1
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TOTEM – settembre 2005TOTEM – settembre 2005
Penn State University
Pennsylvania, USA
University of Siena and Sezione INFN di Pisa
Siena and Pisa, Italy
Brunel University
Uxbridge, UK
Case Western Reserve University
Ohio, USA
Politecnico di Bari and Sezione INFN
Bari, Italy
University of Helsinki and HIP
Helsinki, Finland
University of Genova and Sezione INFN
Genova, Italy
CERN
Geneva, Switzerland
Academy of Sciences
Praha, Czech Republic
2
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
• Current models predict for 14 TeV: 90 – 130 mb
• Aim of TOTEM: ~ 1% accuracy
• Luminosity independent method:
Total p-p Cross-SectionTotal p-p Cross-Section
Status of the art
inelel
ttot
NN
dtdN
+×
+= =0
2
)/(
116
ρπσ
02
2
116
L=
×+
=t
tot dtdN
ρπσ
inelasticelastictot NN +=σL
Optical Theorem
3
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
• Argomenti trattati: single e double Pomeron exchange, eventi e p,
low-x physics, forward physics• Coordinamento a cura di A. de Roeck e K. Eggert.• Fase attuale: raccolta contributi da parte di singoli e working groups.• In particolare - WG sull’Higgs a 120 GeV prodotto diffrattivamente: il
contributo verra’ anche pubblicato nei proceeding dell’HERA/LHC
workshop: Diffractive Higgs: CMS/TOTEM Level-1 Trigger Studies.• Componenti del WG: M.Arneodo, V.Avati, R.Croft, F.Ferro,
M.Grothe, C.Hogg, F.Oljemark, K.Osterberg, M.Ruspa (entrambi gli
esperimenti e diverse istituzioni rappresentati).
• LOI attesa per novembre 2005 …CMS
TOTEM
CMS/TOTEM Diffraction and Forward CMS/TOTEM Diffraction and Forward Physics LOIPhysics LOI
4
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TOTEM Experiment
CMS Experimental Area (IP5)
Leading Protons measured at+147m & +220m from the CMS
Leading Protons measured at-220m & -147m from the CMS
(Also CMS is here...)
TOTEM & CMS
5
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TOTEM DetectorsTOTEM Detectors
RP1RP1 (RP2)(RP2) RP3RP3
220 m220 m(180 m)(180 m)147 m147 m
Roman Pots:Roman Pots:
~14 m
CMSCMST1:3.1 << 4.7
T2: 5.3 < < 6.5
10.5 m T1T1 T2T2
HF
Inelastic Telescopes:Inelastic Telescopes:
6
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
I telescopi inelastici di TOTEM in CMSI telescopi inelastici di TOTEM in CMS
Telescopio T2
Telescopio T1
Camera a vuoto
CMS End Cap
7
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
T1 and T2 TelescopesT1 and T2 Telescopes
~3 m
T1: Cathode Strip Chambers
Compass APV hybrids400 mmCastor Calorimeter (CMS)
Vacuum ChamberT2: GEMs
2004 Test Beam in X5
<IP5
8
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
La collaborazione è cresciutaLa collaborazione è cresciuta
Collaboratori italiani:Collaboratori italiani: Il gruppo di Siena/Pisa è entrato in TOTEM ( +9 fisici, 4.5 FTE). Il gruppo di Genova è aumentato (ora 8 fisici, 6.5 FTE).
Nuovi collaboratori stranieri:Nuovi collaboratori stranieri: Ingresso di 2 gruppi USA (Penn. State e Case Western) fondi nel
2006
In prospettiva (?):In prospettiva (?): Il gruppo di DESY e di Zeuthen decideranno presto la loro
partecipazione a LHC, una parte potrebbe venire in TOTEM Estonia: interesse manifestato da Lipman. Altri collaboratori italiani (analisi dati)?
