch is available when emergency situation.
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion ::
No nNon--permit required conf ined space, retrieval system. Avai lable num ber ofpermit requir ed conf ined sp ace, retrieval system. Avai lable number of
winch at s i t e that can be used as retrieval of personn el durin g emergency atwinch at s i t e that can be used as retrieval of personn el durin g emergency at
l imited entry vert ical access conf ined space.l imited entry vert ical access conf ined space.
7/29/2019 107th HSJV Weekly Meeting
6/26
2/24/20
s s e s o es s e s o e
presented andpresented and
discussed bydiscussed by
BARAKAH NUCLEAR POWER PLANT PROJECT
Team.Team.
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
7/26
2/24/20
Methods of Communicat ionMethods of Communicat ion ::
1.1 . Safe ty A ler tsSafety Alerts
..
3.3 . Notice boardsNotice boards
4.4. Meet i ngsMeetings--
dai ly, weekly, month lydai ly, weekly, month ly
5.5 . Incident repor tsIncident reports
6.6. Ot her sOthers
BARAKAH NUCLEAR POWER PLANT PROJECT
Descript ionDescript ion ::
The manner HSE issues are commun icated from site. Site Manager o fThe manner HSE issues are commun icated from site. Site Manager o f
Subcontractor sh ould lead in the transfer of info rmation. Al l HSE issues andSubcontractor sh ould lead in the transfer of info rmation. Al l HSE issues and
instru ct ions sho uld reach workers and understands the message correct ly.instru ct ions sho uld reach workers and understands the message correct ly.
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
8/26
2/24/20
Item
Ancil lary Ar ea Camp Area Offic e Area Power Blo ck Village 1 Village 2 HSJV Total NMDC Total
For theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
CumFor theWeek
Cum
Near Misses 0 0 0 0 0 2 0 5 0 0 0 0 0 7 0 0
Over speeding 0 0 0 0 0 0 0 0 0 1 0 0 0 1 0 0
(This Week From Feb 16 Feb 22, 2013)
First Aid Cases(FA) 0 1 0 0 0 0 2 4 0 2 0 2 2 9 0 0
MedicalTreatment Cases
(MTC)0 0 0 0 0 2 1 3 0 0 0 0 1 5 0 0
Restricted Work
Cases (RWC) 1 1 0 1 0 0 0 1 0 0 0 0 1 3 0 0
LTIs 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Property/Vehicle
Accid ents 0 1 0 1 0 1 2 3 0 1 1 2 3 9 0 0
Environmental0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend : Ancill ary Rebar Shop, Batch Plant, Paint Shop, Heavy Equipm ent Shop
Power Block Cut Off Wall, Wharf Area, Concrete Block Area
* : 41 cases (Oc t- Dec. 2011), 64 cases (2012), 4 (2013)
e ease
Forthisweek Cumulative
OneStrike Policy 0 109*
Source: CAR, Near Miss, Observation Cards and Walkthrough
AreaNo. of No. of KEPCO
SUBCON
(This Week From Feb 16 Feb 22 , 2013)
KEPCO&HSJV SUBCON
Anc il lary
Area5 52 8 44
Camp
Area4 20 16 4
Office
Area5 74 5 69
Power
150
200
250
300
350
267
BARAKAH NUCLEAR POWER PLANT PROJECT
Block 5 318 51 267
Village 1 5 77 6 71
Village 2 5 16 0 16
Total Findings 557
0
50
100
Ancillary
Area
Camp
Area
Office
Area
Power
Block
Village1 Village2
816
5
51
6 0
44
4
69 71
16
7/29/2019 107th HSJV Weekly Meeting
9/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
(This Week From Feb 16 Feb 22 , 2013)
Issued
NearMissNearMiss
CARCAR
0 0 0 0
3 43 177 223
Findings TotalKE
P
C
O
H
S
J
V
S
U
B
C
O
N
Open Closed
KEPCO HSJV Subcon KEPCO SubconHSJV
0 0 0 0 0 0
3 0 0 0 43 177
BARAKAH NUCLEAR POWER PLANT PROJECT
TOTALTOTAL
OC&
WFOC
&
WF 0 40 294 334
3 83 471 557
0 0 0 0 40 294
3 0 0 0 83 471
7/29/2019 107th HSJV Weekly Meeting
10/26
2/24/20
for the Period
Company
Feb16 Feb22,2013
CCAP CAR/NM
Geumhwa 1 0
HSJV 1 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Total 3 0
(This Week From Feb 16 Feb 22, 2013)
4552
59
PPE
MaterialManagement
Access&Egress
Signs,Barriers&barricades
1111
1320
2122
2425
2932
34
Hand&PowerTools
Documents
Environmental
Health&Welfare
WasteManagement
ColorCoding
Lifting
Scaffolding
WorkingatHeight
Plant&Equipment
ElectricalSafety
FirePrevention
BARAKAH NUCLEAR POWER PLANT PROJECT
15
688
9
0 10 20 30 40 50 60 70
ConfinedSpace
PTW
PoorIllumination
HotWorks
FallProtection
Training
Source: CAR, Near Miss, Walkthrough and Observation Card
7/29/2019 107th HSJV Weekly Meeting
11/26
2/24/20
Install barricade on open
excavation ( RCB, Al Raeel) Surplus electrical cable Erect access way for
personnel working at height
1 32
Provide details, warning
signs on electrical
distribution panel (PowerBlock, Gusan)
Provide warning si gnage, and
barricade on pipelines under
hydro test (TGB, Younch ang
PB)
place (ADB, Seobon)
Water proofi ng materials must
not be left in the work ing area.
