12
10 th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Embed Size (px)

Citation preview

Page 1: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

10th AMEDA MEETING

Marrakech - October 21-23, 2009Rachid HABOUB

Page 2: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

2

PRELIMINARY REMARKS

Page 3: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

WHAT IS MCL UP TO ?

3

NEW MARKET INFRASTRUCTURE

Current platform went live in 1998

Completed over 10 years loyal service

Page 4: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Environment has changed considerably

• Trading volumes picked up

• Spectrum of instruments has widened

• Structured products are emerging

• Expectations of market players are much higher

4

Page 5: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

The main features of our target platform are the following :

Four-tier Architecture

• User interface layer

• Application layer

• Communication service layer

• Database layer

5

Page 6: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Business continuity

•On the main site

Production system + hot stand-by system, connected by a HACMP cluster.

•On the DR site

Synchronous replication mechanism between Production and DR is considered.

6

Page 7: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Authentication/Security

• Use of a combination of BPID/User ID/Password + use of RSA token

• Data encryption (data in transit between browser and web server using HTTPS)

• SSL encryption for CFT

7

Page 8: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Communication media

• Dedicated leased lines

• VPN as back-up vector

8

Page 9: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Business model

2 different business models in parallel :

• Exchange trades : GNS / T+3

• OTC trades : GGS / T+0

NB : Different components will be dedicated to specific segments

9

Page 10: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Implementation time-frame

• Full stack (Main+DR) has been installed

• Application being tested

• Bi-lateral testing with BP’s under way

• Users training to be performed in few weeks from now

• Final release of the application expected shortly

• Go-live date still to be firmed up (current target is early 2010)

10

Page 11: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

CONCLUSION

CSD’s are facing many challenges :

1- Technology change

2- Market change

3- Regulatory change

11

Page 12: 10th AMEDA MEETING Marrakech - October 21-23, 2009 Rachid HABOUB

Thank you

12