9
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
CMSCMS TOTEM detector review con CMS il 3 maggio 2005TOTEM detector review con CMS il 3 maggio 2005 TOTEM electronic review con CMS il 12 maggio 2005TOTEM electronic review con CMS il 12 maggio 2005
General Comments (dal documento conlcusivo)General Comments (dal documento conlcusivo)CMS would like to thank TOTEM for preparing a detailed series of CMS would like to thank TOTEM for preparing a detailed series of
presentations which allowed us to understand the TOTEM readout presentations which allowed us to understand the TOTEM readout electronics conceptual design, how it interacts with CMS electronics electronics conceptual design, how it interacts with CMS electronics implementation and procurement, and the status of TOTEM implementation and procurement, and the status of TOTEM implementation. The concept appears sound, and the team is to be implementation. The concept appears sound, and the team is to be congratulated on reaching this stage of development with what are clearly congratulated on reaching this stage of development with what are clearly minimal resources. A few general points were evident in the review:minimal resources. A few general points were evident in the review:
1.1. From the CMS point of view, the concept appears to be compatible with From the CMS point of view, the concept appears to be compatible with the CMS DAQ and electronics readout, and probably requires the least the CMS DAQ and electronics readout, and probably requires the least development effort required to achieve this goal.development effort required to achieve this goal.
2.2. The complexity of this system is comparable to any subsystem in CMS – The complexity of this system is comparable to any subsystem in CMS – most of which have considerably more effort available.most of which have considerably more effort available.
3.3. The manpower appears to be very mismatched to such an ambitious The manpower appears to be very mismatched to such an ambitious project.project.
10
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Responsabilità italiane:Responsabilità italiane:
BariBari DAQ Generale e Trigger interface (parzialmente)
GenovaGenova Costruzione rivelatori ed elettronica FE di T1
Pisa/SienaPisa/Siena Elettronica FE di T2 e trigger inelastico Test ed installazione rivelatori a GEM
(costruzione dei rivelatori resp. Helsinki, back-up da parte di Pisa/Siena se necessario)
Queste responsabiltà sono state già discusse al CB di TOTEM
Totem Italia : Bari, Genova, Pisa/SienaTotem Italia : Bari, Genova, Pisa/Siena
11
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TELESCOPIO T1AGGIORNAMENTO
RISPETTO A CSN1 DI TRIESTE 7.7.05
GENOVA
CSC
Programmazione della produzione del rivelatoreProgrammazione della produzione del rivelatore Costruzione del supporto del rivelatoreCostruzione del supporto del rivelatore Rivisitazione della elettronica di frontend e del Rivisitazione della elettronica di frontend e del
trigger di T1trigger di T1
12
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Genova: stato costruzione T1Genova: stato costruzione T1 Produzione dei piani compositi (Nomex)Produzione dei piani compositi (Nomex)
Contatti con quattro ditte per definire la produzione dei compositi. Documentazione per il bando di gara completato. Bando sottoposto alla approvazione della G.E.
PCB, tendifili e cornice gas PCB, tendifili e cornice gas Disegni completati, selezione delle ditte in corso.
Progetto INTAS con PNPI Progetto INTAS con PNPI Proposta sottoposta il 6/9.
Contratto con PNPI per l’assemblaggio delle camereContratto con PNPI per l’assemblaggio delle camere Avviata discussione tecnica. Occorre ancora definire alcuni dettagli.
13
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
SUPPORTI LE ROTAIE DI SUPPORTO
Le due rotaie e il pezzo che le unisce, sono state completate.
CESTELLO DI ALLUMINIO
Disegno ultimato.
Un prototipo è stato costruito dall’officina meccanica.
E’ pronto.Sarà provato insieme alle rotaie a fine settembre.
BILANCINO (per installazione in CMS)
14
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Lettura digitale dei catodi:
I segnali del preamp. analogico (BUCKEYE or PASA) vanno ad una serie di comparatori (LCOMP) per determinare la posizione del massimo in “mezza striscia”
L’uscita digitale con risoluzione ‘1/2 strip’ può essere
letta utilizzando il chip VFAT (se opportunamente modificato nella prossima sottomissione)
Alternativa allo studioAlternativa allo studio
Elettronica di front-endElettronica di front-end A giugno si è stabilito che l’elettronica di lettura A giugno si è stabilito che l’elettronica di lettura
analogica dei catodi basata sul chip ALTRO è inadeguata analogica dei catodi basata sul chip ALTRO è inadeguata per i nostri scopi. (Vedi CSN1 7.7.05)per i nostri scopi. (Vedi CSN1 7.7.05)
Richiede studi montecarlo in fase di completamento:
Le simulazioni preliminari indicano un peggioramento della risoluzione marginale.
