    REPAIR, MAINTENANCE&

    LIFEEXTENSION SOLUTIONS(RMLES)

    FOR OFFSHOREPLATFORMJACKETS

    BY ZOEY LIM

    Field Life Extension Through Asset Integrity 2013 Asset Integrity Forum

    Date : 18thSept 2013

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    2/13

    www.iev-group.com

    CONTENTS

    1. The Initiators

    2. Systematic Approach

    3. Structural Assessment

    4. Basic Approaches

    5. Selection Criteria

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    3/13

    www.iev-group.com

    THE INITIATORS

    Damaged Structures

    Fatigue loads

    Vessel collision

    Dropped objects

    Corrosion

    Damage during installation

    Welding or fabrication fault

    Explosions

    Under-design

    Common Damages :Dents, bows, cracks, tears,

    permanent deformation, holes,

    loss of thickness, etc .

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    4/13

    www.iev-group.com

    Intact Structures

    Change in Platform Operation

    Placement of additional equipment

    Development of marginal or satellite fields using subsea systems

    Enhanced Oil Recovery Program

    Recertification of offshore structures Change of Industry Codes

    In particular for structures in service beyond its originally designed

    service life.

    Increased Safety Measures

    THE INITIATORS (cont.)

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    5/13

    www.iev-group.com

    SYSTEMATIC APPROACH

    Initiators of RMLES

    Structural Analysis Global

    and Refined Local Analysis

    SUBSTRUCTUREINSPECTION DATA

    OTHER INPUT DATA

    Ph. 1 Substructure Survey

    Structure OK

    Proposed RMLES Scheme &

    Methodology

    Ph. 3 RMLES Selection

    Further Structural Analysis

    & 3rdParty Approval

    NG

    Ph. 2 Structural Analysis

    Detailed Engineering and

    Preparation

    Offshore Installation

    Planning

    Execution & Documentation

    Ph. 4 Design & Preparation

    3rdParty Inspection &

    Approval

    Ph. 5 Execution

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    6/13

    www.iev-group.com

    STRUCTURAL ASSESSMENT

    Global analysis using updated loading, structural and

    environmental conditions including in-place analysis,

    push over, unity check of members and nodes

    Local analysis of

    nodes where defectsare identified

    Fatigue analysis

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    7/13

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    8/13www.iev-group.com

    REDUCE LOADINGS

    Removal of redundant equipment from topside

    Wave Zone Clean-up Removal of unused/redundant structures in the splash zone area

    Marine Growth Removal

    Marine Growth Control Technology

    (permanent) High pressure water jetting (periodic)

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    9/13www.iev-group.com

    REPAIR DAMAGES

    Dented/Bowed

    Member

    Non-fatigue

    CrackFatigue CrackCorrosion

    Tubular

    Grouting

    Weld doubler

    plates over

    dent Member

    replacement

    Weld Patch

    Plates

    Grouted sleeve

    Member

    replacement

    Anodereplacement if

    due to anode

    depletion

    Splash zone

    coating

    Weld gussets

    Grouted

    clamps or

    sleeves

    Underwaterdry welding

    Remedial

    Grinding

    Underwater

    dry welding

    Weld gussets

    Grouted

    clamps orsleeves

    Remedial

    Grinding

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    10/13www.iev-group.com

    LOCAL STRENGTHENING

    Insufficient Fatigue Life

    Weld improvement by modification

    Insufficient Structural Capacity Underwater Dry Welding to install doubler plates or sleeves

    Clamping methods Tubular grouting

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    11/13www.iev-group.com

    GLOBAL STRENGTHENING

    Create alternate load paths by introducingnew members connected using :

    Dry Welding

    Clamps

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    12/13www.iev-group.com

    SELECTION CRITERIA

    Life extension requirements for the installation

    Technical Performance & Reliability

    Costs

    Water Depth

    Offshore support & Equipment requirements

    Timescale of each phase

    Availability of local resources

    Tolerance acceptability

    Existing applications & Knowledge

    Environmental & Safety requirements

    Post execution inspection requirements

    Potential challenges for each phase

  • 8/13/2019 (10) Lim Joo Wee, IEV (2)

    13/13www.iev-group.com

    Thank you