(TGB1, Isam Kabbani)
Initiate arrangement of
storage area at steel
fabrication ex. A place forplywood (Ancillary, Yooa)
(RCB, Advan)
Removal of obstruc tion on
access to substation
(STC, Jongh ap)
Ensure ladder is secured as
per industry practices
(RCB, Seoyong PB)
BARAKAH NUCLEAR POWER PLANT PROJECT
Lifting works should beenclosed by barricade
(Village 1, Hyundai C&I)
Signs, & Barricades Material Management
Perform material arrangement
in the area. (TGB, D&I)
Access and Egress
Clearing entrance of build ing
from portable tools (Village
1, Eunmin)
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
12/26
2/24/20
700
800
70
80KEPCO/HSJV
SUBCON
(This Week From Feb 16 Feb 22, 2013)
100
200
300
400
500
600
10
20
30
40
50
60 Manpower
BARAKAH NUCLEAR POWER PLANT PROJECT
00
Seoyo
ng
Seoyong(PB)
TowersTech
Gusan
Gusan(PB)
Eunm
in
Jongh
ap
Jonghap(PB)
YounCha
ng
YounChang(PB)
Hwach
on
W
BG
Hila
lco
Advan
Hanlim
Uw
ell
YooA
HyundaiC&I
Sam
jin
Euge
ne
Daemyu
ng
Seob
on
D
&I
AlRa
eel
DO
W
Sam
ho
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
13/26
2/24/20
9.010.0
FindingsScore=NumberofCausalxRisk(FactorScore)FindingsScore=NumberofCausalxRisk(FactorScore)
Source: CAR, Near Miss, Walkthroughand Observation Card reported by
KEPCO & HSJV
0.01.02.03.04.05.06.07.0
.
3.8
6.0
3.6 4.1
2.1 2.2
0.20.9
.
1.5 1.5
0.2
2.93.6
1.0
BARAKAH NUCLEAR POWER PLANT PROJECT
ActionPlanActionPlan forCompanyrequiringassistanceandsupportfromthesystemforCompanyrequiringassistanceandsupportfromthesystem
1.JointInspection willbecarriedoutbyAreaManagementTeam.
2.SpotTrainingwillbegiven toworkersaboutmajorfindings
3.Actionplanwillbe submittedtoHSJVHSETeamdevelopby ADVAN
Legend : (I) Infra, (PB) Power Block
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
14/26
2/24/20
Total No. of Findings: 55 Access&Egress,11
Hand&PowerTools,1
Health&Welfare,
1
Environmental,1Material
Management,1HotWorks,1
Signs,Barriers&Barricades,
1 ColorCoding,1
Cause Nos
Access&Egress 11
Housekeeping 9
Control Measure Due Date
Laddershouldbefixedby
suitable part,accessmust
beclearedofobstruction
Alw ays
Scaffolding,4
FallProtection,2PPE,2
WasteManagement,2
ectr ca a ety,1
BARAKAH NUCLEAR POWER PLANT PROJECT
Improvearrangement cables
lyingontheground.
Observehousekeeping
at
all
times
Alw ays
Housekeeping,9FirePrevention,6
Lifting,6Workingat
Height,5
Source: CAR, Near Miss, Walkthrough and Observation Card
Top Hazards
Total No. of Findings: 41
Housekeeping,9
PPE,2
Scaffolding,1Supervision,1 ColorCoding,1
ElectricalSafety,1
Cause Nos
Housekeeping 9
Signs,Barriers&Barricades 5
Control Measure Due Date
Removalofexcessconcrete
intimelymanner.
ArrangementofcablesAlw ays
Plant&
Hand&PowerTools,2
Health&Welfare,2
Training,2
BARAKAH NUCLEAR POWER PLANT PROJECT
.