15
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Diagramma a blocchi del FEDiagramma a blocchi del FE
Utilizzando il nuovo schema, l’elettronica di FE non sarà ilUtilizzando il nuovo schema, l’elettronica di FE non sarà ilfattore che limita le prestazioni del rivelatore.fattore che limita le prestazioni del rivelatore.Inoltre si realizza una migliore integrazione con il resto del Inoltre si realizza una migliore integrazione con il resto del DAQ di Totem che usa VFAT/GOL in RP e in T2.DAQ di Totem che usa VFAT/GOL in RP e in T2.
16
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TELESCOPIO T1ATTIVITA’ 2006
GENOVA
CSC
Costruzione del rivelatore.Costruzione del rivelatore. Test della rotaia di supporto in CMS.Test della rotaia di supporto in CMS. Costruzione e montaggio del supporto.Costruzione e montaggio del supporto. Test del rivelatore sul fascio.Test del rivelatore sul fascio. Progettazione e produzione della elettronica FE.Progettazione e produzione della elettronica FE.
17
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TempisticaTempistica Produzione dei piani compositi, PCB .. (GENOVA)Produzione dei piani compositi, PCB .. (GENOVA)
Q4 2005 - Q2 2006 Test della rotaia di supporto del rivelatore (CERN)Test della rotaia di supporto del rivelatore (CERN)
Febbraio (2 settimane) Montaggio delle camere (PNPI)Montaggio delle camere (PNPI)
Tutto 2006 Installazione di 1/4 di T1 (CERN)Installazione di 1/4 di T1 (CERN)
Luglio 2006 Test su fascio (CERN)Test su fascio (CERN)
Q4 2006 (1-2 mesi) Assemblaggio e test camere (CERN)Assemblaggio e test camere (CERN)
Q3 2006 – Q4 2006 Progettazione elettronica (GENOVA)Progettazione elettronica (GENOVA)
Q4 2005 – Q2 2006 Produzione elettronica (1/3) (GENOVA)Produzione elettronica (1/3) (GENOVA)
Q2 2006 – Q4 2006
Altre attivita’ di GenovaAltre attivita’ di Genova Simulazione TOTEM & LOI CMS/TOTEMSimulazione TOTEM & LOI CMS/TOTEM
18
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Setup a Genova
Camere di test riportate a Genova.
Quattro piani di CSC sono operative con gas e HV.
Sarà utilizzato per sviluppare l’elettronica finale del rivelatoree l’integrazione del sistema.
19
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Attività :Attività : In sede:
Setup test di un modulo GEM-T2 letto con APV (Q4 2005)(in attesa di avere disponibili i VFAT2xlettura
digitale)Test con sorgente e cosmiciTest dei rivelatori T2 ( 2006-2007)Simulazione del T2 e studi di rate Progettazione trigger systemContributo alla progettazione e realizzazione scheda di FE
GEM con VFAT2 e CC Al CERN:
Test dei rivelatori T2 (2006-2007) Test di integrazione con l’elettronica di CMS nel CMS 904 lab
(Q1 2006) Test beam di 20 moduli finali T2 (2006) Assemblaggio e integrazione di T2 (Q3-4 2006 & Q1-2 2007)
Pisa/SienaPisa/Siena
20
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
5 µm
70 µm
55 µm
50 µm
Electrons
Ions70 µm
140 µm
GEM 1
GEM 2
ED
ET1
EI
DRIFT
READOUT
DRIFT
TRANSFER 1
INDUCTION
GEM 2
ET2 TRANSFER 2
Three GEM foils kept in Three GEM foils kept in position by thin spacersposition by thin spacers
Readout board is a printed Readout board is a printed board with pads and board with pads and stripsstrips
Elettrodi 50 m kapton + 2x5 m rame Struttura fra 2 piatti honeycomb Stesalit
T2: Triple GEMT2: Triple GEM GGASAS EELECTRON LECTRON MMULTIPLIERULTIPLIER
21
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Totem GEM Final Design 2005Totem GEM Final Design 2005 65() x 24(= 1560 padsPads: x = 0.06 x 0.018π ~2x2 mm2 __ ~7x7 mm2
Strips: 256x2 (width 80 m, pitch 400 m)
=π/2
Analog R/O circular stripsVia APV25
Digital R/O padsVFAT for Trigger
10 triple-GEM planes, to cope with high particle fluxes 5.3<||<6.8
Technology used in COMPASS
pads
strips
Asymmetric back-to-back mounting Support – 2 rails per semi telescope Water cooling; 200 watts total to dissipate
Cooling
Gas in/out
HV divider
13 VFAT + 4 APV /module?
Scheda di FE
22
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Trigger out (8)Trigger out (8)
FrontEnd& Comp(128)
DACs for
bias
Tracking
DataMemor
y256
deep
Data outData out
Trigger inTrigger inClockClockResetResetPulsePulseSyncSyncI2C signalsI2C signals
PowerPower
Controllogic
Tracking
Data L1Memor
y128
deep
I2C SEU robust slow control registers
Trigger generation
VFATVFAT
ASIC specifico per TOTEM. Seconda sottomissione a dicembre 2005
23
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
VFAT2VFAT2
24
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Coincidence Chip (CC)Coincidence Chip (CC)
Programmable coincidence between sectors of different planes Programmable coincidence between sectors of different planes Advantages of full-custom chip for experiment:Advantages of full-custom chip for experiment:
Radiation tolerant, severe on-detector reduction of trigger bits Ex: RP: trigger bits reduced from ~ 1000 to < 20 per RP station
I2C controlled, fully CMS compatible Minimal latency, carries out coincidence within one clock cycle
CC
VFAT
Up to 8 trigger Up to 8 trigger bits/VFAT bits/VFAT
Up to 80 inputsUp to 80 inputs
CC
Can cascade, 1 Can cascade, 1 BC per layer BC per layer
CountingRoom
VFAT
25
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
T2 Trigger
• Each sector has 104 CC LVDS trigger outputs 2 Sectors for each side, for a total of 416 trigger signals
• We plan to bring all LVDS signal with 40 couples cables for a total of 6 cables for each side (quotation in progress) in the counting room
•At least 2 boards, one for each side, will receive all the signal and an eventual third merger card is needed
26
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
BarrelTrigger board
BarrelTrigger board
208 208
mixer
T2 trigger bits
27
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Use of an existing 9U VME Board, build receivers mezzanine, and build trigger equations on on-board FPGAs
28
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Possible implementations for a global trigger
T1 Trigger
T2 Trigger Merger
RP receiver ?
Trigger bitsFrom CC
29
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
BARIBARI
Daq Generale e Trigger interfaceDaq Generale e Trigger interface Infrastruttura generale DAQ + timing e interfaccia
al sistema di trigger Partecipazione a tutte le fasi del progetto:
DesignSviluppiImplementazioneRunInterfaccia e integrazione dell'esperimento
nella sua collocazione finale
30
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Attività :Attività : In sede:
Studio del timing e della distribuzione dei segnali di triggerSviluppo di software
Al CERN: Test dei rivelatori T2 (Q4 2005-2006) Test di integrazione con l’elettronica di CMS nel CMS
904 lab (Q1 2006) software di Controllo/timing/calibrazione (2006) Test beams (2006– 2007) Costruzione finale e integrazione DAQ
(Q3-4 2006 & Q1-2 2007)
Totem BariTotem Bari
31
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Where TOTEM enters the CMS Where TOTEM enters the CMS systemsystem
La parte nel riquadroLa parte nel riquadro
è di competenza diè di competenza di
TotemTotem
32
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
RPS1 RPS2 RPS3 RPS4GEM
GEM
GEM
GEM
CSC
CSC
CSC
CSC
18 18
DCC DCC
18 18
DCC DCC
18
DCC
18
DCC
DCC
CMS DAQ System
FRL
2
S-Link
FRL
2
S-Link
FRL
2
S-Link
FRL
2
S-Link
FRL
2
S-Link
FRL
2
S-Link
FRL
?