Install barricadeonopen
excavation.Scaffolding
surplusmaterialsshouldbe
boundedbybarricade.
Alw ays
Signs,Barriers&Barricades,5Workingat
Height,4FirePrevention,3
Access&Egress,3
MaterialManagement,3
Equipment,2
Source: CAR, Near Miss, Walkthrough and Observation Card
7/29/2019 107th HSJV Weekly Meeting
15/26
2/24/20
Top Hazards
Cause Nos
Housekeeping 6
Total No. of Findings : 37 Access&Egress,1 ColorCoding,1
ElectricalSafety,2
FirePrevention,1Waste
Management,1
Material
Management,3 Training,1
Signs, Barriers,&Barricades 6
Control Measure Due Date
Managementof
housekeepingat
constructionsite,and
insidecamp
Alw ays
Complete barricadeof
Health&
Welfare,3
Housekeeping,6
Signs,Barriers&
Barricades,6
superv s on,
BARAKAH NUCLEAR POWER PLANT PROJECT
excavation, construction
materialandstationary
equipment.
Alw ays
Source: CAR, Near Miss, Walkthrough and Observation Card
Lifting,2Plant&
Equipment, 4
,
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
16/26
2/24/20
AREAAREA : Power B lock (: Power Block (AdvanAdvan) February 19,2013) February 19,2013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECT
PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION
AREAAREA :: Village 2 (AlVillage 2 (Al RaeelRaeel) February 19,2013) February 19,2013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECT
PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION
7/29/2019 107th HSJV Weekly Meeting
17/26
2/24/20
AREAAREA : Pow er Bl ock (RCB/AB) (: Power Block (RCB/AB) (SeoyongSeoyong) Feb. 21, 2013) Feb. 21, 2013
CORRECTIVE ACTION:CORRECTIVE ACTION:
BARAKAH NUCLEAR POWER PLANT PROJECT
PLANNED SUPERVISOR PREVENTIVE ACTIONPLANNED SUPERVISOR PREVENTIVE ACTION
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
18/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
InspectionInspection DateDate AttendeesAtt endees RemarkRemarkCommit tee Inspec tion 2013-02-19 HSJV, KEPCO, HSE Managemen t Team 8 Find ings
Weekly Inspection 2013-02-20 HSJV HSE Team 16 Findings
3
4
5
FindingsperCompany Total
6NoPPE
FindingsperCausal
2
1 1
2 2
4
1 1
2
0
1
2
Advan Geumhwa Hanlim Samjin Seobon Seoyong(PB) Uwell YounChang YounChang(PB)
BARAKAH NUCLEAR POWER PLANT PROJECT
1
1
1
2
2
3
0 1 2 3 4 5 6 7
NoWorkPermit
LacksSafetyControl
PoorGrounding
ImproperEquipment
Lacks Training
LacksFirePreventionEquipment
Key item : Welding & Hot Works
7/29/2019 107th HSJV Weekly Meeting
19/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
No.Source of
InjuryArea Descr ip tion
Immediate
Act ion
Planned Supervisor
Preventive Act ion
1 Backpain
Hilal Co.
SteelFixer
Powerblock
(laydown
area
Theabovementioned
employeewashelpingto
unloadsteelembeddedplate
fromtheloadingbodyofpick
up.Duringthetime,oneplate
wasstackedwiththeother
platethenheappliedmore
pressureandhisbackgot
Consult
Oral
analgesic
givenfor
pain
BARAKAH NUCLEAR POWER PLANT PROJECT
16022013
11:20
suspec e gamen spra n. e
plateweightwasaround25kg
andhandledbytwopersons
7/29/2019 107th HSJV Weekly Meeting
20/26
2/24/20
No. Source ofInjury
Area Descr iption ImmediateAct ion
Planned SupervisorPreventive Act ion
2Pain,Right
knee
HSJV
Workshop
TowerCrane
Operator
PowerBlock
Workersrightknee
washitbyaslow
movingcrane
trolley.
Analgesicspray
applied
Elasticbandage
applied
Icecompress
done
Oralanalgesic
BARAKAH NUCLEAR POWER PLANT PROJECT
17:00
Mefenamic Acid
No.Source of
InjuryArea Descr iption
Immediate
Act ion
Planned Supervisor
Preventive Act ion
3
Hitting his
rightlower
back
portionof
hisear
Seoyong
Surveyor
PowerBlock
RCB/ABArea
Hewasdoinghis
surveyactivitieson
thegroundlevel
A&Bareawhen
suddenlyahand
cutterfellfromthe
groundhittinghis
DoctorReferral
tooutsidefor
further
treatmentina
Hospital.
BARAKAH NUCLEAR POWER PLANT PROJECT
10:00
rightlower
back
portionofear.
7/29/2019 107th HSJV Weekly Meeting
21/26
2/24/20
No.Source of
InjuryArea Descr ip tion
ImmediateAct ion
Planned SupervisorPreventive Act ion
4
Pain, Rt
Ring&
Smallfinger
Swelling
YooA
Welder
Ancillary,
Steel
Fabrication
Shop
Whilehesteppedonthe
cabinsstair,hislegslipped
andhelosthisbalance
andfelldownwith
weldingmachine.Hisright
handring&smallfingers
trappedinbetween
Elastic
Bandageapply
withsplint
Referralto
Hospitalfor
further
evaluation
BARAKAH NUCLEAR POWER PLANT PROJECT
15:40
ground.CheckXray.
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
22/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location PetrolStation
Description Fuelleakagehappenedatconnectionpart duringfillingafueltank
Actiontaken Imperviousdriptrayplacedonthechargingpointofthepetrolstation
Status CLOSED
BARAKAH NUCLEAR POWER PLANT PROJECT
Location Intersectionbetweenrebarshopandwarehouseinancillaryarea
Description Allcontrolvalvesareexposedtopotentialaccident/incidentswithoutfenceandsignagearoundtheSTPFacility
Actiontaken Installthefenceandpropersignagetopreventaccessofunauthorizedpersonnel
Status OPEN
7/29/2019 107th HSJV Weekly Meeting
23/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
Location AroundRCB Unit2inpowerblock
Description ObservedminorhydraulicoilleakagefromADVANconcretepumptruck#BNPP1987
Theconnecting
hose
was
damaged
and
temporary
wrapped
by
gloves
and
tapes.
Actiontaken Theconnectinghosewasrepaired andreplacedwithaproperjointvolt
Status CLOSED
BARAKAH NUCLEAR POWER PLANT PROJECT
Location GIBareainpowerblock
Description Observedminorhydraulicoilleakagefromstationarydiesel generatorequipmentACM84
Actiontaken Cleanedupcontaminatedsoilandprovideddriptraytocontainoilleakage
Status CLOSED
7/29/2019 107th HSJV Weekly Meeting
24/26
2/24/20
INo.0 Date
c i on y
CompanyDescription Status
osing
Date
xpiraion
DateR ef . N o. M ai n Ar ea S ub -A re a I ss ued By
Issuer
CompanyUA/UC
1 20Feb13 Hilalco
StationarydieseloperatedgeneratorequipmentACM84observedminor
hydraulicoilleakagebeneaththeequipment
Closed 24Feb13 25Feb13 20130518PowerBlock
GIBArea HSJVRenatoPonce
UC
2 20Feb13 Advan
Advanconcretepumptrucki.d.#BNPP1987parkatRCBUnit2observed
minorhydraulic oilleakageontheconcretegroundandthesourceof
leakage istemporarywrapbyknetted
Closed 23Feb13 25Feb13 20130524PowerBlock
RCBUnit2
HSJVRenatoPonce
UC
BARAKAH NUCLEAR POWER PLANT PROJECT
g oves.
3 24Feb13HSJVO&M
Allcontrol
valves
are
exposed
to
potentialaccident/incidentwithoutfenceandsignagearoundSTPfacilityin
Ancillaryarea.
Open 06Mar13 000000160 Ancillary
Intersection
between
rebarshopand
warehouse
KEPCOYang,JiYoung
UC
WASTEMANAGEMENTUPDATE
Week=14/02/2013 20/02/2013
Thisweek Lastweek
Collected(m3) Disposal(m3) Recycled(m3) Recycle(%) Collected(m3) Disposal(m3) Recycled(m3) Recycle(%)
Paper 72 0 0 24 0 0
Metal 32 0 90 88 0 0
Construction 120 495 0 96 675 0
Concrete 0 0 0 0 0 45Wood(Good) 0 0 0 0 0 0Wood(Bad) 192 180 0 280 225 0
Plastic 72 0 0 104 0 0
BARAKAH NUCLEAR POWER PLANT PROJECT
Legend:Collected WastefromSitetoTemporaryStorageAreaDisposal WastefromTemporaryStorageAreatoLandfillArea
Recycle Treatedwaste(GMET)toRecyclingPlants
Municipal 0 288 0 0 264 0Hazardous 16 16 0 0 0 0
TotalSolidWaste 504 979 90 9.19% 592 1164 45 3.86%
7/29/2019 107th HSJV Weekly Meeting
25/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT
7/29/2019 107th HSJV Weekly Meeting
26/26
2/24/20
BARAKAH NUCLEAR POWER PLANT PROJECT
BARAKAH NUCLEAR POWER PLANT PROJECT