S-Link
APV APV
33
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
TOTEM Readout/Test System nel CMS 904 lab.
to FRL
FRL
or FED Kit
VFAT Emulator
DCC
cPCI Crate
VME64x Crate
TTC
34
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
To FRL
CMS ECAL Data Concentrator Card
ECAL DCC
Adapter + S-Link64 board
- Partially Equipped Board: - 1 NGK Receiver for 9 channels; - 2 Xilinx Receiver Blocks and Deserializers;- S-Link64 on Rear Adapter; - 16MB of Spy Memory;- Reprogramming: - Receiver Blocks; - Event Merger; - Event Builder;========================== TOTEM need: ~20 DCC; ~20 Adapters and 20 S-Link64;==========================+ Available Design+ Board Used in ECAL;- Not Tested when partially equipped;- FPGA design changes;- VME Rear Modules;- Costs;
ECAL DCC
35
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Bari - ricercatoriBari - ricercatori
Ricercatori equivalenti: 2.8Ricercatori equivalenti: 2.87070INFNINFNE.RadicioniE.Radicioni44
7070INFNINFNM.G. CatanesiM.G. Catanesi33
7070Prof. Ass.Prof. Ass.M.CalicchioM.Calicchio22
7070Prof. Ass.Prof. Ass.V.BerardiV.Berardi11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaRicercatoriRicercatori
M. G. Catanesi Responsabile locale
36
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
GENOVA - ricercatoriGENOVA - ricercatori
Ricercatori equivalenti: 6.4Ricercatori equivalenti: 6.48080Prof. Ass.Prof. Ass.Sette GiuseppeSette Giuseppe88
7070Prof. Ord.Prof. Ord.Santroni AlbertoSantroni Alberto77
4040Ric. INFNRic. INFNRobutti EnricoRobutti Enrico66
9090Dir. Ric. INFNDir. Ric. INFNMacrì MarioMacrì Mario55
6060Ric. Univ.Ric. Univ.Lo Vetere MaurizioLo Vetere Maurizio44
100100AssegnistaAssegnistaFerro FabrizioFerro Fabrizio33
1001001° Ric. INFN1° Ric. INFNBuzzo AlbertoBuzzo Alberto22
100100Prof. Ass. Prof. Ass. Bozzo MarcoBozzo Marco11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaRicercatoriRicercatori
M. Lo Vetere Responsabile locale
+ Dottorandi
37
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
GENOVA - tecnologi e tecnici per il 2006GENOVA - tecnologi e tecnici per il 2006
Tecnologi equivalenti: 0.6Tecnologi equivalenti: 0.63030TecnologoTecnologoMusico PaoloMusico Paolo22
3030TecnologoTecnologoCuneo StefanoCuneo Stefano11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaTecnologiTecnologi
7070TecnicoTecnicoMinutoli SaverioMinutoli Saverio22
5050TecnicoTecnicoMorelli AldoMorelli Aldo33
Tecnici equivalenti: 2.6Tecnici equivalenti: 2.67070TecnicoTecnicoNegri MarcoNegri Marco44
7070TecnicoTecnicoCerchi StefanoCerchi Stefano11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaTecniciTecnici
38
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
PISA/SIENA - RicercatoriPISA/SIENA - Ricercatori
+ Assegnisti e Dottorandi
A.Scribano Rappresentante Nazionale S.Lami Responsabile locale
6060Prof. Ord. SienaProf. Ord. SienaScribano AngeloScribano Angelo88
Ricercatori equivalenti: 4.2Ricercatori equivalenti: 4.23030Ric. Univ. SienaRic. Univ. SienaTurini NicolaTurini Nicola99
5050Primo Ric. Pisa.Primo Ric. Pisa.Sanguinetti GiulioSanguinetti Giulio77
3030Prof. Ass. SienaProf. Ass. SienaPaoletti RiccardoPaoletti Riccardo66
5050Prof. Ord. SienaProf. Ord. SienaMeucci MarioMeucci Mario55
7070Ric. Univ. SienaRic. Univ. SienaLatino GiuseppeLatino Giuseppe44
7070Ric. INFN PisaRic. INFN PisaLami StefanoLami Stefano33
3030Ric. Univ. SienaRic. Univ. SienaCiocci Maria AgneseCiocci Maria Agnese22
3030Prof. Ord. SienaProf. Ord. SienaBottigli UbaldoBottigli Ubaldo11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaRicercatoriRicercatori
39
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
PISA - tecnologi per il 2006PISA - tecnologi per il 2006
Tecnologi equivalenti: 0.6 (+ 1 borsista)Tecnologi equivalenti: 0.6 (+ 1 borsista)TecnologoTecnologoSpinella FrancoSpinella Franco22
2020TecnologoTecnologoBardi AntonioBardi Antonio11
Percentuale Percentuale TotemTotem 2006 2006
QualificaQualificaTecnologiTecnologi
4040
40
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Richieste nel 2006Richieste nel 2006
Vengono presentate solo le richieste di Vengono presentate solo le richieste di Costruzione Apparati sulla base del draft di Costruzione Apparati sulla base del draft di MoU presentato alle Funding AgenciesMoU presentato alle Funding Agencies
I referees daranno il dettaglio delle richieste I referees daranno il dettaglio delle richieste globaliglobali
41
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
MoUMoU
Memorandum of Understanding
for Collaboration to construct the TOTEM Detector
between
The EUROPEAN ORGANIZATION FOR NUCLEAR RESEARCH,
hereinafter referred to as CERN, Geneva, as the Host Laboratory
on the one hand,
and
an Institute/ Funding Agency of the TOTEM Collaboration.on the other hand.
Presented to the Funding Agencies in the Meeting of July 15,2005
and basically agreed for the global core cost and sharing.Warning for Common Fund & Contingency.
42
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Management PositionsManagement Positions
Spokesperson Karsten Eggert
Deputy Marco Bozzo
Collaboration Board Chairperson Angelo Scribano
Resource Coordinator Karsten Eggert
Physics Coordinator Risto Orava
Technical Coordinator Ernst Radermacher
Deputy & Integration Coordinator Marco Oriunno
Electronics Coordinator Walter Snoeys
Project Leaders
Ernst RadermacherRoman Pots Project
Deputy Marco Oriunno
Silicon Detectors Cinzia Da Via,
Gennaro Ruggiero
T1 Detector
T1 Electronics
Enrico Robutti
Maurizio Lo Vetere
T2 Project Kari Kurvinen,
Leszek Ropelewsk
Trigger Electronics Nicola Turini
Trigger and DAQ Emilio Radicioni
Test Beam Mario Deile
Offline software Valentina Avati
43
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Participation of Institutes in Detector ConstructionParticipation of Institutes in Detector Construction
Sub-system Preliminary responsibilitiesBrunel CERN Helsinki INFN
(Bari)INFN(Genoa)
INFN(Pisa)
NICPB(Tallinn)
Prague USA(Penn St.)
USA(CWRU)
Roman PotsMechanics x xSi-Detectors x xFE electronics for Si-Det. x x x xSupport and installation x xProton Trigger x x x xT1 DetectorCSC Detectors xCSC FE electronics xSupport and installation x xInelastic Trigger x x xT2 DetectorGEM Detectors x xGEM FE electronics x x x x xSupport and installation x xInelastic Trigger x xDAQ electronics x x x x
44
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Values of Commitments by Funding AgenciesValues of Commitments by Funding Agencies
CERN INFN Finland Brunel Prague* NSF C. Fund1 ROMAN POTS
1. Roman Pot mechanics 620 225 396 2. Movement 159 159 3. Beam position monitor 125 106 10 10 4. Detector mechanics 85 85 5. Silicon sensors 228 110 55 63 6. Cooling 422 422 7. Electronics 530 304 196 308. Power supplies and cables 264 264 9. Miscellaneous 40 2473 40
2 T1-CSC
1. 70 CSC Detectors 627 627 2. Electronics 871 197 550 1243. Power supplies and cables 159 1594. Supports and services 369 2025 260 109
3 T2-GEM
1. 50 GEM Detectors 339 339 2. Electronics 615 80 303 203 303. Power supplies and cables 181 181 4. Mechanics and services 199 1333 110 89
4 DAQ EVENT BUILDER
1. Readout column 420 92 235 92 2. Readout builder column 384 804 84 215 84 3. Filter farm** 384
TOTAL TOTEM 6635 2427 2111 449 55 406 648 539
* Including approx. 200 kCHF as in kind contribution** Optional for high luminosityEstonia: about 36 kCHF as Common Fund and 40 kCHF for investment
45
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Spending ProfileSpending Profile
Periods [half year]
2005/1 2005/2 2006/1 2006/2 2007/1 2007/2 >2007
CERN 2427 188 400 765 750 256 26 42INFN 2111 47 264 638 715 286 54 108
Finland 449 34 68 175 172 0 0 Brunel 55 55 0 0 0 0 0
Prague 406 0 101 205 93 6 0 NSF 648 0 9 433 122 21 21 42
C. Fund 539 15 37 135 246 58 49
TOTALTOTEM 6635 338 879 2352 2097 627 150 192
Spending profile for TOTEM
0
500
1000
1500
2000
2500
2005/1 2005/2 2006/1 2006/2 2007/1 2007/2 >2007
Period [half year]
Expenses [kCHF]
TOTAL TOTEM
Spending profile per funding agency
0
100
200
300
400
500
600
700
800
900
2005/1 2005/2 2006/1 2006/2 2007/1 2007/2 >2007
Period [half year]
Expenses [kCHF]
CERN
INFN
Finland
Brunel
Prague
NSF
C. Fund
46
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Totem Bari (DAQ)Totem Bari (DAQ)
Richieste per il 2006:Richieste per il 2006:
Costruzione Apparati : 272 KEuro
2/3 DAQ underground (FED ReadOUT + Local Cluster) (420KSF * 2/3) /1,5 = 187 KEuro)
1/3 Readout Builder ( 384KSF*1/3)/1,5 =85.0 KEuro
DAQ Total Cost : DAQ Total Cost : 804 KSF di cui DAQ-Italia = 450 KSF
Readout Columns x link 17.5KSF TOTAL 420KSFReadout Columns x link 17.5KSF TOTAL 420KSFReadout Builder Columns x link 16.0KSF TOTAL 384KSFReadout Builder Columns x link 16.0KSF TOTAL 384KSFFILTER FARM x link 16.0KSF TOTAL 384KSF FILTER FARM x link 16.0KSF TOTAL 384KSF
(alta luminosità - nell’MoU p.m.-2008?)(alta luminosità - nell’MoU p.m.-2008?)
47
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Richieste 2006 su costruzione apparatiRichieste 2006 su costruzione apparati: Keuro 475: Keuro 475
Completamento della struttura di supporto di T1 (rotaia ancora Completamento della struttura di supporto di T1 (rotaia ancora da costruire, cestelli in alluminio) da costruire, cestelli in alluminio)
50 KEuro Completamento dei restanti 3/4del rivelatore T1 (1/4 del costo, Completamento dei restanti 3/4del rivelatore T1 (1/4 del costo,
assegnato sul 2005)assegnato sul 2005) 275 KEuro
Produzione di 1/3 della elettronica di front-end di T1Produzione di 1/3 della elettronica di front-end di T1 150 KEuro
Totem Genova (T1)Totem Genova (T1)50 CSC Detectors 627 KSF50 CSC Detectors 627 KSF
Electronics 870 KSFElectronics 870 KSF
Power supplies & Cables 159 KSFPower supplies & Cables 159 KSF
Support & Services 369 KSFSupport & Services 369 KSF
T1 Total Cost : 2025T1 Total Cost : 2025 KSF di cui T1-Italia = 1177 KSF
48
Total Cross Section, Elastic Scattering and Diffraction Dissociation at the LHC
CSN1 - Napoli 23 Settembre 2005 - Angelo Scribano
Totem Pisa (T2)Totem Pisa (T2)50 GEM Detectors 339 KSF50 GEM Detectors 339 KSF
Electronics 615 KSFElectronics 615 KSF
Power supplies & Cables 181 KSFPower supplies & Cables 181 KSF
Mechanics & Services 198 KSFMechanics & Services 198 KSF
T1 Total Cost : 1333T1 Total Cost : 1333 KSF di cui T1-Italia = 484 KSF (303 Electr. + 181 Power supplies)
Richieste per il 2006:Richieste per il 2006:
Costruzione Apparati : KEuro 243 (+120 s.j. x backup GEM)
2/3 Elettronica = 179 KEuro2/3 Power supplies = 64 Keuro